Loading...
HomeMy WebLinkAboutOpening of Bids - Dept of PW Service Center Re-Roofing Proj No R124-032B - Hoekstra RoofingCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name South Bend Public Works Service Center Project No. R124-032B For Bids Due December 10, 2024 PART (Must be completed for all bids. Please type or print) Date: December 9, 2024 Bidder (Firm): Hoekstra Roofing Company Address: 1963 Olmstead Road City/State/Zip: Kalamazoo, MI 49048 Telephone Number: (269 ) 343-5536 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Department of Public Works Service Center Re -roofing the City of South Bend, Indiana, in accordance with plans and specifications prepared by: WDi Architecture, Daryl Williams -Dotson and dated November 15, 2024 for the sum of (enter the Total Bid as shown on the Proposal) Six hundred twenty thousand two h undred dollars ($ 620 200.00 ) (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. Tom Lundquist, CFO (Signature) (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this _ Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member day of 20 Joseph R. Molnar, Vice President Breana N Micou, Member Murray L, Miller, Member Attest: Theresa Heffner, Clerk Version 07/19/2023 Contractor's Bid for Public Works - 2 �ITII /y.l Q BIDIPROPOSAL I> CITY OF SOUTH BEND Project Name: South Bend Public Works Service Center Re -roofing Project Number: R124.032BB For Bids Due: November 26, 2024 Contractor Name: Hoekstra Roofing Company BASE BID Item No. Description Quantity Unit Unit Price Total Amount 1 Roofing repairs and replacements $598,950.00 2 Unforseen Conditions Allowance $25 000.00 3 Sealing Open masonry joints 250 Leefl $15.00 $3,750.00 4 Replacing wet insulation and liner 200 Square No bid No bid* feet BASE BID TOTAL $620,200.00 *This work is more work than the ALTERNATE #1 benefit of doing it. Item Description Quantity Unit Unit Price Total Amount No. Substitute 60 mil PVC membrane for Tri- 6 polymer Alloy Membrane and delete Manufacturer Inspection Services No change 7 8 9 10 ALTERNATE#1 TOTAL No Change Bidder (Firm): Hoekstra Roofing Company Address: 1963 Olmstead Road City/State/Zip: Kalamazoo, MI 49048 Telephone Number: (269 ) 343-5536 By _ (Signature) Tom Lundquist, CFO (Printed Name of Person Signing) Version 07/19/2023 Contractor's Bid for Public Works -7 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 07/19/2023 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Michigan ) ) SS: Kalamazoo COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 07/19/2023 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 07/19/2023 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 9th day of oeaember, 2024 Hoekstra Roofing Company Contractor/Bidder (Firm) Sig o Contractor/Eidder or Its Agent Tom Lundquist, CFO Printed Name and Tide Subscribed and sworn to before me this 9th day of December 2024 My Commission Expires 08/08/2026 —Iw a,m w� Notary Public County of Residence Van Buren, MI MELISSA SHOLANDER NOTARY PUBLIC - STATE OF MICHIGAN COUNTY OF VAN BUREN My Commission Expires Au ust O8, 2026 Acting in the County of Version 07/19/2023 Contractor's Bid for Public Works-6 CNASURETY CONTRACTOR: (Name, legal status and address) Hoekstra Roofing Company 1963 Olmstead Road Kalamazoo, MI 49048 OWNER: (Name, legal status and address) Bond No. Bid Bond SURETY: Western Surely Company (Name, legal status and principal place of business) 151 N. Franklin Street 17th Floor Chicago, IL 60606 City of South Bend Board of Public Works 227 West Jefferson Blvd. South Bend, IN 46601 BOND AMOUNT: 5% Five Percent of Amount Bid PROJECT: (Name, location or addmas, and Project number, if any) Department of Public Works Service Center Re -roofing Project #124-032 This document has Important legal consequences. Consultation with an attorney is encouraged with respect to Its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Pmject and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any prevision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted therefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 22nd day of October 2024 �LWAsI/� (Witness)Melissa Sholander (Witness) Catherine M. Krueger Suretv Phone No. 312-822.5000 Rdmed In coopemllon with the American Institute ofAmhltects (AIA). The language In this document conlon is to the language used In AIA Document A310 - Bid Bond- 2010 Edition. Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized suit existing corporation having its principal office fir the City of Sioux Falls, and State of South Dakota, and that it does by virtue ofthe signature mid seal herein affixed hereby make, comtitute mid appoint Amy J. Fordc , Individu ldly of Toledo, OH , its tare and lawful Anorney(s)-hh-Fact with full power and authority hereby conferred to sign, seal and execute for mid on its behalf bonds, undertakings and other obligatory instruments of similar nahue - In Unlimited Amounts — SuretpBondNu: Bid Bond Principal: Hoekstm Roofing Company Obligee: City of South Bend Board of Public Works suit to bind it thereby as fully it to the same extent as if such instruments were signed by a duly authorized officer ofthe corporation and A the acts of said Attorney, promised to the authority hereby given, one hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the Authorizing By -Laws and Resolutions printed at the ban= of this page, duly adopted, as indicated, by the shareholders of the corporation. In RTmess Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this But day ofJmsua y, 2024. a$.astpETYP WESTERN SURETY COMPANY W,PPOa9p'e f g ;�EAx' ♦Y P Larry Kasten, Vice President Siete of South Dakota l Comity of Mwiehaha ss On this IOth day of January, 2024, before me personally came Lary Kasten, to me known, who, being by me dndy sweet, did depose and say: that he resides in Tire City offhows Falls, Stale of South Dakota; that he is a Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument; that he knows the seal of mid corporation; that the seal affixed to the said instrument is such corporate seal; that it was so affixed personal to authority given by the Bond of Directors of said cooperation and dint he signed his more thereto prominent to like authority, mid acknowledges more to be the act and deed ofsafd corporation. My cornnussion exphes '....."M. BENT" „f March 2 2026 is � xmam auauw/;�yI: �. aourx oaxoras�544�C' r.......................r M. Bent, Notary Pubic CERTIFICATE I, Paola Kolsmd, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force, mid father certify unit the By -Law and Resolutions ofthe corpomtiwiprinted below this certificate are still in force. In testimony whereofI have hereunto subscribed my name and affixed die mal of the said Corporation this 22nd dayof October , 2024. �o*odRq°off WESTERN SURETY COMPANY au,a� as>N uw`� Paula Related, Assistant Secretary Authorizing By -Laves and Resolutions OF WESTERN SURETY COMPANY This PowerofAttomey is made and executed personal to and by authority ofthe following By -Law duly adopted by the shareholders of the Company. Section T. AB bonds, policies, undertakings, Powers ofAnomey, or other obligations ofthe corpoaton shall be executed in the corporate name ofthe Company by the President, Seeretary, mud Assistant Secretary, Treasurer, or any Vice President, array such other oRcers as the Board of Directors may authorize. Tthe President, any Vice President, Secretary, airy Assistant Secretary, orthe Treasurer may appoint Attorneys in Factor agents who shall have authority to issue bonds, policies, or undertakings in the were ofthe Company. The corporate seal is not necessary for the validity of any bonds, policies, undMakings, Powers of Attorney or ether obligations of the corporation. The signature ciliary such officer and the corporate seal maybe prided by facsimile. This PowerofAtooey is signed by Larry Kasten, Vice President, who has been authorizecipmsuant to the above Bylawto execute power ofattomeys on behalfof Western Surety Corepary. This Power ofAnomey may be signed by digital signature mid sealed by a digital or otherwise electmhuc-fomatted corporate seal under and by the authority of the following Resolution adopted by the Board ofITrectars ofthe Company by umaulmom written consent dated the 27° day of April, 2022: "RESOLVED: Tbal it is in the best interest offie Company to periodically ratify and confirm my corporate documents signed by digital signatures and to ratify and confine the use ofa digital orothensise electmnic-fomatted corporate seal, each to be considered the act and deed ofthe Company." Go to ssisvv.cn... hetv.com> Owner / Obligee Sendces> Validate Bond Coverage, Ifyou want tu verily bond authenticity. Form F12MG-2013 CITY OF SOUTH BEND ','� ,;'. MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number: R124.032B Project Name: South Bend Public Works Service Center Re -roofing Bidder: Hoekstra Roofing Company Total Bid Amount: 620,200.00 MBE Goal: 0.6% Page 1 of 1 Name &Atltlress of MBE Primary Contact Person (Name/relephone) scope of Work to be Performed (Attach scope/schedule If you read additional space) Dollar Amount of MBE Component Percentage of Total Bid/fT al osai Leon's Roofing LLC 3628 East Tillman Road Fort Wayne, IN 46816 Omar Leon 260-557-8489 omar.oscar@leonsro Flat roofing, dyrwall, and powerwashing f.com $189,440.00 30% Submitted by: Tom Lundquist, CFO —77 December 9, 2024 Print Name Signa Date ***Goals should be calculated based on the Base Bid only..*** Version 07/19/2023 Contractor's Bid for Public Works-9 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number: 11124-032B Project Name: South Bend Public Works Service Center Re -roofing Bidder: Hoekstra Roofing Company Total Bid Amount: WBE Goal: 2.1% Page of Name &Adtlress of WBE Primary Contact Person (Name/relephone) Scope of Work to be Performed (Attach scope/schedule If you need additional space) Collar Amount of WBE Component Percentage of Total Bkl/Pro oral None Submitted by: Tom Lundquist, CFO December 9, 2024 Print Name Signat Date ***Goals should be calculated based on the Base Bid only.*** Version 07/19/2023 Contractor's Bid for Public Works -10 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAMAt PLANot.FORM MBE-2.0 This completed form should be included as part of the Bids documents Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: Project Name: Bidder: Contact Person: Address: Data. December 9, 2024 South Bend Public Works Service Center Re -roofing Hoekstra Roofing Company Jeff Bos, Project Estimator Telephone: 269-303-8525 (cell) 1963 Olmstead Road City; Kalamazoo state: MI zip; 49048 Email: Jeff@hoekstraroofing.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth In the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed In the table below': EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htt ://wwwJn. ov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. 1 affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website htt:llwww.in. ov/idoa. I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs In the scopes of work of the contract. V I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. See Questionna re I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 07/19/2023 Contractor's Bid for Public Works -11 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number: 2. A description of information provided by the bidder or subcontractor, and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 07/19/2023 Contractor's Bid for Public Works -12 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: R124-032B Date: December 9, 2024 Project Name: South Bend Public Works Service Center Re -roofing Bidder: Hoekstra Roofing Company Contact Person: Jeff Bos, Project Estimator Telephone: 269-303-8525 (cell) Address: 1963 Olmstead Road City: Kalamazoo State; MI Zip: 49048 Email: jeff@hoekstraroofing.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below': EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority, and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: httD://www.inoov/idoa1. ov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website flhtIn1/www.In.cmv/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 07/19/2023 Contractor's Bid for Public Works - 13 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. 'Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional Information. Version 07/19/2023 Contractor's Bid for Public Works - 14 CITY OF SOUTH BEND y�y 4 MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE I OF I Project Number: R124-032B MBE Participation Goal 0.6% Project Name: South Bend Public Works Service Center Re -roofing Bidder: Hoekstra Roofing Company By: Lundquist CFO December 9,2024Lundguist CFO December 9, 2024 (Sig (Title) (Date) MBE Firm Leon's Roofing LLC Owner or Contact at MBE Firm Omar Leon Telephone: 260-557-8489 Fax: N/A Email: omar.oscarcdleonsroof.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Flat roofing, dyrwall, and powerwashing RESULTS OF CONTACT WITH THE MBE FIRM: MBE Firm Owner or Contact at MBE Finn Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 07119/2023 Contractor's Bid for Public Works -15 !c(1\1111 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 \_r+ WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE + OF I Project Number: R124-032B WBE Participation Goal 2.1% Project Name: South Bend Public Works Service Center Re -roofing Bidder: Hoekstra Roofing Company By: Tom Lundquist, CFO December 9, 2024 " (Title) (Date) WBE Finn NIA Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 07/19/2023 Contractor's Bid for Public Works -16 1316 CoUNfY-CITY BUILDING 227 W.JEFFERsONBOULEVA D Soum BEND, INDIANA 46601-1830 Date: To: From Subject Project Name: ProjectNo.: PHONE 574/235-9251 FM 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND JAWS MUELLER, MAYOR BOARD OF PUBLIC WORKS PW Service Center Roof Replacement R124-032B ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Hoekstra Roofing Company Authorized Signature Tom Lundquist, CFO Date: December 9. 