ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS February 25, 2025 Ms. Jessica Clark, PE Lochmueller Group, Inc. 112 West Jefferson Blvd., Suite 500 South Bend, IN 46601 jclark@lochgroup.com RE: Amendment No. 1 to Owner-Engineer Agreement Dear Ms. Clark: At its February 25, 2025 meeting, the Board of Public Works approved the above referenced amendment for engineering services for the design of the Riverfront West Urban Neighborhood Development in the amount of $613,500. Enclosed please find a copy of the amendment for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/hh Page 1 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. This is EXHIBIT K, consisting of 15 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated January 28, 2025. AMENDMENT TO OWNER-ENGINEER AGREEMENT Amendment No. 1 1.Background Data: a.Effective Date of Owner-Engineer Agreement: January 28, 2025 b.Owner:Board of Public Works, City of South Bend c.Engineer: Lochmueller Group, Inc. d.Project:Riverfront West Urban Neighborhood Development 2.Description of Modifications: a.Engineer shall perform or furnish the following Additional Services: Project Description The CONSULTANT shall study an approximately 17.0-acre area bounded by E. Wayne Street to the north, MLK Jr. Blvd. to the west, East Monroe Street to the south and the St. Joseph River to the east to develop a preliminary interior public street lay-out and water, sanitary sewer, and stormwater master plan and provide design, plans, and contract documents for the northernmost section of street from Jefferson Blvd. to approximately 640 feet south. A preliminary sketch of the potential development was provided by Torti Gallas + Partners and “Concept Study 1” will be used as the basis to commence work on this project. Scope of Services The scope of services to be provided by the CONSULTANT include the following: 1.TOPOGRAPHIC DATA COLLECTION SURVEY (original agreement): 1.1. Conduct a topographic survey of approximately 17.0 acres in size as shown in Attachment “1.0” Survey Limits, generally described as being bound on the north by E. Wayne Street, on the west by Doctor MLK Jr. Blvd., on the south by Monroe St. and on the east by the existing sidewalk along the St. Joseph River, not including the area of the existing Post Office. LiDAR data collection will be utilized for the majority of the project area to minimize parcel access, increase survey crew safety in roadways and to reduce overall survey effort and turnaround time. 1.2. As a minimum, the topographic survey shall include the location and elevation of all visible features, including but not limited to building corners, paved and gravel surfaces, guardrail, Page 2 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. posts, fences, gates, driveways, field entrances, sidewalk surfaces, individual trees (except limits only of heavily wooded areas), shrubs, landscaping areas, signs, poles, posts, manholes, risers, valves, meters, pits, etc. 1.3. Set approx. 100 temporary 12” x 18” white plastic adhesive ground targets for the LiDAR data collection throughout the project area, including on private parking lots and interior roadways. 1.4. Locate utilities within the project area using observed evidence along with the “Indiana 811” service and a private utility locating service. 1.5. Locate and detail with elevation inverts of the approximately 230 existing storm and sanitary drainage structures within the project area. 1.6. Establish a horizontal datum of INGCS St. Joseph County coordinate system by using terrestrial traverse observations and GPS static observations incorporating the “INCORS” network. 1.7. Establish a vertical datum of NAVD88 by using GPS static observations and a bench level circuit. 1.8. Set (12) horizontal control points and (12) vertical benchmarks with references. 1.9. Research affected property owners, obtain mailing addresses, and send survey notices to all. 1.10. Utilize existing St. Joseph County GIS parcel layers to represent approximate boundary lines within the project area. 1.11. Provide utility contact list. 1.12. Provide an electronic CAD drawing containing one-foot contours, topographic survey linework and surface model. CAD file shall be AutoCAD, Civil 3D format. 1.13. Provide Survey field book in PDF format. 2.0 MAJOR SUBDIVISION – to be covered in future amendment 3.0 WATER RESOURCE UTILITIES – PRELIMINARY DESIGN 3.1 Develop a base map from provided utility data and survey data that is collected. 3.2 Conduct an early coordination meeting with City of South Bend staff and Indiana Department of Environmental Management (IDEM) permitting staff for water and sewer extensions. 3.3 Develop relocation/replacement plan for the following utilities: 3.3.1 Sanitary sewer, including any combined sewer within the project corridor 3.3.2 Drinking water 3.3.2.1 Estimate current and projected demands from proposed buildings 3.3.3 Storm sewer 3.3.3.1 Review the Downtown South Bend Stormwater Plan report and model(s) prepared by McCormick Engineering. 3.3.3.2 Review effective Flood Insurance Study (FIS) report and joint probability analysis to verify anticipated tailwater conditions at proposed outfall point. Page 3 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 3.3.3.3 Develop alignment and layout for proposed storm sewer within the new corridor based primarily on sizing provided in McCormick report. It is anticipated that adjustments to the existing storm sewer calculations will be required based on the preliminary street layout developed as part of the work detailed in Section 6 of this scope of services and in order to account for necessary vertical and horizontal separations and conflict avoidance with other utility relocations analyzed in this project. 3.4 Submit preliminary drawings for the proposed facilities. The following preliminary drawings are anticipated to be a part of the design submittal: 3.4.1 Overall site layout for proposed utility relocations and/or replacements. 3.4.2 Plan view layouts for all improvements included in the project. 3.4.3 Preliminary profiles. 3.4.4 Preliminary removal and demolition plans. 3.5 Create one (1) memo that summarizes findings for stormwater, sanitary sewers, and water mains. 3.6 Develop a table of contents for required utility related technical specifications. 3.7 Prepare a preliminary opinion of probable construction cost. 3.8 Submit one electronic copy set of all documents to the CLIENT for review and comment. 3.9 Attend preliminary field check meeting upon submitting preliminary plans. 4.0 WATER RESOURCE UTILITIES – FINAL DESIGN – PHASE 1 4.1 Address CLIENT review comments from preliminary documents submittal. 4.2 Complete final design calculations for storm sewer including inlet spacing and storm sewer hydraulic model of the proposed pipe network, assuming a maximum of twelve (12) inlets. 4.3 Submit final drawings for the proposed facilities. The following final drawings are anticipated to be a part of the design submittal: 4.3.1 Overall site layout for Phase 1 proposed utility relocations and/or replacements 4.3.2 Plan view layouts for all improvements included in the project 4.3.3 Final profiles 4.3.4 Final removal and demolition plans 4.3.5 Erosion control plans 4.3.6 Structure data table 4.3.7 Detail drawings 4.4 Prepare utility related technical specifications. Where appropriate City of South Bend standard specifications will be used. 4.5 Prepare utility construction permit applications for water main and sanitary sewer. Respond to one round of comments from City of South Bend reviewer. Finalize applications and submit to the Indiana Department of Environmental Management, for Phase 1 improvements only. 4.6 Prepare a Construction Stormwater General Permit application packet for submittal to the Regional Soil and Water Conservation District and to Indiana Department of Environmental Management, for Phase 1 improvements only. 4.7 Prepare a final opinion of probable cost. Page 4 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 4.8 Attend up to one (1) meeting with CLIENT representative or other stakeholder(s) to discuss layout and design of facilities for Phase 1 improvements. 4.9 Submit one (1) electronic copy set of all documents to the CLIENT for review and comment. 4.10 Assumptions 4.10.1 The existing water main and sanitary sewer pipe sizes would be maintained during design. 4.10.2 The base fee assumes the project will meet the requirements for a Notice of Intent (NOI) to Construct a Water Main Extension. A separate fee is provided if the project does not meet the requirements for an NOI and a water main construction permit with hydraulic modeling is required instead. 4.10.3 Individual parcels may be responsible for detention of on-site stormwater in excess of a planned allowable release from each site, where feasible, (TBD during the preliminary design and included within stormwater findings memo) and detention of stormwater within the proposed right-of-way will not be required as system conveyance will drain to an existing outfall. 4.11 Hydraulic modeling of the water distribution system (Provided only if needed) 4.11.1 Utilize the City’s copy of the city-wide water model created by Black & Vetch to evaluate an existing and proposed condition of the River West area. The model extent will be limited to the area needed to complete an IDEM water main construction permit. 4.11.2 Calibrate the model based on fire flow data provided by the Client. 4.11.3 Prepare a report summarizing the findings of the modeling analysis suitable for submittal to IDEM as part of a water main construction permit. 5.0 PROJECT MANAGEMENT 5.1 Conduct one (1) in-person project kickoff meeting with CLIENT representative to discuss project objectives and goals, scope of project, project schedule and milestones, as well as project coordination between the CLIENT and CONSULTANT. 5.2 Coordinate with other consultants, and CLIENT to confirm proposed work is in conjunction with other improvements and share street and/or utility details/alignments and attend up to eight (8) meetings. 5.3 Coordinate with CLIENT, as required, for additional information and attend up to twelve (12) bi-monthly meetings with CLIENT to review design progress and submittals. 5.4 Provide monthly project progress updates. 5.5 Coordinate project team. 6.0 PRELIMINARY STREET LAY-OUT 6.1 CONSULTANT will develop a base map from existing record documents and new topographic survey of existing site. 6.2 Provide a scaled, preliminary engineering lay-out plan for internal streets including the following: 6.2.1 Street alignment(s) 6.2.2 Plan and profiles sheets 6.2.3 Street Typical Section including, one (1) for local access only streets and one (1) Page 5 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. for more major through/collector streets for the development. It is anticipated the streets will consist of an urban, two-lane section with sidewalk and/or a multi-use path on each side of the road. Delineate space for proposed lighting, on-street parking, street trees and other amenities. 6.3 The scaled drawing will be made available as a Shape file and in pdf format to the CLIENT for use with GIS type programs, Google Earth, etc. 6.4 Prepare a preliminary Engineer’s Opinion of Probable Cost. 6.5 Geometric design parameters will be to City of South Bend standards. 6.6 CONSULTANT will make one (1) set of revisions to the preliminary plans as necessary based on CLIENT comment. 6.7 Attend Preliminary Field Check meeting upon submittal of preliminary plans. 7.0 STREET DESIGN, PLANS AND CONTRACT DOCUMENTS – PHASE 1 7.1 CONSULTANT will prepare street design plans, including traffic calming measures, and contract documents for Phase 1 improvements only. 7.2 Maintenance of traffic (MOT) for the project will be designed in accordance with the most recent version of the Indiana Manual of Uniform Traffic Control Devices (MUTCD). 7.2.1 Coordination will be done with the adjacent businesses to confirm access is maintained in an acceptable manner. 7.3 CONSULTANT will design trails, sidewalks, and curb ramps to meet current ADA standards. 7.4 CONSULTANT will prepare urban street landscaping plan. 7.5 CONSULTANT will perform final design and engineering calculations. 7.6 CONSULTANT will prepare details of non-standard roadway items to be included on detail sheets with the project plans. 7.7 CONSULTANT shall prepare plans for new roadway signage and pavement markings to be in accordance with the IMUTCD. 7.8 Prepare final specifications and construction drawings for permitting and bidding to include: 7.8.1 Title Sheet 7.8.2 Sheet Index 7.8.3 Street Typical Sections 7.8.4 Plan and Profile 7.8.5 Maintenance of Traffic 7.8.6 Lighting Plan 7.8.7 Landscaping Plan 7.8.8 Striping and Signage Plan 7.8.9 Lighting Details 7.8.10 Landscaping Details 7.8.11 Construction Details 7.8.12 Earthwork/Summary Tables 7.8.13 Street Cross Sections 7.9 Prepare an Engineer’s Opinion of Probable Cost. Submit in excel format. 7.10 Submit electronic files to the CLIENT for review and comment. 7.11 Incorporate front end documents from CLIENT in project specifications. Page 6 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 7.12 CONSULTANT will perform QA/QC prior to submission. 7.13 CONSULTANT will make one (1) set of final revisions to the plans and specifications as necessary based on CLIENT comment. 8.0 GUIDING DOCUMENTS The project will be designed in English Units and in accordance with the following references, polices, and guidelines: 8.1 City of South Bend Construction Standards and Specifications. 8.2 American Association of State Highway and Transportation Officials – “A Policy on Geometric Design of Highways and Streets” 8.3 American Association of State Highway and Transportation Officials – “Roadside Design Guide” 8.4 INDOT Standard Specifications, 2024 8.5 INDOT Design Memoranda 8.6 INDOT Drainage Design Manual 8.7 INDOT Design Manual 8.8 Illuminating Engineering Society (IES) guidance 8.9 Indiana Manual on Uniform Traffic Control Devices for Streets and Highways 8.10 Where conflict exists between the City of South Bend Construction Standards and Specifications, and those of INDOT, the City of South Bend Construction Standards and Specifications shall prevail, unless otherwise directed. 9.0 DECORATIVE STREET LIGHTING DESIGN 9.1 Design services include new decorative street lighting equipment along the new roadway starting on Jefferson Blvd just east of MLK Jr. Blvd extending approximately 640 feet into the proposed River West development. 9.2 Coordinate with CLIENT to verify project goals, aesthetic lighting preferences, and overall performance requirements for the proposed lighting facilities. 9.3 Review existing topography survey base sheets. 9.4 Develop a lighting model utilizing Acuity Visual software to determine appropriate light pole locations, meeting average and minimum illumination thresholds. 9.5 Prepare a preliminary lighting plan sheet reflecting the locations of existing lighting infrastructure and installation of new lighting infrastructure within the project limits listed in Task 9.1, with the following: 9.5.1 Lighting Index and General Note Sheet 9.5.2 General plan sheet related elements including plan views; location of existing utilities, service points, and lighting equipment; Right-of-Way information; proposed conduit/wire type and locations; and all proposed lighting elements. 9.6 Revise plans based on initial review comments and then submit as Final lighting design, including the following: 9.6.1 Design data details including initial lamp lumens; average maintained illumination; depreciation factors; uniformity ratios; mounting heights; and luminaire classifications. 9.6.2 Development of iso-illuminance or point illuminance exhibits depicting the proposed light levels meet average and avg/min requirements. Page 7 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 9.6.3 New foundations, light poles, LED fixtures, T-bases, conduit, cable duct, and handholes. 9.6.4 City of South Bend standard foundation and structure designs will be used for all new lighting elements. Lochmueller will provide limited structural analysis to ensure standard foundations will suffice with the proposed decorative lighting poles. 9.6.5 Completion of wire size and breaker size calculations to each circuit. 9.6.6 Voltage drop calculations. 10.0 UTILITY COORDINATION The CONSULTANT shall have an INDOT certified Utility Coordinator perform utility coordination services in accordance with 105 IAC 13, IDM Chapter 104, and INDOT Accommodation Policy. Utility coordination is included for coordination with up to 16 public utilities. Specific tasks for this utility coordination include the following: 10.1 Perform the requirements of IAC 13-3-1, including the identification and documentation of utility stakeholders within the Project Limits; and prepare and distribute all required utility correspondence. 10.2 Prepare and send a letter to each affected utility requesting verification of the information shown in the project plans. 10.3 Prepare and send each utility a set of preliminary plans and request that the utility identify conflicts with their facilities. Perform conflict analysis and consider design alternatives to avoid or minimize impacts to utility facilities. Develop utility conflict matrix. 10.4 Coordinate SUE activities with survey team. Include the SUE data in project deliverables, plans, and coordination efforts. Coordinate to acquire SUE QLA information as needed. SUE services will be performed by others. 10.5 Send each utility a set of preliminary final plans and request utility work plans, assist in the development of the work plans, and review the work plans for the identified facilities within the project area. 10.6 Recommend work plans for approval including narrative portion and relocation drawing. 10.7 There is a possibility a utility could have property interests that make them eligible for reimbursement. The CONSULTANT shall provide the CLIENT with utility reimbursement requests, work with the CLIENT to determine eligibility, and draft utility reimbursable agreements and submit to the utility and CLIENT for approval. Review and verify easement documentation. Review and approve utility cost estimates. Review utility relocation costs. 10.8 Lead or facilitate any meetings involving utility specific activities such as kick-off meetings, conflict resolution meetings and reimbursement eligibility meetings. 10.9 Conduct post letting coordination services to include tracking utility relocations, answering utility related questions, and in person or virtual attendance at construction progress meetings. 11.0 PRE-CONSTRUCTION, BID PHASE, AND CONSTRUCTION PHASE SERVICES 11.1 Prepare Notice to Bidders Page 8 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 11.2 Review and respond to Contractor questions submitted during bidding and prepare addenda as needed. 11.3 Attend pre-bid meeting. 