HomeMy WebLinkAboutAccess Agreement - South Bend Range EPA Testing - MACOGSITE ACCESS AGREEMENT WITH PROPERTY OWNER
TO ALLOW FOR COMPLETION OF ENVIRONMENTAL SITE ASSESSMENT6
$1'5(/$7('$&7,9,7,(6
MACOG REGIONAL BROWNFIELDS COALITION
This Site Access Agreement (“Agreement”) is made by and between _____________________
____________________ (“Owner”), Michiana Area Council of Governments (“MACOG”), and
its designated consultant 5REHUWV(QYLURQPHQWDO6HUYLFHV//&(“Consultant”) regarding the
Owner’s property located at_______________________________________________ (“Site”).
MACOG requests permission for the Consultant and/or other authorized environmental
contractors, employees of the local government, employees of MACOG, or other designees
authorized by MACOG and/or the Consultant (collectively, “Authorized Parties”) to enter the
Site for the exclusive purpose of conducting environmental investigation activities associated
with potential petroleum and/or hazardous substances contamination. Prior to Authorized
Parties entering the site, MACOG shall provide notice to the Owner to specify the Authorized
Parties and MACOG will notify the owner of changes in the list of Authorized Parties.
1. Owner hereby grants permission to Authorized Parties to enter upon the Site to perform
investigation activities at the Site as part of the MACOG Regional Brownfields Coalition.
This permission is effective immediately upon the execution of this Agreement by Owner
and acceptance of the Agreement by MACOG.
2. As a condition of this agreement, the Owner will provide the following information:
a. Known location of any utility and/or infrastructure improvement on the property.
b. Access to the entire Site for the purposes set forth in this Agreement including all exterior
and interior (if applicable) areas of the Site.
3. The permission granted by Owner under this Agreement is contemplated to be used for the
following activities that may be performed by Authorized Parties:
a. Accessing areas where contamination may exist, including areas where underground
storage tanks (“USTs”), aboveground storage tanks (“ASTs”) or petroleum and/or
hazardous substances releases are, or are suspected to be, located; including if necessary
the removal of a UST to access contamination underneath the UST;
b. Investigation of soil, groundwater and air or vapor, or other material deemed appropriate
by MACOG including, but not limited to, the installation of soil borings, test pits and/or
installation and maintenance of temporary or permanent groundwater monitoring wells,
the use of geophysical equipment, the use of drilling equipment for collection of samples,
the logging, gauging and sampling of existing wells, videotaping, preparation of site
sketches, taking photographs, and any testing or sampling;
c. Survey of asbestos-containing material and lead-based paint conditions;
d. Clandestine Drug Lab / Meth Lab Inspection;
e. On-Site observation and oversight of environmental investigation activities;
f. Disclosure of environmental information as required by law.
City of South Bend
133 Cherry Street, South Bend, IN 46628
4. The Owner agrees not to damage or interfere with the use of any ground water monitoring
well or mechanical equipment that is installed as permitted herein, and agrees to notify third
parties who plan to conduct any activity on the property described above that monitoring
wells or equipment (if any) have been installed on the property.
5. If investigation-derived waste, including but not limited to contaminated soil and/or
groundwater is identified or generated during site investigation activities, and is required to
be removed and disposed off-site, the site owner will be considered the generator of the
waste and will sign a waste manifest upon removal. Such removal will be performed at no
cost to the Owner.
6. Upon completion of the investigation, Authorized Parties will restore the property to as near
as practicable the condition of the property immediately prior to the commencement of such
activities, but not including paving or concrete replacement at ground surface.
7. The granting of this permission by the Owner is not intended, nor should it be construed, as
an admission of liability on the part of the Owner or the Owner’s successors and assigns for
any contamination discovered on the Site.
8. Authorized Parties may enter the Site during normal business hours and may also make
special arrangements to enter the Site at other times after agreement from the Owner.
9. Authorized Parties shall enter upon the Site at their own risk, and Owner shall not be held
responsible or liable for injury, damage, or loss incurred by any Authorized Party arising out
of or in connection with activities under this Agreement, except to the extent that any injury
is caused due to the acts or omissions of Owner, any lessee of the Site, or any employee or
agent of the Owner. MACOG is not providing any indemnification, either jointly or
severally, to the Owner, the Consultant or its agents, assigns or designees.
10. MACOG will supply to Owner all information derived from the environmental investigation
activities conducted at the Site. MACOG may use such information for any purpose at its
discretion.
11. In exercising its access privileges, Authorized Parties will take reasonable steps not to
interfere with the Owner’s operations on the Site.
12. Authorized Parties will give notice to the Owner at least one (1) week in advance of the start
of field activities on the Site.
13. Owner ensures that Owner and any/all Site operators will grant Authorized Parties access to
the entire Site for the purposes set forth in this Agreement.
14. Any party to this Agreement may terminate this Agreement by giving two (2) months
advanced written notice, or all parties may terminate the Agreement at any time by written
agreement.
15. This Agreement does not obligate the Owner for any costs associated with the environmental
site assessments conducted under the MACOG Regional Brownfields Coalition.
16. This Agreement shall expire upon MACOG’s issuance of correspondence to the Owner
indicating completion of project activities under MACOG Regional Brownfields Coalition.
_________________
Date Signed
_________________
Date Signed
_________________
Date Signed
Agreed to by:
_________________________________
Site Owner
Name and Title:
Relationship to Property:
_________________________________
WitnessRSWLRQDO:
_________________________________
MACOG
James Turnwald, Executive Director
CONTACT INFORMATION
MACOG Point of Contact: Name: Leah Thill, 'LUHFWRURI6XVWDLQDELOLW\
Phone:
Email: OWKLOO@macog.com
Local Government Point of
Contact:
Name:
Phone:
Email:
Environmental Consultant Contact: Company:5REHUWV(QYLURQPHQWDO
Name'DYH-HIIHUV
Phone:
Email:GMHIIHUV#UREHUWVHQYLURQPHQWDOQHW
Site Owner:
Site Owner Authorized Executive:
Site Owner’s Telephone Number:
Site Owner’s Email Address:
Site Property Address(es):
Site Owner’s Mailing Address (if
other than Site Address):
Property Parcel #(s), if known:
Civil City of South Bend
133 Cherry St, South Bend, IN 46628
227 W Jefferson Blvd, South Bend, IN 46601
71-08-11-153-007.000-026
(574)235-9337
adoctor@southbendin.gov
Allison Doctor
March 11, 2025
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 3/4/2025
Name Allison Doctor Department DCI
BPW Date 03/11/2025 Phone Extension 9337
Review and Approval Required Prior to Submittal to Board
Diversity Compliance
and Inclusion Officer Officer Name
BPW Attorney Attorney Name
Dept. Attorney Attorney Name Danielle Weiss
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Access Agreement Ease./Encroach
Required Information
Company or Vendor Name MACOG
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Environmental Testing at South Bend Range
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description The site access agreement would allow MACOG to perform EPA-funded
environmental testing at South Bend Range (133 Cherry Street).
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: