Loading...
HomeMy WebLinkAbout2011 Local Road and Street ReportPRESCRIBED BY STATE BOARD OF ACCOUNTS - REV 20D8 CITY AND TOWN FORM NO. 225 COUNTY FORM NO. 16 Saint Joseph COUNTY, INDIANA City OF South Bend (CITY OR TOWN) (NAME OF UNIT) (CITY AND TOWN FORM 225 ONLY) ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS (1C 8- 17 -4.1) FOR THE YEAR ENDED DECEMBER 31, 2011 P. 1 ANNUAL OPERATIONAL. REPORT FOR LOCAL ROADS AND STREETS SECTION I - FINANCIAL STATEMENT Cash and Investments - January 1 Operating Receipts: Taxes Intergovernmental Charges for Services Operating Transfers In Other Receipts Total Operating Receipts Bands Proceeds Other Receipts Interfund Loan Proceeds Investments Matured or Sold Total Receipts Operating Disbursements: Highway and Streets Administration Maintenance and Repair Construction and Reconstruction General Undistributed Debt Service Total Operating Disbursements Other Disbursements Interfund Loan Payments Interfund Loans Made Investments Purchased Total Disbursements Excess Over (Under) Total Disbursements Cash and Investments - December 31 Motor Local Total Vehicle Road & Cumulative Other All Highway Street Bridge Funds Funds $2,012,185 $2,194,756 $0 $9,707,921 $13,914,862 1,863,283 0 0 7,435,412 9,298,695 2,951,072 1,030,958 0 0 3,982,030 243,979 0 0 10,974 254,953 470,0 '00 0 0 0 470,000 36,504 6,031 0 167,528 210,063 5,564,838 1,036,989 0 7,613,914 14,215,741 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,564,838 1,036,989 0 7,613,914 14,215,741 170,112 146,292 0 776,752 1,093,156 3,891,953 16,906 0 1,688,904 5,597,763 2,100,936 1,842,543 0 5,087,214 9,030,693 0 0 0 0 0 0 0 0 251,938 251,938 6,163,001 2,005,741 0 7,804,808 15,973,550 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,163,001 2,005,741 0 7,804,808 15,973,550 0 (598,163) (968,752) 0 (190,894) (1,757,809) $1,414,022 $1,226,004 $0 $9,517,027 $12,157,053 Douglas Rd TIF Major Moves W ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION la - DETAIL OF OPERATING RECEIPTS FOR COMMON FUNDS Motor Local Total of All Total Vehicle Road & Cumulative Other All Highway Street Bridge Funds Funds (1) Operating Receipts: Taxes, list source((s) Wheel Tax Property Tax Other Taxes Total Taxes (2) Distribution from State Auditors Office Intergovernmental, list source(s) Gasoline Tax Major Moves State Operating Grant Total Intergovernmental (2) Charges for Services, list service(s) Internal Charges for Servies Traffic Signal Maintenance Sale of Scrap Metal Sale of Signs Total Charges for Services (2) Other, list source(s) Interest on Investments Inter-fund Operating Transfer Local Grant Local Loan Miscellaneous Reimbursements Total Other (2) Total Operating Receipts Note: 1 From Section lb 2 Totals to Section 1,863,283 0 0 0 1,863,283 0 0 0 7,435,412 7,435,412 0 0 0 0 0 1,863,283 0 0 7,435,412 9,298,695 2,951,072 1,030,958 0 0 3,982,030 0 0 0 0 0 0 0 0 0 0 2,951,072 1,030,958 0 0 3,982,930 138,206 0 0 0 138,206 105,773 0 0 0 105,773 0 0 0 2,837 2,837 0 0 0 8,137 8,137 243,979 0 0 10,974 254,953 5,314 6,031 0 27,258 38,603 470,000 0 0 0 470,000 0 0 0 0 0 0 0 0 0 0 31,190 0 0 140,270 171,460 506,504 6,031 0 167,528 680,063 5,564,838 1,036,989 0 7,613,914 14,215,741 P. 3 ANNUAL OPERATIONAL REPORT 1,680,813 0 FOR LOCAL ROADS AND STREETS 855,575 190,679 SECTION Ib - DETAIL OF OPERATING RECEIPTS FOR OTHER FUNDS 306,053 7,435,412 General General CED CED CED CED CED Total Fund Fund Major SSDA #1 Central SBCDA Airport Douglas Road All Engineering T&L Moves TIF Medical TIF TIF TIF TIF Funds(l) Operatfng Receipts: Taxes, list source((s) Property Taxes Other Total Taxes Distribution from State Auditors Office Intergovernmental, list source(s) Major Moves Total Intergovernmental Charges for Services, list service(s) Sale of Scrap Metal Sale of Signs Total Charges for Services Other, list source(s) Miscellaneous Reimbursement Local Grant Local Loan Sale Scrap Metal Interest on Investments Total Other Total.Operating Receipts (1) 716,483 1,680,813 0 783,731 855,575 190,679 2,902,078 306,053 7,435,412 0 0 0 0 0 0 0 0 0 716,483 1,680,813 0 783,731 855,575 190679 2,902,078 306,053 7,435,412 0 a 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 2,837 0 0 0 0 0 0 2,837 0 8,137 0 0 0 0 0 0 8,137 0 10,974 0 0 0 0 0 0 10,974 57,113 273 82,884 0 0 0 0 0 140,270 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 27,012 0 0 0 0 246 27,258 57,113 273 109,896 0 0 0 D 246 167,528 773,596 1,692,060 109,896 783,731 855,575 190,679 2,9x2,078 306,299 7,613,914 Note: t Totals to Section [a; 'total of All Other Funds Column P. 4 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ila - DETAIL OF OPERATING DISBURSEMENTS OF COMMON FUNDS Motor Local Total of All Total Vehicle Road & Cumulative Other All Highway Street Bridge Funds(1) Funds Administration: Personal Services Supplies Other Services and Charges Capital Outlay . Total Administration (2) Maintenance and Repair: Personal Services Supplies Other Services and Charges Capital Outlay Total Maintenance and Repair (2) Construction and Reconstruction: Personal Services Supplies (Paving /Concrete) Other Services and Charges Capital Outlay Total Construction and Reconstruction (2) General and Undistributed: Personal Services Supplies Other Services and Charges Capital Outlay Total General and Undistibuted (2) Debt Service: Payments of Principal and Interest (2) Total Operating Disbursements Note: i From Section Ilb 2 Totals to Section I 0 0 0 528,082 528,082 0 0 0 14,234 14,234 170,112 146,292 0 217,483 533,887 0 0 0 16,953 16,953 170,112 146,292 0 778,752 1,093,156 2,904,298 0 0 95,546 2,999,844 453,005 9,406 0 651,380 1,113,791 385,107 7,500 0 941,978 1,334,585 149,543 0 0 _ 0 149,543 3,891,953 16,906 0 1,688,904 5,597,763 0 0 0 0 0 2,100,936 450,000 0 0 2,550,936 0 0 0 1,220,027 1,220,627 0 1,392,543 0 3,867,187 5,259,730 2,100,936 1,842,543 0 5,087,214 9,030,693 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,163,001 2,005,741 P. 5 0 251,938 251,938 0 7,804,808 15,973,550 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilh - DETAIL OF OPERATING DISBURSEMENTS FOR OTHER FUNDS Total Operating Disbursements 773,596 1,692,060 336,666 783,731 855,575 190,679 2,902,078 270,423 7,BD4,808 Note:1 Totals to Section [in; Total -Ml Other Funds Column w General General CED CED CED CED CED Total Fund Fund Major SSDA 91 Central SBCDA Airport Douglas Road All Engineering T &L Moves TIF Medical TIF TIF TIF TIF Funds (1) Adm Wstration: Personal Services 528,082 0 D 0 0 0 0 0 528,082 Supplies 14,234 0 0 0 0 0 0 0 14,234 Other Services and Charges 214,327 3,156 0 0 0 0 0 0 217,483 Capital Outlay 16,953 0 0 0 0 0 0 0- 16,953 Total Administration 773,596 3,156 0 0 0 0 0 U 776,752 Maintenance and Repair: Personal Services 0 95,546 0 0 0 0 0 0 95,546 Supplies 0 651,360 0 0 0 0 0 0 651,380 Other Services and Charges 0 941,976 0 D 0 0 0 0 941,978 Capital Outlay 0 0 2 0 0 a 0 0 0 Total Maintenance ard Repair 0 1,688,904 0 0 0 0 0 0 9,666,904 Construction and Reconstruction: Personal Services 0 0 0 0 0 0 0 0 0 Supplies C 0 0 0 0 0 0 0 0 Other Services and Charges 0 0 43,200 690,066 0 0 466,276 18,485 1,220,027 Capital Outlay 0 0 293,466 93,665 855,575 190,679 2,433,802 0 3,867,187 Total Construction and Reconstruction 0 0 336,666 783,731 855,575 190,679 2,902,075 18,485 5,087,214 General and Undistributed: Personal Services 0 0 0 0 0 0 0 0 0 Supplies 0 0 0 0 0 0 0 0 0 Other Services and Charges 0 0 0 0 0 0 0 0 0 Capital Outlay 0 0 0 0 0 0 0 0 0 Total General and Undistibuted 0 0 0 0 0 .0 0 0 0 Debt Service: Payments of Principal and Interest 0 0 0 0 0 ❑ 0 251,938 251,938 Total Operating Disbursements 773,596 1,692,060 336,666 783,731 855,575 190,679 2,902,078 270,423 7,BD4,808 Note:1 Totals to Section [in; Total -Ml Other Funds Column w ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54406 (8 -10) NOTE: These are the same funds reported in Section 11, with additional information on individual projects. PAVIKIr; MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only' known) Road/Street From Road/Street To Road /Steel Length (M 1) Width (ft) o 2 o U z C -0 A m m� i m E o a a 0 T U te° r m : ',° u_ m o U N a � R o J d .2- u..l a n. � U o La Fayette St. Sample St. South St. 1600 52 _ X _ _ $87,892 Jefferson St. St Joseph St. Niles Ave. 1032 66 X {#� $46,756 Locust Rd. 3015 Locust 3501 Locust 1570 28 X _ $31,813 Walnut St. Indiana Ave. Prairie Ave. 1023 30 X $17,317 Morris St. Donald St. Prairie Ave. 635 24 X $ 7,970.69 $7,971 Webster St. Indiana Ave. Edwards St. 500 20 X $ 8,075.58 $5,076 Arnold St. Sample St. Huron St. 23 X _ $25,411 Illinois St. Sample St. Ford St. k1375-1- 30 X $31,932 Meadow Ln. Birchwood St. Edison St. 26 X $20,965 Edison St. Meadow Ln. Sample St. 990 26 X $19,426 Sample St. Sylvan Ln. Mayflower Rd 975 50 X ## $30,969 California Ave. Cottage (3 rov Blaine Ave. 1340 24 X ##1#}###{# $18,996 Hillcrest Rd. Angela Blvd. Wakewa Ave 1600 24 X $ 7,511.79 $7,512 Blyler PI. Riverside Dr. Culver P).- 775 26 X $19,031 Culver Pl. Sherman Ave Inglewood Pl. 1045 30 X $24,410 Ribourde Dr. Boland Dr. West to Deac 1015 24 X $13,744 Bertrand St. Olive St. Johnson St. 1300 30 X $22,794 Prast St, Johnson St. Huey St. 620 24 X $ 9,878.31 $9,878 Wilber St, Linden Ave. Fassnacht St 970 20 X $13,565 Liston St. Washington P Birdsell Ave. 560 38 X $14,882 Elwood Ave. Portage Ave. Wilber St. 1300 24 X �# $28,746 Colfax Ave. Orange St. LaPorte Ave. 690 38 X $22,488 Cleveland Ave Lincolnway LaPorte Ave. 950 24 X _ $16,218 Lawndale Ave. Lincolnway W LaPorte Ave. 477 24 . X $ 6,591.89 $6,592 Blaine Ave. Cal ifomia Av Vassar Ave. 540 38 X $15,337 Ryer St. Elwood Ave. Keller St. 1300 30 X $22,915 Kenmore St. Elwood Ave. Keller St. 1300 35 X $27,684 Wellington St. Elwood Ave. Keller St. 1300 35 X $39,836 Longley St. Eclipse Pl. East to D.E. 815 30 X $26,346 Brookfield St. Lincolnway W Fassnacht St 1550 32 X. $43,554 P. 7 ANNUAL_ OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. PAVING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type cf Work Project Cost Provide this information only if known) Road/Street From Road/Street To RoadlSteet Length (mi) Width (ft) o d z o f6 U y m F r i m in U ro a o Q a o ~ U U -° N p 2i ¢ O J ¢ a E d n W ¢ n a U �o Napolean St. St Peter St. Lawrence St. 1218 35 X $27,760 Campeau St. Eddy St. Twyckenham 2523 20 X � $33,882 Greenlawn AvE McKinley Ave Colfax Ave. 763 36 X $20,762 Emerson St. Mishawaka A Northside Blv 1550 29 X $28,561 Mishawaka AA Roberts St. Twyckenham 1400 76 X $79,654 Logan St. Mishawaka A Northside Blv 1610 42 X fit ## $55,568 Marshall St. Logan St. 33rd St. 1250 26 X ##### $16,410 Corby Blvd. Manchester F Patty Ln. 1160 40 X $28,954 Corby Blvd. Hickory Rd. Manchester 1340 40 X $31,192 Ironwood Dr. Corby Blvd. Edison Rd. 2260 40 X _ $98,583 Frances St. Corby Blvd. St Vincent St, 960 29 X _ $21,367 Howard St. Notre Dame A S. R. 23 Twyckenham 2120 26 Xy $32,576 LaSalle St. Jefferson Blvi 1440 39 X $38,606 Sorin St. St, Louis Blvd Notre Dame 1660 23 X $21,310 Carroll St. Monroe St. Bronson St. 925 41 X $ 5,144.03 $5,144 St. Joseph St. Irvington St. Ewing St. 1157 29 X $22,001 Norman St. Michigan St. East to Dead 473 24 X $ 9,245.50 $9,246 Marine St. lndiana Ave. Broadway St. 575 24 X $ 7,364.25 $7,364 Oakpark Ct. Miami St. East to Dead 600 20 X $ 6,379.58 $6,380 Darby Ct. Landsdown D West to CulD 500 26 X h#ff#49999 $10,840 Donmo ey r Ave Fellows St, Miami St. 2540 30 X $57,324 Crown Ct. Riding Mall Di SoAo CulDe 434 22 X $ 8,821.72 $8,822 Fellows St. Donmoyer Av Dean St. 1290 40 X $50,338 Indiana Ave. Miami St. Leer St. 1230 32 X $18,586 Hampshire Dr. Gotham Dr. Riding Mall D 1450 27 X #####W## $27,425 Brora Dr. Thornhill Dr. Greenock St. 394 27 X $ 5,012.81 $5,013 Greenock St. Brora Dr. Kintyre Dr. 670 27 X $13,785 Kintyre Dr. Greenock St. Thornhill Dr. 315 27 X $ 5,144.03 $5,144 Echo Dr. Clayton Dr. Clayton Dr. 1935 28 $53,175 Widener Ln. Miami St. West to D.E. 340 24 X $ 3,731.92 $3,73z ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section ll, with additional information on individual projects. PAVING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only if known) Road /Street From Road /Street To RoadlSteet Length {mi) Width ( €t) c °— U 2 C O U m z C n - m a 'U G t m � E 0 H O 0 U) (9 v F F a n Q 0 v m L [4 o ~ U o U N N ¢ 0. ¢ a_ c a) E w ¢ 0- O U o L— OVERLAYS Chippewa St. Main St. to RJR Track X _ $10,502 Donald St. Webster St. Walnut St. X $ 6,091.14 $6,091 Swygart St. Indiana Ave. Edwards St. X $ 1;458.32 $1,488 Poland St. Walnut St. Webster St. X $ 3,690.79 $3,691 Huron St. Bendix St. Liberty St. X $ 772.98 W $773 Dubai[ Ave. Phillipa St. Olive St. X $ 944.72 $945 Mayflower Rd. Sample St. Western Ave.. X $ 2,382.88 $2,383 Michigan St. at Fairview St. X $ 728.56 _ $729 Edwards St. Walnut St. Arnold St. X $ 3,326.50 $3,327 St. Phillipa St. X $ 2,280.98 $2,281 Ave. Diamond Ave Lawndale Ave. X $ 2,333.36 $2,333 rOlive e. Diamond Ave Lawndale Ave. X $ 3,053.84 $3,054 Bulla St. O'Brien St. Johnson St. X $ 3,086.96 $3,087 Calhoun St. Meade St. Olive St. X $ 5,089.12 $5,089 Kessler Blvd. Woodlawn Bb Kessler PI. X $ 3,039.76 $3,040 Freemont St. Elwood Ave. Keller St. X $ 3,756.00 $3,756 Bergan St. Johnson St. Brookfield St X $ 3,417.12 $3,417 Rockne Dr. Ironwood Dr. Bader Ave. X $13,546 Rexford Dr. Browne Ln. West to D.E. X $ 6,023.94 $6,024 Jefferson Blvd. Niles Ave. Intersection X $ 2,546.96 $2,547 Corby Blvd. Eddy St. Niles Ave. X $ 9,502.72 $1,503 Ironwood Dr. McKinley Ave No. to RIR Tracks X $ 6,102.24 $6,102 LaSalle St. Greenlawn A Esther St. X $ 5,921.76 $5,922 Ironwood Dr. Corby Blvd. McKinley Ave. X � $22,358 Edgewater Dr. Monroe St. Bronson St. X $ 6,928.88 $6,929 Bronson St. Lincoinway E Edgewater Dr. X $ 3,770.40 $3,770 Walter St. Michigan St. Fellows St. X $ 837.20 $837 Erskine Blvd. Irvington St, Donmoyer Ave. X $ 2,369.84 _ $2,370 Oakside St. Miami St. Erskine Blvd. X $ 3,852.24 $3,852 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. PAVING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only if known) C C w � 2 O Qf C 16 C ' V A O From To Length Width 3 c ¢ ¢ ¢ 79 Road/Street Road/Street Road /Steet w) ft � r i ° UL CL r° Dubail St. Clyde St, Marine SL X $ 7,245.30 $7,245 Kem Rd. Miami St. York Rd. X $ 1,572.48 $1,572 Southeast St. Greenwood D York Rd. X $ 3,549.92 $3,550 Ridgedaie Rd. Twyckenham Hilltop Dr. X $ 3,880.88 $3,881 Jackson Rd. Miami St. York Rd. X $ 2,261.60 $2,262 Riding Mall Dr. Harrow Dr. Gotham Dr. X $11,489 #ffMWW9hW Eckman St. Erskine Blvd. High St. X $ 766.32 $766 Dale St. Oakside St. Woodside St. X $ 746.72 $747 Danbury Dr. Gotham Dr. Selwin Ct. X $ 2,268.80 $2,259 Monroe St. Lincolnway E Edgewater Dr. X 1 $ 3,046.64 L $3,047 TOTAL MVH FUNDS FOR ROADISTREET CONSTRUCTION. AND RECONSTRUCTION $ $1,733,216 P. 10 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION - Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROAD /STREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this iWformation only if known) RoadlStreet Address, Length (rni) Width (ft) O U 3 g 0 2 It 'w 41 v in 0 r N � ri a 5 � rj N [6 � ¢ a � ¢ o � E or ¢ a p U �2 30th St. 1214 X $222.0.0 $222.00 31St. 1214 X _ $222.00 $222.00 32nd St. 1214 X $222.00 $222.00 30th St. 1215 X 1 $222.00 $222.00 30th St. 1321 X $222.00_,_ $222.00 29th St. 1215 X $222.60 $222.00 29th St. 1317 X $222.00 $222.00 28th St. 936 X $222.00 $222.00 28th St. 1010 X $222.00 $222.00 Ironwood Dr. 1101 X $222.00 $222.00 20th St. 926 X $222.00 $222.00 Hildreth St, 1702 X $222.00 $222.00 Esther St. 1107 X $222.00 $222.00 Bellevue St, 1105 X L $222,00 _ $222.00 River Ave. 639 X $222.00. 1 $222.00 Bronson St. 730 X $222.00 $222.00 Bronson St. 637 X $222.00 _ $222.00 Clinton St. 612 X $222.00 $222.00 Michigan St. 740 X T $222.00_ $222.00 Broadway Ave. 513 X $222.60 $222.00 Virginia St. 1533 X $222.00 $222.00 Dale St. 1526 X $222.00 $222.00 High St. 1514 X $222.00 $222.00 Indiana Ave. 819 X $222.00 $222.00 High St. 1428 X _ $222.60 $222.00 Haney SL 301 X $222.00 $222.00 Haney St. 409 X $222.00 $222.00 Haney St. 136 X $222.00 WW $222.00 Dubail Ave. 822 X $222.00 $222.00 Dubail Ave. 902 X $222.00 $222.00 Dubail Ave. 640 X $222.00 $222.00 Dubail Ave. 530 X $222.00 $222.06 Dubail Ave. 418 X $222.00 $222.00 P. 11 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Illa - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section II, with additional Mormation on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only if known) Road /Street Address Length (Mt) Width {ft) � o u U 3 z a � 6z � � v (n v v LL U U 2 0 ¢ R � ¢ � E .2L W °� O CJ t2 Dubai] Ave. 302 +-xx $222.00 $222.00 Dubail Ave. 230 $222.00 $222.00 Calvert St. 895 X $222.00 $222.00 Ironwood Dr. 754 X $222,00 $222.00 Ironwood Dr. 634 X $222.00 $222.00 23rd St. 502 X $222.00 $222.00 23rd St. 702 X $222.00 $222.00 24th St. 844 X $222.00 $222,00 24th St. 754 X $222.00 $222.00 24th St. 502 X $222.00 $222.00 25th St. 506 X 1 $222.00 $222.00 25th St. 754 X $222.00 $222.00 26th St. 502 X $222.00 $222.00 26th St. 702 X $222.00 $222.00 26th St. 806 X $222.00 $222.00 30th St. 729 X $222.00 $222.00 30th St. 529 X $222.00 $222.00 29th St. 728 X 1 $222.00 $222.00 29th St. 841 X $222.00 $222.00 30th St. 502 X $222.00 $222.00 30th St. 726 X $222.00 $222.00 30th St. 802 X $222.00 $222.00 32nd St. 840 X $222.00 $222.00 32nd St. 501 X $222.00 $222.00 Mish. Ave. 3109 X $222.00 $222.00 32nd St. 502 X $222.06 $222.00 33rd St. 502 X $222.00 $222.00 33rd St. 602 X X $222.00 $222.00 33rd St. 754 $222.00 $222.00 34th St. 841 X $222.00 $222.00 34th St. 842 X $222.00 $222.00 Logan St. 841 X $222.00 $222.00 30th St. 1002 X $222.00 $222.00 P. 12 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8-10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area . Type of Work Project Cost (Provide this information only if known Road/Street Address Length (mi) Width (ft) O U V1 C 0 3 z fa � 15 2' � `t m � N 2 � U 4! in T l4 v r � Q N u- r 12 c U N fit 2 Q °� O -J Q. a C E �- 4 a ill 9 �° 31 st St. 1349 X $222.00 $222.00 Pleasant St. 3110 X $222.00 $222,40 Pleasant St. 3113 X $222.00 $222.00 32nd St. 915 X $222.00 $222.00 32nd St. 914 X $222.00 $222.00 Pleasant St. 3209 X $222.00 $222.00 Pleasant St. 3210 X $222.00 .$222.00 Northside Blvd, 3309 X 1 $222.00 $222.00 Pleasant St. 3315 X $222.00 $222.00 Mishawaka AvE 3312 X $222.00 $222.00 34th St. 946 X $222.00 $222.00 33rd St. 1109 X $222.00 $222.00 32nd St. 1109 X $222.00 $222,00 Vine St. 2815 X $222.00 $222.00 Pleasant St. 2217 X $222.00 $222.00 Vine St. 2217 X $222.00 $222.00 23rd St. 946 X $222.00 $222.00 Vine St. 2316 X $222.00 $222.00 Pleasant St. 2402 X $222.00 $222.00 Pleasant St. 2504 X $222.00 $222.00 Pleasant St. 2515 X $222.00 $222.00 Vine St. 2519 X $222.00 $222.00 27th St. 943 X $222.00 $222.00 Vine St. 2518 X $222.00 $222.00 Pleasant St. 2618 X $222,00 $222.00 Pleasant St. 2714 X $222.00 $222.00 Northside Blvd. 2813 X $222.00 $222.00 28thSt. 945 X $222.00 $222.00 Roberts SL 914 X $222.00 $222.00 Twyckenham E 1218 X $222.00 _ $222.00 Hildreth St. 1516 X . $222.00 $222.00 St Joe St. 511 X $222.00 $222.00 Columbia St. 628 X $222.00 $222.00 P. 13 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia- CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported In Section 11, with additional information on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide th(s information only if known) Road /Street Address Length (mi) Width (ft) G _ () z a t � E F- v W m r1J v H� b E2 U 2 U j0 ¢ a S] ¢ d 2 W ¢ D U 76 (° Fellows St. 618 X $222.00 $222.00 South St. 508 X $222.00 $222.00 Broadway St. 125 X $222.00 $222.00 Broadway SL 201 X $222.00 $222.00 Broadway St. 401 X $222.00 _ $222.00 Broadway St. 315 X $222.00 $222.00 Broadway St. 621 X $222.00 $222.00 Broadway St. 721 X $222.00 $222.00 High St. 1413 X _ $222.00 $222.00 Broadway St. 718 X _ $222.00, $222.00 Broadway St. 614 X $222.00_ $222.00 Rush St. 1416 X $222.00 $222.00 Hanel St. - - 225 X $222.00 - $222.00 Haney St. 103 X $222.00 $222.00 Indiana Ave. 1010 X $222.00 $222.00 Indiana Ave. 806 X $222.00 $222.00 Indiana Ave. 610 X $222.00 $222 -00 Fellows St. 1614 X $222.00 $222.00 Indiana Ave. 302 X $222.00 $222.00 Indiana Ave. 408 X $222.00 $222.00 Carroll St. 1617 X $222.00 $222.00 Indiana Ave. 220 X $222.00 $222.00 Michigan St. 1612 X $222.00 $222.00 St Joe St. 1711 X $222.00 $222.00 Dubail Ave. 202 X $222.00 $222.00 Dayton St. __ 618 X $222.00 $222.00 Dayton St. 806 X $222.00 $222.00 23rd St. 843 X $222.OD $222.00 23rd St. 725 X $222.00 $222.00 23rd St. 529 X $222.00 $222-00 24th St. 601 X $222.00 $222.00 24th St. 725 X $222.00 $222.00 25th St. 605 X $222.00 $222.00 P. 14 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Illa - CONSTRUCTION AND RECONSTRUCTION Part of Stata Form 54400 (8 -10) NOTE: These are the same funds reported in Sectfon II, with additional Information on indiv[dual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost Provide this information only ifknown) RoadiStreet Address Length {mi) Width (ft} [-2 D m X t N w v rn i n LL U ¢ of ¢ °� E W ¢ a U 5 H 25th St. 725 X $222A0 $222.00 26th St. 601 X $222.00 $222.00 $222.00 25th St. $44 X $222.00 25th St. 726 X $222.00 $222.00 26th St, 602 X $222.00 $222.00 26th St. 730 X $222.00 $222.00 26th St, 846 X $222.00 $222.00 27th St. 842 X $222.00 $222.00 27th St. 726 X $222.00 $222.00 27th St. 530 X $222.00 $222.00 30th St. 602 X $222.00 $222.00 30th St. 726 X $222.00 $222.00 30th St. 842 X $222.00 $222.00 31 st St. 726 X $222.00 $222,00 31 st St. 602 X $222,00 $222.00 32nd St. 530 X $222.00 $222.00 32nd St. 842 X $222.00 $222.00 331d St. 842 X $222.00 $222.00 33rd St. 726 X $222.00 $222.00 34th St. 529 X $222.00 $222.00 34th St. 722 X $222.00 $222.00 34th St. 842 X $222.00 $222,00 34th St. 602 X $222.00 $222.00 35th St. 602 X $222.00 $222.00 35th St. 842 X $222.00 $222.00 35th St. 726 X $222.00 $222.00 36th St. 914 X $222.00 $222.00 36th St. 1110 X $222.00 $222.00 35th St. 1214 X $222.00 $222.00 35th St. 1110 X $222.00 $222.00 35th St. 916 X $222.00 $222.00 34th St, 1112 X $222.00 $222.00 34th St. 1216 X $222.00 $222.00 P. 15 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREET$ SECTION Illa - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54490 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. AT 1 FY GRADING; MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only if known) Road /Street Length Address (rni) 1214 Width (ft) 0 3 z r � N j N ro 1 si Q E2 U N O c Q in 33rd St. X $222.00 $222.0.0 33rd St. 9112 X $222.00 $222.00 32nd St. 914 X $222.00 $222.00 31 st St. 916 X $222.00 $222.00 25th St. 1101 X $222,00---- $222.00 25th St. 925 X $222.00 $222.00 25th St. 922 X $222.00 $222.00 26th St. 926 X $222,00 $222.00 26th St. 1023 X $222.00 $222.00 26th St. 1102 X $222.06 $222.00 Bellevue St. 909 X $222.00 $222.00 Bellevue SL 1105 X $222.00 $222.00 St Joe St. 1513 X $222.00 $222.00 Dayton St. 114 X $222,00 $222.00 Carroll St. 1814 X $222.00 $222.00 Columbia St. 1812 X $222.00 $222.00 Bowman St. 237 X $222.00 $222.00 30th St. 505 X $222.00 $222.00 30th St. 621 X _ $222.00 $222.00 30th St. 711 X $222.00 _. $222.00 301h St. 815 X _ $222.00 $222.00 29th St. 805 X $222.00 $222.00 29th Si. 729 X $222.00 $222.00 29th St. 505 X $222.00 $222.00 29th St. 617 X $222.00 $222.00 28th St. 513 X $222.00 $222.00 28th St. 601 X $222.00 $222.00 28th St. 723 X $222.00 $222.00 Sheridan Ave. 840 X $222.00 $222.00 Samp[e St. 3921 X $222.00 $222.00 $222.00 36th St. 628 X $222.06 36th St. 522 X $222.00 _ $222.00 35th St. J 510 X $222.00 $222.00 P. 16 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ella - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section Il, with additional Information on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only ifknown) Road /Street Address Length (mi) Width (ft) g U U z C a c a `t n W � V U) a r m N LL E c U N id ¢ � N J ¢ CL � a Sit ¢ rJ U _ r° 35th St. 618 X $222.00 $222.00 35th St. 732 X $222.00 $222.00 35th St. 834 X $222.00 $222.00 35th St. 511 X $222.00 $222.00 34th St. 609 X $222.00 $222.00 34th St. 745 X $222.00 $222.00 36th St, 602 X $222.00 $222.00 36th St. 722 X $222.00 $222.00 36th St. 721 X $222.00 $222.00 36th St. 1014 X $222.00 $222.00 Pleasant Si 3610 X $222.00 $222.00 35th St. 924 X $222.00 $222.00 35th St. 1038 X $222.00 $222.00 35th St. 1110 X $222.00 $222.00 35th St, 1218 X $222.00 $222.00 34th St. 1230 X $222.00 $22100 34th St. 1022 X $222.00 $222.00 34th St. 1118 X $222.00 $222.00 Mishawaka Avd 3318 X $222.00 $222.00 Vine St. 2811 X $222.00 $222.00 Vine St. 2902 X $222.00 $222.00 Pleasant St. 2901 X $222.00 $222.00 Pleasant St. 2813 X $222.00 $222.00 Vine St. 2810 X $222.00 $222.00 27th St. 1302 X $222.00 $222.00 Nursery Ct. 2814 X $222.00 $222,00 23rd St. 1023 X $222.00 $222.00 21 st St. 1001 X $222.00 $222.00 Bellevue St. 1005 X $222.00 $222.00 Bellevue St. 1014 X $222.00 $222.00 Bellevue St. 1105 X $222.00 $222.00 Bellevue St. 1110 X $222.00 $222.00 Esther St. 917 X $222.00 $222.00 P. 17 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part d State Form 54400 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. m I FV l:RAnI1Jr; MOTOR VEHICLE HIGHWAY FUND ROAD/STREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information onlyifknown) Road /Street G 2 6 O n U :o Length Width g Address (mi) (ft) z s 't a, 77 r v t U) m � F -0 v '¢ `tl u p m m E2 5i c ¢ U ° J ¢ a C E m ui ¢ of F X $222.00 $222.00 rSSt.631 614 X $222.00 $222.00 516 X $222.00 $222.00 Broadway St. 116 X $222.00 $222.00 30th St. 610 X $222.00 $222.00 Mishawaka Av 2917 X $222.00 $222.00 32rd St. 1008 X $222.00 _ $222.00 32nd St. 914 X $222.00 $222.00 34th St. 1109 X $222.00 $222.00 34th St. 932 X $222.00 $222.00 36th St. 914 X $222.00 $222.00 24th St. 812 X $222.00 J $222.00 Donald St. 812 X $222.00 $222.00 Haney St. 533 X $222.00 $222.00 Indiana Ave. 717 X $222.00 $222,00 Indiana Ave. 625 X $222.00 $222.00 Indiana Ave. 509 X $222.00 $222.00 Indiana Ave. 205 X $222.00 $222.00 Indiana Ave. 411 X $222.00 $222.00 Indiana Ave. 307 X $222.00 $222.00 Dubail Ave. 965 X $222.00 $222.00 Indiana Ave. 718 X $222.00 $222.00 Albert St. 521 X $222.00 $222.00 Albert St. 617 X $222.00 $222.00 Al bert St. 733 X $222.00 $222.00 Albert St. 819 X $222.00 $222.00 Edison St. 723 X $222.00 $222.00 Edison St. 841 X $222.00 $222.00 Fellows St. 1810 X $222.00 $222.00 Calvert St. 308 X $222.00 $222.00 Main St. 1121 X $222.00 $222.00 Main St. 1201 X $222.00 $222.00 Ewing St. 1119 ___ X __ $222.00 AM ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Illa- CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Locaticn of Project Area Type of Work Project Cost (Provide this information only if known) Road /Street Address Length (ml) Width (ft) O U i 3 z C O L a py m eY C N w X T al m F = LL � O G U id ¢ °- Q - - F Ewing St, 9 001 $222.00 $222.00 Donald St. 809 X $222.00 $222.00 Donald St. 903 X $222.00 $222,00 Ewing St. 302 X $222.00 $222.00 Ewing St. 418 X $222.00 $222.00 Ewing St. 518 x _$222.00 _ $222.00 Ewing St. 604 _ X $222.00 _ $222.00 Altgeld St. 546 X $222.00 $222.00 Altgeld St. 302 X $222.00 $222.00 Altgeld St. 546 X $222.00 $222.00 Altgeld St. 702 X $222.00 $222.00 Victoria St. 902 X $222.00 $222.00 Woodside St. 302 X $222.00 $222.00 Woodside St, 416 X $222.00 $222,00 Woodside St. 202 X $22100 $222.00 Irvington St. 530 X $222.00 $222.00 Irvington St. 646 X $222.00 $222.00 Eckman St. 802 X $222.00 $222.00 Eckman St. 926 X $222.00 $222.00 Oakside St. 1022 X $222.00 $222.00 DonmoyerAve 1021 X $222.00 $222.00 Indiana Ave. 1223 x $222.00 $222.00 Indiana Ave. 1167 X $222.00 $222.00 Dubail Ave. 1212 X $222.00 $222.00 Dubail Ave. 1312 X $222.00 $222.00 Dayton St. 1352 X $222.00 $222.00 Dayton St. 1316 X $222.00 $222.00 Randolph St 1212 X $222.00 $222.00 Randolph St. 1316 X $222.00 $222.00 bowman St. 1426 X $222.00 $222.00 Calvert St. 1401 X $222.00 _ $222.00 Calvert St. 1353 X $222 -DD - --- LA $222.00 Ewing St. 1 1381 11 1 �_ _.1 X 1 1 11 _.., { $222.00 I L__1 $222.00 II P. 19 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Illa - CONSTRUCTION AND RECONSTRUCTION Part of Stata Form 54490 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only ifknown) Road /Street Address Altgeld St. 133 Length (mi) Width (ft) C O U G z 3 .. � .0 N � G � ca ? F � � Q � L _ � c U 0 � ¢ a J ¢ C W rr Q Q U � X $222.00 $222.00 Altgeld St. 110 X $222.00 $222.00 Victoria St. 140 X $222.00 $222.00 Fairview St. 114 X $222.00 $222.00 Fairview St. 201 X $222.00 $222.00 Fairview St. 502 X $222.00 $222.00 Irvington St. 517 X $222,00 $222.00 Irvington St. 601 X $222.00 $222.00 Fairview St. 728 X $222.00 $222.00 Irvington St. 801 X $222.00 _ $222.00 Irvington St, 901 X $222.00 $222,00 Fairview St. 906 X $222.00 $222.00 Irvington St. 136 X $222.00 $222.00 St Joseph St. 202 X $222.00 $222.00 Farneman St. 114 X $222.00 $222.00 Michigan St. 3110 X $222,00 $222.00 Irvington St. 902 X $222.00 $222.00 Irvington St. 802 X $222.00 $222.00 Woodside St. 829 X $222.00 $222.00 Woodside St. 921 X $222.00 $222.00 Haney St. 1112 X $222.00 _ $222.00 Marine St. 