11.4 Prepare the Bid Tabulation and Recommendation. 11.5 Conduct Pre-Construction Meeting and prepare minutes. 11.6 Review and respond to Contractor questions during construction. 11.7 Review equipment information sheets, shop drawings, and related information submitted by the Contractor to confirm concurrence with the design intent and applicable standards. 11.8 Attend up to twelve (12) construction progress meetings. 12.0 Services Not Being Provided by CONSULTANT The services not being provided by CONSULTANT under this Agreement include, but are not limited to, the following: 12.1 Boundary Retracement surveys of the parcels within the project site. 12.2 Any subdivision platting and associated fees/meetings for the land transfer and/or roadway vacations within the project area. 12.3 Detailed topographic survey data collection of any existing buildings within the project area. 12.4 Topographic survey data collection of the existing Post Office parcel within the project area. 12.5 Hydraulic modeling of the water distribution system, unless requested 12.6 Hydraulic modeling of the sanitary sewer system 12.7 Storm water quality and/or green infrastructure design 12.8 Fire flow testing 12.9 Detention design 12.10 Environmental Documentation 12.11 Public Involvement 12.12 Pavement Design – City of South Bend standards will be used. 12.13 Right-of-Way Engineering and Right-of-Way Services 12.14 Monitoring of accurate placement of utility relocations. 12.15 Daily inspections of utility relocation including material inspections and/or inspection of or Buy America compliance during installation. 12.16 Temporary lighting plans are not assumed to be needed as part of this scope of work. 12.17 Lighting custom foundation design, geotechnical analysis, or subsurface investigations. 12.18 Construction Inspection Services 13.0 Items provided by Owner 13.1 All relevant sections of the Downtown South Bend Stormwater Plan including the report narrative, access to the Riverfront West hydrologic and hydraulic model(s), and associated documentation prepared by McCormick Engineering. 13.2 Access to Black & Vetch city-wide water model. 14.0 Services resulting from significant changes in the general scope, extent or character of the Project or its design including, but not limited to, changes in size, complexity, CLIENT ’s Page 9 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. schedule, character of construction or method of financing; and revising previously accepted studies, reports, design documents or Contract Documents when such revisions are required by changes in laws, rules, regulations, ordinances, codes, or orders enacted subsequent to the preparation of such studies, reports, or documents, or are due to any other causes beyond CONSUTLANT’s control, shall require a change in work. b. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: Refer to Exhibit C Compensation Packet BC-2 c. The schedule for rendering services is modified as follows: Preliminary Layout mid-March 2025 Preliminary Plans (Phase 1) mid-April 2025 Final Plans and Specifications (Phae 1) end of May 2025 Letting June 24, 2025 d. Other portions of the Agreement (including previous amendments, if any) are modified as follows: not applicable 5. Agreement Summary (Reference only) a. Original Agreement amount:$141,700.00 b. Net change for prior amendments:$0.00 c. This amendment amount:$613,500.00 d. Adjusted Agreement amount:$755,200.00 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above-referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is January 15, 2025. OWNER: ENGINEER: By: By: Jessica Clark, PE Title: Title: Northern Indiana Regional Leader Date Signed: Date Signed: February 18, 2025 February 25, 2025 Page 1 Exhibit C –Compensation Packet BC-2: Basic Services (other than RPR) – Standard Hourly Rates Method of Payment EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. This is EXHIBIT C, consisting of 6 pages, referred to in and part of the EXHIBIT K to the Agreement between Owner and Engineer for Professional Services dated February 25, 2025. Payments to Engineer for Services and Reimbursable Expenses COMPENSATION PACKET BC-2: Basic Services – Standard Hourly Rates Article 2 of the Agreement is supplemented to include the following agreement of the parties: ARTICLE 2 – OWNER’S RESPONSIBILITIES C2.01 Compensation For Basic Services (other than Resident Project Representative) – Standard Hourly Rates Method of Payment A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of Engineer’s Resident Project Representative, if any, as follows: 1. An amount equal to the cumulative hours charged to the Project by each class of Engineer’s personnel times Standard Hourly Rates for each applicable billing class for all services performed on the Project, plus Reimbursable Expenses and Engineer’s Consultants' charges, if any. 2. Engineer’s Reimbursable Expenses Schedule and Standard Hourly Rates are attached to this Exhibit C as Appendices 1 and 2. 3. The total compensation for services under Paragraph C2.01 is estimated to be $613,500.00 based on the following estimated distribution of compensation: a. Water Resources Analysis, Design & Permits $295,700.00 b. Water Resources Modeling, if necessary $7,400.00 c. Preliminary Street Lay-out $49,100.00 d. Street Design, Plans & Contract Documents (Phase 1) $85,800.00 e. Lighting Design & Plans (Phase 1) $22,800.00 f. Landscaping (Phase 1) $50,000.00 g. Project Management & Meetings $45,500.00 h. Utility Coordination $23,800.00 Page 2 Exhibit C –Compensation Packet BC-2: Basic Services (other than RPR) – Standard Hourly Rates Method of Payment EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. i. Construction & Bid Phase Services $33,400.00 4. Engineer may alter the distribution of compensation between individual phases of the work noted herein to be consistent with services actually rendered, but shall not exceed the total estimated compensation amount unless approved in writing by Owner. See also C2.03.C.2 below. 5. The total estimated compensation for Engineer’s services included in the breakdown by phases as noted in Paragraph C2.01.A.3 incorporates all labor, overhead, profit, Reimbursable Expenses and Engineer’s Consultants' charges. 