HomeMy WebLinkAbout2011 Local Road and Street ReportPRESCRIBED BY STATE BOARD OF ACCOUNTS - REV 20D8 CITY AND TOWN FORM NO. 225
COUNTY FORM NO. 16
Saint Joseph COUNTY, INDIANA
City OF South Bend
(CITY OR TOWN) (NAME OF UNIT)
(CITY AND TOWN FORM 225 ONLY)
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
(1C 8- 17 -4.1)
FOR THE YEAR ENDED
DECEMBER 31, 2011
P. 1
ANNUAL OPERATIONAL. REPORT
FOR LOCAL ROADS AND STREETS
SECTION I - FINANCIAL STATEMENT
Cash and Investments - January 1
Operating Receipts:
Taxes
Intergovernmental
Charges for Services
Operating Transfers In
Other Receipts
Total Operating Receipts
Bands Proceeds
Other Receipts
Interfund Loan Proceeds
Investments Matured or Sold
Total Receipts
Operating Disbursements:
Highway and Streets
Administration
Maintenance and Repair
Construction and Reconstruction
General Undistributed
Debt Service
Total Operating Disbursements
Other Disbursements
Interfund Loan Payments
Interfund Loans Made
Investments Purchased
Total Disbursements
Excess
Over (Under) Total Disbursements
Cash and Investments - December 31
Motor
Local
Total
Vehicle
Road &
Cumulative
Other
All
Highway
Street
Bridge
Funds
Funds
$2,012,185
$2,194,756
$0
$9,707,921
$13,914,862
1,863,283
0
0
7,435,412
9,298,695
2,951,072
1,030,958
0
0
3,982,030
243,979
0
0
10,974
254,953
470,0 '00
0
0
0
470,000
36,504
6,031
0
167,528
210,063
5,564,838
1,036,989
0
7,613,914
14,215,741
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5,564,838
1,036,989
0
7,613,914
14,215,741
170,112
146,292
0
776,752
1,093,156
3,891,953
16,906
0
1,688,904
5,597,763
2,100,936
1,842,543
0
5,087,214
9,030,693
0
0
0
0
0
0
0
0
251,938
251,938
6,163,001
2,005,741
0
7,804,808
15,973,550
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6,163,001
2,005,741
0
7,804,808
15,973,550
0
(598,163)
(968,752)
0
(190,894)
(1,757,809)
$1,414,022
$1,226,004
$0
$9,517,027
$12,157,053
Douglas Rd TIF
Major Moves
W
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION la - DETAIL OF OPERATING RECEIPTS FOR COMMON FUNDS
Motor Local Total of All Total
Vehicle Road & Cumulative Other All
Highway Street Bridge Funds Funds (1)
Operating Receipts:
Taxes, list source((s)
Wheel Tax
Property Tax
Other Taxes
Total Taxes (2)
Distribution from State Auditors Office
Intergovernmental, list source(s)
Gasoline Tax
Major Moves
State Operating Grant
Total Intergovernmental (2)
Charges for Services, list service(s)
Internal Charges for Servies
Traffic Signal Maintenance
Sale of Scrap Metal
Sale of Signs
Total Charges for Services (2)
Other, list source(s)
Interest on Investments
Inter-fund Operating Transfer
Local Grant
Local Loan
Miscellaneous Reimbursements
Total Other (2)
Total Operating Receipts
Note: 1 From Section lb
2 Totals to Section
1,863,283
0
0
0
1,863,283
0
0
0
7,435,412
7,435,412
0
0
0
0
0
1,863,283
0
0
7,435,412
9,298,695
2,951,072
1,030,958
0
0
3,982,030
0
0
0
0
0
0
0
0
0
0
2,951,072
1,030,958
0
0
3,982,930
138,206
0
0
0
138,206
105,773
0
0
0
105,773
0
0
0
2,837
2,837
0
0
0
8,137
8,137
243,979
0
0
10,974
254,953
5,314
6,031
0
27,258
38,603
470,000
0
0
0
470,000
0
0
0
0
0
0
0
0
0
0
31,190
0
0
140,270
171,460
506,504
6,031
0
167,528
680,063
5,564,838
1,036,989
0
7,613,914
14,215,741
P. 3
ANNUAL OPERATIONAL REPORT
1,680,813
0
FOR LOCAL ROADS AND STREETS
855,575
190,679
SECTION Ib - DETAIL OF OPERATING RECEIPTS FOR OTHER FUNDS
306,053
7,435,412
General General
CED CED CED CED CED
Total
Fund Fund Major
SSDA #1 Central SBCDA Airport Douglas Road
All
Engineering T&L Moves
TIF Medical TIF TIF TIF TIF
Funds(l)
Operatfng Receipts:
Taxes, list source((s)
Property Taxes
Other
Total Taxes
Distribution from State Auditors Office
Intergovernmental, list source(s)
Major Moves
Total Intergovernmental
Charges for Services, list service(s)
Sale of Scrap Metal
Sale of Signs
Total Charges for Services
Other, list source(s)
Miscellaneous Reimbursement
Local Grant
Local Loan
Sale Scrap Metal
Interest on Investments
Total Other
Total.Operating Receipts (1)
716,483
1,680,813
0
783,731
855,575
190,679
2,902,078
306,053
7,435,412
0
0
0
0
0
0
0
0
0
716,483
1,680,813
0
783,731
855,575
190679
2,902,078
306,053
7,435,412
0
a
0
0
0
0
0
0
a
0
0
0
0
0
0
0
0
0
0
2,837
0
0
0
0
0
0
2,837
0
8,137
0
0
0
0
0
0
8,137
0
10,974
0
0
0
0
0
0
10,974
57,113
273
82,884
0
0
0
0
0
140,270
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
27,012
0
0
0
0
246
27,258
57,113
273
109,896
0
0
0
D
246
167,528
773,596
1,692,060
109,896
783,731
855,575
190,679
2,9x2,078
306,299
7,613,914
Note: t Totals to Section [a; 'total of All Other Funds Column
P. 4
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ila - DETAIL OF OPERATING DISBURSEMENTS OF COMMON FUNDS
Motor Local Total of All Total
Vehicle Road & Cumulative Other All
Highway Street Bridge Funds(1) Funds
Administration:
Personal Services
Supplies
Other Services and Charges
Capital Outlay .
Total Administration (2)
Maintenance and Repair:
Personal Services
Supplies
Other Services and Charges
Capital Outlay
Total Maintenance and Repair (2)
Construction and Reconstruction:
Personal Services
Supplies (Paving /Concrete)
Other Services and Charges
Capital Outlay
Total Construction and Reconstruction (2)
General and Undistributed:
Personal Services
Supplies
Other Services and Charges
Capital Outlay
Total General and Undistibuted (2)
Debt Service:
Payments of Principal and Interest (2)
Total Operating Disbursements
Note: i From Section Ilb
2 Totals to Section I
0
0
0
528,082
528,082
0
0
0
14,234
14,234
170,112
146,292
0
217,483
533,887
0
0
0
16,953
16,953
170,112
146,292
0
778,752
1,093,156
2,904,298
0
0
95,546
2,999,844
453,005
9,406
0
651,380
1,113,791
385,107
7,500
0
941,978
1,334,585
149,543
0
0 _
0
149,543
3,891,953
16,906
0
1,688,904
5,597,763
0
0
0
0
0
2,100,936
450,000
0
0
2,550,936
0
0
0
1,220,027
1,220,627
0
1,392,543
0
3,867,187
5,259,730
2,100,936
1,842,543
0
5,087,214
9,030,693
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0
6,163,001 2,005,741
P. 5
0 251,938 251,938
0 7,804,808 15,973,550
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilh - DETAIL OF OPERATING DISBURSEMENTS FOR OTHER FUNDS
Total Operating Disbursements 773,596 1,692,060 336,666 783,731 855,575 190,679 2,902,078 270,423 7,BD4,808
Note:1 Totals to Section [in; Total -Ml Other Funds Column
w
General
General
CED
CED
CED
CED
CED
Total
Fund
Fund
Major
SSDA 91
Central
SBCDA
Airport
Douglas Road
All
Engineering
T &L
Moves
TIF
Medical TIF
TIF
TIF
TIF
Funds (1)
Adm Wstration:
Personal Services
528,082
0
D
0
0
0
0
0
528,082
Supplies
14,234
0
0
0
0
0
0
0
14,234
Other Services and Charges
214,327
3,156
0
0
0
0
0
0
217,483
Capital Outlay
16,953
0
0
0
0
0
0
0-
16,953
Total Administration
773,596
3,156
0
0
0
0
0
U
776,752
Maintenance and Repair:
Personal Services
0
95,546
0
0
0
0
0
0
95,546
Supplies
0
651,360
0
0
0
0
0
0
651,380
Other Services and Charges
0
941,976
0
D
0
0
0
0
941,978
Capital Outlay
0
0
2
0
0
a
0
0
0
Total Maintenance ard Repair
0
1,688,904
0
0
0
0
0
0
9,666,904
Construction and Reconstruction:
Personal Services
0
0
0
0
0
0
0
0
0
Supplies
C
0
0
0
0
0
0
0
0
Other Services and Charges
0
0
43,200
690,066
0
0
466,276
18,485
1,220,027
Capital Outlay
0
0
293,466
93,665
855,575
190,679
2,433,802
0
3,867,187
Total Construction and Reconstruction
0
0
336,666
783,731
855,575
190,679
2,902,075
18,485
5,087,214
General and Undistributed:
Personal Services
0
0
0
0
0
0
0
0
0
Supplies
0
0
0
0
0
0
0
0
0
Other Services and Charges
0
0
0
0
0
0
0
0
0
Capital Outlay
0
0
0
0
0
0
0
0
0
Total General and Undistibuted
0
0
0
0
0
.0
0
0
0
Debt Service:
Payments of Principal and Interest
0
0
0
0
0
❑
0
251,938
251,938
Total Operating Disbursements 773,596 1,692,060 336,666 783,731 855,575 190,679 2,902,078 270,423 7,BD4,808
Note:1 Totals to Section [in; Total -Ml Other Funds Column
w
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54406 (8 -10)
NOTE: These are the same funds reported in Section 11, with additional information on individual projects.
PAVIKIr;
MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only' known)
Road/Street
From
Road/Street
To
Road /Steel
Length
(M 1)
Width
(ft)
o
2
o
U
z
C
-0
A
m
m�
i
m
E
o
a
a
0
T
U
te°
r
m
:
',°
u_
m
o
U
N
a
�
R
o
J
d
.2-
u..l
a
n.
�
U
o
La Fayette St.
Sample St.
South St.
1600
52
_
X
_ _
$87,892
Jefferson St.
St Joseph St.
Niles Ave.
1032
66
X
{#�
$46,756
Locust Rd.
3015 Locust
3501 Locust
1570
28
X
_
$31,813
Walnut St.
Indiana Ave.
Prairie Ave.
1023
30
X
$17,317
Morris St.
Donald St.
Prairie Ave.
635
24
X
$ 7,970.69
$7,971
Webster St.
Indiana Ave.
Edwards St.
500
20
X
$ 8,075.58
$5,076
Arnold St.
Sample St.
Huron St.
23
X
_
$25,411
Illinois St.
Sample St.
Ford St.
k1375-1-
30
X
$31,932
Meadow Ln.
Birchwood St.
Edison St.
26
X
$20,965
Edison St.
Meadow Ln.
Sample St.
990
26
X
$19,426
Sample St.
Sylvan Ln.
Mayflower Rd
975
50
X
##
$30,969
California Ave.
Cottage (3 rov
Blaine Ave.
1340
24
X
##1#}###{#
$18,996
Hillcrest Rd.
Angela Blvd.
Wakewa Ave
1600
24
X
$ 7,511.79
$7,512
Blyler PI.
Riverside Dr.
Culver P).-
775
26
X
$19,031
Culver Pl.
Sherman Ave
Inglewood Pl.
1045
30
X
$24,410
Ribourde Dr.
Boland Dr.
West to Deac
1015
24
X
$13,744
Bertrand St.
Olive St.
Johnson St.
1300
30
X
$22,794
Prast St,
Johnson St.
Huey St.
620
24
X
$ 9,878.31
$9,878
Wilber St,
Linden Ave.
Fassnacht St
970
20
X
$13,565
Liston St.
Washington P
Birdsell Ave.
560
38
X
$14,882
Elwood Ave.
Portage Ave.
Wilber St.
1300
24
X
�#
$28,746
Colfax Ave.
Orange St.
LaPorte Ave.
690
38
X
$22,488
Cleveland Ave
Lincolnway
LaPorte Ave.
950
24
X
_
$16,218
Lawndale Ave.
Lincolnway W
LaPorte Ave.
477
24 .
X
$ 6,591.89
$6,592
Blaine Ave.
Cal ifomia Av
Vassar Ave.
540
38
X
$15,337
Ryer St.
Elwood Ave.
Keller St.
1300
30
X
$22,915
Kenmore St.
Elwood Ave.
Keller St.
1300
35
X
$27,684
Wellington St.
Elwood Ave.
Keller St.
1300
35
X
$39,836
Longley St.
Eclipse Pl.
East to D.E.
815
30
X
$26,346
Brookfield St.
Lincolnway W
Fassnacht St
1550
32
X.
$43,554
P. 7
ANNUAL_ OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
PAVING
MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type cf Work
Project Cost Provide this information only if known)
Road/Street
From
Road/Street
To
RoadlSteet
Length
(mi)
Width
(ft)
o
d
z
o
f6
U
y
m
F
r i
m
in
U
ro
a
o
Q
a
o
~
U
U
-°
N
p
2i
¢
O
J
¢
a
E
d
n
W
¢
n
a
U
�o
Napolean St.
St Peter St.
Lawrence St.
1218
35
X
$27,760
Campeau St.
Eddy St.
Twyckenham
2523
20
X
�
$33,882
Greenlawn AvE
McKinley Ave
Colfax Ave.
763
36
X
$20,762
Emerson St.
Mishawaka A
Northside Blv
1550
29
X
$28,561
Mishawaka AA
Roberts St.
Twyckenham
1400
76
X
$79,654
Logan St.
Mishawaka A
Northside Blv
1610
42
X
fit ##
$55,568
Marshall St.
Logan St.
33rd St.
1250
26
X
#####
$16,410
Corby Blvd.
Manchester F
Patty Ln.
1160
40
X
$28,954
Corby Blvd.
Hickory Rd.
Manchester
1340
40
X
$31,192
Ironwood Dr.
Corby Blvd.
Edison Rd.
2260
40
X
_
$98,583
Frances St.
Corby Blvd.
St Vincent St,
960
29
X
_
$21,367
Howard St.
Notre Dame A
S. R. 23
Twyckenham
2120
26
Xy
$32,576
LaSalle St.
Jefferson Blvi
1440
39
X
$38,606
Sorin St.
St, Louis Blvd
Notre Dame
1660
23
X
$21,310
Carroll St.
Monroe St.
Bronson St.
925
41
X
$ 5,144.03
$5,144
St. Joseph St.
Irvington St.
Ewing St.
1157
29
X
$22,001
Norman St.
Michigan St.
East to Dead
473
24
X
$ 9,245.50
$9,246
Marine St.
lndiana Ave.
Broadway St.
575
24
X
$ 7,364.25
$7,364
Oakpark Ct.
Miami St.
East to Dead
600
20
X
$ 6,379.58
$6,380
Darby Ct.
Landsdown D
West to CulD
500
26
X
h#ff#49999
$10,840
Donmo ey r Ave
Fellows St,
Miami St.
2540
30
X
$57,324
Crown Ct.
Riding Mall Di
SoAo CulDe
434
22
X
$ 8,821.72
$8,822
Fellows St.
Donmoyer Av
Dean St.
1290
40
X
$50,338
Indiana Ave.
Miami St.
Leer St.
1230
32
X
$18,586
Hampshire Dr.
Gotham Dr.
Riding Mall D
1450
27
X
#####W##
$27,425
Brora Dr.
Thornhill Dr.
Greenock St.
394
27
X
$ 5,012.81
$5,013
Greenock St.
Brora Dr.
Kintyre Dr.
670
27
X
$13,785
Kintyre Dr.
Greenock St.
Thornhill Dr.
315
27
X
$ 5,144.03
$5,144
Echo Dr.
Clayton Dr.
Clayton Dr.
1935
28
$53,175
Widener Ln.
Miami St.
West to D.E.
340
24
X
$ 3,731.92
$3,73z
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section ll, with additional information on individual projects.
PAVING
MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
From
Road /Street
To
RoadlSteet
Length
{mi)
Width
( €t)
c
°—
U
2
C
O
U
m
z
C
n
-
m
a
'U
G
t
m
�
E
0
H
O
0
U)
(9
v
F
F
a
n
Q
0
v
m
L
[4
o
~
U
o
U
N
N
¢
0.
¢
a_
c
a)
E
w
¢
0-
O
U
o
L—
OVERLAYS
Chippewa St.
Main St.
to RJR Track
X
_
$10,502
Donald St.
Webster St.
Walnut St.
X
$ 6,091.14
$6,091
Swygart St.
Indiana Ave.
Edwards St.
X
$ 1;458.32
$1,488
Poland St.
Walnut St.
Webster St.
X
$ 3,690.79
$3,691
Huron St.
Bendix St.
Liberty St.
X
$ 772.98
W
$773
Dubai[ Ave.
Phillipa St.
Olive St.
X
$ 944.72
$945
Mayflower Rd.
Sample St.
Western Ave..
X
$ 2,382.88
$2,383
Michigan St.
at
Fairview St.
X
$ 728.56
_
$729
Edwards St.
Walnut St.
Arnold St.
X
$ 3,326.50
$3,327
St.
Phillipa St.
X
$ 2,280.98
$2,281
Ave.
Diamond Ave
Lawndale Ave.
X
$ 2,333.36
$2,333
rOlive
e.
Diamond Ave
Lawndale Ave.
X
$ 3,053.84
$3,054
Bulla St.
O'Brien St.
Johnson St.
X
$ 3,086.96
$3,087
Calhoun St.
Meade St.
Olive St.
X
$ 5,089.12
$5,089
Kessler Blvd.
Woodlawn Bb
Kessler PI.
X
$ 3,039.76
$3,040
Freemont St.
Elwood Ave.
Keller St.
X
$ 3,756.00
$3,756
Bergan St.
Johnson St.
Brookfield St
X
$ 3,417.12
$3,417
Rockne Dr.
Ironwood Dr.
Bader Ave.
X
$13,546
Rexford Dr.
Browne Ln.
West to D.E.
X
$ 6,023.94
$6,024
Jefferson Blvd.
Niles Ave.
Intersection
X
$ 2,546.96
$2,547
Corby Blvd.
Eddy St.
Niles Ave.
X
$ 9,502.72
$1,503
Ironwood Dr.
McKinley Ave
No. to RIR Tracks
X
$ 6,102.24
$6,102
LaSalle St.
Greenlawn A
Esther St.
X
$ 5,921.76
$5,922
Ironwood Dr.
Corby Blvd.
McKinley Ave.
X
�
$22,358
Edgewater Dr.
Monroe St.
Bronson St.
X
$ 6,928.88
$6,929
Bronson St.
Lincoinway E
Edgewater Dr.
X
$ 3,770.40
$3,770
Walter St.
Michigan St.
Fellows St.
X
$ 837.20
$837
Erskine Blvd.
Irvington St,
Donmoyer Ave.
X
$ 2,369.84
_
$2,370
Oakside St.
Miami St.
Erskine Blvd.
X
$ 3,852.24
$3,852
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
PAVING
MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
C
C
w
�
2
O
Qf
C
16
C
' V
A
O
From
To
Length
Width
3
c
¢
¢
¢
79
Road/Street
Road/Street
Road /Steet
w)
ft
�
r i
°
UL
CL
r°
Dubail St.
Clyde St,
Marine SL
X
$ 7,245.30
$7,245
Kem Rd.
Miami St.
York Rd.
X
$ 1,572.48
$1,572
Southeast St.
Greenwood D
York Rd.
X
$ 3,549.92
$3,550
Ridgedaie Rd.
Twyckenham
Hilltop Dr.
X
$ 3,880.88
$3,881
Jackson Rd.
Miami St.
York Rd.
X
$ 2,261.60
$2,262
Riding Mall Dr.
Harrow Dr.
Gotham Dr.
X
$11,489
#ffMWW9hW
Eckman St.
Erskine Blvd.
High St.
X
$ 766.32
$766
Dale St.
Oakside St.
Woodside St.
X
$ 746.72
$747
Danbury Dr.
Gotham Dr.
Selwin Ct.
X
$ 2,268.80
$2,259
Monroe St.
Lincolnway E
Edgewater Dr.
X
1 $ 3,046.64
L
$3,047
TOTAL MVH FUNDS FOR ROADISTREET CONSTRUCTION. AND RECONSTRUCTION $ $1,733,216
P. 10
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
- Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROAD /STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this iWformation only if known)
RoadlStreet
Address,
Length
(rni)
Width
(ft)
O
U
3
g
0
2
It
'w
41
v
in
0
r
N
�
ri
a
5
�
rj
N
[6
�
¢
a
�
¢
o
�
E
or
¢
a
p
U
�2
30th St.
1214
X
$222.0.0
$222.00
31St.
1214
X
_
$222.00
$222.00
32nd St.
1214
X
$222.00
$222.00
30th St.
1215
X 1
$222.00
$222.00
30th St.
1321
X
$222.00_,_
$222.00
29th St.
1215
X
$222.60
$222.00
29th St.
1317
X
$222.00
$222.00
28th St.
936
X
$222.00
$222.00
28th St.
1010
X
$222.00
$222.00
Ironwood Dr.
1101
X
$222.00
$222.00
20th St.
926
X
$222.00
$222.00
Hildreth St,
1702
X
$222.00
$222.00
Esther St.
1107
X
$222.00
$222.00
Bellevue St,
1105
X
L
$222,00
_
$222.00
River Ave.
639
X
$222.00.
1 $222.00
Bronson St.
730
X
$222.00
$222.00
Bronson St.
637
X
$222.00
_
$222.00
Clinton St.
612
X
$222.00
$222.00
Michigan St.
740
X
T
$222.00_
$222.00
Broadway Ave.
513
X
$222.60
$222.00
Virginia St.
1533
X
$222.00
$222.00
Dale St.
1526
X
$222.00
$222.00
High St.
1514
X
$222.00
$222.00
Indiana Ave.
819
X
$222.00
$222.00
High St.
1428
X
_
$222.60
$222.00
Haney SL
301
X
$222.00
$222.00
Haney St.
409
X
$222.00
$222.00
Haney St.
136
X
$222.00
WW
$222.00
Dubail Ave.
822
X
$222.00
$222.00
Dubail Ave.
902
X
$222.00
$222.00
Dubail Ave.
640
X
$222.00
$222.00
Dubail Ave.
530
X
$222.00
$222.06
Dubail Ave.
418
X
$222.00
$222.00
P. 11
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Illa - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional Mormation on individual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Length
(Mt)
Width
{ft)
�
o
u
U
3
z
a
�
6z
�
�
v
(n
v
v
LL
U
U
2
0
¢
R
�
¢
�
E
.2L
W
°�
O
CJ
t2
Dubai] Ave.
302
+-xx
$222.00
$222.00
Dubail Ave.
230
$222.00
$222.00
Calvert St.
895
X
$222.00
$222.00
Ironwood Dr.
754
X
$222,00
$222.00
Ironwood Dr.
634
X
$222.00
$222.00
23rd St.
502
X
$222.00
$222.00
23rd St.
702
X
$222.00
$222.00
24th St.
844
X
$222.00
$222,00
24th St.
754
X
$222.00
$222.00
24th St.
502
X
$222.00
$222.00
25th St.
506
X 1
$222.00
$222.00
25th St.
754
X
$222.00
$222.00
26th St.
502
X
$222.00
$222.00
26th St.
702
X
$222.00
$222.00
26th St.
806
X
$222.00
$222.00
30th St.
729
X
$222.00
$222.00
30th St.
529
X
$222.00
$222.00
29th St.
728
X
1
$222.00
$222.00
29th St.
841
X
$222.00
$222.00
30th St.
502
X
$222.00
$222.00
30th St.
726
X
$222.00
$222.00
30th St.
802
X
$222.00
$222.00
32nd St.
840
X
$222.00
$222.00
32nd St.
501
X
$222.00
$222.00
Mish. Ave.
3109
X
$222.00
$222.00
32nd St.
502
X
$222.06
$222.00
33rd St.
502
X
$222.00
$222.00
33rd St.
602
X
X
$222.00
$222.00
33rd St.
754
$222.00
$222.00
34th St.
841
X
$222.00
$222.00
34th St.
842
X
$222.00
$222.00
Logan St.
841
X
$222.00
$222.00
30th St.
1002
X
$222.00
$222.00
P. 12
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8-10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area .
Type of Work
Project Cost (Provide this information only if known
Road/Street
Address
Length
(mi)
Width
(ft)
O
U
V1
C
0
3
z
fa
�
15
2'
�
`t
m
�
N
2
�
U
4!
in
T
l4
v
r
�
Q
N
u-
r
12
c
U
N
fit
2
Q
°�
O
-J
Q.
a
C
E
�-
4
a
ill
9
�°
31 st St.
1349
X
$222.00
$222.00
Pleasant St.
3110
X
$222.00
$222,40
Pleasant St.
3113
X
$222.00
$222.00
32nd St.
915
X
$222.00
$222.00
32nd St.
914
X
$222.00
$222.00
Pleasant St.
3209
X
$222.00
$222.00
Pleasant St.
3210
X
$222.00
.$222.00
Northside Blvd,
3309
X 1
$222.00
$222.00
Pleasant St.
3315
X
$222.00
$222.00
Mishawaka AvE
3312
X
$222.00
$222.00
34th St.
946
X
$222.00
$222.00
33rd St.
1109
X
$222.00
$222.00
32nd St.
1109
X
$222.00
$222,00
Vine St.
2815
X
$222.00
$222.00
Pleasant St.
2217
X
$222.00
$222.00
Vine St.
2217
X
$222.00
$222.00
23rd St.
946
X
$222.00
$222.00
Vine St.
2316
X
$222.00
$222.00
Pleasant St.
2402
X
$222.00
$222.00
Pleasant St.
2504
X
$222.00
$222.00
Pleasant St.
2515
X
$222.00
$222.00
Vine St.
2519
X
$222.00
$222.00
27th St.
943
X
$222.00
$222.00
Vine St.
2518
X
$222.00
$222.00
Pleasant St.
2618
X
$222,00
$222.00
Pleasant St.
2714
X
$222.00
$222.00
Northside Blvd.
2813
X
$222.00
$222.00
28thSt.
945
X
$222.00
$222.00
Roberts SL
914
X
$222.00
$222.00
Twyckenham E
1218
X
$222.00
_
$222.00
Hildreth St.
1516
X
.
$222.00
$222.00
St Joe St.
511
X
$222.00
$222.00
Columbia St.
628
X
$222.00
$222.00
P. 13
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia- CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported In Section 11, with additional information on individual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide th(s information only if known)
Road /Street
Address
Length
(mi)
Width
(ft)
G
_
()
z
a
t
�
E
F-
v
W
m
r1J
v
H�
b
E2
U
2
U
j0
¢
a
S]
¢
d
2
W
¢
D
U
76
(°
Fellows St.
618
X
$222.00
$222.00
South St.
508
X
$222.00
$222.00
Broadway St.
125
X
$222.00
$222.00
Broadway SL
201
X
$222.00
$222.00
Broadway St.
401
X
$222.00
_
$222.00
Broadway St.
315
X
$222.00
$222.00
Broadway St.
621
X
$222.00
$222.00
Broadway St.
721
X
$222.00
$222.00
High St.
1413
X
_
$222.00
$222.00
Broadway St.
718
X
_
$222.00,
$222.00
Broadway St.
614
X
$222.00_
$222.00
Rush St.
1416
X
$222.00
$222.00
Hanel St.
- - 225
X
$222.00
-
$222.00
Haney St.
103
X
$222.00
$222.00
Indiana Ave.
1010
X
$222.00
$222.00
Indiana Ave.
806
X
$222.00
$222.00
Indiana Ave.
610
X
$222.00
$222 -00
Fellows St.
1614
X
$222.00
$222.00
Indiana Ave.
302
X
$222.00
$222.00
Indiana Ave.
408
X
$222.00
$222.00
Carroll St.
1617
X
$222.00
$222.00
Indiana Ave.
220
X
$222.00
$222.00
Michigan St.
1612
X
$222.00
$222.00
St Joe St.
1711
X
$222.00
$222.00
Dubail Ave.
202
X
$222.00
$222.00
Dayton St.
__ 618
X
$222.00
$222.00
Dayton St.
806
X
$222.00
$222.00
23rd St.
843
X
$222.OD
$222.00
23rd St.
725
X
$222.00
$222.00
23rd St.
529
X
$222.00
$222-00
24th St.
601
X
$222.00
$222.00
24th St.
725
X
$222.00
$222.00
25th St.
605
X
$222.00
$222.00
P. 14
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Illa - CONSTRUCTION AND RECONSTRUCTION
Part of Stata Form 54400 (8 -10)
NOTE: These are the same funds reported in Sectfon II, with additional Information on indiv[dual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost Provide this information only ifknown)
RoadiStreet
Address
Length
{mi)
Width
(ft}
[-2
D
m
X
t
N
w
v
rn
i
n
LL
U
¢
of
¢
°�
E
W
¢
a
U
5
H
25th St.
725
X
$222A0
$222.00
26th St.
601
X
$222.00
$222.00
$222.00
25th St.
$44
X
$222.00
25th St.
726
X
$222.00
$222.00
26th St,
602
X
$222.00
$222.00
26th St.
730
X
$222.00
$222.00
26th St,
846
X
$222.00
$222.00
27th St.
842
X
$222.00
$222.00
27th St.
726
X
$222.00
$222.00
27th St.
530
X
$222.00
$222.00
30th St.
602
X
$222.00
$222.00
30th St.
726
X
$222.00
$222.00
30th St.
842
X
$222.00
$222.00
31 st St.
726
X
$222.00
$222,00
31 st St.
602
X
$222,00
$222.00
32nd St.
530
X
$222.00
$222.00
32nd St.
842
X
$222.00
$222.00
331d St.
842
X
$222.00
$222.00
33rd St.
726
X
$222.00
$222.00
34th St.
529
X
$222.00
$222.00
34th St.
722
X
$222.00
$222.00
34th St.
842
X
$222.00
$222,00
34th St.
602
X
$222.00
$222.00
35th St.
602
X
$222.00
$222.00
35th St.
842
X
$222.00
$222.00
35th St.
726
X
$222.00
$222.00
36th St.
914
X
$222.00
$222.00
36th St.
1110
X
$222.00
$222.00
35th St.
1214
X
$222.00
$222.00
35th St.
1110
X
$222.00
$222.00
35th St.
916
X
$222.00
$222.00
34th St,
1112
X
$222.00
$222.00
34th St.
1216
X
$222.00
$222.00
P. 15
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREET$
SECTION Illa - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54490 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
AT 1 FY GRADING;
MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Length
Address (rni)
1214
Width
(ft)
0
3
z
r
�
N
j
N
ro
1 si
Q
E2
U
N
O
c
Q
in
33rd St.
X
$222.00
$222.0.0
33rd St.
9112
X
$222.00
$222.00
32nd St.
914
X
$222.00
$222.00
31 st St.
916
X
$222.00
$222.00
25th St.
1101
X
$222,00----
$222.00
25th St.
925
X
$222.00
$222.00
25th St.
922
X
$222.00
$222.00
26th St.
926
X
$222,00
$222.00
26th St.
1023
X
$222.00
$222.00
26th St.
1102
X
$222.06
$222.00
Bellevue St.
909
X
$222.00
$222.00
Bellevue SL
1105
X
$222.00
$222.00
St Joe St.
1513
X
$222.00
$222.00
Dayton St.
114
X
$222,00
$222.00
Carroll St.
1814
X
$222.00
$222.00
Columbia St.
1812
X
$222.00
$222.00
Bowman St.
237
X
$222.00
$222.00
30th St.
505
X
$222.00
$222.00
30th St.
621
X
_
$222.00
$222.00
30th St.
711
X
$222.00
_.
$222.00
301h St.
815
X
_
$222.00
$222.00
29th St.
805
X
$222.00
$222.00
29th Si.
729
X
$222.00
$222.00
29th St.
505
X
$222.00
$222.00
29th St.
617
X
$222.00
$222.00
28th St.
513
X
$222.00
$222.00
28th St.
601
X
$222.00
$222.00
28th St.
723
X
$222.00
$222.00
Sheridan Ave.
840
X
$222.00
$222.00
Samp[e St.
3921
X
$222.00
$222.00
$222.00
36th St.
628
X
$222.06
36th St.
522
X
$222.00
_
$222.00
35th St.
J
510
X
$222.00
$222.00
P. 16
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ella - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section Il, with additional Information on individual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only ifknown)
Road /Street
Address
Length
(mi)
Width
(ft)
g
U
U
z
C
a
c
a
`t
n
W
�
V
U)
a
r
m
N
LL
E
c
U
N
id
¢
�
N
J
¢
CL �
a
Sit
¢
rJ
U
_
r°
35th St.
618
X
$222.00
$222.00
35th St.
732
X
$222.00
$222.00
35th St.
834
X
$222.00
$222.00
35th St.
511
X
$222.00
$222.00
34th St.
609
X
$222.00
$222.00
34th St.
745
X
$222.00
$222.00
36th St,
602
X
$222.00
$222.00
36th St.
722
X
$222.00
$222.00
36th St.
721
X
$222.00
$222.00
36th St.
1014
X
$222.00
$222.00
Pleasant Si
3610
X
$222.00
$222.00
35th St.
924
X
$222.00
$222.00
35th St.
1038
X
$222.00
$222.00
35th St.
1110
X
$222.00
$222.00
35th St,
1218
X
$222.00
$222.00
34th St.
1230
X
$222.00
$22100
34th St.
1022
X
$222.00
$222.00
34th St.
1118
X
$222.00
$222.00
Mishawaka Avd
3318
X
$222.00
$222.00
Vine St.
2811
X
$222.00
$222.00
Vine St.
2902
X
$222.00
$222.00
Pleasant St.
2901
X
$222.00
$222.00
Pleasant St.
2813
X
$222.00
$222.00
Vine St.
2810
X
$222.00
$222.00
27th St.
1302
X
$222.00
$222.00
Nursery Ct.
2814
X
$222.00
$222,00
23rd St.
1023
X
$222.00
$222.00
21 st St.
1001
X
$222.00
$222.00
Bellevue St.
1005
X
$222.00
$222.00
Bellevue St.
1014
X
$222.00
$222.00
Bellevue St.
1105
X
$222.00
$222.00
Bellevue St.
1110
X
$222.00
$222.00
Esther St.
917
X
$222.00
$222.00
P. 17
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part d State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
m I FV l:RAnI1Jr;
MOTOR VEHICLE HIGHWAY FUND
ROAD/STREET PROJECTS
Location of Project Area Type of Work
Project Cost (Provide this information onlyifknown)
Road /Street
G
2 6
O
n
U :o
Length Width g
Address (mi) (ft) z s
't
a,
77
r
v
t
U)
m
�
F
-0
v
'¢
`tl
u
p m
m
E2 5i
c ¢
U
°
J
¢
a
C
E
m
ui
¢
of F
X
$222.00
$222.00
rSSt.631
614
X
$222.00
$222.00
516
X
$222.00
$222.00
Broadway St.
116
X
$222.00
$222.00
30th St.
610
X
$222.00
$222.00
Mishawaka Av
2917
X
$222.00
$222.00
32rd St.
1008
X
$222.00
_ $222.00
32nd St.
914
X
$222.00
$222.00
34th St.
1109
X
$222.00
$222.00
34th St.
932
X
$222.00
$222.00
36th St.
914
X
$222.00
$222.00
24th St.
812
X
$222.00
J $222.00
Donald St.
812
X
$222.00
$222.00
Haney St.
533
X
$222.00
$222.00
Indiana Ave.
717
X
$222.00
$222,00
Indiana Ave.
625
X
$222.00
$222.00
Indiana Ave.
509
X
$222.00
$222.00
Indiana Ave.
205
X
$222.00
$222.00
Indiana Ave.
411
X
$222.00
$222.00
Indiana Ave.
307
X
$222.00
$222.00
Dubail Ave.
965
X
$222.00
$222.00
Indiana Ave.
718
X
$222.00
$222.00
Albert St.
521
X
$222.00
$222.00
Albert St.
617
X
$222.00
$222.00
Al bert St.
733
X
$222.00
$222.00
Albert St.
819
X
$222.00
$222.00
Edison St.
723
X
$222.00
$222.00
Edison St.
841
X
$222.00
$222.00
Fellows St.
1810
X
$222.00
$222.00
Calvert St.
308
X
$222.00
$222.00
Main St.
1121
X
$222.00
$222.00
Main St.
1201
X
$222.00
$222.00
Ewing St.
1119 ___
X
__
$222.00
AM
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Illa- CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
ALLEY GRADING
MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Locaticn of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Length
(ml)
Width
(ft)
O
U
i
3
z
C
O
L
a
py
m
eY
C
N
w
X
T
al
m
F
=
LL
�
O
G
U
id
¢
°-
Q
-
-
F
Ewing St,
9 001
$222.00
$222.00
Donald St.
809
X
$222.00
$222.00
Donald St.
903
X
$222.00
$222,00
Ewing St.
302
X
$222.00
$222.00
Ewing St.
418
X
$222.00
$222.00
Ewing St.
518
x
_$222.00
_
$222.00
Ewing St.
604
_
X
$222.00
_
$222.00
Altgeld St.
546
X
$222.00
$222.00
Altgeld St.
302
X
$222.00
$222.00
Altgeld St.
546
X
$222.00
$222.00
Altgeld St.
702
X
$222.00
$222.00
Victoria St.
902
X
$222.00
$222.00
Woodside St.
302
X
$222.00
$222.00
Woodside St,
416
X
$222.00
$222,00
Woodside St.
202
X
$22100
$222.00
Irvington St.
530
X
$222.00
$222.00
Irvington St.
646
X
$222.00
$222.00
Eckman St.
802
X
$222.00
$222.00
Eckman St.
926
X
$222.00
$222.00
Oakside St.
1022
X
$222.00
$222.00
DonmoyerAve
1021
X
$222.00
$222.00
Indiana Ave.
1223
x
$222.00
$222.00
Indiana Ave.
1167
X
$222.00
$222.00
Dubail Ave.
1212
X
$222.00
$222.00
Dubail Ave.
1312
X
$222.00
$222.00
Dayton St.
1352
X
$222.00
$222.00
Dayton St.
1316
X
$222.00
$222.00
Randolph St
1212
X
$222.00
$222.00
Randolph St.
1316
X
$222.00
$222.00
bowman St.
1426
X
$222.00
$222.00
Calvert St.
1401
X
$222.00
_
$222.00
Calvert St.
1353
X
$222 -DD
- ---
LA
$222.00
Ewing St. 1 1381 11 1 �_ _.1 X 1 1 11 _.., { $222.00 I L__1 $222.00 II
P. 19
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Illa - CONSTRUCTION AND RECONSTRUCTION
Part of Stata Form 54490 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
ALLEY GRADING
MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only ifknown)
Road /Street Address
Altgeld St. 133
Length
(mi)
Width
(ft)
C
O
U
G
z
3
..
�
.0
N
�
G
�
ca
?
F
�
�
Q
�
L
_
�
c
U
0
�
¢
a
J
¢
C
W rr
Q
Q
U
�
X
$222.00
$222.00
Altgeld St. 110
X
$222.00
$222.00
Victoria St. 140
X
$222.00
$222.00
Fairview St. 114
X
$222.00
$222.00
Fairview St. 201
X
$222.00
$222.00
Fairview St. 502
X
$222.00
$222.00
Irvington St. 517
X
$222,00
$222.00
Irvington St. 601
X
$222.00
$222.00
Fairview St. 728
X
$222.00
$222.00
Irvington St. 801
X
$222.00
_
$222.00
Irvington St, 901
X
$222.00
$222,00
Fairview St. 906
X
$222.00
$222.00
Irvington St. 136
X
$222.00
$222.00
St Joseph St. 202
X
$222.00
$222.00
Farneman St. 114
X
$222.00
$222.00
Michigan St. 3110
X
$222,00
$222.00
Irvington St. 902
X
$222.00
$222.00
Irvington St. 802
X
$222.00
$222.00
Woodside St. 829
X
$222.00
$222.00
Woodside St. 921
X
$222.00
$222.00
Haney St. 1112
X
$222.00
_
$222.00
Marine St. 1614
X
$222.00
$222.00
Indiana Ave 1216
X
$222.00
$222.00
Dubail Ave. 1224
X
$222.00
$222.00
Dubail Ave. 1324
X
$222.00
$222.00
Dayton St. 1332
X
$222.00__
$222.00
Dayton St. 1112
X
$222.00
$222.00
Milton St. 1150
X
$222.00
$222.00
Calvert St. 1114
X
$222.00
22.00
Ma0eSt. 1903
X
$222.00
r$2222.00
Leer St. 1906
X
$222.00
$222.00
Leer St. 2014
X
.
$222.00
$222.00
Fox St. 1222
_
f
X
$222.00
$222.00
P. 20
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8-10)
NOTE: These are the same funds reported in Section II, with additional f nformation on individual projects.
ALLEY GRADING
MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project Area Type of Work
Project Cost (Provide this information only if known)
C
O
_i O ay
Length Width g r m
Road /Street Address (mi) (ft) z � 0r
Ewing St. 1229
E
ctl
E
0
X
?,
E
F
m
v
4
u_'
o
c
U
¢
a
¢
°�
C
a
¢
CL
$222.00
$222.00
Donald St. 1156
X
$222.00
$222.00
Fox St. 1161
X
$222.00
$222.00
Donald St. 115
X
$222.00
$222.00
Donald St. 237
X
$222.00
$222.00
Fox St. 202
X
$222.00
$222.00
Fox Si. 921
X
$222.00-----
$222.00
Fox St. 811
X
$222.00
$222.00
Bowman St. 901
X
$222.00
$222.00
Altgeld SL 201
X
$222.00
$222.00
Victoria St. 201
X
$222.00
$222.00
Irvington St. 301
X
$222.00
$222.00
Victoria St. 302
X
$222.00
$222.00
Victoria St. 502
X
$222.D0
$222.00
Fairview St. 637
X
$222.00
$222.00
Fairview St. 713
X
$222.00
$222.00
Eckman St. 132
X
$222.00
$222.00
Eckman St. 231
X
$222.00
$222.00
Oakside St. 201
X
$222.00
$222.00
Oakside St. 236
X
$222.00
$222.00
Woodside St. 303
X
$222.00
$222.00
Donmoyer Ave 502
X
$222.00
$222.00
Eckman St. 502
X
$222.00
$222.00
Oakside St. 613
X
$222.00
$222.00
Woodside St. 902
X
$222.00
$222.00
Haney St. 1112
X
$222.00
$222.00
Bowman St. 1122
X
$222.00
$222.00
Leer St. 1911
X
$222.00
$222.00
Bowman St. 1224
X
$222.00
$222.00
Donald St. 1450
X
$222.00
$222.00
Fox St. 1311
X
$222.00
$222.00
Donald St. 1224
X
$222.00
$222.00
Fox St. 1312
X
$222.00
$222.D0
P. 21
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROAD$ AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on Individual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADlSTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information onlylfknown)
RoadlStreet 1
Address
Length
(mi)
Width
{ft)
o
-
in
(]
z
G
�
d
d
o!
N
E
m
E
U
rn
T
�l]
U
r
�
<
LL
m
U
5
m
itl
SC
¢
9
2
c
m
a
ff
SF.I
o
U
Fox St.
1.426
X
$222.00
$222.00
Leer St.
1422
X
$222.00
$222.00
Bowman St.
129
X
$222.00
$222.00'
Donald St.
228
X
$222.00
$222,00
Donald St.
119
X
$222.00
$222.00
Fox St.
822
X
$222.00
$222.00
Fox St.
926
X
$222.00
$222.00
Calvert St.
1012
X
$222.00
$222.00
Bowman St.
1018
X
$222.00
$222.00
Calvert St,
1410
X
$222.00
$222.00
Ewing St.
1012
X
_
$222.00
$222.00
Ewing St.
934
X
$222.00
$222.00
Ewing St.
822
X
$222.00
$222.00
Ewing St.
724
X
$222.00
_
$222.00
Ewing St.
634
X
_
$222.00
$222.00
Altgeld St.
635
X
$222.00
$222.00
Aitgeld St.
901
X
$222.00
$222.00
Altgeld St.
922
X
$222.00
_
$222.00
Altgeld St
818
X
$222.00
$222.00
Addison St.
4005
X
$222.00
$222.00
Addison St.
3909
X
$222.00
$222.00
Addison St.
3815
X
$222.00
$222.00
Addison St.
3711
X
$222.00
$222.00
Addison St.
3621
X
$222.00
$222.00
Addison St.
3527
X
$222.00
$222.00
Michigan St.
3210
X
$222.00
_
$222.00
Eckman St.
902
X
$222,00
$222.00
Oakside St.
1018
X
$222.00
$222.00
Michigan St,
2408
X
$222.00
$222.00
Broadway St.
1130
X
$222.00
$222.00
Haney St.
1217
X
$222.00
$222.00
[ndiana Ave.
1118
X
$222.00
$222.OD
Indiana Ave.
1322
X
$222.00
$222.00
P. 22
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Illa - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Locat[on of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Length
(mf)
-
Width
(fl)
�
U
z
c
4
N
o
p7
.v
-
N
v
0�
C
E
F-
U
E
>
co
T
ro
U7
V
Liz:
E2
d
�
7
¢
W
F
ar
LL
p
U
a
N
4
¢
Q
- `o
fl
J
¢
a..
�
0.
.5
Cr
W
¢
w
p
0
o
Indiana Ave.
1316
X
$222.00
$222.00
Dubail Ave.
1343
X
$222.00
$222.00
Dubail Ave.
1436
X
$222.00
$222.00
Randolph St.
1215
X
$222.00
$222.00
Bowman St,
1152
X
11
$222.00
1
$222.00
Donald St.
1345
X
$222.00
$222.00
Donald St,
1405
X 1
$222.00
$222.00
Fox St.
1146
X
$222.00
$222.00
Ewing St.
1148
X
$222.00
$222.00
Angela Blvd.
549
X
$222.00
$222.00
Angela Blvd.
429
X
$222.00
$222.00
M[nerSt.
1306
X
$222.00
$222.00
Sunnymede Av
306
X
$222.00
$222.00
McKinley Blvd.
1402
X
$222.00
$222.00
McKinley Blvd.
1722
X
$222.00
$222.00
Wall St.
1425
X
$222.00
$222.00
25th St.
529
X
$222.00
$222.00
25th St,
610
X
$222-00
$222.00
28th St.
705
X
$222.00
$222.00
Irvington St.
119
X
$222.00
$222.00
Ewing St.
1230
X
$222.00
_
$222.00
Ewing St.
1610
X
$222.00
$222.00
Ewing St.
1702
X
_$222.00
$222.00
Ewing St.
1818
X
$222.00
$222.00
AltgeEd St.
1309
X
$222.00
$222.00
Corby Blvd,
1346
X
$222.00
$222.00
Howard St.
1342
X
$222.00
$222.00
Wilber St.
645
X
$222.00
$222.00
Orange St.
2517
X
$222.00
$222.00
Kaley St.
1220
X
$222.00
$222.00
Elwood Ave.
3515
X
----FF
$222.00
$222,00
Johnson St.
1750
X
$222.00
$222.00
Kin}ron St
1510
X
$222.00
$222.00
P. 23
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section 11, vfth additional information on f ndividual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Tye of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Length
(mi)
Width
(ft)
o
p
3
z
S
=
2
X
w
�
ar
4
in
T
Co
r
=
-5
�
z
U
N
¢
¢
a
E
E
4
a
?
°
Angela Blvd.
506
X
$222.00
$222.00
Osfemo PI.
404
X
$222.00
$222.00
Ostemo PI.
332
X
$222.00
$222.00
Sommers St.
419
x
$222.00
$222.00
Olive St.
2322
X
$222.00
$222.00
Olive St.
2232
X
$222.00
$222.00
Portage Ave.
1616
X_
_ $222.00
$222.00
Ford St.
2414
X
$222.00
$222.00
Ford St.
2510
X
$222.60
$222.00
Huron St.
2626
X
$222.00
$222.00
Olive St.
128
X
$222.00
$222.06
Kale St.
1227
X
$222.00
$222.00
Prast St.
2614
X
$222.00
$222.00
Fredrickson St.
2629
X
$222.00
$222.00
Prast St.
2110.
X
$222.00
$222.00
1501
X
$222.00
$222.00
Huey St.
1423
X
$222.00
$222.00
Wellington St.
1418
X
$222.00
$222.00
Wellington St.
1513
X
$222.00
$222.00
Illinois St.
1414
X
$222.00
$222.00
Kinyon St.
1523
X
I
I
I
$222.00
$222.00
Wilber St.
1421
X
$222.00
$222.00
Wilber St.
1507
X
$222.00
$222.00
Lafayette Blvd.
621
X
$222.00
$222.00
Angela Blvd.
302
X
$222.00
$222.00
Angela Blvd.
420
X
$222.00
$222.00
Angela Blvd.
709
X
$222.00
$222.00
Angela Blvd.
429
X
$222.00
$222.00
Angela Blvd.
513
X
$222.00
$222.00
Angela Blvd.
619
X
$222.00
$222.00
Angela Blvd.
801
X
$222.00
_ _
$222.00
Hawthorne St.
206
X
$222.00
$222.00
Hawthorne St.
310
X
$222.00
$222.00
P. 24
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54490 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only ifknown)
RoadlStreet
Address
Length
(ml)
Width
(ft)
E
z
t
N
w
N
ti
U
c
U
m
¢
nJ
¢
�
C
E
¢
-J
>2
32nd St.
918
X
$222.00
$222.00
33rd St.
642
X
$222.00
$222.00
Logan St.
1105
X
$222.00
$222.00
Logan St.
1021
X
$222.00
$222.00
Mishawaka Avf
1413
X
$222.00
$222.00
Mishawaka AvE
1311
X
$222.00 „
$222.00
Main St.
3206
X
$222.00
$222.00
Michigan St.
3209
X
$222.00
$222.00
Main St.
3443
X
$222.00
$222.00
Main St.
3120
X
$222.00
$222.00
Main St.
3014
X
$222.00
$222.00
Main St.
2900
X
$222.00
$222.00
Main St.
2722
X
$222.00
$222.00
Michigan St.
2713
X
$222.00
$222.00
Michigan St.
2829
$222.00
$222.00
Fairview St.
107
$222.00
$222.00
$222.00
Ewing St.
225
Ix
$222.00
Ewing St.
317
$222.00
$222.00
Franklin St.
1930
X
$222.00
$222.00
Franklin St.
2019
X
$222.00
$222.00
Franklin St.
2124
X
$222.00
$222.00
Franklin St.
2222
X
$222.00
$222.00
Franklin St.
2010
X
$222,00
$222.00
Franklin St.
2185
X
$222.00
$222.00
Franklin St.
2213
X
$222.00
$222.00
Ewing St.
419
X
$222.00
$222.00
William St.
1930
X
$222.00
$222.00
William St.
2012
X
$222.00
$222.00
Sheridan St.
840
X
$222.00
$222.00
s St.
833
X
$222.00
_
$222.00
klin St.
1715
X
$222.00
$222.00
klin St.
L
1835
X
$222.00
$222.00
klin St.
1635
X
$222.00
$222.00
P. 25
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Illa - CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54400 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on Individual projects.
ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND
ROADISTREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
Road /Street
Address
Length
(mi)
Width
(ft)
O
2
3
z
O
rz
�
N
N
[D c�
0
w
- -5
H
�
.9
�
ii
O
U
�
U
N
ig
�
¢
a
N
J
¢
-J
i=
E
6
W
¢
°�
O
U
3
F
William-St..---
1633
X
$222.00
$222.00
William St.
2215
X
$222.00
$222.00
Taylor St.
1916
X
$222.00
_
$222.00
Taylor St.
2010
x
$222.00
$222.00
Jackson St.
437
_
X
$222.00
$222.00
Sheridan Ave.
840
X
$222.00
$222.00
Illlnols St.
843
X
$222.00
_
$222.00
Indiana Ave.
2011
X
$222.00
$222.00
Indiana Ave.
2109
X
_
$222.00
$222.00
Indiana Ave.
1925
X
$222.00
$222.00
Taylor St.
1615
X
$222.00
$222.00
Indiana Ave.
618
X
$222.00
$222.00
Scott St.
1316
X
$222.00
$222.00
Calvert St.
1613
X
$222.00
$222.00
Emerson St.
813
X
$222.00
$222.00
24th St.
601
X
$222.00
$222.00
27th St.
930
X
$222,00
$222.00
Home Ct.
2817
X
$222.00
$222.00
30th St.
1215
X
$222.00
$222.00
29th St.
518
X
$222.00
$222.00
South St.
614
X
$222.00
$222.00
South St.
416
X
$222.00
$222.00
Tutt St.
127
x
$222.00
$222.00
TOTAL MVH FUNDS FOR ROADISTREET CONSTRUCTION AND RECONSTRUCTION $
$114,996
P. 26
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION Illa- CONSTRUCTION AND RECONSTRUCTION
Part of State Form 54490 (8 -10)
NOTE: These are the same funds reported in Section II, with additional information on individual projects.
CRACKSEALING MOTOR VEHICLE HIGHWAY FUND
ROAD/STREET PROJECTS
Location of Project
Area
Type of Work
Project Cost (Provide this information only if known)
c
Road/Street
From
Road /Street
-
To
RoadlSteet
Length
(mi)
Width
(ft)
C
O
5
E
o
U
3
z
C
o
n
r
rY
a)
q
N
ar
°
E
m
a
in
I—
v
p7
¢
u�
o
U
¢
-J
¢
W
¢
a
N
U
z
�2
Chapin St.
Western Ave.
Sample St.
2500
64
$940.00
$940.00
Sample St.
Chapin St.
Grant St.
5738
50
$1,316.00
$1,316.00
Orkney Dr.
York Rd.
McDougall Cf,
480
25
$564.00
$564.00
Mary Ct.
New Energy Dr.
W. to CuIDeSac
650
36
$582.80
$582.80
Youngs Ct.
New Energy Dr.
W. to CuIDeSac
1000
36
$639.20
$639.20
Michigan St
Chippewa Ave.
Broadway St.
8690
52
$3,384.00
$3,384.00
Michigan St.
Broadway St.
Sample St.
1825
65
$1,034.60
$1,034.00
TOTAL MVH FUNDS FOR ROADlSTREET CONSTRUCTION AND RECONSTRUCTION $
$8,461}
P. 27
z
D
t=
W W n Z)
a. �i h
�nz �
100
Zap N
Qp °z z
0a _rn
W z O
0.J 0 Q
U U
?Ow a
zwF- 0
a LL °
v
m
z
D
F
U
W
N
}so0 le }as
o
m o
o
o
o
n
CD
0 O
CO C�
o O
0 0
a
0
Q
o
o a
O
C)
rn
f-- O
n m
C)
Q
n
O Q
n Cl
O UD
CD m
N
n
o
O
n a
c0 a)
d:
d-
O O
-t Lo
r-
oo
cc C
Mm
Cl n
W
m
uu) -
LO
M
m
i'n r
c*7
n
co
�r
c
m
u>
n u
EA
Lr3 (o
V3
E9
tc, H9
N
64 b9
FfT
E9 N
auawdpb3 ydl
C)
o
c
c
°
O
t
N
c
c
cl
H
loge- HdZ
°o
b
c0
c
C
u
6
sNPIEM vcP
cD
o
o
c
c
c
Cl
Ln
d-
c
u
E
IMO-L 10RAL100
Q
O
m O
.q O
O
Q
O
cD
O
0
O O
0 O
O
O
O
O
O c
O c
O
W
n O
I- co
Q
d
n
c 0
0
6 co
0 co
N
n
O
O c
n c
o:
cc ai
v_
v
o
�- Lo
n
w
-c r
co
r- n
l
N
ui
ni do
v
-:i
rn
Lo
m
r-
m
' Q
rn
um-,
N
e3
FF3 c9
E9
H3
64 64
64 E»
rfl
V3
(n c
pasty pid ieaapaj
x
x
x
x
x
/48JES 1 01}}e1l
x
x
x
x
x
x
ueLu sail aos ing
6u ine}lnsaa
x
uoi�e�p �geyay
x
x
x
x
x
uogonl}su0o MaN
x
x
L
C
O
}
C
d'
c
C G
C co
C
a
C
N
E
N
E
E
S- E
mr
C
m
r C
u
N
o
C
m m
G G
m o)
G'
o
C
v�
co
�
m
E
C
C
O
�
C
O
L
p
O
rn
"ca
m
v
C
r
m O
C J
F
m
U_
U
C
N
N
�
}
Q
N
ca
C
N
N
`
N
m
w
N
'L3
p
fG
q� co
E
N
m
W Ef
c
Y C
U
c
U
C
cry �
F
U
C
N
m
}
to
C
_ U
B Y
7
}
Q
t
LJ
m
O
m
m
E
O F
-o F
75
C: C
U
O
-C7 ti
C1
U
G] 67 C
47
}
1 N
N E2
g
a)
t
C C
U w
N
N 7 v
N 2
O
7 U G
d
N
O L C
D
.+
—
O N
N
�J
C
U
w
N m
c�4
m C rn
J
'B
EL��¢
d)
CCL�
7
�LYz
N O�'
W
O
In
C
W
a;
F
a
0
to
0
M
C
V
LL
Z
N
U
K
r
U)
Z
O
U
W
rA Q
ne
0�o
N
� � U
z oH
a zo
a
Lu
a
J
OQ= �
U- Z m
Q O O u
Z Q w m
a CLlnr
;SOO IP ;ol
es cf.
;uewdlnb3 Vdl
Fogel Vdl
JOgel Vdl
lalo-L ;oPiluoo
IP }OI ;OSJ;UO3
rl-
Paso piv lejapad
AlajeS 1 O!}}eal
uawleaay ooelinS
6uloe�nsa�3
uo!lelll ?gP4ai!
uol;onjlsua0 MaN
G
�
C '�=
1
I
J
m
0
F
N
m
�-0
00
N
O
fY
r v m U c u m
L L
;sOO le101
;uewdlnb3 ddl
JOgel Vdl
IP }OI ;OSJ;UO3
rl-
uo6l u}e l
LWAK
O; Iaap}og�eneJ tiC � sy0 naa
� v � a g F � E N O o o � N m Tp
�
C �
r
O
C'j N
L
45 C 2 C 0 U O O N
C
� O
"O
N C
FA O
U
w
r,
IL
F
Q
n
m
N
0
C4
r
C
LL
It
fr
a
Q
a
N
V
U-
LL
U
a
F
z
z
0
U
W
1-3-Z
CC tu
0 W a
z
��0
E-
zap
ON
0
a
0
o
UJ X
n -=
0a=
J U Z
<00
a0U)
iso0 lelol
Ea �s
luewd!nb ydl
aoge-{ 'ddl
lelol
PaSfi P!V 11
f4el2s 1
uoponilsuao MON
v> cf
juawd!nb7] Vdl
J0921 Hdl
sle!aaleW Ndl
11310_L JOWIu00
L
[A 6
'D
l+laluS 1 og L)l
uaw }eai_L eaepnS
bu!ae}i nse'd
i m
uo!le3!I!gLq[M
m
c"
E
J
L
�
'6
J �
i
�
N
'O
m
o
m
2
12
o
v
2
w a
D-
E m
O
O
N
U7
m
N
u
v
2 T
u
W
Er
o
co
o m
c
u
y
ca
C
4
CO
CD
� 7
II
o �
a
� r �
Q J
c
Q
[1]
r-
0
u
N (D
D
O �
V y
rn
o
5=
O Er�j
U �
D
C
N D
C u,
O
U
O
a
N
�7
LL
LL
asoo lelol
v> cf
juawd!nb7] Vdl
J0921 Hdl
sle!aaleW Ndl
11310_L JOWIu00
[A 6
Paso P!V iwapad
l+laluS 1 og L)l
uaw }eai_L eaepnS
bu!ae}i nse'd
uo!le3!I!gLq[M
E
uoponilsuoo MON
L
�
'6
J �
i
'O
m
12
v
2
D-
E m
O
O
U7
m
r. JU
i
i
1
S
i
i
s
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION IV - CLASSIFICATION OF HIGHWAY OR STREET EMPLOYEES
Part of State Form 54400 (8 -10)
Work Classification
Number of Employees
Full Time Part Time
(Man Months t Year
Highway Director *
0
Supervisor(s) - Managers
3
Assistant Supervisor(s)
1
Engineer(s) - FTE
0
Assistant Engineer(s)
0
Clerical Assistant(s)
0
Foremen
3
Truck Drivers
24
Equipment Operators
8
Garage Mechanics .
0
General Laborer(s)
1
5
List others:
Fiscal Officer
1
Accounting Clerk
1
Sign Artist
1
Operation Technicians
4
Signal Technicians
3
Highway Director retired in December, 2011. One of the managers
serves as interim Highway Director
Total
49
6 .
P. 31
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION V- EQUIPMENT INVENTORY
Vart o15Y1e Form iR :00 ( &10)
8ereau Of SUe
Unit No
=Is
Mske
Model
Deserl Uon
Yearof
Manufacsrre Purchase
Ac6ua[Costrll
r/ frade
201
FORD
EXPLORER
4X4 SUV
2007
._.......�.........
2007
$20,OOD.00
............. ..�..- ..- .�..,.- ..- .,..,.
............. 02 - -' -
........ ...........
FOR..... _. ...... .......
FORD
.., ... ,..,. -. -.-.- ....................,......
F250
......_._.___.__._.._.........,
4X4 PICKUP
.,... -..._ --
2004
-_._ � ...,......,-
2004
- -- - --
522,720.00
- ------------ -. -_..
.......203 .- .-
.,. -_.... FDRD ,._...._.....,..,..,..,..F25o
°_ ....... .....................
.... _ .... ...... ,...........
4X4 PICKUP
.. -.... _- ._
2004
�.- .............
2004
,..,...... ......
$22,720,00
................
............ 204 ...............
.... ..... ..................
CHEVROLET
............_..-.;...-............,.-...-.,.-,
2500
................ ,....... ,.............._..
4X4 PICKUP
.- . -�.�_.
2002
u- ................
2002
.
$24,148.90
..
..... .-. - ............
204R
........... . .........
MAULOIN
40.... ...... ...........
_ ............ -
2TON ROLLER
tee5
Y Y.Y..
195...-
$0.635.00
.. .-
205A
..
...-
CHEVROLET
u. u.. Y.. ............
4590
. ...............
1 TON DUMP
2004
2004
$42,270.00
HONDA
NIA
PLATE COMPACTOR
1993
....... ......
1993
.,.
$1,150.00
-' -$42 �........._..
.- ..- .- ......-
20sACHEVROLET
_ ..
. .......... ...............
4600
...... ._
1 TON DUMP
2094
2004
270.00
2O80 1 3
M B W
APZD00
PLATE COMPACTOR
2002
u �_Y --
2002
-2001 -
$1,41500
-510,4......-._.
2050
_.......,. -- -- . - -. -.
INGERSOLL RAND
.. ............. .
185 - -
- -- AIR COMPRESSOR
�.._
2001.....
.....1989........... -
.,.1959 -._
00 00
._.$1,0�..._._._...
.. -. 2960._..
.- ._.NULLAIR- _- ..�..� - .........
h1PB90 .. ...... .....
......_AIR HAMMER
.....1..... ..... ...
-- .188..._..
K.0 a
...................
.. -. 20sE ...............
SULLAIR........- ................MP......
.. -.. ........
,.__._.AIRIiAMMER- _........._....
..- ....- .- ...,-- .--
9
...,.- - -....
$1 58p.00
._...._._,.- _.._._._.
_....... -
206 y
_ .,. �_. � ................._
SULLAIR
�.-.,..-.,.-.-..-.....___._.._.-..-..-.-.-.-...,._.-.-.......................,
MPB90
.............
................. ..---'2014..
�.
........ ,............
.....
. ..................
BOX - ~_
.................-
. ..... - . .... - -.-.......
.._...._._.._..-
$21,093,00
...._. -.....
287A
....,...
CHEVROLET W . ... ..........
....... .. .. ... ....... _ .......
4509
,........... ,.... _..,.- ,.-............
1 TON DUMP
.._._.......-...,..,
2064
............ _........._.._
2004
._._........................
$42278.00
................
207E
...... ............................ ...................
SULLAIR
..._.._.._. __._-
MPB90
...,..,......- ..........__
AIR HAMMER
........
1989
....... ,... .- .- .. ... ....
1989
....... .......
$1,o00.D0
... .. ....... ............
.._ ............................-._..--.
28TH
�..__. �_.�.,.-
SULLAIR
...,.- ...- .- .- .-- .._.__ - _.,
MPB 90
....... ,............. .., ..........
AIR HAMMER
1980
1989
$1,00D.00
207118
KM
80007
PATCH BOX
2602
2002
N!A
2078
MAULDIN
4000
2TON ROLLER
2001
..............
2801
,............._............,.
$14,850.00
............ ... ...
203
.. ..
.°-._- _•__....,................ -..
CHEVROLET
.. - _ ...., ..,.-,..,.-...,-
-.- . -._ _._._._.
2500
�-.-..._..._ ..........................
4X4 PICKUP
... _.-... .... ._...
2002
.........._ ....
2082
..............
$24,148.00
.,..,................ -. -..
203..6..
--'--._ � ...................................._
MBW
..._._._._._._.- ...- ..-
AP2505
.- .....� _-_...........,......,.......... .......-- .-
PLATE COMPACTOR
. ...... --
2003
2003
$1,475.00
....................
299
"__ ._.........,...,....................
FORD
.................... ........
F250
... -,...... ----------------------- .-
W4 TON 4X4
.-................ ..................
2011
2071
........._..........--
..................... ..
$28,826.74
..- .�...-
...- ._ .... ..... ...
2090
... _. �...........,...,........,. ...- ..-
INGERSOLL RAND
.,_- ____._._._.,.. -. -... - ...,.-
1n5
...- -.. -._ ...........,......................,.-...--..............._._._.,...,..,...
AIR COMPRESSOR
1004
-.... -.-
1994
-1992.. -.
$9,115.00
....-
....- .209D
w_Y..u. SULLAIRMP89D
....... .....
... ..... -~AIR HAMMER.- ..- .- ._- .-
... - -.• 1092
. -. -..
$2,500.09..•
..- .....- ...,...- .........
... ........ .... ......
209E
........_..........................-,..-_...___._._._._..._.,......,......._................,......,...............--.......
SULLAIR
MPI'90
AIR HAMMER
......_..__.._.,.__.,...-
1092
1992
$2,500.00
..- _209H -. - -
-� Y.Y.- SiILLAIR ..... .. ....
.. . ... MPB90........ ..........~
'AIRHAMMER............-
...• -. -i 0Be .... ..-...989...
,. _.,.....,.....
......................-
- -..- $1.000,00..5
.- ._....
......... .. ..........
209HB
--.. .._.............- ......- . -. -. -.
FALCON
_- _- .__.__._._._.- .- .- ... - -.,.-
RMI-
-.-.._..._._............,.... ....- .......
PATCH BOX
.. ..............
2015
201D
$21,093,00
..... ....-
B..... NG.- .--
... -__... 8308 ......... ... . ...
.... .- -~3TON ROLLER ..- ._.--
... -. -. 2903.__,._.
-, 2003 ....
..2D06 -.
...- $16.................
590.00
-- ~.529......-._.....
... -_21V -_.�.-
.CHEVROLET .- ..
-..- _._.2500 .. .... ... . ......
. .. .�_ 4X4 PICKUP.-..-.-.-.-.-
...- ...2O8e..._...._-
_65.00
21OBB
WA
HONDA
PLATE COMPACTOR
1994
-
1994
-- --
St ,225.U0
- -^-
--
2100
--
INGERSOLLRAND
-----1^ - --
85
-^ -~-A
IR COMPRE391IR
-•- •---
1995
1995
90.00
19,111,1.
-. -.
-..........--.--.
210R
............ _ ... ,.--.,..,.-.-.- .._.__.__..._.,._.,--
BEUTHLING
.- . -..,.. -
I33DD
-- ,....... --- ............ ....... .-..._.----
3TON ROLLER
..... -. ...
2583
..,.....,. .,......--
2D03
'- _..............
$16,590,00
..- .....,� --_
211'
.......... .... ........................... ...............
FORD
.... .. ........ .. .............._..........
F45D
..,..,.....,..,.......- ._ -. -
FLATBED UTILITY
- -- --- ...._...._..,..,.
2011
_.--_.,.... .........--
2011
..-
$31,674.13
-.-
.....2120 Y
............................
CHEVROLET ..-
___.,.- 4500,......,.... ...-.
_..- .......1 TON DUMP...-.-._...
- ........2004.__ -
.,...2004,..,..
-.- 342............
,270.90
........-- ...._..._.
.- ._. -_ - --
212C
.�.�..�..�..� .... ...... . .. .. ._ ..___._.,.-
INGERSOLL RAND
.- ...- ..- .... -. - _.
1R5
-. -.._ .................................
AIR COMPRESSOR
....... . .......... .....
2001
,... ,..........
2001
-
$10,400.00
. -.
..... -.� -__�
212E
.. ............_......--....--..__,.._.__.__..._.,.._...,.................._........................,............._..._...._..........
SULLAIR
MPB90
AIR HAMMER
.... ...............
1992
1992
..- .- .._..- ........�
$1,160.00
....._212H .................
SULLAIR . -. -_..
_... .... MPB98........- .-
.., -...., .... AIR HAMMER .._- .. -. -_..
_....1989 . -.,
1989....
-. . -$1 000
.,- ._.__.....
��.
212H8
........ �� .............'-----.-.-.-....,.
KM
... _., ................. ....__.
8008T
���.................... ,.......... .........
PATCH BOX
.... ,............. ,.- . ...
2062
,... ,.... .......
2002
.
$13,90u.00
_ "-
- 219.,._.-
...,..,.... ..CASE ._ . ....
............ 580...... . -.__ _.....,...--...-.
BACKHOE...._...... ...____..1998........r7996
-....
-.-
$53.724.0'»..
O
-.-- ,_._...�.-.
214
..........._..--...,____ _....,.--
HYSTER
.--- ----- ....-- . -._... -.
P50135652LP
-..,............-'-'------.-._..._._._._...
FORKLIFT
._._._._- ---'-..-
1967
----- .-- . -..
1957
$8,500.00
�._......_...........,.. ,
u.214F-----
-- -- -- - - -- YALE.._.-__.,.-.--_
4--- K5-...- �.. �._..........-.....-.,.._.--.--...._......_._._._.._...._..
FORKLIFT
,....,..- .- ..-
1999
...,........�w.
1999
.._.._.............._..........
$12,B04� -DO
....2108...................
..........................
HONDA __._.....,......,.PLATE
COMPA�._.._.._.__..._...._..........,.-.-....-....-.-_.
CTOR
1995
'196
�__W
$1,309.0
� .._.....,...�_..........,.
.............
217
.- -- . .....
BLAW KNCX
----- .--------- -- ------ ........,..,...........
P F
.... ............. , .........
ASPHALT PAVER
........... ........
1993
-... -.
1993
......
$154,070.00
................_..............
......... 2170 ....
...... .-._.. .................
BLAW KNOX
.....,.- . - -_ -.- ,..,...._ ..........................._......--...__..._......,...-...
WEDGELOCK
PAVER SCREED
.,.............,....- ..-
1993
_.....-
1993
NIA
.........,..,.....,..,....,.. -.
...._ ......... . ....
2178
._..._.._._.__._.--._.-.,..,-.-----'-
BLAW KNOX
�•-•-•_...........,...-----.-..-._.....-........._
OMNI3
.... ,...........
PAVER SCREED
..--.-..,.-.-_....._,_...__.,.....,...
2001
2001
..�,........._...
w,500.90
�.- .......,........,. -....-
._.....---.--_
217BB
...................,..........-......-.-.-.....-._.............,.......--.--_.._.
NIA
HONDA
................. _. .........................
PLATE COMPACTOR
-.-._.
1995
1995
,._...,...._ .,........................
$1,300,00
,
- ...217R
............... ,... ,............. ..,.-.-._..-......._.................
INGERSOLL RAND
...
DD90
...--...-..-._.....----------------------
0 TON ROLLER
..-.-.-..-.-.-------
1994
__..,.�...�...............
1944
$75,500.00
..- ._...- .,.- .- . -. -. -.
..- '-21BR .............TA..
. .... .- ...- .....-
�...- •R515sAY.......
.. - 7.5 TON ROLLER ....
. -. - .- .-.-.� R -. �.
1985
.. _.....,
1985
.....,........., ..--
$44,175.00
..,........,...-- ....,.....
......... .......
2187
._....._.._.---- .........-..........
MILWAUKEE
._....... _................ .......
C2
,............ _...........................
TRAILER
.... _
1951
1981
.....-
NIA
....- ..- .-- .,.- .- .- . -. -..
...............
22
.........._.--.......................-
.�........,..,..,..,..........- .--.,.--..-......._._._.,.-...-.,..-..-....-_-__._....-_.-._...............,...-
..........,......,..,.....,....
-------------------
....
221
.... ...... ... ....... ... .. .... .. ....
CHEVROLET
................................................
4500
.... ...._._._..._........,..........._......."_-...___
FLATBED TRUCK
2003
_....,.......�.,...-
2003
.. -.
$30,120.90
-.- - .- ..- ...-- .... -. -__
...............,
222
...... ...... -.............
NEW HOLLAND
....__ ----------- .
L818O
-...--. ............... ....... - ., .......... ._.,......-..
SKID LOADER
__•-
2001
.......
2001
.................
$39,961.06
................... .
.. .. .. .. .......
222T
......................................,...,........................-
CRONKHITE
.--...--.-...-------------
55
,._.- .- ..- .- .--
SKID LOADER TRAILER
.- .- .- ...- .. -_,_
2001
_...........,....._-...
2001
....-
$4,785.00
.- ...- .- ....--- ..- .- .... -.
................
223
..._ .... _ .... ,.-, .............. .-.-.
WIRTGEN
.- ......... ...............
WI DOOF
...--.--.-._._._. _._._- .- _.- .- .- .- .- .- _....
COLD PLANER
" -_ -.
2000
W.....,
2000
.....�- ...-- .- ..,..-
$247,857.00
- ._.- .,.,
0
. .. . ..............
. .. ..TRAILER,-..-_
-_ -..—
20DU
�__,.......
2000
�.,...,.- .......--
$22,100,00
.....- ._.---- ._. -_ -...
.- _Z . ................................
24R
..... ..-
SAKAI
....,............ .....
SVV850
...... ..... ....................... ... .-.-....--'__
12 TON ROLLER
2000
2060
.................
$60,200.00
.- ..... . ...... .
-.-.-..........
2247
_............ ....... ........................_...................-...---.•-__.._.
DYNAVVELD
247TA
_.._._.....-- ..........,...___.
TRAILER
_--...............,
2001
.,.....,..,...,..,.......
2001
-....-
$14,000.00
.._- .- .,...- .. -___
...............
227
.....................................,-,.......,............,....,............--...
FORD
TANDEM AXLE
--- ._._._._._.- .---------- ..__ -..,
DUMP TRUCK
-..-............
2003
2098
$104,650,00
P. 32
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROADS AND STREETS
SECTION V • EQUIPMENT INVENTORY
P. 33
P.0 alsuie Form 30900 Io-7al
Bureau Of zk—h
Yearof
Ac€ual COStI'I
UNt No
Make
M9de1
Desch lion
manufacN
Pumhnse
w/otrade
2278
VALLEY
TANDEM DUMP
LEAF BOX
1989
$2,500.00
BED . ............
_._._.._......._..........
_-- ._. ... ......
..__..___....._.
...
_.__...... _._........,.
.^- 221V_._.__
_...- .TARCO ................BIGT
VAC'-
LEAF VACUUM
1990
... ....... ___....,....�.
1899
... ..__._
514,979.00
._......._._ ............
._..- ...........
223
.............................................
INTERNATIONAL
..._...._-__...._..__......._._._.._..._
TANDEM AXLE
._....._..,._..,.........._.
DUMPTRUCK
-.,
1994
1894
65053
2238
TANDEM DUMP
LEAF BOX
1990
................
.. BED
..__I.._ .... ,.... ,._._...._._.
...... __._...... .- .. _..---
___._._..___.._.._..
_1980 ........
.__52500^DO...
..__._._...
228V
_
- _VALLEY...
TARCO
BIG T VAC
LEAFVACUUM
1989
1989
$14,979,00
_...,..,.....,........ .........
•__ 229...._......_
.................................._.........-.__._._.
INTERNATIONAL
.................
TANCEM AXLE
. ............. ,..................-.-_..._._..,..___._............__.__._
DUMPTRUCK
2011
2011
$166,485,45
_ ............. ...........
2298
.._.. .._..,..,......_..............-
VALLEY
_ ._._... _._._ _..__._.__._.
DUMP
._._._.,._._...._..,.....,..... -,_..._...,..
LEAF BOX
........ .__._._.............
1990
_..
1990
_........................... .
$2,500.00
....................._---_.,._._._..._..._._._._...
BED
._._.__._.,..,...............,. _.,
_._ _._....._._.,_.-
.._. ------------ .
..... .... ............. ..
»_._.,._...._._....._...,._......._..._.._._..
229V
TAROO
BIG TVAC
LEAFVACUUM
1089
..._..
1989
................... ._,............................
$14,979.00
_............... .
.................._.....,........_
FREIGHTLINER
------- .....__._...,.._._.-'-'__._._.,._....................._-._..._..._._.------
TANDEM AXLE
DUMPTRUCK
2008
2008
$125,553.00
..... 2308........... ..... ..... v . ...........................
ALLEY
!!) flR MDUMP
LEAF BOX._.._._._._.,..._.-1969_..._._.._...._._.__.........................._.-
1989
$2,500,00
BED
._.._............. ... .......
._._._._...... , ..........---- ...._--- __._.....
�._._._..._.._..
___.,..__._._.... ................,......._...._,
...............
231
........ ...------------ ----- ......�,.._
CHEVROLET
4504
FLATBEDTRUOK
2D95
..... .........
2005
_.,.._._.
$28,437.00
.............._ -_.._
._._. 238._..._..
INTERNATIONAL -. -
- -- ~TRACTOR_.__. _._.................
_ TRUCK " -- �_... ......
...... .189 0
1990
- - -_ - - -- - - ---I
$52,455.00
r-, -. - -. - - — -
..................__._..
233T
.. ......... ............ ...._
EAGERBEAVER
_. -._.. ................. ..._.....................
20XTP
,.... ..... ..............