2024 1/7 PW Service Center Roof Replacement R124-032B Addendum No. 1 Date: November 27, 2024 To: All Planholders From: Lidya Abreha, Project Manager You must acknowledge receipt of this addendum by signing the first page and returning a copy with your quote. The items in this addendum are to become part of the original documents as if included therin. Only the noted items are affected, and the remainder of the original contract document is to remain in its entirety. This Addendum modifies the Contract Documents as follows: PART 1 - SPECIAL PROVISIONS PART 2 — PROJECT SPECIFICATIONS PART 1- SPEIAL PROVISIONS 1.01 Section XIII Part B.1 REVISE The project will have a completion date of May 23, 2025 Calendar days for all work with The project will have a completion date of May 23, 2025 for all work. PART 2 — PROJECT SPECIFICATIONS 1.01 REPLACE Section 07 5400 (Thermoplastic Membrane) of the project specifications with the attached document found on Pages 3 to 7 of this addendum (PVC Membrane) -This addendum consists of a total of 7 pates - 2/7 WDi Project Number 240318 26-Nov-24 Public Works Service Center Re -roofing SECTION 07 5419 POLYVINYL CHLORIDE ROOFING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Rigid roof insulation 2. Roof insulation cover board 3. Thermoplastic PVC membrane roofing 4. Base flashings 5. Expansion joint covers 6. Walkway material. B. Related Documents: 1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 2. Section 07 0150 Preparation for Reroofing 3. Section 07 6200 Sheet Metal Flashing and Trim 4. Section 07 9200 Elastomeric Sealants 1.2 REFERENCES A. ASTM International 1. ASTM C728, Standard Specification for Perlite Thermal Insulation Board, 2. ASTM C1177/C1177M, Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing. 3. ASTM C1278/C1278M, Standard Specification for Fiber -Reinforced Gypsum Panel. 4. ASTM C1289, Standard Specification for Faced Rigid Cellular Polyisocyan u rate Thermal Insulation Board. 5. ASTM C1549, Standard Test Method for Determination of Solar Reflectance Near Ambient Temperature Using a Portable Solar Reflectometer. 6. ASTM D3273, Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an Environmental Chamber. 7. ASTM D4434, Standard Specification for Poly (Vinyl Chloride) Sheet Roofing. 8. ASTM E108, Standard Test Methods for Fire Tests of Roof Coverings 9. ASTM E1980, Standard Practice for Calculating Solar Reflectance Index of Horizontal and Low -Sloped Opaque Surfaces B. American National Standards Institute 1. ANSI/FM 4474, 'Standard for Evaluating the Simulated Wind Uplift Resistance of Roof Assemblies C. UL 1. UL 580, 'Safety Testing for Uplift Resistance of Roof Assemblies' 2. UL 1897, 'UL Standard for Safety Uplift Tests for Roof Covering Systems' D. American Society of Civil Engineers 1. ASCE-7, 'Minimum Design Loads and Associated Criteria for Buildings and Other Structures' E. Single Ply Roofing Industry (SPRI) 1. SPRI ES-1, 'Test Standard for Edge Systems Used with Low Slope Roofing Systems F. National Roofing Contractors Association (NRCA) 1. 'Roof Wind Designer' 2. 'Roofing and Waterproofing Manual' G. FM Global (FMG) 1. FM Global 1-49: Loss Prevention Data Sheet for Perimeter Faashings. 2. FM Global 1-29: Loss Prevention Data Sheet for Above Deck Roof Components. H. SMACNA 1. SMACNA Architectural Sheet Metal Manual (Seventh Edition) for construction details. Polyvinyl Chloride Roofing 3 of 7 Section 07 5419 WDi Project Number 240318 26-Nov-24 Public Works Service Center Re -roofing 1.3 DEFINITIONS A. Roofing Terminology: See ASTM D 1079 and glossary in NRCA's "The NRCA Roofing and Waterproofing Manual" for definition of terms related to roofing work in this Section. 1.4 SUBMITTALS A. See Section 013300 B. Submittals for Review 1. Product Data: Manufacturer's product specifications, installation instructions, and general recommendations for each product. 2. Shop Drawings Indicating: a. Base flashings and membrane terminations - Indicate details meet requirements of NRCA and FMG required by this Section. b. Tapered insulation, including slopes and crickets. C. Roof plan showing types and orientation of roof deck and orientation of membrane roofing and fastening spacings and patterns for mechanically fastened membrane roofing if applicable. d. Insulation fastening patterns for corner, perimeter, and field -of -roof locations. C. Quality Assurance Submittals: 1. Certificates of Compliance: Certification from an independent testing laboratory that roofing system meets fire hazard and windstorm classification requirements. D. Warranties: Unexecuted sample copies of special warranties. E. Closeout Submittals 1. Executed copies of warranties. 2. Maintenance Data: Include in maintenance manuals. 1.5 QUALITY ASSURANCE A. Installer Qualifications: An employer of workers trained and certified by manufacturer, including a full-time on -site supervisor with a minimum of five years' experience installing products comparable to those specified, able to communicate verbally with Contractor, Architect, and employees, and qualified by the manufacturer to install manufacturer's product and furnish warranty of type specified. B. Manufacturer Qualifications: 1. Manufacturer shall manufacture membrane material for five (5) consecutive years. a. No product with documented failure will be allowed. 2. Manufacturer that is UL listed for membrane roofing system used for this Project. 3. Source Limitations: a. Provide roof components including roof insulation and fasteners for roofing system from same Manufacturer as membrane roofing or approved by Roofing Membrane Manufacturer. C. Manufacturer's Installation Instructions: Obtain and maintain on -site access to manufacturer's written recommendations and instructions for installation of products. D. Preinstallation Roofing Conference: Conduct conference at Project site. 1. Meet with Owner, Architect, roofing Installer, roofing system manufacturer's representative, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof -mounted equipment. 2. Review and discuss: Contract Documents, roofing system manufacturer's literature, project conditions, scheduling, and other matters affecting application. 3. Tour representative areas of roofing substrates; discuss substrate construction, related work, work conditions, and materials compatibility. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver roofing materials to project site in original containers with seals unbroken and labeled with product manufacturer's name or product brand name. B. Comply with most current product data sheet requirements when handling, storing, protecting, or installing roofing materials. Including but not limited to avoiding physical damage, deterioration by sunlight, excessive moisture, or other potentially damaging conditions. Polyvinyl Chloride Roofing 4 of 7 Section 07 5419 WDi Project Number 240318 26-Nov-24 Public Works Service Center Re -roofing C. Store liquid materials in their original undamaged containers in a clean, dry, protected location; away from direct sunlight; within the temperature range noted on the product data sheet. D. Handle and store roofing materials and equipment in a manner to avoid permanent deflection of deck. 1.7 PROJECT CONDITIONS A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements. B. Daily Protection: Coordinate installation of roofing so insulation and other components of roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast. 1. Provide tie -offs at and of each days work to cover exposed roofing and insulation with a course of roofing sheet securely in place with joints and edges sealed. 2. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing. 3. Remove temporary plugs from roof drains at end of each day. 4. Remove and discard temporary seals before beginning work on adjoining roofing. 1.8 WARRANTY A. Provide Manufacturer's 20 year warranty covering membrane, roof insulation, and system accessories. Comply with all warranty procedures required by Manufacturer, including notifications, scheduling, and inspections. 1. Limit ofLiability: No dollar limitation(NDL) B. Scope of Coverage: Repair leaks in the roofing system caused by 1. Ordinary wear and tear 2. Normal exposure to the elements 3. Manufacturing defects in materials 4. Defective workmanship used to install these materials 5. Damage due to winds up to 55 mph PART 2 • GENERAL 2.1 MANUFACTURERS A. Acceptable Manufacturers: Membrane 1. Elevate Building Products, Nashville, TN www.holcimelevate.com 2. GAF Materials Corp.Parsippany-Tray Hills, NJ www.gaf.cem 3. Johns Manville Corporation, Denver CO www.jm.com 4. Sika Roofing, Canton, MA www.usa.sika.com 5. Other approved by Architect prior to Bidding. See Section 016200. B. Acceptable Manufacturers: Cover Board: 1. GP Gypsum Corporation. www.ao.cem C. Source Limitations: Obtain components for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer. 2.2 MATERIALS A. Rigid Insulation 1. Type: ASTM C1289, Type II, rigid polyisocyanurate faced both sides with glass fiber mat facings 2. Thermal Resistance: As indicated by Drawings 3. Provide board tapered to 114 inch per foot 4. Maximum board size: 4 x 4 feet B. Cover Board: 1. Type: ASTM C1177V177M or ASTM C1278IC1278M; 48 inches wide x thickness indicated, maximum practical length, square cut ends and edges 2. Mold resistance: 10, tested to ASTM D3273. C. Roof Membrane: 1. Type: ASTM D4434, reinforced plasticized polyvinyl chloride (PVC), ultraviolet resistant. Polyvinyl Chloride Roofing 5 of 7 Section 07 5419 WDi Project Number 240318 26-Nov-24 Public Works Service Center Re -roofing 2. Size: a. Maximum sheet size permitted by application and job conditions. b. Thickness: 60 mils 3. Color: White 2.3 ACCESSORIES A. Fastener Plates: Manufacturer's standard B. Induction Welding Plates: Aluminum/zinc alloy coated steel, specifically designed for induction welding applications. C. Walkway Pads: Preformed resilient pads, recommended by roofing manufacturer, minimum 1/2 inch thick. D. Mechanical Fasteners: Hot -dip galvanized or fluoropolymer coated steel, approved by roofing system manufacturer, type and length suited to project conditions. E. Other Accessories: 1. By manufacturer of roofing system, including adhesives, tapes, solvents, sealants, water cutoff mastic, and prefabricated pipe flashings. PART 3 - GENERAL 3.1 PREPARATION A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing system manufacturer's written instructions. Remove sharp projections. B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof -drain plugs when no work is taking place or when rain is forecast. C. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing. 3.2 INSTALLATION A. General Application: Install roofing system in accordance with roofing system manufacturer's instructions, NRCA Manual, and approved Shop Drawings. B. Insulation 1. Apply with long edges continuous and perpendicular to deck ribs. Stagger end joints in adjacent rows. Locate ends over solid bearing. 2. Apply top layer with long edges perpendicular to those of base layer, with joints staggered in adjacent rows. Offset joints from those in base layer. 3. Mechanically fasten to substrate in manufacturer's recommended fastening pattern. 4. Fit insulation to other boards at perimeter and around penetrations with maximum 1/4 inch voids. C. Cover Board 1. Apply panels with long edges continuous and perpendicular to direction of insulation. Stagger end joints in adjacent rows. Offset joints from those in insulation. 2. Mechanically fasten to substrate in manufacturer's recommended fastening pattern. 3. Fit panels to other panels and at perimeter and around penetrations with maximum 1/4 inch voids. D. Roof Membrane 1. Position sheets without stretching; minimize wrinkles. Allow membrane to relax before proceeding, 2. Provide minimum 5-1/2 inch lap at joints between adjacent sheets. 3. Splice sheets by heat welding method. 4. Induction Welded Membrane: Fasten membrane using membrane Manufacturer's recommended induction plates, fasteners, fastener spacing, and procedures. 5. Fasten membrane to perimeter nailers with fasteners spaced as recommended by roofing Manufacturer. E. Daily Seal: 1. Ensure that water does not flow beneath completed sections of roof. 2. Temporarily seal loose edge of membrane with night seal when weather is threatening. 3. When work is resumed, pull sheet free before continuing installation. Polyvinyl Chloride Roofing 6 of 7 Section 07 5419 WDi Project Number 240318 26-Nov-24 Public Works Service Center Re -roofing Flashings 1. Construct in accordance with roofing system manufacturer's standard details. 2. Juncture of Horizontal and Vertical Surfaces: a. Use longest practical length flashing to minimize joints. b. Complete splice between flashing and main roof sheet before bonding flashing to vertical surface. Extend splice3 inches beyond fasteners that attach membrane to horizontal surface. c. Adhere flashing to substrate with full bed of adhesive. d. Fasten top of flashing at 12inches on center maximum, under metal flashing. 3. Penetrations through Membrane: a. Flash pipe with premolded pipe flashings wherever possible. b. Where molded pipe flashings cannot be installed, use field fabricated pipe seals. C. Seal clusters of pipes and unusually shaped penetrations with minimum 4 inch high flashing containing pourable sealer. 4. Expansion Joints: a. Complete roof membrane and flashing installation prior to installing expansion joint. b. Set joint cover on top of wood nailers; secure on each side through metal flange. C. Seal joint cover flanges to membrane as for sheet splice. G. Roof Drains: 1. Taper insulation around drain to provide smooth transition from roof surface to drain clamping ring 2. Seal between membrane and drain base with water cutoff mastic. H. Walkways: 1. Install walkways at traffic concentration points (such as roof hatches, access doors, rooftop ladders, etc.) and locations as identified on Contract Documents. 3.3 FIELD QUALITY CONTROL A. Arrange for roofing system manufacturer's technical personnel to inspect roofing installation upon completion. B. Repair or remove and replace components of roofing system that do not comply with specified requirements. C. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements. D. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements. 3.4 PROTECTION A. Protect new roofing system from damage and wear during construction period. Inspect new roofing for damage if used during construction END OF SECTION Polyvinyl Chloride Roofing 7 of 7 Section 07 5419 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name South Bend Public Works Service Center Re -roofing Project No. For Bids Due R124-032B December 10, 2024 Contractor Name: Hoekstra Roofing Company The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section 11 acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 07/19/2023 General Conditions - 11 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 07/19/2023 General Conditions - 12 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) _ Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) _ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) _ For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 07/19/2023 General Conditions - 13 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowled ements: (i) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder / with the City of South Bend. (ii) V By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) V By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) V By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachment : (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) List identifying all former business names. (iii) _ Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) (iv) V years. Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I V am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) V Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 07/19/2023 General Conditions - 14 (ix) AZ Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i)y List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: December 9, 2024 (Sign Here Tom Lundquist, CFO (Print Name Here) Hoekstra Roofing Company (Name of Company) 1963 Olmstead Road (Address of Company) Kalamazoo Michigan, 49048 269-343-5536 (Telephone Number) Version 07/19/2023 General Conditions- 15 Fk CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name South Bend Public Works Service Center Re -roofing Project No. R124-032B For Bids Due December 10, 2024 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely V executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and WBE-2.1]. Acknowledge Receipt of 1 Addendum(s) included with the bid. V All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either y printed or typed underneath signature. This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Hoekstra Roofing Company Date: December 9, 2024 By Authorized Representative: Signature: Print Name & Title: Tom Lundquist, CFO Version 07/192023 Contractor's Bid for Public Works -1 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofing.com Pre -Qualification Checklist Attachments December 9, 2024 Attachments (i) IN SOS on-line records: See attached (ii) Former business names: Cooper Roofing (iii) MIOSHA violations within last five years: 05/04/22 Mobile Equipment violation, and 10/19/23 Serious Personal Protective Equipment and Serious Fall Protection violations. (iv) Statement of staffing capabilities: Hoekstra Roofing Company has the necessary labor resources to staff and complete the work we are bidding. (v) Statement that individuals are classified as employees: All individuals who will perform work on this project will be properly classified as employees or independent contractors. (vi) Evidence of training: Not applicable (vii) Drug testing plan: See attached from our Employee Handbook (viii) Approved surety company: See attached (ix) Statement of tax delinquencies: Hoekstra Roofing Company has no federal, state, or local tax liens or delinquencies in the past three years. (x) List of completed projects: See attached t APPROVED AND FILED DIEGO MORALES INDIANA SECRETARY OF STATE 04/02/2024 03:40 PM BUSINESS ID 201805291260310 BUSINESS TYPE Foreign For -Profit Corporation BUSINESS NAME HOEKSTRA ROOFING CO. ENTITY CREATION DATE 05/29/2018 JURISDICTION OF FORMATION Michigan PRINCIPAL OFFICE ADDRESS 1963 Olmstead Road, Kalamazoo, MI, 49048, USA YEARS 2024/2025 EFFECTIVE DATE 04/02/2024 EFFECTIVE TIME 3:40 PM REGISTERED AGENT TYPE Business Commercial Registered Agent NAME C T CORPORATION SYSTEM ADDRESS 334 North Senate Avenue, Indianapolis, IN, 46204, USA TITLE Secretary NAME Philip Wood ADDRESS 1963 Olmstead Road, Kalamazoo, MI, 49048, USA TITLE President NAME Philip Wood ADDRESS 1963 Olmstead Road, Kalamazoo, MI, 49048, USA APPROVED AND FILED w DIEGO MORALES INDIANA SECRETARY OF STATE 04/02/2024 03:40 PM IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY April 2, 2024. THE UNDERSIGNED ACKNOWLEDGES THAT A PERSON COMMITS A CLASS A MISDEMEANOR BY SIGNING A DOCUMENT THAT THE PERSON KNOWS IS FALSE IN A MATERIAL RESPECT WITH THE INTENT THAT THE DOCUMENT BE DELIVERED TO THE SECRETARY OF STATE FOR FILING. SIGNATURE Thomas D. Lundquist TITLE CFO Business ID: 201805291260310 Filing No.: 10279178 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofing.com Taken from our Drug Free Workplace Policy 6. Drug and Alcohol Testing Each employee, as a condition of employment, will be required to participate in pre- employment, return to work, client required, post significant job -related accident and reasonable suspicion testing. For CDL drivers, drug and alcohol testing will be performed based on Dept. of Transportation Title 49, CFR Part 40 requirements. Drug and alcohol testing may be conducted at HRC, the jobsite, or at a drug testing facility. If an employee is off on leave for more than 30 days, a return -to -work drug test must be completed and passed before the employee is allowed to return to work. Some of HRC's customers require drug and alcohol testing of each employee that will be on their jobsite. Employee consent to submit to testing as stated above is required as a condition of employment, and the employee's refusal to consent may result in disciplinary action. HRC may require a blood test, urinalysis or other drug/alcohol testing. An employee will be subject to the same discipline as a positive test if he/she refuses the screening or test, adulterates or dilutes the specimen, substitutes the specimen with that from another person or sends an imposter, will not sign the required forms or refuses to cooperate in the testing process in such a way that prevents completion of the test. Revised: 07/02/2024 52 CNASURETY Kevin J. Van Otterloo Underwriting Director Grand Rapids, MI Telephone 616-285-2682 800-432-9534 x2682 Email:Kevin.VaoOtterloo@cna.com March 28, 2024 To Whom it May Concern: Re: Hoekstra Roofing Kalamazoo, MI We are providing this information at the request of our principal We have been providing surety bonds for Hoekstra Roofing Co. since 1994. We continue to be confident in Hoekstra's ability to perform. We have approved bonds for them covering jobs up to $6,000,000 and overall work programs of $40,000,000. We recommend Hoekstra for your favorable consideration. This letter is not to be construed as an agreement to provide surety bond for any particular project, but is offered as an indication of our past experience and confidence in this form. Any specific request for bonds will be underwritten on its own merits. Western Surety Company (NAIC# 13188) is an underwriting company of CNA Surety and is an approved surety on the Department of Treasury's Listing with a current US Treasury Limit of $151,103,000. Western Surety Company maintains an A (Excellent) AM Best Rating and a financial size of XIV. Sincerely, Kevin Van Otterloo Western Surety Company 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofing.com Experience — Proiects Completed in 2022 a. Bed, Bath, & Beyond and Bob's Furniture Westnedge, Kalamazoo, MI (22J1BED) Construction Manager: Meyer C. Weiner $481,400 Completed: October 19, 2022 Self -performed: 10% b. Bridge Organics, Vicksburg, MI (22D1 BRIDGE) Construction Manager: None $275,450 Completed: November 23, 2022 Self -performed: 100% c. Fowler Public Schools, Waldron School Renovations, Fowler, MI (22J1FOWLER) Construction Manager: The Christman Company $445,300 Completed: September 1, 2022 Self -performed: 10% d. Grace Health Battle Creek Partial Roof Replacement, BC, MI (22J1GRACE) Construction Manager: CSM Group $200,000 Completed: September 1, 2022 Self -performed: 100% e. Grand Rapids Public Schools, Union HS & Ottawa HS, GR, MI (21J1GRPS) Construction Manager: None $1,604,468 Completed: July 5, 2022 Self -performed: 60% f. Grandville Public Schools, West Elementary & Robotics Building Roof Improvements, Grandville, MI (22J1WEST) Construction Manager: Owen -Ames -Kimball $764,000 Completed: September 15, 2022 Self -performed: 10% g. Graphic Packaging Boiler, Kalamazoo, MI (20D2GRAPH) Construction Manager: Wieland $350,245 Completed: May 31, 2022 Self -performed: 100% h. Graphic Packaging Phase 2 Warehouse, Kalamazoo, MI (20D3GRAPH) Construction Manager: Wieland $1,524,217 Completed: May 31, 2022 Self -performed: 100% i. Graphic Packaging Ops Office, Kalamazoo, MI (20D4GRAPH) Construction Manager: Wieland $225,409 Completed: May 31, 2022 Self -performed: 100% j. Graphic Packaging Admin Office, Kalamazoo, MI (20D5GRAPH) Construction Manager: Wieland $182,169 Completed: May 31, 2022 Self -performed: 100% k. Graphic Packaging Building 72 Pipe Rack, Kalamazoo, MI (21D1GRAPH) Construction Manager: Wieland $166,860 Completed: May 31, 2022 Self -performed: 100% I. Graphic Packaging Bronco K2 Building Pipe, Kalamazoo, MI (21D2GRAPH) Construction Manager: Wieland $28,800 Completed: May 31, 2022 Self -performed: 100% m. Graphic Packaging Bronco K1-K2, Kalamazoo, MI (21 D3GRAPH) Construction Manager: Wieland $355,360 Completed: May 31, 2022 Self -performed: 100% Continued on Page 2 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofing.com Page 2 n. Graphic Packaging Roll Conveyor Bridge, Kalamazoo, MI (21 DSGRAPH) Construction Manager: Wieland $452,407 Completed: May 31, 2022 Self -performed: 100% o. Graphic Packaging Plant 6 Roof Patching, Kalamazoo, MI (21 D7GRAPH) Construction Manager: Wieland $47,090 Completed: May 31, 2022 Self -performed: 100% p. Graphic Packaging Plant 6 upper Pipe Flashing, Kalamazoo, MI (21D8GRAPH) Construction Manager: Wieland $45,900 Completed: May 31, 2022 Self -performed: 100% q. Graphic Packaging Temp Roof on Oil Room, Kalamazoo, MI (21 D9GRAPH) Construction Manager: Wieland $16,750 Completed: May 31, 2022 Self -performed: 100% r. Graphic Packaging East Ramp, Kalamazoo, MI (21D10GRAPH) Construction Manager: Wieland $11,650 Completed: May 31, 2022 Self -performed: 100% s. Graphic Packaging Building 20 Transformer, Kalamazoo, MI (22D1GRAPH) Construction Manager: Bierlein Companies $13,080 Completed: May 31, 2022 Self -performed: 100% t. Hamilton High School and Elementary School, Hamilton, MI (22J1HAMILT) Construction Manager: Owen -Ames -Kimball $817,000 Completed: October 22, 2022 Self -performed: 10% u. Harding's Westnedge, Portage, MI (22J1HARDIN) Construction Manager: Meyer C. Weiner $607,000 Completed: September 23, 2022 Self -performed: 100% v. Kalamazoo Christian Middle School Gym, Kalamazoo, MI (21J1KCHR) Construction Manager: Kalleward Group $174,000 Completed: August 31, 2022 Self -performed: 100% w. Kalamazoo Public Schools, Northglade Montessori, Kalamazoo, MI (22D1KPS) Construction Manager: Skillman Corporation $326,874 Completed: August 24, 2022 Self -performed: 100% x. Mead Johnson Building 31, Zeeland, MI (21P1MEAD) Construction Manager: None $349,000 Completed: August 1, 2022 Self -performed: 100% y. Mercy Health Saint Mary's 200 Jefferson Building, Grand Rapids, MI (22J2MERCY) Construction Manager: None $388,600 Completed: October 19, 2022 Self -performed: 100% z. Mercy Health Saint Mary's 260 Jefferson Building Roofs J1-J3 & J5-J6, Grand Rapids, MI (22J1MERCY) Construction Manager: None $445,000 Completed: September 28, 2022 Self -performed: 100% Continued on Page 3 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofmg.com Page 3 aa. Michigan Career and Technical Institute, Plainwell, MI (21 P1 MCTI) Construction Manager: None $4,700,000 Completed: August 31, 2022 Self -performed 90% bb. Miller Poultry, Goshen Hatchery Roofs 2-8, Goshen, IN (21D1GOSHEN) Construction Manager: None $530,547 Completed: May 15, 2022 Self -performed: 100% cc. Mishawaka -Penn -Harris Public Library, Harris Branch, Granger, IN (22J1HARRIS) Construction Manager: DLZ Indiana $465,000 Completed: May 31, 2022 Self -performed: 10% dd. Montabella Schools, Blanchard, MI (21D1MONTA) Construction Manager: The Christman Company $1,228,271 Completed: August 31, 2022 Self -performed: 100% ee. Old Navy / Boomerang Westnedge, Portage, MI (22J1 OLD) Construction Manager: Meyer C. Weiner $178,200 Completed: September 30, 2022 Self -performed: 100% ff. Perrigo Plant 5 Roof Areas 1-4 & 18, Allegan, MI (22H1 PERRIG) Construction Manager: None $450,589 Completed: August 31, 2022 Self -performed 100% gg. Perrigo EAO, Allegan, MI (22J1 PERRIG) Construction Manager: None $336,100 Completed: November 19, 2022 Self -performed: 100% hh. Planet Fitness Westnedge, Portage, MI (22J1PLANET) Construction Manager: Meyer C. Weiner $180,000 Completed: September 30, 2022 Self -performed: 100% ii. Riverwalk Condos, North/South Roofs, St. Joseph, MI (22J1RIVER) Construction Manager: None $113,425 Completed: August 1, 2022 Self -performed: 100% jj. Stryker PDC Warehouse Expansion, Portage, MI (22J1STRYKR) Construction Manager: Rockford Construction $2,392,000 Completed: June 30, 2022 Self -performed: 100% kk. Thornapple Kellogg Schools, Middle School Renovations, Middleville, MI (22ATHORN) Construction Manager: Owen -Ames -Kimball $883,200 Completed: July 31, 2022 Self -performed: 10% II. Vicksburg Paper Mill, Vicksburg, MI (19P1VICKPM) Construction Manager: Frederick Construction $1,750,440 Completed: December 30, 2022 Self -performed: 100% mm. Western Michigan University, Gilmore Theater Complex, Kalamazoo, MI (22D2WMU) Construction Manager: None $33,500 Completed: July 31, 2022 Self -performed: 100% Continued on Page 4 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofing.com Page 4 Experience — Projects Completed in 2023 a. Blodgett Spectrum POB, Grand Rapids, MI (22J1 BLODG) Construction Manager: Christman Company $84,800 Completed: February 15, 2023 Self -performed: 100% b. Bridgeman City Hall / Fire Station, Bridgeman, MI (23J1 BRIDG) Construction Manager: None $97,224 Completed: December 22, 2023 Self -performed: 100% c. Charlotte Schools, Charlotte, MI (22J1CHAR) Construction Manager: Granger Construction $1,274,443 Completed: September 15, 2023 Self -performed: 80% d. Coldwater Community Schools, Jefferson Elementary & Legg MS (22D1 COLD) Construction Manager: Owen -Ames -Kimball $256,382 Completed: October 25, 2023 Self -performed: 100% e. Coreweil Health Lakeland, St. Joseph, MI (23J3CORE) Construction Manager: None $350,000 Completed: December 22, 2023 Self -performed: 100% f. Corewell Health South Pavilion, Grand Rapids, MI (23J1CORESP) Construction Manager: None $1,150,000 Completed: October 31, 2023 Self-performed:80% g. Grand Rapids Public Schools, Innovation Central HS Renovations, GR, MI (22J 1 GRPS) Construction Manager: Rockford Construction $1,135,000 Completed: April 30, 2023 Self -performed: 100% h. Grandville Public Schools, Cummings Elementary, Grandville, MI (23J1CUMMIN) Construction Manager: Owen -Ames -Kimball $584,000 Completed: December 12, 2023 Self -performed: 90% i. Grandville Public Schools, High School, Grandville, MI (23J1GRAND) Construction Manager: Owen -Ames -Kimball $289,000 Completed: December 12, 2023 Self -performed: 10% j. Hastings Area Schools, Star Elementary, Hastings, MI (23J1HASTIN) Construction Manager: None $818,500 Completed: September 9, 2023 Self -performed: 10% k. Jackson County Courthouse, Jackson, MI (22J1JACKS) Construction Manager: Tremco $318,800 Completed: September 15, 2023 Self -performed: 50% I. Kalamazoo Civic Theater, Kalamazoo, MI (22D1CIVIC) Construction Manager: Miller Davis $231,475 Completed: May 10, 2023 Self -performed: 99% m. Kalamazoo Public Schools, Central High School, Kalamazoo, MI (23D3KPS) Construction Manager: Trumble Group $192,915 Completed: September 29, 2023 Self -performed: 50% Continued on Page 5 1963 Olmstead Road • Kalamazoo, MI49048 • (269) 343-5536 • www.hoekstraroofing.com Page 5 n. Kalamazoo Public Schools, Hillside Elementary, Kalamazoo, MI (22D2KPS) Construction Manager: Skillman $91,980 Completed: September 29, 2023 Self -performed: 100% o. Kalamazoo Public Schools, Loy Norrix High School, Kalamazoo, MI (23D4KPS) Construction Manager: Hall Builders $223,125 Completed: September 29, 2023 Self -performed: 50% p. Lansing Community College West Campus, Lansing, MI (22D1LANSIN) Construction Manager: DLZ Michigan, Inc. $1,454,925 Completed: May 25, 2023 Self -performed: 10% q. Metro Health — Caledonia, Caledonia, MI (22J2METRO) Construction Manager: None $184,500 Completed: May 12, 2023 Self -performed: 100% r. Metro Health — Cedar Springs, Cedar Springs, MI (22J3METRO) Construction Manager: None $177,500 Completed: May 26, 2023 Self -performed: 10% s. Metro Health — Comstock Park, Comstock Park, MI (22J4METRO) Construction Manager: None $242,000 Completed: May 25, 2023 Self -performed: 10% t. Metro Health—Jenison, Jenison, MI (22J5METRO) Construction Manager: None $131,800 Completed: May 19, 2023 Self -performed: 10% u. Metro Health —Southwest, Grand Rapids, MI (22J6METRO) Construction Manager: None $374,400 Completed: May 23, 2023 Self -performed: 100% v. Michigan State Police Coldwater Post, Coldwater, MI (23J1 MSPCW) Construction Manager: None $622,300 Completed: July 31, 2023 Self -performed 100% w. Michigan State Police Grand Haven Post, Grand Haven, MI (23J2MPSGH) Construction Manager: None $363,600 Completed: July 31, 2023 Self -performed 100% x. North Kent Sewer Authority, Grand Rapids, MI (22J1NORTH) Construction Manager: Prein&Newhof $1,212,000 Completed: April 15, 2023 Self -performed: 10% y. Saint Joseph County Jail, Centerville, MI (22J1 STJOE) Construction Manager: ABM $817,000 Completed: August 15, 2023 Self -performed: 100% z. Spectrum Health Helipad, Grand Rapids, MI (22J3SPECTR) Construction Manager: None $1,305,000 Completed: July 31, 2023 Self -performed: 60% aa. USG Otsego Paper, Otsego, MI (23D1USG) Construction Manager: None $279,563 Completed: November 30, 2023 Self -performed: 10% Continued on Page 6 1963 Olmstead Road • I';alamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofing.com Page 6 bb.Viking Corporation Roof Sections K&M, Hastings, MI (22P1VIKING) Construction Manager: None $1,236,400 Completed: June 30, 2023 Self -performed: 100% cc. Western Michigan University, Beam Power Plant, Kalamazoo, MI (23D3WMU) Construction Manager: None $205,209 Completed: July21, 2023 Self -performed: 100% dd. Western Michigan University, Friedmann Hall, Kalamazoo, MI (23D1 WMU) Construction Manager: None $241,656 Completed: July 30, 2023 Self -performed: 100% as. Western Michigan University, Haenicke Hall, Kalamazoo, MI (23D2WMU) Construction Manager: None $34,788 Completed: July 30, 2023 Self -performed: 100% ff. Western Michigan University, Henry Hall, Kalamazoo, MI (23D6WMU) Construction Manager: None $26,380 Completed: August 15, 2023 Self -performed: 10% gg. Western Michigan University, Innovations Center, Kalamazoo MI (23J1WMU) Construction Manager: None $588,435 Completed: August 21, 2023 Self -performed: 10% hh. Western Michigan University, John Gill Press Box, Kalamazoo, MI (23D5WMU) Construction Manager: None $15,542 Completed: August 4, 2023 Self -performed: 100% ii. Western Michigan University, Sindecuse Health Center, Kalamazoo, MI (23D8WMU) Construction Manager: None $388,563 Completed: August 31, 2023 Self -performed: 100% jj. Western Michigan University, Sprau Tower, Kalamazoo, MI (23D7WMU) Construction Manager: None $94,755 Completed: August 4, 2023 Self -performed: 10% kk. Western Michigan University, Wood Hall, Kalamazoo, MI (23D4WMU) Construction Manager: None $822,437 Completed: August 31, 2023 Self -performed: 10% Experience — Proiects Completed in 2024 a. Blackmer Pump Low Bay Roofs North and South, Grand Rapids, MI (24131BLACK) Construction Manager: None $728,275 Completed: October 23, 2024 Self -performed: 90% b. Corewell Health C-Tower, St. Joseph, MI (24J2CORE) Construction Manager: None $120,463 Completed: October 21, 2024 Self -performed: 90% c. Corewell Health Lakeland Roofs 5, 40, & 41, St. Joseph, MI (24J4CORELK) Construction Manager: None $425,000 Completed: June 19, 2024 Self -performed: 90% Continued on Page 7 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofing.com Page 7 d. Corewell Health Lakeland Window Infill, St. Joseph, MI (24J2CORELK) Construction Manager: None $214,500 Completed: June 19, 2024 Self -performed: 100% e. DeKalb County Middle School, Waterloo, IN (24D1DEKALB) Construction Manager: None $1,060,335 Completed: September 5, 2024 Self -performed: 60% f. Dewitt Schools, David Scott Elementary, Dewitt, MI (24J1DEWITT) Construction Manager: Clark Construction $948,500 Completed: September 24, 2024 Self -performed: 10% g. Flowserve Training Center, Kalamazoo, MI (24D1FLOW) Construction Manager: None $92,106 Completed: May 1, 2024 Self -performed: 70% h. Flowserve Roof 11, Kalamazoo, MI (24J1 FLOW) Construction Manager: None $249,883 Completed: October 8, 2024 Self -performed: 75% i. Gast Manufacturing Roof Areas 5-7, 7a, 10-13, 15-17, Benton Harbor, MI (23D1 GAST) Construction Manager: None $2,547,702 Completed: February 17, 2024 Self -performed: 100% j. Grace Health Pharmacy Addition, Battle Creek, MI (23J1GRACE) Construction Manager: Schweitzer $94,300 Completed: April 12, 2024 Self -performed: 100% k. Hamilton Middle School, Hamilton, MI (24J2HAMILT) Construction Manager: Owen -Ames -Kimball $916,758 Completed: September 27, 2024 Self -performed: 90% I. Hamilton Schools, Sandyview Elementary, Hamilton, MI (24J1HAMILT) Construction Manager: Owen -Ames -Kimball $265,701 Completed: September 5, 2024 Self -performed: 75% m. Jackson College, Jackson, MI (24J1JACKS) Construction Manager: None $1,301,200 Completed: November 14, 2024 Self -performed: 100% n. Kalamazoo College, Kalamazoo, MI (23J1KCOLL) Construction Manager: Owen -Ames -Kimball $154,300 Completed: June 19, 2024 Self -performed: 90% o. Kalamazoo Metro Transit CCTA, Kalamazoo, MI (24D1METRO) Construction Manager: None $494,265 Completed: October 18, 2024 Self -performed: 100% p. Kalamazoo Public Schools, Lincoln International Studies, Kalamazoo, MI (24D2KPS) Construction Manager: None $21,695 Completed: August 19, 2024 Self -performed: 100% q. Kalamazoo Public Schools, Loy Norrix High School Health Suite, Kalamazoo, MI (24D1 KPS) Construction Manager: AJ Veneklasen $44,450 Completed: August 1, 2024 Self -performed: 80% Continued on Page 8 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofingxom Page 8 r. Kalamazoo Public Schools, Woods Lake Elementary, Kalamazoo, MI (23D1KPS) Construction Manager: Skillman Corporation $440,763 Completed: September 19, 2024 Self -performed: 100% s. Kalamazoo Valley Community College Redwood Building, Kalamazoo, MI (23D1 KVCC) Construction Manager: Kalleward Group $303,586 Completed: May 28, 2024 Self -performed: 100% t. Kraft Heinz, Kendallville, IN (24D1KRAFT) Construction Manager: Shouldice $160,410 Completed: October 1, 2024 Self -performed: 85% u. Lakeview School District, Middle School, Battle Creek, MI (23J1LAKMS) Construction Manager: CSM Group $1,247,927 Completed: July 16, 2024 Self -performed: 50% v. Lawrence Public Schools, High School, Lawrence, MI (24D1LAWREN) Construction Manager: None $750,677 Completed: September 24, 2024 Self -performed: 60% w. Mead Johnson Roofs 15 and 30A, Zeeland, MI (24J1MEAD) Construction Manager: None $245,572 Completed: August 6, 2024 Self -performed: 80% x. Mead Johnson WWTP Roof 5C, Zeeland, MI (24J2MEAD) Construction Manager: None $68,640 Completed: July 23, 2024 Self -performed: 100% y. Metro Health — B Building on Main Campus (22J1METRO) Construction Manager: None $2,510,512 Completed: February 16, 2024 Self -performed: 100% z. Michigan State Police Forensics Center, Lansing, MI (23J3MSPFC) Construction Manager: Intertek $728,275 Completed: June 29, 2024 Self -performed: 10% aa.North Adams Bellmont High School, Decatur, IN (24D1NORTH) Construction Manager: None $251,950 Completed: July 16, 2024 Self -performed: 50% bb. Plainfield Township Fire Station #1, Belmont, MI (24J1 PLAIN) Construction Manager: Fishbeck $157,590 Completed: June 12, 2024 Self -performed: 70% cc. Rettenmaier USA, Schoolcraft, MI (22D1RETTEN) Construction Manager: Dan Vos Construction $225,275 Completed: January 8, 2024 Self -performed: 10% dd. South Haven Schools, Lincoln Elementary School, South Haven, MI (24J1SHLINC) Construction Manager: GDK Construction $968,463 Completed: October 28, 2024 Self -performed: 70% ee.Spring Lake Public Schools, High School, Spring Lake, MI (24J1SPRING) Construction Manager: None $1,699,300 Completed: August 26, 2024 Self -performed: 30% Continued on Page 9 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofing.com Page 9 ff. St. Catherine of Siena Stanley Center, Portage, MI (24J2STCATH) Construction Manager: None $104,425 Completed: September 18, 2024 Self -performed: 96% gg. Stryker Instruments, Portage, MI (24J2STRYK) Construction Manager: Belfor Property Restoration $1,518,650 Completed: October 23, 2024 Self-performed:77% hh. Stryker PDC, Portage, MI (24J1STRYK) Construction Manager: Belfor Property Restoration $2,251,714 Completed: August 14, 2024 Self -performed: 96% ii. Three Rivers Public Schools, Middle School, Three Rivers, MI (23J1TRMS) Construction Manager: Skillman Corporation $893,630 Completed: September 20, 2024 Self -performed: 10% jj. UofM Health West, POB AHU Replacement, Wyoming MI (23J1UMPOB) Construction Manager: Kasco Construction $143,424 Completed: February 19, 2024 Self -performed: 100% kk. Westchester Woods Apartments, Kalamazoo, MI (23D1WEST) Construction Manager: None $212,432 Completed: February 15, 2024 Self -performed: 10% It. Western Michigan University, Dunbar Hall Renovations, Kalamazoo, MI (23D1 WMU) Construction Manager: The Christman Company $670,565 Completed: April 30, 2024 Self -performed: 75% mm. Western Michigan University, Gilmore Theater Stair Towers, Kalamazoo, MI (24D5WMU) Construction Manager: None $63,230 Completed: August 30, 2024 Self -performed: 70% nn. Western Michigan University, Office of Sustainability, Kalamazoo, MI (24D3WMU) Construction Manager: None $24,450 Completed: August 5, 2024 Self -performed: 75% oo. Western Michigan University, Read Fieldhouse, Kalamazoo, MI (24D2WMU) Construction Manager: None $54,000 Completed: July 13, 2024 Self -performed: 40% pp. Western Michigan University, Schneider Hall, Kalamazoo, MI (24D4WMU) Construction Manager: None $52,500 Completed: August 26, 2024 Self -performed: 77% gq.W.R. Grace Building 5, South Haven, MI (23J1GRACE) Construction Manager: Miller Davis $70,000 Completed: February 5, 2024 Self -performed: 100% rr. W.R. Grace Building 55. South Haven, MI (23J2GRACE) Construction Manager: Miller Davis $167,500 Completed: February 5, 2024 Self -performed: 100% ss. W.R. Grace Building 9, South Haven, MI (24J1GRACE) Construction Manager: None $41,720 Completed: April 19, 2024 Self -performed: 100% Continued on Page 10 1963 Olmstead Road • Kalamazoo, MI 49048 • (269) 343-5536 • www.hoekstraroofing.com Page 10 ft. W.R. Grace Building 18, South Haven, MI (24J3GRACE) Construction Manager: None $31,700 Completed: October 23, 2024 Self-performed:60% uu. W.R. Grace Plant 1 & Building 16, South Haven, MI (24J2GRACE) Construction Manager: None $315,998 Completed: October 28, 2024 Self -performed: 100% vv. Zeeland Public Schools, Admin Building, Zeeland, MI (23J1ZEELAN) Construction Manager: None $727, 667 Completed: March 19, 2024 Self -performed: 10% ww. Zeeland Public Schools, Early Childhood Center, Zeeland, MI (24J1ECC) Construction Manager: Owen -Ames -Kimball $151,000 Completed: June 21, 2024 Self -performed: 100% xx. Zeeland Public Schools, West High School, Zeeland, MI 24J1ZEELAN) Construction Manager: OAK and GDK $3,140,800 Completed: September 16, 2024 Self -performed: 30% BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/27/2024 Department Public Name Lidva Abreha BPW Date 12/10/2024 Phone Extension 5961 Required Prior to Submittal to Board BPW Attorney ® Attorney Name Michael Schmidt Dept. Attorney ❑ Attorney Name Purchasing ❑ Mickey Lovy Check the Appropriate Item Type — Required. for All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA ® Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution ❑ Other: ❑ Ease./Encroach Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Information Yes ❑ If Yes, Approved by Purchasing No El MBE ❑ WBE Completed E-Verify Form Attached ❑❑ Nos PW Service Center Roofing Replacement (task 2) R124-032B Motor Vehicle High & Sewage Works Capital 202-503-443001 & 642-509-443001 Lump Sum For Change Orders Only Amount of ❑ Increase $ ❑ Decrease ($ ) Previous Amount Current Percent of Change New Amount Total Percent of Change: Time Extension Amount: New Completion Date: Increase Decrease Increase Decrease