1614 X $222.00 $222.00 Indiana Ave 1216 X $222.00 $222.00 Dubail Ave. 1224 X $222.00 $222.00 Dubail Ave. 1324 X $222.00 $222.00 Dayton St. 1332 X $222.00__ $222.00 Dayton St. 1112 X $222.00 $222.00 Milton St. 1150 X $222.00 $222.00 Calvert St. 1114 X $222.00 22.00 Ma0eSt. 1903 X $222.00 r$2222.00 Leer St. 1906 X $222.00 $222.00 Leer St. 2014 X . $222.00 $222.00 Fox St. 1222 _ f X $222.00 $222.00 P. 20 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8-10) NOTE: These are the same funds reported in Section II, with additional f nformation on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only if known) C O _i O ay Length Width g r m Road /Street Address (mi) (ft) z � 0r Ewing St. 1229 E ctl E 0 X ?, E F m v 4 u_' o c U ¢ a ¢ °� C a ¢ CL $222.00 $222.00 Donald St. 1156 X $222.00 $222.00 Fox St. 1161 X $222.00 $222.00 Donald St. 115 X $222.00 $222.00 Donald St. 237 X $222.00 $222.00 Fox St. 202 X $222.00 $222.00 Fox Si. 921 X $222.00----- $222.00 Fox St. 811 X $222.00 $222.00 Bowman St. 901 X $222.00 $222.00 Altgeld SL 201 X $222.00 $222.00 Victoria St. 201 X $222.00 $222.00 Irvington St. 301 X $222.00 $222.00 Victoria St. 302 X $222.00 $222.00 Victoria St. 502 X $222.D0 $222.00 Fairview St. 637 X $222.00 $222.00 Fairview St. 713 X $222.00 $222.00 Eckman St. 132 X $222.00 $222.00 Eckman St. 231 X $222.00 $222.00 Oakside St. 201 X $222.00 $222.00 Oakside St. 236 X $222.00 $222.00 Woodside St. 303 X $222.00 $222.00 Donmoyer Ave 502 X $222.00 $222.00 Eckman St. 502 X $222.00 $222.00 Oakside St. 613 X $222.00 $222.00 Woodside St. 902 X $222.00 $222.00 Haney St. 1112 X $222.00 $222.00 Bowman St. 1122 X $222.00 $222.00 Leer St. 1911 X $222.00 $222.00 Bowman St. 1224 X $222.00 $222.00 Donald St. 1450 X $222.00 $222.00 Fox St. 1311 X $222.00 $222.00 Donald St. 1224 X $222.00 $222.00 Fox St. 1312 X $222.00 $222.D0 P. 21 ANNUAL OPERATIONAL REPORT FOR LOCAL ROAD$ AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on Individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADlSTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information onlylfknown) RoadlStreet 1 Address Length (mi) Width {ft) o - in (] z G � d d o! N E m E U rn T �l] U r � < LL m U 5 m itl SC ¢ 9 2 c m a ff SF.I o U Fox St. 1.426 X $222.00 $222.00 Leer St. 1422 X $222.00 $222.00 Bowman St. 129 X $222.00 $222.00' Donald St. 228 X $222.00 $222,00 Donald St. 119 X $222.00 $222.00 Fox St. 822 X $222.00 $222.00 Fox St. 926 X $222.00 $222.00 Calvert St. 1012 X $222.00 $222.00 Bowman St. 1018 X $222.00 $222.00 Calvert St, 1410 X $222.00 $222.00 Ewing St. 1012 X _ $222.00 $222.00 Ewing St. 934 X $222.00 $222.00 Ewing St. 822 X $222.00 $222.00 Ewing St. 724 X $222.00 _ $222.00 Ewing St. 634 X _ $222.00 $222.00 Altgeld St. 635 X $222.00 $222.00 Aitgeld St. 901 X $222.00 $222.00 Altgeld St. 922 X $222.00 _ $222.00 Altgeld St 818 X $222.00 $222.00 Addison St. 4005 X $222.00 $222.00 Addison St. 3909 X $222.00 $222.00 Addison St. 3815 X $222.00 $222.00 Addison St. 3711 X $222.00 $222.00 Addison St. 3621 X $222.00 $222.00 Addison St. 3527 X $222.00 $222.00 Michigan St. 3210 X $222.00 _ $222.00 Eckman St. 902 X $222,00 $222.00 Oakside St. 1018 X $222.00 $222.00 Michigan St, 2408 X $222.00 $222.00 Broadway St. 1130 X $222.00 $222.00 Haney St. 1217 X $222.00 $222.00 [ndiana Ave. 1118 X $222.00 $222.OD Indiana Ave. 1322 X $222.00 $222.00 P. 22 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Illa - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Locat[on of Project Area Type of Work Project Cost (Provide this information only if known) Road /Street Address Length (mf) - Width (fl) � U z c 4 N o p7 .v - N v 0� C E F- U E > co T ro U7 V Liz: E2 d � 7 ¢ W F ar LL p U a N 4 ¢ Q - `o fl J ¢ a.. � 0. .5 Cr W ¢ w p 0 o Indiana Ave. 1316 X $222.00 $222.00 Dubail Ave. 1343 X $222.00 $222.00 Dubail Ave. 1436 X $222.00 $222.00 Randolph St. 1215 X $222.00 $222.00 Bowman St, 1152 X 11 $222.00 1 $222.00 Donald St. 1345 X $222.00 $222.00 Donald St, 1405 X 1 $222.00 $222.00 Fox St. 1146 X $222.00 $222.00 Ewing St. 1148 X $222.00 $222.00 Angela Blvd. 549 X $222.00 $222.00 Angela Blvd. 429 X $222.00 $222.00 M[nerSt. 1306 X $222.00 $222.00 Sunnymede Av 306 X $222.00 $222.00 McKinley Blvd. 1402 X $222.00 $222.00 McKinley Blvd. 1722 X $222.00 $222.00 Wall St. 1425 X $222.00 $222.00 25th St. 529 X $222.00 $222.00 25th St, 610 X $222-00 $222.00 28th St. 705 X $222.00 $222.00 Irvington St. 119 X $222.00 $222.00 Ewing St. 1230 X $222.00 _ $222.00 Ewing St. 1610 X $222.00 $222.00 Ewing St. 1702 X _$222.00 $222.00 Ewing St. 1818 X $222.00 $222.00 AltgeEd St. 1309 X $222.00 $222.00 Corby Blvd, 1346 X $222.00 $222.00 Howard St. 1342 X $222.00 $222.00 Wilber St. 645 X $222.00 $222.00 Orange St. 2517 X $222.00 $222.00 Kaley St. 1220 X $222.00 $222.00 Elwood Ave. 3515 X ----FF $222.00 $222,00 Johnson St. 1750 X $222.00 $222.00 Kin}ron St 1510 X $222.00 $222.00 P. 23 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section 11, vfth additional information on f ndividual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Tye of Work Project Cost (Provide this information only if known) Road /Street Address Length (mi) Width (ft) o p 3 z S = 2 X w � ar 4 in T Co r = -5 � z U N ¢ ¢ a E E 4 a ? ° Angela Blvd. 506 X $222.00 $222.00 Osfemo PI. 404 X $222.00 $222.00 Ostemo PI. 332 X $222.00 $222.00 Sommers St. 419 x $222.00 $222.00 Olive St. 2322 X $222.00 $222.00 Olive St. 2232 X $222.00 $222.00 Portage Ave. 1616 X_ _ $222.00 $222.00 Ford St. 2414 X $222.00 $222.00 Ford St. 2510 X $222.60 $222.00 Huron St. 2626 X $222.00 $222.00 Olive St. 128 X $222.00 $222.06 Kale St. 1227 X $222.00 $222.00 Prast St. 2614 X $222.00 $222.00 Fredrickson St. 2629 X $222.00 $222.00 Prast St. 2110. X $222.00 $222.00 1501 X $222.00 $222.00 Huey St. 1423 X $222.00 $222.00 Wellington St. 1418 X $222.00 $222.00 Wellington St. 1513 X $222.00 $222.00 Illinois St. 1414 X $222.00 $222.00 Kinyon St. 1523 X I I I $222.00 $222.00 Wilber St. 1421 X $222.00 $222.00 Wilber St. 1507 X $222.00 $222.00 Lafayette Blvd. 621 X $222.00 $222.00 Angela Blvd. 302 X $222.00 $222.00 Angela Blvd. 420 X $222.00 $222.00 Angela Blvd. 709 X $222.00 $222.00 Angela Blvd. 429 X $222.00 $222.00 Angela Blvd. 513 X $222.00 $222.00 Angela Blvd. 619 X $222.00 $222.00 Angela Blvd. 801 X $222.00 _ _ $222.00 Hawthorne St. 206 X $222.00 $222.00 Hawthorne St. 310 X $222.00 $222.00 P. 24 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Ilia - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54490 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only ifknown) RoadlStreet Address Length (ml) Width (ft) E z t N w N ti U c U m ¢ nJ ¢ � C E ¢ -J >2 32nd St. 918 X $222.00 $222.00 33rd St. 642 X $222.00 $222.00 Logan St. 1105 X $222.00 $222.00 Logan St. 1021 X $222.00 $222.00 Mishawaka Avf 1413 X $222.00 $222.00 Mishawaka AvE 1311 X $222.00 „ $222.00 Main St. 3206 X $222.00 $222.00 Michigan St. 3209 X $222.00 $222.00 Main St. 3443 X $222.00 $222.00 Main St. 3120 X $222.00 $222.00 Main St. 3014 X $222.00 $222.00 Main St. 2900 X $222.00 $222.00 Main St. 2722 X $222.00 $222.00 Michigan St. 2713 X $222.00 $222.00 Michigan St. 2829 $222.00 $222.00 Fairview St. 107 $222.00 $222.00 $222.00 Ewing St. 225 Ix $222.00 Ewing St. 317 $222.00 $222.00 Franklin St. 1930 X $222.00 $222.00 Franklin St. 2019 X $222.00 $222.00 Franklin St. 2124 X $222.00 $222.00 Franklin St. 2222 X $222.00 $222.00 Franklin St. 2010 X $222,00 $222.00 Franklin St. 2185 X $222.00 $222.00 Franklin St. 2213 X $222.00 $222.00 Ewing St. 419 X $222.00 $222.00 William St. 1930 X $222.00 $222.00 William St. 2012 X $222.00 $222.00 Sheridan St. 840 X $222.00 $222.00 s St. 833 X $222.00 _ $222.00 klin St. 1715 X $222.00 $222.00 klin St. L 1835 X $222.00 $222.00 klin St. 1635 X $222.00 $222.00 P. 25 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Illa - CONSTRUCTION AND RECONSTRUCTION Part of State Form 54400 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on Individual projects. ALLEY GRADING MOTOR VEHICLE HIGHWAY FUND ROADISTREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only if known) Road /Street Address Length (mi) Width (ft) O 2 3 z O rz � N N [D c� 0 w - -5 H � .9 � ii O U � U N ig � ¢ a N J ¢ -J i= E 6 W ¢ °� O U 3 F William-St..--- 1633 X $222.00 $222.00 William St. 2215 X $222.00 $222.00 Taylor St. 1916 X $222.00 _ $222.00 Taylor St. 2010 x $222.00 $222.00 Jackson St. 437 _ X $222.00 $222.00 Sheridan Ave. 840 X $222.00 $222.00 Illlnols St. 843 X $222.00 _ $222.00 Indiana Ave. 2011 X $222.00 $222.00 Indiana Ave. 2109 X _ $222.00 $222.00 Indiana Ave. 1925 X $222.00 $222.00 Taylor St. 1615 X $222.00 $222.00 Indiana Ave. 618 X $222.00 $222.00 Scott St. 1316 X $222.00 $222.00 Calvert St. 1613 X $222.00 $222.00 Emerson St. 813 X $222.00 $222.00 24th St. 601 X $222.00 $222.00 27th St. 930 X $222,00 $222.00 Home Ct. 2817 X $222.00 $222.00 30th St. 1215 X $222.00 $222.00 29th St. 518 X $222.00 $222.00 South St. 614 X $222.00 $222.00 South St. 416 X $222.00 $222.00 Tutt St. 127 x $222.00 $222.00 TOTAL MVH FUNDS FOR ROADISTREET CONSTRUCTION AND RECONSTRUCTION $ $114,996 P. 26 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION Illa- CONSTRUCTION AND RECONSTRUCTION Part of State Form 54490 (8 -10) NOTE: These are the same funds reported in Section II, with additional information on individual projects. CRACKSEALING MOTOR VEHICLE HIGHWAY FUND ROAD/STREET PROJECTS Location of Project Area Type of Work Project Cost (Provide this information only if known) c Road/Street From Road /Street - To RoadlSteet Length (mi) Width (ft) C O 5 E o U 3 z C o n r rY a) q N ar ° E m a in I— v p7 ¢ u� o U ¢ -J ¢ W ¢ a N U z �2 Chapin St. Western Ave. Sample St. 2500 64 $940.00 $940.00 Sample St. Chapin St. Grant St. 5738 50 $1,316.00 $1,316.00 Orkney Dr. York Rd. McDougall Cf, 480 25 $564.00 $564.00 Mary Ct. New Energy Dr. W. to CuIDeSac 650 36 $582.80 $582.80 Youngs Ct. New Energy Dr. W. to CuIDeSac 1000 36 $639.20 $639.20 Michigan St Chippewa Ave. Broadway St. 8690 52 $3,384.00 $3,384.00 Michigan St. Broadway St. Sample St. 1825 65 $1,034.60 $1,034.00 TOTAL MVH FUNDS FOR ROADlSTREET CONSTRUCTION AND RECONSTRUCTION $ $8,461} P. 27 z D t= W W n Z) a. �i h �nz � 100 Zap N Qp °z z 0a _rn W z O 0.J 0 Q U U ?Ow a zwF- 0 a LL ° v m z D F U W N }so0 le }as o m o o o o n CD 0 O CO C� o O 0 0 a 0 Q o o a O C) rn f-- O n m C) Q n O Q n Cl O UD CD m N n o O n a c0 a) d: d- O O -t Lo r- oo cc C Mm Cl n W m uu) - LO M m i'n r c*7 n co �r c m u> n u EA Lr3 (o V3 E9 tc, H9 N 64 b9 FfT E9 N auawdpb3 ydl C) o c c ° O t N c c cl H loge- HdZ °o b c0 c C u 6 sNPIEM vcP cD o o c c c Cl Ln d- c u E IMO-L 10RAL100 Q O m O .q O O Q O cD O 0 O O 0 O O O O O O c O c O W n O I- co Q d n c 0 0 6 co 0 co N n O O c n c o: cc ai v_ v o �- Lo n w -c r co r- n l N ui ni do v -:i rn Lo m r- m ' Q rn um-, N e3 FF3 c9 E9 H3 64 64 64 E» rfl V3 (n c pasty pid ieaapaj x x x x x /48JES 1 01}}e1l x x x x x x ueLu sail aos ing 6u ine}lnsaa x uoi�e�p �geyay x x x x x uogonl}su0o MaN x x L C O } C d' c C G C co C a C N E N E E S- E mr C m r C u N o C m m G G m o) G' o C v� co � m E C C O � C O L p O rn "ca m v C r m O C J F m U_ U C N N � } Q N ca C N N ` N m w N 'L3 p fG q� co E N m W Ef c Y C U c U C cry � F U C N m } to C _ U B Y 7 } Q t LJ m O m m E O F -o F 75 C: C U O -C7 ti C1 U G] 67 C 47 } 1 N N E2 g a) t C C U w N N 7 v N 2 O 7 U G d N O L C D .+ — O N N �J C U w N m c�4 m C rn J 'B EL��¢ d) CCL� 7 �LYz N O�' W O In C W a; F a 0 to 0 M C V LL Z N U K r U) Z O U W rA Q ne 0�o N � � U z oH a zo a Lu a J OQ= � U- Z m Q O O u Z Q w m a CLlnr ;SOO IP ;ol es cf. ;uewdlnb3 Vdl Fogel Vdl JOgel Vdl lalo-L ;oPiluoo IP }OI ;OSJ;UO3 rl- Paso piv lejapad AlajeS 1 O!}}eal uawleaay ooelinS 6uloe�nsa�3 uo!lelll ?gP4ai! uol;onjlsua0 MaN G � C '�= 1 I J m 0 F N m �-0 00 N O fY r v m U c u m L L ;sOO le101 ;uewdlnb3 ddl JOgel Vdl IP }OI ;OSJ;UO3 rl- uo6l u}e l LWAK O; Iaap}og�eneJ tiC � sy0 naa � v � a g F � E N O o o � N m Tp � C � r O C'j N L 45 C 2 C 0 U O O N C � O "O N C FA O U w r, IL F Q n m N 0 C4 r C LL It fr a Q a N V U- LL U a F z z 0 U W 1-3-Z CC tu 0 W a z ��0 E- zap ON 0 a 0 o UJ X n -= 0a= J U Z <00 a0U) iso0 lelol Ea �s luewd!nb ydl aoge-{ 'ddl lelol PaSfi P!V 11 f4el2s 1 uoponilsuao MON v> cf juawd!nb7] Vdl J0921 Hdl sle!aaleW Ndl 11310_L JOWIu00 L [A 6 'D l+laluS 1 og L)l uaw }eai_L eaepnS bu!ae}i nse'd i m uo!le3!I!gLq[M m c" E J L � '6 J � i � N 'O m o m 2 12 o v 2 w a D- E m O O N U7 m N u v 2 T u W Er o co o m c u y ca C 4 CO CD � 7 II o � a � r � Q J c Q [1] r- 0 u N (D D O � V y rn o 5= O Er�j U � D C N D C u, O U O a N �7 LL LL asoo lelol v> cf juawd!nb7] Vdl J0921 Hdl sle!aaleW Ndl 11310_L JOWIu00 [A 6 Paso P!V iwapad l+laluS 1 og L)l uaw }eai_L eaepnS bu!ae}i nse'd uo!le3!I!gLq[M E uoponilsuoo MON L � '6 J � i 'O m 12 v 2 D- E m O O U7 m r. JU i i 1 S i i s ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION IV - CLASSIFICATION OF HIGHWAY OR STREET EMPLOYEES Part of State Form 54400 (8 -10) Work Classification Number of Employees Full Time Part Time (Man Months t Year Highway Director * 0 Supervisor(s) - Managers 3 Assistant Supervisor(s) 1 Engineer(s) - FTE 0 Assistant Engineer(s) 0 Clerical Assistant(s) 0 Foremen 3 Truck Drivers 24 Equipment Operators 8 Garage Mechanics . 0 General Laborer(s) 1 5 List others: Fiscal Officer 1 Accounting Clerk 1 Sign Artist 1 Operation Technicians 4 Signal Technicians 3 Highway Director retired in December, 2011. One of the managers serves as interim Highway Director Total 49 6 . P. 31 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION V- EQUIPMENT INVENTORY Vart o15Y1e Form iR :00 ( &10) 8ereau Of SUe Unit No =Is Mske Model Deserl Uon Yearof Manufacsrre Purchase Ac6ua[Costrll r/ frade 201 FORD EXPLORER 4X4 SUV 2007 ._.......�......... 2007 $20,OOD.00 ............. ..�..- ..- .�..,.- ..- .,..,. ............. 02 - -' - ........ ........... FOR..... _. ...... ....... FORD .., ... ,..,. -. -.-.- ....................,...... F250 ......_._.___.__._.._........., 4X4 PICKUP .,... -..._ -- 2004 -_._ � ...,......,- 2004 - -- - -- 522,720.00 - ------------ -. -_.. .......203 .- .- .,. -_.... FDRD ,._...._.....,..,..,..,..F25o °_ ....... ..................... .... _ .... ...... ,........... 4X4 PICKUP .. -.... _- ._ 2004 �.- ............. 2004 ,..,...... ...... $22,720,00 ................ ............ 204 ............... .... ..... .................. CHEVROLET ............_..-.;...-............,.-...-.,.-, 2500 ................ ,....... ,.............._.. 4X4 PICKUP .- . -�.�_. 2002 u- ................ 2002 . $24,148.90 .. ..... .-. - ............ 204R ........... . ......... MAULOIN 40.... ...... ........... _ ............ - 2TON ROLLER tee5 Y Y.Y.. 195...- $0.635.00 .. .- 205A .. ...- CHEVROLET u. u.. Y.. ............ 4590 . ............... 1 TON DUMP 2004 2004 $42,270.00 HONDA NIA PLATE COMPACTOR 1993 ....... ...... 1993 .,. $1,150.00 -' -$42 �........._.. .- ..- .- ......- 20sACHEVROLET _ .. . .......... ............... 4600 ...... ._ 1 TON DUMP 2094 2004 270.00 2O80 1 3 M B W APZD00 PLATE COMPACTOR 2002 u �_Y -- 2002 -2001 - $1,41500 -510,4......-._. 2050 _.......,. -- -- . - -. -. INGERSOLL RAND .. ............. . 185 - - - -- AIR COMPRESSOR �.._ 2001..... .....1989........... - .,.1959 -._ 00 00 ._.$1,0�..._._._... .. -. 2960._.. .- ._.NULLAIR- _- ..�..� - ......... h1PB90 .. ...... ..... ......_AIR HAMMER .....1..... ..... ... -- .188..._.. K.0 a ................... .. -. 20sE ............... SULLAIR........- ................MP...... .. -.. ........ ,.__._.AIRIiAMMER- _........._.... ..- ....- .- ...,-- .-- 9 ...,.- - -.... $1 58p.00 ._...._._,.- _.._._._. _....... - 206 y _ .,. �_. � ................._ SULLAIR �.-.,..-.,.-.-..-.....___._.._.-..-..-.-.-.-...,._.-.-......................., MPB90 ............. ................. ..---'2014.. �. ........ ,............ ..... . .................. BOX - ~_ .................- . ..... - . .... - -.-....... .._...._._.._..- $21,093,00 ...._. -..... 287A ....,... CHEVROLET W . ... .......... ....... .. .. ... ....... _ ....... 4509 ,........... ,.... _..,.- ,.-............ 1 TON DUMP .._._.......-...,.., 2064 ............ _........._.._ 2004 ._._........................ $42278.00 ................ 207E ...... ............................ ................... SULLAIR ..._.._.._. __._- MPB90 ...,..,......- ..........__ AIR HAMMER ........ 1989 ....... ,... .- .- .. ... .... 1989 ....... ....... $1,o00.D0 ... .. ....... ............ .._ ............................-._..--. 28TH �..__. �_.�.,.- SULLAIR ...,.- ...- .- .- .-- .._.__ - _., MPB 90 ....... ,............. .., .......... AIR HAMMER 1980 1989 $1,00D.00 207118 KM 80007 PATCH BOX 2602 2002 N!A 2078 MAULDIN 4000 2TON ROLLER 2001 .............. 2801 ,............._............,. $14,850.00 ............ ... ... 203 .. .. .°-._- _•__....,................ -.. CHEVROLET .. - _ ...., ..,.-,..,.-...,- -.- . -._ _._._._. 2500 �-.-..._..._ .......................... 4X4 PICKUP ... _.-... .... ._... 2002 .........._ .... 2082 .............. $24,148.00 .,..,................ -. -.. 203..6.. --'--._ � ...................................._ MBW ..._._._._._._.- ...- ..- AP2505 .- .....� _-_...........,......,.......... .......-- .- PLATE COMPACTOR . ...... -- 2003 2003 $1,475.00 .................... 299 "__ ._.........,...,.................... FORD .................... ........ F250 ... -,...... ----------------------- .- W4 TON 4X4 .-................ .................. 2011 2071 ........._..........-- ..................... .. $28,826.74 ..- .�...- ...- ._ .... ..... ... 2090 ... _. �...........,...,........,. ...- ..- INGERSOLL RAND .,_- ____._._._.,.. -. -... - ...,.- 1n5 ...- -.. -._ ...........,......................,.-...--..............._._._.,...,..,... AIR COMPRESSOR 1004 -.... -.- 1994 -1992.. -. $9,115.00 ....- ....- .209D w_Y..u. SULLAIRMP89D ....... ..... ... ..... -~AIR HAMMER.- ..- .- ._- .- ... - -.• 1092 . -. -.. $2,500.09..• ..- .....- ...,...- ......... ... ........ .... ...... 209E ........_..........................-,..-_...___._._._._..._.,......,......._................,......,...............--....... SULLAIR MPI'90 AIR HAMMER ......_..__.._.,.__.,...- 1092 1992 $2,500.00 ..- _209H -. - - -� Y.Y.- SiILLAIR ..... .. .... .. . ... MPB90........ ..........~ 'AIRHAMMER............- ...• -. -i 0Be .... ..-...989... ,. _.,.....,..... ......................- - -..- $1.000,00..5 .- ._.... ......... .. .......... 209HB --.. .._.............- ......- . -. -. -. FALCON _- _- .__.__._._._.- .- .- ... - -.,.- RMI- -.-.._..._._............,.... ....- ....... PATCH BOX .. .............. 2015 201D $21,093,00 ..... ....- B..... NG.- .-- ... -__... 8308 ......... ... . ... .... .- -~3TON ROLLER ..- ._.-- ... -. -. 2903.__,._. -, 2003 .... ..2D06 -. ...- $16................. 590.00 -- ~.529......-._..... ... -_21V -_.�.- .CHEVROLET .- .. -..- _._.2500 .. .... ... . ...... . .. .�_ 4X4 PICKUP.-..-.-.-.-.- ...- ...2O8e..._...._- _65.00 21OBB WA HONDA PLATE COMPACTOR 1994 - 1994 -- -- St ,225.U0 - -^- -- 2100 -- INGERSOLLRAND -----1^ - -- 85 -^ -~-A IR COMPRE391IR -•- •--- 1995 1995 90.00 19,111,1. -. -. -..........--.--. 210R ............ _ ... ,.--.,..,.-.-.- .._.__.__..._.,._.,-- BEUTHLING .- . -..,.. - I33DD -- ,....... --- ............ ....... .-..._.---- 3TON ROLLER ..... -. ... 2583 ..,.....,. .,......-- 2D03 '- _.............. $16,590,00 ..