TRAILER
.... _._._.-------
1895
1995
.... ,._._...................___
$12,300.00
-- __ -._
234.,._,
........................ ........ ,__...
CHEVROLET
_...._.._..,..,..,._._...__._..._._.._.,.......
4500
............___._._......_.,..,
FLATBED TRUCK
.................
2034
..,.__.--
2004
--- ... -- --
$38,335.00
..... -----
._._...._. ......
235
._ ... ............ ...... I ....... _
FORD
... ......................... .--------------------
F550
- I... -.. _ ................
FLATBED TRUCK
.---------------
2008
-- - --
2006
_..... ..........._-
$32,138.00
"..-- __.�._.._...,
........_ . ...:.
239
... ... ......... .... ....... ....
INTERNATIONAL
......... ,............ ,._ ...............
TANDEM AXLE
,..,..,...........-..._-_. .,._..._...._._,_.._._._._
DUMPTRUCK
2003
2003
$500,e15.94
.,._..__.........
2398
.............. ......_.___�� _._..._.
VALLEY
._._..._._._.___.._._._._...._......
TP,IVDEM DUMP
...._��.__._......._._._.,.__..
LEAF BOX
_...._._._._...._..,.......
2003
.......__..._.._..,.__.._..._..
2063
$5,745.00
..__� -..._.
BED
__. ................. ... . ..............
.......-._-._..,.__.._.,._._.__._......__._.
,._..........,................_
� ._.___.,.._.._...,.
._._ .. .............,..._.__.........,
24 0
INTERNATIONAL
TANDEM AXLE
DUMPTRUCK
2003
2003
$100,815.94
_._.....___._......._...
.................
2408
_._...,......,............_ - -. _.__
VALLEY
__. __.._._.._.___._. _......_._...................�.
TANDEM DUMP
__.._._.._....__._.__..._.._._._..,._
LEAF BOX
...........,................___
2003
2006
$5,745.00
BED
242
SWARTZ
WILDCAT
ROADPATCHER
2OD5
__..,..__...._.......
2005
....� __-- .._�..
5130,365.00
_......._...,._.._..._....
243
INTERNATIONAL._
..... .........._..........
_.TANDEM AX LE
...___._....._._._..._._.,..._.
DU MP TRUCK
1997
1987
572,005,00
241B
TANDEM DUMP
VALLEY
LEAF BOX
1989
1939
$2,500.00
_.__.._._.,..._-__._._.,..
BED
-------------- ,..-------
_...... _.-...._._., .......... .----------
.._._. _._._---- ......_.._..._...
-__..
._.... ,... ,.............
.........................
743V
....___ --
TARCO
BIG T VAC
LEAFVACUUM
1939
1959
$14,979.DC
................ --- .------ ._- --- _.. ....... ....
SINGLE DUMP
2448 VALLEY
....... ,........ ....
LEAF BOX
... ...,.................
1989
---- --
1888
...,.. ..... ,... .... ...... ,.
$2Y500.00_
BED
244v
TAR CO
BIG TVAC
LEAFVACUUM
1989
1939
$14,979.00
245
ETNYRE
CENTENNIAL
DISTRIBUTOR
2000
2000
�...,._..,..,..._._......_._
5141,494.98
................,
246
_................_..._._.._._..._,...__..._._._...._._.__..,........,.........._..-_'-_...._._.._._..,._.__
SWARTZ
WILDCAT
._...._.._.._.�.�.,..,._......,
ROADPATCHER
2001
_,__�
2001
-___._
$129,445.00
___.._...,_.._._..,...
._.__ ..... ..............
.....NG._... -.-
........... ..........
._SINGLE AXLE
.... ...............................
DUMP TRUCK
............
2004
..,__�_
2004
$82,481.00
---------- .-----
2488
__ ------ _-- ------------- ..--
VALLEY
51 NGLffDUMP .... .....
.. �.. �-.•'"._.__ ............ __.__ .....
LEAF BOX
.._.._._._..........,..
1989
-.. ..-- , -.- -_.
1939
---- ,---- -------------
$2,500AD
............... ..........
........_�..-- _._..,._.._._._.,
BED
____._.._. ................ .................,.--
-------------- .___._.._
.,.._..........................
---- .........
.................... ..
249
INTERNATIONAL
TANDEM AXLE
DUMPTRUCK
1997
1997
$72,005.00
.__._..._... --- -., -- -- - - -- ___..._._.._._..,..__.
2498 VALLEY
..... ...........................�...
TANDEM DUMP
-..-_ ._._,......_.._._._.,...._....
LEAF BOX
, .,.._._.............._,
1989
..�. ___.._ ._......,..,.._.,..._.._.._._..
1989
$2,500.00
,...... ._._...
BED
_ .................... ----......-.-..«-._._._._.,......_._._.__.
..._._..._._...................
- .-- ._._._.,._..
__...,.__.,..,..._.._....
........ .................
250
.........___.....
INTERNATIONAL
SINGLE AXLF
DUMPTRUCK
2000
2000
$77,99700
------- _ .......
25DB
.............. . ...... ............
VALLEY
_._SINGLE bUMP_. ........
.-.... ....................... _....__
LEAF BOX
_._................ -.
1989
. -
1950
52,500.00
BED
..._._.__._.................
-.. _.__._....._._.._._._._.__..._.._..._..,..,..
..................-
_._.-._._._-
._.._.,..._._. ........
.............................._,-_.__._._._.._._.__..____._......
250V
TARCO
BIG TVAC
LEAFVACUUM
1989
1985
. __ ........
514,979.00
. ......... ,......... _._
2......-
_ - -..^ _ FORD ---- - -._.,
. - TANDEM AJCLE.........T.
-~ -DUMP TRUCK ... ._
... _... ..............._......
1993
_.
1993
$08,310.00
..................._
2518
..... .......__.__._.._...._..,._._..
VALLEY
_ ._....._.._._...._.,......._.,
TP.NDBED UMP
................ . ... ........ .,..,..,.............
- LEAF BOX
_.. .............
1989
______.._..._._
1080
---------------- --- ..
$2,500.00
2510
SNOW EQUIPMENT
1600 GAL,
ANTI ICING TANK
2001
2001
$17,231,00
SALES INC.........
-_FOAD
_
.........................._.-.-__._....
_._..._..._._...._.._.._.._._._
............. .
-.. -_
TANDEM AXLE
DUMPTRUCK
1983
1998
$89,010.40
................_.....
2528._,..____..
,�__. _._..._..................TANDEM
VALLEY
Dl1MP...._..__._._._..._.,.._._._..__......
.........
BOX
........._. ........-
..__._..._.,.._._.,..,
__...___._._._.._._.
---
ED..,............._.
_..._....................1889
-.- .._._._._LEAF
__..-
__._1989 __.
- .-$2.504.
......
2520
.......................B
SNOW EQUIPMENT
1600 GAL,
ANTI ICING TANK
2002
2002
$14,759.04
SALES INC
253
INTERNATIONAL
SINGLEAXLE
DUMPTRUCK
2000
2000
$77,997.09
... -2590
VALLEY._.......
BINGBED [7MP.T-
BOX
$2.-._._._....
590.00
Y...__...
_._.__._._.
- -LEAF
_______________
__ _1989„._
_.__._1989- .-
.- .-
253V
TARCO
BIG T VAO
LEAFVACUUM
1933
.__.__._,._..._._.,.__._.,
1980
$14.979.00'
.._. .... ._..........
._.254_._.......kNTERNA7IGNAL
.... SINGLEAXLE - ..._._
...................__.._...._._.........,..........
DUMP TRUOK
...--
2000
2000
$68,492.00
VALLEY._..,..,._.___._...._
P_.__.__,..,_,._._..
SINGLE DllM.„.._
LEAF BOX
1039
-_...
1969
$2,590.00
BEI7....
_._..._._..._.......,.........
------
---- --------
... ....... ....
....... _
.... ....
.. ...........
_z548 ........
. .
255
......
FORD
TANDEM AXLE
DU MPTRUCK
1998
1908
$71010.00
.__ 2559_.,.._...,..
.__. - VALLEY._..._..4hI�BEU
�JMP ..................
-
-LEAF BOX .,..,._.,......._
1989..__
2.500.00
............................
-..._.
.__1988.._..._$__.._._......_..
................
.....................
2550
......................... ................... M-..-.-.._. ._......,..,.._._.,._.__._._._.
SNOW EQUIPMENT 1 3D0 GAL.
ANTI ICING TANK
2002
2002
$14.759,00
____SALES INC ......
..... ...... "-... -, .._ ... ,... ..........
.___.__._..,. _.._._._..........,....._.._...
_._...._...._..__.,.
_ ............
_. ........ ....... ...... ,
258
STERLING
51NGLE AXLE
DUMP TRUOIC
2004
2004
$02,49100
_._.2588,._..
_..
.._ .. VALLEY ._._._...,..SINGLE
Dl1MP_. .......
._._.. ......... _ ............................_._.._._._.__._..__.____
LEAF BOX
1989
__._.,.._..___._.,..._..,......
1988
$2,500,00
BED
........_....
..............
_._. _ ..............
_.._...,............... ,.
........ ..............
2578
...__ ....................... ,._.....,............,.____..
VALLEY
.... ....._._._..""'__.._.,.._..................
SINGLE DUMP
LEAF BOX
1989
1969
$2,500.00
..................
BED
. .............M...- .- _._...._.., _._._...._._.__._..._........_._.,..
..,.........._...-._._.._
.,.._._.,._._._._._.....__._...
...... 258_.,.
____.,_._...�
FORD
TANDEM AXLE
DUMPTRUCK
1998
1906
$72,870.00
..... ________
2588
.... .........................._.� ._._._._._......_..._._...___._.,.._._._......_;.......
VALLFY
TANDBED UMP.,..._._._...____._._...._
................._._._._._.._.,
LEAF BOX
1989
1989
._..___._._..._..,.....
$2,500.00
--- ._._....,..... ......._..,....,.._._._._.__._.
__.......__...
258D
_..ALL _._..........,..--
SNOW EQUIPMENT 1300 CAL.
ANTI ICING TANK
2001
2081
$17,231.00
...............
...._SALES INC._._...
.......,......- ._.._..._._ .... ...
... ....... .. _._ ._._......................_�.__
_. --- --------
._,._.... �. __..,_..._._...__._.._......_..
P. 33
ANNUAL OPERATIONAL REPORT
FOR LOCAL ROAD$ AND STREETS
SECTION V - EQUIPMENT INVENTORY
Pad al5lak Dann s5aoo la -toJ
P. 34
Y—f
Aet..I C-F
Unit N.
Make Model
Descri Gon Manuf -t
Purchaas
� h de
252
FORO SINGLE AXLE
DUMP TRUCK 1998
1998
$59,.9DAD
................ ............--1.,_,...
2528
.,............�.�......._...___
SINGLEDU1�iP
._.._..........,.._�.- ---.---......,....._.,.._..._.._.,....._._..._._.,..,._
LEAF BOX 18
._...,..........._-
1989
.._- ........
--
BED... _
_. _..._.
...._._.. ................. _ ....... ........................_..._89
.. ..................�.�.,...,.
�.�.,.�____._._
...- -I-
._., _...�.�.-
262V
.VALLEY.��.,...,.
TARCO BIGTVAC
LEAFVACUUM 1988
_.,..,..,..,......,......_
1969
$14,079.00
-_ ----- -- - - --
.......................__.._._............._.....,....._._.._..._._:__
263
.... ... ..._.._.................-....................
INTERNATIONAL TANDEM AXLE
......_._._._._._._ ... _.._.,...
DUMP TRUCK 2011
2011
$166,486.45
' -. 253B.�., ....
...- '- '4ALLE'lYU.�.._..._TANOEM DUMP- ..................._..LEAF
BOX .....................'19 ......... ,._._............,.....
89
1969
.� -- __._...._.....,
$2,590,00
.. ... ,... . __._._..__BED ..__..._..._.._.,........____....
._............,._..._._._._._.. _........__._._... _._.,..,..,..,......
. .....
-.- ---- -- - - --
...... ......................�
z53V
. „................,..,
TARCC BIGTVAC
LEAF VACUUM 1966
........
1969
.------ I
$14,979,00
_---- __---------
................ ...
254
---- . ---- L ..... ,......... _.,..,_. ------- _------------ --------.___.....,................_...__._._...._._..
INTERNATIONAL TANDEM AXLE
................
DU MP TRUCK 1994
2D1
52,5D0.90
2848
VALLEY TANDEM DUMP
LEAF BOX 1919
19.9
52,509.00
BED
264V
TARCO BIG TVAC
LEAF VACUUM 1969
luau
$14,979.00
265
FREIGHTLINER TANDEM AXLE
'DUMP TRUCK 2006
20us
$125,550.90
._._...._ .....................
2858
............................... �. _._.___.__....._....
TANDEM DUMP
VALLEY
BED.._........_
_._....,__....,..,..,.......,....._._._.,._.. ......._......_._...__._.......
LEAF BOX 7989
- ............................... .........
.............
............__..-
19394
......,..�.............._.,
52,500400
..,._ 2.....-_...-
.............__._...._.__..... _._._.__
SINGLE DUMP
VALLEY
LEAF BOX '1 959
1569
$2 , 500. 0 0
BED
265
FREIGHTLINER TANDEM AXLE
DUMP TRUCK 2006
2005
5104,080.09
.......�...._._..