6. The amounts billed for Engineer’s services under Paragraph C2.01 will be based on the cumulative hours charged to the Project during the billing period by each class of Engineer’s employees times Standard Hourly Rates for each applicable billing class, plus Reimbursable Expenses and Engineer’s Consultants' charges. 7. The Standard Hourly Rates and Reimbursable Expenses Schedule will be adjusted annually (as of January) to reflect equitable changes in the compensation payable to Engineer. C2.02 Compensation For Reimbursable Expenses A. Owner shall pay Engineer for all Reimbursable Expenses at the rates set forth in Appendix 1 to this Exhibit C. B. Reimbursable Expenses include the following categories: transportation and subsistence incidental thereto; providing and maintaining field office facilities including furnishings and utilities; toll telephone calls and mobile phone charges; reproduction of reports, Drawings, Specifications, Bidding Documents, and similar Project-related items in addition to those required under Exhibit A. In addition, if authorized in advance by Owner, Reimbursable Expenses will also include expenses incurred for the use of highly specialized equipment. C. The amounts payable to Engineer for Reimbursable Expenses will be the Project-related internal expenses actually incurred or allocated by Engineer, plus all invoiced external Reimbursable Expenses allocable to the Project, the latter multiplied by a factor of one. C2.03 Other Provisions Concerning Payment A. Whenever Engineer is entitled to compensation for the charges of Engineer’s Consultants, those charges shall be the amounts billed by Engineer’s Consultants to Engineer times a factor of one. B. Factors. The external Reimbursable Expenses and Engineer’s Consultants' factors include Engineer’s overhead and profit associated with Engineer’s responsibility for the administration of such services and costs. Page 3 Exhibit C –Compensation Packet BC-2: Basic Services (other than RPR) – Standard Hourly Rates Method of Payment EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. C. Estimated Compensation Amounts: 1. Engineer’s estimate of the amounts that will become payable for specified services are only estimates for planning purposes, are not binding on the parties, and are not the minimum or maximum amounts payable to Engineer under the Agreement. 2. When estimated compensation amounts have been stated herein and it subsequently becomes apparent to Engineer that the total compensation amount thus estimated will be exceeded, Engineer shall give Owner written notice thereof, allowing Owner to consider its options, including suspension or termination of Engineer's services for Owner's convenience. Upon notice, Owner and Engineer promptly shall review the matter of services remaining to be performed and compensation for such services. Owner shall either exercise its right to suspend or terminate Engineer's services for Owner's convenience, agree to such compensation exceeding said estimated amount, or agree to a reduction in the remaining services to be rendered by Engineer, so that total compensation for such services will not exceed said estimated amount when such services are completed. If Owner decides not to suspend the Engineer's services during the negotiations and Engineer exceeds the estimated amount before Owner and Engineer have agreed to an increase in the compensation due Engineer or a reduction in the remaining services, then Engineer shall be paid for all services rendered hereunder. To the extent necessary to verify Engineer’s charges and upon Owner’s timely request, Engineer shall make copies of such records available to Owner at cost. Page 4 Exhibit C –Compensation Packet BC-2: Basic Services (other than RPR) – Standard Hourly Rates Method of Payment EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Appendix 1 Engineer’s Reimbursable Expenses Schedule Permit fees Advertising/publishing fees Plan set reproduction Page 5 Exhibit C –Compensation Packet BC-2: Basic Services (other than RPR) – Standard Hourly Rates Method of Payment EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Appendix 2 Engineer’s Standard Hourly Rates Employee Classification Class Code 2025 Straight time Billable Rate Administrative Assistant ZSA $91.80 3D Visual Design 3DV $143.24 Construction Project Supervisor I CB1 $144.07 Construction Project Supervisor II CB2 $172.94 Construction Engineer I CE1 $128.52 Construction Engineer II CE2 $167.01 Construction Engineer III CE3 $191.10 Construction Inspector I CI1 $107.41 Construction Inspector II CI2 $129.09 Corporate Administrator ZMA $136.95 Engineer Designer I ED1 $117.46 Engineer Designer II ED2 $142.40 Engineer Designer III ED3 $154.97 Engineer Designer IV ED4 $175.96 Engineering Intern I EI1 $113.52 Engineering Intern II EI2 $120.37 Engineering Intern II EI3 $132.20 Engineering Tech I ET1 $85.97 Engineering Tech II ET2 $104.19 Engineering Tech III ET3 $152.65 Environmental Specialist I PB1 $98.50 Environmental Specialist II PB2 $119.80 Environmental Specialist III PB3 $142.83 Environmental Specialist IV PB4 $173.82 Environmental Geologist PLG $181.94 Environmental Technician PT2 $110.17 Field Lab Technician I FLT1 $89.35 Graphic Designer YGR $99.81 Historian/Section 106 Specialist II PH2 $94.03 Historian/Section 106 Specialist III PH3 $153.73 Historian/Section 106 Specialist IV PH4 $172.44 IT System Specialist CSS $192.10 Lead Utility & Railroad Coordinator UC3 $167.13 Professional Surveyor LS4 $211.72 Project Engineer I EN1 $146.64 Page 6 Exhibit C –Compensation Packet BC-2: Basic Services (other than RPR) – Standard Hourly Rates Method of Payment EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Employee Classification Class Code 2025 Straight time Billable Rate Project Engineer II EN2 $156. 23 Project Engineer III EN3 $183.45 Project Engineer IV EN4 $205.30 Project Liason EPL $173.42 Realty Specialist RES $113.48 ROW Service Specialist RSS $162.32 Senior Appraiser RSA $189.80 Senior Engineer I ENS1 $228.47 Senior Engineer II ENS2 $255.15 Senior Transporation Planner I TPS $199.29 Landscape Architect LA $144.70 Senior Landscape Architect LA1 $249.37 Senior Project Manager I ESM1 $235.53 Senior Project Manager II ESM2 $280.78 Senior Project Manager III ESM3 $332.60 Senior Project Manager IV ESM4 $355.29 Student Intern EST $71.23 Survey Party Chief II SP2 $121.77 Survey Party Chief III SP3 $143.17 Survey Technician SVT $87.07 Transportation Planner I TP1 $102.25 Transportation Planner II TP2 $121.56 Transportation Planner I TP3 $141.49 Utility & Railroad Coordinator I UC1 $113.48 Utility & Railroad Support UCS $108.14 Project:River West Development Client:City of South Bend FEE TYPE ORIGINAL FEE AMENDMENT 1 TOTAL Water Resource Anlysis, Design & Permits HNTE $295,700.00 $295,700.00 WR modeling, if necessary HNTE 7,400.00$ $7,400.00 Surveying $141,700.00 $141,700.00 - Field & Office Services Lump Sum - Private Utility Locating Service Lump Sum - Mobile LiDAR Lump Sum Street Layout HNTE 49,100.00$ $49,100.00 Design, Plans & Contract Documents HNTE 85,800.00$ $85,800.00 Lighting Plan HNTE 22,800.00$ $22,800.00 Landscaping Plan HNTE 50,000.00$ $50,000.00 Project Management & Meetings (WR + HWY)HNTE 45,500.00$ $45,500.00 Utility Coordination HNTE 23,800.00$ $23,800.00 Construction & Bid Phase Services (Lighting + WR + Hwy)HNTE 33,400.00$ $33,400.00 $141,700.00 $613,500.00 $755,200.00Total Not To Exceed Fee Fee Summary February 18, 2025 ITEM Project Name:River West Development Client:City of South Bend Lochgroup Project No.:121-3067 TOTAL TOTAL TASK DESCRIPTION HOURS DOLLARS / TASK / TASK LABOR Project Management WR Project Management 2025 24 24 $5,652.72 Kick-off meeting (1) - in person 2025 6 6 12 $2,784.00 Project Progress Meeting (5) - virtual 2025 12 12 $2,741.64 Meeting (1) -in person 2025 6 6 $1,370.82 SUBTOTAL: Project Management 0 30 24 0 0 0 0 0 54 $12,549.18 Preliminary Design Data Collection Review and Utility Base Map 2025 16 24 8 16 64 $10,416.24 IDEM Coordination Meeting 2025 2 1 3 $603.58 Plan Development (5 P&P sheets)2025 8 40 8 120 176 $26,189.04 Demolition Plan Development (3 plan sheets)2025 8 8 48 64 $9,836.08 Drinking Water Evaluation 2025 24 40 24 88 $14,237.76 Estimated Projected Demands for Proposed Buildings 2025 4 16 20 $3,260.12 Sanitary Sewer Evaluation 2025 16 24 24 64 $10,063.76 Evaluate Sewer Separation 2025 4 24 24 52 $7,850.84 Storm Sewer Evaluation 2025 16 16 16 48 $8,280.16 Review McCormick stormwater report and model(s)2025 16 16 32 $6,001.76 Review effective FIS and JPA 2025 4 16 20 $3,260.12 Modifications to ex. H&H calculations 2025 12 40 40 16 108 $15,700.44 Preliminary Storm Sewer Layout 2025 8 24 16 48 $7,273.04 Specifications Table of Contents 2025 4 8 12 $2,087.00 Preliminary Findings Memo & Release Rates 2025 16 40 12 8 76 $12,104.76 Internal Progress Meetings 2025 12 12 12 12 48 $7,654.56 Cost Estimate 2025 4 12 12 8 36 $5,257.20 QA/QC 2025 8 24 8 8 8 8 64 $12,412.48 SUBTOTAL: Preliminary Design 8 0 198 369 0 156 16 276 1,023 $162,488.94 Water Resources Design STAFF HOURS BY CLASSIFICATION Rate Year Senior Project Manager II Senior Project Manager I Senior Engineer I Project Engineer I Environmental Specialist III Engineering Intern II Engineering Designer IV Engineeering Designer II Page 1 of 2 Project Name:River West Development Client:City of South Bend Lochgroup Project No.:121-3067 TOTAL TOTAL TASK DESCRIPTION HOURS DOLLARS / TASK / TASK LABOR Water Resources Design STAFF HOURS BY CLASSIFICATION Rate Year Senior Project Manager II Senior Project Manager I Senior Engineer I Project Engineer I Environmental Specialist III Engineering Intern II Engineering Designer IV Engineeering Designer II Final Design Address Preliminary/Final Client Review Comments 2025 4 8 12 24 48 $7,947.16 Plan Development (5 sheets)2025 16 24 4 120 164 $24,966.72 Demolition Plan Development (3 sheets)2025 8 8 12 28 $4,709.68 Erosion Contol Plan Sheets (3 sheets)2025 16 24 40 $5,702.88 Erosion Contol Narrative Sheets (2 sheets)2025 12 16 28 $3,992.36 Detail Sheets 2025 8 16 40 64 $9,870.00 Final Water Main Design 2025 4 8 12 $2,087.00 Final Sanitary Sewer Design 2025 4 8 12 $2,087.00 Final Inlet Spacing 2025 24 40 24 88 $14,237.76 Final Inlet Piping Design 2025 8 16 8 32 $5,136.96 Final Storm Sewer Trunkline Design 2025 8 12 20 $3,587.44 Specifications 2025 24 40 64 $11,348.88 Structure Data Table 2025 4 8 8 20 $3,226.20 Internal Progress Meetings 2025 12 12 12 12 48 $7,654.56 Cost Estimate 2025 4 12 12 8 36 $5,257.20 Water Main NOI 2025 4 12 16 $2,673.56 Sanitary Sewer Construction Permit 2025 4 12 16 $2,673.56 CSGP 2025 2 40 42 $6,170.14 QA/QC 2025 8 24 8 8 8 56 $11,449.52 2025 0 $0.00 2025 0 $0.00 2025 0 $0.00 2025 0 $0.00 SUBTOTAL: Final Design 8 4 166 248 68 56 12 272 834 $134,778.58 Total Hours ECI 16 34 388 617 68 212 28 548 1,911 $309,816.70 Hourly Rate (2025)$280.78 $235.53 $228.47 $146.64 $142.83 $120.37 $175.96 $142.40 Hourly Rate (2026) 4.0%$292.01 $244.95 $237.61 $152.51 $148.54 $125.18 $183.00 $148.10 Hourly Rate (2027) 4.0%$303.69 $254.75 $247.11 $158.61 $154.48 $130.19 $190.32 $154.02 Hourly Rate (2028) 4.0%$315.84 $264.94 $257.00 $164.95 $160.66 $135.40 $197.93 $160.18 $309,816.70 DIRECT EXPENSES No. No. Unit Rate Mileage (Site)2 190 Mi./Trip x $254.60 Mileage (On-Site Miles) Mi./Trip x $0.00 Lodging Nights x $0.00 Per Diem Days x $0.00 SUBCONSULTANT FEES TOTAL FEE: $309,900.00 Total Direct Expense Cost and Subconsultant Fees Page 2 of 2 Project Name:River West Development Client:City of South Bend Lochgroup Project No.:121-3067 TOTAL TOTAL TASK DESCRIPTION HOURS DOLLARS / TASK / TASK LABOR Water Main Permit and Hydraulic Model Request and Review Existing Data 2025 4 4 $913.88 Demand Data for Model 2025 2 2 $456.94 Setup Ex. Condition Model 2025 4 4 $913.88 Calibrate Model 2025 4 4 $913.88 Proposed Condition Model 2025 2 2 $456.94 Report Narrative 2025 2 2 $456.94 Report Tables 2025 2 2 $456.94 Report Figures 2025 4 4 $913.88 Additional Permitting Forms 2025 4 4 $913.88 QA/QC 2025 2 2 4 $928.00 SUBTOTAL: Water Main Permit and Hydraulic Model 2 30 0 32 $7,325.16 Total Hours ECI 2 30 0 32 $7,325.16 Hourly Rate (2025)$235.53 $228.47 $0.00 Hourly Rate (2026) 4.0%$244.95 $237.61 $0.00 Hourly Rate (2027) 4.0%$254.75 $247.11 $0.00 Hourly Rate (2028) 4.0%$264.94 $257.00 $0.00 $7,325.16 DIRECT EXPENSES No. No. Unit Mileage (Site) Mi./Trip x $0.00 Mileage (On-Site Miles) Mi./Trip x $0.00 Lodging Nights x $0.00 Per Diem Days x $0.00 SUBCONSULTANT FEES $0.00 TOTAL FEE: $7,400.00 Water Resources - Water Main Permit and Hydraulic Model STAFF HOURS BY CLASSIFICATION Rate Year Senior Project Manager I Senior Engineer I Engineering Tech I Total Labor Cost Total Direct Expense Cost and Subconsultant Fees Page 1 of 1 