- .....,� --_ 211' .......... .... ........................... ............... FORD .... .. ........ .. .............._.......... F45D ..,..,.....,..,.......- ._ -. - FLATBED UTILITY - -- --- ...._...._..,..,. 2011 _.--_.,.... .........-- 2011 ..- $31,674.13 -.- .....2120 Y ............................ CHEVROLET ..- ___.,.- 4500,......,.... ...-. _..- .......1 TON DUMP...-.-._... - ........2004.__ - .,...2004,..,.. -.- 342............ ,270.90 ........-- ...._..._. .- ._. -_ - -- 212C .�.�..�..�..� .... ...... . .. .. ._ ..___._.,.- INGERSOLL RAND .- ...- ..- .... -. - _. 1R5 -. -.._ ................................. AIR COMPRESSOR ....... . .......... ..... 2001 ,... ,.......... 2001 - $10,400.00 . -. ..... -.� -__� 212E .. ............_......--....--..__,.._.__.__..._.,.._...,.................._........................,............._..._...._.......... SULLAIR MPB90 AIR HAMMER .... ............... 1992 1992 ..- .- .._..- ........� $1,160.00 ....._212H ................. SULLAIR . -. -_.. _... .... MPB98........- .- .., -...., .... AIR HAMMER .._- .. -. -_.. _....1989 . -., 1989.... -. . -$1 000 .,- ._.__..... ��. 212H8 ........ �� .............'-----.-.-.-....,. KM ... _., ................. ....__. 8008T ���.................... ,.......... ......... PATCH BOX .... ,............. ,.- . ... 2062 ,... ,.... ....... 2002 . $13,90u.00 _ "- - 219.,._.- ...,..,.... ..CASE ._ . .... ............ 580...... . -.__ _.....,...--...-. BACKHOE...._...... ...____..1998........r7996 -.... -.- $53.724.0'».. O -.-- ,_._...�.-. 214 ..........._..--...,____ _....,.-- HYSTER .--- ----- ....-- . -._... -. P50135652LP -..,............-'-'------.-._..._._._._... FORKLIFT ._._._._- ---'-..- 1967 ----- .-- . -.. 1957 $8,500.00 �._......_...........,.. , u.214F----- -- -- -- - - -- YALE.._.-__.,.-.--_ 4--- K5-...- �.. �._..........-.....-.,.._.--.--...._......_._._._.._...._.. FORKLIFT ,....,..- .- ..- 1999 ...,........�w. 1999 .._.._.............._.......... $12,B04� -DO ....2108................... .......................... HONDA __._.....,......,.PLATE COMPA�._.._.._.__..._...._..........,.-.-....-....-.-_. CTOR 1995 '196 �__W $1,309.0 � .._.....,...�_..........,. ............. 217 .- -- . ..... BLAW KNCX ----- .--------- -- ------ ........,..,........... P F .... ............. , ......... ASPHALT PAVER ........... ........ 1993 -... -. 1993 ...... $154,070.00 ................_.............. ......... 2170 .... ...... .-._.. ................. BLAW KNOX .....,.- . - -_ -.- ,..,...._ ..........................._......--...__..._......,...-... WEDGELOCK PAVER SCREED .,.............,....- ..- 1993 _.....- 1993 NIA .........,..,.....,..,....,.. -. ...._ ......... . .... 2178 ._..._.._._.__._.--._.-.,..,-.-----'- BLAW KNOX �•-•-•_...........,...-----.-..-._.....-........._ OMNI3 .... ,........... PAVER SCREED ..--.-..,.-.-_....._,_...__.,.....,... 2001 2001 ..�,........._... w,500.90 �.- .......,........,. -....- ._.....---.--_ 217BB ...................,..........-......-.-.-.....-._.............,.......--.--_.._. NIA HONDA ................. _. ......................... PLATE COMPACTOR -.-._. 1995 1995 ,._...,...._ .,........................ $1,300,00 , - ...217R ............... ,... ,............. ..,.-.-._..-......._................. INGERSOLL RAND ... DD90 ...--...-..-._.....---------------------- 0 TON ROLLER ..-.-.-..-.-.------- 1994 __..,.�...�............... 1944 $75,500.00 ..- ._...- .,.- .- . -. -. -. ..- '-21BR .............TA.. . .... .- ...- .....- �...- •R515sAY....... .. - 7.5 TON ROLLER .... . -. - .- .-.-.� R -. �. 1985 .. _....., 1985 .....,........., ..-- $44,175.00 ..,........,...-- ....,..... ......... ....... 2187 ._....._.._.---- .........-.......... MILWAUKEE ._....... _................ ....... C2 ,............ _........................... TRAILER .... _ 1951 1981 .....- NIA ....- ..- .-- .,.- .- .- . -. -.. ............... 22 .........._.--.......................- .�........,..,..,..,..........- .--.,.--..-......._._._.,.-...-.,..-..-....-_-__._....-_.-._...............,...- ..........,......,..,.....,.... ------------------- .... 221 .... ...... ... ....... ... .. .... .. .... CHEVROLET ................................................ 4500 .... ...._._._..._........,..........._......."_-...___ FLATBED TRUCK 2003 _....,.......�.,...- 2003 .. -. $30,120.90 -.- - .- ..- ...-- .... -. -__ ..............., 222 ...... ...... -............. NEW HOLLAND ....__ ----------- . L818O -...--. ............... ....... - ., .......... ._.,......-.. SKID LOADER __•- 2001 ....... 2001 ................. $39,961.06 ................... . .. .. .. .. ....... 222T ......................................,...,........................- CRONKHITE .--...--.-...------------- 55 ,._.- .- ..- .- .-- SKID LOADER TRAILER .- .- .- ...- .. -_,_ 2001 _...........,....._-... 2001 ....- $4,785.00 .- ...- .- ....--- ..- .- .... -. ................ 223 ..._ .... _ .... ,.-, .............. .-.-. WIRTGEN .- ......... ............... WI DOOF ...--.--.-._._._. _._._- .- _.- .- .- .- .- .- _.... COLD PLANER " -_ -. 2000 W....., 2000 .....�- ...-- .- ..,..- $247,857.00 - ._.- .,., 0 . .. . .............. . .. ..TRAILER,-..-_ -_ -..— 20DU �__,....... 2000 �.,...,.- .......-- $22,100,00 .....- ._.---- ._. -_ -... .- _Z . ................................ 24R ..... ..- SAKAI ....,............ ..... SVV850 ...... ..... ....................... ... .-.-....--'__ 12 TON ROLLER 2000 2060 ................. $60,200.00 .- ..... . ...... . -.-.-.......... 2247 _............ ....... ........................_...................-...---.•-__.._. DYNAVVELD 247TA _.._._.....-- ..........,...___. TRAILER _--..............., 2001 .,.....,..,...,..,....... 2001 -....- $14,000.00 .._- .- .,...- .. -___ ............... 227 .....................................,-,.......,............,....,............--... FORD TANDEM AXLE --- ._._._._._.- .---------- ..__ -.., DUMP TRUCK -..-............ 2003 2098 $104,650,00 P. 32 ANNUAL OPERATIONAL REPORT FOR LOCAL ROADS AND STREETS SECTION V • EQUIPMENT INVENTORY P. 33 P.0 alsuie Form 30900 Io-7al Bureau Of zk—h Yearof Ac€ual COStI'I UNt No Make M9de1 Desch lion manufacN Pumhnse w/otrade 2278 VALLEY TANDEM DUMP LEAF BOX 1989 $2,500.00 BED . ............ _._._.._......._.......... _-- ._. ... ...... ..__..___....._. ... _.__...... _._........,. .^- 221V_._.__ _...- .TARCO ................BIGT VAC'- LEAF VACUUM 1990 ... ....... ___....,....�. 1899 ... ..__._ 514,979.00 ._......._._ ............ ._..- ........... 223 ............................................. INTERNATIONAL ..._...._-__...._..__......._._._.._..._ TANDEM AXLE ._....._..,._..,.........._. DUMPTRUCK -., 1994 1894 65053 2238 TANDEM DUMP LEAF BOX 1990 ................ .. BED ..__I.._ .... ,.... ,._._...._._. ...... __._...... .- .. _..--- ___._._..___.._.._.. _1980 ........ .__52500^DO... ..__._._... 228V _ - _VALLEY... TARCO BIG T VAC LEAFVACUUM 1989 1989 $14,979,00 _...,..,.....,........ ......... •__ 229...._......_ .................................._.........-.__._._. INTERNATIONAL ................. TANCEM AXLE . ............. ,..................-.-_..._._..,..___._............__.__._ DUMPTRUCK 2011 2011 $166,485,45 _ ............. ........... 2298 .._.. .._..,..,......_..............- VALLEY _ ._._... _._._ _..__._.__._. DUMP ._._._.,._._...._..,.....,..... -,_..._...,.. LEAF BOX ........ .__._._............. 1990 _.. 1990 _........................... . $2,500.00 ....................._---_.,._._._..._..._._._._... BED ._._.__._.,..,...............,. _., _._ _._....._._.,_.- .._. ------------ . ..... .... ............. .. »_._.,._...._._....._...,._......._..._.._._.. 229V TAROO BIG TVAC LEAFVACUUM 1089 ..._.. 1989 ................... ._,............................ $14,979.00 _............... . .................._.....,........_ FREIGHTLINER ------- .....__._...,.._._.-'-'__._._.,._....................._-._..._..._._.------ TANDEM AXLE DUMPTRUCK 2008 2008 $125,553.00 ..... 2308........... ..... ..... v . ........................... ALLEY !!) flR MDUMP LEAF BOX._.._._._._.,..._.-1969_..._._.._...._._.__.........................._.- 1989 $2,500,00 BED ._.._............. ... ....... ._._._._...... , ..........---- ...._--- __._..... �._._._..._.._.. ___.,..__._._.... ................,......._...._, ............... 231 ........ ...------------ ----- ......�,.._ CHEVROLET 4504 FLATBEDTRUOK 2D95 ..... ......... 2005 _.,.._._. $28,437.00 .............._ -_.._ ._._. 238._..._.. INTERNATIONAL -. - - -- ~TRACTOR_.__. _._................. _ TRUCK " -- �_... ...... ...... .189 0 1990 - - -_ - - -- - - ---I $52,455.00 r-, -. - -. - - — - ..................__._.. 233T .. ......... ............ ...._ EAGERBEAVER _. -._.. ................. ..._..................... 20XTP ,.... ..... .............. TRAILER .... _._._.------- 1895 1995 .... ,._._...................___ $12,300.00 -- __ -._ 234.,._, ........................ ........ ,__... CHEVROLET _...._.._..,..,..,._._...__._..._._.._.,....... 4500 ............___._._......_.,.., FLATBED TRUCK ................. 2034 ..,.__.-- 2004 --- ... -- -- $38,335.00 ..... ----- ._._...._. ...... 235 ._ ... ............ ...... I ....... _ FORD ... ......................... .-------------------- F550 - I... -.. _ ................ FLATBED TRUCK .--------------- 2008 -- - -- 2006 _..... ..........._- $32,138.00 "..-- __.�._.._..., ........_ . ...:. 239 ... ... ......... .... ....... .... INTERNATIONAL ......... ,............ ,._ ............... TANDEM AXLE ,..,..,...........-..._-_. .,._..._...._._,_.._._._._ DUMPTRUCK 2003 2003 $500,e15.94 .,._..__......... 2398 .............. ......_.___�� _._..._. VALLEY ._._..._._._.___.._._._._...._...... TP,IVDEM DUMP ...._��.