2668
-.. . ............_...._..__.__...___ _.. _._._._.:_._............._...._..............._.._..
TANOEM DUIdP
VALLEY
...... ,._._.._.,.._. _._.......,..,......_.........,
LEAF BOX 1989
__...�.- �._.....,....
19.8
..,........._.,.., ..... _..
52,50940
BED
-,
-
275
PISP�RY LED15
SOLUTIONS
ARROW BOARD 2002
2002
$3,895.00
276
DISPLAY LE015
ARROW BOARD 2DD2
ZD02
$3,695.00
SOLUTIONS
2504
N!A NIA
AIR HAMMER NIA
WA
_...,....._.,._......_..._.___.
NIA
........--- .
281
.......... ._._.... ------- ---- _ .................... - ......
FORD BINGLEAXLE
...... ... .......... .. --- ...................... .............._.____....,..,..,.
DUMP TRUCK 1695
1998 -
$57,090.00
~628164
31NGFED UfMPY
VALLEY-
SOX-
?-
19894
. -. -. -. ... -.. -
. -.... - .19856
.u.- .Y.Y-- --LEAF
..-- .^
uW -.-
.$2_50000..
Z81
TAROO BIGTVAC
LEAF VACUUM 1989
...-
1989
---------- --- _..,..
$14,97049
......... .........
_.........._ ......
282
... ............................... ... ........... ..». ---- ... .............
INTERNATIONAL SINGLE AXLE
_ .... . ...... ....................... ,.
DUMP TRUCK 1959
1997
$72,005.60
..._......_..� ....
2628
..........._......._.__.,.__.,........_...__..........._....._......__..._...
TANDEM BUMP
VALLEY
........ .._..,._._..._.,..,........... -m - _.- ..._.._...._.,..,...._...___
LEAF BOX 1989
.
_._._. -------- ....
....... :.90.00
.. W282D
-_.8 ... .................................
18DD GAL,
SNOSALES
............................. -. _........................_.,.__
ANTI ICING TANK
$14_��69,0._.
76949
INCENT.....
- -20026 uu-
yy1112
.....
283
INTERNATIONAL TANDEM AXLE
DUMP TRUCK 1597
1997
$72,095.009
...................................
......................�........ _................._..,........
TANDEM �l1�JiP
,.... ..... ........._.__.,._............_. - ..__.9., ....._...........I-
9D
9"..._.__
_............._.....,.
6NO -C GAL..........._
A-NK
0
NCENT........_76w
_._.__ANTICCING
................ _^._2DD2......
_....._2002__.,.._$4,750C
_
283V
TARCO BIGTVAC
LEAF VACUUM 5989
1989
- --
$14,979.00
---
-V YU264 --
INTERNATIONAL - TANDEM AXLE
-- -- -2DUMP TRUCK- ........ -_ -~- 1994.....,..,...2010
$2.500.0�.............
0
2648
VALLEY ...................._....
TANDEM DUMP
-. LEAF BOX._.,: .............._ . - yYiue9� . ..
1989__....._.$2.5
......... _.,
00,00
BEO.............._._.._._._._.
-------------
._._..__._._.... ......................... ...
.......__.
............ ....
285
.. ..__..__....,.__..._.,...,........._.._-
CHAMPION c7DA
MAINTAINER 1555
_....._......._......._...,.___
1995
$70,605,09
..... ............. .,.
288
...._.CHAMPION .................._ CID,.............
A
_..,.._...._._............ ._...._....,..,................ -.........
MAINTAINER IW
-_,._... ........._...
1997
........ _......
$78,87900
......................
---- .... .......
289
_._ ...... ..... ............. ....._._-....-...............__.._.._._._...._._.
HUBER MBsOA
_._.._.,..,.................. -.
MAINTAINER 1985
....
1995
............. ___.,..
O
S58.301 CO
.......... .._.__._.
_ ..................
290
............ .................. ..................... ..........
BOMAG MPHIDDR
....... .......... ...... ....................... __ -^.............
SOIL MIXER 1555
,..._..---- ..-----
1965
_._.,._...___
$188,051n0
. .. ...... ..... -.__.
......291T ....
........... DECK...__..., ... .. MIGHT Y...........,..,..
MOVER
... .................. _._.._.,.._.,......,........_. _.._,.
SKID LOADERTRAILER 1555
1995
....4.2004...-
$4.231.90
._$35.469,DC.
Y.Y...292.- . -...-
NEW HOLLAND -. T- .--- -LS180.� .........
........ .. .. ...SKID LOADER.- _.- .T.- -..... 2o4.W..
— ---- ---------
_._._._.__.__.,._
_..._ .._......_._....
... ,..............
292T
.._._..._._._...._.__...,.... ...._._.__- .�- ....�....,..._.__
NIA NIA
...__ ........... ............................... .__
SKID LOADER TRAILER 1558
.. _............,...........
IDoe
......... ...____
$895440
...... _ .... ......
.......293._.,._
__..._.�. -GEHL ............. .... . 6635'......,..,._..
DXT
..... _.__ .._ ...... ._.._._._._...,....... _...
SKID LOADER 1996
Iu%
----------- ....
$3955,1,00
...................
...� ... ..........
293T
........ ............................... __ _.._I ----------------
BECK MIGHTY MOVER
. ......... .......................... _'.
SKID LOADERTRAILER 1996
1096
_._ ......
$4,205,00
........ _., .......... .
..,._._294 ...�
......... _ ................_.,....-.._ .............,......,...,..__._
PSI M413XT
_._........ ....._.._._._..,......_..._- w--.................,..,......_._._._._.
MAINTAINER 2005
_�..�...........�.,........_.,.
2965
_._._... .......�..._..._.__._._._,._...
$85,6DTDD
....._._.._._.._..
295
.._._,._...._...._._.........., _ . .-.. ....................__._......_._.._...
STEPP SMT
-------------------- .----- ...
CRACKSEALER 2003
.......... _., ......
2008
..,._._ .......... ..
$1937500
............... ,....... ,
:__._._.._ .....
2P7
...................,........_-...-................._.,.____.__._...._.__._._._._.._........._
STEPP 1200
...... .
CRACK SEALER 1998
....,..,....._._.,..,._._._.._.
1598
_._....... .....
$23,030.00
_._._._..._._.___._ -
--- 290..__
__..._..._... CASE...,......-... ..................._.,...__.__.......
821
..... _._._._....._.............._ ��....
CASE LOA DER 1992
.................. .... _._
1992
_....2000._.
$98,950.00
_ ..__...,...,.
_ . .._.. . _
299
..
CASE - .......921C ._._......_.._.,._.
-CASE LOADER 2009
.._._._..._........_...,..._.,.
$231,374.00
............,._.........,.....
.................
29913
...................-_.._.......,.......,..... ..,..__.__._._.�.__...,..NULT1-
ADS GRAPPLER
PURPOSE..........,..._..__._
BUCKET 290
2000
WA
9118 ._.
..._.�....... VALLEY ..................SINGLEOU'MP
BED
.... .....LEAF BOX........... . .... .... . -198 __..__._
9
--- _.__
1969
_ _..................,.........
$2,SDO.DO
91313 ....................VALLEY
"......_ .,.- SINGBED 11FidP ....,.._.._.........,._LEAF
BOX _..,...........,.._..._..._., 9........
69
.. .. ....... . . ..
1919
. ...... _.......---- ...,......
$2,500.00
........ ................. .. .....
................... __--...--------......_._._..,._._ ._..__....._....._._.,..._.....
.,.........---- .........._,
_..._._ .......................................
913V
TABOO .BIGTVAC
LEAF VACUUM 1989
........... ...... .2002
1969
--
$14,979100
...$29,416....,.
................
2270
..... .- - ..- ........................
TENNANT ATLV4300
^.m..^. -... LITTER VACUUM
2002..
09
5548
-
VELOCITY TANDEM DUMP
BED
LEP.F BOX 2001
.....,.._._......_..__._._...._
2005
..._._.........,._�.,....___,
$7,656.00
.5 .-... -,_
....... ........�...
5428
- .-..._..._- .....,..._ ...._ TANOBI ..__,._._.....,..._..........
VELOCITY Eo UMP
-._—..................,._
LEAF BOX 2005
2005
$7,556.0
_._..._.. _.._ _ .._._.._._.......,.......m
._....._............. _._. _._._. _............__..,.
_._._.,._.. .,................—
......,... -�
........ _.. ........
911V
.......— .......................
TARCO BIG TVAC
LEAF VACUUM 1989
1919
$14,979.09
P. 34
w
Q
w
w
w
Cl) Q�
WWI
w
CL
LLI Q
� N o
azzLU
za-
°o um
a�aw
d Cd U
oao
QVw
Zj0
zO�Z
a0=
LL
U
7
Z
0
F-
0
w
N
P. 35
Q)
w
U)
N
L
7
4-
O
Q
LD
CL
}
L
N
�
c
U
o
C:
N
(6
N
N
L�
J
C
O
O]
C
E
LL
0
:�r
co
N
O
0
"'
Q
co
L
Q
fl
o
c ¢
LU Q
U E
a
c�
CNJ
co
� U
N
(6
Z3 ❑
c�
Q
a�
"0
>
C N -0
U
U
N
(B U
O
(?
Q
C:
O
Q CJ�
U)
W
N
2
_0
Q
d
Q7
c
U
so
°
U
O
>_
O
O =
O
d
Q
T m
m
C7
U
P. 35
U)
F... F
Q LU
a F
J �
Qa
b_ CC
4� a
LL a
uU
OQ
�C
Q
Q II
■ .
m
N �
� C
L5 O
U C =
O O
m L)
r-
0
a_
O Tn U
� N
o. m
o ai
U _ C
ro U)
ELI
(D a
N = L4
is 0
C L
N .-
O w
(0 (% a
0 0
L
C
ISOO IS}Ol
C7
O
CA
m
O
7
o
c
CO
' LO
' h
'
M
'
' cc
'
�t
ti
C
C'i
N
CQ
O
Q
N
CI)
0
O
co
'd'
c
Cfl
LO
h
Lq
cl1
W
C
t�?tp
ca fiab'}fA607�
v-->
6% CO
tr*
SEA
cS
b3 E
}UGWO11jos Ieuld
c
lOONI Aq Pled -egg pad
o
O
0
0
0
0
o
c
o
co
m
0
0
0
o
c
m
cc
LO
cr)
cc
o
o
0
LO
0
LO
0
(0
c
c
cr
N
N
cc
O
w
cil
c
CI)
0
.
ti
LO
N
o
o
d
o
v
v
<
m
V)
LO
v
LO
ti
•�i=
c
LOGNI of pled WILL IeaO]
o
0
m
0)
o
o
0
0
=5
Cl)
M
O
CA
N
CD
h
4
d
co
m
0
H
lOQNI Aq pasingwipd
S}UMPSUOO 01 pled
bHWO
X
x
o
dS01
X
N
cC°
a6plag
is
Q
V/ Ii -d1S
X
X
N
LL
53H-d15
X
d1S
X
IO
N
ro
a
U
OO
X
X
x
X
X
X
X
o
AAE
73d
X
O
Z
�
L
O
D
N
LO
N
cc
p
O
�M
7
N
0
O
00
O
00
oO
m
O
O
4
ED
O
CD
N
O
CD
O
O
CD
0
o
m
C
C
C
C
C
C
N
C
ID
O
O
O
O
.rL
`m
m
a
U
CO
C
C
O
o
o
m
m
U
C
7
C
N
C
U
O
N
H
N
0
w
CD
U,
Q Y
ro
c
Q
(D
o
vQ
.L
U
E
a
E
m
c
O
a
a
O
3
o
-
o
u
m
w
mX
L
Q
(U
N
cz
X
0
I1
ll.
t
'2
■ .
m
N �
� C
L5 O
U C =
O O
m L)
r-
0
a_
O Tn U
� N
o. m
o ai
U _ C
ro U)
ELI
(D a
N = L4
is 0
C L
N .-
O w
(0 (% a
0 0
L
C
Submitted by;
DATE: 20 N/A
Engineer /Director
DATE: 20 NIA
County Highway Supervisor
Approved:
NIA
DATE: 20
Board of County Commissioners
Submitted by:
DATE: May Zj 20 12
City Engineer
DATE; May 20 12 Pi
Street Commission r or Supervisor
DATE: May as 20 12
Approved:
Mayor or Pr e"N of T uncil
P. 37
Attachments Sent With Annual. Road Report:
Attachment A - Alley maintenance
Attachment B - Paving areas (1, 2, 3, 4, downtown)
Attachment C - Vendors
Attachment D - Inlays, sewer cuts and sewer insurance
Attachment E - Emulsions (Bit Mat Products)
Attachment F - Infrared repairs (ARS)
Attachment G - Pothole patching
Attachment H - Miscellaneous patching
P. 38
Due Date - June 1st of the following year:
Mr. Charlie Pride or Mr. Todd Austin
State Board of Accounts
302 West Washington Street, Room E418
Indianpolis, Indiana 46204 -2765
Financial Management Unit
Indiana Department of Transportation
Indiana Government Center North, Room N725
Indianapolis, Indiana 46204
Mr. John Haddock, Director
Indiana Local Technical Assistance Program (LTAP)
Vision Technology 1
1435 Win Hentschei Drive, 8100
West Lafayette, Indiana 47906 -4150
Mayor's Office
Common Council Members
City Clerk
Council Attorney
Street Department
Engineering
Administration & Finance
P. 39