HomeMy WebLinkAboutOpening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - ShaffnerVersion 3/15/2024 Page - 7 Public Works Quote CITY OF SOUTH BEND, INDIANA CONTRACTOR’S QUOTE FOR PUBLIC WORK PROJECT NAME: Studebaker National Museum Skylight Replacement PROJECT NO. 124-019 QUOTES DUE (Must be completed for all quotes. Please type or print) Date: Firm: Address: City/State/Zip: Telephone Number: ( ) Email Address: Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend, Department of Public Works and dated for the sum of (enter the Total Quote as shown on the Proposal) ($ ) (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. ACCEPTANCE The above quote is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS President Members By (Signature) (Printed Name of Person Signing) November 12th, 2024 @ 9:00am to bpwbids@southbendin.gov 11-8-24 Shaffner Heaney and Assoc 2508 S Main Street South Bend, IN 46614 574 2327470 11-8-24 Seventy Six Thousand Nine Hundred and Forty Seven 76,947.00 Douglas Greco Dgreco@shaproducts.com Version 3/15/2024 Page - 19 Public Works Quote QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME Studebaker National Museum Skylight Replacement PROJECT NO. 124-019 QUOTES DUE November 12th, 2024 @ 9:00am to bpwbids@southbendin.gov Item No. Description Total Amount 1 $ Total Amount of Quote $ Firm: Address: City/State/Zip: Telephone Number: ( ) Fax Number: ( ) By (Signature) (Printed Name of Person Signing) Skylight work per the plans and specs.76,947.00 76,947.00 Shaffner Heaney and Assoc. 2508 S Main Street South Bend, IN 46614 574. 232-7470 N/A Douglas Greco Version 3/15/2024 Page - 8 Public Works Quote CITY OF SOUTH BEND EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING PROVISIONS DIVERSITY UTILIZATION It is the policy of the City of South Bend to provide equal employment and business opportunity for all persons, partnerships, companies, and corporations in accordance with the rules, regulations and guidelines of the applicable federal, state and local laws. This policy of equal employment and business opportunity shall apply to every contractor or subcontractor bidding or holding a public contract with the City of South Bend. In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part of every construction contract entered into by the City of South Bend and all subcontractors entered into pursuant to any such contract and the bidder hereby certifies that it/he/she will abide by these provisions. The contractor will not discriminate against any applicant or employee because of race, color, religion, sex, national origin, or handicap. The contractor will take affirmative action to ensure that all applicants or employees are treated fairly and equitably. Such action shall include but not be limited to the following: hiring, up-grading, demotion or transfer, recruitment, advertising, lay-offs or termination, rates of pay or other forms of compensation and selection for training including apprenticeship programs. The contractor shall agree to post in conspicuous places available to employees and applicants, notices to be provided setting forth the provisions of the Non-Discrimination Clause. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. The contractor will send to each labor union or representative of workers with which it/he/she has a bargaining agreement or other contract or understanding, a notice to be provided, advising the labor union or worker's representatives of the contractor's commitment under this section, and shall post copies of the notices in conspicuous places available to applicants and employees. The contractor will comply with all provisions of Executive Order 11246 (as amended by 11375) and of the rules, regulations and relevant orders of the Department of Labor. Subpart B -- Contractors' Ag reements Sec. 202. Except in contracts exempted in accordance with Section 204 of this Order, all Government contracting agencies shall include in every Government contract hereinafter entered into the following provisions: "During the performance of this contract, the contractor agrees as follows:" "(1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated equally during employment, without regard to their race, color, religion, sex or national origin. Such action will include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause." "(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin." Version 3/15/2024 Page - 9 Public Works Quote "(3) The contractor will send to each labor union or representative of workers with which it/he/she has a collective bargaining agreement or other contract of understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment." "(4) The contractor will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules and regulations, and relevant orders of the Secretary of Labor." "(5) The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders." "(6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of such rules, regulations, or orders, in this contract may be cancelled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked* as provided in Executive Order No 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law." "(7) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the contractor may request the United States to enter into such litigation to protect the interests of the United States." The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, that if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate in work on or under the contract. The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance. The applicant further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency Version 3/15/2024 Page - 10 Public Works Quote may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings. * Corrected to read "invoked". In the original text the word "involved" was printed in error. Version 3/15/2024 Page - 16 Public Works Quote When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Indiana St. Joseph Version 3/15/2024 Page - 17 Public Works Quote 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor’s good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal-eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. Version 3/15/2024 Page - 18 Public Works Quote I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. *** I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this day of , 20__ Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this day of , 20 My Commission Expires Notary Public County of Residence 8th November 24 Shaffner Heaney and Assoc. Douglas Greco / Architectural Consultant PROJECT MANUAL FOR STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT SOUTH BEND, INDIANA Project No. 124-019 Prepared for: CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Prepared by: 929 Lincolnway East, Suite 200 South Bend, IN 46601 For Quotes Due November 12th, 2024 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 0 – QUOTING AND CONTRACT REQUIREMENTS Quote Notice (1page) Public Works Quote (Version 3/15/2024) (27 pages) DIVISION 1 – GENERAL REQUIREMENTS Summary of the Work ...................................................................................................... 01010 Contract Modification Procedures .................................................................................... 01035 Project Coordination ......................................................................................................... 01040 Cutting and Patching ........................................................................................................ 01045 Permits and Regulations .................................................................................................. 01062 Substitution Procedures ................................................................................................... 01250 Shop Drawings and Product Data .................................................................................... 01340 Schedule of Values .......................................................................................................... 01370 Construction Facilities ...................................................................................................... 01500 Contract Closeout ............................................................................................................ 01700 Cleaning ........................................................................................................................... 01710 Project Record Documents .............................................................................................. 01720 Guarantees and Warranties ............................................................................................. 01740 Operating and Maintenance Manuals .............................................................................. 01800 DIVISION 2 thru DIVISION 5 ........................................................................................... Not Used DIVISION 6 – WOOD, PLASTICS AND COMPOSITES Rough Carpentry .............................................................................................................. 06100 DIVISION 7 – THERMAL AND MOISTURE PROTECTION Flashing and Sheet Metal ................................................................................................ 07600 DIVISION 8 - OPENINGS Translucent Skylights ....................................................................................................... 08952 DIVISION 9 thru DIVISION 16 ......................................................................................... Not Used DIVISION 0 Bidding and Contract Requirements QUOTE NOTICE Notice is hereby given that the City of South Bend, Indiana, Board of Public Works will receive sealed electronic quotes at bpwbids@southbendin.gov until 9:00 a.m., Local Time, on November 12th, 2024 for the following: Studebaker National Museum Skylight Replacement Project No. 124-019 The Title of the Quote and Project Number (where applicable) as described above must be included in the subject line of the email to which you have attached your quote. The name of the company/vendor, address, contact email address and phone number must be included in the body of the email. Detailed instructions and information, including the link to the Reserved Mailbox for electronic quote submittals, is available at southbendin.gov/bids. Work includes selective skylight replacement at Studebaker National Museum, 201 Chapin Street in South Bend, all more particularly described in plans and specifications prepared by Alliance Architects, phone 574-288-2052. Electronic quotes must be on the City of South Bend Contractor’s Quote for Public Work Quote Form. Each quoter or contractor (hereinafter the contractor) must comply with “City of South Bend Minority and Women Business Enterprise Inclusion Program Plan” included in the Public Works Quote Form. The contractor commits itself to the goals for minority manpower and all other requirements, terms, and conditions of these quote conditions by submitting a properly sealed quote. It is the sole responsibility of the potential quoter to comply with all submission requirements applicable. Please note: The City reserves the right to request supplemental information provided by the quoter, and may also conduct random inquiries of the quoter’s current and previous customers regardless of pre-qualified status. Contractors interested in accessing the roofs for verification shall contact Patrick Sherman, City of South Bend Project Manager, at 574-235-5601 to arrange the visit. Any questions about quoting conditions must be addressed to the Owner and Alliance Architects in writing no later than November 7th, 2024. The Board reserves the right to reject any or all quotes or to accept a full or partial award of the quote or quotes which, in its judgment, will be to the best interests of the City of South Bend. If the Board elects to award the base quote plus any alternate(s), the Board will look at the totality of the cost when determining the lowest, responsive, and responsible quote. BOARD OF PUBLIC WORKS Theresa Heffner, Clerk Version 3/15/2024 Page - 1 Public Works Quote SCOPE OF WORK CITY OF SOUTH BEND PROJECT NAME: Studebaker National Museum Skylight Replacement PROJECT NO. 124-019 QUOTES DUE I.PROJECT DESCRIPTION A.The project includes the furnishing of all equipment, material, insurance, and labor for skylight replacement at Studebaker National Museum within the City of South Bend, IN. II.PREVAILING SPECIFICATIONS AND CONSTRUCTION STANDARDS AND SPECIFICATIONS A.The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and CONSTRUCTION STANDARDS AND SPECIFICATIONS, most recent version, are to be used on this project. B. Each Quote provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANDARDS AND SPECIFICATIONS prior to submitting a quote. C.Wherever the PREVAILING SPECIFICATIONS refer to “State Specifications,” it shall mean the 2022 INDOT Standard Specifications for the letting effective after September 1, 2021. D.These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. E.In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. III.TERM “OR EQUAL” A.Prevailing Specifications: None B.Additions 1.Where the term "or equal" is used in these specifications, the Quote provider deviating from specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its proposed article or equal. The City of South Bend shall be the sole judge in determining if the “or equal” offered meets the specification. IV.TAX EXEMPT A.Prevailing Specifications: None B.Additions 1.Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. V.INDEMNIFICATION A.Prevailing Specifications: None B.Additions 1.Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by Contractor, or because of arising out of any defect in the goods, materials or equipment supplied by the Quote provider. November 12th, 2024 @ 9:00am to bpwbids@southbendin.gov Version 3/15/2024 Page - 2 Public Works Quote VI.INSURANCE A.Prevailing Specifications: 2022, INDOT Standard Specifications Section 103 B.Additions: 1.All Contractors and subcontractors doing business with the City of South Bend shall present a Certificate of Insurance showing coverage in the following minimum amount: a.General Liability: Premises-Completed Operations or Products, Bodily Injury and Property Damage Combined Single Limit - $5,000,000. b.There shall be no exclusion for explosion, collapse or underground hazard. c.Workmen’s Compensation: Statutory State of Indiana Employer's Liability - $100,000. d.Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. e.The City of South Bend shall be named as additional insured on the Certificate of Insurance. VII.CONTROL OF WORK A.Prevailing Specifications: 2022, INDOT Standard Specifications Section 105 B.Additions: 1.The complete responsibility for this project lies with the Director of Public Works of the City of South Bend, Indiana acting through his authorized representatives. 2.Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform all work required under this item. There will be no direct payment for this item. 3.The contractor is responsible to maintain the site which includes but is not limited to; dust control, site security, erosion control, and protecting adjacent properties. 4.Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South Bend Department of Public Works. VIII.LEGAL RELATIONS A.Prevailing Specifications: 2022, INDOT Standard Specifications Section 107 B.Additions: 1.The Owner, where mentioned in these documents, is the City of South Bend. The Architect, where mentioned in these documents, is Alliance Architects, South Bend, Indiana. 2.The Contractor shall apply for and obtain any and all required permits for the work from local, state, and federal agencies and shall comply with permit requirements, including the St. Joseph County / City of South Bend Building Department. 3.If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with the Secretary of State of Indiana to engage in business within the State of Indiana. 4.The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner reserves the right to immediately terminate the public work project awarded should the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result in the forfeiture of Contractor’s performance bond to the Owner. IX.PROSECUTION AND PROGRESS A.Prevailing Specifications: 2022, INDOT Standard Specifications Sec. 108 B.Additions: 1.The project will have a completion date of March 31st, 2024. The contract time will start when the Notice to Proceed is delivered and signed. 2.The City, Engineer, and Contractor will hold a pre-construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3.Contractor shall provide a schedule to the Owner prior to beginning any work on the site. 4.The Contractor shall utilize the City of South Bend selected project management software for reporting of all activities related to the contracted work. Version 3/15/2024 Page - 3 Public Works Quote X. CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 108 B. Additions 1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor’s subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XI. DEFAULT AND TERMINATION A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 108 B. Additions: 1. Events of Default shall include Contractor’s failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. 2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is not cured within the ten (10) day cure period, the City may at any time thereafter terminate this contract in which case the termination shall be final and effective. 3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies provided under separate provisions of this contract, the right of set-off against any payments due or to become due to the Contractor against the retainage, the right to take over and complete the Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that the Contractor has in order under Contractor’s subcontracts are assigned to the City, subject to the City’s right to take assignment of all or only selected subcontracts at the City’s discretion. The sole obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed after the date of the assignment. In the event a conditional assignment has not been executed, the Contractor shall execute or cause to be executed any assignment, agreement, or other document that may be necessary in the sole opinion of legal counsel to the City’s Board of Public Works to evidence compliance with this provision. The Contractor shall promptly deliver such documents upon the City’s request. In the case of such assignment, unless otherwise agreed in writing, The Contractor remains liability to subcontractors for any payment already involved, and for any claim, suit or cause of action based upon or resulting from any error, omission, negligence or other breach of contract by the Contractor, its officers, employees, or agents arising prior to the date of assignment to the City. Version 3/15/2024 Page - 4 Public Works Quote XII. LIQUIDATED DAMAGES A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 108 B. Additions: 1. The contractor shall proceed with the work at such rate of progress to insure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the Contract Time for completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work, and excludes the time for unavoidable delays which were beyond the control and without the fault of the Contractor. 2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in default after the time of completion stipulated in the Contract Documents. 3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following and the Contractor has promptly given written notice of such delay to the Owner and Engineer/Architect. a. To any preference, priority, or allocation order duly issued by the Owner. b. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. XIII. RETAINAGE AND FINAL PAYMENT A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 109 B. Additions: 1. Payments will be made every thirty (30) calendar days 2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 3. Before final payment and retainage are released the Contractor must satisfy the following: a. Provide proof that all subcontractors have been paid promptly, including fully documenting payments in the City’s Minority and Women Owned Business utilization tracking software B2G Now. See www.southbend.diversitycompliance.com. b. All parts and labor meet requirements stated in the specifications. c. Provide copies of test reports or cut sheets on all materials supplied. d. Provide As-Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works. e. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver of Lien. XIV. WARRANTY A. Prevailing Specifications: None B. Additions 1. All Parts shall include the following: a. Performance specifications b. Bill of Materials c. Warranties on all parts d. Installation and safety requirements Version 3/15/2024 Page - 5 Public Works Quote XV. OTHER UTILITIES A. Prevailing Specifications: None B. Additions: 1. The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 811 (in Indiana) or 1-800-382-5544 (outside of Indiana), or via www.indiana811.org, at least two (2) working days, not counting Saturdays, Sundays or federal and state holidays before proceeding with construction. It shall also be the Contractor’s responsibility to contact any other utility that is not contacted by Indiana811 and verify the utility locations. 2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, etc. in order to assure that all utilities that need to be replaced or relocated can be done with a minimum disturbance to service. The Contractor shall also be responsible for coordinating schedules with the various utilities such that they can proceed with their relocation work as efficiently as possible. 3. If the odor of natural gas is detected in a work area at any time during the course of work, the Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also immediately notify the residents of adjacent properties. The Contractor shall advise the residents to evacuate their homes immediately if the odor is present within the dwelling. 4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the Contractor at no additional cost to the City or the Owner of the system. XVI. MAINTENANCE OF TRAFFIC A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 105 & 801 B. Additions: 1. Maintenance of traffic during construction shall conform to the “Indiana Manual on Uniform Traffic Control Devices” and the City of South Bend Design and Construction Standards. 2. The attached “Traffic Closure Request” form is to be used for any lane restrictions or closures and required to be filled out and sent to the Department of Public Works 3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary facilities shall be left unattended in the right-of-way of any street or left parked overnight without proper marking and lighting. 4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its proposed schedule of operations for the review of the Engineer. The schedule of operations as reviewed by the Engineer shall be maintained at all times. 5. There will be no direct payment for this work. XVII. DESCRIPTION OF WORK A. Prevailing Specifications: None B. Additions 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to replace the skylight at Studebaker National Museum within the City of South Bend. 2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and their property from damage caused by the Contractor’s operations. XVIII. PLANS A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1. The plans consist of two (2) drawing Sheets. 2. The work shall conform to the plans. 3. The drawings are schematic in nature. 4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. 5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. Version 3/15/2024 Page - 6 Public Works Quote IV.M/WBE GOALS A.Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women Business Enterprise Inclusion Program Plan B.Additions: 1. There will be no M/WBE goals associated with this project as it has been determined to be not commercially sub-dividable and not associated with a NAICS code that is part of the Program Plan. DIVISION 1 General Requirements CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT SUMMARY OF THE WORK 01010-1 SECTION 01010 - SUMMARY OF THE WORK A. General 1. Related Documents: Drawings and general provisions of the contract, including General Conditions and Special Provisions and other Division-1 Specification Sections, apply to this Section. 2. Project Summary: a. The Project includes the furnishing of all equipment, material, insurance, and labor for building improvements to Studebaker National Museum, 201 Chapin Street, including but not limited to skylight replacement, all located within South Bend, Indiana. b. The "Work" of this Contract is defined in the Contract Documents to include, but not necessarily to be limited to, the Studebaker National Museum, 201 Chapin Street, as indicated on the Plans and as outlined in these Specifications. c. The Contractor's coordination of the Project shall include all portions of the Work indicated by the Contract Documents including coordination of the work of subcontractors. d. The Contractor shall carry out this Project under the Codes and Rules of the State of Indiana and any applicable local ordinances. 3. Field Measurements: Before ordering any materials or commencing with any work, Contractor shall field verify all existing conditions, take measurements, and shall be responsible for the correctness of same. 4. Contractor Use of Premises: During the construction period, the Contractor shall have use of the site for construction operations to the extent possible. 5. Construction Documents: The Plans and Specifications are intended to provide the general requirements of the Project, based on the best information at the time of design. The Contractor shall be responsible to provide all additional layout, dimensions, coordination, survey work, labor and materials necessary to provide a complete and operating system. END OF SECTION 01010 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CONTRACT MODIFICATION PROCEDURES 01035-1 SECTION 01035 - CONTRACT MODIFICATION PROCEDURES A. General 1. General a. Minor Changes in the Work: Architect may issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710, "Architect's Supplemental Instructions". b. Owner-Initiated Proposal Requests: Architect may issue a detailed description of proposed changes in the work may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications. 