__._......._._._.,.__.. LEAF BOX _...._._._._...._..,....... 2003 .......__..._.._..,.__.._..._.. 2063 $5,745.00 ..__� -..._. BED __. ................. ... . .............. .......-._-._..,.__.._.,._._.__._......__._. ,._..........,................_ � ._.___.,.._.._...,. ._._ .. .............,..._.__........., 24 0 INTERNATIONAL TANDEM AXLE DUMPTRUCK 2003 2003 $100,815.94 _._.....___._......._... ................. 2408 _._...,......,............_ - -. _.__ VALLEY __. __.._._.._.___._. _......_._...................�. TANDEM DUMP __.._._.._....__._.__..._.._._._..,._ LEAF BOX ...........,................___ 2003 2006 $5,745.00 BED 242 SWARTZ WILDCAT ROADPATCHER 2OD5 __..,..__...._....... 2005 ....� __-- .._�.. 5130,365.00 _......._...,._.._..._.... 243 INTERNATIONAL._ ..... .........._.......... _.TANDEM AX LE ...___._....._._._..._._.,..._. DU MP TRUCK 1997 1987 572,005,00 241B TANDEM DUMP VALLEY LEAF BOX 1989 1939 $2,500.00 _.__.._._.,..._-__._._.,.. BED -------------- ,..------- _...... _.-...._._., .......... .---------- .._._. _._._---- ......_.._..._... -__.. ._.... ,... ,............. ......................... 743V ....___ -- TARCO BIG T VAC LEAFVACUUM 1939 1959 $14,979.DC ................ --- .------ ._- --- _.. ....... .... SINGLE DUMP 2448 VALLEY ....... ,........ .... LEAF BOX ... ...,................. 1989 ---- -- 1888 ...,.. ..... ,... .... ...... ,. $2Y500.00_ BED 244v TAR CO BIG TVAC LEAFVACUUM 1989 1939 $14,979.00 245 ETNYRE CENTENNIAL DISTRIBUTOR 2000 2000 �...,._..,..,..._._......_._ 5141,494.98 ................, 246 _................_..._._.._._..._,...__..._._._...._._.__..,........,.........._..-_'-_...._._.._._..,._.__ SWARTZ WILDCAT ._...._.._.._.�.�.,..,._......, ROADPATCHER 2001 _,__� 2001 -___._ $129,445.00 ___.._...,_.._._..,... ._.__ ..... .............. .....NG._... -.- ........... .......... ._SINGLE AXLE .... ............................... DUMP TRUCK ............ 2004 ..,__�_ 2004 $82,481.00 ---------- .----- 2488 __ ------ _-- ------------- ..-- VALLEY 51 NGLffDUMP .... ..... .. �.. �-.•'"._.__ ............ __.__ ..... LEAF BOX .._.._._._..........,.. 1989 -.. ..-- , -.- -_. 1939 ---- ,---- ------------- $2,500AD ............... .......... ........_�..-- _._..,._.._._._., BED ____._.._. ................ .................,.-- -------------- .___._.._ .,.._.......................... ---- ......... .................... .. 249 INTERNATIONAL TANDEM AXLE DUMPTRUCK 1997 1997 $72,005.00 .__._..._... --- -., -- -- - - -- ___..._._.._._..,..__. 2498 VALLEY ..... ...........................�... TANDEM DUMP -..-_ ._._,......_.._._._.,...._.... LEAF BOX , .,.._._.............._, 1989 ..�. ___.._ ._......,..,.._.,..._.._.._._.. 1989 $2,500.00 ,...... ._._... BED _ .................... ----......-.-..«-._._._._.,......_._._.__. ..._._..._._................... - .-- ._._._.,._.. __...,.__.,..,..._.._.... ........ ................. 250 .........___..... INTERNATIONAL SINGLE AXLF DUMPTRUCK 2000 2000 $77,99700 ------- _ ....... 25DB .............. . ...... ............ VALLEY _._SINGLE bUMP_. ........ .-.... ....................... _....__ LEAF BOX _._................ -. 1989 . ­- 1950 52,500.00 BED ..._._.__._................. -.. _.__._....._._.._._._._.__..._.._..._..,..,.. ..................- _._.-._._._- ._.._.,..._._. ........ .............................._,-_.__._._._.._._.__..____._...... 250V TARCO BIG TVAC LEAFVACUUM 1989 1985 . __ ........ 514,979.00 . ......... ,......... _._ 2......- _ - -..^ _ FORD ---- - -._., . - TANDEM AJCLE.........T. -~ -DUMP TRUCK ... ._ ... _... ..............._...... 1993 _. 1993 $08,310.00 ..................._ 2518 ..... .......__.__._.._...._..,._._.. VALLEY _ ._....._.._._...._.,......._., TP.NDBED UMP ................ . ... ........ .,..,..,............. - LEAF BOX _.. ............. 1989 ______.._..._._ 1080 ---------------- --- .. $2,500.00 2510 SNOW EQUIPMENT 1600 GAL, ANTI ICING TANK 2001 2001 $17,231,00 SALES INC......... -_FOAD _ .........................._.-.-__._.... _._..._..._._...._.._.._.._._._ ............. . -.. -_ TANDEM AXLE DUMPTRUCK 1983 1998 $89,010.40 ................_..... 2528._,..____.. ,�__. _._..._..................TANDEM VALLEY Dl1MP...._..__._._._..._.,.._._._..__...... ......... BOX ........._. ........- ..__._..._.,.._._.,.., __...___._._._.._._. --- ED..,............._. _..._....................1889 -.- .._._._._LEAF __..- __._1989 __. - .-$2.504. ...... 2520 .......................B SNOW EQUIPMENT 1600 GAL, ANTI ICING TANK 2002 2002 $14,759.04 SALES INC 253 INTERNATIONAL SINGLEAXLE DUMPTRUCK 2000 2000 $77,997.09 ... -2590 VALLEY._....... BINGBED [7MP.T- BOX $2.-._._._.... 590.00 Y...__... _._.__._._. - -LEAF _______________ __ _1989„._ _.__._1989- .- .- .- 253V TARCO BIG T VAO LEAFVACUUM 1933 .__.__._,._..._._.,.__._., 1980 $14.979.00' .._. .... ._.......... ._.254_._.......kNTERNA7IGNAL .... SINGLEAXLE - ..._._ ...................__.._...._._.........,.......... DUMP TRUOK ...-- 2000 2000 $68,492.00 VALLEY._..,..,._.___._...._ P_.__.__,..,_,._._.. SINGLE DllM.„.._ LEAF BOX 1039 -_... 1969 $2,590.00 BEI7.... _._..._._..._.......,......... ------ ---- -------- ... ....... .... ....... _ .... .... .. ........... _z548 ........ . . 255 ...... FORD TANDEM AXLE DU MPTRUCK 1998 1908 $71010.00 .__ 2559_.,.._...,.. .__. - VALLEY._..._..4hI�BEU �JMP .................. - -LEAF BOX .,..,._.,......._ 1989..__ 2.500.00 ............................ -..._. .__1988.._..._$__.._._......_.. ................ ..................... 2550 ......................... ................... M-..-.-.._. ._......,..,.._._.,._.__._._._. SNOW EQUIPMENT 1 3D0 GAL. ANTI ICING TANK 2002 2002 $14.759,00 ____SALES INC ...... ..... ...... "-... -, .._ ... ,... .......... .___.__._..,. _.._._._..........,....._.._... _._...._...._..__.,. _ ............ _. ........ ....... ...... , 258 STERLING 51NGLE AXLE DUMP TRUOIC 2004 2004 $02,49100 _._.2588,._.. _.. .._ .. VALLEY ._._._...,..SINGLE Dl1MP_. ....... ._._.. ......... _ ............................_._.._._._.__._..__.____ LEAF BOX 1989 __._.,.._..___._.,..._..,...... 1988 $2,500,00 BED ........_.... .............. _._. _ .............. _.._...,............... ,. ........ .............. 2578 ...__ ....................... ,._.....,............,.____.. VALLEY .... ....._._._..""'__.._.,.._.................. SINGLE DUMP LEAF BOX 1989 1969 $2,500.00 .................. BED . .............M...- .- _._...._.., _._._...._._.__._..._........_._.,.. ..,.........._...-._._.._ .,.._._.,._._._._._.....__._... ...... 258_.,. ____.,_._...� FORD TANDEM AXLE DUMPTRUCK 1998 1906 $72,870.00 ..... ________ 2588 .... .........................._.� ._._._._._......_..._._...___._.,.._._._......_;....... VALLFY TANDBED UMP.,..._._._...____._._...._ ................._._._._._.._., LEAF BOX 1989 1989 ._..___._._..._..,..... $2,500.00 --- ._._....,..... ......._..,....,.._._._._.__._. __.......__... 258D _..ALL _._..........,..-- SNOW EQUIPMENT 1300 CAL. ANTI ICING TANK 2001 2081 $17,231.00 ............... ...._SALES INC._._... .......,......- ._.._..._._ .... ... ... ....... .. _._ ._._......................_�.__ _. --- -------- ._,._.... �. __..,_..._._...__._.._......_.. P. 33 ANNUAL OPERATIONAL REPORT FOR LOCAL ROAD$ AND STREETS SECTION V - EQUIPMENT INVENTORY Pad al5lak Dann s5aoo la -toJ P. 34 Y—f Aet..I C-F Unit N. Make Model Descri Gon Manuf -t Purchaas � h de 252 FORO SINGLE AXLE DUMP TRUCK 1998 1998 $59,.9DAD ................ ............--1.,_,... 2528 .,............�.�......._...___ SINGLEDU1�iP ._.._..........,.._�.- ---.---......,....._.,.._..._.._.,....._._..._._.,..,._ LEAF BOX 18 ._...,..........._- 1989 .._- ........ -- BED... _ _. _..._. ...._._.. ................. _ ....... ........................_..._89 .. ..................�.�.,...,. �.�.,.�____._._ ...- -I- ._., _...�.�.- 262V .VALLEY.��.,...,. TARCO BIGTVAC LEAFVACUUM 1988 _.,..,..,..,......,......_ 1969 $14,079.00 -_ ----- -- - - -- .......................__.._._............._.....,....._._.._..._._:__ 263 .... ... ..._.._.................-.................... INTERNATIONAL TANDEM AXLE ......_._._._._._._ ... _.._.,... DUMP TRUCK 2011 2011 $166,486.45 ' -. 253B.�., .... ...- '- '4ALLE'lYU.�.._..._TANOEM DUMP- ..................._..LEAF BOX .....................'19 ......... ,._._............,..... 89 1969 .� -- __._...._....., $2,590,00 .. ... ,... . __._._..__BED ..__..._..._.._.,........____.... ._............,._..._._._._._.. _........__._._... _._.,..,..,..,...... . ..... -.- ---- -- - - -- ...... ......................� z53V . „................,.., TARCC BIGTVAC LEAF VACUUM 1966 ........ 1969 .------ I $14,979,00 _---- __--------- ................ ... 254 ---- . ---- L ..... ,......... _.,..,_. ------- _------------ --------.___.....,................_...__._._...._._.. INTERNATIONAL TANDEM AXLE ................ DU MP TRUCK 1994 2D1 52,5D0.90 2848 VALLEY TANDEM DUMP LEAF BOX 1919 19.9 52,509.00 BED 264V TARCO BIG TVAC LEAF VACUUM 1969 luau $14,979.00 265 FREIGHTLINER TANDEM AXLE 'DUMP TRUCK 2006 20us $125,550.90 ._._...._ ..................... 2858 ............................... �. _._.___.__....._.... TANDEM DUMP VALLEY BED.._........_ _._....,__....,..,..,.......,....._._._.,._.. ......._......_._...__._....... LEAF BOX 7989 - ............................... ......... ............. ............__..- 19394 ......,..�.............._., 52,500400 ..,._ 2.....-_...- .............__._...._.__..... _._._.__ SINGLE DUMP VALLEY LEAF BOX '1 959 1569 $2 , 500. 0 0 BED 265 FREIGHTLINER TANDEM AXLE DUMP TRUCK 2006 2005 5104,080.09 .......�...._._.. 2668 -.. . ............_...._..__.__...___ _.. _._._._.:_._............._...._..............._.._.. TANOEM DUIdP VALLEY ...... ,._._.._.,.._. _._.......,..,......