Loading...
HomeMy WebLinkAbout6A6 Approve Request for Proposal (Main Street Housing) - SignedSouth Bend Redevelopment Commission 227 West Jefferson Boulevard, Room 1308, South Bend, Indiana Redevelopment Commission Agenda Item DATE : 1/6/25 FROM: Joseph Molnar, Assistant Director of Growth & Opportunity SUBJECT: Approval of Main Street Housing RFP Funding Source* (circle) River West; River East; South Side; Douglas Road; West Washington; RDC General; Riv. East Res. * Funds are subject to the City Controller's determination of availability; if funds are unavailable, as solely determined by the City Controller, then the authorization of the expenditure of such funds shall be void and of no effect. PURPOSE OF REQUEST: Approval of the Request for Proposals for the land located adjacent to the Morris PAC SPECIFICS: The attached Request for Proposals (“RFP”) is soliciting proposals from interested developers for a new housing project in downtown South Bend. The Raclin Murphy Encore Center is currently under construction adjacent to the Morris Performing Arts Center (the “Morris”). The Raclin Murphy Encore Center will be a 20,000-square-foot expansion of the Morris. The Encore Center is Phase II of The Neverending Encore which was the culmination of the 100th anniversary of the Morris following Phase I which totaled $10 million in improvements to the Morris. The final Phase III of The Neverending Encore is an envisioned to be an attached parking garage. This garage will be constructed in the surface parking lot on Main Street. The attached RFP envisions enhancing the parking garage with a housing development that can bring additional vitality downtown. The housing development contemplated includes placing units on top of the “L” shaped garage (Option A) or constructing the housing development as a separate building, adjacent to the parking garage (Option B). The RFP does not envision the Redevelopment Commission selling land to a developer but rather entering into a long-term lease agreement. The RFP sets out clear project requirements, submission requirements, evaluation criteria, and the process for evaluation. Staff recommend the approval of the RFP. _________________________Pres/V-Pres ATTEST: __________________Vice President Date: ____________________ APPROVED Not Approved SOUTH BEND REDEVELOPMENT COMMISSION January 9, 2025  County-City Building 227 W Jefferson Blvd, Suite 1400 S South Bend, IN 46601 James Mueller, Mayor Phone Email Website 311 inside City limits 311@southbendin.gov Southbendin.gov City of South Bend Department of Community Investment CITY OF SOUTH BEND REDEVELOPMENT COMMISSION DEVELOPER REQUEST FOR PROPOSALS – MAIN STREET HOUSING Introduction The Redevelopment Commission is pleased to present this Request for Proposals for the downtown housing development associated with the Morris Performing Arts Center (PAC). The City of South Bend is requesting proposals for the creative inclusion of housing in conjunction with a new downtown parking garage constructed by the City. We are excited to identify a partner who can collaborate with the City to achieve this important residential development. With the recent expansion of the Morris PAC proceeding towards construction, the time is right to now turn attention to supporting this important cultural asset with connected parking while also continuing to bring more residents to our downtown. Project Description The City of South Bend is soliciting proposals from interested and experienced developers for a new housing project associated with the Morris Performing Arts Center (PAC). The City of South Bend is embarking on an enhancement project for the Morris PAC. This will include a new expansion to the Morris PAC which will complete the street scape along Michigan Street between the existing Morris PAC and the La Salle Apartments. This new expansion will be a two-level building with a footprint of approximately 8,500 GSF. (Reference attached renderings of the Morris PAC expansion.) The City will also be constructing a new parking garage to support the Morris PAC. This garage will be constructed in the surface parking lot on Main Street, west of this new Morris PAC expansion and above its existing loading dock. (Reference the attached site plan and concept floor plans.) The City is contemplating two configurations for the parking garage: Option A) An “L” shaped garage that covers the surface parking lot and spans over the truck access to the loading dock, or City of South Bend Community Investment Option B) A simple two -bayed parking garage which is constructed directly west of the PAC expansion only. Both garages are anticipated to include 400 +/- spaces with vehicular ingress and egress off of Main Street. Access to the Morris PAC loading dock will remain on Main Street. The parking garage levels will all be constructed above grade. The City is desiring to enhance the parking garage with a housing development that can bring additional vitality to the downtown. The housing development contemplated includes placing units on top of the “L” shaped garage (Option A) or constructing the housing development as a separate building, adjacent to the parking garage (Option B) which will necessitate the housing spanning over the loading dock access. The construction of the parking garage will be either a cast-in-place concrete structure or a precast structure. This decision will be based on construction cost and compatibility with the proposed housing development. Additionally for both options, the City’s Municipal Utilities Office, located at the northeast corner of Colfax and Main Streets, will be demolished allowing this parcel to be included with the housing development. This will allow the housing development to have street presence and pedestrian access at this corner. The housing development on this site can then span the alley to the north and connect to the remainder of the housing placed on top of the “L” shaped garage (Option A) or connect with the housing placed over the loading dock access (Option B). The housing development for both options is anticipated to include 60 – 90 housing units, depending on the mix of unit types. The parking garage will be a shared garage for use by the tenants of the housing development and the public, including patrons of the Morris PAC for scheduled events. It is anticipated that 90 – 135 spaces will be made available for the housing development depending on the final number of units constructed. The remaining balance of the spaces will be available as public parking spaces. It is anticipated that the housing spaces will be nested / separated on the upper floors of the parking garage for both the LaSalle Apartments, the Hoffman Apartments, and the new housing. The architectural character of the proposed development (reference attached renderings) suggests a cohesively designed development consistent with downtown urban design. The City will provide an architectural façade for the parking garage for either option. The housing development’s exterior will complement the parking garage facade design to create a cohesive look to the overall development. Collaboration with the design of both components will be needed to accomplish a successful result. Developer Qualifications / Incentives / Development Framework This Request for Proposals (RFP) is directed to interested developers who have demonstrated experience with urban housing developments that include parking garages. These housing developments need to have either integrated garages with the housing (similar to Option A) or stand-alone garages adjacent and connected to the housing (similar to Option B). The developer will need to have been in the urban housing development business for a minimum of 10 years. Familiarity with the City of South Bend’s on-going downtown revitalization, demographics, and overall housing market will be beneficial. City of South Bend Community Investment The developer will need to specify in their submittal any incentives (City, Federal, or otherwise) and the amounts thereof that is anticipated to be included in the project capital stack and provide information regarding the process and timeline for securing these. It is expected that the City of South Bend will own the Parking Garage and the land the housing development is built on and lease the land to the developer of the housing development via an indefinite long-term ground lease. The site is zoned DT Downtown which is the appropriate zoning classification for this scale and type of project. Developers should be familiar with the zoning requirements and proposed projects which meet the intent of the South Bend zoning ordinance. Submission The submission requirements will be as follows: Cover Letter including: o Organization Name o Address o Phone & Email Team Organization: o Description of Team o Organizational Chart with Individuals o Key Staff o Description of Roles (including percentage of each team members time devoted to the project) o Resumes Proposal for Housing Development: o Outline of development and financial terms (Pro Forma expected later) o Any or all proposed lease payment or terms to the Redevelopment Commission o Projected overall construction costs and other private investment o Proposed project schedule o Details regarding unit affordability, including percentage of proposed affordable units o Details regarding incentives developer is requesting o Project exterior renderings and diagrammatic floor plans Description of the proposed Developer and Operator: o Identify other firms co -submitting the proposal and their relationship to the developer, and involvement in the project o Description of developer’s in-house capabilities o Number of years in business o Documentation of financial ability to complete the project Examples of Prior Relevant Experience: o Number of Projects o Location of Projects o Number of Units o Total Project Cost o Imagery of Completed Examples City of South Bend Community Investment All exhibits, drawings, renderings, and other material included in the submission, in addition to the sealed bid, will be retained by the Redevelopment Commission. The Redevelopment Commission reserves the right to accept, reject, or table any and / or all offers for any / all reasons. Submission Instructions Questions shall be submitted to Joseph R. Molnar no later than 5:00pm local time March 27, 2025. The Redevelopment Commission intends to respond in writing or email to all questions that will be an addendum to the RFP, and such information will be provided to all respondents receiving a packet via email. All such addenda shall become a part of the RFP, and all respondents shall be bound by such addenda, whether or not received by the submitter. Respondents shall submit their responses electronically to jrmolnar@southbendin.gov and should reference this proposal in both the subject line of the email and in the proposed document. All response files should be in PDF format, with individual file sizes limited to 20MB. All responses must be received by 12:00pm local time, March 27, 2025. Hard copies may be required at a later date. Timeline o RFP Released January 9, 2025 o Questions Due March 27, 2025 o Offering Sheet and Question Responses Provided April 10, 2025 o Proposals Due April 24, 2025 o Redevelopment Commission Proposal Opening May 8, 2025 o Interviews May 15, 2025 – June 12, 2025 o Staff Recommendation to Redevelopment Commission July 10, 2025 . Option Agreement & Project Agreement In order to ensure timely commencement of the site development, within 90 days of notification of selection, the selected developer may be required to enter into a written agreement pertaining to the eventual lease of the site. Upon notification of selection, the developer will concurrently proceed with due diligence, pre-development activities, requests for incentives, and pursuit of real estate entitlements, while also working with the City to negotiate a required Project Agreement for the ground lease. Appendix Site Plan Diagrammatic Floor Plans Axonometric Massing Studies Renderings PURPOSE + OVERVIEW The City of South Bend is soliciting proposals from interested and experienced developers for a new housing project associated with the Morris Performing Arts Center (PAC). The City will be constructing a new parking garage to support the Morris PAC. This garage will be constructed in the surface parking lot on Main Street, west of this new Morris PAC expansion and above its existing loading dock. •Option A) An “L” shaped garage that covers the surface parking lot and spans over the truck access to the loading dock, or •Option B) A simple two-bay parking garage which is constructed directly west of the PAC expansion only. The City is desiring to enhance the parking garage with a housing development that can bring additional vitality to the downtown. The housing development contemplated includes placing units on top of the “L” shaped garage (Option A) or constructing the housing development as a separate building, adjacent to the parking garage (Option B) which will necessitate the housing spanning over the loading dock access. This RFP does not commit the Commission to award a contract or pay costs incurred in preparation of a proposal responding to this request. For questions or clarifications, please contact Joseph Molnar at: jrmolnar@southbendin.gov. PROJECT REQUIREMENTS Adhere to Option A or B for the Housing Development placement; Meet zoning ordinance requirements; Be urban in building design and site layout; Exterior of Housing Development complement the facade of the parking garage for either option Reflect the architectural character of surrounding properties and South Bend’s architectural history; and Feature a variety of housing options (size and price points) AT A GLANCE 0.84 ACRES ADJACENT TO THE MORRIS PERFORMING ARTS CENTER AND LOCATED IN DTSB DEVELOPER REQUIREMENTS Applicants must have experience with urban housing developments that include parking garages, either integrated or adjacent to the housing. Applicants must have a minimum of 10 years of experience in the urban housing development business. Familiarity with the City of South Bend's on-going downtown revitalization, demographics, and overall housing market will be beneficial Applicants must comply with City of South Bend ordinances and all other federal, state, and local laws and regulations. Applicants must agree to hold the South Bend Redevelopment Commission harmless and to indemnify it and the City of South Bend for any damages or costs related to any claim, suit, or demand related to any action occurring as a result of the Applicant’s proposal. The Commission reserves the right to reject proposals submitted by Applicants who are not current on property taxes or utility payments for any properties currently owned, or for any other reason deemed to be in the best interest of City. SUBMISSION REQUIREMENTS All proposals must be submitted using the legal name of the organization with whom a contract would be executed and must be signed by an authorized representative. An electronic copy of the submittal, in a single PDF document, no larger than 20MB, shall be submitted to jrmolnar@ southbendin.gov with subject line of “Bid: Main Street Housing” and include each of the following: COVER LETTER Provide a brief cover letter including an overview of the Applicant’s organization,, address, phone number and email ORGANIZATIONAL INFORMATION Description of team, organizational chart with individuals, key staff, description of roles, and resumes PROPOSAL FOR HOUSING DEVELOPMENT •Outline of development and financial terms (Pro Forma expected later) •Any or all proposed lease payment and terms •Projected overall construction costs •Proposed project schedule •Details regarding unit affordability, including percentage of proposed affordable units •Details regarding incentives developer is requesting •Project exterior renderings and diagrammatic floor plans DESCRIPTION OF THE PROPOSED DEVELOPER & OPERATOR •Identify other firms, their relationship to the developer, and involvement in the project •Description of developer’s in-house capabilities •Number of years in business •Documentation of financial ability to complete the project EXAMPLES OF PRIOR RELEVANT EXPERIENCE •Number of Projects •Number of Units •Total Project Cost •Imagery of Completed Examples EVALUATION CRITERIA PROCESS FOR EVALUATION The staff of the South Bend Redevelopment Commission will review all submittals to determine whether they are complete and responsive to this RFP. Only submittals that are complete, responsive, and meet all requirements of this RFP will be evaluated. Complete and responsive submittals from qualified applicants will be reviewed in detail as they are submitted. If warranted, the Commission reserves the right to request clarification or additional information from individual applicants. If a bid is accepted, the bid will be publicly recommended at a meeting of the South Bend Redevelopment Commission. RESOURCES South Bend Zoning Ordinance TIF Districts River West Development Plan RFP REQUIREMENTS Proposal is complete and meets or exceeds the requirements of this request for proposals. DESIGN The size and character of the proposed development fits the general design principles for the site. Specifically, the building type(s), design, site layout, number of units, materials, and similar considerations will be evaluated. Special attention should be given to connecting the site to Downtown South Bend and the Morris Performing Arts Center. EXPERIENCE Applicant has sufficient experience and a successful track record of projects of similar type, size, and complexity and has a minimum of 10 years of experience in the urban housing development business FINANCIAL RESPONSIBILITY The Applicant demonstrates the ability to finance and complete the Proposal in the time frames stated. SUSTAINABILITY The degree to which sustainability features are incorporated beyond building code requirements. PROPOSED LEASE TERMS Any or all proposed lease payment or terms to the Redevelopment Commission. PROJECT SCOPE Construction of a mixed use building that contains a minimum of (60) units and ground floor retail. Any other factors which will assure the Commission that the proposal will best serve the interest of the community, both from the standpoint of human and economic welfare and public funds expended. MAIN STREET HOUSING RFP TIMELINE RFP Released January 9, 2025 March 27, 2025 Questions Due April 10, 2025 Offering Sheet & Question Responses Provided April 24, 2025 Proposals Due May 8, 2025 Redevelopment Commission Proposal Opening May 15, 2025 - June 12, 2025 Interviews July 10, 2025 Staff Recommendation to Redevelopment Commission MORRIS PERFORMING ARTS CENTER MORRIS PAC ADDITION (CONSTRUCTION START 2024) 115-121 W COLFAX AVE (TO REMAIN) DEVELOPABLE PARCEL W COLFAX AVE W LASALLE AVE N DOCTOR MLK JR BLVDN MAIN STMORRIS PAC DOCK / COLFAX BUSINESS LOADING ACCESS (TO REMAIN) SITE PLAN STRUCTURED PARKING APPROX. 400 CARS RETAIL OPPORTUNITY MORRIS PAC DOCK / COLFAX BUSINESS LOADING ACCESS RETAIL OPPORTUNITY 60-90 RESIDENTIAL UNITS APPROX 26,000 SF / FLOOR DEVELOPMENT POTENTIAL A MORRIS PAC ADDITION STRUCTURED PARKING APPROX. 400 CARS (ROOFTOP AMENITY OPPORTUNITY) 60-90 RESIDENTIAL UNITS APPROX 26,000 SF / FLOOR DEVELOPMENT POTENTIAL A RETAIL OPPORTUNITY 60-90 RESIDENTIAL UNITS APPROX 26,000 SF / FLOOR RETAIL OPPORTUNITYMORRIS PAC DOCK / COLFAX BUSINESS LOADING ACCESS STRUCTURED PARKING APPROX. 400 CARS DEVELOPMENT POTENTIAL A GROUND LEVEL PLAN RETAIL OPPORTUNITY MORRIS PERFORMING ARTS CENTER MORRIS PAC ADDITION 115-121 W COLFAX RETAIL OPPORTUNITY PARKING RESIDENTIAL LOBBY MORRIS PAC DOCK / COLFAX BUSINESS LOADING ACCESS DEVELOPMENT POTENTIAL A PARKING LEVEL PLAN MORRIS PERFORMING ARTS CENTER 115-121 W COLFAX RESIDENTIAL UNITS (APPROX 6/FL) MORRIS PAC ADDITION PARKING DEVELOPMENT POTENTIAL A RESIDENTIAL LEVEL PLAN MORRIS PERFORMING ARTS CENTER 115-121 W COLFAX RESIDENTIAL UNITS (APPROX 28/FL) ROOFTOP AMENITY OPPORTUNITY MORRIS PAC ADDITION DEVELOPMENT POTENTIAL A DEVELOPMENT POTENTIAL A RETAIL OPPORTUNITY STRUCTURED PARKING APPROX. 400 CARS 60-90 RESIDENTIAL UNITS APPROX 14,000 SF/FLOOR RETAIL OPPORTUNITY MORRIS PAC DOCK / COLFAX BUSINESS LOADING ACCESS DEVELOPMENT POTENTIAL B MORRIS PAC ADDITION STRUCTURED PARKING APPROX. 400 CARS 60-90 RESIDENTIAL UNITS APPROX 26,000 SF / FLOOR DEVELOPMENT POTENTIAL B RETAIL OPPORTUNITY RETAIL OPPORTUNITY STRUCTURED PARKING APPROX. 400 CARS 60-90 RESIDENTIAL UNITS APPROX 26,000 SF / FLOOR MORRIS PAC DOCK / COLFAX BUSINESS LOADING ACCESS DEVELOPMENT POTENTIAL B GROUND LEVEL PLAN MORRIS PERFORMING ARTS CENTER MORRIS PAC ADDITION 115-121 W COLFAX RETAIL OPPORTUNITY PARKING RESIDENTIAL LOBBY RETAIL OPPORTUNITY MORRIS PAC DOCK / COLFAX BUSINESS LOADING ACCESS DEVELOPMENT POTENTIAL B RESIDENTIAL LEVEL PLAN MORRIS PERFORMING ARTS CENTER 115-121 W COLFAX RESIDENTIAL UNITS (APPROX 14/FL) MORRIS PAC ADDITIONPARKING DEVELOPMENT POTENTIAL B DEVELOPMENT POTENTIAL B