1) Proposal Requests are for information only. Do not consider them instructions either to stop work in progress or to execute the proposed change. 2) Within ten (10) days after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change. a) Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. b) Indicate taxes, delivery charges, equipment rental, and amounts of trade discounts. c) Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. c. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to the contract, Contractor may propose changes by submitting a request for a change. 1) Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time. 2) Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. 3) Indicate taxes, delivery charges, equipment rental, and amounts of trade discounts. 4) Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. 5) Comply with requirements in Section 01340 "Shop Drawings and Product Data" if the proposed change requires substitution of one product or system for product or system specified. d. Proposal Request Form: Use AIA Document G709 for Proposal Requests, when required. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CONTRACT MODIFICATION PROCEDURES 01035-2 e. Change Order Procedures: On Owner's approval of a Proposal Request or request for change, Architect will issue a Change Order for signatures of Owner and Contractor on AIA Document G701. f. Construction Change Directive: Architect may issue a Construction Change Directive on AIA Document G714. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. 1) Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time. 2) Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive. a) After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract. 2. Products (Not Used) 3. Execution (Not Used) END OF SECTION 01035 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT PROJECT COORDINATION 01040-1 SECTION 01040 - PROJECT COORDINATION PART 1- GENERAL A. General 1. Related Documents: Drawings and general provisions of the Contract, including General Conditions and Special Provisions and Division 1 specification sections, apply to this section. 2. Work Included: a. This section includes minimum administrative and supervisory requirements necessary for coordination of the Project. These administrative and supervisory requirements shall include, but not be limited to, the following: 1) Coordination. 2) Coordination of existing conditions. 3) Project meetings. 4) Field coordination drawings. 5) Administrative and supervisory personnel. 6) Coordination of Contract closeout. 3. Coordination: a. The Contractor shall coordinate its construction activities with those of all Subcontractors, the Owner, work under other contracts, and other entities as required to insure efficient and orderly installation of the Work. The Contractor shall coordinate its operations with operations included under all Sections of the Specifications that are dependent on each other for proper installation, connection and operation. 1) Where installation of one part of the Work is dependent on installation of other components, either before or after its own installation, the Contractor shall schedule construction activities in the sequence required to obtain the best results. 2) The Contractor shall utilize space efficiently and coordinate installation of different components to ensure maximum accessibility for required maintenance, and repair. Coordinate space requirements and installation of items, which are indicated diagrammatically on Drawings. The contractor shall follow routing indicated for pipes, ducts and wiring as closely as practicable; place runs parallel with line of building unless indicated otherwise. 3) Unless otherwise indicated, in finished areas conceal pipes, ducts and wiring within construction. Coordinate locations of plumbing fixtures, electrical fixtures and electrical outlets with finish elements. 4) Make adequate provisions to accommodate items scheduled for later installation. b. Where necessary, prepare memoranda for distribution to each party involved outlining special procedures required for coordination. Include required notices, reports and attendance at meetings. c. The Contractor shall coordinate scheduling and timing of its administrative procedures to include: 1) Preparation of schedules. 2) Installation and removal of temporary facilities. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT PROJECT COORDINATION 01040-2 3) Delivery and processing of submittals. 4) Progress meetings. 5) Project closeout activities. d. The Contractor shall coordinate construction to ensure that Work is carried out in such a manner as to conserve energy, water and materials. 4. Coordination of Existing Conditions: a. The Contractor shall field verify all existing conditions and coordinate all Work to be performed prior to commencing with construction. b. Coordinate the selective demolition with Owner and other trades as required. Items indicated for demolition shall be completely removed, hauled off site, and disposed of properly at no additional cost to the Owner. 5. Progress Meetings: a. Contractor shall schedule bi-weekly field coordination and progress meetings with the Owner and Architect to: 1) Review overall progress schedule. 2) Review past two-week progress schedule. 3) Review two-week look-ahead schedule. 4) Discuss proposed changes and other important issues. 5) Prepare bi-weekly Progress Meeting minutes for distribution. b. The times and dates of the bi-weekly meetings shall be arranged for the convenience of the Owner’s representatives. c. If required, subcontractors may be asked to attend weekly meetings. 6. Field Coordination: a. Prior to installation of building mechanical, electrical, plumbing, and sprinkler systems, Contractor shall hold a coordination meeting to work out proper locations and pathways for the systems to avoid conflicts. The meeting shall include all interested parties, including all affected subcontractors, Owner’s representative, and a representative of the Architect or Engineer. b. If required, prepare and submit field coordination drawings that indicate coordination with various installation entities including all, subcontractors, Owner as follows: 1) Prepare at appropriate scales to show where conflicts are likely to occur due to limited space and indicate suggested remedy. 2) Indicate areas of conflict and coordinate revisions by parties initiating drawings until resolved. 3) Indicated sizes of materials and available space. 4) Include elevations and sections as required, drawn in sufficient detail, to coordinate the Work. c. Comply with requirements described in Section 01300 Submittals. d. Preparation of coordination drawings is the responsibility of the Contractor or subcontractor principally involved. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT PROJECT COORDINATION 01040-3 e. Installing entities shall modify installations to eliminate conflicts and achieve coordination of systems and Work. f. If Field Coordination Drawings indicate conflicts, which cannot be reconciled without modifying space or design provisions, Architect’s field representative shall review coordination drawings to determine if field modifications are required. g. Failure to exercise field coordination responsibility waives Contractor’s claims for an increase in Contract Sum if design modifications are required to resolve conflicts that might have been avoided by complying with requirements of this Section. 7. Administrative and Supervisory Personnel: a. In addition to its Project Superintendent, the contractor shall provide other administrative and supervisory personnel required for proper performance of the Work. 1) The Project Superintendents must be on site full time during normal working hours. The Superintendent shall not be changed without the Owners and the Century Center Director of Operations approval. 2) The Superintendents shall prepare, and keep on site, a daily log that describes construction activities, site visits by regulatory officials, vendors etc. b. The Contractor shall provide a full-time Project Coordinator, experienced in administration and supervision of building construction, including mechanical and electrical work. This Project Coordinator shall be authorized to act as the coordinator of construction activities between each subcontractor. 1) Construction activities requiring coordination by the Project Coordinator shall include, but not be limited to, the following: a) Scheduling and sequencing the Work. b) Sharing access to work spaces. c) Installations. d) Protection of the Work of each Prime Contractor. e) Cutting and patching. f) Temporary services and facilities. g) Inspections and tests. 8. Coordination of Contract Closeout: a. Contractor shall coordinate completion and clean up of Work with each of the separate subcontractors to include: 1) Coordinating access to Project for correction of defective Work. 2) Assembling and coordinating closeout submittals specified in section 01700 “Contract Closeout”. END OF SECTION 01040 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CUTTING AND PATCHING 01045-1 SECTION 01045 - CUTTING AND PATCHING A. General 1. Work Included: The Contractor shall provide all necessary services associated with cutting and patching for the complete installation of this project. 2. Coordination: a. The Contractor shall coordinate cutting and patching work between each of the trades and shall carry out all cutting and patching work in accordance with applicable OSHA Standards and safety requirements. Protect all new and existing work as cutting and patching is carried out. b. Submit a proposal describing procedures at least ten (10) days before the time cutting and patching will be performed, requesting approval to proceed. Include a description of cutting and patching and changes to existing construction, a list of products to be used and firms or entities that will perform the Work, dates when cutting and patching will be performed, and a list of utilities that cutting and patching procedures will disturb or affect. 3. Structural Elements: a. Where cutting and patching involve adding reinforcement to structural elements, submit details and engineering calculations showing integration of reinforcement with original structure. b. Architect's Approval: Obtain approval of cutting and patching proposal before cutting and patching. Approval does not waive right to later require removal and replacement of unsatisfactory work. c. Do not cut and patch structural elements in a manner that could change their load- carrying capacity or load-deflection ratio. 4. Visual Requirements: a. Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. b. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner. 5. Existing Warranties: a. Remove, replace, patch, and repair materials and surfaces cut or damaged during cutting and patching operations, by methods and with materials so as not to void existing warranties. b. Warranty: Submit a one-year warranty against defects in material and workmanship upon completion of installation. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CUTTING AND PATCHING 01045-2 B. Products 1. Materials: Materials for cutting and patching shall be as approved in the various Sections of these Specifications for new work. 2. Existing Materials: Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of existing materials C. Execution 1. Coordination: a. Verify existing conditions and coordinate schedule of work with other trades to minimize cutting and patching and to select appropriate means and methods to minimize damage. b. Notify the Architect of any deteriorated or unsatisfactory materials and conditions encountered during cutting and patching operations. c. All patching work shall match surrounding materials in "like new" condition. 2. Cutting and Patching: a. Remove and replace all defective materials. Provide samples of existing and new materials for inspection and testing as requested. b. Schedule and coordinate cutting and patching work to allow for the work of other trades. c. Avoid damage to the work of other trades. Repair all damage caused by cutting and patching operations. d. No cutting torches will be allowed without specific approval of the Architect and Owner. If approved, all fire safety precautions shall be taken, including, but not limited to, the use of fire extinguishers, designated fire watch personnel, etc. e. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed. f. Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected. g. Temporary Support: Provide temporary support of Work to be cut. h. Protection: Protect existing construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations. i. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CUTTING AND PATCHING 01045-3 j. Existing Services: Where existing services are required to be removed, relocated, or abandoned, bypass such services before cutting to minimize interruption of services to occupied areas. k. Performance: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay. l. Cut existing construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition. m. Cutting: Cut existing construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations. n. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use. o. Existing Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces. p. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill. q. Excavating and Backfilling: Comply with requirements in applicable Division 2 Sections where required by cutting and patching operations. r. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting. Proceed with patching after construction operations requiring cutting are complete. s. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections of these Specifications. t. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation. u. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing. END OF SECTION 01045 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT AND REPLACEMENT PERMITS AND REGULATIONS 01062-1 SECTION 01062 - PERMITS AND REGULATIONS A. General 1. Scope: a. The Contractor shall comply with all applicable regulations and shall obtain permits for the work as necessary. b. The Contractor shall obtain all building/construction permits necessary for commencement of the work, including building permits, mechanical permits, plumbing permits, electrical permits, etc. c. Permits may be State or Local as applicable. Coordinate as required. If requested, the Architect will furnish additional sets to the Contractor for submission to review agencies for necessary reviews and approval. Initiate submissions and permits in ample time to avoid project delays. 2. Project Closeout: a. At the completion of the project, provide documentation of all approvals by regulatory agencies prior to final acceptance by the Owner. END OF SECTION 01062 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT SUBSTITUTION PROCEDURES 01250-1 SECTION 01250 – SUBSTITUTION PROCEDURES A. General: 1. Related Documents: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 2. Scope of Work: Section includes: a. Special Definitions. b. Methods of Specifying. c. Substitution Procedures. d. Substitution Request Form. 3. Definitions: a. Standard of Quality: Specified manufacturers, materials, products, and equipment have been used in preparing the Contract Documents and thus establish minimum qualities for performance and appropriateness. 1) Materials, products, and equipment described in the Contract Documents establish a standard of required function, dimension, appearance, and quality. 2) Comply with specifications and reference standards as minimum requirements. 3) Where a particular manufacturer and product is indicated, followed by a description of the product (material and equipment) including special features or performance criteria, the manufacturer shall agree to make necessary modifications to their “Standard or Custom Products” to fully comply with the product described. b. Base Quote: Base on materials, products, and equipment described in the Contract Documents. 1) Requests for substitutions shall be made to comply with the procedures specified herein. 2) It is understood and agreed by Contractors, material suppliers, and their subcontractors that quotes and contracts shall be based on products (material and equipment) and processes as specified or as revised by addenda or modification. c. Substitutions: Requests for changes in products (materials and equipment) and methods of construction required by the Contract Documents are requests for “substitutions”, 1) The following are not defined as substitutions as used herein: (a) Revisions to Contract Documents requested by Owner and Architect. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT SUBSTITUTION PROCEDURES 01250-2 4. Methods of Specifying: a. Reference Standard Specifications: Where products (material and equipment) are specified only by reference standard, provide products complying with standard. 1) If reference standard is followed by description of a product’s special features, or performance criteria modify “Standard or Custom Products” to fully comply with the description of the specified product’s special features or performance criteria. b. Descriptive Specifications: Where products (material and equipment) are specified by indicating a detailed description of the required properties, minimum attributes, special features, or performance criteria required, provide products complying with the specified description. 1) If a descriptive specification is followed by a list of specified manufacturers or specified products, select a product from only those listed. 2) If a manufacturer’s standard product is listed in the specification and does not comply with the minimum description indicated, make modifications to the “Standard or Custom Product” to make the product fully comply with the description of the specified product’s special features, or performance criteria. 3) If a list of specified manufacturers includes the following statement “Comparable Architect approved manufacturers”, then select product from only manufacturers listed in the Project Manual or addenda complying with the minimum attributes, special features, or performance criteria. c. Proprietary Specifications: Where the desired products (material and equipment) are indicated by a specific manufacturer’s name, brand name, model number, type designation, or other unique characteristics, provide only products listed in the original Project Manual or addenda. 1) Where indicated in the Project Manual as “No Substitution”, quotes must be based on the specific named product only. d. The design layout, space allocations, connection details, performance criteria, etc., are based on specifically identified proprietary products identified in B. Products: of each specification section. e. Other manufacturers, even if listed as “Acceptable Manufacturers”, shall comply with the minimum levels of material, detailing, and dimensional restrictions established by the proprietary product. 5. Substitution Time Frame and Considerations: a. Pre-Quote Substitutions (Prior Approval): 1) Submittal Time Limit: Not less than 10 days before Quotes are due. 2) Consideration: Substitution will only be considered if submitted by an invited Contractor and each request includes the information listed under “Consideration Requirements” Article specified below. 3) Failure to complete “Substitution Request Form” or submit requested information is grounds for rejection. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT SUBSTITUTION PROCEDURES 01250-3 b. Substitution Requests Made After Award of Contract: 1) Consideration: Substitution will only be considered if submitted by the Contractor and substitution request is being made because a specified product has become unavailable. 2) Request shall include information listed under “Consideration Requirements” Article specified below. 6. Supporting Information for Substitutions: a. Include the following supporting information: 1) Name of Product: Name of material or equipment for which substitution is being requested and a complete description of the proposed substitute including drawings, product data, performance and test data, and any other information necessary for an evaluation. 2) Architect Notification: The Architect must be notified of changes in other materials, equipment or other Work that incorporation of this substitute would require. a) Alterations or changes to other Work are the responsibility of the Contractor proposing substitution, including redesign if determined by Architect. b. Burden of proof of the merit of the proposed substitute is upon the proposer. c. It is understood and agreed Contractors, material suppliers, and their subcontractors that quotes and contracts shall be based on products (material and equipment) and processes as specified or as revised by addenda or modification. 7. Consideration Requirements: a. Substitution request will be considered by Architect when the following conditions are satisfied: 1) Extensive revisions to Contract Documents are not required. 2) Proposed changes are in keeping with the general intent of Contract Documents. 3) Request is timely, fully documented, and properly submitted. 4) Additionally, 1 or more of the following are satisfied: a) If a specified product is not available. b) Specified product or method of construction cannot be provided within Contract Time. Request will not be considered if product or method cannot be provided as a result of failure to pursue the Work promptly or coordinate activities properly. c) Specified product or method of construction cannot receive necessary approval by a governing authority, and requested substitution can be approved. d) Substantial advantage is offered to Owner, in terms of cost, time, energy conservation of other considerations of merit, after deducting offsetting responsibilities the Owner may be required to bear as determined by Architect, which includes additional compensation to Architect for redesign and evaluation services, increased cost of other construction, or separate contractors, and similar considerations. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT SUBSTITUTION PROCEDURES 01250-4 e) Specified product or method of construction cannot be provided in a manner that is compatible with other materials and where Contractor certifies substitution will overcome incompatibility. f) Specified product or method of construction cannot be coordinated with other materials, and Contractor certifies proposed substitution can be coordinated g) Specified product or method of construction cannot provide a warranty required by the Contract Documents and Contractor certifies proposed substitution provides required warranty. b. Where proposed substitution involves more than 1 installer; installers shall cooperate to coordinate the Work, provide uniformity and consistency and to assure compatibility of products. c. Submit a separate substitution request for each product, supported with complete product data, drawings, and samples. 1) Comparison of qualities of proposed substitution with specified materials. d. To determine if proposed substitution complies with the function, appearance, quality, performance, and dimensional characteristics of specified item, Architect may: 1) Require sample units, technical product data, and independent test reports sufficient to establish compliance. a) Cost of which shall be paid by the submitting party. e. Substitution request not complying will be returned without action other than to record noncompliance with submittal requirements. 8. Architect’s Evaluation Process: a. Architect is sole judge of acceptability of proposed substitution. b. Architect will review requests for substitutions with reasonable promptness and respond as follows: 1) Request additional information or documentation necessary for evaluation. 2) Pre-Quote: Notify Quoters of the decision to accept proposed substitution 3) by written addendum. 4) Post Award: Notify Contractor in writing of the decision to accept or reject proposed substitution. c. Accepted substitutions will be documented by Modification (Change Order), including manufacturers’ names and catalog numbers. END OF SECTION 01250 SUBSTITUTION REQUEST FORM To: Project: We hereby submit for your consideration the following product instead of the specified item for the above project: Section Paragraph Specified Item __________ ________________________ ____________________________________________ Proposed Substitution: Attach complete technical data including laboratory tests if applicable. Include complete information, changes to Drawings and/or Specifications which the proposed substitution requires for proper installation. Fill in blanks below; use additional sheets if necessary: A. Is the substitution product superior to specified? Y N (Circle one) Yes? In what way? B. Is the substitution product equal to the specified product? Y N (Circle one) If yes, what is the reduction in Contract Amount? $ C. Is the specified product no longer available? Y N (Circle one) If yes, provide documentation that product is no longer available on manufacturer’s letterhead. The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by Design Consultant: □ Accepted □ Accepted as Noted Signature □ Not Accepted □ Received Too Late Firm: By: Address: Date: Remarks: Telephone: CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT SHOP DRAWINGS AND PRODUCT DATA 01340-1 SECTION 01340 - SHOP DRAWINGS AND PRODUCT DATA A. General 1. Summary: a. Make submittals required by the Contract Documents, and revise and resubmit as necessary to establish compliance with the specified requirements, all as described in this section. b. Related Work: Individual requirements for submittals may be described in pertinent Sections of these Specifications. c. Work Not Included: The Contractor may require his subcontractors to provide drawings, setting diagrams and similar information to help coordinate the Work, but such data shall remain between the Contractor and his subcontractors and will not be reviewed by the Architect unless specifically called for within the Contract Documents. 2. Submittals: Make submittals of Shop Drawings, Samples, Substitution Requests and other items in accordance with the provisions of this Section. 3. Quality Assurance: a. Coordination of Submittals: 1) Prior to each submittal, carefully review and coordinate all aspects of each item being submitted. 2) Verify that each item in the submittal conforms in all respects with the specified requirements. 3) By affixing the Contractor's signature to each submittal, certify that this coordination has been performed. b. Review and approval of Shop Drawings by the Architect is for general conformity to design intent only. This review does not authorize changes to the contract sum or relieve the Contractor in any way of his contract obligations. c. Substitutions: When a material, product, or method is listed in the Specifications or on the Drawings, it shall be considered the basis of design. Where "or equal" is indicated, other products shall be considered acceptable provided that they meet the design intent (as interpreted by the Owner and Architect) and fit in the available space. Where "or equal" is indicated, other products will be considered acceptable provided that they are submitted to and approved by the Owner and Architect (prior to quoting) in accordance with the Scope of Work, III. Term “Or Equal”. B. Products 1. Manufacturer’s Literature: a. Where contents of submitted literature from manufacturers include data not pertinent to the submittal, clearly show which portions of the contents are being submitted for review. b. Submit the number of copies which are required to be returned, plus two (2) copies which will be retained by the Architect. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT SHOP DRAWINGS AND PRODUCT DATA 01340-2 c. Electronic submittals are permissible in lieu of hard copies. A single electronic file shall be submitted for each shop drawing or product data to be reviewed. C. Execution 1. Grouping of Submittals: a. Unless otherwise specified, make submittals in groups containing all associated items to assure that information is available for checking each item when it is received. 1) Partial submittals may be rejected as not complying with the provisions of the Contract. 2) The Contractor may be held liable for delays so occasioned. 2. Timing of Submittals: a. Make submittals far enough in advance of scheduled dates for installation to provide time required for reviews, for securing necessary approvals, for possible revisions and resubmittals, and for placing orders and securing delivery. b. In scheduling, allow at least seven (7) working days for review by the Architect following the Architect's receipt of the submittal. END OF SECTION 01340 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT SCHEDULE OF VALUES 01370-1 SECTION 01370 - SCHEDULE OF VALUES A. General 1. Summary: Provide a complete Schedule of Values, outlining the costs of various portions of the work. Schedule of Values shall be completed on AIA Document G703. This document shall be used as an application and certificate for payment. With prior approval, the Contractor may submit Schedule of Values on an alternative form. 2. Content: a. Classification of items shall generally follow the major components, in the order outlined, in the Table of Contents of the Specifications. For each item, provide a separate material and labor cost. Each listed item shall include a proportional amount of subcontractor and prime contractor overhead and profit. b. The sum of the above values shall equal the total contract amount. These amounts will be updated as the work is completed with each application for payment. 3. Submittal: a. Submit three (3) copies of the Schedule of Values within seven (7) days after the contract for the work is awarded. The Contractor shall make any changes requested by the Architect or Owner within five (5) days after receiving comments. b. Applications for payment shall be submitted in accordance with General Conditions. c. If the Architect or Owner requires, provide substantiating data justifying line item amounts in the Schedule of Values. END OF SECTION 01370 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CONSTRUCTION FACILITIES 01500-1 SECTION 01500 - CONSTRUCTION FACILITIES A. General 1. Related Documents: Drawings and general provisions of the Contract, including Scope of Work and other Division 1 Specifications apply to this Section. 2. Summary: a. This Section includes minimum requirements for construction facilities and temporary controls, including temporary utilities, support facilities, and security and protection. The Contractor retains all responsibility for the adequacy of all jobsite safety precautions and programs. 1) Except that equipment furnished by subcontractors shall comply with requirements of pertinent safety regulations, such equipment normally furnished by the individual trades in execution of their own portions of the Work are not part of this Section. 3. Requirements: Provide or coordinate use of existing facilities and temporary controls needed for the Work with the Owner. 4. Temporary Utilities: a. Existing Utilities: exercise care and protect existing services and utilities encountered. In the even of accidental interruption of a service or utility, take prompt remedial action and immediately inform the Owner and related utility company. 1) Coordinate work requiring disconnection, reconnection, and interruptions of services and utilities with Owner and any utility company that may be affected. Give Owner 48-hours notice prior to any planned interruption. 2) Obtain Owner’s approval of scheduled times before proceeding. b. Temporary Water: Make connections to Owner’s existing water services to provide water for construction purposes. c. Temporary Sanitary Facilities: Contractor to provide temporary toilet facilities for use by construction personnel. d. Temporary Electric Power and Light: The Owner’s electrical energy will be available to the Contractor at no cost to the Contractor, provided that the contractor’s use of Owner’s power causes no inconvenience or disruption to the Owner. The Contractor shall provide an alternate power supply, such as portable generators, if disruption occurs. The Contractor is responsible for temporary power runs from one or more locations to point of use. 5. Delivery, Storage and Handling: Coordinate all routes of delivery, parking arrangements and required permits with the Architect and Owner's Representative before starting construction. 6. Enclosures: Provide and maintain for the duration of construction all enclosures, scaffolds, tarpaulins, canopies, warning signs, steps, platforms, and other temporary construction necessary for proper completion of the Work in compliance with pertinent safety and other regulations. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CONSTRUCTION FACILITIES 01500-2 7. Health and Safety: a. General: This section outlines the health and safety requirements to be followed by the Contractor during the performance of the work specified. If a conflict occurs between these requirements and current regulations, the more stringent shall apply. b. Safety: Contractor shall comply with all applicable federal, state, and local laws, ordinances, rules, and regulations (including the Occupational Safety and Health Act of 1970 and the regulations issued thereunder). c. Contractor's Responsibilities: 1) The Contractor is solely responsible for the health, safety, and protection of its on-site personnel during the performance of the work. The Contractor shall perform the work specified in these contract documents in accordance with the Health and Safety Requirements specified herein. It shall be the responsibility of the Contractor to be familiar with the required health and safety regulations in the performance of this work. 2) The Contractor shall have a working knowledge of federal and state occupational safety and health regulations. 3) Should any unforeseen or site-specific safety related factor, hazard, or condition become evident during the performance of the work, the Contractor shall take immediate action to establish and maintain safe working conditions and to safeguard site personnel, the public, and the environment. The Contractor shall also immediately inform the Architect of such a condition. 4) The Contractor shall provide safe pedestrian passage during the construction period and coordinate all security and protection facilities with the Owner. d. Work Areas: The Contractor shall clearly lay out and identify work areas or zones and shall limit equipment, operations and personnel access in the areas as described below. e. Housekeeping: All work wash areas shall be maintained in a well kept and tidy condition. Particular attention must be paid to work in public areas with potential access by vehicles or pedestrians. Road and walkways must be kept clear as possible. Cones or caution tape should be used to demarcate work areas and danger zones. 8. Maintenance and Removal: a. Maintain temporary facilities and controls as long as needed for safe and proper completion of the Work. b. Remove such temporary facilities and controls as rapidly as progress of the Work will permit, or as directed by the Architect or Owner's Representative. c. The Contractor shall adequately protect the work, adjacent property and the public and shall be responsible for any damage or injury due to his act or neglect. d. The Contractor shall provide for and document proper disposal of any materials and facilities which are disposed during or after the project, refuse, equipment, etc. END OF SECTION 01500 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CONTRACT CLOSEOUT 01700-1 SECTION 01700 - CONTRACT CLOSEOUT A. General 1. Summary: This Section specifies administrative and procedural requirements for project closeout including, but not limited to, inspection procedures, project record document submittal, operating and maintenance manual submittal, submittal of warranties, final cleaning. 2. Substantial Completion: a. Preliminary: Before requesting inspection for Certificate of Substantial Completion, complete the following list. In the application for payment that coincides with the date Substantial Completion is claimed, show 100% completion for the portion of the work claimed as substantially complete. Include supporting documents for completion, as indicated in these contract documents and a statement showing an accounting of changes to the contract sum. If 100% completion cannot be shown, include a list of incomplete items, the value of incomplete construction and reasons the work is not complete. Prior to claiming Substantial Completion, all final testing, balancing, start-up and clean-up procedures shall be complete. In addition, the Contractor shall provide the following additional written documentation: 1) Provide all final submittals, including warranties, operating and maintenance manuals, workmanship bonds, guarantees, final lien waivers, etc. as called for by other sections of the Specifications. 2) Deliver tools, spare parts, spare materials, etc. to the Owner's designated storage area. b. Inspection Procedures: After receipt of the request for inspection, the Architect and Owner's Representatives will inspect the project site and operation of equipment and systems. The above parties will advise the Contractor of deficiencies and unfulfilled requirements. The Architect or Owner's Representative will prepare the Certificate of Substantial Completion following inspection or advise the Contractor of construction that must be completed or corrected before the Certificate will be issued. This inspection will be repeated after a request for re-inspection is made by the Contractor. The work referenced in the Architects Inspection Report shall be completed prior to requesting additional inspections. 3. Final Acceptance: a. Before requesting final inspection for certification of final acceptance and final payment, the following must be completed; 1) Submit the Final Payment Request with final release and supporting documentation, not previously submitted and accepted. Include certificates of insurance for products and completed operations where required. 2) Submit an updated final statement accounting for final additional changes to the contract sum. 3) Submit a copy of the Architect's Final Inspection with a Contractor's cover letter stating that each item has been completed or otherwise resolved for acceptance. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CONTRACT CLOSEOUT 01700-2 b. Re-inspection Procedures: The Architect will re-inspect the work upon receipt of the above items. Upon completion of re-inspection, the Architect will prepare a Certificate of Final Acceptance or advise the Contractor of work that is incomplete and required before final acceptance can be issued. 4. Correction Period Walk-Thru: a. One (1) week after the date of Completion, coordinate a Project Walk-Thru with the Owner and Architect to review Project in regard to work that is defective or that does not conform to the Contract Documents. b. Architect will prepare a Correction List of items to be corrected or replaced prior to expiration of any warranties. c. Contractor shall promptly correct work indicated on Correction List and submit written notice to the Architect that the Correction List items have been completed. 5. Record Documents: Provide record documents as specified in Section 01720 “Project Record Documents”. B. Products (Not Used) C. Execution 1. Final Cleaning: a. General cleaning during construction is required, as defined in the General Conditions, and as described elsewhere in the Specifications. b. Final cleaning shall be as described in Section 01710 “Cleaning”. END OF SECTION 01700 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT CLEANING 01710-1 SECTION 01710 - CLEANING A. General 1. Summary a. Throughout the construction period, maintain the buildings and site in a standard of cleanliness as described in this Section. b. Related Work: In addition to standards described in this Section, comply with requirements for cleaning as described in pertinent other Sections of these Specifications. 2. Quality Assurance: Conduct daily inspection, and more often if necessary, to verify that requirements for cleanliness are being met. B. Products 1. Cleaning Materials and Equipment: Provide required personnel, equipment and materials needed to maintain the specified standard of cleanliness. 2. Compatibility: Use only the cleaning materials and equipment which are compatible with the surface being cleaned, as recommended by the manufacturer of the material. C. Execution 1. Progress Cleaning: a. Retain stored items in an orderly arrangement allowing maximum access and providing required protection of materials. b. Do not allow accumulation of scrap, debris, waste material and other items. c. At least each day, completely remove all scrap, debris, and waste material from the job site. d. Provide adequate storage for all items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology. 2. Final Cleaning: a. "Clean," for the purpose of this Article, and except as may be specifically provided otherwise, shall be interpreted as meaning the level of cleanliness generally provided by skilled cleaners using commercial quality building maintenance equipment and materials. b. Prior to completion of the Work, remove from the job site all tools, surplus materials, equipment, scrap, debris, and waste. 3. Cleaning During Owner’s Occupancy: Should the Owner occupy the Work or any portion thereof prior to its completion by the Contractor and acceptance by the Owner, responsibilities for interim and final cleaning shall be as determined by the Architect/Owner. END OF SECTION 01710 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT PROJECT RECORD DOCUMENTS 01720-1 SECTION 01720 - PROJECT RECORD DOCUMENTS A. General 1. Summary: Throughout progress of the Work, maintain an accurate record of changes in the Contract Documents. 2. Submittals: a. The Architect's approval of the current status of Project Record Documents may be a prerequisite to the Architect's approval of requests for progress payment and request for final payment under the Contract. b. Prior to submitting each request for progress payment, secure the Architect's approval of the current status of the Project Record Documents. c. Prior to submitting request for final payment, submit the final Project Record Documents to the Architect and secure his approval. 3. Quality Assurance: a. Accuracy of Records: 1) Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2) Accuracy of records shall be such that a future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. b. Make entries within 24 hours after receipt of information that the change has occurred. 4. Delivery, Storage and Handling: a. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage. b. In the event of loss of recorded data, use means necessary to again secure the data to the Architect's approval. 1) Such means shall include, if necessary, in the opinion of the Architect, removal and replacement of concealing materials. 2) In such case, provide replacements to the standards originally required by the Contract Documents. B. Products 1. Record Documents: Job Set: Promptly following receipt of the Owner's Notice to Proceed, secure from the Architect at no charge to the Contractor, one complete set of all Documents comprising the Contract. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT PROJECT RECORD DOCUMENTS 01720-2 C. Execution 1. Maintenance of Job Set: a. Making Entries on Drawings: Using an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. END OF SECTION 01720 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT GUARANTEES AND WARRANTIES 01740-1 SECTION 01740 - GUARANTEES AND WARRANTIES A. General 1. Summary: a. Provide guarantees and warranties as defined in the Scope of Work XIV. Warranty. b. Disclaimers and Limitations: Manufacturer's disclaimers and limitations on product warranties do not relieve the Contractor of the warranty on the work that incorporates the product, nor does it relieve the suppliers, manufacturers and subcontractors required to countersign special warranties with the Contractor. 2. Warranty Requirements: a. When correcting warranted work that has failed, remove and replace other work that has been damaged as a result of such failure or that must be removed and replaced to provide access for a correction of warranted work. b. When work covered by warranty has failed and been corrected by replacement or re-building, reinstate the warranty by written endorsement. c. Upon determination that work covered by warranty has failed, replace or re-build the work to an acceptable condition, complying with requirements of the Contract Documents. The Contractor is responsible for cost of replacing or re-building defective work regardless of whether the Owner has benefitted from use of the work through a portion of its anticipated useful service life. The Contractor shall be responsible for all costs of the replacement. d. Written warranties made to the Owner are in addition to implied warranties and shall not eliminate the duties, obligations, rights and remedies otherwise available under law, nor shall warranty period be interpreted as limitations on time in which the Owner can enforce such duties, obligations, rights or remedies. e. The Owner reserves the right to refuse to accept work for the project where a special warranty, certification or similar commitment is required. 3. Submittals: Submit written guarantees and warranties to the Architect prior to the date of Certificate for Substantial Completion. This submission shall include Contractor's warranty on all work covered by the project, along with copies of warranties specified elsewhere in the Construction Documents for equipment and systems. The warranty period for this project shall not begin until certification for final project acceptance has been made by the Contractor and approved by the Architect. END OF SECTION 01740 CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT OPERATING AND MAINTENANCE MANUALS 01800-1 SECTION 01800 - OPERATING AND MAINTENANCE MANUALS A. General 1. Summary: The Contractor will provide complete Operating and Maintenance Manuals for all equipment and systems in quantities and types as requested by the Owner. 2. Description: a. Operating and Maintenance Manuals for equipment shall include (as available and applicable): 1) Repair trouble shooting lists 2) Schedule of recommended maintenance 3) Recommended materials for preventative maintenance 4) Complete parts lists and locations of suppliers 5) Guarantee and warranty sheets 6) Chemical safety data sheets (as applicable) 7) Copies of any available original installation instructions b. The Contractor shall bind all Operating and Maintenance Material into a "D" ring type, 3 ring binder with binder ring locks. Provide tabs between each piece of equipment and provide an index to all equipment cuts and other sections of information. c. Under its own tab, at the front of the Operating and Maintenance Manual, provide additional Contractor information as follows: 1) Copy of Contractor's One Year Warranty covering the entire project, starting from the date of final acceptance by the Owner. 2) Copy of Contractor's Certificate of Completion 3) Copy of Contractor's Final Waiver of Lien 4) Complete list of project Subcontractors, including addresses, telephone numbers and fax numbers, as applicable. d. Refer to various other sections of the specifications for additional information applicable to specific equipment and systems. 3. Submittal Procedures: a. Submit Operating and Maintenance Manuals in accordance with Section 01300. b. After initial submittal, make any corrections or additions requested by Architect to comply with the requirements of the Contract Documents. END OF SECTION 01800 DIVISION 2 thru DIVISION 5 Not Used DIVISION 6 Wood, Plastics and Composites CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT ROUGH CARPENTRY 06100-1 SECTION 06100 – ROUGH CARPENTRY A. Scope 1. Rough carpentry includes carpentry work not specified as part of other sections and which is generally not exposed, except as otherwise indicated. Types of work in this section include rough carpentry for: a. Wood framing with dimension lumber. b. Wood grounds, nailers, and blocking. c. Temporary closures and protection. 2. Related Documents: The provisions of the General Conditions, Supplementary Conditions, and the sections included under Division 1, General Requirements, are included as a part of this section as though bound herein. 3. References: a. Lumber Standard: Comply with PS-20 and with applicable rules of the respective grading and inspecting agencies for species and products indicated. 4. Submittals: a. Product Data: Submit manufacturer's specifications and installation instructions for manufactured materials. b. Material Certificates: Where dimensional lumber is provided to comply with minimum allowable unit stresses, submit listing of species and grade selected for each use, and submit evidence of compliance with specified requirements. Compliance may be in form of a signed copy of applicable portion of lumber producer's grading rules showing design values for selected species and grade. Design values shall be as approved by the Board of Review of American Lumber Standards Committee. c. Wood Treatment Data: Submit treatment manufacturer's instructions for proper use of each type of treated materials. 1) Pressure Treatment: For each type specified, include certification by treating plant stating chemicals and process used, net amount of salts retained, and conformance with applicable standards. 2) For Cromated Copper Arsenate (CCA) water borne preservatives include statement that moisture content of treated materials was reduced to a maximum of 19 percent prior to shipment to project site. d. Warranty of chemical treatment manufacturer for each type of treatment. 5. Delivery, Storage, and Handling: a. Delivery and Storage: Keep materials dry during delivery and storage. Protect against exposure to weather and contact with damp or wet surfaces. Stack lumber and plywood, and provide air circulation within stacks. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT ROUGH CARPENTRY 06100-2 6. Project Conditions: a. Installer must examine the substrates and supporting structure and the conditions under which the carpentry work is to be installed; and notify the Architect in writing of conditions detrimental to the work. Do not proceed with the installation until unsatisfactory conditions have been corrected. b. Coordination: Fit carpentry work to other work; scribe and cope as required for accurate fit. Correlate location of furring, nailers, blocking, grounds, and similar supports to allow proper attachment of other work. B. Products 1. Materials: a. Lumber, General: 1) Factory mark each piece of lumber and plywood with type, grade, mill and grading agency, except omit marking from surfaces to be exposed with transparent finish or without finish. 2) Nominal sizes are indicated, except as shown by detail dimensions. Provide actual sizes as required by PS-20, for the moisture content specified for each use. a) Provide dressed lumber, S4S, unless otherwise shown or specified. b) Provide seasoned lumber with 19 percent maximum moisture content at time of dressing. b. Lumber Framing: Members shall be "SPF" (Spruce-Pine-Fir) unless noted otherwise and grading shall be as follows: 1) Plates, Blocking and Furring: Stud Grade. c. Miscellaneous Materials: 1) Fasteners and Anchorages: Provide size, type, material, and finish as indicated and as recommended by applicable standards, complying with applicable Federal Specifications for nails, staples, screws, bolts, nuts, washers, and anchoring devices. Provide metal hangers and framing anchors of the size and type recommended by the manufacturer for each use including recommending nails. Where rough carpentry work is exposed to weather, in ground contact or in area of high relative humidity, provide fasteners and anchorages with a hot dip zinc coating (ASTM A153). 2. Wood Treatment: a. Preservative Treatment: Where lumber or plywood is indicated as "PTWD-WD" or "Treated" or is specified herein to be treated, comply with the applicable requirements of the American Wood Preservers Association (AWPA). Mark each treated item to comply with the American Lumber Standards Committee (ALSC) Quality Mark requirements. 1) Pressure treat items with water borne preservatives complying with AWPA Standard U1 for lumber, timbers and plywood. After treatment kiln dry to a maximum moisture content of 19 percent. Treat indicated items and the following: CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT ROUGH CARPENTRY 06100-3 a) Wood cants, nailers, blocking, stripping, and similar members in connection with roofing, gutters, conductor heads, flashing, vapor barriers, fascia, soffits, curbs, and waterproofing. b) Wood sills, sleepers, blocking, furring, plates, nailers, stripping, and similar concealed members in contact with masonry or concrete. b. Complete fabrication of treated items prior to treatment, wherever possible. If cut after treatment, coat cut surfaces with heavy brush coat of same chemical used for treatment. Observe each piece of lumber or plywood after drying and discard damaged or defective pieces. C. Execution 1. Installation: a. General: 1) Discard units of material with defects which might impair the quality of the work, and units which are too small to fabricate the work with minimum joints or the optimum joint arrangement. 2) Set carpentry work accurately to required levels and lines, with members plumb and true and accurately cut and fitted. 3) Securely attach carpentry work to substrates by anchoring and fastening as shown and as required by recognized standards. Countersink nailheads on exposed carpentry work and fill holes. Use common wire nails, except as otherwise indicated. Use finishing nails for finish work. Select fasteners of size that will not penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting of wood; predrill as required. 4) Apply field treatment complying with AWPA M4 to cut surfaces of preservative treated lumber and plywood. b. Wood Grounds, Nailers, and Blocking: 1) Provide wherever shown and where required for screeding or attachment of other work. Form to shapes as shown and cut as required for true line and level of work to be attached. Coordinate location with other work involved. 2) Attach to substrates as required to support applied loading. Countersink bolts and nuts flush with surfaces, unless otherwise shown. Build into masonry during installation of masonry work. Where possible, anchor to formwork before concrete placement. 3) Provide permanent grounds of dressed, preservative treated, key beveled lumber not less than 1-1/2” wide; and of the thickness required to bring face of ground to exact thickness of finish material involved. Remove temporary grounds when no longer required. c. Wood blocking, nailers, and grounds shall be provided as necessary to receive finish items. END OF SECTION 06100 DIVISION 7 Thermal and Moisture Protection CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT FLASHING AND SHEET METAL 07600-1 SECTION 07600 – FLASHING AND SHEET METAL A. Scope 1. Provide labor, materials, and equipment necessary for complete installation of flashing and sheet metal work, including manufactured systems. Work under this section includes, but is not limited to: a. Flashing/step flashing. b. Sealants and bonding agents between components of this section and between the roof and other materials. 2. Related Documents: The provisions of the General Conditions, Supplementary Conditions, and the sections included under Division 1, General Requirements, are included as a part of this section as though bound herein. 3. Related Work Specified Elsewhere: a. Section 08952 TRANSLUCENT SKYLIGHTS. 4. General: Provide and install all accessories and items essential for the completeness of the sheet metal installation. Such items, unless otherwise shown on the Drawings or specified, shall be the same kind of material as the item to which applied. Nails, screws, and bolts shall be of the types suited for the purpose intended and shall be compatible with the metal to which it will contact. 5. Forming and assembling of sheet metal components shall be performed using methods that will not void the manufacturer's 20-year finish or 5-year spray coated warranty. 6. Submittals: a. Product Data, Flashing, and Accessories: Manufacturer's technical product data, installation instructions and general recommendations for each specified sheet material and fabricated product. b. Submit complete color choice samples of the following flashing, sheet metal and accessory items: 1) Specified sheet materials to be exposed as finished surfaces. 2) Factory fabricated products exposed as finish work. c. Shop drawings showing layout, profiles, methods of joining, and anchorage details, including major counterflashing, trim/fascia units, scuppers and downspouts. 7. Quality Assurance: a. Where pre-engineered manufactured systems are specified, other field fabricated or shop/field fabricated substitutions will not be accepted. However, where shop/field fabrications are indicated pre-engineered systems will be considered with Architect approval. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT FLASHING AND SHEET METAL 07600-2 b. Except as otherwise indicated, the workmanship of sheet metal work, method for forming joints, anchoring, cleating and provisions for expansion shall conform to the standard details and recommendations of the Copper Development Association and the "Architectural Sheet Metal Manual" published by SMACNA; and workmanship shall be of the best quality, in accordance with best trade practice and the recommendations and specifications of the Sheet Metal and Air Conditioning Contractors National Association, Inc. 8. Project Conditions: Coordinate work of this section with adjoining work for proper sequencing of each installation to ensure best possible weather resistance and protection of materials and finishes against damage. B. Products 1. Materials: a. The type and locations of the various kinds, gauges, thickness, and finish of sheet metal to be used is specified hereinafter under the individual items. Where sheet metal is indicated on Drawings and kind or type of metal is not definitely specified, aluminum shall be provided. b. Galvanized sheet metal shall be commercial quality with 0.20 percent copper, ASTM A525 except ASTM A527 for lock forming; G90 hot dip galvanized, mill phosphatized where indicated for painting; 20 gauge thick except as otherwise indicated. 2. Miscellaneous Materials and Accessories: a. Fasteners: Same metal as flashing/sheet metal or other non-corrosive metal as recommended by sheet manufacturer. Match finish of exposed heads with material being fastened. b. Bituminous Coating: SS PC-Paint 12, solvent type bituminous mastic, nominally free of sulfur, compounded for 15 mil dry film thickness per coat. c. Mastic Sealant: One component, low-viscosity, self-wetting, butyl-blend mastic. d. Elastomeric Sealant: Generic type recommended by manufacturer of metal and fabricator of components being sealed and complying with requirements for joint sealants. 1) One component polyurethane sealant, complying with ASTM C920, Type S, Grade NS, Class 25 (non-sag). e. Universal Single Ply Sealant: Solvent-free, one-part, polyether sealant that provides a weather tight seal to a variety of building substrates. f. Roofing Cement: ASTM D2822, asphaltic. g. Epoxy Seam Sealer: 2-part non-corrosive metal seam cementing compound, recommended by metal manufacturer for exterior/interior non-moving joints including riveted joints. h. Bonding Adhesive: Manufacturers standard high-strength, synthetic rubber adhesive for bonding membrane to various surfaces. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT FLASHING AND SHEET METAL 07600-3 i. Metal Accessories: Provide sheet metal clips, straps, anchoring devices, and similar accessory units as required for installation of work, matching or compatible with material being installed, non-corrosive, size and gauge required for performance. 3. Finishes: a. General: Apply coatings either before or after forming and fabricating panels, as required by coating process and as required for maximum coating performance capability. Protect coating either by application of strippable film or by packing plastic film or other suitable material between panels in a manner to properly protect the finish. Furnish, air drying spray finish in matching color for touch-up. b. Shop-Applied Finish: AAMA 2605, high-performance coating, two-coat shop applied, 70% polyvinylidene fluoride (PVDF) coating based on ELF Autochem, Inc. Kynar 500. Color(s) selected shall be selected by Architect from manufacturer’s full color range. 4. Fabrication: a. General: Shop fabricate work to greatest extent possible. Comply with details shown and with applicable requirements of SMACNA "Architectural Sheet Metal Manual" and other recognized industry practices. Fabricate for waterproof and weather resistant performance, with expansion provisions for running work, sufficient to permanently prevent leakage, damage, or deterioration of the work. Form work to fit substrates. Comply with material manufacturer instructions and recommendations for forming material. Form exposed sheet metal work without excessive oil-canning, buckling, and tool marks, true to line and levels indicated, with exposed edges folded back to form hems. b. Seams: Fabricate non-moving seams in sheet metal with flat-lock seams. For metal other than aluminum, fin edges to be seamed, form seams and solder. Form aluminum seams with epoxy seam sealer; rivet joints for additional strength where required. c. Expansion Provisions: Where lapped or bayonet-type expansion provisions in work cannot be used or would not be sufficiently water/weatherproof, form expansion joints of intermeshing hooked flanges, not less than 1" deep, filled with mastic sealant (concealed within joints). d. Sealant Joints: Where movable, non-expansion type joints are indicated or required for proper performance of work, form metal to provide for proper installation of elastomeric sealant, in compliance with SMACNA standards. e. Separations: Provide for separation of metal from non-compatible metal or corrosive substrates by coating or other permanent separation as recommended by manufacturer/fabricator. f. Shop fabricate sheet metal, gutter, downspouts, and flashings to configurations indicated on the Drawings. Refer to Section “B” for product specification requirements. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT FLASHING AND SHEET METAL 07600-4 C. Execution 1. Examination: The Installer must examine substrates and conditions under which metal flashings will be installed and notify Contractor in writing of unsatisfactory conditions. Do not proceed with installation until unsatisfactory conditions have been corrected in a manner acceptable to the Installer. 2. Preparation: Separate dissimilar metals from each other by painting each metal surface in area of contact with a heavy application of bituminous coating. 3. Installation: a. Except as otherwise indicated, comply with manufacturer's installation instructions and recommendations and with SMACNA "Architectural Sheet Metal Manual". b. Install work with provisions for thermal expansion of flashings and other items exposed for more than 15' continuous length. Maintain a watertight installation at expansion seams. Locate expansion seams where shown, or if not shown, in conformance with applicable recommendations of "Architectural Sheet Metal Manual" by SMACNA. c. Sheet metal work shall be watertight and weathertight; lines, arises, and angles sharp and true; plain surfaces free from waves and buckles. Workmen shall be experienced in the trade and thoroughly capable of performing the Work in accordance with these requirements. d. Prefabricated reglets and counterflashings shall be installed in accordance with manufacturer's printed instructions. Coordinate reglets with work by others. 1) Position counterflashing into reglet and "snap" into place against roof membrane flashing. 4. Cleaning and Protection: a. Clean exposed metal surfaces in accordance with manufacturer's instructions. Touch-up damaged metal coatings. b. Protection: Provide protective measures as required to ensure that work of this section will be without damage or deterioration at time of Substantial Completion. END OF SECTION 07600 DIVISION 8 Openings CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT TRANSLUCENT SKYLIGHTS 08952-1 SECTION 08952 - TRANSLUCENT SKYLIGHTS A. Scope This section covers furnishing all labor, materials, and equipment necessary for complete installation of translucent panels within an existing skylight frame system, as indicated. 1. Related Documents: The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements, are included as a part of this Section as though bound herein. 2. Performance Requirements: a. General: Provide assemblies capable of withstanding loads and thermal and structural movements indicated without failure. Failure includes the following: 1) Sandwich-panel deflection exceeding manufacturer’s recommended limits or causing panel failure. 2) Thermal stresses transferred to the building structure. 3) Noise or vibration created by thermal and structural movement and wind. 4) Loosening or weakening of fasteners, attachments, and other components. b. Thermal Movement: Provide systems that allow for thermal movement resulting from the following maxi um change (range) in ambient and surface temperatures by preventing buckling, sealant failure, and other detrimental effects. 1) Temperature Change (Range): 120 deg. F, ambient; 180 deg. F, material surfaces. c. Air Infiltration: Provide skylights with maximum air leakage of 0.05 cfm/sq.ft. of surface when tested according to ASTM E283 at a minimum static-air-pressure differential of 6.24 PSF. d. Water Penetration: Provide skylights that do not evidence water penetration when tested according to ASTM E 331 at 15 psf and to AAMA 501.1 Dynamic Water Test at 15 psf. 3. Submittals: a. Product data for each type specified, including details of construction relative to materials, dimensions of individual components, profiles, finishes, and glazing light transmission and thermal characteristics. b. Shop drawings showing sizes, materials, and details of construction. Include shop drawing submittals certified load bearing data. 1) Submit complete signed and stamped data by a licensed Engineer certifying that provided assemblies of members and connections will adequately support required loadings. c. Submit test reports from accredited laboratories verifying required performance characteristics. 1) Test reports required include: a) Flame Spread and Smoke Development (ASTM E84) b) Burn Extent (ASTM D635) c) Insulated “U” Factor (NFRC 100) d) Impact Strength (UL 972) e) Class A Covering Burning Brand (ASTM E108) f) Color Difference (ASTM D2244) g) Beam Bending Strength (ASTM E 72) CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT TRANSLUCENT SKYLIGHTS 08952-2 h) Solar Heat Gain Coefficient (NFRC or Calculations) i) Condensation Resistance Factor (AAMA 1503) j) Air Leakage (ASTM E283) k) Structural Performance (ASTM E 330) l) Water Penetration (ASTM E 331) m) Fall Through Resistance (ASTM E 661) 5. Quality Assurance: a. Installer Qualifications: An experienced installer to assume engineering responsibility who has specialized in installing skylights similar to those indicated for this Project, and who is acceptable to manufacturer. 1) Engineering Responsibility: preparation of data for skylights, including Shop Drawings, based on engineering analysis of manufacturer’s standard skylights similar to those indicated for this Project. b. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in Indiana and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of skylight panels that are similar to those indicated for this Project in material, design, and extent. c. Sandwich-Panel Fire-Test-Response Characteristics: Provide fiberglass sandwich panels identical to those tested for the following fire-test-response characteristics per test method indicated below by an independent testing and inspecting agency acceptable to authorities having jurisdiction. 1) Plastic Self-Ignition Temperature: 650 deg. F. or more when tested per ASTM D1929. 2) Interior-Face Surface Burning: Flame-spread and smoke-developed ratings of not more than 20 and 200, respectively, per ASTM E84. 3) Exterior-Face Surface Burning: Class A, burning brand only, per ASTM E108. 6. Product Handling: Store skylight panels on the long edge, several inches above the ground, blocked to prevent warping and under cover. 7. Project Conditions: a. Field Measurements: Where skylights are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication and indicate measurements on Shop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work. 8. Warranty: a. General Warranty: Special warranty specified in this Article shall not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents. b. Special Warranty: Written warranty, executed by manufacturer agreeing to repair or replace components of skylights that fail in materials or workmanship within specified warranty period. Failures include, but are not limited to, the following: 1) Structural Failures CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT TRANSLUCENT SKYLIGHTS 08952-3 2) Deterioration of metals, metal finishes, fiberglass sandwich panels, and other materials beyond normal weathering. 3) Water leakage, defined as uncontrolled water appearing on normally exposed interior surfaces of skylights from sources other than condensation. Water controlled by flashing and gutters and drained back to the exterior and that cannot damage adjacent materials or finishes is not water leakage. 4) Warranty Period: 10 years for translucent glazing material. B. Products 1. Manufacturers: a. Manufacturers: Subject to compliance with requirements, provide products by the following: 1) Kalwall Corporation 2) Kingspan Light + Air b. Products of other manufacturers will be considered for acceptance provided they equal or exceed the material requirements and functional qualities of the specified product. 1) Refer to Section 01250 SUBSTITUTION PROCEDURES for additional requirements. 2. Panel Components: a. Aluminum: Alloy and temper recommended by manufacturer for use and finish indicated, and as follows: 1) Extrusions: 6063-T5 and 6063-T6. 2) Width of I-beam shall be no less than 7/16”. b. Fiberglass Sandwich Panels: 2 3/4" thick with uniformly colored, translucent, fiberglass-reinforced-polymer face sheets permanently attached to a grid core using adhesive. Thermoplastic faces are NOT acceptable. 1) Erosion Protection: Manufacturer’s standard. 2) Grid Core: Aluminum I-beams of 6063-T5 alloy. 3) Grid Core Insulation: Fill panel cores with fiberglass batt. 4) Adhesive: Waterproof, heat-and pressure-resin type with tensile bond strength of 750 psi when tested according to ASTM C297 after aging according to ASTM D1037, and shear bond strength of 700 psi when tested according to ASTM D1002 after aging according to ASTM 1183. 5) Impact Resistance: No failure at impact of 60 ft. x lbf according to free-falling ball impact test using a 3 1/2" diameter, 6.3 lb. ball. 6) Color Stability: Not more than 3.0 units Delta E after 60 months when tested according to ASTM D2244. c. Fasteners and Accessories: Manufacturer’s standard corrosion-resistant, nonstaining, nonbleeding fasteners and accessories; compatible with adjacent materials. 1) Nonmovement Joints: Provide slip-joint linings, spacers, and sleeves of material and type recommended by manufacturer. 2) Aluminum-Retaining-Cap or Batten Fasteners: ASTM A193/A 193M, Series 300 stainless-steel screws; type as recommended by manufacturer. d. Skylight-System Gaskets and Joint Fillers: Manufacturer’s standard permanent gaskets and joint fillers for sliding, compression, and nonmoving joints. CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT TRANSLUCENT SKYLIGHTS 08952-4 e. Skylight-System Sealants: Compatible with components with which sealants come in contact and recommended by skylight and sealant manufacturers for this use. 3. Fabrication, General: a. Aluminum Components: As follows: 1) Fabricate components that, when assembled, will have accurately fitted joints with ends coped, mitered, or butted to produce hairline joints free of burrs and distortion. 2) Fabricate components to drain water passing joints and to drain condensation and moisture occurring or migrating within assemblies to the exterior. 3) Fabricate components to accommodate expansion, contraction, and field adjustment and to provide for minimum clearance and shimming at assembly perimeter. 4) For shapes with sharp profiles, straight and free of defects of deformations, before finishing. 5) Fit and assemble components to greatest extent practicable before finishing. 6) Reinforce members as required to retain fastener threads. 7) Where fasteners are exposed to view from interior, countersink fastener heads and finish them to matching framing. 8) Before shipping, shop-assemble, mark, and disassemble components that cannot be permanently shop assembled. b. Fiberglass-Sandwich-Panel Fabrication: As Follows: 1) Laminate face sheets to grid core under a controlled heat-and-pressure process with straight adhesive bonding lines that cover the width of core members and that have sharp edges. 2) White spots indicating lack of bond at intersections of grid core members are limited in number to 4 for every 40 sq.ft. of panel and limited in diameter to 3/64". 3) Fabricate with grid pattern that is symmetrical about centerlines of each panel. 4) Fabricate panel to allow condensation within the panel to escape. 5) Reinforce panel corners. 4. Translucent Roof Panels: a. Grid Pattern: 1) 12" x 24" nominal shoji b. U-Value per ASTM C236: 1) No greater than 0.30 Btu/sq.ft. x h x deg F. c. Interior Face Color: 1) Clear “Crystal” d. Exterior Face Color: 1) Clear “Crystal” 5. Components and Accessories: a. Panel Grid: Fabricate the panel grid core from extruded 6063-T6 aluminum I-beams. Mechanically interlock the muntin and mullion I-beam grid to prevent variations in alignment at intersections and to minimize bond skips. b. Translucent Facing: Fabricate panels using fiberglass face sheet metal manufactured with uniform color which is free of ridges, wrinkles, clusters of air bubbles and pinholes CITY OF SOUTH BEND STUDEBAKER NATIONAL MUSEUM SKYLIGHT REPLACEMENT TRANSLUCENT SKYLIGHTS 08952-5 and with the following characteristics: 1) Flammability for Interior Face Sheet: Flame spread no greater than 20 and smoke development, no greater than 200 per ASTM E84. 2) Burn extent for interior sheet, shall not exceed 1" per ASTM D635. 3) Protective Coating on Exterior Face Sheet: 1 mil thick DuPont Tedlar, factory applied by licensed sheet manufacturer for architectural use. Coating shall be fully field refinishable if damaged. 4) Weatherability of Exterior Face Sheet: Not more than 4.0 Delta E units of color variation per ASTM D2244 after 5 years of outdoor weathering in South Florida at 45 degrees, facing South per ASTM D1435. Fabricate from colorfast resins. C. Execution 1. Examination: Examine substrates and conditions, with installer present, for compliance with requirements for installation tolerances and other conditions affecting performance. Proceed with installation only after unsatisfactory conditions have been corrected. 2. Installation: a. General: Comply with manufacturer’s written instructions for protecting, handling, and installing skylight components. 1) Fit aluminum component joints to produce hairline joints free of burrs and distortion. 2) Rigidly secure nonmovement joints. 3) Accommodate thermal and mechanical movements. b. Erection Tolerances: Install assembly components true in plane, accurately aligned, and without warp or rack. Adjust to comply with the following tolerances: 1) Variation From Plane: Limit variation from plane or location shown to 1/8" in 10' over total length. 2) Alignment: Where surfaces abut in line and at corners and where surfaces are separated by less than 3", limit offset from true alignment to 1/8". c. Install sealants according to sealant manufacturer’s written instructions to provide weatherproof joints. Install joint fillers behind sealant as recommended by sealant manufacturer. 3. Cleaning: Clean assemblies inside and outside, immediately after installation, according to manufacturer’s written recommendation. Remove temporary protective coverings and strippable coatings from factory-finished metal surfaces and fiberglass sandwich panels. Remove labels and markings from all components. END OF SECTION 08952 DIVISION 9 thru DIVISION 16 Not Used BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/07/2024 Name Patrick Sherman Department Public Works BPW Date 11/12/2024 Phone Extension 5601 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Mickey Lovy Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name TBD New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Studebaker Museum Skylight Replacement Project Number 124-019 Funding Source Fund 324 Account No. PR-00034498 Amount TBD Terms of Contract Public Works Quote Request: Lump Sum Purpose/Description Quote request for the repair/renovation of the main skylight at the Studebaker Museum. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease ( %) New Amount $ Total Percent of Change: Increase Decrease ( %) Time Extension Amount: New Completion Date: