My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2025 Tree Removal Project No. 125-018 - KPEM LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - 2025 Tree Removal Project No. 125-018 - KPEM LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 12:43:46 PM
Creation date
2/25/2025 12:43:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: <br />PROJECT NO. <br />Q OTES DUE <br />2025 Tree and Stump Removal <br />125-018 <br />O�SpiSTH g�\ <br />v G,, <br />1865 <br />February 2511, 2025 by 9:00am EST. Electronic quotes are to be <br />delivered via email to bpwbids _soutbbendino ov <br />(Must be completed for all quotes. Please type or print) <br />Date: , g���� Firm. _'k L LL <br />Address: �as(�.� <br />City/State/Zip: L�Or;-�(�, ��f q&� j—O Telephone Number: 1 $ I <br />Agent of Bidder (if Applicable): ej -I` (own <br />Pursuant to notices given, the undersigned offers to furnish labor and/or materi I necessary to complete the <br />public works project of: <br />2025 Tree and StumD Removal <br />the City of South, Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of <br />and dated <br />Department of Public Works <br />for the sum of (enter the Total Quote as shown on the Proposal) <br />(Enter Sum of Total Quote shown on Proposal) Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums <br />attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown in <br />the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization <br />of the units shall be shown on a separate attachment. <br />By <br />(Si turn <br />(Printed Name of Person Signing) <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />Murray L. Miller, (Member <br />ACCEPTANCE <br />day of <br />Joseph R. Molnar, Vice President <br />Breana N. Micou, Member <br />Attest: Theresa Heffner, Clerk <br />20 <br />Version 9/29/2021 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.