_........., LEAF BOX 1989 __...�.- �._.....,.... 19.8 ..,........._.,.., ..... _.. 52,50940 BED -, - 275 PISP�RY LED15 SOLUTIONS ARROW BOARD 2002 2002 $3,895.00 276 DISPLAY LE015 ARROW BOARD 2DD2 ZD02 $3,695.00 SOLUTIONS 2504 N!A NIA AIR HAMMER NIA WA _...,....._.,._......_..._.___. NIA ........--- . 281 .......... ._._.... ------- ---- _ .................... - ...... FORD BINGLEAXLE ...... ... .......... .. --- ...................... .............._.____....,..,..,. DUMP TRUCK 1695 1998 - $57,090.00 ~628164 31NGFED UfMPY VALLEY- SOX- ?- 19894 . -. -. -. ... -.. - . -.... - .19856 .u.- .Y.Y-- --LEAF ..-- .^ uW -.- .$2_50000.. Z81 TAROO BIGTVAC LEAF VACUUM 1989 ...- 1989 ---------- --- _..,.. $14,97049 ......... ......... _.........._ ...... 282 ... ............................... ... ........... ..». ---- ... ............. INTERNATIONAL SINGLE AXLE _ .... . ...... ....................... ,. DUMP TRUCK 1959 1997 $72,005.60 ..._......_..� .... 2628 ..........._......._.__.,.__.,........_...__..........._....._......__..._... TANDEM BUMP VALLEY ........ .._..,._._..._.,..,........... -m - _.- ..._.._...._.,..,...._...___ LEAF BOX 1989 . _._._. -------- .... ....... :.90.00 .. W282D -_.8 ... ................................. 18DD GAL, SNOSALES ............................. -. _........................_.,.__ ANTI ICING TANK $14_��69,0._. 76949 INCENT..... - -20026 uu- yy1112 ..... 283 INTERNATIONAL TANDEM AXLE DUMP TRUCK 1597 1997 $72,095.009 ................................... ......................�........ _................._..,........ TANDEM �l1�JiP ,.... ..... ........._.__.,._............_. - ..__.9., ....._...........I- 9D 9"..._.__ _............._.....,. 6NO -C GAL..........._ A-NK 0 NCENT........_76w _._.__ANTICCING ................ _^._2DD2...... _....._2002__.,.._$4,750C _ 283V TARCO BIGTVAC LEAF VACUUM 5989 1989 - -- $14,979.00 --- -V YU264 -- INTERNATIONAL - TANDEM AXLE -- -- -2DUMP TRUCK- ........ -_ -~- 1994.....,..,...2010 $2.500.0�............. 0 2648 VALLEY ...................._.... TANDEM DUMP -. LEAF BOX._.,: .............._ . - yYiue9� . .. 1989__....._.$2.5 ......... _., 00,00 BEO.............._._.._._._._. ------------- ._._..__._._.... ......................... ... .......__. ............ .... 285 .. ..__..__....,.__..._.,...,........._.._- CHAMPION c7DA MAINTAINER 1555 _....._......._......._...,.___ 1995 $70,605,09 ..... ............. .,. 288 ...._.CHAMPION .................._ CID,............. A _..,.._...._._............ ._...._....,..,................ -......... MAINTAINER IW -_,._... ........._... 1997 ........ _...... $78,87900 ...................... ---- .... ....... 289 _._ ...... ..... ............. ....._._-....-...............__.._.._._._...._._. HUBER MBsOA _._.._.,..,.................. -. MAINTAINER 1985 .... 1995 ............. ___.,.. O S58.301 CO .......... .._.__._. _ .................. 290 ............ .................. ..................... .......... BOMAG MPHIDDR ....... .......... ...... ....................... __ -^............. SOIL MIXER 1555 ,..._..---- ..----- 1965 _._.,._...___ $188,051n0 . .. ...... ..... -.__. ......291T .... ........... DECK...__..., ... .. MIGHT Y...........,..,.. MOVER ... .................. _._.._.,.._.,......,........_. _.._,. SKID LOADERTRAILER 1555 1995 ....4.2004...- $4.231.90 ._$35.469,DC. Y.Y...292.- . -...- NEW HOLLAND -. T- .--- -LS180.� ......... ........ .. .. ...SKID LOADER.- _.- .T.- -..... 2o4.W.. — ---- --------- _._._._.__.__.,._ _..._ .._......_._.... ... ,.............. 292T .._._..._._._...._.__...,.... ...._._.__- .�- ....�....,..._.__ NIA NIA ...__ ........... ............................... .__ SKID LOADER TRAILER 1558 .. _............,........... IDoe ......... ...____ $895440 ...... _ .... ...... .......293._.,._ __..._.�. -GEHL ............. .... . 6635'......,..,._.. DXT ..... _.__ .._ ...... ._.._._._._...,....... _... SKID LOADER 1996 Iu% ----------- .... $3955,1,00 ................... ...� ... .......... 293T ........ ............................... __ _.._I ---------------- BECK MIGHTY MOVER . ......... .......................... _'. SKID LOADERTRAILER 1996 1096 _._ ...... $4,205,00 ........ _., .......... . ..,._._294 ...� ......... _ ................_.,....-.._ .............,......,...,..__._ PSI M413XT _._........ ....._.._._._..,......_..._- w--.................,..,......_._._._._. MAINTAINER 2005 _�..�...........�.,........_.,. 2965 _._._... .......�..._..._.__._._._,._... $85,6DTDD ....._._.._._.._.. 295 .._._,._...._...._._.........., _ . .-.. ....................__._......_._.._... STEPP SMT -------------------- .----- ... CRACKSEALER 2003 .......... _., ...... 2008 ..,._._ .......... .. $1937500 ............... ,....... , :__._._.._ ..... 2P7 ...................,........_-...-................._.,.____.__._...._.__._._._._.._........._ STEPP 1200 ...... . CRACK SEALER 1998 ....,..,....._._.,..,._._._.._. 1598 _._....... ..... $23,030.00 _._._._..._._.___._ - --- 290..__ __..._..._... CASE...,......-... ..................._.,...__.__....... 821 ..... _._._._....._.............._ ��.... CASE LOA DER 1992 .................. .... _._ 1992 _....2000._. $98,950.00 _ ..__...,...,. _ . .._.. . _ 299 .. CASE - .......921C ._._......_.._.,._. -CASE LOADER 2009 .._._._..._........_...,..._.,. $231,374.00 ............,._.........,..... ................. 29913 ...................-_.._.......,.......,..... ..,..__.__._._.�.__...,..NULT1- ADS GRAPPLER PURPOSE..........,..._..__._ BUCKET 290 2000 WA 9118 ._. ..._.�....... VALLEY ..................SINGLEOU'MP BED .... .....LEAF BOX........... . .... .... . -198 __..__._ 9 --- _.__ 1969 _ _..................,......... $2,SDO.DO 91313 ....................VALLEY "......_ .,.- SINGBED 11FidP ....,.._.._.........,._LEAF BOX _..,...........,.._..._..._., 9........ 69 .. .. ....... . . .. 1919 . ...... _.......---- ...,...... $2,500.00 ........ ................. .. ..... ................... __--...--------......_._._..,._._ ._..__....._....._._.,..._..... .,.........---- .........._, _..._._ ....................................... 913V TABOO .BIGTVAC LEAF VACUUM 1989 ........... ...... .2002 1969 -- $14,979100 ...$29,416....,. ................ 2270 ..... .- - ..- ........................ TENNANT ATLV4300 ^.m..^. -... LITTER VACUUM 2002.. 09 5548 - VELOCITY TANDEM DUMP BED LEP.F BOX 2001 .....,.._._......_..__._._...._ 2005 ..._._.........,._�.,....___, $7,656.00 .5 .-... -,_ ....... ........�... 5428 - .-..._..._- .....,..._ ...._ TANOBI ..__,._._.....,..._.......... VELOCITY Eo UMP -._—..................,._ LEAF BOX 2005 2005 $7,556.0 _._..._.. _.._ _ .._._.._._.......,.......m ._....._............. _._. _._._. _............__..,. _._._.,._.. .,................— ......,... -� ........ _.. ........ 911V .......— ....................... TARCO BIG TVAC LEAF VACUUM 1989 1919 $14,979.09 P. 34 w Q w w w Cl) Q� WWI w CL LLI Q � N o azzLU za- °o um a�aw d Cd U oao QVw Zj0 zO�Z a0= LL U 7 Z 0 F- 0 w N P. 35 Q) w U) N L 7 4- O Q LD CL } L N � c U o C: N (6 N N L� J C O O] C E LL 0 :�r co N O 0 "' Q co L Q fl o c ¢ LU Q U E a c� CNJ co � U N (6 Z3 ❑ c� Q a� "0 > C N -0 U U N (B U O (? Q C: O Q CJ� U) W N 2 _0 Q d Q7 c U so ° U O >_ O O = O d Q T m m C7 U P. 35 U) F... F Q LU a F J � Qa b_ CC 4� a LL a uU OQ �C Q Q II ■ . m N � � C L5 O U C = O O m L) r- 0 a_ O Tn U � N o. m o ai U _ C ro U) ELI (D a N = L4 is 0 C L N .- O w (0 (% a 0 0 L C ISOO IS}Ol C7 O CA m O 7 o c CO ' LO ' h ' M ' ' cc ' �t ti C C'i N CQ O Q N CI) 0 O co 'd' c Cfl LO h Lq cl1 W C t�?tp ca fiab'}fA607� v--> 6% CO tr* SEA cS b3 E }UGWO11jos Ieuld c lOONI Aq Pled -egg pad o O 0 0 0 0 o c o co m 0 0 0 o c m cc LO cr) cc o o 0 LO 0 LO 0 (0 c c cr N N cc O w cil c CI) 0 . ti LO N o o d o v v < m V) LO v LO ti •�i= c LOGNI of pled WILL IeaO] o 0 m 0) o o 0 0 =5 Cl) M O CA N CD h 4 d co m 0 H lOQNI Aq pasingwipd S}UMPSUOO 01 pled bHWO X x o dS01 X N cC° a6plag is Q V/ Ii -d1S X X N LL 53H-d15 X d1S X IO N ro a U OO X X x X X X X o AAE 73d X O Z � L O D N LO N cc p O �M 7 N 0 O 00 O 00 oO m O O 4 ED O CD N O CD O O CD 0 o m C C C C C C N C ID O O O O .rL `m m a U CO C C O o o m m U C 7 C N C U O N H N 0 w CD U, Q Y ro c Q (D o vQ .L U E a E m c O a a O 3 o - o u m w mX L Q (U N cz X 0 I1 ll. t '2 ■ . m N � � C L5 O U C = O O m L) r- 0 a_ O Tn U � N o. m o ai U _ C ro U) ELI (D a N = L4 is 0 C L N .- O w (0 (% a 0 0 L C Submitted by; DATE: 20 N/A Engineer /Director DATE: 20 NIA County Highway Supervisor Approved: NIA DATE: 20 Board of County Commissioners Submitted by: DATE: May Zj 20 12 City Engineer DATE; May 20 12 Pi Street Commission r or Supervisor DATE: May as 20 12 Approved: Mayor or Pr e"N of T uncil P. 37 Attachments Sent With Annual. Road Report: Attachment A - Alley maintenance Attachment B - Paving areas (1, 2, 3, 4, downtown) Attachment C - Vendors Attachment D - Inlays, sewer cuts and sewer insurance Attachment E - Emulsions (Bit Mat Products) Attachment F - Infrared repairs (ARS) Attachment G - Pothole patching Attachment H - Miscellaneous patching P. 38 Due Date - June 1st of the following year: Mr. Charlie Pride or Mr. Todd Austin State Board of Accounts 302 West Washington Street, Room E418 Indianpolis, Indiana 46204 -2765 Financial Management Unit Indiana Department of Transportation Indiana Government Center North, Room N725 Indianapolis, Indiana 46204 Mr. John Haddock, Director Indiana Local Technical Assistance Program (LTAP) Vision Technology 1 1435 Win Hentschei Drive, 8100 West Lafayette, Indiana 47906 -4150 Mayor's Office Common Council Members City Clerk Council Attorney Street Department Engineering Administration & Finance P. 39