Loading...
HomeMy WebLinkAboutRTA & Title Sheet - South Well Field Water Treatment Plant Improvements Proj No 117-059A INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Michael Schmidt, Assistant City Attorney Public Works Theresa Heffner, Clerk of the Board of Public Works FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: Title Sheet and Request to Advertise South Well Field, Water Treatment Plant, and Distribution System Improvements Project No. 117-059A / DFO PROJ00000082 DATE: February 27, 2025 The Department of Public Works, Division of Engineering and Division of Water Works request the Board of Public Works approval of two (2) Title Sheets and two (2) Requests to Advertise for Project No. 117-059A South Well Field, Water Treatment Plant, and Distribution System Improvements at the Board of Public Works Regular Meeting on March 11, 2025. Project 117-059A is the final project required to complete the improvements at the South Well Field Water Treatment Plant Facility. The project will be bid as two separate Bid Packages. Public Works will evaluate the bid pricing of each design alternative prior to project award. Bid Package #1 includes a chlorine detention tank, pumping equipment, well improvements, and water treatment process improvements. Bid Package #1 will be a single, non-divisible bid. Bid Package #2 includes a chlorine detention pipe, site work, injection vaults, well improvements, and water building process improvements. Bid Package #2 will be bid as a Divisible Bid with Division A Treatment Process and Building Improvements and Division B Pipe Installation and Site Work Improvements. This alternative has enough variation in scope items that may encourage different contractors to be one or both Divisions. The Department of Public Works, Division of Engineering, and Division of Water Works will review Bid Package #1 and Bid Package #2 to determine the most cost-effective project prior to issuing a recommendation for project award. Tentative Bidding Schedule (Notice to Bidders will be provided in MS Word format once virtual links are added to the Notice to Bidders Document):  March 14, 2025 First Advertisement  March 21, 2025 Second Advertisement  March 26, 2025 Pre-Bid Meeting, 10:00 AM at Board of Public Works Conference Room  April 22, 2025 Bid Opening  May 13 or May 27, 2025 Project Award For questions regarding the subject Agenda Request or project scope of work, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT SEWER WATER TRAFFIC STREET OTHER CITY OF SOUTH BEND, INDIANA PREVAILING SPECIFICATIONS LATEST EDITION, TO BE USED WITH THESE PLANS. PROJECT LOCATION SEE INDEX TO DRAWINGS - 001-G-1 RECOMMENDATIONS OF CITY STAFFBOARD OF PUBLIC WORKS TABLE OF CONTENTS STANDARD DRAWINGS CITY OF SOUTH BEND ENGINEERING DIVISION 1316 COUNTY-CITY BUILDING SOUTH BEND, IN 46601 PLANS PREPARED BY:PLANS PREPARED FOR: SHEETS 1 OF 69 SOUTH WELL FIELD, WATER TREATMENT PLANT, AND DISTRIBUTION SYSTEM IMPROVEMENTS CONTRACT A - WELL FIELD AND WATER TREATMENT PLANT IMPROVEMENTS (BID PACKAGE 1) CITY PROJECT NO: 117-059 FEBRUARY 2025 DATE DATEKARA M. BOYLES, PHD, PE DESIGN AND ADMINISTRATION CITY ENGINEER JACOB M. KLOSINSKI, PE DATEDIRECTOR OF WATER WORKSMATTHEW BUSSELL DATEKYLE LUDLOW CONSTRUCTION MANAGER ELIZABETH A. MARADIK DATE PRESIDENT MEMBER VICE PRESIDENTJOSEPH R. MOLNAR GARY A. GILOT MEMBER DATE DATE DATE MEMBER DATE MURRAY L. MILLER BREANA N. MICOU CLERK DATETHERESA M. HEFFNER 5-6 7-1 7-4 5-7 7-2 7-7 105 EAST JEFFERSON BLVD. SOUTH BEND, INDIANA 46601 574-288-4580 3/6/2024 3/6/2025 March 11, 2025 105 EAST JEFFERSON BLVD. SOUTH BEND, INDIANA 46601 574-288-4580 CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT SEWER WATER TRAFFIC STREET OTHER CITY OF SOUTH BEND, INDIANA PREVAILING SPECIFICATIONS LATEST EDITION, TO BE USED WITH THESE PLANS. PROJECT LOCATION SEE INDEX TO DRAWINGS - 001-G-1 RECOMMENDATIONS OF CITY STAFFBOARD OF PUBLIC WORKS TABLE OF CONTENTS STANDARD DRAWINGS CITY OF SOUTH BEND ENGINEERING DIVISION 1316 COUNTY-CITY BUILDING SOUTH BEND, IN 46601 PLANS PREPARED BY:PLANS PREPARED FOR: SHEETS 1 OF 63 SOUTH WELL FIELD, WATER TREATMENT PLANT, AND DISTRIBUTION SYSTEM IMPROVEMENTS CONTRACT A - WELL FIELD AND WATER TREATMENT PLANT IMPROVEMENTS (BID PACKAGE 2) CITY PROJECT NO: 117-059 FEBRUARY 2025 DATE DATEKARA M. BOYLES, PHD, PE DESIGN AND ADMINISTRATION CITY ENGINEER JACOB M. KLOSINSKI, PE DATEDIRECTOR OF WATER WORKSMATTHEW BUSSELL DATEKYLE LUDLOW CONSTRUCTION MANAGER ELIZABETH A. MARADIK DATE PRESIDENT MEMBER VICE PRESIDENTJOSEPH R. MOLNAR GARY A. GILOT MEMBER DATE DATE DATE MEMBER DATE MURRAY L. MILLER BREANA N. MICOU CLERK DATETHERESA M. HEFFNER 5-6 5-9 7-1 7-4 5-7 5-11 7-2 7-7 3/6/2024 3/6/2025 March 11, 2025 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 02-27-2025 Name: Jacob M. Klosinski Department of Public Works – Engineering Division BPW Date: 03-11-2025 Phone Extension: Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Mickey Lovy / Ron O'Connor Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name South Well Field, Water Treatment Plant, and Distribution System Improvements Project Number 117-059A / DFO PROJ00000082 Funding Source Southside TIF and Water Capital Fund Account No. PR/PO # Amount Terms of Contract Special Contract Provisions Purpose/Description The Division of Engineering and Division of Water recommend the approval of the Title Sheet and Request to Advertise for the subject project. Two (2) Title Sheets, one for Bid Package #1 and one for Bid Package #2 are provided Refer to Inter-Office Memorandum for scope of work and bid schedule. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: March 11, 2025