Project Name:River West Development Client:City of South Bend Lochgroup Project No.:121-3067 TOTAL TOTAL TASK DESCRIPTION HOURS DOLLARS / TASK / TASK LABOR Preliminary Master Layout Plan Existing Data Collection 2025 2 8 10 $1,370.06 Incorporating Existing Data in CAD files 2025 8 8 $1,139.20 Base Map 2025 4 4 8 16 16 8 20 76 $12,075.12 Roadway Lay-out Sheets 2025 4 4 16 20 44 $6,174.68 Base Alignments 2025 2 4 2 8 $1,328.30 Base Profiles 2025 2 8 10 $1,630.06 Base Typicals 2025 4 4 8 $1,156.16 GIS Conversions 2025 4 4 $569.60 Client Meeting 2025 2 2 2 6 $1,311.78 Revisions per City Comments 2025 4 4 4 8 8 16 44 $6,781.72 Project Management & Meetings 2025 4 24 8 36 $8,603.60 QA/QC 2025 4 4 8 16 $3,893.00 SUBTOTAL: Preliminary Master Layout Plan 10 32 30 12 26 46 40 74 270 $46,033.28 Preliminary Design Survey Documentation in Plans 2025 8 8 $1,139.20 Alignment Design 2025 2 2 $293.28 Profile Design 2025 2 4 6 $1,043.50 Preliminary Typical Sections 2025 1 2 4 7 $1,062.47 Preliminary Plan & Profile Sheets 2025 2 4 20 26 $3,670.08 Preliminary ADA Design/Traffic Calming 2025 2 4 32 32 70 $10,634.22 Maintenance of Traffic 2025 2 8 16 26 $3,908.46 Maintenance of Traffic - Pedestrian 2025 8 8 16 $2,312.32 Preliminary Corridor 2025 4 24 28 $4,144.28 Preliminary Approach Design 2025 4 8 12 $1,764.12 Preliminary Road Storm Sewer 2025 8 8 16 $2,717.44 Preliminary Cross Sections 2025 4 16 20 $2,864.96 Title Sheet/Index Sheet 2025 4 4 $569.60 Utility Conflict Review 2025 8 8 $1,249.84 Preliminary Quantities 2025 4 8 8 20 $2,855.64 Preliminary Cost Estimate 2025 2 2 4 8 $1,298.20 Project Management & Meetings 2025 4 44 12 60 $14,228.08 QA/QC 2025 4 4 12 20 $4,806.88 SUBTOTAL: Preliminary Design 8 50 35 8 30 92 18 116 357 $60,562.57 Engineering Designer II ROADWAY DESIGN STAFF HOURS BY CLASSIFICATION Rate Year Senior Project Manager II Senior Project Manager I Senior Engineer Project Engineer III Project Engineer II Project Engineer I Engineering Intern III Page 1 of 2 Project Name:River West Development Client:City of South Bend Lochgroup Project No.:121-3067 TOTAL TOTAL TASK DESCRIPTION HOURS DOLLARS / TASK / TASK LABOR Engineering Designer II ROADWAY DESIGN STAFF HOURS BY CLASSIFICATION Rate Year Senior Project Manager II Senior Project Manager I Senior Engineer Project Engineer III Project Engineer II Project Engineer I Engineering Intern III Final Design Coordination with Geotech, WR and Enviro 2025 4 4 8 $1,211.48 Final Utility Conflict Review 2025 4 4 $624.92 Updates per City Review - Preliminary and Final 2025 4 4 8 8 12 24 60 $9,074.64 Finalize Typical Section 2025 2 2 $293.28 Finalize PNP Sheets 2025 2 2 4 8 16 $2,418.22 Finalize Trail and Sidewalk Design 2025 2 8 10 $1,370.06 Finalize Curb Ramp & Traffic Calming Design 2025 2 4 32 16 54 $7,893.74 Finalize Maintenance of Traffic 2025 4 4 8 $1,156.16 Finalize Maintenance of Traffic - Pedestrian 2025 4 2 6 $871.36 Finalize Corridor 2025 4 8 2 14 $2,082.84 Finalize Approach Design 2025 4 8 12 $1,764.12 Finalize Roadway Storm Sewer 2025 4 4 2 10 $1,643.52 Finalize Cross Sections 2025 2 4 6 $862.88 Construction Details 2025 4 4 2 8 18 $3,051.28 Standard Specifications 2025 2 4 6 $1,384.94 Roadway Striping & Signage 2025 4 8 12 $1,668.00 Roadway Summary Tables 2025 8 4 12 $1,627.20 Finalize Quantities 2025 4 8 8 20 $2,855.64 Final Engineers Estimate 2025 2 2 4 8 $1,298.20 Contract Book 2025 8 2 10 $2,341.18 Project Management & Meetings 2025 4 24 8 36 $8,603.60 QA/QC 2025 4 4 12 4 24 $5,431.80 SUBTOTAL: Final Design 8 40 42 12 40 42 82 90 356 $59,529.06 Total Hours ECI 26 122 107 32 96 280 983 $166,124.91 Hourly Rate (2025)$280.78 $235.53 $228.47 $183.45 $156.23 $146.64 $132.20 $142.40 Hourly Rate (2026) 4.0%$292.01 $244.95 $237.61 $190.79 $162.48 $152.51 $137.49 $148.10 Hourly Rate (2027) 4.0%$303.69 $254.75 $247.11 $198.42 $168.98 $158.61 $142.99 $154.02 Hourly Rate (2028) 4.0%$315.84 $264.94 $257.00 $206.36 $175.74 $164.95 $148.71 $160.18 $166,124.91 DIRECT EXPENSES No. No. Unit Mileage (Site) Mi./Trip x $0.00 Mileage (On-Site Miles) Mi./Trip x $0.00 Lodging Nights x $0.00 Per Diem Days x $0.00 SUBCONSULTANT FEES Total Direct Expense Cost and Subconsultant Fees $0.00 TOTAL FEE: $166,200.00 Page 2 of 2 Project Name:South Bend River West Client:City of South Bend, IN Des. No.: RFP No.:N/A Lochgroup Project No.:121-3067 TOTAL TOTAL TASK DESCRIPTION HOURS DOLLARS / TASK / TASK DIRECT LABOR Preliminary Plans Front-end Coord. w/ Road staff & City 2025 1 2 3 $737.72 Preliminary Lighting Modelling 2025 2 6 8 $1,336.78 Lighting Model Exhibits 2025 1 2 8 11 $1,910.84 Electric Utility Coordination - Service Point(s) Determination 2025 2 5 7 $1,703.91 Site Visit 2025 4 4 $913.88 Lighting Plan Sheet Development 2025 3 6 9 $1,565.25 Lighting Detail Sheets 2025 1 2 2 5 $1,031.00 Prelim Qtys (create pay item calc sheets)2025 1 2 4 7 $1,324.28 Estimate 2025 2 2 $456.94 QA/QC 2025 2 2 4 $854.84 2025 0 $0.00 2025 0 $0.00 SUBTOTAL: Preliminary Plans 8 24 28 0 0 0 0 0 60 $11,835.44 Final Plans Revise Lighting Plans Per Preliminary & Final Review 2026 2 4 4 10 $2,144.48 Final Lighting Plan Sheets 2026 2 6 8 $1,390.25 Final Lighting Detail Sheets 2026 2 4 6 $1,085.24 Lighting Model Revisions and Data Extraction for Plans 2026 1 1 3 5 $987.14 Wire/Breaker Size and Voltage Drop Calcs 2026 4 6 10 $2,083.08 Lighting Special Provisions 2026 4 4 $950.44 Qtys and Cost Estimate (update pay item calc sheets)2026 2 2 4 $780.23 QA/QC 2026 4 2 6 $1,473.06 2026 0 $0.00 2026 0 $0.00 SUBTOTAL: Final Plans 11 15 27 0 0 0 0 0 53 $10,893.91 Total Hours ECI 19 39 55 0 0 0 0 0 113 $22,729.35 Average Unburdened Rate (2025)$280.78 $228.47 $146.64 $0.00 $0.00 $0.00 $0.00 $0.00 Average Unburdened Rate (2026) 4.0%$292.01 $237.61 $152.51 $0.00 $0.00 $0.00 $0.00 $0.00 Average Unburdened Rate (2027) 4.0%$303.69 $247.11 $158.61 $0.00 $0.00 $0.00 $0.00 $0.00 Average Unburdened Rate () 4.0%$315.84 $257.00 $164.95 $0.00 $0.00 $0.00 $0.00 $0.00 $22,729.35 $22,729.35 DIRECT EXPENSES No. Unit No. Unit Rate Mileage (Site) Trips x Mi./Trip x $0.67 $0.00 Mileage (On-Site Miles) Trips x Mi./Trip x $0.67 $0.00 Mileage (LDO) Trips x Mi./Trip x $0.67 $0.00 $0.00 TOTAL FEE: $22,800.00 Total Direct Labor Cost Total Labor Cost Total Direct Expense Cost Lighting Design STAFF HOURS BY CLASSIFICATION Rate Year Senior Project Manager II Senior Engineer I Project Engineer I Page 1 of 1 Project Name:Riverfront West Client:City of South Bend Des. No.:Local RFP No.:********* Lochgroup Project No.:121-3067 TOTAL TOTAL TASK DESCRIPTION HOURS DOLLARS / TASK / TASK DIRECT LABOR General Requirements Research Utility Facilities within Project 2025 4 4 $693.68 Create and Maintain Utility Files and Correspondence Records 2025 8 8 $1,387.36 Prepare and Distribute INDOT Letter of Project Initial Notice 2025 8 8 $1,387.36 Prepare and Distribute Utility Letter of Facility Verification Phase 2025 8 8 $1,387.36 Prepare and Distribute Utility Letter of Facility Conflict Identification 2025 8 8 $1,387.36 Prepare and Distribute Utility Letter of Utility Work Plan Development 2025 8 8 $1,387.36 SubTotal General Requirements 44 $7,630.48 Project Utility Meetings (including travel) Initial Kick off Meeting and Goal Establishment 2025 2 2 $346.84 Progress Reports and Progress Meetings 2025 4 4 $693.68 Internal Project Team Meetings 2025 4 4 $693.68 Prepare for and Attend Conflict Resolution Meetings 2025 4 4 $693.68 Sub Total Project Utility Meetings 14 $2,427.88 Utility/Design Integration Evaluate Potential Utility Impacts for Design Alternatives 2025 2 2 $346.84 Coordinate Utility Records and Collect One Call with Survey 2025 4 4 $693.68 Identify and Coordinate SUE services 2025 16 16 $2,774.72 Develop, Maintain, and Update Utility Conflict Matrix 2025 8 8 $1,387.36 Sub Total Utility/Design Integration 30 $5,202.60 Utility ROW Integration Identify and Obtain all Utility Property Interest Documents 2025 2 2 $346.84 Integrate, Review, and Update Easement information into ROW Engineering 2025 2 2 $346.84 Identify and Coordinate Acquisition of Parcels containing Utility Easements 2025 2 2 $346.84 Coordinate Execution of Subordination or Similar Agreements 2025 3 3 $520.26 Sub Total ROW Integration 9 $1,560.78 Receive, Review, and Develop Reimbursement Documents Coordinate and Obtain Utility Cost Estimates 2025 4 4 $693.68 Coordinate Completed Execution of Reimbursement Agreements 2025 4 4 $693.68 Sub Total Receive, Review, and Develop Reimbursement Documents 8 $1,387.36 Receive, Review, and Develop Contract Documents Coordinate and Conduct Utility Constructability Reviews 2025 8 8 $1,387.36 Coordinate, Review, and Approve Utility Work Plans 2025 8 8 $1,387.36 Sub Total Receive, Review, and Develop Contract Documents 16 $2,774.72 Construction Phase Utility Coordination Distribute Utility Relocation Notice to Proceeds 2025 8 8 $1,387.36 Coordinate and Track Utility Relocations 2025 8 8 $1,387.36 Subtotal Construction Phase Utility Coordination 16 $2,774.72 Total Hours ECI 137 0 137 $23,758.54 Average Rate(2025)$173.42 $1.00 Average Rate(2026) 4.0%$180.36 $1.04 Average Rate(2027) 4.0%$187.57 $1.08 Average Rate(2028) 4.0%$195.07 $1.12 $23,758.54 $23,758.54 DIRECT EXPENSES No. No. Unit Mileage (Site) Mi./Trip x $0.00 Mileage (On-Site Miles) Mi./Trip x $0.00 TOTAL FEE: $23,800.00 Utility Coordination STAFF HOURS BY CLASSIFICATION Rate Year Project Liason Project Engineer III PROJECT:River West 0 0 Client Name:City of South Bend TOTAL TOTAL DESCRIPTION HOURS DOLLARS Year / TASK / TASK Bidding Addenda 2025 2 1 4 4 11 $2,287.92 Notice to Bidders 2025 1 1 $253.35 RFI's during Bidding 2025 4 8 12 $2,841.16 Pre-Bid Meeting, prep & minutes 2025 8 2 2 12 $2,777.02 Attend Bid Opening 2025 1 1 $253.35 WR Bid Phase 2025 4 8 4 16 $3,427.72 Bid Tab Preparation & Recommendation 2025 1 1 1 2 5 $1,055.88 2025 0 $0.00 TOTAL 0 21 2 0 23 0 12 58 12,896.40$ 2025 Hourly Rate $253.35 $280.78 $228.47 $146.64 2026 Hourly Rate 4.00%$263.48 $292.01 $237.61 $152.51 2027 Hourly Rate 4.00%$274.02 $303.69 $247.11 $158.61 2028 Hourly Rate 4.00%$284.98 $315.84 $256.99 $164.95 Total Labor Cost $12,896.40 $12,896.40 DIRECT EXPENSES - Lochgroup Direct Expenses Cost Trips Unit Cost Units Quantity Mileage 0.67$ Miles $0.00 Meals 41.00$ Miles $0.00 Total Direct Cost $0.00 TOTAL (Fee + Expenses)$12,900.00 WR BIDDING FEE STAFF HOURS BY CLASSIFICATION Senior Project Manager I Senior Project Manager II Senior Engineer I Project Engineer I Project Name:River West Client:City of South Bend Lochgroup Project No.:121-3067 TOTAL TOTAL TASK DESCRIPTION HOURS DOLLARS / TASK / TASK LABOR Construction Phase Services Clarifying Plans During Construction 2025 4 4 8 $1,930.24 Pre-Construction Meeting, prep & minutes 2025 8 2 2 12 $2,739.84 Lighting - Shop Drawing & questions 2025 4 3 7 $1,692.63 WR - Shop Drawing Review & questions 2025 4 24 8 2 38 $8,198.65 Construction Progress Meetings 2025 24 24 $5,878.83 SUBTOTAL: Construction Phase Services 44 33 10 2 65 $14,561.36 Total Hours ECI 44 33 10 2 89 $20,440.19 Hourly Rate (2025)$235.53 $228.47 $146.64 $142.40 Hourly Rate (2026) 4.0%$244.95 $237.61 $152.51 $148.10 Hourly Rate (2027) 4.0%$254.75 $247.11 $158.61 $154.02 Hourly Rate (2028) 4.0%$264.94 $257.00 $164.95 $160.18 $20,440.19 DIRECT EXPENSES No. Unit Rate Mileage (Site) Trips x $0.67 $0.00 Mileage (On-Site Miles) Trips x $0.67 $0.00 Mileage (LDO) Trips x $0.67 $0.00 SUBCONSULTANT FEES $0.00 TOTAL FEE: $20,500.00 Engineering Designer II Total Labor Cost Total Direct Expense Cost CONSTRUCTION PHASE SERVICES STAFF HOURS BY CLASSIFICATION Rate Year Senior Project Manager I Senior Engineer I Project Engineer I BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 2/18/2025 Name: Charlotte Brach Department of Public Works – Engineering Division BPW Date: 2/25/2025 Phone Extension: 9246 Required Prior to Submittal to Board BPW Attorney X Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Lochmueller Group, Inc. New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name 121-067 Riverfront West Urban Neighborhood Development Project Number PROJ605 Funding Source Riverfront West Development Area TIF Account No. PO # 36167 Amount $613,500.00 (new contract total: $755,200.00) Terms of Contract Lump Sum Special Contract Provisions N/A Purpose/Description Amendment No. 1 to the Professional Services Agreement with Lochmueller Group for Engineering Services for the Riverfront West Urban Neighborhood Development. This amendment will cover the design services for 10% design of the street network and utilities for the whole site, and full design and construction documents for the portion of the site servicing the JC Hart Development. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: