My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Locust Pump Improvements - Proj No 124-058- Engineered Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - Locust Pump Improvements - Proj No 124-058- Engineered Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:53:30 PM
Creation date
11/12/2024 3:43:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
gouT;oF� <br />CITY OF SOUTH BEND, INDIANA. <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />IN6s ; <br />PROJECT NAME: <br />PROJECT NO. <br />QUOTES DUE <br />Tuesday, November 12, 2024, at 9:00 a.m. Local Time, sealed electronic <br />bids are to be submitted by email to bpwbids@_southbendin.gov <br />(Must be completed for all quotes. Please type or print) <br />Date: tIJIIJ?q Firm: INUALUeSt Iµc, <br />Address: Sl000i Lv, -iq `` S4 <br />City/State/Zip: In3015 I N N(o,17F Telephone Number: (31-I ) q-13- (304 <br />Email Address: -F1 Vd\a(4P_Y)Q�neQ'rP-AaAU{ionS.com <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Locust Booster Pump Station Improvements <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated October 2024 for the sum of (enter the Total Quote as shown on the Proposal) <br />�387, ZZ3. D'D ($ 13Sr 7,2-3.oJ ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of <br />in the original contract if accepted by the City of South Bend. If the quote <br />itemization of the units shall be shown on a separate attachmenk----. <br />By <br />ACCEPTANCE <br />The above quote is accepted this day of <br />Subject to the following conditions: <br />Elizabeth A. Maradik, President <br />Gary A, Gilot, Member <br />Murray L. Miller, Member <br />BOARD OF PUBLIC WORKS <br />same as that shown <br />on a unit basis, the <br />20 <br />Joseph R. Molnar, Vice President <br />Breana N. Micou, Member <br />Attest: Theresa Heffner, Clerk <br />Version 3/15/2024 Page - 9 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.