HomeMy WebLinkAboutChange Order No. 6 & Final - Fire Station 8 Proj No 122-034 - R Yoder Construction ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS November 12, 2024 Mr. Erik Parcell R.Yoder Construction, Inc. 27453 County Rd. 150 Nappanee, IN 46550 shelly@ryoderconstuction.com RE: Change Order No. 6 (Final) – Fire Station 8 Replacement – Project No. 122-034 Dear Parcell: At its November 12, 2024 meeting, the Board of Public Works approved the above referenced Change Order be increased by $32,807, bringing the revised contract amount to $4,087,535.70. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/hh Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Zach Hurst, PE, Sr. Project Engineer SUBJECT: Change Order No. 6 - Project No. 122-034 Fire Station #8 Replacement DATE: 11/05/2024 Change Order No. 6 for the subject project addresses the following items: • Occupancy Items: $3,990.00 o These are plan omissions that were discovered during the final Building Department inspection to obtain occupancy. Items such as new bollards, painting, and locksets. •Dedication Plaque:$5,335.00 o This is an owner-initiated change to install a bronze dedication plaque. •Additional Arborvitae:$2,300.00 o This is an owner-initiated change to install additional arborvitae plantings. •Change to no-mow grass:$440.00 o This is an owner-initiated change to switch to no-mow grass on the small southwest hill. •Additional Sidewalk Replacement: $4,276.00 o This is an owner-initiated change to replace some of the deteriorated sidewalk along Twyckenham Drive, as well as provide accessible parking. •Additional Interior Signage:$1,222.00 o This is an owner-initiated change to install additional interior signage within the firehouse noting different room names and numbers. •Digital Sign:$14,916.00 o This is an owner-initiated change to add a digital sign to the front yard, similar to Station #9. •Additional Curb Replacement:$4,869.00 o This is an owner-initiated change to replace curb along Twyckenham Drive to facilitate accessible parking. •Railing Deduct:($4,541.00) o This is a deduct to reflect the Fire Department choosing a less expensive railing type inside the station. •TOTAL:$32,807.00 This change order does not affect the existing contract completion date of September 19, 2024. Funding for this change order is available through the Fire Department’s capital fund. CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: CONTRACTOR RECOMMENDED FOR APPROVAL CONSTRUCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS 11/12/2024 122-034 Fire Station No. 8 Replacement 9/12/2023 6 (Final) PCR #37-Digital Scrolling Message Board on Monument Sign PCR #38-Second Floor Railing Change Deduct PCR #39-Landscaping,Hillside Ground Cover PCR #40-Interior Signage PCR #41-Twyckenham Curb Replacement PCR #42-Twyckenham Sidewalk Replacement PCR #43-Bronze Dedication Plaque PCR #44-Landscaping, Arborvitae PCR #45-Occupancy Items All items completed substantially as planned. See attached Comparison of Estimate for overruns and underruns. The original contract sum $ 3,703,850.00 Net change by previously authorized change orders $ 350,878.70 The contract sum prior to this change order $ 4,054,728.70 By this Change Order, the project amount is X Increased 32,807.00Decreased $ The new contract sum including this change order $ 4,087,535.70 This Change Order represents a total change of 0.81 % Total change for entire project 10.36 % Original contracted completion date/time 9/19/2024 Extension of date/time by previous change orders 0 days Date/time extension by this change order 0 days New completion date/time 9/19/2024 Contractor Signature Printed Name and Title Approved Date: R. Yoder Construction, Inc. Company Name President 27453 County Rd.150 Address Member Nappanee, IN 46550 City, State, Zip Member Member Member November 12, 2024 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/05/2024 Name Zach Hurst Department DPW BPW Date 11/12/2024 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 6 [F] Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name R Yoder Construction New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Fire Station 8 Replacement Project Number 122-034 Funding Source FD Capital Account No. PO-0026318 Amount Change: $32,807.00; Revised Amount: $4,087,535.70 Terms of Contract Purpose/Description Change Order addresses several miscellaneous issues as outlined in attached memo. For Change Orders Only Amount of Increase Decrease $ 32,807.00 ($ ) Previous Amount $ 4,054,728.70 Current Percent of Change: Increase Decrease 0.81% ( %) New Amount $ 4,087,535.70 Total Percent of Change: Increase Decrease 10.36% ( %) Time Extension Amount: New Completion Date: