Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment No 2 to OEA - Edison WTP Proj No. 123-067 - United Consulting
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS January 14, 2025 Mr. Paul Glotzbach, PE United Consulting 8440 Allison Pointe Blvd., Suite 200 Indianapolis, IN 46250 paul.glotzbach@ucindy.com RE: Amendment No. 2 to Owner-Engineer Agreement Dear Mr. Glotzbach: At its January 14, 2025 meeting, the Board of Public Works approved the above referenced amendment for the Edison Water Treatment Plant, Project No. 123-067 in the amount of $39,200 with a new adjusted total $1,140,200. Enclosed please find a copy of the amendment for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/hh Page 1 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. This is EXHIBIT K, consisting of pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated , . AMENDMENT TO OWNER-ENGINEER AGREEMENT Amendment No. __2___ 1.Background Data: a.Effective Date of Owner-Engineer Agreement:October 10, 2023 b.Owner:Board of Public Works, City of South Bend, Indiana c.Engineer:United Consulting d.Project:Edison WTP Improvements, 123-067 2.Description of Modifications: [NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity with respect to the modifications to be made. Use paragraph numbers in this document for ease of reference herein and in future correspondence or amendments.] a. Engineer shall perform or furnish the following Additional Services: 1) Prepare State Revolving Fund (SRF) Preliminary Engineering Report (PER) sections for the Edison WTP to be incorporated into a PER by Others. 2) Prepare exhibits for alternatives. 3) Prepare environmental exhibits as required by IFA including wetland determination and flood plain boundaries from available federal information documentation. 4) Prepare cost estimates and assist with financial evaluations as required by the Indiana Finance Authority (IFA). 5) Coordination with IFA regarding the environmental assessment, preparation of letters of transmittal, cover letters, and responding to comments. 6) Final revisions to the PER following a review and comment period by Owner. 7) Assist with preparation for the public hearing including the agenda, attendance, and drafting of the meeting minutes. Page 2 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. b. The responsibilities of Owner are modified as follows: 1) Provide asset management plan (AMP) information and documentation. 2) Provide information regarding the financial advisor / financial AMP section of the PER. 3) Assist in coordinating with other Engineers involved in the preparation of the overall PER, as needed. 4) Assist with communication with area residents, as needed. c. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: 1) IFA SRF PER Preparation Assistance (Lump Sum): $39,200 d. The schedule for rendering services is modified as follows: Item No.Activity Completion Schedule 1 Draft PER Report Sections 60 Days from Owner Notice to Proceed 2 Final Report Completion 30 Days from Receipt of Owner Draft PER Comments 3. Agreement Summary (Reference only) a. Original Agreement amount: $_96,300____________ b. Net change for prior amendments: $_1,004,700_________ c. This amendment amount: $_39,200 ___________ d. Adjusted Agreement amount: $_1,140,200_________ The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Page 3 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Owner and Engineer hereby agree to modify the above-referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is January 14, 2025. OWNER:ENGINEER: By:By: Title:Title:Keith Bryant, P.E., Senior Vice President By:By: Title:Title:Paul Glotzbach, P.E., Vice President By: Title: By: Title: By: Title: By: Title: Date Signed:Date Signed: 12/10/2024 January 14, 2025 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 01/02/2025 Name Becca Plantz Department Public Works BPW Date 01/14/2025 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name Cynthia Simmons BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name United Consulting New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Edison WTP Improvement Project Number 123-067 Funding Source Water Capital Professional Services Account No. PO-0032687 Amount Original: $96,300.00; Amendment 1: $1,004,700; Amendment 2: $39,200 New Total: $1,140,200 Terms of Contract Hourly NTE Purpose/Description Amendment 2 to services for the State Revolving Fund Preliminary Engineering Report for improvements at the Edison Water Treatment Plant. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: