Loading...
HomeMy WebLinkAboutOpening of Bids - 2024 Community Crossings Round 2 Project No. 124-047 - Rieth-RileyCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name 2024 Community Crossings Round 2 Project No. 124-047 For Bids Due November 12, 2024, 9:00 a.m., Local Time PART I (Must be completed for all bids. Please type or print) Date: November 12, 2024 Bidder (Firm): Rieth-Riley Construction Co., Inc. Address: 25200 State Road 23 City/State/Zip: _South Bend, IN 46614 Telephone Number: ((574))288-8321 Agent of Bidder (if Applicable): Rieth-Riley Construction Co., Inc. Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: 2024 Community Crossings Round 2-Project No. 124-047 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Scott Kreeger and dated November 12, 2024 for the sum of (enter the Total Bid as shown on the Proposal) (Enter su(n of all Divisions shown on Proposal) (umerical The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South nd. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separ a ttac ent. )/ By Ruben Alvarado, Sales A4 .4,- il-1- Manager The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member Murray L. Miller, Member (Printed Name of Person Signing) ACCEPTANCE day of 20 Joseph R. Molnar, Vice President Jordan V. Gathers, Member Attest: Theresa Heffner, Clerk Version 09/29/2021 Contractor's Bid for Public Works - 2 Project Name: 2024 Community Crossings Round 2 Project Number: For Bids Due: Contractor Name: 124-047 November 12, 2024, 9: 00 a.m., Local Time Rie?�-If,-lq Co.. Z*c. 2024 COMMUNITY CROSSINGS ROUND 2 DIVISION 1: BENDIX DR FROM 350FT NORTH OF CLEVELAND RD TO PORTAGE AVE ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 1 Maintenance of Traffic 1 LS $ 9,646.00 $ 9,646.00 2 Mobilization and Demobilization I LS $ 6,293.65 $ 6,293.66 3 Construction Engineering (1.5%) 1 LS $ 3,500.00 $ 3,500.00 4 Milling, 4 in. 2748 SYS $ 3.65 $ 10,030.20 5 Excavation, Common 481 CYS $ 20.00 $ 9,620.00 6 Subgrade Treatment Type 11 1325 SYS $ 22.00 $ 29,150.00 7 HMA Surface, Type C 328 TON $ 105.00 $ 34,440.00 8 HMA Intermediate, Type C 547 TON $ 95.00 $ 51,965.00 9 HMA Base, Type B 291 TON $ 90.00 $ 26,190.00 10 Tack Coat 1 TON $ 624.00 $ 624.00 11 Joint Adhesive, Surface 970 LFT $ 0.50 $ 485.00 12 Joint Adhesive, Intermediate 970 LFT $ 0.50 $ 485.00 13 PCCP for Approaches, 9 in. 48 SYS $ 120.00 $ 5,760.00 14 Manhole, Structure Adjustment 1 EA $ 800.00 $ 800.00 15 Inlet, J10 1 EA $ 3,700.00 $ 3,700.00 16 Pipe, Type 2, Circular, 12 in. 113 LFT $ 100.00 $ 11,300.00 17 Line, Thermoplastic, Solid, 1437 LFT Yellow, 4 IN. $ 1.05 $ 1,508.85 18 Line, Thermoplastic, Solid, White, 840 LFT 4 IN. $ 1.05 $ 882.00 Version 09/29/2021 Contractor's Bid for Public Works - 7 111. R 7 --A BID/PROPOSAL CITY OF SOUTH BEND Project Name: 2024 Community Crossings Round 2 Project Number: 124-047 For Bids Due: November 12, 2024, 9:00 a.m., Local Time Contractor Name: R,-wx colij-Poc//0/7 C&-, ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 19 Line, Thermoplastic, Broken, 716 LFT White, 4 IN. $ 1.05 $ 751.80 20 Grooving for Pavement Markings 3233 LFT $ 0.55 $ 1,778.15 21 Transverse Marking, 63 LFT Thermoplastic, Stop Line, 24 IN. $ 8.95 $ 563.85 Pavement Message Marking, 22 Thermoplastic, Lane Indication 3 EA Arrow $ 125.00 $ 375.00 Pavement Message Marking, 23 Thermoplastic, Lane Indication 3 EA Arrow, Turn and Through $ 125.00 $ 375.00 24 Detector Housing, Replace 1 EA $ 1,969.00 $ 1,969.00 25 Traffic Loop 6 EA $ 828.00 $ 4,968.00 26 Curb and Gutter, Type B, 500 LFT Concrete $ 54.00 $ 27,000.00 27 Sodding, Nursery 142 SYS $ 15.25 $ 2,165.50 28 Topsoil 16 CYS $ 75.00 $ 1,200.00 29 Inspection Hole, Deeper than 3-ft 6 EA $ 340.00 $ 2,040.00 30 Inspection Hole, 3-ft Deep or 10 EA Less $ 308.00 $ 3,080.00 31 Inlet, C1 5 2 EA $ 6,000.00 $ 12,000.00 DIVISION 1 TOTAL $2649646.00 2024 COMMUNITY CROSSINGS ROUND 2 DIVISION 2: JEFFERSON BOULEVARD FROM ILLINOIS ST TO FALCON ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 1 Maintenance of Traffic 1 LS $ 4,068.00 $ 4,068.00 2 Mobilization and Demobilization 1 LS I $ 1,821.60 $ 1,821.60 Version 09/29/2021 Contractor's Bid for Public Works - 8 BID/PROPOSAL . . . ...... . CITY OF SOUTH BEND Project Name: 2024 Community Crossings Round 2 Project Number: 124-047 For Bids Due: November 12, 2024, 9:00 a.m., Local Time Contractor Name: Ri-eft -A7;le ojis#qcie©ti Cy. ,-he. ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 3 Construction Engineering (1.5%) 1 LS $ 4,000.00 $ 4,000.00 4 Milling, 4 in. 4131 SYS $ 4.65 $ 19,209.15 5 HMA Surface Type B 341 TON $ 92.00 $ 31,372.00 6 HMA Intermediate, Type B 568 TON $ 82.00 $ 46,576.00 7 Tack Coat 1 TON $ 624.00 $ 624.00 8 Joint Adhesive, Surface 1352 LFT $ 0.50 $ 676.00 9 Joint Adhesive, Intermediate 1352 LFT $ 0.50 $ 676.00 10 Manhole, Structure Adjustment 4 EA $ 800.00 $ 3,200.00 11 Inlet, Structure Adjustment 2 EA $ 600.00 $ 1,200.00 12 Sidewalk, Concrete 144 SYS $ 100.00 $ 14)400.00 13 Curb Ramp, Concrete 132 SYS $ 280.00 $ 36,960.00 14 Standard Curb 2316 LFT $ 54.00 $ 125,064.00 15 Sodding, Nursery 249 SYS $ 15.25 $ 3,797.25 16 Topsoil 28 CYS $ 75.00 $ 2,100.00 17 Inspection Hole, Deeper than 3-ft 4 EA $ 340.00 1,360.00 18 Inspection Hole, 3-ft Deep or Less 2 EA $ 308.00 $ 616.00 DIVISION 2 TOTAL $2979720.00 2024 COMMUNITY CROSSINGS ROUND 2 DIVISION 3: N. LEE COURT FROM CUL-DE-SAC TO FAIRVIEW AVE ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT I Maintenance of Traffic 1 LS $ 2,144.00 $ 2,144.00 2 Mobilization and Demobilization 1 LS $ 7,681.75 $ 7,681.75 Version 09/29/2021 Contractor's Bid for Public Works - 9 BID/PROPOSAL CITY OF SOUTH BEND .1 .5 Project Name: 2024 Community Crossings Round 2 Project Number: 124-047 For Bids Due: November 12, 2024, 9:00 a.m., Local Time Contractor Name: y Can f-Otf eyl'?A ("a., Zn e. .1 ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 3 Construction Engineering (1.5%) 1 LS $ 3,000.00 $ 3,000.00 4 Excavation, Common 451 CYS $ 20.00 $ 9,020.00 5 Subgrade Treatment Type 11 1159 SYS $ 22.00 $ 25,498.00 6 HMA Surface Type B 96 TON $ 105.00 $ 10,080.00 7 HMA Intermediate,, Type B 159 TON $ 95.00 $ 15,105.00 8 HMA Base, Type B 255 TON $ 90.00 $ 22,950.00 9 Tack Coat I TON $ 624.00 $ 624.00 10 Joint Adhesive, Surface 299 LFF $ 0.50 $ 149.50 11 Joint Adhesive,, Intermediate 299 LFT $ 0.50 $ 149.50 12 PCCP for Approaches,, 6 in. 68 SYS $ 114.00 $ 7,752.00 13 Manhole, Structure Adjustment I EA $ 800.00 $ 800.00 14 Water Valve, Structure Adjustment I EA $ 300.00 $ 300.00 15 Inlet,, J10 1 EA $ 3,700.00 $ 3,700.00 16 Pipe, Type 2, Circular, 12 in. 247 LFT $ 100.00 $ 24,700.00 17 Sidewalk, Concrete 174 SYS $ 90.00 $ 15,660.00 18 Curb Ramp, Concrete 11 SYS $ 400.00 $ 4,400.00 19 Curb and Gutter, Type B,, Concrete 692 LFF $ 54.00 $ 37,368.00 20 Sodding,, Nursery 109 SYS $ 15.25 $ 1,662.25 21 Topsoil 12 CYS $ 75.00 $ 900.00 22 Mailbox Assembly, Reset Single 7 EA $ 200.00 $ 1,400.00 23 Inspection Hole, Deeper than 3-ft 6 EA $ 340.00 $ 2,040.00 24 Inspection Hole, 3-ft Deep or Less 10 EA $ 308.00 $ 3,080.00 25 Inlet, C15 3 EA $ 4,800.00 $ 14,400.00 DIVISION 3 TOTAL $2149564.00 Version 09/29/2021 Contractor's Bid for Public Works - 10 BID/PROPOSAL Project CITY OF SOUTH BEND Name: 2024 Community Crossings Round 2 Project Number: 124-047 For Bids Due: November 12,2024,9:00 a.m., Local Time Contractor Name: 2024 COMMUNITY CROSSINGS ROUND 2 DIVISION 4: S. LEE COURT FROM FAIRVIEW AVE TO CUL-DE-SAC ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT I Maintenance of Traffic I LS $ 2,144.00 $ 2,144.00 2 Mobilization and Demobilization I LS $ 9,705.50 $ 9,705.50 3 Construction Engineering (1.5%) — 1 LS $ 2,400.00 $ 2,400.00 4 Excavation, Common — 408 CYS $ 20.00 $ 8,160.00 5 Subgrade Treatment Type 11 1048 SYS $ 22.00 $ 23,056.00 6 HMA Surface Type B 86 TON $ 105.00 $ 9ffl0.00 7 HMA Intermediate, Type B — 144 TON $ 95.00 $ 13,680.00 8 HMA Base,, Type B — 231 TON $ 90.00 $ 20,790.00 9 Tack Coat I TON $ 624.00 $ 624.00 10 Joint Adhesive, Surface 266 LFr $ 0.50 $ 133.00 11 Joint Adhesive, Intermediate 266 LFF $ 0.50 $ 133.00 12 PCCP for Approaches, 6 in. 52 SYS $ 104.00 $ 5,408.00 13 Manhole, Structure Adjustment 1 EA $ 800.00 $ 800.00 14 Water Valve, Structure Adjustment I EA $ 300.00 $ 300.00 15 Inlet, J10 I EA $ 4,700.00 $ 4,700.00 16 Sidewalk, Concrete 180 SYS $ 90.00 $ 16,200.00 17 Curb Ramp, Concrete 13 SYS $ 400.00 $ 5,200.00 18 Curb and Gutter, Type 13, Concrete 550 LFr $ 54.00 $ 29,700.00 19 Sodding, Nursery 106 SYS $ 15.25 $ 1,616.50 20 Topsoil 12 CYS $ 75.00 $ 900.00 21 Mailbox Assembly, Reset Single 6 EA $ 200.00 $ 1,200.00 Version 09/29/2021 Contractor's Bid for Public Works - 11 BID/PROPOSAL CITY OF SOUTH BEND - Project Name: 2024 Community Crossings Round 2 Project Number: For Bids Due: Contractor Name: 124-047 November 12, 2024, 9:00 a.m., Local Time ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 23 Inspection Hole, Deeper than 3-ft 6 EA $ 340.00 $ 2,040.00 24 Inspection Hole, 3-ft Deep or Less 10 EA $ 308.00 $ 3,080.00 25 Inlet, C15 1 EA $ 5,200.00 $ 5,200.00 DIVISION 4 TOTAL $1669200.00 2024 COMMUNITY CROSSINGS ROUND 2 DIVISION 5: ROGER STREET FROM BENDIX DR TO GOODLAND AVF ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 1 Maintenance of Traffic 1 LS $ 1,834.00 $ 1,834.00 2 Mobilization and Demobilization 1 LS $ 3,402.10 $ 3,402.10 3 Construction Engineering (1.5%) 1 LS $ 1,300.00 $ 1,300.00 4 Milling, 4 in. 1633 SYS $ 5.45 $ 8,899.85 5 HMA Surface Type B 135 TON $ 92.00 $ 12,420.00 6 HMA Intermediate, Type B 225 TON $ 82.00 $ 18,450.00 7 Tack Coat 1 TON $ 624.00 $ 624.00 8 Joint Adhesive, Surface 581 LF - $ 0.50 $ 290.50 9 Joint Adhesive, Intermediate 581 LFf $ 0.50 $ 290.50 10 Manhole, Structure Adjustment 1 EA $ 800.00 $ 800.00 11 Inlet, Structure Adjustment 4 EA $ 600.00 $ 2,400.00 12 Water Valve, Structure Adjustment 1 EA $ 300.00 $ 300.00 13 Transverse Marking, Thermoplastic, Stop Line, 24 IN. 27 L� $ 8.95 $ 241.65 14 Sidewalk, Concrete 20 SYS $ 213.52 $ 4,270.40 15 Curb Ramp, Concrete 9 SYS $ 550.00 $ 4,950.00 Version 09/29/2021 Contractor's Bid for Public Works - 12 .p BID/PROPOSAL CITY OF SOUTH BEND ............ Project Name: 2024 Community Crossings Round 2 Project Number: 124-047 For Bids Due: November 12,2024,9:00 a.m., Local Time Contractor Name: 12; t- 441 (Z i C. ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 16 Standard Curb 530 LF-r $59.00 $3 1 ,270.00 17 Sodding, Nursery 48 SYS $15.25 $732.00 18 Topsoil 5 CYS $75.00 $375.00 DIVISION 5 TOTAL $92,850.00 DIVISION 1 TOTAL $ 264,646.00 1111SION 2 TOTAL $ 297,720.00 DIVISION 3 TOTAL $214,564.00 DIVISION 4 TOTAL $ 166,200.00 DIVISION 5 TOTAL $ 92,850.00 DIVISION I THROUGH 5 TOTAL $ 1,035,980.00 Bidder (Firm): Rieth-Riley Construction Co., Inc. Address: 25200 SR 23 City/State/Zip: South Bend, IN 46614 Telephone Number: 574 288-8321 By (Signature) Ruben Alvarado - Sales Manager (Printed Name of Person Signing) Version 09/29/2021 Contractor's Bid for Public Works - 13 Ea�rttn.>,.F„ i TF1 \a . 0� •iffy Pr T CF • Y. �r-..yam_ ��v1 r CITY OF SOUTH BEND, INDIANAKae , CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name 2024 Community Crossings Round 2 Project No. 124-047 For Bids Due November 12, 2024, 9:00 a.m., Local Time From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing eithera Certified Check X or Bid Bond. X Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments X with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good X Faith Efforts Forms [MBE-2.0 and WBE-2.0] and MMBE Contacted Forms [MBE-2.1 and WBE-2.1]. X Acknowledge Receipt of 3 Addendum(s) included with the bid. X All required additional information is included with the bid. X Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Rieth-Riley Construction Co., Inc. Date: November 12, 2024 By Authorized Represe Signature: Print Name & Title: Ruben Alvarado, Sales Manager Version 09/29/2021 Contractor's Bid for Public Works - 1 PART II (For projects of $100,000 or more —1C 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) According to plan specifications 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. See attachments 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. Subcontractor list will be provided upon award 4. Attach a listing of equipment you have available to use for the proposed project. As required 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. As necessary SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if. awarded. See attachments Version 09/29/2021 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) St. Joseph ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-5, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 09/29/2021 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 09/29/2021 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affmn under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. 1 2th November Dated this - day of .2024 Subscribed and sworn to before me this 12th My Commission Expires 3-27-2030 County of Residence Rieth-Riley Construction Co., Inc. Contra /7 id er Signature of Contractor/Bidder or Its Agent Ruben Alvarado, Sales Manager Printed Name and Title day of November , 2024 PO V&4 0 Z� *Nary Public '*'Kristie A Brooks a�- Fulton County, Indiana Version 09/29/2021 Contractor's Bid for Public Works - 6 :•►B, KNOW ALL MEN BY THESE PRESENTS, TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA Hartford, Connecticut 06183 That we, RIETH-RILEY CONSTRUCTION CO. INC. as Principal, hereinafter called the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, of Hartford, Connecticut, a corporation duly organized under the laws of the State of Connecticut, as Surety, hereinafter called the Surety, are held and firmly bound unto City of South Bend, Indiana . as Obligee, hereinafter called the Obligee, in the sum of Five Percent (5%) of total bid Dollars ($ 5 % of bid ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for 2024 Community Crossings Round 2 Project No. 1 24-047 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 12 th (1, Witness Tai Babilonia day of November 2024 RIETWRI CONSTRUCTION CO., INC. //" 4 (Principal) (Seal) (Name & Title) Ruben Alvarado, Sales Manager TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA 1 Colette R. Chisholm Attorney -in -Fact Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company TRAVELER St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Colette R Chisholm of UNIONDALE , New York , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. � Gift, o State of Connecticut By: City of Hartford ss. Robert L. Rane enior Vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. vA My Commission expires the 30th day of June, 2026 B f Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company ofwof authority; and it is. FURTHER RESOLVED, that the'signature'of each, of..the following officers: President, any Executive. Vice President, any Senior:Vice President, any Vice. President; any.Assistant Vice President, any Secretary, any:Assistant Secretary, and .the seat of.the Company may.:be affixed by facsimileto any Power of Attorney or to...any . certificate relating thereto . appointing'Resident Vice Presidents; Resident Assistant Secretaries -or Attorneys -in Fact for purposes. only of executing. and attesting bonds and undertakings and other. writings obligatory in the -nature thereof, and any such Power of Attorney. orcertificate bearing such facsimile signature or, facsimile. seal shall be valid and binding UpOhs the Company and.any-such power-soexecuteci and certified by such facsimile signature and facsimile seal shall be valid and bidding on the Company in the future with . respect. to any bond or . understanding to which it is attached: I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this...' -'day of 1COt�'ttL CONK c Kevin E. Hughes, Assistant Secretary To verify the authenticity of this Power of Attorney, please callus at 1-800-421-3880 Please refer to the above-namedA ttorney(s)-in-Factand the details of the bond to which this Power of Attorney is attached CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANw'y .... FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Project Number: Bidder: 124-047 Project Name: 2024 Community Crossings Round 2 Rieth-Riley Construction Co., Inc . Total Bid Amount: $1, 035, 980.00 MBE Goal: 2.92% Page _1 of 2 Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal 1st Class Logistics, LLC 2213 St. Charles Ave. South Bend, IN Bernard Coutee 574-993-0071 Trucking / Hauling $30, 260 00 o 2 . 92 0 Submitted by: Drew Snodderly Print Name Signature Version 09/29/2021 Contractor's Bid for Public Works - 14 Date 11/12/2024 � gU ki, CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN t, ..:7 \GF;';.•"j:F FORM WBE-1.0 ;. .. WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Project Number: Bidder: 124-047 Project Name: 2024 Community Crossings Round 2 Rieth-Riley Construction Co. , Inc . Total Bid Amount: $1, 035, 980.00 WBE Goal: 5.39% Paae 1 of 2 Name &Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage (Name/Telephone) (Attach scope/schedule if you need additional space) Component of Total Bid/Proposal State Barricading, Inc. James Michalski Maintenance of Traffic 24963 US 20 West 574-287-2078 $19 , 836.00 1 914 South Bend, IN CE Hughes Milling, Inc. Caroline Hughes Milling g 3113 Holmans Ln. 812-725-8665 $17 2 8 5. 8 4 1• 6 6 8 Jeffersonville, IN , Hawk Enterprises, Inc. Caylee Carlson Electrical 1850 E North St. 219-662-8090 $9, 534 00 0 . 920 C Crown Point, IN . Montgomery Trucking, Inc. Karen Montgomery Trucking / Hauling of In. 260-312-2632 2207 West Cook Rd. Ste A $9, 200 . 00 0 . 888% Ft. Wayne, IN Submitted by: Drew Snodderly Print Name l � % Version 09/29/2021 Contractor's Bid for Public Works - 15 Date 11/12/2024 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 124-047 Date: 11/12/2024 Project Name: 2024 Community Crossings Round 2 Bidder: Rieth-Riley Construction Co., Inc. Contact Person: Drew Snodderly Telephone: 574-288-8321 Address: 25200 SR 23 City: South Bend State: IN Zip: 46614 Email: dsnodderly@rieth-riley.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at:.http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. &-tee, I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (hftp://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into economical) feasible units to facilitate MBE participation. Y P P I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 16 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based ��.-- on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job.. groper demonstration of Vood Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 17 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 124-047 Date: 11 / 12 / 2 02 4 Project Name: 2024 Community Crossings Round 2 Bidder: Rieth-Riley Construction Co., Inc. Contact Person: Drew Snodderly Telephone: 574-288-8321 Address: 25200 SR 23 City: South Bend State: IN Zip: 46614 Email: dsnodderly@rieth-riley.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htt .// www.in. ov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (hftp://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. 1 affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 18 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS 1 affirm that I have made good faith efforts to assist interested WBEs in obtaining ecessary equipment, supplies, materials, or related assistances or services, where appropriate. 1 affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. -Froper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 19 CITY OF SOUTH BEND# MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE 1 OF 1 Project Number: 124-047 MBE Participation Goal 2.92% Project Name: 2024 Community Crossings Round 2 Bidder: Rieth-Riley Construction Co., Inc. By: Z0514_4�'', �� Estimator 11/12/2024 (Signature) Drew Snodge'rly (Title) (Date) MBE -Firm 1st Class Logistics, LLC Owner or Contact at MBE Firm Bernard Coutee Telephone: 574-993-0071 Fax: N/A Email: lstclasslogistics20l3@gmail.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Trucking / Hauling RESULTS OF CONTACT WITH THE MBE FIRM: We Plan to utilize this firm for Trucking / Hauling on this project. MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 20 CITY OF SOUTH BEND i(1 . MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN ''rs` f .r FORM MBE-2.1 rsos WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE 1 OF 2 Project Number: 124-047 WBE Participation Goal 5.39% Project Name: 2024 Community Crossings Round 2 Bidder: Rieth-Riley Construction Co., Inc. By: Estimator 11/12/2024 (Signature) Drew Snod erly (Title) (Date) WBE Firm State Barricading, Inc. Owner or Contact at WBE Firm James Michalski Telephone: 574-287-2078 Fax: 574-287-1744 Email: statebarricadel@aol.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Maintenance of Traffic Services. RESULTS OF CONTACT WITH THE WBE FIRM: We plan to utilize this firm for Maintenance of Traffic Services on this project. WBE Firm CE Hughes Milling, Inc. Owner or Contact at WBE Firm Caroline Hughes Telephone: 812-725-8665 Fax: 812-725-8672 Email: caroline@hughesmilling.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Asphalt Milling. RESULTS OF CONTACT WITH THE WBE FIRM: we plan to utilize this firm for Asphalt Milling Services on this project. Version 09/29/2021 Contractor's Bid for Public Works - 21 (/ 0" Z) ti �U CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE 2 OF 2 Project Number: 124-047 WBE Participation Goal 5.39% Project Name: 2024 Community Crossings Round 2 Bidder: Rieth-Riley Construction Co., Inc. By: Estimator 11/12/2024 (Signature) Drew Snod erly (Title) (Date) WBE Firm Montgomery Trucking, Inc. of In. Owner or Contact at WBE Firm Karen Montgomery Telephone: 260-312-2632 Fax: 260-444-4069 Email: karen.mti@hotmail.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Trucking / Hauling RESULTS OF CONTACT WITH THE WBE FIRM: we Plan to utilize this firm for Trucking / Hauling on this project. WBE Firm Hawk Enterprises, Inc. Owner or Contact at WBE Firm Caylee Carlson Telephone: 219-662-8090 Fax: 219-662-8093 Email: caylee@hawk-inc.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Electrical Contractina Services. RESULTS OF CONTACT WITH THE WBE FIRM: we plan to utilize this firm for Electrical Contracting Services on this project. Version 09/29/2021 Contractor's Bid for Public Works - 21 C2 0 -( 2) CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name 2024 Community Crossings Round 2 Project No. 124-047 For Bids Due November 12, 2024, 9:00 a.m., Local Time Contractor Name: Rieth-Riley Construction Co., Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. **THIS FORM ONLY APPLIES TO BIDS GREATER THAN $250,000. ** INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 71 of The Responsible Bidding Ordinance No. 10975-23 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") within twelve (12) months of obtaining pre -qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre - qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-71 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-71 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 5/20/2024 General Conditions -11 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-72 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least two -hundred fifty thousand dollars ($250,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder for projects greater than $250,000 and all subcontractors performing work greater than $250,000 on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 5/20/2024 General Conditions - 12 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (iii) X By checking this box, I hereby acknowledge that apprenticeship and training programs that I participate in have graduated at least five (5) apprentices in each of the past five (5) years. (iv) X By checking this box, I hereby acknowledge that all subcontractors performing work greater than $250,000 also meet the qualifications .of the Responsible Bidder Ordinance. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) X For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. This includes, but may not be limited to, letters from apprenticeship coordinators detailing the bidder's association with the program, and the United States Department of Labor Office of Apprenticeship Certificates of Registration of Apprenticeship Programs for each type of work to be performed on the project. Version 5/20/2024 General Conditions - 13 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (v) By checking this box, I hereby acknowledge that apprenticeship and training programs that I participate in have graduated at least five (5) apprentices in each of the past five (5) years. (vi) By checking this box, I hereby acknowledge that all subcontractors performing work greater than $250,000 also meet the qualifications of the Responsible Bidder Ordinance. (b) Attachments: (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) List identifying all former business names. (iii) Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (v) For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. This includes, but may not be limited to, letters from apprenticeship coordinators detailing the bidder's association with Version 5/20/2024 General Conditions - 14 the program, and the United States Department of Labor Office of Apprenticeship Certificates of Registration of Apprenticeship Programs for each type of work to be performed on the project. (vi) X Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (vii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. (viii) X Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (ix) List List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: November 12, 2024 (Sign Here) v " - Ruben Alvarado, Sales Manager (Print Name Here) Rieth-Riley Construction Co., Inc. (Name of Company) 25200 State Road 23 (Address of Company) South Bend (City) Indiana (State) (574) 288-8321 (Telephone Number) Version 5/20/2024 General Conditions -15 CITY OF SOUTH BEND JAMES MUELLER, MAYOR DEPARTMENT OF PUBLIC WORKS ERiC HORVATH, DIRECTOR December 14, 2023. Dawn Armstrong Rieth Riley dannstrong@rieth-riley.com RE: Pre -Qualification Verification Dear Ms. Armstrong: This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified . Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Tara Bussell, Permit Manager Entity Type: Domestic For -Profit Corporation Business Status: Active Creation Date: 08/08/1952 Inactive Date: Principal Office Address: 3626 Elkhart Road, P.O. Box 477, Goshen, Expiration Date: Perpetual IN, 46527 - 0477, USA Jurisdiction of Formation: Indiana Business Entity Report Due 08/31/2026 Date: Years Due: Title Name Address Vice President Brian A. Inniger 3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA Director Ronald G. Pope 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA Director A. Keith Rose 3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA Secretary Robert L. Konopinski 3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA CFO Michael J. Weber 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527 - 0477, USA Vice President Chad Loney 3626 Elkhart Road, P. 0. Box 477, Goshen, IN, 46527, USA Vice President Eric Engleking 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA Vice President R. Scott Stine 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA CEO A. Keith Rose 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA Director Brian A. Inniger 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA Type: Individual Narne: ROBERT L. KONOPINSKI Address: 3626 ELKHART RD., Goshen, IN, 46527, USA November 18, 2023 To Whom It May Concern, Rieth-Riley Construction Co., Inc. is a union contractor. Therefore, all apprenticeship, OJT programs, and training programs are approved by and registered with the USDOL through the union hall(s), and the union hall(s) remain Rieth-Riley's primary source of new applicants. Once hired, individuals who perform work for Rieth-Riley are appropriately classified as either employees or independent contractors under all applicable state and federal laws and local ordinances. Sincerely, 'Y. .7 '... NTS 04 . ... . .... . :. . . . .; . . .. 4, A.R.T. T. N '..: Z�. v ;_ M 7: 1 ­ . ... . .. . .. .. . ..; � I. .. PA Bg ?�R� "'A B . . ....... . 4. IF . .... .... Ol y .. ...... .. .... ..... ..... T. N % .. .. ..... .... ....... W. G "k* A ah A.: Ing' ORfill f,.*LAk-6i'-":s-----� V :F_.I!T t 77 --ji . ... .. % R. M-a., .1; HA st; 7. ....... ... .......... 'WICK NVV . . . . . . . . . . .............. . . .. ....... .... .. .. ....... .. .... .... .......... ... . ... ....... .. ... ..... . ......................... .... ....... . ......... ... IIni uptriM all .. ... ............ LO .... b �;_7777777:777 . . ...... VRO asPeGz&,N'O . .... .. . ..... ...... I.......... .... ...... .. O.Mmdtd .. .... .... .... ...... .. .......... Induglo .... ... ... .... ..... ... . . . ........... r MWO ... .. . ........ .... ... .... - ------ - --- .. . enf .... ..... .. Hb' w 5- Of ... . ... . .... h' a . . . ........ . ........ . . ..... . . ... .. ........... .... .. ... . . ........ . ..... .... . ..... . . ..... i.. . .... .. . -Mr RM ..PCa I ....... .... in %Tawr. e ph 0 g R 'IX-Ayu r ig w4; qQn. 1;; -P pqrmq0 Q No . . ........ . . .... . 0 . rac ;. LT 7�T c ni - ....;pry....... •..._. • .:::: - ... ..- -. :.ate-•�... -. .. .... .. ... V. .: .;.. • .:. .. :...:c - :;. a •.:..; ; .. r•:: :.v: . v :. •. : . ;:.:i: it • rt� ... •.: .. .. ..... . .... .. . ...... ..... .. s; Lv V. .. .. ..,: ��:�.:. ..... ... .,.1r •3�, I}V/Y� t • �/� , • Wi -LLI LL! ... .... - t •'t •• e \%1 1 ......-. ... a - .......... ...:. . ..- .. ..... .. ...: t::. .. .. .:.... t: .. .. ....: '.. - .......::i .... ....::. ' .::: Ce .... ........... ... :..... ...... v�• % (;�,�..... ��'.-..4:Y' - •'.: .. .:::may._..;._.... .. ...;�.t• '?::: •: ..'.��>,.•-. .;,.: ,..: 1•y. :.:... .....:">.. .. -.. i�: t. .., t �1. �•�•� pJl : •: :: ; y:.�'ri :% r :... - .... r .......... ... :....:..:: `:G'.•_":� ':::. - .. .. .. :,w•� -. ..... ...tom-. .. ... ,. ..... ....., ......... -: � ::iSt6i - '. � :,. ��. � .pVl�.. . • :... : ... .. .. i/�� _V Nf �./ if : /��: 3 5 Q 6 Q 4 Q 7 7 N 7 7 a 7 a = 6 7 Q 7 4 7 4 7 Q 7 d d = r z a r z a r zz v=i a r z a r a r a r a r Q r a r a r a r a F rl � m '1 n N N o rl a „ m d o0 b ti Ip F 7OZa Z ^Z I h N N umi N N N oa N N o N N c o V~I H u Q a w N N N N O u K ¢ m 3 w ve g -.q ;e g v g ;e ;e ;e ;e ;e O O o � w a i w 2 �I c � o @J .o it' m E E � c @ � ro •E E Z O N 'a d n d n w n m ry m a .t a r dNi uN5 n qm d ant n�f m h J� tt,'11�'i� L W m •N •O •0 ,o .Q .a .Q .Q 'y w G ¢I s z m v c a > Z m .5 O Z it z pumt m d' n m m Gi m rl m N n OI n n n rl m n 1p n m O n m � cc N m U v 0 N C o .t m w NJ 12 fU Z .3 a > a > 3 ¢ > 3 a > ¢ > a > a > a > a > a > a > a > w ad w� do w� wac wsw wlc wm Jle W >q y' Z r a W VI >Q y Z r 3d D W > Z a r a Uf ai Z r a W N .>�(( y 2 r a W Y1 i Z r a in i Z r a W N > K z< r a D W yl i z r a W N Z r a W N Z r a W Z r ya- a G F C, r O ri O b O O •i d m N m n V m rl Ol O o IY N m d O m r .i M N m m ri h m O P P ri N i-/ ° m n ri .i N D i° ui lil N °l 0 M V' N °I V 1 P rti n O 0 M 'i vl P 1 N t° o Z O Q U P h T m N N N ri rl 'i rl rl r1 O W r a¢ O V .� 1 o .. N 0 .� N 0 N N 0 N N 0 .y N 0 .� N 0 .i 1 0 N N 0 .•f N 0 N N 0 .i N 0 K K m 03 w � O O a ;e m vi v a n ;e w ae n o ti g umi e u00i g n g n ae o O E c c U E E E w o c 12 u� E C � � Yn m ;J Q u c 4 Q N Q .G C N � • ,L � t U a N m > E 3 > E a c Q C O u V � C O. •° L t L 72 = a v t E N o E v 9 w Z in m n m '1 n in h rl .1 rl ut ry m m m m n in m m �i P m in P n in m P m n m 1: P m in P T LL tit n ii1 n n T m N n in h N N N G1 m T f� ui n 00 ul N y M ar M h N yl 2 M.42 °, •ao c •c m o W r •• v v '" w v c � m w w w w � c '� •o a � a` o •� C U 'o 0 0 '3 a Q ° V z z C o z$ � 0 U � m` `L vE1 u w r m m t`7 Q � N Nm m N m N n O N o O mRR m p N e0 O n O m P T 1°O O O o N m O N m •-1 in N m O o N m O in N m ri ZI D O V O O O V m 10 O O O O O Q 2 Z o ? Z _ Z z v Z c w a 2 2 Z O W r in d o N ¢ cmm��+w InaBQin m Qg� mxg mevnio in '^mav'�7 S s� m N Fq.�-iNv1 oc�.rvi7 U Z Z F- W Ix . sy 5P-�............ � N.IJO.4 4P :SX8 . ........ . .... . ....... ..... . ....... JOEOPERATING TUND. EN:C(N LQCAL 15G'APPRENTICESHIP fnt­effarflabor and her aim findust Management to.further 0 James M­..5w;eeney14ha1rmq.n Mvid ay,,Nov6rn : ber.27th-,:.:.2." D..ct'vl.d,.M, Snd1W1Se&6takv Bedt Construct lhc..!.*s.a �.Igqgq M 0 --�:L .150 -t.h.06f `­5 j 't' t, oca ore L'U D. E160 1'150 Apo r6fitldes h]p.:.thd-*.s k! I! improvement P to.gram .(A$' [P)i located at: -9.$Q0:.W,,::Spq1h Arsenal Offi f ,wi Mtuton -IL-thii-,oca 1.50 AS Pis a:DO.L-1 6.-g st,6 '"i".."J" ' ' .';:' ­­­ `0 ce.o - .. .. ... . .. .... .. . fa.A' tI6&1h, - 1 ONO IPP, �­,`­, OL AOPrentic-*'bsblp.(OA),..Ltst*dd'be1*6w,a.rothe:nutb*be-r.-* during_the years 2017 11 "1 .. 2 ":' b 2 2'' * J. z 2021 ".100 .2 05 10.19 t2018'�:88 If the; r'e­a've­­6 ny questions regarding the LURE LoW.150Apprenticeshlp, please*f',e.el'f'r.ee.to'Co.nt.act.,Me dlre.ctly-. Kark Kara Assistant Ca. .... Oator 0��P ngin.gW- L..ota:1::150 Apo- hft08h:1.:1p oL w-th-Ars Willi 1_1h9tO'hj.1L. 60.4.81. Tel,.'k-5-.72-2-3201 '15 03 Fax: 818;-423.,.$749' 4,, ;s out y Y 5 Ysff��_q r eis "�sn�4i aurFy. Sss{t °a k, NN xx fCY. c s is WITyr ,i i.. Y wow +i TTTTY 3st s•-a;�5In1• s �•, au .tj1: •;,;: �'i$.� $£S�'. �€�• may. we sib I a 1s` YN Its• fy ¢�r� •: lr9' �aG . .Eabo g�i;?£t AIN :' re. a i Ry. 5 f ? pxo `t `f 14 au: .e7 •. t4..{• �>'h C'`•. s�. y .I will y z (tom gl4 .. .x�y# ?r..`�uu'1 r;': a•; + try. t x `t, :. t;; a��.�€�y'r.. f a 4#1#j t a 4 r ts22YsY s (j1i.�'f? iy t� 3cayy �#.''� ;t9;° O� . %f. :: . sit F•n ;: "x ' S'a'' .'vuy. "c`tr ._ any? `3 �',:�k:�':di£: .(It t I t y '�..'<-`... .d E T.a}t. irq .� '>`• {�I�cffx.��% ,,�St tvS ;v, if`c ���> •r4. y �� :: }rt. � �. A', # i�`.K 3. - 1. �i' t ,3, `':f>s k' j? C"'Y x: .. .soa1 41 N" w•�-'� #LtiS 20 �z+: � a Ix><y'>•� � ��wS�f � i'.�_ h .�k '� : .. {l s� z Hn ;.1., �*�ff�: °zip `�. Q•. 14I rf - g��zys }' , axS r•� :�T�'^ �k„�{a. i fk1Y{: '�i '.?t� .r:� C t� (mot ai • f,d ..al- y � " .ff. �,• � � .( •}i; jt` of ut .cna�' �..i„/, ' 1tfIY , '� � � y �`rIk• A� �%? ��� ...�. S2 • 0ON" '.I>:x Y:. ;�?`� :art .''dl"s.'' ; <a'C.':;i„.:{ :-Iy 3r' I Sky z� 3�a 4 • ��i � t � � kx• ... •, is S', a y �•' n�s. md law . a g. g < kF4 tt�i �_�• JS ,x Ord kR�; i a:. t v 410.1 iq=�. j ay,ary5L ,,P.,tj. A rs4 tttop s 7 p tr � � aR.v 3FP Sx i. 9• i k� s %Y sty � zy i �#�R v�f L ' r t -WIMPt, *k y Ltx;.;>✓oi -✓f ', ut ter. .> '•:.xYri,� � �is.-.�t ��t sXy tr � � � .sf i t '�a rt Cuff: i�? Y@ Oyu f��o � x��.x tnnr jt�t•`"Faf `k;,P INDIANA LAB DR.ERS' TRAINInTG TRUST .FUND David.A. Frye Secretary -Treasurer Jerty'J: BOAC Ch.r*15.4r'I. gy RickyIe�isort, .. Ramon Mendoza, Jr. Brian Short P.®. Box: 758 -. Bedford, Indiana 47421 (812) 279-9151 Noven ber.20. 2023 'To Whom It May Concern: Sean Coak10 birector Johiz _P, Bro m Cliairrrran Kelly Abel. MI oh ael.,Perrara Stan Meyer Nick Tim1.merman Jim Wiseman FAX: (8.12) 279=5545 Toll Free (800) 742-4086 y 9 „:. , T xs :.titter:s to cori£ii-m_ that:at, iem.srt�t�o Co., Irice is . a signatory contiracto in goodstandirig:vith the Indiana Lbores' .Training Trust Fund. e :a. ove;rrieritlonecl .company ..xs a is in the Joint-- Apperiticeship and Training Comrrilttee .trough thisJnion and has been an active .participant in good standing for each of the past five:plus consecutive years, and is_currently eligible to use our,apprentices. on aproject. Fu flier; :our .o*r anizatioii':s ro ram is a :. p g "Proved by the U; S:. Veterans. Administration to az-trcl ate xn the GX..educational benefits ro ram A co. of our a Koval letters are attached p.... p :......._ p ..g. PYp along With the collective .bacgainrig agreement statixig the ratios of Journey workers to Apprentices; which is one-(1) Apprentice for .every five (5} Journey'w "kegs and thereafter may not employ nb."M that (1) Apprentice for every (3) Journey workers. Sincerely91LPK z , Sean -Coakley, Director SC:ap www. indianalaborerstriaining. org -N DEPARTI I I T. C)F VI✓T RA S,;AFFAIRS STAT.APPROVIf G.A- QENGY 402 WESTVIIASHINGTON STREET ROOM W-469 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Br�;v_ver ApP ' rentices-t-f Coordinator Indiana Laborers Trainitia Trust Fund-Appkenticesmp 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brpwer, M Eric Hoicomb,,Governor James M. Brown, Director Jan" Wity 9., 20-19 Th6l�diana State.:A p ovi� - A : ezac conducted.a su e visor visxt-ori 01/8%2019:.at°Indiana p g. g .. y p . y.: . ,abores T�raYn7ng Trrst.:FLu1d-Ap�prentzcep. The:purpose of the visit vas to provide: training to :. :. . the Ce tiiy ig Officials and revie r eiirollrnent.ortilications. record retention acid arepoxting procedures. The organization de onstrated proper. Tecord i�aaipteua ce. and record nzairiter ance a 'd re` `ortiii procedes Diiring the:zszt, 'we" discussed the i�porEance of xportipg hours on.aznanthly basis, �. goo recor:.° eepzng tec ties °and haw to._epQrt a.Ieave o absence or: cornpletion vra VA Form 22-1999b. W- Q::also..0 dated the Ceftz p fyarig Offidials:via.VA.Forxzz:22-:$794, work=processes, acid �vage.scale. If you need any assistance or have ax�y gquestions regarding this tech�iycal. visit p7ease.contact me directly at tgri m.@dya.in.gov or (317) 232-3916. Thank you for the courtesy ektended during MV visit. The .education and trainin o ' g ppor�.uuties that yo-L orgat zation continues to provide veterans and their dependents are appreciated. Sincerely, Taniqua Griffin Program Director Phone (317)-234-6062 Toll Free (800)-400-4520 Fax (317)-234-8744 LJ ZOI­ TA. .'..i'... '.'.':.. ............jE0 E �OF":VETERAR9:AFFA.IRS STATF.APPRovMAONCY 402 WEST :.VVA8 .__,.H1,NGTON ROOM W469 INDIANAPOLIS, INDIANA 48.2104-2.- 38. P f ` e* r A re it cesh7 rdffiaIor Indiana Laborers 9 Appp 439 P a#Qn,1R1-1 Rd' Bedford., IN 47421 Dear Jet baly Brewer, ,Eric Holcomb, .Governor ........... ... .. .... . Ja"O" e-s: K' Brown, 'I.f66for 'Jan.ary 2,09 This will:goknLo,0.1 'ScAie -to� th r-conittu ",ate. W.. p oge ctio Craft Lkb. ore.r.,pry.Wain Fin d.-Ap&eifti000'bP. The 8tat h4' Teviewed -Appxqvin 49Pnc 9 Y the a b c u. m­ e fi t - a- s fisted *1b 6 1 o w: Wage.Scale: Construe. tiota :Criiftl�.4�6', FACILITY CODE;.309_04114 11, -0 "M Xmtg d"' -b §tFw; d".k-, ;f To i�elbo . . ... ..... PV 94R 0 x b- ""IE': -;OM or nus 0 v. h -I! - - . , '" $­ . -, ! . I :t a P, Y­ r!)Y ' Fund ­,pp c-os T that t Will an 0tdr* dwof utflited by on behalf f oft e*than L66�ers TrTrast Fund -A rpitices- . togA to,theit trai'� -programs during the preceding 12`mont1as*, Indiana Laborers iraining Triist Fitti pr6 =9 d-Ap 'nticesbip's advertising will be available for review by any and all future S visits by the uperyisory. SAA or the U.S. Department of Veteran Affairs. Y. Please Cvv,- b.entire, .6kk6t.for content ­ `h d a&b�ky. - Appro valis" 6d Plrstaht to provisions of...; � Title 3 8.1 U.S. C0461 6.87 with an effective date of A-Dfil 1, 2018. If you hayle. free to give rae- a call at 317-232-39.16 or emazl the at tgriiftgdva.ffi,9"*0"V. Tharp you for what -you do for our Veterans, and h ..t have' a great day. Sincerely, ° Taniqua Griffin Program Director State Approving Agency Cc: VARO/ELR 41041 -9 "1 V OP . .4 9 J1- TE A NDJA DEPAff1"­­`N­_­­ F) FTER;. STAT GEN*C 402 WF�ST - Y'8HIN(3T0N STREET:PZOOM -469 INDIANAPOLIS, -INDIANA 46204-2738 d W"'dr .p. APP ph iqq 9: Tdftpund-7A0g6Ati­­­:'hi p 439 PAftbnffvl Rd., B`6'ffokd, jN"4742'1 Dear. Jeremy Btu'­-W­Q-T, Governor James M. BrQWn, Director January 9.7.2019 wiCraft. s. Qr:fhb COi8trWo­a'n. In an orQr..pro gram offered A.H6 jdoaw, .� ­. .. . ..... at:....qaqx aprgy, ddfor.d,, 1ndi.ana. The State .4ppribvmg A g: em . c . V has reviewed-thb do*...Gtaslis below: te belo- ,. .......... ..... ....... L1°7C3 .TIE .... . . . ..... Cou's:trudio n"­-.C`ihA.:LaNrer 4,000-7800 hours 41-2b61.60' FACIL.-*-I-TY-C,'QDE.-.*...-"3.0.004114 .1py W th-aia4d" L dibor ets..1 x 4 Trust To'the:bbstof: . ....... Q. $44. d(.5' S not lit jzc e1toheous-0r_n_uS10,a,dv 6ftis"' 6-h'i6iA :-either by Abfiiai his undet0to 'd.b Eib-of-er.s-TrEiihffig..Trast�.F.=.d-A. understood:by J_at-t ."..7nii pp:. p .�y 'b6hff.o�j - of -the d coMpletexocord� of'-�dl. --adVertist"ig uMiz'ect,by or on �-th '.rq­`ga;-.� s... 0 �Uung programs' xpp'ed 12--onths. The company's p,:, ady $:Png available.:. or. review, by any and all fixture: supervisory visits by SAA orthe U--S.:'D­e­p­a` nt Of Wtekan .Affairs.. This appXoVal is mftde;.'Ptxs*,L'Tant to and uitider"thel.'provisions of Title.3 8 U.S..Coae"8687-with an" eff6etlVe date cf.Januaky S., 2019.. If ybu have any q*qp4ions., please.contact me at 317-232-3 9.16 .9 Tani tea Griffm M12: Program Director State Approving .Agency Cc:VARO/ELR Phone (317)-234-6062 Toll Free (800)-400-4520 Fax(317)-234-8744 Apprentide to us Reps► �� In enturre Date Apprentices Indentured. Between 1/1/2018 And 7/13/2022 Apprentice Program: IN2 Year. Apprentice Status Apprpmices Percentage 201E 0 1.9 t•' 'l%f W F bs>��YfS: �. Y St�Y? £ ba f•<{. Y i It lL% "-. /h 3� - 7�S£ }3 4 �° ..:..� Active Duty :0 24 �Lfs i�N ��^5 Ley .fi��k£ YN ;�et�,FJ �4�� Fr� dih Ad�r. to�Journeyman 3� { j� Y ss Ax � � Xu ,6><'r i%^."4>.yh? 4 h �.irs� $'h,,tt �Q}( Srs •bh k Cf ,_ •. � :3 ¢'���sg iC�`% 7�,4£ 2£'`s { ,:..:5 4. fC .. j x..:•.: '»Sr jtihy a�`xlt3irs.GttfE' y ,P / gyp,. xsF3 55 k Fi£,�.<V�£ -•_°. X fFr2fi5 r- .L J £ 1s0 5g ?/0 L?eceased.. ::.'.::..,rt,<,<tt:<.y:.t•t-:-a:•;:;>,,:....ttt,...ttt;,_::...:,:,r.:....;;t�.:;:.<:.:.r:..,, <.�.«<.,...,:.� . ,a.. Yc, •.; tl'.£atr;'p:>. ..tea,, ?t. i..... .,ii. ,sz. < ,,,......rL,.r. ,Y: ,.r „5, s....,i.•A..v.,, £> $.G.., t . <?r<.;:. t „x} .. ..5.�, �,satc. <: <,.: N.,... lw. 3 ft €sFissi`i�2'`yk3 £ 3s�r �a Graduated :,.. ..... <<v s...>Ss: <. . «a,...:,!.., ... . .... . �..,,.. � ..,#N.bfY.Yvw.:.,.s 'H.Zkra2.; j'x�l. «'<Y !3h%'•s "f,,:. - - - - :�. <�°:;>ti>< r�y�4hX7�k<°fi3K,o} y ..�✓F%sY rc3' .s,z,;r man.: srF ,. 10- 1 18 , Inactive trn G £ 4Y-� ,£2 s£"!'C<2••a- g u tYF LYrrY 7ourneyman£y�,F }' m'sT ,y cG`�;Se 7� �s s 2 fl�i yys. t� °%�� L� F -n.s :,..sk3. ,.Ya:'.31,.w:,f 4 R�>if j. ���-1}51.�t $'..<b�.t-,,._F 4�`t <k�� , w/ �i 'v3�cf�Ed ��.v Sx,<�Is at• -'mob >�i� `h�i'1'��l Q:. ......, ..`<:0,12;:% Med..Susp; :....... :. ::_ :^t4brb<;:Sw..: F•�,-...r.•]:<::y4::;-.y>>i:::3.<Ci£Lh�"v".a.�n��3;�.w.#: .s>.... � w.;».,, : {°L<i •.dF£cE [,�'1{ 3r/' . } <f<'£2 F 0.{'FCy S`1"� <34'kyS-- J.$ i t •'C r ....' F 3�.{ Cma, /� 4 .YLri<C 1 _ 15+3 M`;Y }ta3> m ;:- §�F.>��� 0 �.,83 Suspended:}:::: £>Y ? { cwL- {/ip •y YF 4 » i �, . �Z" s ..tQ :..t...,.,x..,..w::t-•:� y Iw. fft.F'q� €4s -7 w<il j'"'-'s3:•y' F rf Termrnate,�� yyn., _ IN ta t s i.t'f%.4'•<,_' {3,fa b#f }ay... HrL �f����;€r t tfixS46Y __ 6q 6 gg. ^ 0...% 435 ....:.. :Voluntary. withdraw .. "®� I ....:....atd :: 4�:....:.:. ph' iif`d-Ot tlesday, July 13, 2022 MOM marT, Mg leg ,i Ogg NbVjR.7 IN In aw 001 -20 ggi OR 31 HIM It 0,01 R"Wi A 0 z W OCL J ci z O U Imo-• g Y Z N O V W } a W .1 N a a a a a a a a IY a a a a a W W W W Y n W W W > o a o¢ o Q o Q o > o> > o i o a a a r a f- ao agg aa ¢o a90 a �/1 n pnp Vl IG V 10 v�l• W rt1 Om0• b OI b pN� � 01 N m r �/1 b O W yy-- z V N O h m 0ryry0 O f/! In, p S O p un1 'pper 1p h n N n M UI 'yyy V Q� V ¢ N N 1/� N VI VL 1%M1 N .6 Lmf O_ 0 a¢ O u m o 0 0 0 0 0 0 0 0 0 0 0 °w � a n O 3 0 a� O Y C p 3'm S E a u° c ' yo u Yin m LL s °• =1,2z z n ? N x •c �d v 4 Cn 23 > o °u E 'of E 3 „�• u E �°+ E u c ¢ E V i v t;— i p o x H N n M N N uni n n m m N q W m 10 n N � !ll m pw n 'y N w m o e •Z v � 'o ` G `o w 01 G G m o •2 c •2 0 °c o v •o `s d 'o d •o ` °' '° « N n od' a ti ' o N sv m y .o O pC V 'C O N Z - O 2 O u W o cmE c a c > = �ti�. t Y �~ m N b m �Y} 10 ryry W W ��pO t�rl n N O N 8 O O �O{ tl� Nm e4 Ilml � K n M n m m b �G N M IN iil M M o o o ¢ c c N o u n J � c Z 30 O O 2 — o 2 — o 2 — ro V 2 — 2 — m 2 u C c m S V z t ❑ N 3 = w z z c z °n V N E a j o'g O vm m caw¢ 3 �C?u x 12 c c z ry `o 9 N O u1 t p Y01 L❑ u n-1 N OQ N uu�io a �z°w.�.�O1z.Ni�9m IT ���n o ��'vriv�4 K c Y a a a ¢ a a a n a Q a a N> N> N> N> n N> m N> K S N> 1' m N K m J K W C W K W 6 > ¢ Z � a u yZ r a K Z r a Z r a K Z r a Z r a Z r a C Z r a >>QN> C Z r a Z r a K Z¢ r a N Z r a a; N Z r a 0 N L d V N v � N y N O N a N a N •° Z 6 Z Z 2� VI m m m m oo v op ° m oa ry n n o m m N N a "d 1D 8 rtl m ri m W c OO v o O o T 00 ' ' o n 0 V o � ao n a v of G o � my ua •c E a.. Eb Evxs y n n vd t aE o. 3 w U 3 s 'J a s a ry if °. O > m c g>g•m v G V U m c °° 3 E s > m c °u . ° 4 c E °u > °° a o E E °° > m > m � d a a O O tE0'Es c Q m C c •� •EI c N .�°-� � .n c 0 3 � � c �J N n N W � in N r9 O rtl Omp ,rm+i,� �101 N M m n M N N n Inl1 T N n N a w 2 w ae a m m m `w tj o vYi 'C N 'd t; °' 'd v O `c U w` � Y 0 V r � E J o a `Q o 2 i Z ? Z 2 Q ° �' o r z 2 U y Z Z U � Z m 3 ~ � ti m ry ry m m z E o w c Z L C U N c Z w o U s v x a° W vmi yR� N LLm p p� L+ pQppp a q¢l q EY ----- --CoNsTRucTION -C... INC. 100%.Quality 100% Employee Owned o Over 100 Years August 27, 2024 To Whom It May Concern: For your review we have included references from Private firms. that wehave performed work for. AM General Corporation (574) 284-2728 South Bend Inte( ' pational Airport (574) 800-5836 ITR Concessions LLC 574-674-5836 University of No -',,-.re Dame 574-631-7356 CoNsTRurTinN rx 7vv% duality m 100% Employee Owned a Over 100 Years List names and addresses of subcontractors that we have used in public works projects In the last five years: Roadsafe Traffic Systems V&R Trucking Slusser's Green Thumb 3519 Harding Street 1.845 North Elmer Street P.O. Box 33 Indianapolis, In. _ South Bend, In. Logansport, In. Traffic Marking Trucking Landscaping/Erosion Control Hawk Enterprises 1850 E. North Street Crown Point, In, Electric/Signage R&R Excavating 2010 Went Avenue Mishawaka, In. Dirt/Excavating C-Tech Corporation 5300 W. 1.00 North Boggstown, In. Guard rail/Fencing R0. Box 1775 r 25200 S.R. 23 • South Bend, IN 46634 Acorn Landscaping, LLC. 3680 W.-Sample Street South Bend, In. Landscaping Phone; (574) 288-8321 , www.rieth-rileycorn Rieth-Riley Construction Co., Inc. "need to add company 98 0167 assets to this listing Fixed Asset Schedule 3131/2024 Asset # Description Acquisition Date Cost Accum Depr. NSV Purchase Estimated Life! C185000006 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 2019-03-28 19,581.Oo 19,581.00 Condition - NEW Months C185000007 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 2019-03-28 19,581.00 19,581.00 NEW q8 C185000008 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 2019-03-28 19,581.00 19,581.00 - NEW 98 C185000009 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 2019-03-28 19,581.00 19,581,00 NEW 48 C185000010 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 2019.03-28 19,581.00 19,581.00 - NEW 48 C185000011 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 2019-03-28 19,581.00 19,581.00 - NEW 48 C185000012 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 2019-03-28 19,581.00 19,581.00 - NEW 48 C185000013 2019 SULLAIR 185-KUB-DPQ AIR COMPRESSOR 2019-03-28 10,581.00 19.581.00 - NEW 48 DD35000013 2019 WACKER RS12A-90 35" VIBRATORY COMPACTOR 2019-04-18 17,914.00 17,914.00 NEW 48 ODC5100002 2019 CATERPILLAR CC34B 51"VIBR COMBO COMPACTOR 2020-05-15 58,801.85 51.818.91 - 6.982.94 USED 48 DDC5100003 2020 CATERPILLAR CC34B 51"VIBR COMBO COMPACTOR 2020.05-15 68.801.85 51,818.91 6,982.94 USED 48 JT30000003 2006 CHEVROLET 3500 TRUCK 1 TON 2008-12-11 8,743.20 6,334.20 2,409.00 NEW 48 JT30000016 2007 CHEVROLET 3500 TRUCK 1 TON 2009-12-01 10,507.94 7.233.94 3,274.00 NEW 12 JT30000020 2009 CHEVROLET 3500 TRUCK 1 TON 2012-08-03 12,733.75 11,460.38 1,273.37 NEW 12 JT30000025 2009 CHEVROLET 3500 TRUCK 1 TON 2012.06-03 12,295.58 11,066.02 1,229.56 NEW 18 JT30000026 2011 FORD F350 TRUCK 1 TON 2011-06-15 16,780.50 16,760.50 NEW 18 JT30000027 2011 FORD F350 TRUCK 1 TON 2011-06-13 14,193.77 14,193.77 - NEW 14 JT30000028 2011 FORD F350 TRUCK 1 TON 2011-06-13 14,193.77 14,193.77 - NEW 14 JT30000029 2011 FORD F350 TRUCK 1 TON 2011-06-13 14,327.67 14,327.67 NEW 14 JT30000030 2011 FORD F350 TRUCK 1 TON 2011-06-13 14,327.67 14,327.67 - NEW 14 JT30000031 2011 FORD F350 TRUCK 1 TON 2011-06-13 14,327.67 14.327.67 - NEW 14 JT30000032 2011 FORD F350 TRUCK 1 TON 2011-06-13 14,327.67 14,327.67 - NEW 14 JT30000033 2011 FORD F350 TRUCK 1 TON 2011-06-13 14,327.67 14,327.67 NEW 14 JT30000034 2011 FORD F350 TRUCK 1 TON 2011-06-15 13,390.03 13,390,03 - NEW 14 JT30000035 2011 FORD F350 TRUCK 1 TON 2011-06-15 13,390,03 13,390.03 NEW 14 JT30000036 2011 FORD F350 TRUCK 1 TON 2011-06-15 13,390.03 13,390.03 - NEW 14 JT30000037 2011 FORD F350 TRUCK 1 TON 2011-06-15 13,390.03 13,390.03 - NEW 14 JT30000039 2014 RAM 3500 TRUCK 1 TON 2017-08-25 17,536.43 15,782.79 1,753.64 NEW 60 JT40000001 2014 FORD F450 UTILITY TRUCK 2017-07-17 15,624.47 14,062.02 1,562.45 NEW 12 JT40000002 2013 FORD F450 UTILITY TRUCK JT40000003 2014 RAM 4500 UTILITY TRUCK 2017-07-17 15,878.80 14,290.92 1,587.88 NEW 12 12 JT40000004 2014 RAM 4500 UTILITY TRUCK 2013-12-28 2017-07-17 44,910.02 17,759.33 44,910.02 15,983.40 - NEW 1,775,93 NEW 42 JT40000005 2014 RAM 4500 UTILITY TRUCK 2017-07-17 19,039.15 17,135.23 1,903.92 NEW 12 JT40000006 2014 RAM 4500 UTILITY TRUCK 2017-07-17 19,083.13 17,174.82 1,908.31 NEW 12 JT40000007 2014 RAM 4500 UTILITY TRUCK 2017-07-18 19,083.13 17,174.82 1,908.31 NEW 12 JT40000008 2015 RAM 4500 UTILITY TRUCK 2017-12-15 24,575.25 24,575.25 - NEW 12 JT40o00009 2015 RAM 4500 UTILITY TRUCK 2017-12-15 25,351.90 25,351.90 - NEW 18 JT40000010 2015 RAM 4500 UTILITY TRUCK 2017-12-15 24,204.49 24,204.49 - NEW 18 JT40000011 2015 RAM 4500 UTILITY TRUCK 2017-12-15 25,351.89 25,351.89 - NEW 18 JT40000012 2015 RAM 4500 UTILITY TRUCK 2017-12-15 23,868.76 23,868.76 - NEW 18 JT40000013 2015 RAM 4500 UTILITY TRUCK 2017-12-15 23.868.76 23,868.76 - NEW 18 JT40000014 2015 RAM 4500 UTILITY TRUCK 2017-12-15 24,204.49 24,204,49 - NEW 18 JT40000015 2015 RAM 4500 UTILITY TRUCK 2017-12-15 24,204,49 24,204.49 - NEW 18 JT40000016 2015 RAM 4500 UTILITY TRUCK 2017-1245 23,978.28 23,978.28 NEW 18 JT40000017 2015 RAM 4500 UTILITY TRUCK 2017-12-15 25,174.45 25,174.45 - NEW 18 JT40000018 2015 RAM 4500 UTILITY TRUCK 2017-12-15 25,174.45 25,174.45 - NEW 18 JT40000019 2015 RAM 4500 UTILITY TRUCK 2017-12-15 24,204.49 24,204.49 NEW 18 JT40000020 2016 RAM 4500 UTILITY TRUCK JT40000021 2016 RAM 4500 UTILITY TRUCK 2016-04-08 60,230.30 54,207.27 6,023.03 NEW 18 48 JT40000022 2016 RAM 4500 UTILITY TRUCK 2016-04-08 2016-04-08 60,230,30 603230.30 54,207.27 54,207.27 6.023.03 NEW 6,023.03 qg48 JT40000023 2016 RAM 4500 UTILITY TRUCK 2016-04-08 60,230.30 54,207.27 NEW 6.023.03 NEW JT40000024 2016 RAM 4500 UTILITY TRUCK 2016-04-08 60,230.30 54,207.27 6,023.03 NEW 48 JT40000025 2016 RAM 4500 UTILITY TRUCK JT40000026 2016 RAM 4500 UTILITY TRUCK 2016-04-08 59,667.40 53,700.66 5,966.74 NEW 48 48 JT40000027 2016 RAM 4500 UTILITY TRUCK 2016-04-08 2016-04-08 60,230.30 59,667.40 54,207.27 6,023.03 NEW 48 JT40000028 2016 RAM 4500 UTILITY TRUCK 2016-03-28 59,667.40 53,700.66 53,700.66 5,966.74 NEW 5.966.74 NEW 46 JT40000029 2016 RAM 4500 UTILITY TRUCK 2016-03-28 59,667,40 53,700.66 5.966.74 NEW 48 JT40000030 2016 RAM 4500 UTILITY TRUCK 2016-04-08 60,230.20 64,207.27 6,023.03 NEW 48 JT40000031 2017 RAM 4500 UTILITY TRUCK 2017-06-01 60,071.94 54,064.03 6,007.91 NEW 48 JT40000032 2017 RAM 4500 UTILITY TRUCK 2017-04-20 60,071.94 54.064.75 6,007.19 NEW 48 JT40000033 2017 RAM 4500 UTILITY TRUCK 2017-05-04 60,071.94 54.064.75 6,007.19 NEW 48 JT40000034 2017 RAM 4500 UTILITY TRUCK 2017-04-20 60,071.94 54.064.76 6,007J9 NEW 48 JT40000035 2017 RAM 4500 UTILITY TRUCK 2017-04-20 60,071.94 54.064.75 6,007.19 NEW 4848 JT40000036 2017 RAM 4500 UTILITY TRUCK 2017-06-01 60,071.94 54,064.75 6,007,19 NEW JT40000037 2017 RAM 4500 UTILITY TRUCK JT40000038 2017 RAM 4500 UTILITY TRUCK 2017-04-20 60,071.94 54,064.75 6,007.19 NEW 48 48 JT40000039 2017 RAM 4500 UTILITY TRUCK 2017-06-01 2017-05-04 60,071.94 60,071.94 54,064.75 6,007.19 NEW 4g JT40000040 2017 RAM 4500 UTILITY TRUCK 2017-06-01 60,071.94 54,064.75 54,064.75 6.007.19 NEW 6,007J9 NEW 4848 JT40000041 2017 RAM 4500 UTILITY TRUCK 2017-04-20 60,071.94 64,064.75 6,007.19 NEW JT40000042 2017 RAM 4500 UTILITY TRUCK 2017-06-01 60,071.94 54,064.75 8,007.19 NEW 48 JT40000043 2017 RAM 4500 UTILITY TRUCK 2017-04-20 60,071.94 54.064.75 6,007J9 NEW 48 JT40000044 2017 RAM 4500 UTILITY TRUCK 2017-08-01 60,071.94 54,06 6,007J9 NEW q84.75 JT40000045 2017 RAM 4500 UTILITY TRUCK JT40000046 2017 RAM 4500 UTILITY TRUCK 2017-06-01 60,071.94 54,064.75 6,007.19 NEW 48 48 JT40000047 2017 RAM 4500 UTILITY TRUCK 2017-04-20 2017-06-01 60,071.94 60,071.94 54,06415 6.007.19 NEW 48 JT40000048 2017 RAM 4500 UTILITY TRUCK 2017-04-20 59,51 64.064.75 53,559.47 6,007.19 NEW 5,951.05 NEW 480,52 JT40000049 2018 RAM 4500 UTILITY TRUCK 201842-05 61,644.84 61.644.84 - NEW 48 JT40000050 2018 RAM 4500 UTILITY TRUCK 2018-12-05 61,644.84 61.644.84 - NEW 48 JT40000051 2018 RAM 4500 UTILITY TRUCK 2018-12-05 61,644.84 61.644.84 48 JT40000052 2018 RAM 4500 UTILITY TRUCK 2018-12-05 61,644.84 61,644.84 - NEW 48 JT40000054 2018 RAM 4500 UTILITY TRUCK 2018-12-05 61,644.84 61,644.84 48 JT40000055 2018 RAM 4500 UTILITY TRUCK 2018-12-05 61,644.84 61,644.84 - NEW 48 JT40000056 2018 RAM 4500 UTILITY TRUCK 201842-05 61,644.84 61,644.84 - NEW 48 JT40000057 2018 RAM 4500 UTILITY TRUCK 2018-12-19 61,644.84 61,644.84 - NEW 48 JT40000058 2019 CHEVROLET 4500 UTILITY TRUCK 2019-08-28 61,746.58 61,746.58 _ — NEW 48 JT40000059 2019CHEVROLET 4500UTILITY TRUCK 2019-10-03 61,746,58 61,746.58 - NEW 48 JT40000060 2019 CHEVROLET 4500 UTLIITY TRUCK 2019-08-28 61,746.58 61,746.58 - NEW 48 JT40000061 2019 CHEVROLET 4500 UTLIITYTRUCK 2019-08-28 61,746.58 61,746.58 NEW 4B JT40000062019 CHEVROLET 4500 UTILITY TRUCK 2019-10-02 61,746.58 61,746.58 NEW 48 JT40000064 2019 CHEVROLET 4500 UTILITY TRUCK 2019-10-04 61,746,58 61,746,58 - NEW 48 JT40000065 2019 CHEVROLET 4500 UTLIITY TRUCK 2019-10-03 61,746.58 61,746.58 NEW qg JT40000066 2019 CHEVROLET 4500 UTLIITY TRUCK 2019-10-07 61,746.58 61,746.56 NEW 48 JT40000067 2019 RAM 4500 UTILITY TRUCK 2019-10-06 61.746.6 64.106.91 61,746.5 NEW 48 JT40000068 2019 RAM 4500 UTILITY TRUCK 2020-04-06 64,106.91 - NEW 48 JT40000069 2019 RAM 4500 UTILITY TRUCK 2020-04-06 64.106.91 64,106,91 - NEW 48 JT40000070 2019 RAM 4500 UTILITY TRUCK 2020-04-21 64,106.91 64.106.91 - NEW 48 JT40000071 2020 RAM 4500 UTILITY TRUCK 2020-05-21 66,022.21 66,022.21 - NEW 48 48 JT40000072 2019 RAM 4500 UTILITY TRUCK JT40000073 2020 RAM 4500 UTILITY TRUCK 2020-04-06 64,106.91 64,106.91 NEW JT40000074 2020 RAM 4500 UTILITY TRUCK 2020-04-06 2020-04-07 66,022.21 66,022.21 66,022.21 NEW P120000001 2008 CHEVROLET 1500 PICKUP TRUCK 2011-02-02 5,350.03 66,022.21 4,815.03 NEW P120000002 2008 CHEVROLET 1500 PICKUP TRUCK 2011-07-03 5,350.03 3,567.03 535.00 NEW P120000003 2015 RAM 1500 PICKUP TRUCK 2017-12-15 14,714.45 14,714.45 1,783.00 NEW P120000004 2015 RAM 1500 PICKUP TRUCK 2017-12-15 14,714.45 14,714.45 NEW P120000005 2015 RAM 1500 PICKUP TRUCK 2017-12-15 14,714.45 14,714.45 NEW P120000006 2015 RAM 1500 PICKUP TRUCK 2017-12-15 14,714.45 14,714.45 NEW P120000008 2015 RAM 1500 PICKUP TRUCK 2017-12-15 14.714.45 14,714.45 NEW P120000009 2015 RAM 1500 PICKUP TRUCK 2017-12-15 14,621.52 14,621.52 NEW P120000010 2015 RAM 1500 PICKUP TRUCK 2017-12-15 15,199.37 15,199.37 NEW P129000011 2015 RAM 1500 PICKUP TRUCK 2017-12-15 15,199.37 15,199.37 NEW P120000012 2015 RAM 1500 PICKUP TRUCK 2017-12-15 13,304.80 13,304.80 NEW P120000013 2015 RAM 1500 PICKUP TRUCK W/LIFT GATE 2017-12-15 13,304.80 13,304.80 NEW P120000014 2015 RAM 1500 PICKUP TRUCK W/PROGILOGRAPH 2O17-12-15 13,753.85 13,753.85 NEW P120000015 2016 RAM 1500 PICKUP TRUCK W/PROFILOGRAPH 2016-05-18 41,304.67 37,174.20 NEW P120000018 2003 TOYOTA 1500 PICKUP TRUCK 2006-04-01 10,600.00 9,540.00 4,130.47 NEW P120000019 1997 GMC 1500 PICKUP TRUCK 2008-01-29 1.855.00 1,669.50 1,060.00 USED P120000020 2019 RAM 1500 PICKUP TRUCK W/PROFILOGRAPH 2019-04-22 36,842.61 36,842.61 185.50 USED P140000001 2013 RAM 1500 PICKUP TRUCK 4X4 P140000002 2013 RAM 1500 PICKUP TRUCK 4X4 2016-06-03 10,052.46 9,047.21 NEW 1,005.25 NEW P140000003 2014 DODGE RAM 1500 PICKUP TRUCK i/2 TON 4X4 2016-05-03 2016-06-03 9,907.71 8,916.94 990.77 NEW P140000004 2014 DODGE RAM 1500 PICKUP TRUCK 112 TON 4X4 2016-06-03 17,917.90 17,709.05 16,126.11 1,791.79 NEW P140000005 2014 DODGE RAM 1500 PICKUP TRUCK 1Y1 TON 4X4 2016-06-03 14,877.67 15,938.14 1,770.91 NEW P140000006 2015 DODGE RAM 1500 PICKUP TRUCK 1/2 TON 4X4 2017-12-15 16,105.38 13,389.90 1,487.77 NEW P140000007 2015 DODGE RAM 1500 PICKUP TRUCK 1/2 TON 4X4 2017-12-15 16,105.38 16,105.38 16,105.38 NEW P140000008 2016 DODGE RAM 1500 PICKUP TRUCK 1/2 TON 4X4 QUAD 2016-05-18 38,839.98 34,955.98 NEW 3,884.00 P220000001 2003 CHEVROLET 2500 PICKUP TRUCK 2003-02-03 21,233.80 19,110.42 NEW 2,123.38 P220000005 2006 CHEVROLET 2500 PICKUP TRUCK P220000006 2006 CHEVROLET 2500 PICKUP TRUCK 2008-12-11 6,672.35 4,833.85 NEW 1,838.50 NEW P220000023 2008 CHEVROLET 2500 PICKUP TRUCK 2008-12-11 2011-02-02 6,699.21 7,034A6 4,853.21 1,846.00 NEW P220000027 2008 CHEVROLET 2500 PICKUP TRUCK 2011-02-02 7,034.16 6.330.74 703.42 NEW P220000028 2008 FORD F250 PICKUP TRUCK 2011-07-03 7.314.00 6,330.74 5,014.00 703.42 NEW P220000030 2008 FORD F250 PICKUP TRUCK P220000038 2009 CHEVROLET 2500 PICKUP TRUCK 2011-07-03 7,314.00 5,014.00 2,300.00 NEW 2,300.00 NEW P220000039 2009 CHEVROLET 2500 PICKUP TRUCK 2012-02-04 2012-02-04 7,083.45 7,083.45 6,375.10 708.35 NEW P220000045 2009 CHEVROLET 2500 PICKUP TRUCK 2012-06-03 7,083.45 6,375.10 708.35 . NEW P220000046 2009 CHEVROLET 2500 PICKUP TRUCK 2012-06-03 7,083.45 6,375.10 6,375.10 708.35 NEW P220000047 2009 CHEVROLET 2500 PICKUP TRUCK 2012-06-03 7,083A5 6.682.50 708.35 NEW P220000051 2009 CHEVROLET 2500 PICKUP TRUCK 2012-06-03 7,083.45 6,375.10 400.95 NEW P220000052 2009 CHEVROLET 2500 PICKUP TRUCK 2012-06-03 7,150.28 6,435.25 708.35 NEW P220000056 2011 FORD F250 PICKUP TRUCK 2011-06-13 9,224.73 9,224.73 715.03 NEW P220000056 2011 FORD F250 PICKUP TRUCK W/LIFTGATE 2011-08-13 9,224.73 9,224.73 NEW P220000060 2011 FORD F250 PICKUP TRUCK 2011-06-22 9,311.76 9.311.76 NEW P220000061 2011 FORD F250 PICKUP TRUCK 2011-06-22 9,311.76 9,311.76 NEW P220000065 2011 FORD F250 PICKUP TRUCK 2011-06-22 9,860.67 9,860.67 - NEW P220000068 2014 RAM 2500 PICKUP TRUCK P220000069 2014 RAM 2500 4X4 PICKUP TRUCK 2017-05 22 11,832.15 10,648.94 NEW 1,183.21 NEW P220000070 2015 RAM 2500 PICKUP TRUCK 2017-05-22 2017-12-15 13,358.54 15.682.09 12.022.72 1,335.82 NEW P220000071 2015 RAM 2500 PICKUP TRUCK 2017-12-15 15,682.09 15,682.09 15,682.09 NEW P220000072 2015 RAM 2500 PICKUP TRUCK 2017-12-15 16,923.86 16,923.86 NEW P220000073 2015 RAM 2500 PICKUP TRUCK 2017-12-15 16,157.91 16,157.91 NEW P220000074 2015 RAM 2500 PICKUP TRUCK 2017-12-15 16,870.19 16,870.19 NEW - NEW P220000075 2015 RAM 2500 PICKUP TRUCK 2017-12-15 16,870A9 16.870.19 NEW P220000076 2015 RAM 2500 PICKUP TRUCK P220000077 2017-12-15 17,676.87 "*17,675.87 NEW 2015 RAM 2500 PICKUP TRUCK 2017-12-15 17,099.06 17,099.06 NEW P220000079 2016 RAM 2500 PICKUP TRUCK P220000080 2016 RAM 2500 PICKUP TRUCK 2016-04-08 39,355.95 35,420.35 3,935.60 NEW P220000081 2016 RAM 2500 PICKUP TRUCK 2016-04-08 2016-04-08 39.355.95 38,988.13 35,420.35 3,935.60 NEW P220000082 2016 RAM 2500 PICKUP TRUCK 2016-04-08 38,988.13 35,089.32 35,089.32 3,898.81 NEW 3,098.81 P220000083 2016 RAM 2500 PICKUP TRUCK P220000084 2016 RAM 2500 PICKUP TRUCK 2016-04-08 39,355.95 35,420.35 NEW 3,935.60 NEW P220000085 2016 RAM 2500 PICKUP TRUCK 2016-04-08 2016-04-08 383988.14 35,089.33 3.898.81 NEW P220000086 2016 RAM 2500 PICKUP TRUCK 2016-04-08 38,988.14 38.988.13 35,089.33 3.898.81 NEW P220000087 2016 RAM 2500 PICKUP TRUCK 2016-04-08 38,988.13 35,089.32 35,089.32 3,898.81 NEW 3,898.81 NEW P220000088 2016 RAM 2500 PICKUP TRUCK P220000089 2016 RAM 2500 PICKUP TRUCK 2016-04-08 39,355.95 35,420.35 3,935.60 NEW P220000090 2016 RAM 2500 PICKUP TRUCK 2016-03 28 2016-04-08 39,355.95 39,355.95 39,355.95 NEW P220000091 2017 RAM 2500 PICKUP TRUCK P220000092 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,846.01 35,420.35 35,861.41 3,935.60 NEW 3,984.60 NEW P220000093 2017 RAM 2500 PICKUP TRUCK 2017-04-01 2017-04-01 39,846.01 39,846.01 35,861.41 3,984.60 NEW P220000094 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,846.01 35.861.41 35.861.41 3,984.60 NEW P220000095 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39.846.01 35,861.41 3,984.60 NEW 3,984.60 P220000096 2017 RAM 2500 PICKUP TRUCK W/LIFTGATE 2017-04-01 39,846.01 35,861.41 NEW 3.984.60 NEW P220000097 2017 RAM 2500 PICKUP TRUCK P220000098 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,846.01 35,861.41 3,984.60 NEW P220000099 2017 RAM 2500 PICKUP TRUCK 2017-04-01 2017-'04-01 39,846.01 39,846.01 35,861.41 35,861,41 3,984.60 NEW P220000100 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,846.01 35,861.41 3,984.60 NEW 3.984.60 P220000101 2017 RAM 2500 PICKUP TRUCK P220000102 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39.846.01 35,861.41 NEW 3,984.60 NEW P220000103 2017 RAM 2500 PICKUP TRUCK 2017-04-01 2017-04-01 39.846.01 39,846.01 35,861.41 35,861.41 3.984.60 NEW P220000104 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,846.01 35,861.41 3,984.60 NEW 3,984.60 P220000105 2017 RAM 2500 PICKUP TRUCK P220000106 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39.846.01 35,861.41 NEW 3,984.60 NEW P220000107 2017 RAM 2500 PICKUP TRUCK 2017-04-01 2017-04-01 39,846.01 39,846.01 35,861.41 3,984.60 NEW P220000108 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,846.01 35,861.41 35,861.41 3,984.60 NEW 3,984.60 P220000109 2017 RAM 2500 PICKUP TRUCK P220000110 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,846.01 35,861.41 NEW 3,984.60 NEW P220000111 2017 RAM 2500 PICKUP TRUCK 2017-04-01 2017-04-01 39,846.01 39,846.01 35.861.41 3,984.60 NEW P220000112 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39.846.01 35,861.41 35,861.41 3,984.60 NEW P220000113 2017 RAM 2500 PICKUP TRUCK P2200001 i4 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,846.01 35.861.41 3,984.60 NEW 3,984.60 NEW P220000115 2017 RAM 2500 PICKUP TRUCK 2017-04-01 2017-04-01 39,846.01 39,846.01 35,861.41 3.984.60 NEW P220000116 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,846.01 35.861.41 35,861.41 3,984.60 NEW 3,984.60 P2200001 i8 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,473.62 35,526.26 NEW 3,947.36 NEW P220000119 2017 RAM 2500 PICKUP TRUCK P220000120 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,473.62 35,526.26 3,947.36 NEW P22000012i 2017 RAM 2500 PICKUP TRUCK 2017-04-01 2017-04-01 39,473.62 39,473.62 35,526.26 3,947.36 NEW P220000122 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,473.62 35,526.26 35,526.26 3,947.36 NEW P220000123 2017 RAM 2500 PICKUP TRUCK W/LIFTGATE 2017-04-01 39,473.62 35,526.26 3.947.36 NEW 3.947.36 P220000124 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,473.62 35,525.26 NEW 3,947.36 NEW P220000126 2017 RAM 2500 PICKUP TRUCK P220000127 2017 RAM 2500 PICKUP TRUCK 2017-04-01 39,473.62 35.526.26 3,947.38 NEW P220000129 2017 RAM 2500 PICKUP TRUCK 2017-04-01 2020-11-03 39,473.62 35.526.26 3,947.36 NEW 13,852.48 13,852.48 - 24 18 18 48 48 12 12 12 12 12 12 12 12 18 18 18 18 48 48 48 48 48 48 48 48 48 48 48 48 48 48 P220000130 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 P220000131 2017 RAM 2500 PICKUP TRUCK 13,852,48 13,852.48 NEW2020-11-03 12 P220000132 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 - NEW 12 P220000133 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 13,852.48 - NEW 12 P220000134 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 13,852.48 - NEW 12 P220000135 2017 RAM 2500 PICKUP TRUCK 13,852.48 13,852A8 - NEW 12 P220000136 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 13,852,48 - NEW 12 P220000137 2017 RAM 2500 PICKUP TRUCK 2020-11-03 2020-11-03 13,852.48 13,852.48 - NEW 12 P220000138 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852A8 13,852.48 - NEW 12 P220000139 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.49 13,852.49 - NEW 12 P220000140 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.49 13.852.49 - NEW 12 P220000141 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 13,852.48 13,852.48 - NEW 12 P220000142 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 - NEW 12 P220000143 2017 RAM 2500 PICKUP TRUCK 2020-11.03 13,9g6.10 13,946.10 - NEW 12 P220000144 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 13,852.48 - NEW 12 P220000145 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 13,852.48 13,852.48 - NEW 12 P220000146 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 13,852.48 - NEW 12 P220000147 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 - NEW 12 P220000150 2017 RAM 2500 PICKUP TRUCK 2020-11-03 13,852.48 13,852.48 13,852.48 - NEW 12 P22000015i 2018 RAM 2500 TRUCK PICKUP P220000152 2018 RAM 2500 TRUCK PICKUP 2018-08-29 40,026.93 13,852.48 40,026.93 - NEW - NEW 12 P220000153 2018 RAM 2500 TRUCK PICKUP 2018-08-15 2018-08-15 40,026.93 40,026.93 - NEW 48 48 P220000154 2018 RAM 2500 TRUCK PICKUP 2018-08-14 40,026.93 40,026.93 40,026.93 - NEW 48 P220000155 2018 RAM 2500 TRUCK PICKUP P220000156 2018 RAM 2500 TRUCK PICKUP 2018-09-06 40,026.93 40,026.93 40,026.93 - NEW NEW 48 P220000157 2018 RAM 2500 TRUCK PICKUP 2018-08-2018-08-23 23 40,026.93 40,026.93 - NEW 48 48 P220000158 2018 RAM 2500 TRUCK PICKUP 2018-09-06 40,026.93 40,026.93 - NEW 48 P220000159 2018 RAM 2500 TRUCK PICKUP 2018-08-23 40,026.94 40,028.94 40,026.94 - NEW 48 P220000160 2018 RAM 2500 TRUCK PICKUP 2018-08-14 40,026.93 40,026.94 - NEW 48 P220000161 2018 RAM 2500 TRUCK PICKUP 2018-09-06 40,026.94 40,026.93 40,025.94 - NEW 48 P220000162 2018 RAM 2500 TRUCK PICKUP 2018-08-21 40,404.56 40,404.56 - NEW 48 P220000163 2018 RAM 2500 TRUCK PICKUP 2018-08-14 40,404.56 - NEW 48 P220000164 2018 RAM 2500 TRUCK PICKUP 2018-08-21 40,404.56 - NEW 48 P220000162018 RAM 2500 TRUCK PICKUP 2018-08-14 40,404.55 40,404.55 NEW 48 P220000166 2018 RAM 2500 TRUCK PICKUP 2018-08-23 40,404.56 40,404.56 NEW 48 P220000167 2018 RAM 2500 TRUCK PICKUP 2018-09-06 40,404.56 40,404.56 - NEW 48 P220000168 2018 RAM 2500 TRUCK PICKUP 2018-08-29 40,404.56 40.404.56 - NEW 48 P220000170 2018 RAM 2500 TRUCK PICKUP 2018-09-06 40,404.56 40,404.56 40.404.56 NEW 48 P220000170 2018 RAM 2500 TRUCK PICKUP 2018-08-15 40,404.56 40,404.56 4D,404.56 NEW 48 P220000171 2018 RAM 2500 TRUCK PICKUP W/LIFTGATE 2018-OB-23 40,026.93 40,026.93 - NEW 48 P220000172 2018 RAM 2500 TRUCK PICKUP 2018-08-29 40,404.56 40,404.56 - NEW 48 P220000175 2019 RAM 2500 TRUCK PICKUP 2019-06-04 42,760.41 38,484.37 - NEW 48 P220000176 2019 RAM 2500 TRUCK PICKUP 2019-06-27 42,760.41 38,484.37 4,276.04 NEW 48 P220000177 2019 RAM 2500 TRUCK PICKUP 2019-06-04 42,760.41 38,484.37 4,276.04 NEW 48 P220000178 2019 RAM 2500 TRUCK PICKUP 2019-06-27 42,760.41 4,276.04 NEW 48 P220000179 2019 RAM 2500 TRUCK PICKUP 2019-06-14 38,484.37 4,276.04 NEW 48 P220000180 20i9 RAM 2500 TRUCK PICKUP 2019-05-31 42,760.41 38,484.37 4,276.04 NEW 48 P220000i81 2019 RAM 2500 TRUCK PICKUP 2019-06-04 42,760.41 38,484.37 4.276.04 NEW 48 P220000182 2019 RAM 2500 TRUCK PICKUP 2019-06-27 42,760.41 38,484.37 4,276.04 NEW 48 P220000183 2019 RAM 2500 TRUCK PICKUP W/LIFTGATE 2019-06-27 42,760.41 38,484.37 4,276.04 NEW 48 P220000i84 2019 RAM 2500 TRUCK PICKUP 2019-05-31 45,949.01 41,354.11 4,594.90 NEW 48 P220000185 2019 RAM 2500 TRUCK PICKUP 2019-05-31 42,760.41 38,484.37 4,276.04 NEW 48 P220000186 2019 RAM 2500 TRUCK PIKCUP 2019-06-04 42,760.41 38,484.37 4,276.04 NEW 48 P220000187 2019 RAM 2500 TRUCK PICKUP 2019-06-04 42,760.41 38,484.37 4,276.04 NEW 48 P220000188 2019 RAM 2500 TRUCK PICKUP 2019-06-04 42,760.41 38,484.37 4.276.04 NEW 48 P220000i89 2019 RAM 2500 TRUCK PICKUP 2019-05-31 42,760.41 38,484.37 4,276.04 NEW 48 P220000190 2019 RAM 2500 TRUCK PICKUP 2019-05-31 42,760.41 38,484.37 4,276.04 NEW 48 P220000191 2019 RAM 2500 TRUCK PICKUP 2019-06-04 42.760.41 42,760.41 38,484.37 4,276.04 NEW 48 P220000192 2019 RAM 2500 TRUCK PICKUP 2019-05-31 42,760.41 38,484.37 4.276.04 NEW 48 P220000193 2019 RAM 2500 TRUCK PICKUP 2019-06-14 38,484.37 4,276.04 NEW 48 P220000194 2019 RAM 2500 TRUCK PICKUP 2019-06-04 42,760.41 38,484.37 4.276.04 NEW 48 P220000195 2019 RAM 2500 TRUCK PICKUP 2019-06-14 42,760.41 38.484.37 4,276.04 NEW 48 P220000196 2019 RAM 2500 TRUCK PICKUP 2019-08-14 42,760,41 3848437 ,. 4,276.04 NEW 48 P220000197 2019 RAM 2500 TRUCK PICKUP 2019-06-04 42,760.41 38,484.37 4,276.04 NEW 48 P220000198 2019 RAM 2500 TRUCK PICKUP 2019-06-04 4276041 ,. 38,484.37 4,276.04 NEW 48 P220000199 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,760.41 38,484.37 4,276.04 NEW 48 P220000200 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,216.85 42,216.85 - NEW 48 P220000201 2020 RAM 2500 TRUCK PICKUP W/ LIFTGATE 2020-04-06 42,216.85 42,216.85 42,216.85 NEW 48 P220000202 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,216.85 42,216.85 NEW 48 P220000203 2020 RAM 2500 TRUCK PICKUP W/ LIFTGATE 2020-04-06 42,216.85 42,216,65 NEW 48 P220000204 2020 RAM 2500 TRUCK PICKUP W/ LIFTGATE 2020-04-06 42,216.85 - NEW 48 P220000205 2020 RAM 2500 TRUCK PICKUP W/ LIFTGATE 2020-04-06 42,216.85 42,216.85 - NEW 48 P220000206 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,216.85 42216.85 NEW 48 P220000207 2020 RAM 2500 TRUCK PICKUP 42,216,85 42,.216.85 NEW 48 P220000208 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,216.86 42.216.85 - NEW 48 P220000209 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,216.85 42,216.85 NEW 48 P220000210 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,216.85 42,216.85 - NEW 48 P220000211 2020 RAM 2500 TRUCK PICKUP 2020-04-06 2020-04-08 42,216.85 42,216.85 - NEW 48 P220000212 2020 RAM 2500 TRUCK PICKUP 2020-05-21 42,216.85 42,216.85 NEW 48 P220000214 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42 ,216,85 41,337.44 44 879.41 NEW 48 P220000215 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,216.85 41,337. - NEW 48 P220000216 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,216.85 42.216.85 - NEW 48 P220000217 2020 RAM 2500 TRUCK PICKUP 2020-04-06 42,216.85 42,216.85 - NEW 48 P220000218 2020 RAM 2500 TRUCK PICKUP 2020-05-21 42.216.85 42,216.85 NEW 48 P220000219 2020 RAM 2500 TRUCK PICKUP 2020-05-21 42,216,85 41,337.44 879.41 NEW 48 P220000220 2020 RAM 2500 TRUCK PICKUP 2020-05 21 42.216.85 41,337.44 879.41 NEW 48 P220000221 2020 RAM 2500 TRUCK PICKUP 2020-04-21 42,216.85 41,337.44 879.41 NEW 48 P220000222 2020 RAM 2500 TRUCK PICKUP 2020-04-21 42,216.85 42.216.85 - NEW 48 P240000001 200 CHEVROLET 2500 PICKUP TRUCK 4X4 2003-02-03 42.216.85 24,165.80 42,216.85 NEW 48 P240000003 2008 CHEVROLET 2500 PICKUP TRUCK 4X4 2011-02-02 10,243.30 21,749.22 9.218.97 2,416,58 NEW 48 P240000004 2008 CHEVROLET 2500 PICKUP TRUCK 4X4 2011-07-03 7,869.00 1.024.33 NEW 12 P240000007 2011 FORD F250 PICKUP TRUCK 4X4 2011-06-22 5,418.00 2,451,00 NEW 12 P240000008 2014 RAM 2500 PICKUP TRUCK 4X4 2017-05-22 10,859.37 10,859.37 14 P240000009 2015 RAM 2500 PICKUP TRUCK 4X4 2017-12-15 13.392.57 12,053.31 1,339.26 NEW 4g P240000010 2015 RAM 2500 PICKUP TRUCK 4X4 2017-12-15 18,268.76 18 268.76 18 P240000011 2015 RAM 2500 PICKUP TRUCK 4X4 2017-12-15 18,846.61 18,846.61 18,846.61 NEW 18NEW P240000012 2020 CHEVROLET 2500 PICKUP TRUCK 4X4 2020-04-06 45,260.24 45,260.24 18,846.61 18 VAN0000001 2016 NISSAN NVP 3500 V6 8 VAN PASSENGER 2016-04-02 45,260,24 45,260,2 - 48 WRKT180002 2019 ROAD WIDENER FHDR DUAL SIDE ATTACHMENT 2019-04-24 36,090.79 32,481.71 3,60 NEW 48 WRKT190003 201E AMI BKT320.42 GRAPTOR BUCKET 2019-07-10 - NEW 48 WRKT190004 2019 AMI BKT320-42 GRAPTOR BUCKET 20 25,773.63 25.773.63 - NEW 48 DD35000014 2020 CATERPILLAR C81.7 35"VIBRATORY COMPACTOR -07-10 202121-04-20 25,773.62 25,773.62 NEW 4828,724.94 DD35000015 2020 CATERPILLAR C81.7 35" VIBRATORY COMPACTOR 2021-04-20 20,945,40 7,779,54 NEW 48 DD48000019 2021 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2021-12-27 28,72 28,724.94 20,945.40 7.779.54 NEW 48 DD48000020 2021 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2021-12-27 .94 20,945.40 27,779.54 NEW 48 50,691.25 25,662.42 25,028.83 NEW 48 DD48000021 2021 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2021-12-27 60,691.25 DD48000022 2021 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2021-12-27 50,691.25 25,682.42 25,028.83 NEW DD48000023 2021 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2021-12-27 25,662.42 25,028.83 NEW DD48000024 2021 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2021-12-27 50,691.25 60,691.25 25,662.42 25,028.83 NEW DD51000014 2021 CATERPILLAR CB34B 51 " VIBRATORY COMPACTOR 2021-04-20 25,662.42 25,028,83 NEW DD51000015 2021 CATERPILLAR C834B 51" VIBRATORY COMPACTOR 2021-04-14 61,381.62 40,281.85 21,099.77 NEW DD51000016 2021 CATERPILLAR CB34B 51" VIBRATORY COMPACTOR 2021-04-26 61,381.62 40,281.85 21,099.77 NEW DD51000017 2021 CATERPILLAR CB34B 51 " VIBRATORY COMPACTOR 2021-04-26 60,807.96 61,381.62 39,905.25 20,902.71 NEW DD51000018 2021 CATERPILLAR CB34B 51" VIBRATORY COMPACTOR 2021-04-26 61,381.62 40,281.85 21,099.77 NEW DD51000019 2021 CATERPILLAR CB34B 51" VIBRATORY COMPACTOR 2021-04-14 40,281.85 21,099.77 NEW JT30000041 2021 RAM 3500 TRUCK 1 TON 2021-06-16 61,381.62 69,589.66 40,281.85 21.099.77 NEW JT40000075 2021 RAM 4500 UTILITY TRUCK 2021-06-02 67,766.50 42,209.30 17,380.36 NEW JT40000076 2021 RAM 4500 UTILITY TRUCK 2021-08-25 67,768.50 48,001.20 43,765.80 19,765.30 NEW JT40000077 2021 RAM 4500 UTILITY TRUCK 2021-06-02 67,765.53 48,000.52 24,000.70 NEW 19,765.01 JT40000078 2021 RAM 4500 UTILITY TRUCK JT40000079 2021 RAM 4500 UTILITY TRUCK 2021-08-25 67,766.50 43,765.80 NEW 24,000.70 NEW JT40000080 2021 RAM 4500 UTILITY TRUCK 2021-06-17 2021-06-16 67,766.50 46,589.40 21,177.10 NEW JT40000081 2021 RAM 4500 UTILITY TRUCK 2021-06-16 67,766.50 67.766.50 46,589.40 21,177.10 NEW JT40000082 2021 RAM 4500 UTILITY TRUCK 2021-06-17 67,766.50 46,589.40 21,177.10 NEW JT40000083 2021 RAM 4500 UTILITY TRUCK 2021-06-16 67,766.50 46,589,40 21,177.10 NEW P220000223 2021 RAM 2500 TRUCK PICKUP 2021-05-27 44,133.51 46,589.40 21,177.10 NEW P220000224 2021 RAM 2500 TRUCK PICKUP 2021-06-23 44,133.51 31,261.30 12,872.21 NEW P220000225 2021 RAM 2500 TRUCK PICKUP 2021-06-02 44,133.51 30,341.85 31,261.30 13,791.66 NEW P220000226 2021 RAM 2500 TRUCK PICKUP 2021-06-28 44,133.51 30,341.85 12,872.21 NEW P220000227 2021 RAM 2500 TRUCK PICKUP 2021-05-24 44,133.51 31.261.30 13,791.66 NEW P220000228 2021 RAM 2500 TRUCK PICKUP 2021-05-24 44,133.51 31,261.30 12,872.21 NEW P220000229 2021 RAM 2500 TRUCK PICKUP 2021-06-17 44,133.51 30,341.85 12,872.21 NEW 13,791.66 P220000230 2021 RAM 2500 TRUCK PICKUP 2021-05-24 44,133.51 31,261.30 NEW 12,872.21 P220000231 . 2021 RAM 2500 TRUCK PICKUP P220000232 2021 RAM 2500 TRUCK PICKUP 2021-05-27 44,133.51 31,261.30 NEW 12,872.21 NEW P220000233 2021 RAM 2500 TRUCK PICKUP 2021-07-13 2021-06-17 44,133.51 30,341.85 13,791.66 NEW P220000234 2021 RAM 2500 TRUCK PICKUP 2021-05-24 44,133.51 44,133.51 31.261.30 12,872.21 NEW P220000235 2021 RAM 2500 TRUCK PICKUP 2021-05-27 44,133.51 31,261.30 12,872.21 NEW P220000236 2021 RAM 2500 TRUCK PICKUP 2021-06-28 44,133.51 31,261.30 31,261.30 12,872.21 NEW P220000237 2021 RAM 2500 TRUCK PICKUP 2021-06-23 44,133.51 30,341.85 12,872.21 NEW P220000238 2021 RAM 2500 TRUCK PICKUP 2021-00-17 44,133.51 30,341.85 13,791.66 P220000239 2021 RAM 2500 TRUCK PICKUP 2021-06-17 44,133.51 30,341.85 13,791.66 NEW P220000240 2021 RAM 2500 TRUCK PICKUP 2021-05 27 44,133.51 31,261.30 13,791.66 NEW P220000241 2021 RAM 2500 TRUCK PICKUP P220000242 2021 RAM 2500 TRUCK PICKUP 2021-05-27 44,133.51 31,261.30 12,872.21 NEW 12,872.21 NEW P220000243 2021 RAM 2500 TRUCK PICKUP 2021-05-24 2021-05-27 44,133.51 31,261.30 12,872.21 NEW P220000244 2021 RAM 2500 TRUCK PICKUP 2021-06 23 44,133.51 44,133.51 31,261.30 12,872.21 NEW P220000245 2021 RAM 2500 TRUCK PICKUP 2021-05-27 44,133.51 30,341.85 31,261.30 13,791.66 NEW 12.872.21 SPRAY00001 2021 INTEGRAL DX IDX20000 SPRAY SYSTEM W/AP10-30 2022-01 20 365,789.00 198,135.60 NEW WRKT300007 2021 CATERPILLAR H110ES-312 2000FT LB BREAKER (315) 2021-09-28 41,302.00 25,813.80 167.653.40 NEW WRKT300008 2021 CATERPILLAR H110ES-312 2000FT--LB BREAKER (315) 2021-09-28 41,302.00 15,488.20 NEW WRKT300009 2021 CATERPILLAR H110ES-312 2000FT LB BREAKER (315) 2021-09-28 41,302.00 25,813.80 25,813.80 15,488.20 NEW WRKT300010 2021 CATERPILLAR H110ES-3122000FT-LB BREAKER (315) 2021-09-28 41,302.00 25,813.80 15,488.20 D035000016 2022 CATERPILLAR CB1.7 35" VIBRATORY COMPACTOR 2022-04-28 29,706.50 14.234.47 15,488.20 NEW OD35000017 2022 CATERPILLAR C131.7 35" VIBRATORY COMPACTOR 2022-04-28 29,706.50 14,234.47 15,472.03 NEW DD35000018 2022 CATERPILLAR C131.7 35" VIBRATORY COMPACTOR 2022-08-26 31,488.36 12,464.19 15,472.03 NEW JT40000084 2021 CHEVROLET4500 UTILITYTRUCK 2022-04-01 79,118.15 39,558.96 19,024.17 NEW SPRAY00002 2021 INTEGRAL DX IDX20000 SPRAY SYSTEM W/AP10-57 2022-06-08 395,872.00 181,441.26 39,559.19 NEW 214,430.74 SPRAY00003 2021 INTEGRAL DX IOX20000 SPRAY SYSTEM W/AP10-62 2022-06-08 395,872.00 181,441.26 NEW 214,430.74 DD35000020 2023 CATERPILLAR CS1.7 35" VIBRATORY COMPACTOR 2023-04 21 33,464.25 7,668.87 NEW DD35000021 2023 CATERPILLAR CB1.7 35" VIBRATORY COMPACTOR 2023-04-21 33,464.25 7,668.87 25,795.38 NEW DD48000027 2023 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2023-04-21 59,225.64 13,572.79 25,795.38 NEW DD48000028 2023 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2023-04-21 59,226.64 13,572.79 45,653.85 NEW DD48000029 2023 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2023-05-10 60,888.35 13,953.61 45,653.85 NEW D048000030 2023 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2023-05-10 60,888.35 13,953.61 46,934.74 NEW DD48000031 2023 CATERPILLAR CB2.7 48" VIBRATORY COMPACTOR 2023-05-10 60,888.35 13,953.61 46,934.74 NEW JT30000043 2022 RAM 3500 SRW TRUCK UTILITY SERVICE 4WD 2023-11-22 66,916.46 3,559.70 46,934.74 NEW JT30000044 2022 RAM 3500 SRW TRUCK UTILITY SERVICE 4WD 2023-11-27 65,114.46 5.426.20 63,356.76 NEW 59,688.26 JT40000085 2023 RAM 4500 UTILITY TRUCK JT40000086 2023 RAM 4500 UTILITY TRUCK 2023-06-14 84,190.83 17,539.80 NEW 66,651.03 NEW JT40000087 2023 RAM 4500 UTILITY TRUCK 2023-05-15 2023-06-05 84,191.89 19,294.00 64,897.89 NEW JT40000088 2023 RAM 4500 UTILITY TRUCK 2023-07-20 84,190.83 84,190.83 173539.80 66.651.03 NEW JT40000089 2023 RAM 4500 UTILITY TRUCK JT40000090 2022 CHEVROLET 4500 UTILITY TRUCK 2023-08-05 84,190.83 14,031.84 17,539.80 70,158.99 NEW 66,651.03 NEW JT40000096 2023 CHEVROLET 4500 UTILITY TRUCK 2023-04-01 2024-02-23 86,901.30 21,725.28 65,176.02 NEW JT40000097 2023 CHEVROLET 4500 UTILITY TRUCK 2024-02-23 92,216.75 92.216.75 1.921.18 90,295.57 NEW P140000009 2023 CHEVROLET 1500 PICKUP TRUCK 4X4 2023-04-12 60,199.17 1,921.18 90.296.57 NEW P140000010 2023 CHEVROLET 1500 PICKUP TRUCK 4X4 2023-04-12 60,199.17 15.049.80 15,049.80 45,149.37 NEW P140000011 2023 CHEVROLET 1500 PICKUP TRUCK 4X4 P140000012 2023 CHEVROLET 1600 PICKUP TRUCK 4X4 2023-04-01 58,792.12 14,698.08 45,149.37 NEW 44.094.04 NEW P140000013 2023 CHEVROLET 1500 PICKUP TRUCK 4X4 2023-04-01 2023-04-01 58,792.12 14.698.08 44,094.04 NEW P140000014 2023 CHEVROLET 1500 PICKUP TRUCK 4X4 2023-04-01 58,792.12 14,698.08 44,094.04 NEW P140000015 2023 CHEVROLET 1500 PICKUP TRUCK 4X4 2023-04-01 58.792.12 14,698.08 44,094.04 NEW P140000016 2023 CHEVROLET 1500 PICKUP TRUCK 4X4 2023-04-01 58,792.12 58,792.12 14,698.08 44,094.04 NEW P140000017 2023 CHEVROLET 1500 PICKUP TRUCK 4X4 2023-04-01 58,792.12 14,698.08 143698.08 44,094.04 NEW P140000018 2023 CHEVROLET 1600 PICKUP TRUCK 4X4 2023-04-01 59,771.17 44.094.04 NEW P140000019 2022 CHEVROLET 1500 PICKUP TRUCK 4X4 2023-04-01 49,729.35 14,942.76 12,432.36 44,828.41 NEW P140000020 2022 CHEVROLET 1500 PICKUP TRUCK 4X4 2023-04-01 60,312.50 12,578.16 37,296.99 NEW P140000021 2023 CHEVROLET 1500 PICKUP TRUCK 4X4 P220000250 2024 RAM 2500 TRUCK PICKUP 2023-04-01 55,427.65 13,856.88 37,734.34 NEW 41.570.77 NEW P220000251 2024 RAM 2500 TRUCK PICKUP 2023-12-04 2024-01-25 57,024.60 2,376.02 54,848.58 NEW P220000253 2024 RAM 2500 TRUCK PICKUP 2023-10-23 57.065.80 57,024.60 2,377.74 54,688.06 NEW P220000255 2024 RAM 2500 TRUCK PICKUP 2023-10-09 57,024.60 6,308.13 7,618.32 50,716.47 NEW 49,406.28 P220000256 2024 RAM 2500 TRUCK PICKUP P220000258 2024 RAM 2500 TRUCK PICKUP 2024-01-25 57,065.80 2,377.74 NEW 54,688.06 NEW P220000260 2024 RAM 2500 TRUCK PICKUP 2024-01-25 2023-10-23 57,065.80 2,377.74 54.688.06 NEW P220000261 2024 RAM 2500 TRUCK PICKUP 2023-10-23 57,024.60 57.024.60 6,308.13 50,716.47 NEW P220000263 2024 RAM 2500 TRUCK PICKUP 2023-10-23 57,024.60 6,308A3 50,716.47 NEW P220000264 2024 RAM 2500 TRUCK PICKUP 2023-10-23 57,024.60 6,308.13 50,716.47 NEW P220000266 2024 RAM 2500 TRUCK PICKUP 2023-10-23 57,024.60 6,308.13 50,716.47 NEW P220000267 2024 RAM 2500 TRUCK PICKUP 2023-10-23 57,024.60 6,308A3 60,716.47 NEW P220000268 2024 RAM 2500 TRUCK PICKUP P220000269 2024 RAM 2500 TRUCK PICKUP 2023-10-23 57,024.60 6,308A3 6,308A3 50.716.47 NEW 60,716.47 NEW P220000271 2024 RAM 2500 TRUCK PICKUP 2023-10-23 2023-10-23 57,024.60 57,024.60 6,30BA3 50,716.47 NEW DT10000002 1997 INTERNATIONAL 4700 SINGLE AXLE FLATBED DUMP TRUCK 2001-05-01 16,735.33 8,308.13 50.716.47 NEW DT10000004 1997 INTERNATIONAL 4700 SINGLE AXLE FLATBED DUMP TRUCK 2001-05-01 12,751.33 3,984.00 NEW DT10000005 1997 INTERNATIONAL 4700 FLATBED SINGLE AXLE DUMP TRUCK 1996-07-15 18.011.82 14.027.82 3,984.00 NEW DT10000006 1996 INTERNATIONAL 4700 SINGLE AXLE FLATBED DUMP TRUCK 1999-08-02 8,963.49 8.067.14 896.35 NEW DT10000007 1999 KENWORTH T300 SINGLE AXLE FLATBED DUMP TRUCK 2004-02-09 313823.66 28,223.66 3,600.00 NEW DT10000008 1999 KENWORTH T300 SINGLE AXLE FLATBED DUMP TRUCK 2004-02-09 15,900.00 9,929.10 5,970.90 NEW 17,911.80 11,940.90 5,970.90 NEW 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 30 30 72 36 DTIOOOD009 2004 KENWORTH T300 SINGLE AXLE FLATBED DUMP TRUCK DT10000010 2005 KENWORTH T300 SINGLE AXLE FLATBED DUMP TRUCK 2004.06-21 59,855.02 53,869.52 5,985.50 NEW 72 DT10000011 2005 KENWORTH T300 SINGLE AXLE FLATBED DUMP TRUCK 2010.03-31 2010-03-31 21,762.38 13,775.18 7,987.20 NEW 24 DTIOG00013 2008 KENWORTH T300 SINGLE AXLE FLATBED DUMP TRUCK 2012-06-03 20,571.77 24,164.56 13,025.04 7,546.73 NEW 24 DTIOO00014 2008 KENWORTH T300 SINGLE AXLE FLATBED DUMP TRUCK 2012-06-03 24,164.56 21,748.10 2,416.46 NEW 24 DTICO00015 2008 KENWORTH T300 SINGLE AXLE FLATBED DUMP TRUCK 2012-06-03 23,938.72 21,748.10 2,416.46 NEW 24 DTIOG00016 2010 KENWORTH T370 SINGLE AXLE FLATBED DUMP TRUCK 2013.09-30 34,153.14 21,544.85 2,393.87 NEW 24 DTIOOOOO17 2011 KENWORTH T370 SINGLE AXLE FLATBED DUMP TRUCK 2010-03-25 31,722.83 30,737.83 3,415.31 NEW 16 DT10000018 2021 KENWORTH T370 SINGLE AXLE FLATBED DUMP TRUCK 2020-07-16 137,904.34 31.722.83 75,647.20 36 DTIOCO0019 2021 KENWORTH T370 SINGLE AXLE FLATBED DUMP TRUCK 2020-07-15 137,904.34 75,847.20 62,057.14 NEW 62,057.14 72 DT10000020 2021 KENWORTH T370 SINGLE AXLE FLATBED DUMP TRUCK 2020-07-15 137,904.34 75,847.20 NEW 62,057.14 72 DTI0000021 2021 KENWORTH T370 SINGLE AXLE FLATBED DUMP TRUCK 2020-07-15 137,904.34 75,847.20 NEW 62,057.14 72 DT10000022 2021 KENWORTH T370 SINGLE AXLE FLATBED DUMP TRUCK 2020-07-15 137,904.34 75,84720 NEW 62,057.14 72 DTIGO00023 2021 KENWORTH T370 SINGLE AXLE FLATBED DUMP TRUCK 2020-07-16 137,904.34 75,847.20 NEW 62.057.14 72 F1310000001 1998 INTERNATIONAL 4700 SINGLE AXLE FLATBED TRUCK 1997-06-09 42,694.54 38,425,09 NEW 4,269.45 NEW 72 F610000002 1991 FORD F800 SINGLE AXLE FLATBED TRUCK FBS1000001 1997 INTERNATIONAL 4700 SINGLE AXLE FLATBED SERVICE TRU, 2006-04-01 2001-05-01 8,480.00 7,632.00 848.00 USED 72 36 FBSICO0002 1998 KENWORTH T300 SINGLE AXLE FLATBED SERVICE TRUCK 2002-12-02 17,902.41 13,942.41 3,960.00 NEW 30 FBSW200001 2006 FREIGHTLINER M2106 FLATBED SERVICE TANDEM AXLE TRI 2010-03-31 20,840.42 15,303.42 5,537.00 NEW 24 FBSW200002 2009 KENWORTH T370 FLATBED SERVICE TANDEM AXLE TRUCK 2013.02-05 24,146.07 15,204.81 8,941.26 NEW 24 FRM1000001 2007 KENWORTH T300 FORM TRUCK 2010.03-15 23,015.57 18,187.71 20,714.01 2,301.56 NEW 36 FTH1000001 2019 CATERPILLAR TL1055D FORKLIFT TELEHANDLER 2021-01 27 179,095.95 11,932.71 82,831.90 6,255.00 NEW 96,264.05 36 JT30000038 2013 FORD F350 UTILITY SERVICE TRUCK SRW 2017-12-15 20,333,39 2D,333.39 NEW 72 JT30000040 2015 RAM 3500 TRUCK UTILITY SERVICE SRW 2017-12-15 22,844.97 22,844.97 - NEW 24 MST0000011 2013 HIND 268A SERVICE TRUCK 2017-12-15 48,278.98 48,278,98 - NEW NEW 42 MST0000012 2013 HINO 268A SERVICE TRUCK 2017-12-15 48,278,98 48,278.98 NEW 18 MSTOODOO13 2013 HINO 268A SERVICE TRUCK 2017-12-15 48,278,98 48,278.98 - NEW 18 MSTOC00014 2016 HINO 268A SERVICE TRUCK MSTOOOOO15 2015 HINO 268A SERVICE TRUCK 2019-10-07 54,499.08 49,049,17 - 5,449.91 USED 18 24 MSTOODOO16 2015 HINO 268A SERVICE TRUCK 2019-10-07 2019-10-07 54,499.08 54,499.06 49,049.17 5,449.91 NEW 24 MST0000018 2019 HINO 268A-19 SERVICE TRUCK 2018-05-18 154,514.42 49,049,17 140,590.53 53449.91 NEW 13,923.89 NEW 24 MSTOD00019 2019 HINO 268A-19 SERVICE TRUCK MST0000020 2019 HINO 268A-19 SERVICE TRUCK 2018-05-18 154,514.42 140,590.53 13,923.89 NEW 72 72 MST0000021 2019 HINO 338 TRUCK LURE 2018-05-18 2018-05-11 154,514.42 152,988.60 140,590.53 13,923.89 NEW 72 TCA0000001 1996 INTERNATIONAL 4700 CRASH ATTENUATOR TRUCK 2001-05-01 16,735.33 139,202.36 12,751.33 13,786.24 NEW 72 TCA0000002 1997 INTERNATIONAL 4700 CRASH ATTENUATOR TRUCK 2001-OS-0i 16,735.33 12,751.33 3.984.00 NEW 3,984.00 30 TORL000002 2019 FORD F550 4X4 DRILL TRUCK TFW2000003 2006 FREIGHTLINER M2106 TANDEM AXLE TRUCK + WATER & FUI 2021-02-23 2010-03-31 53,393.00 24,694.17 NEW 28,698.83 NEW 30 72 TKMS000001 1965 FORD C7529 TRUCK DRYER JET 2006-04-01 25,761.39 25,761.39 15,204.81 15.204.81 10,556.58 NEW 24 F810000004 2017 FORD F.S50 SINGLE AXLE FLATBED TRUCK MST0000022 2022 RAM 5500 SERVICE TRUCK 2021-06-28 38,405.65 16,322.35 22.083.27 USED 36 72 MST0000023 2022 RAM 5500 SERVICE TRUCK 2022-05-12 2022-05-10 157,356.34 157,356.34 157,356.34 45,239.85 112,116.49 NEW 72 AD30000001 2012 KOMATSU HM300-3 TRUCK DUMP ARTICULATED 30 TON 2016-07-01 00 45,239.85 112,116.49 NEW 72 APOfi0D0001 2014 CATERPILLAR AP255E PAVER ASPHALT TRACK 2018-04-19 34,023.08 225,000,00 34,023.09 25,000.00 USED 72 AP08000003 2014 CATERPILLAR AP555E PAVER ASPHALT 8'TRACK 2020-07 29 85,478.40 85,478.40 (0.01) USED 46 AP08000004 2014 CATERPILLAR AP555E PAVER ASPHALT 8' TRACK 2020-07-29 85,478.40 85,478.40 _ NEW 36 APOS000005 2015 CATERPILLAR AP555E PAVER ASPHALT 8' TRACK 2020-07-29 104,955.90 104,955.90 NEW 36 AP08000006 2015 CATERPILLAR AP555E PAVER ASPHALT 8' TRACK 2020-07-29 104,955.90 104,955.90 _ NEW 36 AP08000007 2015 CATERPILLAR AP555E PAVER ASPHALT 8' TRACK 2016-03-25 94.860.00 94,860.00 NEW 96 AP08000008 2015CATERPILLAR AP555EPAVER ASPHALT 8'TRACK 2016-03-25 94.860.00 94,860.00 NEW 36 AP08000010 2017 WEILER P3858 PAVER ASPHALT 8' TRACK AP10000004 2005 SLAW KNOX PF5510 PAVER ASPHALT 10' TRACK- REBUILD 2017-08-03 2005-06-16 52,404.15 43,670.40 - NEW 8,733.75 NEW 36 96 APIOOOOO12 2013 CATERPILLAR AP1055E PAVER ASPHALT 10' TRACK 2017-12-15 332,018.99 147,561.81 332.018.99 147,561.82 - NEW 96 APIOOOOO13 2013 CATERPILLAR AP1 055E PAVER ASPHALT I O'TRACK 2017-12-15 147,212.99 147,213.00 (0.01) NEW (O.Oi) NEW 24 AP10000020 2015 VOGELE 5200-21 PAVER ASPHALT 10' TRACK AP10000024 2016 CATERPILLAR AP1055F PAVER ASPHALT 10'TRACK 2015-04-01 420,980.00 378,882.01 42,097.99 NEW 24 96 AP10000025 2016 CATERPILLAR API 055F PAVER ASPHALT I O'TRACK 2021-03-25 2016-0325 114,240.00 121,094.40 114,240.00 NEW 36 AP10000026 2016 CATERPILLAR AP1055F PAVER ASPHALT I O' TRACK 2016-03-25 114.240.00 121,094.40 114,240,00 _ 36 APi0000043 2005 SLAW KNOX PF5510 PAVER ASPHALT IO' TRACK 2009-03-17 125.000.00 125,000.00 NEW 36 APC0000001 1994 PAVER ASPHALT CURB ATT7713 ATTACHMENT BED WATERIFUEL 2006-04-01 1,000.00 900.00 USED 100.00 USED 46 36 BL15000001 2015 CATERPILLAR 42OFS LOADER BACKHOE 2008-04-19 2018-04-19 55.704.62 51,039.15 55,704.62 51,039.16 - NEW BLISO00002 2015 CATERPILLAR 420FS LOADER BACKHOE BLI5000003 2018-04-19 51,073.93 51,073.94 (0.01) USED (0.01) USED 72 2017 CATERPILLAR 420F28T LOADER BACKHOE 2018-04-19 30,529.85 26,095.92 4,433.93 USED 72 BL15000004 2018 CATERPILLAR 420172 LOADER BACKHOE 2019-08-30 5,500.00 5,500.00 NEW 84 BL15000005 2018 CATERPILLAR 4201`2 LOADER BACKHOE 2019-12-19 24,175.26 24,175.26 - NEW 36 BM60000001 JLG 60HA 60' BOOM LIFT C185000003 SULLAIR 185 AIR COMPRESSOR 2016-07-01 4,393.00 3,953.70 439.30 USED p 12 C185000005 1986 INGERSOLL RAND 185 AIR COMPRESSOR 2000-04-01 2006-04-01 2.300.00 1,000.00 2,100.00 200.00 USED 12 CBRK000001 2002 ARROW HJ1350 CONCRETE BREAKER 2002-02-25 41,825.75 1,000.00 37,943.37 - USED 3,882.38 NEW 36 CBRK000002 2002 ARROW HJ1350 CONCRETE BREAKER CRBOOO0008 2017 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVE 2002-04-26 2017-04-01 58,275.00 52,447.50 5,827.50 NEW 96 96 ORB0000009 2018 POWER CURBER 5700-CMAX CURB & GUTTER CONCRETE F 2018-04-01 339,551.66 463,440.54 297,108.00 347,580.72 42,443.66 NEW 96 CRB0000010 2019 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVE 2019-04-01 345.524.40 215,952.60 115,859.82 NEW 96 CRB0000011 2020 POWER CURBER 5700-D CURB & GUTTER CONCRETE PAVE 2020-03-16 343.170.40 171,585.12 129,571.80 NEW 171,585.28 96 CRBOOOOO13 2021 POWER CURBER 5700-D CURB & GUTTER CONCRETE PAVE 2021-02-11 339.264.90 130,758.37 NEW 208,506.53 NEW 96 CSPOO00002 2006 ETNYRE 10-20 SPREADER CHIP 2018-04-01 108,123.50 108,123.50 - USED 96 CST3000001 1987 HYSTER C330A STATIC COMPACTOR CST3000002 1987 HYSTER C330A STATIC COMPACTOR 1987-12-10 29,744.00 26,769.60 2,974AO NEW 48 96 CST3000003 1988 HYSTER C330B STATIC COMPACTOR 1987-i2A0 1988-08-23 29,744.00 28,860.00 26.769.60 25,974.00 2.974.40 NEW 96 CST3000004 1988 HYSTER C330B STATIC COMPACTOR 1988-08-23 28,860.00 25,974.00 2,886.00 NEW 2.886.00 NEW 96 CST3000005 HYSTER C3308 STATIC COMPACTOR 2009-04-30 3,000.00 3,000.00 - USED 96 CST3000006 HYSTER C330B STATIC COMPACTOR 2009-04-30 3,000.00 3,000,00 - USED 24 CST3000007 HYSTER C3308 STATIC COMPACTOR 2009-04-30 3,000.00 3,000.00 - USED 24 CST3000008 1998 SOMAG BW5AS STATIC COMPACTOR 2005-03-31 5,000.00 6,000.00 USED 24 CST3000009 1983 HYSTER C330A STATIC COMPACTOR CWKTi 10001 G & Z TC850 WATER SYSTEM ATTACHMENT BURLAP DRAG W/TC. 2005-03-31 2001-05-18 2,500.00 2.250.00 250.00 USED 24 12 CWKT300001 GOMACORETRACTABLE ATTACHMENT CONVEYOR W/SF2-04 1997-06-03 13,604.30 22,745.00 12.243.87 20.470.50 1,360.43 NEW 96 CWKT500003 2001 PAN HYDRAULIC VIBRATOR W/FIN-01 CWKT600003 PARAPET ATTACHMENT MOLD W/SF2-04 2001-06-14 3,591.31 3,232.18 2,274.60 NEW 359.13 NEW 96 48 D090000001 2016 CATERPILLAR D4K XL DOZER 2001-05-20 2016-04-28 22,415.00 12l,771.74 20,173.50 109,594.57 2,241.50 NEW 12,177.17 96 DOGOO00003 2018 CATERPILLAR D4K2 LGP DOZER 2020-04-01 19,148.92 19,148.92 NEW USED 96 D105000001 2013 CATERPILLAR D5K2 LGP DOZER D105000004 2008 CATERPILLAR D5K LGP DOZER 2017-12-15 45,651.61 41.086.45 4,565.16 NEW p 42 D105000005 2009 CATERPILLAR D5K LGP DOZER 2013-03-18 2013-03-18 70,860.00 83,580.00 63,774.00 75,222.00 7,086.00 USED 96 D105000006 2014 CATERPILLAR D5K2 LGP DOZER 2019-12-23 23,433.56 21,090.20 8,358.00 USED 2,343.36 NEW 96 D105000007 2016 CATERPILLAR D5K2 LGP DOZER DIOSO00008 2016 CATERPILLAR DSK2 LGP DOZER 2017-04-01 106,713.64 96,042.28 10A71.36 USED 36 84 84 D105000009 2016 CATERPILLAR D5K2 LGP DOZER 2017-04-01 2017-04-01 103,010.60 102,941.29 92,709.54 10.301.06 USED 84 D105000010 2016 CATERPILLAR D5K2 LGP DOZER 2017-04-01 109,873.34 92,647.16 98,886.01 10.294.13 USED 10,987.33 USED 84 D105000011 2016 CATERPILLAR D5K2 LGP DOZER /3105000012 2018 CATERPILLAR D5K2 LGP DOZER 2017-04-01 118,547.46 106,692.71 11,854.75 USED 84 84 D105000013 2015 CATERPILLAR D5K2 LGP DOZER 2020-04-01 2019-09-30 25,975.64 89,880.00 25,975.64 61,792.50 - USED 48 D130000001 2017 CATERPILLAR D6K2 LGP DOZER 2019-12-19 4,000.00 4,000.00 28,087.50 USED 72 D130000002 2019 CATERPILLAR 06K2 XL DOZER 2020-11-25 91,373.84 41,118.24 - USED 50,255.60 NEW a36 s D185000002 2015 CATERPILLAR D6N LGP DOZER 2015-06-17 219,27iJ3 219,271.13 - USED D225000001 2014 CATERPILLAR 06TXL DOZER D225000002 2014 CATERPILLAR D6TXL DOZER 2019-04-18 101,497.95 91,348A5 10,i49.80 NEW DC20000001 2001 KENWORTH T800 TANDEM TRACTOR 2019-12-23 2006-03-01 54,390.35 23.443.91 48,951.32 15,629.27 5.439.03 NEW DC20000002 2003 KENWORTH T800 TANDEM TRACTOR 2003.04-01 89,897.66 80,907.89 7,814.64 NEW 8,989.77 NEW DC20000003 2005 KENWORTH T800 TANDEM TRACTOR 2009-03-19 29,128.16 19,968.36 9,159.80 NEW DC20000004 2004 KENWORTH T800 TANDEM TRACTOR 2004-03-15 77.633.36 69,070.39 8,562.97 NEW DC20000005 2005 KENWORTH T800 TANDEM TRACTOR 2010-03-15 25,280.40 16,853.60 8,426.80 NEW DC20000006 2005 KENWORTH T800 TANDEM TRACTOR 2010-03-31 31,227.28 21,407.28 9,820.00 NEW DC20000007 2006 KENWORTH T800 TANDEM TRACTOR DC20000008 2007 KENWORTH T800 TANDEM TRACTOR 2010-03-31 31,227.28 21,407.28 9.820.00 NEW DC20000009 2005 KENWORTH T800 TANDEM TRACTOR 2010-03-31 2010-03-31 31,227.28 31,227.28 21,407.28 9,820.00 NEW DC20000010 2006 KENWORTH T800 TANDEM TRACTOR 2010-03-31 28,850.52 21,407.28 19,862.52 9,820.00 NEW 8,988.00 NEW DC20000011 2008 KENWORTH T800 TANDEM TRACTOR 2013-D4-01 18,356.40 16,520.76 1.835.64 NEW DC20000012 2008 KENWORTH T800 TANDEM TRACTOR 2013-04-01 18,356.40 16.520.76 1,835.64 NEW DC20000013 2008 KENWORTH T800 TANDEM TRACTOR 2013-04-01 22,978.68 20,680.81 2,297.87 NEW DC20000014 2009 KENWORTH T800 TANDEM TRACTOR 2013-02-05 34,862.53 31.376.28 3.486.25 NEW DC20000015 2009 KENWORTH T800 TANDEM TRACTOR 2013-02-05 31,542.60 28,388.34 3,154.26 NEW DC20000016 2009 KENWORTH T800 TANDEM TRACTOR 2013-02-05 29,527.51 26,574.76 2,952.75 NEW DC20000017 2009 KENWORTH T800 TANDEM TRACTOR 2013-02-05 27,595.80 24,836.22 2,759.58 NEW DC20000018 2010 KENWORTH T800 TANDEM TRACTOR DC20000019 2010 KENWORTH T800 TANDEM TRACTOR 2013-09-30 33,173.92 29,856.53 3,317.39 NEW DC20000020 2010 KENWORTH T800 TANDEM TRACTOR 2010-03-12 2010-03-12 28,191.90 28,191.90 28,191.90 28,191.90 NEW DC2000002i 2012 KENWORTH T800 TANDEM TRACTOR 2016-03-01 46,412.76 41,771.48 - NEW 4,641.28 NEW DC20000022 2016 CATERPILLAR CT660 TANDEM TRACTOR 2016-04-26 155,329.40 139,796.46 15,532.94 NEW DC20000023 2016 CATERPILLAR CT660 TANDEM TRACTOR 2016-04-26 155,329.40 139,796.46 15,532.94 NEW DC20000025 2015 CATERPILLAR CT660L TANDEM TRACTOR -GLIDER 2016-04-22 178,626.00 160,763.40 17,862.60 NEW OC20000026 2015 CATERPILLAR CT660L TANDEM TRACTOR -GLIDER 2016-04-22 178,626.00 160,763.40 17,862.60 NEW DC20000027 2015 CATERPILLAR CT660LTANDEM TRACTOR -GLIDER 2016-04-22 178,626.00 160,763.40 17,862.60 NEW DC20000028 2018 KENWORTH T880 TANDEM TRACTOR 2017-05-18 160,608.54 124,973.33 35.635.21 NEW DC20000029 1987 INTERNATIONAL F-9370 TANDEM TRACTOR 2006-94-01 5,830.00 5,247.00 583.00 USED DC20000030 1992 INTERNATIONAL 94008BA TANDEM TRACTOR 2006-04-01 13.780.00 13,780.00 USED DC20000031 1993 KENWORTH T800 TANDEM TRACTOR 2006-04-01 22,790.00 20,511.00 2,279.00 USED DC20000032 2001 KENWORTHT800 TANDEM TRACTOR 2006-04-01 63,600.00 57,240.00 6,360.00 USED DC20000033 2002 KENWORTH T800 TANDEM TRACTOR 2006-04-01 71,190.00 64,071.00 7,119.00 USED DC20000034 2002 KENWORTH T800 TANDEM TRACTOR 2006-04-01 71,550.00 64,395.00 7,155.00 USED DC20000035 2004 PETERBUILT359 TANDEM TRACTOR 2008-01-29 57,240.00 51,516.00 5,724.00 USED DC20000036 1991 KENWORTH W900 TANDEM TRACTOR 2009-03-i6 8,480.00 7,632.00 848.00 USED DC20000037 1999 MACK CL713 TANDEM TRACTOR 2009-03-16 8,480.00 7.632.00 848.00 USED DC20000038 1987 INTERNATIONAL F-9370 TANDEM TRACTOR 2005-03-31 3,312.50 2,981.25 331.25 USED OC20000039 2015 CATERPILLAR CT660L TANDEM TRACTOR 2016-03-01 171,877.16 154,689.44 17,187.72 NEW DC20000040 2015 CATERPILLAR CT660L TANDEM TRACTOR -GLIDER 2016-04-22 178,626.00 160,763.40 17,862.60 NEW DC20000043 2022 KENWORTH T880 TANDEM TRACTOR 2021-02-25 168,312.76 58,383.41 109,929.35 NEW DC20000044 2022 KENWORTH T880 TANDEM TRACTOR 2021-02-22 168.312.76 58,383.41 109,929.35 NEW DC20000045 2022 KENWORTH T880 TANDEM TRACTOR 2021-02-22 168,312.76 58,383.41 109,929.35 NEW DC30000001 2011 KENWORTH T800 TRIAXLE TRACTOR 2010-03-12 39,641.25 39,641.25 NEW DCW2000001 1997 INTERNATIONAL 9200 TANDEM TRACTOR + WATER 2001-05-01 23,150.89 16,020.77 7,130.12 NEW DCW2000002 1998 KENWORTH T6008 TANDEM TRACTOR + WATER 2002-06-03 34,281.78 32,881.78 1.400.00 NEW DCW2000003 1998 KENWORTHT800B TANDEM TRACTOR+ WATER 2002-06-03 34,281.78 25,732.78 8.549.00 NEW DCW2000004 1998 KENWORTH T800B TANDEM TRACTOR+ WATER 2002-06-03 34,281.7E 25,732.78 8,549.00 NEW DCW2000005 1999 KENWORTH T80013 TANDEM TRACTOR+ WATER 2004-02-16 21,066.47 10,597.10 10,469.37 NEW DCW3000001 1995 WHITE WH65T TRI AXLE TRACTOR+ WATER 1995-05-01 83,768.84 75,382.95 8,375.89 NEW DCW3000002 1996 KENWORTH T800 TRI AXLE TRACTOR+ WATER 2000-02-16 40,535.84 32,099.26 8,436.58 NEW DCW3000003 1996 KENWORTH T800 TRI AXLE TRACTOR+ WATER 2000-02-16 40,615.86 32,099.26 8,516.60 NEW DCW3000004 1996 KENWORTH T800 TRI AXLE TRACTOR+ WATER 2001-05-01 27,596.52 20,250.69 7,345.63 NEW DCW3000005 1996 KENWORTH T800 TRI AXLE TRACTOR + WATER 2001-05-01 27,912.88 20.250.89 7,661.99 NEW DCW3000006 2004 KENWORTH T800 TRI AXLE TRACTOR+ WATER 2004-03-i6 98.058.95 87.573.95 10,485.00 NEW DCW3000007 2006 KENWORTH T800 TRI AXLE TRACTOR+ WATER 2010-03-15 32,086.22 21.047.41 11,038.81 NEW DCW3000008 2010 KENWORTH T800 TRI AXLE TRACTOR+ WATER 2016-03-01 37,123.93 35,042.65 2,081.28 NEW DD48000001 2016 CATERPILLAR C8248 48" VIBRATORY COMPACTOR 2016-05-17 42,191 A8 37.972.06 4,219.12 NEW DD48000002 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016.05-17 42,589.21 38,330.29 4,258.92 NEW DD48000003 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016-05-17 42,589.21 38,330.29 4.258.92 NEW D048000004 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016-05-17 42,191.18 37,972.06 4.219.12 NEW DD48000005 2016 CATERPILLAR C824B 48" VIBRATORY COMPACTOR 2016-05-17 42,191.18 37,972.06 4,219.12 NEW D048000006 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016-05-17 42.589.21 38,330.29 4,258.92 NEW DD48000007 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016-05-23 42,191.18 37,972.06 4,219.12 NEW OD48000008 2016 CATERPILLAR C824B 48" VIBRATORY COMPACTOR 2016-05-23 42.191.18 37,972.06 4,219A2 NEW DD48000009 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016-05-23 42,191.18 37,972.06 4,219.12 NEW DD48000010 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016-05-23 42,191.18 37,972.06 4,219.12 NEW DD48000011 2016 CATERPILLAR CB248 48" VIBRATORY COMPACTOR 2016-05-23 42,589.21 38,330.29 4,258.92 NEW DD48000012 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016-05-17 42,191.18 37.972.06 4,219.12 NEW DD48000013 2016 CATERPILLAR C824B 48" VIBRATORY COMPACTOR 2016-05-17 42,191.18 37,972.06 4.219.12 NEW DD48000014 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016-05-23 42,589.21 38,330.29 4,258.92 NEW DD48000015 2016 CATERPILLAR C824B 48" VIBRATORY COMPACTOR 2016-05-23 42,191.18 37,972.06 4,219.12 NEW DD48000016 2016 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2016-05-23 42,191.18 37,972.06 4,219.12 NEW DD48000017 2017 CATERPILLAR CB24B 48" VIBRATORY COMPACTOR 2018-05-24 42,574.90 38,311.41 4,257.49 NEW DD48000018 2005 CATERPILLAR 224 48" VIBRATORY COMPACTOR 2009-03-16 15,800.00 15,800.00 USED DD51000001 2016 CATERPILLAR CB34B 51" VIBRATORY COMPACTOR 2016-04-29 56,168.34 50,551.51 5,616.83 NEW DD51000002 2016 CATERPILLAR CB34B 51"VIBRATORY COMPACTOR 2016-04-29 66,698.23 51,028.41 5,669.82 NEW DD51000003 2016 CATERPILLAR CB34B 51"VIBRATORY COMPACTOR 2016-04-29 56068.34 50,551.51 5,616.83 NEW DD51000004 2016 CATERPILLAR C834B 51" VIBRATORY COMPACTOR 2016-04-29 56,698.23 51,028.41 5,669.82 NEW DD51000005 2016 CATERPILLAR CB348 51" VIBRATORY COMPACTOR 2016-04-29 66,698.23 51,028.41 5,669.82 NEW DD51000006 2016 CATERPILLAR CB34B 51" VIBRATORY COMPACTOR 2016-04-29 56,698.23 51,028.41 5,669.82 NEW DD51000007 2016 CATERPILLAR CB34B 51"VIBRATORY COMPACTOR 2016-05-06 56,168.34 50,551.51 5,616.83 NEW D051000008 2016 CATERPILLAR CB34B 51"VIBRATORY COMPACTOR 2016-05-06 66,698.23 51.028.41 5,669.82 NEW DD51000009 2016 CATERPILLAR CB34B 51"VIBRATORY COMPACTOR 2016-05-06 56,698.23 51.028.41 5,669.82 NEW DD51000010 2016 CATERPILLAR CB34B 51"VIBRATORY COMPACTOR 2016-05-06 56,168.34 60,551.51 5,616.83 NEW DD51000011 2016 CATERPILLAR C834B 51"VIBRATORY COMPACTOR 2017-08-03 18,182.80 16,364.52 1,818.28 USED DD59000001 2018 CATERPILLAR C137 59" VIBRATORY COMPACTOR 2018-05-24 123,847.15 82.435.97 41.411.18 NEW DD59000002 2018 CATERPILLAR C137 59" VIBRATORY COMPACTOR 2018-07-17 123,847A5 80,113.83 43,733.32 NEW DD59000003 2018 CATERPILLAR 0137 59" VIBRATORY COMPACTOR 2018-07-17 123,847.15 80.113.83 43.733.32 NEW DDS9000004 2018 CATERPILLAR CB7 59" VIBRATORY COMPACTOR 2018-06-03 123,847.15 81,274.90 42,572.25 NEW DD59000005 2019 CATERPILLAR C137 59" VIBRATORY COMPACTOR 2019-05-24 123,847.15 67,342.06 56,505.09 NEW DD59000006 2020 CATERPILLAR CB7 59" VIBRATORY COMPACTOR 2020-11-25 101,147.36 37,930.40 63,216.96 NEW DD59000007 2020 CATERPILLAR CB7 59" VIBRATORY COMPACTOR 2020-11-25 102,101.69 38,288.00 63.813.59 NEW DD59000008 2020 CATERPILLAR CB7 59" VIBRATORY COMPACTOR 2020-11-25 102,101.59 38,288.00 63,813.59 D066000005 2018 CATERPILLAR CB10 67" VIBRATORY COMPACTOR 2019-08-30 21,924.60 21,924.60 NEW D066000006 2018 CATERPILLAR CB10 67" VIBRATORY COMPACTOR 2019-08-30 6,000.00 6,000.00 NEW DD78000005 2007 HAMM HD12OV 78" VIBRATORY COMPACTOR 2007-04-24 137.749.50 123,974.55 13,774.95 NEW DD78000006 2007 HAMM HD120V 78"VIBRATORY COMPACTOR 2007-04-25 137,749.50 123,974.55 13,774.95 NEW DD78000007 2008 CATERPILLAR CB534DXW 78" VIBRATORY COMPACTOR 2010-02-01 56,068.00 44.566.00 11,502.00 NEW DD78000020 2014 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-04-26 92,607.05 83,346.35 9,260.70 USED D078000021 2011 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-04-26 82,735.22 74,461.70 8.273.52 USED OD78000022 2015 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2017-08-03 19,897.85 14,923.20 4,974.65 USED D078000023 2010 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-04-26 49,480.71 44,532.64 4,948.07 USED 24 24 24 24 24 24 24 24 36 48 48 48 48 48 4a 48 48 48 48 48 48 96 DD78000024 2011 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-04-26 81,058.58 72,952.72 8,105.86 USED DD78000025 2014 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-04-26 79,705.46 71,734.91 7,970.55 USED DD78000026 2011 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-06-17 53,201.72 47,381.55 5,320.17 USED DD78000027 2015 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-05-12 144,749.60 128,917.85 15,831.75 NEW DD78000028 2015 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-05-12 143,396.80 127,712.65 15,684.15 NEW OD78000029 2015 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-05-12 144,749.60 128.917.85 15,831.75 NEW DD78000030 2015 CATERPILLAR C854XW 78" VIBRATORY COMPACTOR 2016-05-12 143,373.48 127,691.75 15,681.73 NEW DD78000031 2015 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2017-08-03 26,002.48 23,402.23 2,600.25 USED DD78000032 2015 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-05-12 144,749.60 128,917.85 15,831.75 NEW DD78000033 2015 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2016-05-12 144,749.60 128,917.85 15,831.75 NEW DD78000034 2015 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2017-08-03 22,547.55 20,292.80 2,254.75 USED OD78000035 2016 CATERPILLAR C864B 78" VIBRATORY COMPACTOR 2017-08-03 50,892.04 43,62140 7,270.44 USED DD78000036 2016 CATERPILLAR C864B 78" VIBRATORY COMPACTOR 2017-08-03 49,782.61 42,670.60 7,112.01 USED DD78000037 2014 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2018-04-19 1,274.08 1,274.08 - USED DD78000038 2014 CATERPILLAR CB54XW 78" VIBRATORY COMPACTOR 2018-04-19 21,148.84 21,148.84 - USED DD78000039 2017 CATERPILLAR CB64B 78" VIBRATORY COMPACTORR 2018-04-30 105,190.06 80,958.84 24,231.22 USED DD78000040 2017 CATERPILLAR CB64B 78" VIBRATORY COMPACTOR 2018-04-30 103,907.80 79,971.90 23,935.90 USED DD78000041 2017 CATERPILLAR CB64B 78" VIBRATORY COMPACTOR 2018-04-30 109,525.66 84,295.79 25,229.87 USED DD78000042 2017 CATERPILLAR CB643 78" VIBRATORY COMPACTOR 2018-04-30 143,648.86 i 10,558,19 33,090.67 USED D078000043 2017 CATERPILLAR CB64B 78" VIBRATORY COMPACTOR 2018-04-30 144,978.29 111,581.34 33,396.95 USED DD78000044 2017 CATERPILLAR CB64B 78" VIBRATORY COMPACTOR 2018-04-30 152,169.55 117,116.09 35,053.46 USED DD78000045 2017 CATERPILLAR CB64B 78" VIBRATORY COMPACTOR 2018-04-30 156,790.68 120,672.70 36,117.98 USED DD78000046 2017 CATERPILLAR C864B 78" VIBRATORY COMPACTOR 2018-04-30 153,568.85 118,192.98 35,375.87 USED DD78000047 2017 CATERPILLAR CB64B 78" VIBRATORY COMPACTOR 2018-04-30 158,529.53 122,011.03 36,518.50 USED DD78000048 2017 VOLVO DD120C 78" VIBRATORY COMPACTOR 2018-04-27 109,275.89 84,298.32 24,977.57 USED OD78000049 2017 VOLVO DD120C 78" VIBRATORY COMPACTOR 2018-04-27 109,296.22 84,314.16 24,982.06 USED DD78000050 2017 VOLVO DD120C 78" VIBRATORY COMPACTOR 2018-04-27 104,686.66 80,758.08 23,928.58 USED DD78000051 2017 VOLVO DD120C 78" VIBRATORY COMPACTOR 2018-04-27 108,989.13 84,077.28 24.911.85 USED D084000003 2015 CATERPILLAR CB64 84" VIBRATORY COMPACTOR 2018-04-19 16,735.07 16,735.07 - USED DD84000004 2015 CATERPILLAR CB64 "'VIBRATORY COMPACTOR 2018-04-19 39,651.14 39,651.14 - USED DD84000005 2013 HAMM HD140 84" VIBRATORY COMPACTOR 2018-04-30 15,762.05 15,762.05 - USED DD84000009 .2019 CATERPILLAR CB68B 84" VIBRATORY COMPACTOR 2020-11-25 134.618.16 50,482.00 84,136.16 DD84000010 2019 CATERPILLAR CB68B 84" VIBRATORY COMPACTOR 2020-11-25 116,074.72 43,528.00 72.546.72 NEW DD84000011 2019 CATERPILLAR CB16 84" VIBRATORY COMPACTOR 2020-11-25 125,421.26 47,032.80 78,388.46 NEW DDC5100001 2019 CATERPILLAR CC34B 51" VIER COMBO COMPACTOR 2019-10-04 58,392.04 52,552.84 5.839.20 NEW DIS1000002 1996 FORD F800 SINGLE AXLE DISTRIBUTOR TRUCK 2001-05-01 33,020.23 26,049.23 6,971.00 NEW DIS1000003 1996 FORD F800 SINGLE AXLE DISTRIBUTOR VRAM TRUCK 2001-05-01 33,020.23 26,049.23 63971.00 NEW DIS1000004 1996 FORD F800 SINGLE AXLE DISTRIBUTOR TRUCK 2001-05-01 33,333.94 26,362.94 6,971.00 NEW DIS1000006 1996 FORD F800 SINGLE AXLE DISTRIBUTOR TRUCK 2001-05-01 33,333.94 26,362.94 6,971.00 NEW DIS1000007 1996 FORD F800 SINGLE AXLE DISTRIBUTOR TRUCK 2001-05-01 33,020.23 26,049.23 6,971.00 NEW DIS1000008 1996 FORD F800 SINGLE AXLE DISTRIBUTOR TRUCK 2001-05-01 33,020.23 26.049.23 6,971.00 NEW DISi000009 1996 FORD F800 SINGLE AXLE DISTRIBUTOR TRUCK 2001-05-01 33,333.94 26,362.94 6,971.00 NEW DIS1000010 1996 FORD F800 SINGLE AXLE DISTRIBUTOR TRUCK 1997-09-03 37,592.40 29,727.90 7,864.50 NEW DIS10000i2 1998 FORD F800 SINGLE AXLE DISTRIBUTOR TRUCK 2001-07-02 41,179.61 33,529.61 7,650.00 NEW DIS1000013 1999 FREIGHTLINER FL70 SINGLE AXLE DISTRIBUTOR TRUCK 2004-02-09 21,200.00 13,100.00 8,100.00 NEW DIS1000014 2000 FREIGHTLINER FL70 SINGLE AXLE DISTRIBUTOR TRUCK 2005-02-01 31,361.44 22,561.44 8,800.00 NEW DISi000015 2001 FREIGHTLINER FL70 SINGLE AXLE DISTRIBUTOR TRUCK 2006-04-30 27,379.80 27,379.80 - NEW DISI DOOD16 2011 KENWORTH T370 SINGLE AXLE DISTRIBUTOR TRUCK 2010-03-25 44,375.36 44,375.36 - NEW DIS1000017 2012 KENWORTH T370 SINGLE AXLE DISTRIBUTOR TRUCK 2016-03-01 55,643.93 50,079.54 5,564.39 NEW DIS1000019 2002 KENWORTH T300 SINGLE AXLE DISTRIBUTOR TRUCK 2006-04-01 66,250.00 59,625.00 6,625.00 USED 0131000020 2005 INTERNATIONAL 7300 SFA SINGLE AXLE DISTRIBUTOR TRU(2009-03-16 63,600.00 57,240.00 6,360.00 USED DIS1000021 1999 FREIGHTLINER FL70 SINGLE AXLE DISTRIBUTOR TRUCK 2009-03-16 10,600.00 9,540.00 1,060.00 USED DISi000022 2003FREIGHTLINER, FL70SINGLE AXLE DISTRIBUTOR TRUCK 2009-03-16 31,800.00 28,620.00 3.180.00 USED DIS2000001 2008 KENWORTH T370 TANDEM AXLE DISTRIBUTOR TRUCK 2013-03-05 28,961.74 26,065.57 2,896.17 NEW DIS2000002 2008 KENWORTH T370 TANDEM AXLE DISTRIBUTOR TRUCK 2013-03-05 2B,961.74 26,065.57 2,896.17 NEW DIS2000003 2009 KENWORTH T370 TANDEM AXLE DISTRIBUTOR TRUCK 2013-09-30 28,292.80 25,463.60 2,829.20 NEW DIS2000004 2010 KENWORTH T370 TANDEM AXLE DISTRIBUTOR TRUCK 2013-09-30 55,711AS 50,140.32 5,571.14 NEW DIS2000005 2010 KENWORTH T370 TANDEM AXLE DISTRIBUTOR TRUCK 2013-09-30 56,237.04 50,613.34 5,623.70 NEW DIS2000006 2014 CATERPILLAR CT6603 TANDEM AXLE DISTRIBUTOR TRUCK 2017-12-27 115,031.25 103,419.61 11,611.64 NEW DIS2000007 2014 CATERPILLAR CT660S TANDEM AXLE DISTRIBUTOR TRUCK 2017-12-27 116,116.44 104,613.32 11,503.12 NEW DIS2000008 2018 KENWORTH T470 TANDEM AXLE DISTRIBUTOR TRUCK 2017-06-04 215,510A6 165,673.62 49,836.54 NEW DIS2000009 2018 KENWORTH T470 TANDEM AXLE DISTRIBUTOR TRUCK 2017-06-04 215,510.16 165.673.62 49,836.54 NEW DIS2000010 2018 KENWORTH T470 TANDEM AXLE DISTRIB UTOR TRUCK 2017-06-04 215,510.16 165.673.62 49,836.54 NEW DIS2000011 2019 KENWORTH T470 TANDEM AXLE DISTRIBUTOR TRUCK 2018-07-23 211,926.79 151,705.89 60,220.90 NEW DIS2000012 2019 KENWORTH T470 TANDEM AXLE DISTRIBUTOR TRUCK 2018-07-23 211,926.79 151,705.89 60,220.90 NEW DIS2000013 2020 KENWORTH T470 TANDEM AXLE DISTRIBUTOR TRUCK 2019-06-25 224,072.65 119,738.76 104,333.89 NEW DIS2000014 2020 KENWORTH T470 TANDEM AXLE DISTRIBUTOR TRUCK 2019-06-25 224,072.65 133,043A3 91.029.52 NEW DIS2000oi5 2021 KENWORTH T470 TANDEM AXLE DISTRIBUTOR TRUCK 2020-08-03 231,973.73 93.514.25 138,459.48 NEW DIS2000016 2021 KENWORTH T470 TANDEM AXLE DISTRIBUTOR TRUCK 2020-'08-03 230,102.39 92,760.03 137,342.36 NEW DTi0000012 2002 KENWORTH T300 SINGLE AXLE FLATBED DUMP TRUCK 2006-04-01 70,320.30 62,010.00 8,310.30 USED DT20000001 1998 KENWORTH T300 TANDEM AXLE DUMP TRUCK 2001-07-02 42,770.47 35,874.47 6,896.00 NEW DT20000003 1999 KENWORTH T300 TANDEM AXLE DUMP TRUCK 2004-02-09 22,396.75 15,119.85 7,276.90 NEW DT20000004 1998 FORD 8000 TANDEM AXLE DUMP TRUCK 2000-04-01 55,800.00 50,800.00 5,000.00 USED DT2o0000o5 1981 FORD L9000 TANDEM AXLE DUMP TRUCK 2015-05-02 10,500.00 10,500.00 - USED DT20000008 1986 INTERNATIONAL F-1954 TANDEM AXLE DUMP TRUCK 2006-04-01 5,300.00 4,770.00 530.00 USED DT20000009 1987 INTERNATIONAL F-1954 TANDEM AXLE DUMP TRUCK 2006-04-01 10,600.00 9,540.00 1.060.00 USED DT20000010 2002 KENWORTH T300 TANDEM AXLE DUMP TRUCK 2006-04-01 47,700.00 42,930.00 4,770.00 USED DT20000011 1999 STERLING L8513 TANDEM AXLE DUMP TRUCK 2006-04-01 45,050.00 40,545.00 4,505.00 USED DT20000014 1991 INTERNATIONAL 4900 TANDEM AXLE DUMP TRUCK 2005-03-31 7,089.28 6.380.35 708.93 USED DT200000i5 1993 INTERNATIONAL F-4900 TANDEM AXLE DUMP TRUCK 2005-03-31 8.149.28 7.334.35 814.93 USED DT30000001 2001 KENWORTH T800 TRI AXLE DUMP TRUCK 2005-02-01 40,908.91 29,768,91 i 1,140,00 NEW DT30000002 2001 KENWORTH T800 TRI AXLE DUMP TRUCK 2005-02-01 40.908.91 29,768.91 11,140.00 NEW DT30000003 2001 KENWORTH T800 TRI AXLE DUMP TRUCK 2005.02-01 40,908.91 29,768.91 11,140.00 NEW DT30000004 2008 KENWORTH T800 TRI AXLE DUMP TRUCK 2013-04-01 26.896.00 24,206.40 2,689.60 NEW DT30000005 2016 KENWORTH T880 TRI AXLE DUMP TRUCK 2015-08-29 164,600.00 148,140.00 16,460.00 NEW DT30000006 20i6 KENWORTH T800 TRI AXLE DUMP TRUCK 2015-08-29 167,900.00 151,1io,00 16.790.00 NEW DT30000007 20i6 KENWORTH T800 TRI AXLE DUMP TRUCK 2015-08-29 167,500.00 150,750.00 16,750.00 NEW DT30000008 2016 KENWORTH T800 TRI AXLE DUMP TRUCK 2015-08-29 168,150.00 151.335.00 16,815.00 NEW DT30000009 2016 KENWORTH T880 TRI AXLE DUMP TRUCK 2015-08-29 167,250.00 150,525.00 16,725.00 NEW DT30000010 2016 KENWORTH T880 TRI AXLE DUMP TRUCK 2015-08-29 167,762.00 150,965.80 16,776.20 NEW DT30000011 2016 KENWORTH T880 TRI AXLE DUMP TRUCK 2015-08-29 167,550.00 150,795.00 16,755.00 NEW DT30000012 2016 KENWORTH T880 TRI AXLE DUMP TRUCK 2015-08-29 167.400.00 150,660.00 16.740.00 NEW DT30000013 2013 CATERPILLAR CT660 TRI AXLE DUMP TRUCK 2016-04-26 120,548.40 108,493,56 12.054.84 USED DT30000014 2016 CATERPILLAR CT660 TRI AXLE DUMP TRUCK 2017-04-01 105,513.fi0 94,962.24 10,551.36 USED DT30000015 2017 CATERPILLAR CT660S TRI AXLE DUMP TRUCK 2017-04-01 163,531.64 128.781.24 34,750.40 NEW DT30000016 2017 CATERPILLAR CT660S TRI AXLE DUMP TRUCK 2017-04-01 163,531.64 128,781.24 34,750.40 NEW DT30000017 1994 FORD LT8000 TRI AXLE DUMP TRUCK 2006-04-01 26,500.00 23,850.00 2.650.00 USED DT40000001 2001 KENWORTH T800 QUAD AXLE DUMP TRUCK 2006-03-01 34,041.30 22,694.20 11,347A0 NEW DT40000002 2001 KENWORTH T800 QUAD AXLE DUMP TRUCK 2006-03-01 34,041.30 22,694.20 i 1,347.10 NEW DT40000003 2001 KENWORTH T800 QUAD AXLE DUMP TRUCK 2006-03-01 34,041.30 22.694.20 11.347.10 NEW DT40000004 2001 KENWORTH T800 QUAD AXLE DUMP TRUCK 2006.03-01 34,041.30 22.694.20 11,347.10 NEW DT40000005 2001 KENWORTH T800 QUAD AXLE DUMP TRUCK 2006-03-01 34,041.30 22.694.20 11,347.10 NEW DT40000006 2001 KENWORTH T800 QUAD AXLE DUMP TRUCK 2006-03-01 34,041.30 22,694.20 11,347.10 NEW DT40000007 2004 KENWORTH T800 QUAD AXLE DUMP TRUCK 2004-04-01 120,729.10 107,492.99 13,236.11 NEW DT40000008 2005 KENWORTH T800 QUAD AXLE DUMP TRUCK 2010.03-31 41,689.36 28,899.36 12.790.00 NEW DT40000009 2006 KENWORTH T800 QUAD AXLE DUMP TRUCK 2011-07-03 38,723.40 25,815AO 12,908.00 NEW DT40000010 2000 KENWORTH T800 QUAD AXLE DUMP TRUCK 2011-07-03 38,723.40 25,815.40 12,908.00 NEW DT40000011 2006 KENWORTH T800 QUAD AXLE DUMP TRUCK 2011-07-03 38,723AO 25,815.40 12,908.00 NEW DT40000012 2006 KENWORTH T800 QUAD AXLE DUMP TRUCK 2011-07-03 38,723.40 25,815.40 12,908.00 NEW DT40000013 2008 KENWORTH T800 QUAD AXLE DUMP TRUCK 2013-04-01 27,097.00 24,387.30 2,709.70 NEW DT40000014 2008 KENWORTH T800 QUAD AXLE DUMP TRUCK 2013-04-01 27,097.00 24,387.30 2,709.70 NEW DT40000015 2008 KENWORTH T800 QUAD AXLE DUMP TRUCK 2013-04-01 27,097.00 24,387.30 2.709.70 NEW DT40000016 2008 KENWORTH T800 QUAD AXLE DUMP TRUCK 2013-04-01 27,097.00 24,387.30 2,709.70 NEW DT40000017 2012 KENWORTH T800 QUAD AXLE DUMP TRUCK 2016-03-01 60,243.87 54,219.48 6,024.39 NEW DT40000018 2012 KENWORTH T800 QUAD AXLE DUMP TRUCK 2016-03-01 60,243.87 54,219.48 6,024.39 NEW DT40000019 2012 KENWORTH T800 QUAD AXLE DUMP TRUCK 2016-03-01 60,243.87 54,219.48 6,024.39 NEW DT40000020 2017 KENWORTH T880 QUAD AXLE DUMP TRUCK 2016-02-29 183,196.00 164.876.40 18,319.60 NEW DT40000021 2014 CATERPILLAR CT660 QUAD AXLE DUMP TRUCK 2018-04-01 90,950.00 90.950.00 USED DT40000022 2019 KENWORTH T880 QUAD AXLE DUMP TRUCK 2018-07 23 185,701.00 132.932.55 62,768.45 NEW EX08000001 2016 CATERPILLAR 308E2 8 METRIC TON EXCAVATOR 2017-04-01 85,392.25 76,853.03 8,539.22 USED EX08000002 2016 CATERPILLAR 308E2 TC 8 METRIC TON EXCAVATOR 2017-04-01 81,820.14 73,638.13 8,182.01 USED EX08000003 2020 CATERPILLAR 308CR-07A 8 METRIC TON EXCAVATOR 2020-11-25 102,617.48 383481.60 64,135.88 NEW EX08000004 2020 CATERPILLAR 308CR-07A 8 METRIC TON EXCAVATOR 2020-11-25 103,100.90 38,662.80 64,438A0 NEW EX08000005 2020 CATERPILLAR 308CR-07A 8 METRIC TON EXCAVATOR 2020-11-25 102,747.45 38,530.40 64,217.05 NEW EX13000001 2004 CATERPILLAR 312CL 13 METRIC TON EXCAVATOR 2005-03-31 85,000.00 76.500.00 8,500.00 USED EX15000001 2013 CATERPILLAR 314ELCR 15 METRIC TON EXCAVATOR 2013-09-27 185,071.94 185,071.94 USED EX15000002 2015 CATERPILLAR 314EL TC 15 METRIC TON EXCAVATOR 2018-04-27 59,397.86 59,397.86 USED EX23000001 2013 CATERPILLAR 320EL 23 METRIC TON EXCAVATOR 2016-08-01 106,623.27 95,960.94 10,662.33 NEW EX23000002 2013 CATERPILLAR 320ELRR 23 METRIC TON EXCAVATOR 2016-08-01 112,122.76 100,910.48 11,212.28 NEW EX23000003 2013 CATERPILLAR 320ELRR 23 METRIC TON EXCAVATOR 2016-08-01 104,493.47 94,044.12 10,449.35 NEW EX23000004 2014 CATERPILLAR 320ELRR 23 METRIC TON EXCAVATOR 2016-04-26 167.349.13 150,814.22 16,734.91 USED EX23000005 2014 CATERPILLAR 320ELRR 23 METRIC TON EXCAVATOR 2016-04-26 167,949.84 151,154.86 16,794.98 USED EX23000006 2016 CATERPILLAR 320ELRR 23 METRIC TON EXCAVATOR 2018-04-19 8,255.61 8,255.61 USED EX23000009 2017 CATERPILLAR 323FL 23 METRIC TON EXCAVATOR 2019-01-01 25,688.55 17,340.04 8,348.51 USED EX23000010 2019 CATERPILLAR 323-07B TO 23 METRIC TON EXCAVATOR 2020-11-25 133,564.49 50,086.80 83,477.69 NEW EX23000011 2019 CATERPILLAR 323-07B TC 23 METRIC TON EXCAVATOR 2020-11-25 138,275.08 51,853.20 86,421.88 NEW EX23000012 2019 CATERPILLAR 323-07B TC 23 TON EXCAVATOR 2020-11-25 138,175.13 51,815.60 86,359.53 NEW EX40000001 2013 CATERPILLAR 336EL 40 METRIC TON EXCAVATOR LONG RE 2016-08-01 152.777.96 137,500.16 15,277.80 NEW EX40000002 2013 CATERPILLAR 336EL 40 METRIC TON EXCAVATOR 2016-08-01 152,478.65 137,230.79 15,247.86 NEW EX40000003 2013 CATERPILLAR 336EL 40 METRIC TON EXCAVATOR 2016-08-01 152,495.15 137,245.64 15,249.51 NEW EX40000004 2014 CATERPILLAR 336EL 40 METRIC TON EXCAVATOR 2019-12-23 54,143.74 483729.37 6,414.37 NEW EX40000005 2014 CATERPILLAR 336EL 40 METRIC TON EXCAVATOR 2019-12-23 57,837.89 52,054.10 5,783.79 NEW EX40000006 2013 CATERPILLAR 336EL 40 METRIC TON EXCAVATOR 2016-02-01 210,148.00 189,133.20 21,014.80 USED EX40000010 2015 CATERPILLAR 328DLCR 40 METRIC TON EXCAVATOR W/ THL 2018-04-18 6,976.09 6,976.09 USED EX40000013 2018 CATERPILLAR 336F 40 METRIC TON EXCAVATOR 2019-01-01 77,015.14 51,985.08 25,030.06 USED EX40000014 2015 CATERPILLAR 328DLCR 40 METRIC TON EXCAVATOR 2020-03-05 175,000.00 157,500.00 17,500.00 USED EXBOOC0001 2013 CATERPILLAR 349EL 50 METRIC TON EXCAVATOR 2019-12-23 68,114.86 61,303.37 6,811 A9 NEW EXSOOO0002 2013 CATERPILLAR 349EL 50 METRIC TON EXCAVATOR 2019-12-23 79,418.40 71,476.56 7.941.84 NEW EX50000004 2019 CATERPILLAR 349FL 50 METRIC TON EXCAVATOR 2020-11-25 391,526.58 146,822.40 244,704A8 NEW EXSOOO0005 2019 CATERPILLAR 349FL 50 METRIC TON EXCAVATOR 2020-11-25 391,526.58 146,822.40 244,704.18 FIN0000001 1995 GOMACO C-450-X-72 DECK FINISHER 1995-04-26 36,870.75 33.182.95 3,687.80 NEW FINOO00002 2016 CMI BID -WELL 3600 DECK FINISHER 2016-03-29 168,888.44 168,888.44 - NEW FKL0000001 1984 ALLIS CHALMERS 706C FORKLIFT 1984-02-28 21,997.50 19.797.75 2,199.75 NEW FKL0000003 2002 CASE 586G FORKLIFT 2002-04-23 22,832.72 18,627.72 4,205.00 NEW FRK4000001 GEHL ATTACHMENT FORKS SKID STEER 2000-04-01 400.00 400.00 USED FUEL6606 FUEL TANKS W16578 DUMP TRK 2018-11-21 5.999.45 5,399.50 599.95 NEW GEN0000001 1976 CATERPILLAR 3304T GENERATOR 90 kW 1976-04-21 10,413.52 10,413.52 - NEW GEN0000002 1978 CATERPILLAR D363PGTA GENERATOR 1978-03-06 38,734.50 38,734.50 - NEW GEN0000005 CATERPILLAR 3406B GENERATOR 1995-07-29 15,000.00 13,500.00 1,500.00 USED HDG2000001 1987 TALBERT TDW-80K-HRG-RA-IT LOWBOY TRAILER 1987-05-28 40,415.58 36.374.02 4.041.56 NEW HDG2000002 1994 TALBERT TDW-30-HRG LOWBOY TRAILER 1996-07-15 6,249.49 5,624.54 624.95 NEW HDG2000003 1996 TALBERT TDW-30-HRG-1 T1-RP LOWBOY TRAILER 2001-05-01 15,137.14 11,533.14 3,604.00 NEW HDG2000004 1997 TALBERT TDW-30-HRG-1-T1-RP LOWBOY TRAILER 1997-04-10 37,667.55 33,900.79 3,766.76 NEW HOG2000005 1997 TALBERT TDW-30-HRG-1-T1-RP LOWBOY TRAILER 1997-04-10 37,667.55 33,900.79 3,766.76 NEW HDG2000006 1993 ROGERS CTWH40DSF22-67-R20 LOWBOY TRAILER 2006-04-01 19,080.00 17,172.00 1,908.00 USED HDG3000001 1991 TALBERT T30W40-HRG-R-1-T-1 LOWBOY TRAILER 1991-04-22 52,180.35 48,962.31 5,218.04 NEW HDG3000002 1995 TALBERT T3DW-30-HRG-1 Ti LOWBOY TRAILER 1995-05-19 49,234.98 48,458.76 776.22 NEW HDG3000003 1995 TALBERT T3DW-30-HRG-1 T1 LOWBOY TRAILER 1995-0549 10,296.02 9,266.42 1,029.60 NEW HDG3000004 1996 TALBERT T3DW40-HRG-RA-1 Ti LOWBOY TRAILER 2001-05-01 21.211.01 16,161.01 5,050.00 NEW HDG3000005 1996 TALBERT T3DW-50HRG-RA-1-T1 LOWBOY TRAILER 2001-05-01 21,211.01 16,161.01 6,050.00 NEW HDG3000006 1996TALBERT T3DW-30-HRG-1 Ti LOWBOY TRAILER 2001-05-01 18,298.76 13,982.76 4,316.00 NEW HDG3000007 1996 TALBERT T30W-30-HRG-1 Ti LOWBOY TRAILER 2001-05-01 18,298.76 13,982.76 4.316.00 NEW HDG3000008 2002TALBERT T3W-45-HRG-RA-1 Ti LOWBOY TRAILER 2007-04-18 17,022.22 11,348.14 5,674.08 NEW HDG3000009 2004TALBERT T3DW-45-HRG-RA-1-T1 LOWBOY TRAILER 2009-03-19 17.022.22 11,669.32 5,352.90 NEW HDG3000010 2005 ETNYRE RTN45TD3 LOWBOY TRAILER 2010-03-31 16,411.55 11,468.55 4,943.00 NEW HDG3000011 2009 ETNYRE RTN55 LOWBOY TRAILER 2009-04-01 24,012.41 24,012.41 - NEW HDG3000012 2010 ETNYRE RTN45TD3 LOWBOY TRAILER 2010-03-15 20,223.00 20.223.00 NEW HDG3000013 2016 TRAIL KING TK110 LOWBOY TRAILER 2015-08-04 82.607.73 74,346.96 8,260.77 NEW HDG3000014 2016 TRAIL KING TK110 LOWBOY TRAILER 20i5-OM4 82,607.73 74,346.96 8,260.77 NEW HDG3000015 2016 TRAIL KING TK110HOG LOWBOY TRAILER 2015-08-04 83,309.09 74,978.18 8,330.91 NEW HDG3000016 2008 TALBERT T4-DW-50SA-HR6 LOWBOY TRAILER 2015-09-01 44,520.00 40.068.00 4,452.00 USED HDG3000017 1997 TALBERT LOWBOY TRAILER 2005-03-31 14,906.78 13,416.10 1,490.68 USED HDG3000018 2017XLTRAILER XL110LOWBOY TRAILER 2019-08-03 81,616.15 44.378.70 37,237.45 USED HDG4000001 2001 TRAIL EZE LOWBOY TRAILER 2005-03-31 27,560.00 24,804.00 2,756.00 USED HEV0000001 2016 CATERPILLAR CT660L SBA TRUCK HYDROVAC 2018-02-01 360,025.80 250,673.40 109,352.40 USED HST2000001 2012 TRAIL KING TK70HT LOWBOY 2018-07-24 32.100.00 28,890.00 3,210.00 USED HST2000002 2012 TRAIL KING TK70HT LOWBOY 2018-07-24 32.100.00 28,920.00 3,180.00 USED MG20000001 1975 CATERPILLAR 120G GRADER 2005-03-31 16,875.00 15,187.50 1,687.50 USED MG40000002 2007 CATERPILLAR 140H GRADER 2007-04-01 252,346.78 227,112.10 25,234.68 NEW MG40000003 2014 CATERPILLAR 140M2 GRADER 2019-12-23 62,618.22 56,356.40 6,261.82 NEW MG40000004 2011 CATERPILLAR 160M AWD GRADER 2018-04-19 496.13 496.13 - USED MG40000005 1979 CATERPILLAR 140G GRADER MG40000006 1979 CATERPILLAR 14G GRADER 2006-04-01 40,000.00 36,000.00 4,000.00 USED MG40000007 1990 CATERPILLAR 140G GRADER 2005-03-31 2005-03-31 20,188.00 28,125.00 18,169.20 25,312.50 2,018.80 USED 2,812.50 MG40000008 1993 CATERPILLAR 140G GRADER 2005-03-31 .61,500.00 55,350.00 USED 6,150.00 USED MG40000009 2000 CATERPILLAR 16OH GRADER 2005-03-31 101,000.00 90,900.00 10,100.00 USED MG40000010 2016 CATERPILLAR 140M3 MOTOR GRADER 2020-04-01 50.834.59 50,834.59 - USED MJS0000005 2017CIMLINEMiDHASPHALT JOINT SEALER 2017-04-01 46,587.80 46,587.80 NEW MJS0000006 2017 CIMLINE MiDH ASPHALT JOINT SEALER 2017-04-01 46,587.80 46,587.80 - NEW MJS0000007 2019 CIMLINE M4DHP JOINT SEALER DW 2019-12-04 51.376.67 44,526.56 6,850.11 USED MM05000001 2001 WIRTGEN W500 MILLING MACHINE 2005-03-01 47,500.00 42,750.00 4.750.00 USED MST0000017 1998 FREIGHTLINER FL60 SERVICE TRUCK 2016.07-01 15,000.00 13,500.00 1,500.00 USED MTA0000001 2013 WEILER E2850 ASPHALTTRANSFER VEHICLE 2017-12-15 171.415.61 171.415.61 NEW MTA0000002 2011 WEILER E2850 ASPHALTTRANSFER VEHICLE 2017-1245 142,834.02 142,834.02 USED MTA0000003 2012 WEILER E2850 ASPHALT TRANSFER VEHICLE 2019-12-23 75,039.06 75,039.06 USED MTA0000004 2012 WEILER E2850 ASPHALT TRANSFER VEHICLE 2019-12-23 65,520.38 65,520.38 - USED MTA0000005 2015 WEILER E2850 ASPHALT TRANSFER VEHICLE 2015-04-08 519,680.31 519,680.31 NEW MTA0000006 2015 WEILER E2850 ASPHALT TRANSFER VEHICLE 2016-04 26 408,428A5 408,428.15 - NEW MTA0000008 2015 WEILER E2850 ASPHALT TRANSFER VEHICLE 2016-04-27 499,455.56 499,455.56 - NEW MTA0000009 2016 WEILER E2850 ASPHALT TRANSFER VEHICLE 2016-05-26 499,465.56 494,252.70 5,202.86 NEW 36 36 48 MTA0000010 2016 WEILER E2850 ASPHALT TRANSFER VEHICLE 2016-05-26 499,455.56 494,252.70 5,202.86 NEW MTA0000016 2019 WEILER E1650B ASPHALT TRANSFER VEHICLE 2020-11-25 212,880.98 88,700.40 124,180.58 NEW MTC0000001 1994 CMI MTP400CP CONCRETE TRANSFER VEHICLE 1994-08-09 199,660.00 179,694.00 19,966.00 NEW MTC0000002 1995 CMI MTP400CP CONCRETE TRANSFER VEHICLE 1995-04-21 243,376.79 230,072.37 13,304.42 NEW MTCOOD0003 1995 CMI MTP400CP CONCRETE TRANSFER VEHICLE 2001-11-05 85,746.92 66743.92 19,003.00 NEW MTC0000004 2011 GOMACO RTP-500 CONCRETE TRANSFER VEHICLE 2016-02-22 107,025.00 107:025.00 - NEW OD66000001 2019 CATERPILLAR CBI 66" VIBRATORY COMPACTOR OSCILL 2020-11 25 110,437.32 41.414.00 69,023.32 NEW OD66000002 2019 CATERPILLAR CB10 66" VIBRATORY COMPACTOR OSCILL 2020-11-25 111,450.55 41,794.00 69,656.55 NEW 0066000003 2015 CATERPILLAR C854B 66" VIBRATORY COMPACTOR OSCILL 2018-04-30 123,167,97 110,842.17 12,315.80 USED OD78000007 2015 HAMM HD1201VO 78" VIBRATORY COMPACTOR 2018-04-30 28,417.09 28,417.09 USED OD78000018 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2019-05-24 180,219.03 99,683.45 80,535.58 NEW OD78000019 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2019-05 24 180.219.03 99,683.45 80,535.58 NEW OD78000020 2019 CATERPILLAR C813 78" VIBRATORY COMPACTOR 2019-05-24 180,219.03 99,683.45 80,535.58 NEW OD78000021 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2019-05 24 180,219.03 99,683.45 80,535.58 NEW OD78000022 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2019-05-24 186,435.28 102,569.14 82,866A4 NEW OD78000023 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2019-05-24 185,435.28 102,569.14 82,866.14 NEW OD78000024 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR OSCILL 2019-05-24 185,435.28 102,569.14 82,866.14 NEW OD78000025 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR OSCILL 2019-05-24 185,435.28 102,569.14 82,866A4 NEW OD78000026 2019 CATERPILLAR CS13 78" VIBRATORY COMPACTOR OSCILL 2019-05-24 185,435.28 100,830.68 84,604.60 NEW OD78000027 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR OSCILL 2019-05-24 185,435.28 100,830.68 84,604.60 NEW OD84000001 2019 CATERPILLAR CBI 84" VIBRATORY COMPACTOR 202041 25 153,318.93 57,494.80 95,824.13 NEW OD84000002 2019 CATERPILLAR C816 84" VIBRATORY COMPACTOR OSCILL 2020-11-25 163,317.45 57,494.00 95,823.45 NEW PAC0000020 CRUSHER PIONEER PBF0000002 CONVEYOR BELT 1971-02-02 5,066.67 4.560.00 506.67 NEW PBS0000005 CONVEYOR WEIGH BELT 1978-02-17 1980-07-22 10,456.00 10,787.63 10,456.00 10,787.63 - NEW PCA0000017 CONVEYOR 1980-03-29 14,350.00 14,350.00 NEW - NEW PCA0000021 CONVEYOR BELT PCA0000022 CONVEYOR 1975-03-19 12,115.43 11,173.32 942.11 NEW PCA0000023 CONVEYOR 1978-08-31 1978-08-31 19,400.42 19,400.42 19,400.42 19,400.42 - NEW PCA0000036 CONVEYOR 1978-02-17 10,456.00 10,456.00 NEW - NEW PCA0000063 CONVEYOR PCCO000020 CONVEYOR 1975-03-28 15,485.23 14,281.08 1,204.15 NEW PCM0000018 COMPRESSOR AIR 185 1980-03-29 2017-06-21 14,350.00 13,684.60 14,350.00 12,384.60 NEW 1,300.00 USED PCR0000011 CRUSHER PF84000001 2012 CATERPILLAR CP56 84" PADFOOT SOIL COMPACTOR 1976-10-24 2017-12-15 13,000.00 59,387.82 13,000.00 NEW PF84000002 2013 CATERPILLAR CP56 U' PADFOOT SOIL COMPACTOR 201742-15 67,202.66 53,449.04 60,482.39 5,938.78 NEW 6,720.27 NEW PF84000003 2014 CATERPILLAR CP56 84" PADFOOT SOIL COMPACTOR 201942-23 30,766.91 27,690.22 3.076.69 USED PF84000004 1998 CATERPILLAR CP563C 84" PADFOOT SOIL COMPACTOR 2005.03-31 50,000.00 45,000.00 5.000.00 USED PN70000001 1999 CATERPILLAR P8300B PNUEMATIC COMPACTOR 2005-03-31 36,471.00 32,823.90 3,647.10 USED PN90000002 2013 CATERPILLAR PS150C PNUEMATIC COMPACTOR 2019-12-23 11,831.48 10,648.33 1,183.15 USED PN90000003 2013 CATERPILLAR PS150C PNUEMATIC COMPACTOR 2019-12-23 13,181.98 11,863.78 1,318.20 USED PN90000004 2006 CATERPILLAR PSI500 PNUEMATIC COMPACTOR 2017-08-03 689.26 689.26 USED PN90000005 2008 CATERPILLAR PS150 COMPACTOR PNE TIRED COMPACTOR 2018-04-19 5,595.50 5,595.50 USED PN90000007 1981 HYSTER C530 PNEUMATIC TIRED COMPACTOR 2005-03-31 4,375.00 3,937.50 437.50 USED PN90000008 1995 HYSTER C530A PNEUMATIC TIRED COMPACTOR 2005-03-31 9,375.00 8,437.50 937.50 USED PN90000009 1979 HYSTER C530A PNEUMATIC TIRED COMPACTOR 2005-03-31 3,750.00 3,375.00 375.00 USED PS20000003 1993 TOWN & COUNTRY PLACER SPREADER 2005-03-31 1393519.38 125,567.45 13.951.93 USED PS20000004 2011 GOMACO PS2600 PLACER SPREADER 2017-04-01 97,696.35 97,696.35 NEW PSC0000002 SCREW CONVEYOR 1979-03-02 34.500.00 34,500.00 - NEW PSS0000012 SCREEN AGGREGATE PWS0000006 WASHER EAGLE 1991-04-27 41,861.41 37,675.27 4,186.14 NEW PWS0000007 TANK CLASSIFYING 1974-09-13 1989-04-02 15,000.00 105,262.20 13,833.60 94,735.98 1,166.40 NEW RF45000001 2016 CATERPILLAR 770G TRUCK DUMP OFF ROAD 2020-11-10 265,000.00 101,859.58 10,526.22 NEW 163,140.42 USED RF45000002 2016 CATERPILLAR 770G TRUCK DUMP OFF ROAD 2020-11-10 265,000.00 101.859.58 163,140.42 USED RM00000001 2011 MAULDIN 413XTGRADER ROAD MAINTAINER 2017-04-01 21,859.32 19,673.39 2,185.93 USED SCR1100001 1989 CATERPILLAR 613C SCRAPER 2005.03-31 31,875.00 28,687.50 3,187.50 USED SD66000001 1996 HYPAC 820C 66" VIBRATORY SOIL COMPACTOR 2000-04-01 29,300.00 24,000.00 5,300.00 USED 8066000002 2001 CATERPILLAR C3433C 66" VIBRATORY SOIL COMPACTOR 2009-03-16 22,000.00 19.800.00 2,200.00 USED SD66000003 2001 CATERPILLAR CS433C 66" VIBRATORY SOIL COMPACTOR 2005-03-31 60,000.00 54,000.00 6,000.00 USED SD66000004 2016 CATERPILLAR CS44B 66" VIBRATORY SOIL COMPACTOR 2020-03-30 74,928.38 38.534.40 36,393.98 USED SD84000003 2014 CATERPILLAR CS56B W' SOIL COMPACTOR 2019-12-23 31,564.47 28,408.02 3,156.45 USED SD84000004 2015 CATERPILLAR CS56B 84" SOIL COMPACTOR 2018-04-19 27,286.21 24.557.59 2,728.62 USED SD84000005 2016 CATERPILLAR CS56B 84" SOIL COMPACTOR 2019-08-30 6,500.00 6,500.00 USED S084000006 2017 CATERPILLAR CS56B 84" SOIL COMPACTOR 2019-12-19 8,300.00 8,300.00 USED SD84000007 2015 CATERPILLAR C856B 84" SOIL COMPACTOR 2020-11-25 59,899.84 53,909.86 5,989.98 USED SF20000004 1996 GOMACO GP2000 2-TRACK SLIPFORM CONCRETE PAVER 2000-04-01 161,936.38 132.250.48 29,685.90 NEW SF40000001 2000 GOMACO COMMANDER III GT6300 4-TRACK CONCRETE PAV 2004-02-09 179,845.72 153,520.82 26,324.90 NEW SF40000002 2006 CMI TEREX SF2204B 4-TRACK CONCRETE PAVER 2012-11-15 103,057.40 103,057.40 NEW SF40000003 2010 GOMACO COMMANDER III GT6300 4-TRACK CONCRETE PAV 2010-06-04 200,189.23 200,189.23 NEW SKL0000001 1998 JCB 214S SKIP LOADER SKL0000002 1999 JCB 2148 SKIP LOADER 2000.04-01 35,200.00 30,200.00 5,000.00 USED SKL0000004 1986 DUMOR 724 SKIP LOADER 2006-04-01 2005-03-31 25,000.00 6,250.00 22,500.00 5,625.00 2,500.00 USED SKL0000005 1989 DUMOR 724 SKIP LOADER 2005-03-31 7,500.00 6.750.00 625.00 USED 750.00 USED SKL0000006 1989 DUMOR 724 SKIP LOADER 2005-03-31 7,500.00 6,750.00 750.00 USED SKL0000007 1990 DUMOR 724 SKIP LOADER SKL0000008 1989 DUMOR 724 SKIP LOADER 2005-03-31 7,500.00 6,750.00 750.00 USED SSL0000001 1993 GEHL 5625SX SKID STEER LOADER 2005-03-31 2000-04-01 7,500.00 7,800.00 6,750.00 6.800.00 750.00 USED 1,000.00 USED SSL0000006 2003 NEW HOLLAND LS180HF SKID STEER LOADER 2006-04-01 20,000.00 18,000.00 2.000.00 USED SSL0000007 2003 NEW HOLLAND L8180HF SKID STEER LOADER 2006-04-01 20,000.00 18,000.00 2.000.00 USED SSL0000008 2004 JCB 190 SKID STEER LOADER 2008-01-29 19,750.00 17,775.00 1,975.00 USED SWP0000001 1985 BROCE H15 BROOM SWP0000002 1995 ROSCO RB48 BROOM 2000-04-01 5,500.00 4,000.00 1,500.00 USED TC00000001 1991 CMI TC-250 CONCRETE TEXTURE CURE 2005-03-31 1991-04-26 5.000.00 56,713.68 4,500.00 51,042.31 500.00 USED 5,671.37 NEW TC00000002 2001 G & Z TC850 CONCRETE TEXTURE CURE 2006-03-14 70,615.16 49,461.36 21,153.80 NEW TC00000003 2004 G & Z TC850 CONCRETE TEXTURE CURE 2004-04-01 231,922.25 208,730.02 23.192.23 NEW T020000001 1995 RAGLAN 24' TANDEM AXLE DUMP TRAILER 1995-05-03 6,288.97 5.660.07 628.90 NEW TD20000002 1995 RAGLAN 24' TANDEM AXLE DUMP TRAILER 2001-05-01 16,173.73 12,140.73 4.033.00 NEW TD20000003 1995 RAGLAN 24' TANDEM AXLE DUMP TRAILER 2001-05-01 16,173.73 12,140.73 4,033.00 NEW TD20000004 1995 RAGLAN 24' TANDEM AXLE DUMP TRAILER 2001-05-01 16,173.73 12,140.73 4.033.00 NEW T020000005 1995 RAGLAN 24' TANDEM AXLE DUMP TRAILER 2001-05-01 16,173.73 12,140.73 4,033.00 NEW T020000006 1995 RAGLAN 24' TANDEM AXLE DUMP TRAILER 2001-05-01 16,173.73 12,140.73 4,033.00 NEW T020000007 1995 RAGLAN 24' TANDEM AXLE DUMP TRAILER 2001-05-01 16,173.73 12,140.73 4,033.00 NEW TD20000008 2001 RAGLAN 24' TANDEM AXLE DUMP TRAILER 2006-04-30 14.632.65 9,754.65 4,878.00 NEW TD20000009 2001 RAGLAN 24' TANDEM AXLE DUMP TRAILER 2006-04-30 14,632.65 14,632.65 NEW TD20000010 1969 TI-BROOK 24.60-0 TANDEM AXLE DUMP TRAILER 2006-06-05 26,888.72 24,199.85 2,688.87 NEW TD20000011 2017 DIERZEN PIT BOSS DGLKT 23' TANDEM AXLE DUMP TRAILEI 2016.09-01 41,930.00 35,801.88 6,128.12 NEW TD20000012 2017 DIERZEN PIT BOSS DGLKT 23' TANDEM AXLE DUMP TRAILEI2016-09-01 42,180.00 36,015.08 6,164.92 NEW TDRL000001 1984 CHEVROLET 3500 DRILL TRUCK 1983-11-30 14,490.00 13,041.00 1,449.00 NEW TEX0000001 2008 GRADALL SL4100 TELESCOPING EXCAVATOR 2008-07-11 277.091.48 240,382.33 27.709.15 NEW TF20000001 1998 KENWORTH T300 TANDEM AXLE TRUCK + FUEL 2001-07-02 40,382.86 34,071.86 6.311.00 NEW TFW1000001 1995 INTERNATIONAL 4900 SINGLE AXLE TRUCK + WATER & FUEI 2005-03-31 15,900.00 14,310.00 1,590.00 USED TFW1000002 1995 INTERNATIONAL 4900 SINGLE AXLE TRUCK + WATER & FUEI 2005-03-31 15,900.00 14,310.00 1,590.00 USED TFW1000003 1996 INTERNATIONAL 4900 SINGLE AXLE TRUCK + WATER & FUEI 2005.03-31 16,562.50 14,906.25 1.656.25 USED TFW1000004 1997 INTERNATIONAL 4900 SINGLE AXLE TRUCK + WATER & FUE12005-03-31 19,875.00 17,887.50 1,987.50 USED TFW1000005 1999 INTERNATIONAL 4900 SINGLE AXLE TRUCK + WATER & FUEI2005-03-31 27.825.00 25,042.50 2,782.60 USED 84 TFW2000001 1999 KENWORTH T800 TANDEM AXLE TRUCK+ WATER & FUEL 2004.0246 20,029.94 11,929.94 8,100.00 NEW 24 TFW2000002 1999 KENWORTH T800 TANDEM AXLE TRUCK+ WATER & FUEL 2004-02.09 18,311.94 9,513.00 8,798.94 NEW 24 TFW2000004 2007 KENWORTH T800 TANDEM AXLE TRUCK+ WATER & FUEL 2013.04-01 27,975.15 25,177.63 2,797.52 NEW 24 TFW2000005 2009 KENWORTH T800 TANDEM AXLE TRUCK+ WATER & FUEL 2013.02-05 29,723.78 26,751.40 2,972.38 NEW 36 TFW2000006 2010 KENWORTH T800 TANDEM AXLE TRUCK + WATER & FUEL 2013.09-30 51,508.80 46,357.92 5,150.88 NEW 42 TFW2000007 2012 KENWORTH T800 TANDEM AXLE TRUCK+ WATER & FUEL 2016-03-01 66,900.54 60,210.49 6,690.05 NEW 36 TFW2000008 2012 KENWORTH T800 TANDEM AXLE TRUCK + WATER & FUEL 2016-03-01 66,900,54 60,210.49 6,690.05 NEW 36 TFW2000009 2018 KENWORTH T880 TANDEM AXLE TRUCK + WATER & FUEL 2017-06-04 232,729.74 178,910.88 63,818.86 NEW 96 TFW2000010 2018 KENWORTH T880 TANDEM AXLE TRUCK + WATER & FUEL 2017-06-04 232,729.74 178,910.88 53,818.86 NEW 96 TFW2000011 2018 KENWORTH T880 TANDEM AXLE TRUCK+ WATER & FUEL 2017-06-04 234,702.03 180,427.06 64,274.97 NEW 96 TGI OOO0003 2002 BEST TNT20K TAG TRAILER 2009-03-16 1.060.00 954.00 106.00 USED 12 TG10000004 2005 TRAIL KING TK20LP TAG TRAILER 2009-03-16 7,730.00 6,957.00 773.00 USED 36 TG20000001 2015 TRAIL KING TK40LP TAG TRAILER 2015-05-02 23.126.10 20,813.49 2,312.61 NEW 96 TG20000002 2018 XL SPECIALIZED XL40 TAG TRAILER 2018-05-24 24,478.30 16,293.08 8,185.22 NEW 96 TG20000003 2005 TRAIL KING TK20LP TAG TRAILER 2009-03-16 10,600.00 9,540.00 1,060.00 USED 36 TG20000004 2005 TRAIL KING TKT40 TAG TRAILER 2009-03-16 7,910.00 7,119.00 791.00 USED 36 TGN3000001 1996 TALBERT T3LW-30-FG-i-T1 TD GOOSENECK TILT TRAILER 2001-05.01 13,960.79 10,667.79 3,293.00 NEW 30 TGN3000002 1998 TALBERT T3LW-30-FG-1-T1 TD GOOSENECK TILT TRAILER 1998-03-20 26,877.54 24,077.54 2,800.00 NEW 98 TGN3000003 1998 TALBERT T3LW-30-FG-1-T1 TD GOOSENECK TILT TRAILER 2001-07-02 23,115.99 20,315.99 2,800.00 NEW 48 TGN3000004 2018 XL TRAILER XL60 GOOSENECK TILT TRAILER 2017-04-12 43,698.57 34,412.88 9,285.69 NEW 96 TGN3000005 2005 TRAIL KING TKT504200 GOOSENECK TILT TRAILER 2009-03-16 23,320.00 20,988.00 2,332.00 USED 48 TGN3000006 1998 TRAIL KING TKT504200 GOOSENECK TILT TRAILER 2009-03-16 3,1*80.00 2,862.00 318.00 USED 12 TGN3000007 2000 TRAIL KING TKT50-4200 GOOSENECK TILT TRAILER 2009-03-16 8,480.00 7,632.00 848.00 USED 12 TLB4000001 2003 TRAIL KING OLS426 4 AXLE LIVE BOTTOM TRAILER 2000-04-01 41,340.00 37.206.00 4,134.00 USED 96 TLB4000002 2003 TRAIL KING OLS426 4 AXLE LIVE BOTTOM TRAILER 2006-04-01 41,340.00 37,206.00 4,134.00 USED, 96 TLB8000001 1988 RED RIVER MFG L8838 8 AXLE LIVE BOTTOM TRAILER 1989-05-01 84;240.00 75,816.00 8,424.00 USED 96 TLB8000002 1988 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1989-05-01 84:240.00 75,816.00 8,424.00 USED 96 TLB8600003 1992 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1992-07-06 108,107.50 97,296.75 10,816.75 NEW 96 TLB8000004 1992 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1992-07-16 108,107.50 97,296.75 10,810.75 NEW 96 TLB8000005 1990 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1994-04-05 19,760.00 17,784.00 1,976.00 USED 96 TLB8000006 1990 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1994-04-05 19,760.00 17,784.00 1,976.00 NEW 96 TLB8000007 1990 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1994-04-05 19,760.00 17,784.00 1,976.00 NEW 96 TL98000008 1990 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1994-04.05 19,760.00 17.784.00 1,976.00 NEW 96 TLBBOO0009 1990 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1994-04-05 19,760.00 17,784.00 1,976.00 USED 96 TLB8000010 1893 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1997-05-01 10,143.45 0.33 10,143.12 USED 48 TLB80000i 1 1993 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1997-05-01 8,362.97 0.22 8,362.75 USED 48 TLB8000012 1993 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1997-05-01 8,404.45 0.22 8,404.23 USED 48 TLB8000013 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1999-01-25 40.539.81 33,924,81 6,616.00 NEW 36 TLB8000014 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1997-05-01 26.766.62 15,766.62 11,000.00 NEW 48 TLB8000015 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1999-01-25 40,539.81 33,924.81 6,615.00 NEW 36 TLB8000016 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1997-05-01 26,373.32 15,373.32 11,000.00 NEW 48 TLB8000017 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1999-06-24 37,100.00 27,100.00 10,000.00 USED 36 TLB8000018 1994 RED RIVER MFG L8838 8 AXLE LIVE BOTTOM TRAILER 1999-06-24 37,100.00 27,100.00 10,000.00 NEW 36 TLB8000019 1994 RED RIVER MFG L8838 8 AXLE LIVE BOTTOM TRAILER 1999-06-29 37,100.00 27,100.00 10,000.00 NEW 36 TL88000020 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1999-06 24 373100.00 27,100.00 10,000.00 NEW 36 TL88000021 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 1999-06 24 37,100.00 27,100.00 10,000.00 NEW 36 TL88000022 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2000-02-16 47,216.20 36,674.90 10,541.30 NEW 36 TLB8000023 1994 RED RIVER MFG L8838 8 AXLE LIVE BOTTOM TRAILER 2000-02-16 47,216.20 36,674.90 10,541.30 NEW 36 TLB8000024 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2000-02-16 47,216.20 36,674.90 10,541.30 NEW 36 TLB8000025 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2000-02-16 47,216.19 36,674.89 10,541.30 NEW 36 TLB8000026 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2000-02-16 47,216A9 36,674.89 10,541.30 NEW 36 TLB8000027 1994 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2000-02-16 47,216.19 36,674.89 10,541.30 NEW 36 TLB8000028 1995 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2001-05-01 25,583.24 17,538.24 8,045.00 NEW 24 TLB8000029 1995 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2001-05-01 25,583.23 17,538.23 8,045.00 NEW 24 TLB8000030 1995 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2001-05-01 25,583.24 17,538.24 8,045.00 NEW 24 TLB8000031 1995 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2001-05-01 25,583.24 17,538.24 8.045.00 NEW 24 TLB8000032 1995 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2001-05-01 25,583.24 17,538.24 8,045.00 NEW 24 TLE8000033 1995 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2001-05-01 25,583.24 17,538,24 8.045.00 NEW 24 TL88000034 1095 RED RIVER MFG L8838 8 AXLE LIVE BOTTOM TRAILER 2001-OS-01 25,583.24 17,538.24 8,045.00 NEW 24 TLB8000035 1995 RED RIVER MFG LB838 8 AXLE LIVE BOTTOM TRAILER 2001-05-01 25,583.24 17,538.24 8,045,00 NEW 24 TLB8000036 2005 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2010-03-31 40,649.45 28,906.45 11.743.00 NEW 36 TLB8000037 2005 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2010-03-31 40,649A5 28,906.45 11,743.00 NEW 36 TLB8000038 2001 TRAIL KING LB-838 8 AXLE LIVE BOTTOM TRAILER 2006-04-01 77,812.05 70,030.85 7,781.20 USED 120 TLB8000039 2003 TRAIL KING LB-838 8 AXLE LIVE BOTTOM TRAILER 2014-06-06 53,000.00 47.700.00 5,300.00 USED 36 TLB8000040 2003 TRAIL KING LB-838 8 AXLE LIVE BOTTOM TRAILER 2014-06-06 45,050.00 40,545.00 4,505.00 USED 36 TLB8000041 2003 TRAIL KING LM38 8 AXLE LIVE BOTTOM TRAILER 2014-06-06 47.700.00 42,930.00 4,770.00 USED 36 TLB8000042 2015 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2015-05-30 167,649.60 150,884.64 16,764.96 NEW 96 TLB8000043 2015 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2015-05-30 167,649.60 150.884.64 16,764.96 NEW 96 TL88000044 2015 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2015-05-30 167,649.60 150.884.64 16,764.96 NEW 96 TL88000045 2015 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2016-05-30 167.649.60 150.884.64 16.764.96 NEW 96 TLB8000046 2016 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2016-01-02 170.063.22 153,056.90 17,006.32 NEW 96 TLB8000047 2016 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2016-01-02 170,063.22 153,056.90 17,006.32 NEW 96 TLB8000048 2016 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2016-01-02 170.063.22 153,056.90 17,006.32 NEW 96 TLB8000049 2016 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2016-01-02 170,063.22 153,055.90 17,006.32 NEW 96 TLB8000050 2016 TRAIL KING OL8840 8 AXLE LIVE BOTTOM TRAILER 2016-01-02 170,063.22 153,058.90 17,006.32 NEW 96 TLB8000051 2016 TRAIL KING OLB840 8 AXLE LIVE BOTTOM TRAILER 2016-01-02 170,063.22 153.056.90 17,006.32 NEW 96 TLB8000052 2016 TRAIL KING OLS840NGH 8 AXLE LIVE BOTTOM TRAILER 2017-04-01 91,236.52 82,112.87 9,123.65 NEW 84 TL88000053 2016 TRAIL KING OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2017-04-01 91,236.52 82,112.87 9,123.65 NEW 84 TLBBOOOO54 2016 TRAIL KING OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2017-04-01 91.236.52 82,112.87 9.123.65 NEW 84 TL88000055 2016 TRAIL KING OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER 2017-04-01 91,236.52 82,112.87 9,123.65 NEW 84 TLB8000057 2001 RED RIVER MFG LB-838 8 AXLE LIVE BOTTOM TRAILER 2006-04-01 54,060.00 48,654.00 5,406.00 USED 9E TLB8000058 2001 RED RIVER MFG LM38 8 AXLE LIVE BOTTOM TRAILER 2006-04-01 54,060.00 48,654.00 5,406.00 USED 9E TLB8000059 2002 RED RIVER MFG LM38 8 AXLE LIVE BOTTOM TRAILER 2006-04-01 62,010.00 55,809.00 6.201.00 USED 9E TLB8000060 2002 TRAIL KING OLB426 8 AXLE LIVE BOTTOM TRAILER 2006-04-01 62,010.00 55,809.00 6,201.00 USED 9E TLB8000061 2002 TRAIL KING OL8426 8 AXLE LIVE BOTTOM TRAILER 2006-04-01 67,310.00 60,579.00 6,731.00 USED 9E TLB8000062 1995 RED RIVER MFG LB-838 8 AXLE LIVE BOTTOM TRAILER 2005-03-31 31,800.00 28,620.00 3,180.00 USED 4E TLB8000063 1995 RED RIVER MFG LB-838 8 AXLE LIVE BOTTOM TRAILER 2005-03-31 31,800.00 28,620.00 3,180.00 USED 4£ TLB8000064 1995 RED RIVER MFG LB-838 8 AXLE LIVE BOTTOM TRAILER 2005-03-31 31,800.00 28,620.00 3.180.00 USED 4£ TLB8000065 1998 RED RIVER MFG LB-838 8 AXLE LIVE BOTTOM TRAILER 2005-03-31 31,800.00 28,620.00 3,180.00 USED 4£ TLB8000066 1996 RED RIVER MFG LM38 8 AXLE LIVE BOTTOM TRAILER 2005-03-31 31,800.00 28,620.00 3,180.00 USED 4£ TL88000067 2018 RED RIVER OLS840NGH 8 AXLE LIVE BOTTOM TRAILER 2019-05-07 82,944.33 45,878.40 37,065.93 USED 9E TL88000068 2018 RED RIVER OLS840NGH 8 AXLE LIVE BOTTOM TRAILER 2019-05-07 90,303.60 49.949.40 40,354.20 NEW 9E TLB8000069 2018 RED RIVER OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2019-05-07 83,124.33 45,978.11 37,146.22 NEW 9£ TLB8000070 2018 RED RIVER OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2019-05-07 83,221.73 46,031.80 37.189.93 NEW 9E TLB8000071 2018 RED RIVER OL8840NGH 8 AXLE LIVE BOTTOM TRAILER 2019-OS-07 89,916.96 49,735.23 40,181.73 NEW 9£ TLB8000072 2018 RED RIVER OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2020-04-03 110,122.22 62,927.04 47,195.18 NEW 8, TLB8000073 2018 RED RIVER OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2020-04-03 110,076.11 62,900.64 47,175.47 NEW 8, TLB8000074 2020 RED RIVER OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2021-02-17 115,615.40 40,103.93 75,511.47 NEW 9£ TLB8000075 2020 RED RIVER OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2021-0247 115,663.45 40,120.56 75,542.87 NEW 9! TL88000076 2020 RED RIVER OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2021-02-20 115,421.66 40,036.96 75,384.60 NEW 9( TL88000077 2021 RED RIVER OLB840NGH 8 AXLE LIVE BOTTOM TRAILER 2021-02-17 166,910.00 57,896.86 109,013.14 NEW 91 TLB8000079 2021 RED RIVER OLB840NG-HH 8 AXLE LIVE BOTTOM TRAILER 2021-02-17 166.710.00 57,827.67 108,882.33 NEW 91 TLB8000080 2021 RED RIVER OLB840NG-HH 8 AXLE LIVE BOTTOM TRAILER 2021-02-17 166,460.00 57,740.72 108,719.28 NEW 9i TL88000081 2021 RED RIVER OLS840NG-HH 8 AXLE LIVE BOTTOM TRAILER 2021-02-17 166,460.00 57,740.72 108,71S.28 NEW 91 TRC0000002 2009 CARLSON TR-100 TRENCH COMPACTOR 2010-03-17 20,495.00 30,495.00 - NEW 31 TRCH000001 1999 VERMEER T455 TRENCHER 2015-07-09 69,015.00 69,015.00 - USED TRLD000001 1992 DORSEY 24-DS-TRI LEAD DUMP TRAILER 2006-04-01 11,660.00 10,494.00 1,166.00 USED TRLOOD0002 1988 EAST LEAD DUMP TRAILER 2008-01-29 15,900.00 14,310.00 1,590.00 USED TRLD000003 2003 MAC LEAD 24' DUMP TRAILER 2008-01 29 19,080.00 17,172.00 1,908.00 USED TRLD000004 2005 MAC LEAD 24' DUMP TRAILER 2008.01-29 21.200.00 19,080.00 2,120.00 USED TRLD000005 2005 MAC PUP 20' DUMP TRAILER 2008.01-29 26,500.00 23,850.00 2,650.00 USED TRLD000006 2003 MAC PUP 20' DUMP TRAILER 2008-01-29 31,800.00 28,620.00 3,180.00 USED TSF2000001 1988 FORD WG64TT/A STREET FLUSHER WATER TRUCK 1988-07-12 70,634.27 59,452.67 11,181.60 NEW TSF2000002 1991 INTERNATIONAL F 2674 SBA T/A STREET FLUSHER WATER1990-06-14 80,136.46 72,122.82 8,013.64 NEW TSF2000003 1991 KENWORTH T800 T/A STREET FLUSHER WATER TRUCK 1991-04-04 81,927.03 72,806.97 9,120.06 NEW TSF2000004 1995 WHITE 2674 T/A STREET FLUSHER WATER TRUCK 1995-05-01 20,297.82 17,266.49 3,031.33 NEW TSF2000005 1996 INTERNATIONAL 9400SBA T/A STREET FLUSHER WATER TRI 2001-05-01 28,797.73 21,957.73 6,840.00 NEW TSF2000006 1996 INTERNATIONAL 9200 T/A STREET FLUSHER WATER TRUCK 2001-05-01 25,988.29 16,020.77 9.967.52 NEW TSF2000007 1996 INTERNATIONAL 9400 T/A STREET FLUSHER WATER TRUCK 2001-05-01 30,739.05 21,957.73 8,781.32 NEW TSF2000008 1987 INTERNATIONAL F-9370 T/A STREET FLUSHER WATER TRUC 2006-04-01 9,540.00 8,586.00 954.00 USED TSF2000009 1989 FORD LTS9000 T/A STREET FLUSHER WATER TRUCK 2005-03-31 7.685.00 8,916.50 768.50 USED TSF3000001 1995 WHITE WG64T TRIAXLE STREET FLUSHER WATER TRUCK 1995-05-01 86,974.65 76,182.57 10,792.08 NEW TT20000001 1996 TRAIL KING TKT40-2400 TILT TAG TRAILER 1995-08-31 17,173.23 15,455.90 1,717.33 NEW TT20000003 1997 ETNYRE CHP20TPS TILT TAG TRAILER 1997-04-01 17,043.64 15,339.28 1.704.36 NEW TT20000004 1997 ETNYRE CHP20TPS TILT TAG TRAILER 1997-04-01 16,897.33 16.207.60 1,689.73 NEW TT20000005 1997 ETNYRE CHP20TPS TILT TAG TRAILER 1997-04-01 16,897.33 15,207.60 1,689.73 NEW TT20000006 1998 TALBERT TT20 TILT TAG TRAILER 1996-03-20 11,370.18 9,720.18 1,650.00 NEW TT20000007 1998 TALBERT TT20 TILT TAG TRAILER 1998.03-20 11,370.18 9,720.18 1,650.00 NEW TT20000008 1998 TALBERT TT20 TILT TAG TRAI LER 1998-03-20 11,370.18 9,720.18 1,650.00 NEW TT20000009 1998TALBERT TT20TILT TAG TRAILER 2001-07-02 8,941.06 7,291.06 1,650.00 NEW TT20000010 1998 TALBERT TT20 TILT TAG TRAILER 2001-07-02 8,856.73 7,206.73 1,650.00 NEW TT20000011 1998 TALBERT TT20 TILT TAG TRAILER 2001-07-02 8,856.73 7,206.73 1,650.00 NEW TT20000012 1998 TALBERT TT20 TILT TAG TRAILER 2002-06-03 6,454.71 4,804.71 1.650.00 NEW TT20000013 1998 TALBERT TT20 TILT TAG TRAILER 2002-06-03 6,516.18 4,866.18 1,650.00 NEW TT20000014 1998 BEST TTL40K TILT TAG TRAILER 1999-08-02 14,369.32 12,724.32 1,645.00 NEW TT20000015 1998BEST TTL46KTILT TAG TRAILER 2002-12-02 4,363.21 2,718.21 1.645.00 NEW TT20000016 1998 BEST TTL40K TILT TAG TRAILER 1999-05-14 19,650.00 17,685.00 1,965.00 NEW TT20000017 2006 TOWMASTER T40T TILT TAG TRAILER 2006-05-09 26,403.25 23,762.92 2,640.33 NEW TT20000018 2010 TOWMASTER T20T TILT TAG TRAILER 2010-04-19 15,565.04 14.008.54 1.556.50 NEW TT20000019 2016 XL TRAILER XL40 TILT TAG TRAILER 2017-04-01 32.127.03 25,299.96 6.827.07 NEW TT20000020 2018 XL TRAILER XL40 TILT TAG TRAILER 2017-04-M 31,857.05 25,087.44 6,769.61 NEW TT20000021 2018 XL TRAILER XL40 TILT TAG TRAILER 2017-04-01 31,857.05 25,087.44 6,769.61 NEW TT20000023 2005 TRAIL KING TK20LP TILT TAG TRAILER 2009-03-16 7,730.00 6,957.00 773.00 USED TT20000024 1996 ETNYRE CHP20TPS TILT TAG TRAILER 2005-03-31 2,517.50 2,265.75 251.75 USED TT20000025 1996 ETNYRE CHP20TPS TILT TAG TRAILER 2005-03-31 2,517.50 23265.75 251.75 USED TT20000026 1996 ETNYRE CHP20TPS TILT TAG TRAILER 2005-03-31 2,517.50 2,265.75 251.75 USED TT20000027 1996 ETNYRE CHP20TPS TILT TAG TRAILER 2005-03-31 2,517,50 2,265.75 251.75 USED TT20000028 1997 ETNYRE CHP20TPS TILT TAG TRAILER 2005-03-31 2,517.50 2.265.75 251.75 USED TT20000029 1997 ETNYRE CHP20TPS TILT TAG TRAILER 2005.03-31 2,517.50 2,517.50 - USED TT20000030 1998 BEST TILT TAG TRAILER 2005-03-31 2,650.00 2,385.00 265.00 USED TT20000031 1998 BEST TILT TAG TRAILER 2005-03-31 2,650.00 2,385.00 265.00 USED TT20000032 1998BEST TILT TAG TRAILER 2005-03-31 2,650.00 2,385.00 265.00 USED TT20000033 1993 ETNYRE TILT TAG TRAILER 2005-03-31 4,770.00 4.293.00 477.00 USED TT20000034 2019 XL TRAILERS XL40 TILT TAG TRAILER 2019-07-17 36,847.16 19,690.08 17,157.08 NEW 7720000035 2019 XL TRAILERS XL40 TILT TAG TRAILER 2019-07-17 36,847.16 19,690.08 17,157.08 NEW TT20000036 2019 XL TRAILERS XL40 TILT TAG TRAILER 2019-07-17 36,847.16 19,690.08 17,157.08 NEW TT20000037 2019 XL TRAILERS XL40 TILT TAG TRAILER 2019-05-07 27,786.50 15,369.50 12,417.00 USED TT25000001 1996 ETNYRE CHP25TPS TILT TAG TRAILER 1996.06-18 22,973.80 20,676.42 2,297.38 NEW TT25000002 2008 TOWMASTER T50T TILT TAG TRAILER 2007-09-18 32,741.00 29,466.90 3,274.10 NEW T1725000003 2008 TOWMASTER T50T TILT TAG TRAILER 2008.04-02 32,741.00 29,466.90 3,274.10 NEW TT25000004 2008 TOWMASTER T50T TILT TAG TRAILER 2008-04-02 32,74i.00 29,466.90 3.274.10 NEW TTK0000001 1988 ETNYRE LWR INSULATED TANK TRAILER 1988-05-05 30,287.63 27,258.87 3,028.76 NEW TW10000001 1998 FORD L8000 SINGLE AXLE TRUCK+ WATER 2016-07-01 20,000.00 18,000.00 2,000.00 USED TWIOOO0002 GMC SINGLE AXLE TRUCK + WATER 2009-03-16 250.00 250.00 USED TWIOD00003 1991 INTERNATIONAL 4900 SINGLE AXLE TRUCK+ WATER 2005-03-31 11,925.00 10,732.50 1,192.50 USED TW20000001 1998 KENWORTH T800 TANDEM AXLE TRUCK + WATER 2002-06-03 35,488.51 26,995.51 8,493.00 NEW TW20000002 1998 KENWORTH T800 TANDEM AXLE TRUCK + WATER 2002-12-02 29,372.33 21.155.33 8,217.00 NEW UTF0000003 2000 JOHN DEERE 9400 FARM TRACTOR 2016-07-01 44,776.00 40,298.40 4,477.60 USED WD08000001 2006 MIDLAND SPD-8 WIDENER 2012-12-02 20,823.48 18,877.36 1,946A2 NEW WDIDO00003 2013 WEILER W530 WIDENER 2017-12A5 77,691.66 77,691.66 - NEW WD10o00004 2013 WEILER W530 WIDENER 2016-04-26 123,184.45 123,184.45 - USED WD10000005 2015 WEILER W530A WIDENER 2016.04-26 242,617.65 242,617.65 - NEW WDIO000006 2018 WEILER W530A WIDENER 2019-09-03 158,167.16 114,232.04 43,935.12 USED WD10000007 2018 WEILER W530A WIDENER 2020-03-30 12%617.39 82,411.68 41.205.71 USED WD10000008 2018 WEILER W530A WIDENER 2019-09-03 166,602.23 127,265.60 39,336.63 USED WD10000009 2016 WEILER W530A WIDENER 2020-03-30 127,381.48 72,789.60 54,591.88 USED WD10o00010 2019 WEILER W530A WIDENER W/BROOM 2020-03-30 233,794.24 133.596.48 100,197.76 NEW WD10000011 2019 WEILER W530A WIDENER W/BROOM 2020-03-30 231,499.88 154,333.44 77,166.44 NEW WD10000012 2017 WEILER W530A WIDENER 2020-04-03 202,055.83 115,460.64 86,595.19 USED WD14000002 1997 SLAW KNOX RW195D WIDENER 1998-07-01 177,226.00 155,753.00 21,473.00 NEW WD14000003 1998 SLAW KNOX RW195D WIDENER 2001-07-02 109,609A2 94,127A2 15,482.00 NEW WD14000004 2002 SLAW KNOX RW195D WIDENER 2006.04-01 172,500.00 155,250.00 17,250.00 USED WD14000005 2001 SLAW KNOX RW195D WIDENER 2010-11-02 32.527.50 32,527.50 - USED WLO1000001 2011 CATERPILLAR 907H LOADER WHEEL 2017-08-03 20.279.37 18.251.43 2,027.94 USED WL01000002 2013 CATERPILLAR 908H2 LOADER WHEEL 2017-08-03 33,481.17 30,133.05 3,34SA2 USED WL01o00003 2015 CATERPILLAR 907M LOADER WHEEL 2018-04-19 30.923.16 30,923.16 - USED WL03000001 2013 CATERPILLAR 938K LOADER WHEEL 2016-08-01 103.895.57 93,506.01 10,389,56 NEW WL03000002 2013 CATERPILLAR 938K LOADER WHEEL 2016-08-01 107,013.24 96.311.92 10,701.32 NEW WLO3000003 2014 CATERPILLAR 938K LOADER WHEEL 2017-12-27 119,456.87 107,511.18 11,945.69 NEW WL03000004 2014 CATERPILLAR 938K LOADER WHEEL 2017-12-27 119,501.92 107,551.73 11.950.19 NEW WL03000005 2014 CATERPILLAR 938K LOADER WHEEL 2017-12-27 119,466.10 107,519.49 11,946.61 NEW WL03000006 2014 CATERPILLAR 938K LOADER WHEEL 2017-12-27 119,416,68 107,474.99 11,941.69 NEW WL03000007 2014 CATERPILLAR 938K LOADER WHEEL 2017-12-27 130,137A6 117,123A4 13,013.72 NEW WL03000008 2014 CATERPILLAR 938K LOADER WHEEL 2020-09-18 59,814.74 53,833.27 5.981.47 NEW WL03000009 2014 CATERPILLAR 938K LOADER WHEEL 2020.09-18 61,074.51 54,967.06 6,107.45 NEW WL03000010 2014 CATERPILLAR 938K LOADER WHEEL 2020-09-18 59,B14.74 53,833,27 5.981.47 NEW WL030000il 2014 CATERPILLAR 938K LOADER WHEEL 2020-09-18 59,814.74 53,833.27 5,981.47 NEW WL03000012 2016 CATERPILLAR 938M LOADER WHEEL 2018-04-19 22,984.14 22.984.14 - NEW WL03000016 2017 CATERPILLAR 938M LOADER WHEEL 2020-04-01 23,559.30 23,559.30 - NEW WL04000001 2012 CATERPILLAR 950K LOADER WHEEL 2017-12-15 93,917.45 84,525.71 9.391.74 NEW WL04000002 2013 CATERPILLAR 950K LOADER WHEEL 2018-12-17 124,662.36 124.662,36 NEW WL04000003 2019 CATERPILLAR 950GC LOADER WHEEL 2020-11-25 185,216.46 69A56,00 115,760.46 NEW WL05000001 2005 CATERPILLAR 962G LOADER WHEEL 2005-06-20 210,996.18 189,896.56 21,099.62 NEW WLOSOOOD02 2006 CATERPILLAR 962H LOADER WHEEL 2006.04-28 231,897.26 208.707.53 23,189.73 NEW VVLO5000003 2006 CATERPILLAR 962H LOADER WHEEL 2006-04-28 243,416.28 219,074.65 24,341.63 NEW WL07000001 2013 CATERPILLAR 972K WHEEL LOADER 2016-08-01 17%569.37 153,512.43 17,056.94 NEW WL07000002 2013 CATERPILLAR 972K WHEEL LOADER 2017-12-15 122,740A0 110,466.09 12,274.01 NEW WL07000004 2014 CATERPILLAR 972K WHEEL LOADER 2014-03-24 170,072.76 170,072.76 - NEW WL07000005 2014 CATERPILLAR 972K WHEEL LOADER 2020-03-06 148,400.00 133,560.00 14,840.00 USED WL07000006 2014 CATERPILLAR 972M WHEEL LOADER 2019-09-19 163,686.31 147.317.68 16,388.63 USED 36 60 120 96 96 120 120 96 12 144 36 36 42 48 24 42 60 84 72 72 72 84 84 72 36.00 72 36 WL07000007 2016 CATERPILLAR 972M XE WHEEL LOADER 206-07-01 413,130.21 360,382.60 52,747.61 NEW WL07000008 2016 CATERPILLAR 972M XE WHEEL LOADER 2016-07-01 413,130.21 360,382.60 62,747.61 NEW 98 WL07000009 2016 CATERPILLAR 972M XE WHEEL LOADER 2016-08-01 409,269.18 352,994.80 56,274.38 NEW 96 WL07000010 2016 CATERPILLAR 972M XE WHEEL LOADER 2016-08-01 409,269.18 352,994.80 56,274.38 NEW 96 WL08000001 2006 CATERPILLAR 980H LOADER WHEEL REBUILD 2006-04 28 404,867.00 364,380.30 40,486.70 NEW 96 WL08000002 2006 CATERPILLAR 980H LOADER WHEEL REBUILD 2006-05-02 397,828.60 358,045.74 39,782.86 NEW 96 14q WL08000003 2006 CATERPILLAR 980H LOADER WHEEL REBUILD 2006-OS-03 401,426,24 361,283.62 40,142.62 NEW WL08000004 2008 CATERPILLAR 980H LOADER WHEEL REBUILD 2008-04-15 472,743.50 440,968.19 31,775.31 NEW 96 WL08000005 2009 CATERPILLAR 980H LOADER WHEEL REBUILD 2009-03-31 338,664.78 312,859.41 25,805.37 NEW 96 WL08000006 2009 CATERPILLAR 980H LOADER WHEEL 2009-04-29 74,759.48 74,759.48 - NEW 96 WL08000007 2010 CATERPILLAR 980H LOADER WHEEL REBUILD 2010-03-05 108,264.95 108,264.95 - NEW 36 WL08000008 2010 CATERPILLAR 980H LOADER WHEEL REBUILD 2016-11-04 37,188.80 33,209.51 3,979.29 NEW 36 WL08000009 2010 CATERPILLAR 980H LOADER WHEEL 2016-11-04 37,188.80 33,209.60 3,979.20 NEW 3636 WL08000010 2010 CATERPILLAR 980H LOADER WHEEL 2016-11-04 37,188.80 33,246.79 3,942.01 NEW WL08000012 2014 CATERPILLAR 980M LOADER WHEEL 2018-04-27 398,851.87 358.966.68 39,885.19 USED 36 WL08000013 2016 CATERPILLAR 980M LOADER WHEEL 2016-04-28 465,702.52 419,132.27 46,570.25 NEW 72 WL08000018 2018 VOLVO L220H LOADER WHEEL 2020-03-24 144,945.00 86,966.88 67,978.12 USED 98 WLO8000024 2019 CATERPILLAR 980M WHEEL LOADER 2020-03-30 380,629.57 195,752.16 184,877.41 NEW 72 WL09000001 2014 CATERPILLAR 982M LOADER WHEEL 2016-04-27 486,726.48 438,053.83 48,672.65 USED 84 WL09000002 2016 CATERPILLAR 982M LOADER WHEEL 2016-04-28 535,252.52 481,727.27 63,525.25 NEW 72 WL10000001 2005 CATERPILLAR 988G LOADER WHEEL 2014-11-19 117.500.00 105,750.00 11,750.00 NEW 96 98 WLi0000002 2015 CATERPILLAR 986H LOADER WHEEL 2019-Oi-01 118,414.87 106,573.38 11,841.49 USED 6 WRKT100001 1999 H&M HA700 VIBRATORY DRIVER + EXTRACTOR 2004-12-02 42,373.46 38.136.46 4,237.00 USED WRKT100002 200410E IA9 DIESEL ATTACHMENT HAMMER 2004-02-10 39,432.00 35,488.80 3,943.20 NEW 06 WRKTi00003 200410E 1-30 DIESEL ATTACHMENT HAMMER 2004-02-10 75,101.00 67,590.90 7,510.10 NEW 9 WRKT100004 BREAKER LEADS 2004-02-10 17,172.00 15,454.80 1,717.20 NEW 96 WRKT130001 MISKIN SP-C17 ATTACHMENT PULL SCRAPER 2016-07-01 15,000.00 13,500.00 1,500.00 USED 96 WRKT160001 2001 DOMOR RIVINIUS R60OB/C SPREADER BOX 2001-10-08 21,108.62 18,997.76 2,110.86 NEW 4 WRKT700002 ROME ATTACHMENT HARROW DISK 1999-04 23 3,559.81 3,203.83 355.98 USED 96 WXi9000001 WHEELED EXCAVATOR WHEELED EXCAVATOR 2018-04-30 110,357.56 110,357.56 - USED 2 12 WX19000003 2018 CATERPILLAR M317F CR WHEELED EXCAVATOR 2019-08-30 18,000.00 18,000.00 - NEW WX20000001 2015 CATERPILLAR M32OF WHEELED EXCAVATOR 2018-04-30 106,436.62 106,436.62 - USED 36 WX22000001 2015 CATERPILLAR M322F WHEELED EXCAVATOR 2018-04-30 122,847.48 122,847.48 - USED 72 TLB8000078 2021 RED RIVER OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER 2021-02-17 166.710.00 57,827.67 108,882.33 NEW 72 AP08000009 2016 CATERPILLAR AP555F PAVER ASPHALT 8' TRACK 2021-06-03 118,932.00 112,324.78 6,607.22 NEW 96 APi0000022 2015 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2021-06-01 99,146.04 93,638.04 5,608.00 NEW 36 APi0000023 2015 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2021-06-01 93,534.00 88,337.78 5,196.22 NEW 36 AP10000027 2016 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2021-06-01 114,240.00 107,893.22 6,346.78 NEW 36 AP10000028 2016 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2021-06-01 121,094.40 114,366.82 6,727.58 NEW 36 AP10000029 2016 CATERPILLAR APi055F PAVER ASPHALT 10' TRACK 2021-06-01 121,094.40 114,366.82 6,727.58 NEW 36 APi0000030 2016 CATERPILLAR AP1055F SPRAY PAVER ASPHALT i0' TRACK 2021-06-03 114,240.00 107,893.22 6,346.78 NEW 36 AP10000031 2016 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2021-06-03 114,240.00 107,893.22 6,346.78 NEW 36 D130000003 2019 CATERPILLAR 06K2 LGP DOZER 2021-05-25 16,701.80 4,400.20 12,301.60 NEW 36 D225000004 2020 CATERPILLAR D6 LAHZ2 DOZER 2021-05-25 8,680.57 - 8,680.57 NEW 72 DC30000005 2015 CATERPILLAR CT660L TRI AXLE TRACTOR -GLIDER 2016-04-22 178,626.00 160,763.40 17,862.60 NEW 72 EX08000006 2021 CATERILLAR 308A 8 METRIC TON EXCAVATOR 2021-04-21 129,718.24 42,563.85 87,154.39 NEW 96 EXMS000001 2003 CATERPILLAR 5090E MINING SHOVEL EXCAVATOR 2021-05-14 397,821.00 104,684.74 293,136.26 USED 96 MJS0000008 2021 CRACK PRO 260 D-E2755HH ASPHALTJOINT SEALER 2021-03-24 58,020.75 29,402.33 28.618.42 NEW 120 MJS0000009 2021 CRACK PRO 260 D-E2755HH ASPHALT JOINT SEALER 2021-03-24 58,020.75 29,402.33 28,618.42 NEW 60 MJS0000010 2021 CRACK PRO 260 D-E2755HH ASPHALT JOINT SEALER 2021-03-24 58,020.75 29,402.33 28,618.42 NEW 60 MJS0000011 2021 CRACK PRO 260 D-E2755HH ASPHALT JOINT SEALER 2021-03-24 58,020.75 29,402.33 28,618.42 NEW 60 MM12000003 2018 CATERPILLAR PM313 MILLING MACHINE 2021-04-08 249,100.00 84,071.16 165,028.84 USED 60 TORL00002A 2021 MOBILE DRILL B-31 DRILL RIG WrfDRL-02 2021-10-06 119.840.00 48,268.76 71,571.24 NEW 96 TFBD000001 2022 WILSON CD1080 DROP DECK TRAILER 2021A0-25 49,274.34 13,396.55 35,877.79 NEW 72 TFBD000002 2022 WILSON CD1080 DROP DECK TRAILER 2021-10-25 50,867.34 13,829.52 37,037.82 NEW 96 TSF2000010 1999 KENWORTH T300 T/A STREET FLUSHER WATER TRUCK 2004-02-09 22,373.42 15,208.52 7,164.90 NEW 98 TT10000002 2022 FELLING FT-20 IT -I TILT TAG TRAILER 2021-05-13 23,238.26 7,625.10 15,613.16 NEW 24 TT10000003 2022 FELLING FT 20 IT I TILT TAG TRAILER 2021-05-13 23,238,26 7,625.10 15,613A6 NEW 96 TT10000004 2022 FELLING FT 20 IT -I TILT TAG TRAILER 2021-0543 23,238.26 8,472.45 14,765.81 NEW 96 TT20000038 2022 FELLING FT-45-2 TILT TAG TRAILER 2021-05-13 38.070.48 12,848.76 25,221.72 NEW 96 TT20000039 2022 FELLING FT45-2 TILT TAG TRAILER 2021-05-13 38,070.48 12,491.85 25,578.63 NEW 96 TT20000040 2022 FELLING FT-45-2 TILT TAG TRAILER 2021-05-13 38,070.48 12.491.85 25,578.63 NEW 96 TT20000041 2022 FELLING FT45-2 TILT TAG TRAILER 2021-05-13 38,070.48 12,491.85 25,578.63 NEW 96 TT20000042 2022 FELLING FT45-2 TILT TAG TRAILER 2021-05-13 38,070.48 12,491.85 25,578.63 NEW 96 TT20000043 2022 FELLING FT45-2 TILT TAG TRAILER 2021-0543 38,070.48 12,491.85 25,578.63 NEW 96 WL07000025 2020 CATERPILLAR 972M XE WHEEL LOADER 2021-06-25 66.641.66 17,015.95 49,625.71 NEW 96 WL07000026 2020 CATERPILLAR 972M XE WHEEL LOADER 2021-05-25 38,981.41 2,729.30 36,252.11 NEW 72 AD35000002 2015 CATERPILLAR 735B TRUCK DUMP ARTICULATED 35 TON 2022-05-11 98,882.22 56,857.38 42,024.84 NEW 72 AD35000003 2015 CATERPILLAR 735B TRUCK DUMP ARTICULATED 35 TON 2022-05-11 106.824.35 61,424.03 45,400.32 NEW 36 AD35000004 2016 CATERPILLAR 735C TRUCK DUMP ARTICULATED 35 TON 2022-05-11 105.449.04 60,633.29 44,8i5.75 NEW 36 AP08000011 2016 CATERPILLAR AP555F PAVER ASPHALT 8' TRACK 2022-05-12 109.011.06 69,646.07 39,364.99 NEW 36 AP08000012 2016 CATERPILLAR AP555F PAVER ASPHALT 8' TRACK 2022-05-12 87,702.70 56,032.37 31,670.33 NEW 36 AP10000032 2016 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2022-05-12 108,049.62 69,031.74 39,017.88 NEW 36 AP10000033 2017 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2022-05-12 136,408.50 87,149.99 49,258.51 NEW 36 AP10000034 2017 CATERPILLAR AP1055F PAVER ASPHALT i G'TRACK 2022-05-12 136,408.50 87.149.99 49,258.51 NEW 36 AP10000035 2017 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2022-05-11 126,983.82 81,128.59 45,855.23 NEW 36 D130000005 2022 CATERPILLAR D4 LGP AHZ2 DOZER 2022-04-28 212,653.94 45,853.49 166,800.45 NEW 36 D225000003 2015 CATERPILLAR D6T XW DOZER 2022-05-17 64,010.56 36,805.98 27,204.58 NEW 96 DD84000006 2016 CATERPILLAR CB68B 84" VIBRATORY COMPACTOR 2022-0547 66,058.46 37,983.58 28,074.88 NEW 36 DD84000007 2016 CATERPILLAR CB68B 84" VIBRATORY COMPACTOR 2022-05-17 70,107.99 40,312A0 29,795.89 NEW 36 DD84000008 2016 CATERPILLAR CB68B 84" VIBRATORY COMPACTOR 2022-05-17 69.452.78 39,935.36 29.517.42 NEW 36 DI81000018 2017 INTERNATIONAL 4300SBA SINGLE AXLE DISTRIBUTOR TRUC 2022-05-11 39,555.11 22,744.24 16,810.87 USED 36 EX15000003 2015 CATERPILLAR 314EL TO 15 METRIC TON EXCAVATOR 2022-05-17 36,156.89 20,790.16 15,366.73 NEW 36 EX15000004 2017 CATERPILLAR 315F 15 METRIC TON EXCAVATOR 2022-05-17 47,770.44 27,469.82 20,300.62 NEW 36 EX23000007 2016 CATERPILLAR 320ELRR 23 METRIC TON EXCAVATOR 2022-05-17 37,821.55 21.747.42 16.074.13 NEW 36 EX23000008 2017 CATERPILLAR 323F 23 METRIC TON EXCAVATOR 2022-05-17 55,641.24 31.993.69 23,647.55 NEW 36 EX40000007 2015 CATERPILLAR 320DLCR 40 METRIC TON EXCAVATOR 2022-05-11 43,565.05 25,049.99 18,515.06 NEW 36 EX40000008 2016 CATERPILLAR 336FL 40 METRIC TON EXCAVATOR 2022-05-11 54,412.98 31,287.36 23,125.62 NEW 36 EX40000009 2016 CATERPILLAR 336FL 40 METRIC TON EXCAVATOR 2022-05-11 48,661.75 27,980.42 20,681.33 NEW 36 EX40000011 2017 VOLVO ECR305CL 40 METRIC TON EXCAVATOR 2022-05-17 65,267.57 37,540.37 27,747.20 NEW 36 EX40000012 2017 VOLVO ECR305CL 40 METRIC TON EXCAVATOR 2022-05-17 71,342.51 41,021.88 30,320.63 NEW 36 MJS0000015 2021 CRACK PRO 125D E2745 HH ASPHALT JOINT SEALER 2023-03-14 62,289.61 13,496.08 48,793.53 NEW 36 MJSa000016 2021 CRACK PRO 260 D-E2755HH ASPHALT JOINT SEALER 2023-03-14 87,666.81 14,661.14 53,005.67 NEW 60 MJS0000017 2021 CRACK PRO 260 D-E2755HH ASPHALT JOINT SEALER 2023-03-14 87,666.81 14,661.14 53.005.67 NEW 60 MJS0000018 2021 CRACK PRO 260 D-E2755HH ASPHALTJOINT SEALER 2023-03-14 67,666.81 14,661A4 53,005.67 NEW 60 MJ80000019 2021 CRACK PRO 260 D-E2755HH ASPHALTJOINT SEALER 2023-03-14 67,666.81 14,661.14 53,005.67 NEW 60 60 MJS0000020 2022 CRACK PRO 260 D-E2755HHASPHALTJOINT SEALER 2023-03-14 71,909.46 15,580.37 56,329.09 MJ80000021 2022 CRACK PRO260 D-E2755HH ASPHALT JOINT SEALER 2023-03-14 71,909.46 15,580.37 NEW 60 MTA0000007 2014 WEILER E2850 ASPHALT TRANSFER VEHICLE 2022-05-11 44,687.03 28,550.13 56,329.09 NEW 60 MTAODOOD11 2016 WEILER E2850 ASPHALT TRANSFER VEHICLE 2022-OS-11 72,848.64 463542.11 16,136.90 NEW 36 MTA0000012 2016 WEILER E2850 ASPHALT TRANSFER VEHICLE 2022-05-11 79,056.20 50.508.23 26,306.53 NEW 36 MTA0000013 2017 WEILER E2850 ASPHALT TRANSFER VEHICLE 2022-08-30 114,318.42 28,547.97 NEW 36 OD78000008 2018 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2022-05-17 59,419.93 22,625.58 91,692.84 NEW 96 OD78000009 2018 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2022-05-17 58,864.60 34,166.50 33,847.26 25,253.43 NEW 36 OD78000010 2018 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2022-0547 59,419.93 34,166.50 25,017.34 NEW 36 OD78000011 2018 CATERPILLAR CBi3 78" VIBRATORY COMPACTOR 2022-05-17 59,419.90 25,253.43 NEW 36 OD78000012 2018 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2022-05-17 68,864.60 34,166.50 25,253.40 NEW 36 OD78000013 2018 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2022-05-17 58,864.60 33,847.26 25,017.34 NEW 36 OD78000014 2018 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2022-05-17 58,864.00 33,047.26 33,847.26 25,017,34 NEW 36 OD78000015 2018 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2022-05-17 59,419.93 34,166.50 25,017.34 NEW 36 OD78000016 2018 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2022-0547 59,419.93 34,166.50 25,253.43 NEW 36 OD78000017 2018 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 2022-05-17 59,419.93 34,166.50 25,253.43 NEW 36 OD78000038 2020 CATERPILLAR CB13 78" VIBRATORY COMPACTOR OSCILL 2022-04-28 174.172.46 37,556.01 25,253.43 NEW 36 0078000039 2020 CATERPILLAR CB13 78" VIBRATORY COMPACTOR OSCILL 2022-04.28 173,185.92 37,343.26 136,616.45 USED 96 TEX0000002 2016 GRADALL XL41 00 IV TELESCOPING EXCAVATOR 2022-05-11 69,616,50 40,029.43 135,842.66 USED 96 WL03000013 2017 CATERPILLAR 938M LOADER WHEEL 2022-05-17 52,012.48 29,907.13 29,587.07 NEW 36 WL03000014 2017 CATERPILLAR 938M LOADER WHEEL 2022-05-17 68,972.71 33,909.36 22,105.35 NEW 36 WL03000015 2017 CATERPILLAR 938M LOADER WHEEL 2022-05-17 68,268.38 33,504.33 25,063.35 NEW 36 WL03000018 2022 CATERPILLAR 938M LOADER WHEEL 2022-05-10 22,463.33 22,463.33 20,217.00 20,217.00 24,764.05 NEW 36 WL07000014 2016 CATERPILLAR 972M XE WHEEL LOADER 2022-05-17 2,246.33 NEW 12 WL07000015 2016 CATERPILLAR 972M XE WHEEL LOADER 2022-05-17 106,831.58 61,428A7 41,246.33 NEW 45,403.41 36 WL07000016 2017 CATERPILLAR 972M XE WHEEL LOADER 2022-05-17 106,778.45 61,397.58 NEW 45,380.87 NEW 3s WX19000002 2017 CATERPILLAR M317F CR WHEELED EXCAVATOR 2022-05-17 69,742.36 40,101.88 29,640.48 NEW 36 APOBOOOO19 2020 CATERPILLAR AP555F PAVER ASPHALT 8' TRACK 2024-01-26 151,980.00 5,066:00 146.914.00 NEW 36 D080000002 2023 CATERPILLAR Di XL DCW3000009 2015 CATERPILLAR CT660LTRIAXLE TRACTOR-GLIDER+WATER 2023-06-07 2023.04-01 144,454,28 13,542.60 130,9i1.68 NEW 54 96 DD55000001 2023 CATERPILLAR C84.4 55" VIBRATORY COMPATOR 2023-04-21 36,283.30' 82,792.32 18,420.70 17,862.60 USED 10 DD55000002 2023 CATERPILLAR CB4.4 55" VIBRATORY COMPATOR 2023-04-21 82,792.32 8,537.98 8,537.98 74,254.34 NEW 96 DD55000003 2023 CATERPILLAR C84.4 55" VIBRATORY COMPATOR 2023-05-10 8662185 8,932,88 74,254.34 NEW 96 D055000004 2023 CATERPILLAR CB4.4 55" VIBRATORY COMPATOR 2023-OS-10 ,. 86,621.85 8,932.88 77,688.97 NEW 96 EX90000001 2017 CATERPILLAR 39OF-LR 90 METRIC TON EXCAVATOR 2023-09-11 665,795.00 43,692.81 77,88.97 NEW 96 HPL3500001 2023 ANDERSON HP35 HYDRA PLATFORM LIFT 2023-04-01 85,600.00 8,559.96 622,102,19 USED 96 MM22000001 2018 CATERPILLAR PM622 MILLING MACHINE 2023-OU9 253,204.80 37,980.72 77,040.04 NEW 215,224.08 USED 120 RB09800001 2024 CERTIFIED REBUILD WL10006001 SSLIOD0012 2021 CATERPILLAR 236D3 SKID STEER LOADER 2024-01-02 333,106.86 18.505.94 314,600.92 NEW 48 36 SSL1800013 2021 CATERPILLAR 236D3 SKID STEER LOADER 2021-04-23 2021-04-23 41,865.76 41,865.76 13,737.15 28,128.61 NEW 96 SSL1800015 2022 CATERPILLAR 236D3 SKID STEER LOADER 2022-04-28 53,233.20 13,737.15 11,478.38 28,128.81 NEW 41.754.82 96 SSL18000i6 2022 CATERPILLAR 236D3 SKID STEER LOADER 2022-04-28 53,233.20 11.478.38 NEW 41,754.82 NEW 96 SSL1800017 2022 CATERPILLAR 236D3 SKID STEER LOADER 2022-04-28 53,233.20 11,478.38 41,754.82 NEW 96 SSL1800018 2022 CATERPILLAR 236D3 SKID STEER LOADER 2022-04-28 53,233.20 11,478.38 41,754.82 NEW 96 SSL2700019 2022 CATERPILLAR 262D3 SKID STEER LOADER 2022-05-25 61,799.99 12,746.36 49,053.63 NEW 96 SSL2700020 2022 CATERPILLAR 262D3 SKID STEER LOADER 8BL2700021 2022 CATERPILLAR 262D3 SKID STEER LOADER 2022-07 29 64,889.08 12,168.80 52,722.28 NEW 96 96 SSL2700022 2022 CATERPILLAR 262D3 SKID STEER LOADER 2022-07-29 2022-07-29 64,889.08 64,889.08 12,166.80 62,722.28 NEW 96 SSL2700023 2022 CATERPILLAR 262D3 SKID STEER LOADER 2022-08-29 64,889.08 12,166.80 11,534.35 52,722.28 NEW 53,354.73 96 SSL2700025 2022 CATERPILLAR 262D3 SKID STEER LOADE 2022-08-29 64,889.08 11,534.35 NEW 53,354.73 NEW 96 SSL3400001 2021 CATERPILLAR 272D3 SKID STEER LOADER 2021-OS-24 67,5fi3,34 21,535.94 46,027.40 NEW 96 WL07000017 2017 CATERPILLAR 972M XE WHEEL LOADER WL07000018 2017 CATERPILLAR 972M XE WHEEL LOADER 2023-06-01 131.041.44 32.760.40 98,281.04 NEW 96 3s WL07000019 2018 CATERPILLAR 972M XE WHEEL LOADER 2023-06-01 2023-06-01 131,041.44 146,178.24 32,760.40 98,281.04 NEW 36 WL08000014 2018 CATERPILLAR 980M LOADER WHEEL 2023-06-01 199,589.52 36,544.60 49,897.40 109,633.64 NEW 149,692.12 NEW 36 WL08000015 2018 CATERPILLAR 980M LOADER WHEEL WL08000016 2018 CATERPILLAR 980M LOADER WHEEL 2023-06-01 201,472.44 50,368.10 l51,104.34 NEW 36 36 WLO9000008 2020 CATERPILLAR 982M LOADER WHEEL 2023-06-01 2023-04-01 199,589.52 350,000.00 49,897.40 149,692.12 NEW 36 APT0000002 2007 LEEBOY 8500 PAVER ASPHALT TOW 2007-04-10 118,167.00 39,375.00 118,167.00 310.625.00 USED D ATT7676 ATTACHMENT JOINT HEATER 2008-03-26 37,240,98 37,240.98 - NEW NEW 48 BKT1000003 CATERPILLAR 60" F/330L BUCKET EXCAVATOR 2005-OS-i6 957445 ,. 861700 957.45 NEW 0 BKT1000004 2006 AIM 48" BUCKET EXCAVATOR 2006-05-18 5,136.76 ,. 4,623.09 513.67 NEW qg CWKT200001 PAVING PACKAGE CLOSE RADIUS CWKT800001 ATTACHMENT 24 FT SKEW W/TG02 2005-04-22 12,402.68 11,162.41 1,240.27 NEW 48 48 CWKT900001 ATTACHMENT TINING SYSTEM W/TC-03 2006-06-20 2010-03-25 19,169.00 12,918.40 17,243.10 • 1,915.90 NEW 48 PHOOO00009 HEATERASPHALT 2016-05-01 18,746.40 12,918.40 18,746.40 - NEW 48 WRKT400007 2004 SWEEPSTER 21072MH002 ATTACHMENT BROOM 2005-03-31 5,575.00 6,017.50 557.50 USED 48 WRKT600001 C-3 40 FT HMA TRANSFER CONVEYOR BLDI6942 MANTON TRANSFORMER & METER 2011-07-03 Si,500.00 46,350.00 5,150.00 NEW 48 48 BLD17133 PUMP AC UNLOADING 2002-06-21 2004-05-15 45,599.83 6,194.48 45,599.83 0 BLO17036 ELECTRICAL BUILDING UPGRAD 2003-04-01 3,980.00 6,194.48 3,980.00 - NEW - NEW 0 BLS14i79 TANKASPHALT BL816858 PLANT SETUP 327 60% 2012-03-01 18,834.55 18,834.55 - NEW 0 p BL8I6947 INSULATION HOT OIL LINES 2001-11-09 2002-10-09 63,501.67 11,830.00 63,501.67 11,930,00 - USED p BLS17024 RACK TRUCK SPRAY DOWN BLSI7059 RACK TRUCK SPRAY DOWN 2003-04-01 7,016.48 7.016.48 - NEW NEW 0 0 BLS17065 SAFETY CATWALK & STAIRS 2003-04-01 2003.08-27 3,850.71 3,850.71 3,850.71 3.850.71 - NEW 0 BLS17120 LADDERS & PLATFORMS SAFETY 2004-04-01 47.900.00 41,900.00 USED - NEW p BLSI7158 INSULATION HOT OIL LINES BL817293 INSULATION HOT OIL LINES 2004-0849 9,600.00 9.600.00 p 0 BL817445 RACK TRUCK SPRAY DOWN 2005-08-01 2018-06-01 4,800.00 4,459.02 4,800.00 4.459.02 - NEW 0 BL317603 LIQUID AC TRANSFER SYSTEM 2007-05-19 151,676.51 151,676,51 - NEW - USED D BL3I7604 LIQUID AC TRANSFER SETUP BLS1762i RACK TRUCK SPRAY DOWN 2007-05-19 284,655.59 284,655.59 - NEW 0 0 BLSI7725 RACK TRUCK SPRAY DOWN 2008-05-03 2008-OS-03 20,108,76 9,304.65 20,108.78 9,304.65 NEW p DRAG000001 1978 BUCYRUS-ERIE 88-B HD DRAGLINE 2019-05-01 119.304.65 9,063.52 119,304.6 NEW 1,98 - NEW D GENOOO0009 1997 CATERPILLAR 3406C GENERATOR 320 kW PRIME 2000-03-22 5,375.08 USED qg GEN0000011 CATERPILLAR 3512 GENERATOR 2000-03-2 135,375.08 39,002.47 135,375.08 39,002.47 - USED 148 GEN0000014 1988 CATERPILLAR 3508 GENERATOR 75OKW 2008-03-07 USED 120 GEN0000015 1999 GENERATOR SET 825KW 2017-04-01 85,162,67 85,162,67 - USED 36 GEN0000016 1999 GENERATOR SET 125KW 2017-04-01 26,263.07 26,263.07 - USED 60 GEN0000017 2018 AKSA POWER ADD-ULP56 GENERATOR 56KW 2018-07-01 31.992.94 12,264.06 19,728.88 NEW 60 GENOODOO18 2018 AKSA POWER ADD-ULP56 GENERATOR 56KW 2018-07-01 26,024.97 8,915.96 17,109.01 NEW jgp0 GEN0000023 1995 GENERATOR GEN0000025 GENERATOR SET455KW 2005-03-31 8,000.00 7,200.00 800.00 USED 120 GEN0000027 GENERATOR SET225KW 2016-07-01 2016-07-01 26,000.00 24,000.00 10,i51.82 15,848.18 USED 240 GEN0000028 GENERATOR SET 100 KW 2016-07-01 8,000.00 12,992.80 3,123.42 11.007.20 USED 4,876.58 USED 240 GEN0000031 2020 AKSA APD-ULP56 GENERATOR 56 KW 2020-10-01 24,138.10 8,448.30 15,689.80 NEW 240 GNT0000001 TRAILER GENERATOR 1999-09-21 46,664.07 46,664.07 - USED 120 GNT0000004 TRAILER GENERATOR GNT0000005 TRAILER GENERATOR 2005-03-31 493,96 444.56 49,40 USED 120 120 GNT0000006 TRAILER GENERATOR 2005-03-31 2005-03-31 212.00 530.00 190.80 21.20 USED 120 LAN14549 WASTE RECOVERY SYSTEM 1982-03-22 116,299A3 477.00 116,299,13 53.00 USED NEW 120 PAB0000002 AUTO CONTROLS & HOUSE 2010-12-14 108,379.81 108,379.81 USED 120 PAB0000003 CONTROL HOUSE 2007-07-21 87,532.03 74,402.23 13,129.80 NEW 120 180 PABO000006 MARTING BLENDING CONTROLS & HOUSE 2012-03-03 99,835.00 99,835.00 - USED PAB0000007 MARTIN BLENDING CONTROLS & HOUSE 2012-03-03 79,355.00 79,355.00 - USED 180 PAB0000013 AUTO CONTROL BATCH MIXING 1992-06-01 26,807.06 26,807.06 - NEW 180 PAB0000014 CONTROLS PLANT/BLENDING 2017-04-01 375,659.91 262,962,00 112,697.91 NEW 120 120 PAB0000015 CONTROLS BURNER 2017-04-01 23,966.78 16,776.48 7,190.30 NEW 120 PAB0000016 CONTROL HOUSE 2008-04-28 125,736.69 125,736.69 - NEW 120 PA80000020 CONTROL HOUSE 2006-04-01 95,245.00 80,958.25 14.286.75 USED 180 PAB0000023 AUTO CONTROL BLENDING SYSTEM 2013.02-16 41 948.18 41,948.18 - NEW PAB0000024 AUTO CONTROL 2000-04-01 24,364.65 21,928,18 2,436.47 NEW 120 120 PAS0000025 CONTROLS PLANT/BLENDING 2017-04-30 418,569.57 291,690.44 126,879.13 NEW 120 PAB0000026 CONTROLS BURNER 2017-04-30 23,836.78 16,611.32 7,225.46 NEW 120 PAB0000027 CONTROLS PLANT/BLENDING 2017-04-30 367,431.69 256,054.19 111,377.50 NEW 120 PAB0000028 CONTROLS PLANTBLENDING 2017-04-30 380,370.65 265.070.68 115,299.97 NEW 120 PAB0000029 CONTROLS PLANT/BLENDING 2018.04-01 46,364.25 27,818.64 18,545.61 NEW 120 PAB0000030 CONTROL BURNER 2005-03-31 13jd7.22 11,183,64 1,973.58 NEW 180 PAB0000032 CONTROL 2005-03-31 10,000.00 8,500.00 1,500.00 USED 180 PA60000033 CONTROLS PLANT/BLENDING 2017-04-30 44,243.93 30,832.50 13,411.43 NEW 120 PAB0000035 2018 LIBRA SYSTEMS ADP-100 PLANT BLENDING CONTROLS 2018-04-01 42,216.17 42,216.17 NEW PAB0000040 AUTO CONTROL UPGRADE 2010-07-26 38,593.73 38,593.73 - NEW 120 PASOC00042 AUTO CONTROL UPGRADE 2001-06-30 39,943.24 3%943,24 - NEW 120 PAB0000049 CONTROLS/PLANT BLENDING 2020-03-30 43,844.92 17,537.76 26,307.16 NEW 120 120 PAB0000050 CONTROLS/PLANT BLENDING 2020-03-30 74,980,00 29,991.84 44,988.16 NEW 120 PAB0000051 2020 MINDS DRUMTRONIC BLENDING CONTROL SYSTEM 2020-04-01 285,767.75 114.3O7.20 171,460.55 NEW PAB0000052 2020 MINDS DRUMTRONIC BLENDING CONTROL SYSTEM 2020-04-01 327,426.43 130,970.40 196,456.03 NEW 120 PAB0000053 2020 MINDS DRUMTRONIC BLENDING CONTROL SYSTEM 2020-04-01 305,403.14 122,181.44 183,241.70 NEW 120 PAC0000001 HOPPER W/PLATE FEEDER 2016-07-01 4,000.00 1,562.18 2,437.82 USED 120 PAC0000002 HOPPERAGGR 2016-07-01 4,000.00 1,562.18 2,437.82 USED 240 240 PAC0000003 CRUSHER CONE 4.25 2016.04-01 141,601.35 56,640.36 84,960.99 NEW 180 PAC0000004 CRUSHER AGGREGATE 2007-03-24 265,348.42 199,011.31 66,337.11 USED 180 PAC0000005 STEDMAN CRUSHER 2005-03-31 10,000.00 9,000.00 1,000.00 USED 120 PAC0000006 CEDARAPIDS JAW CRUSHER 2016-07-01 78,000.00 30;455.80 47,544.20 USED 240 PAC0000007 CRUSHER CONE 2005-03-31 20,000.00 20,000.00 - USED 12 0 PAC0000008 CRUSHER CONE 2008-04-18 190,000.00 142,500.00 47,500.00 USED 12 PAC0000009 CRUSHER CONE 2005-03-31 149,763.00 134,786.70 14,976.30 USED 180 0 PAC0000010 CRUSHER 2005-03-31 57,609.00 51,848.10 6,760.90 USED 120 PAC0000011 CRUSHER AGGREGATE 2006-04-01 268,403.01 201,302.25 67,100.76 USED 120 PAGO000012 CRUSHER PAC0000013 METSO NORBERG GP220 CONE CRUSHER 2005-03-31 2016-07-01 252,930.00 295,000.00 227,637.00 25,293.00 USED 180 120 PAC0000014 CRUSHER CONE 2016-W-01 45,000.00 115,185.58 45,000,00 179,814.42 USED - USED PAC0000016 CRUSHER JAW W/FEEDER 2018-05-31 590,323.22 209,565.02 380,758.20 USED 240 180 PAC0000016 PLANT JAW 2016-07-01 305,000.00 119,089.62 185,910.38 USED 240 PA02 CRUSHER SYSTEM 1998-06-24 11,542.82 10,388.54 1,164.28 NEW p PAP0000000000 2000 MAGNUM 4250TM TRACKMOBILE 2000-07-03 202,858.03 183,030A6 19,827.67 NEW 120 3 PAP00000024 INCH MAGNET 2009-0547 6,494.69 6,458.32 36.37 NEW 180 PAP0000004 USED INCH MAGNET 2007-11-09 10,500,00 10,500.00 - USED PAP0000005 CYCLONE (2) 2016-07-01 3,000.00 1,171AO 1,828.60 USED 120 240 PAS0000002 2000 POWERSCREEN COMMANDER 408 SCREENING PLANT 2003-02-04 88,300.00 79,470.00 8,830.00 USED PAS0000003 1996 FINLAY SCREENING PLANT 2006.04-01 40,000.00 36,000.00 4,000.00 USED 180 120 PAS0000004 2018 MCCLOSKEY INTERNATIONAL MCC 5190-2DT SCREENING PI2017-02-22 250,584.00 01,880.58 158,703.42 NEW PAS0000005 2001 TRIO SCREENING PLANT 2003-02-04 33,300.00 29,970.00 3,330.00 NEW p 180 PAS0000006 KOLMAN-ATHEY 101EXHD SCREENING SCREEN 2016-07-01 15,000.00 5,851.00 9,143.00 USED PAS0000007 1995 FINLAY SCREENING PLANT 2005-03-31 44,000.00 39,600.00 4,400.00 USED 240 240 PAS0000008 CEDARAPIDS SCREENING PLANT 2016-07-01 85,000.00 333189.38 51,810.62 USED 240 PAS0000010 2006 FINTEC 570-186 TRACK SCREENING PLANT 2016-07-01 125,000.00 48,807.42 76,192.58 USED PBE0O00001 BUCKET ELEVATOR 2012-03-03 5,621.00 53621.00 - USED 24240 0 PBF0000001 HARTMAN FEEDER 2005.03-31 9,500.00 9,500.00 - USED PBF0000003 CONVEYOR BELT 30 X 93 1978-02-17 10.456.00 10,456.00 - NEW p PBH0000001 2003 DILLMAN 72M BAGHOUSE 2005-03-31 80.000.00 72,000.00 8,000,00 USEQ 0 120 PBH0000003 ADM BAGHOUSE 2010-12-14 142.984.12 142,984.12 - USED 120 PBH0000004 BAGHOUSE 1989-04-04 98,994.68 98,994.68 - NEW 120 SAG OUH&B PBH0000004 BAGHOUSE 2003-04-04 471,713.50 424,542.15 47.171.35 NEW 180 PBH0000005 BARBER GREENE BAGHOUSE 2012-03-03 99,835.00 99,835.00 - USED PBH0000009 2016 ASTEC SAGHOUSE 2016-04-01 591.379.43 473,103.36 118.276.07 NEW 180 120 PBH0000010 2018 ALMIX BAGHOUSE 2018-06-03 514,243.71 299,975.20 214,268.51 NEW 120 PBH0000011 ASTEC BAGHOUSE 2014-03-28 99.232.12 89,308.91 9,923.21 NEW 75 PBHO000012 1990 DUST COLLECTOR 1992-04-01 58,939.35 58,939.35 - NEW PBH0000013 DCS-RA-2000 DUST COLLECTOR 2001-06-30 53.525.00 53,525.00 - NEW 120 PBH0000016 2014 DILLMAN BAGHOUSE 2014-05-03 311.286.37 186,000.00 125,286.37 NEW 120 180 PBH0000017 BAGHOUSE P81-10000018 CEDARAPIDS SAGHOUSE 2009-03-16 1999-04-23 620,000.00 558,000.00 62,000.00 USED 180 , P8H0000020 BAGHOUSE 2009-03-16 159,893.40 3543000.00 143,904.06 318,600.00 16,989.34 USED 35.400.00 USED 120 PBHOO00021 DUST RECOVERY SYSTEM 1983-07-27 165,100.00 148,590.00 16,510.00 NEW 180 120 PBH0000022 2000 DILLMAN 72M BAGHOUSE 2005-03-31 144,430.00 122,765.50 21,664.50 USED 180 PBH0000023 GENTEC 58544 BAGHOUSE 2005-03-31 59,780.00 53,802.00 5,978.00 USED 120 PBH0000024 CMI BAGHOUSE 2005-04-28 209,942.69 209,942.69 - USED 120 PBH0000025 BAGHOUSE 1993-05-13 194,073.06 194,073.06 - NEW 120 PSH0000029 2018 STACK EXTENSION 2018-08-04 29,854.98 29,854.98 - NEW 120 PBH0000030 BAGHOUSE UPGRADE 1994-03-31 16,972.75 16,972.75 - NEW PBH0000032 KNOCK OUT BOX W/DUCTWORK 2016-04-01 65,985.95 65,985.95 - NEW 120 PBH0000033 AIR SYSTEM UPGRADE 1996-04-15 129,48S.79 116,987.64 12,498.15 NEW 120 120 P8H0000034 EXHAUST STACK FAN 2006-04-01 25,000.00 22,916.90 2,08310 USED 120 PSH0000035 EXHAUST FAN INSTALL W/DUCTWORK 2015-04-01 42,869.22 38,582.52 4,286.70 NEW 120 PBH0000036 EHAUST FAN 2015-04-01 137,179.56 123,461.88 13,717.68 NEW 120 PBH0000037 40' STACK 2015-04-01 20,140.67 18,126.72 2,013.95 NEW 120 PBH0000038 CYCLONE 2014-03-28 33,425.02 30.082.52 3,342.50 NEW 75 PBH0000039 EXHAUST FAN ASSEMBLY 2017-04-30 43,146.15 30,067.65 13,078.50 NEW 120 PBH0000041 EXHAUST STACK EXTENSION 2004-04-24 6,710.04 6,710.04 - NEW PBH0000042 STACK 1994-04-30 22,135.41 19.921.87 2,213.54 NEW 120 120 PBHO000043 STACK EXTENSION 2007-05-26 38,652.63 36,652.63 - NEW 12p PBH0000044 EXHAUST STACK FAN 2001-08-11 42,385.21 42.385.21 - NEW 120 PBH0000051 2018 CWMF BHS-80-672 PULSE JET BAGHOUSE 2019-11-28 726,356.93 357,125.23 369,231.70 NEW 120 PBH0000053 2019 ASTEC D-RPBH-80498 80000 CFM BAGHOUSE 201841-02 796,030.73 384,748.22 411.282.51 NEW 120 PBH0000055 2019 ASTEC D-R-PBH-58-498 58000 CFM BAGHOUSE 2018-12-14 789,105.08 381,401.04 407.704.04 NEW 120 PBS0000004 SCALE BELT AGGRREGATE 2010-04-01 17,401.07 17,401.07 - NEW 120 PBS0000006 CONVEYOR SCALE COLD FEED 2009-03-16 25,500.00 22,950.00 2.550.00 USED 180 PBS0000007 CONVEYOR SCALE RECYCLE 2009-03-16 35,000.00 31.500.00 3.500.00 USED 180 PBS0000008 SCALE BELT 2003-04-26 23,963.04 23,963.04 - NEW 120 PBS0000009 CONVEYOR SCALE COLD FEED 2009-03-16 25,500.00 22,950.00 2,550.00 USED 180 PBS0000010 CONVEYOR SCALE RECYCLE 2009-03-16 35,000.00 31,500.O0 3,500.00 USED 180 PBS0000011 CONVEYOR SCALE COLD FEED 2009-03-16 19,500.00 17,550.00 1,950.00 USED 180 PBS0000012 CONVEYOR SCALE RECYCLE 2009-03-16 29,000.00 26,100.00 2,900.00 USED 180 PBS0000013 CONVEYOR AGG SCALE 1983-07-27 26.320.75 21,688.67 4,632.08 NEW 120 PBS0000014 SCALE BELT AGGRREGATE 2003-11-01 13,473.36 13,473.36 - NEW 120 PBSOO00015 SCALE BELT RECYCLE 2007-0544 13,186.81 13,186,81 - NEW 120 PBS0000016 SCALE BELT AGGRREGATE 2006-05-06 7,808.49 7,808.49 - NEW 180 PBSCOOOO17 SCALE BELTAGGRREGATE 2006-05-06 8,737.49 8,737.49 - NEW PBSOOOOO19 CONVEYOR SCALE 2005-03-31 5,350.00 4,815.00 535.00 USED PBS0000020 SCALE BELT AGGRREGATE 2006-05-06 8.396.02 8,396.02 - NEW PBS0000021 BELTSAMPLER 2004-1046 14,216.42 14,216.42 - NEW PBS0000022 BELT SCALES 2002-0548 24,032.46 24,032.46 - NEW PCA0006001 2018 MCCLOSKEY INTERNATIONAL MCC ST-100V STACKER CON% 2017-02-22 132,500.00 48,583.26 83,916.74 NEW PCA0000012 CONVEYOR 2009-04-01 3,500.00 3,500.00 - USED PCA0000014 CONVEYOR 42" X 2800' 2016-07-01 450,000.00 175,706.40 274,293.60 USED PCA0000015 CONVEYOR CHANNEL FRAME 2016-07-01 27,000.00 10,542.60 16,457.40 USED PCA0000016 CONVEYOR 2016-07-01 5,000.00 1,952.02 3,047.98 USED PCA0000018 CONVEYOR 1980-05-18 57,097.35 57,097.35 - NEW PCA0000019 CONVEYOR UNLOADING 1987-12-11 21,717.03 19,545.33 2,171.70 NEW PCA0000020 WEIGH BRIDGE 2000-05-20 13,413,59 12,072.23 1,341.36 NEW PCA0000024 CONVEYOR SYSTEM 1998-06-24 174,246.74 156,822.07 17,424.67 NEW PCA0000025 WEIGH BRIDGE 2000-07-22 8,743.75 7,869.39 874.36 NEW PCA0000026 CONVEYOR (2) 2002-05-30 93,667.49 84,300.74 9,366.75 NEW PCA0000027 CONVEYOR SAND SCREW 2002-06-03 81,099.44 81,099.44 - NEW PCA0000028 CONVEYOR SYSTEM LATTICE 2006-12-29 31,312.64 31.312.64 - USED PCA0000030 CONVEYOR PCA0000032 CONVEYOR 2005-03-31 8,410.00 7,569.00 841.00 USED PCA0000034 CONVEYOR 2005-03-31 2005-03-31 8,100.00 9,600.00 7,290.00 8,640.00 810.00 USED 960.00 USED PCA0000035 CONVEYOR PCA0000039 CONVEYOR 2005-03-31 20,000.00 18,000.00 2,000.00 USED PCA0000040 CONVEYOR TRI PACK 2008-06-01 2010-05-01 194,103.67 106,450.00 153,077.75 41,025.92 USED PCA000004i CONVEYOR SLIDE -PAC 36 X 80 2018-07-30 132,316.92 98,867.52 50,244.12 7,582.48 NEW 82,072.80 NEW PCA0000042 CONVEYOR RAW AGGRREGATE 2005-03-31 4,800.00 4.320.00 480.00 USED PCA0000043 CONVEYOR 2005-03-31 3,000.00 2,700.00 300.00 USED PCA0000045 CONVEYOR RAW AGGRREGATE 2005-03-31 10,000.00 10,000.00 - USED PCA0000046 CONVEYOR PCA0000048 CONVEYOR 2005-03-31 3.365.00 3,028.50 336.50 USED PCA0000049 CONVEYOR 2005-03-31 2005.03-31 5,050.00 3,385.00 4,545.00 3,046.50 505.00 USED 338.50 USED PCA0000051 CONVEYOR SLIDE -PAC 36 X 80 2018-07-30 132,316.91 50,244.12 82,072.79 NEW PCA0000052 CONVEYOR PCA0000053 CONVEYOR 2005.03-31 7,385.00 6,646.50 738.50 USED PCA0000054 CONVEYOR 2005-03-31 2005-03-31 6,760.00 6,100.00 6,084.00 5,490.00 676.00 USED 610.00 USED PCA0000055 CONVEYOR 2005-03-31 17,615.00 15,853.50 1,761.50 USED PCA0000058 CONVEYOR PCA0000064 CONVEYOR 2005-03-31 39,485.00 35,536.50 3,948.50 USED PCA0000069 CONVEYOR CHANNEL FRAME 2009.06-01 2016-07-01 10,000.00 8,000.00 10,000.00 3.123.42 - NEW 4,876.58 USED PCA0000070 CONVEYOR PCA0000071 CONVEYOR 2016-07-01 30,000.00 11,714.00 18,286.00 USED PCA0000072 CONVEYOR 2016-07-01 .2016-07-01 20,000.00 5,000.00 7.809.02 1,952.02 12,190.98 USED 3,047.98 USED PCA0000073 CONVEYOR FEEDING 2016-07-01 6,000.00 2,342.80 3,657.20 USED PCA0000074 CONVEYOR LATTICE FRAME 2016-07-01 8,000.00 3,123.42 4,876.58 USED PCA0000075 CONVEYORAFRAME 2016-07-01 10,000.00 3,904.38 6,095.62 USED PCA0000076 CONVEYOR FIELD PCA0000077 CONVEYOR 2016-07-01 10,000.00 3,904.38 6,095.62 USED PCA0000078 CONVEYOR FEED 2016-07-01 2016-07-01 4,000.00 8,000.00 1,562.18 3,123.42 2,437.82 USED 4,876.58 PCA0000079 CONVEYOR FEEDER 2016-07-01 12,000.00 4,685.60 USED 7,314.40 USED PCA0000080 CONVEYOR 2016-07-01 5,000.00 1,952.02 3,047.98 USED PCA0000081 CONVEYOR PCA0000082 CONVEYOR FEEDER 2016-07-01 5,000.00 1,952.02 3,047.98 USED PCA0000085 2019 KPI 33-36150 SUPER STACKER CONVEYOR 2016-07-01 2019-08-13 10,000.00 256,800.00 3,904.38 79,893.52 6,095.62 USED 176,906.48 NEW PCB0000001 BATCHING SYSTEM 1996-04-12 169,615.77 169,615.77 - NEW PCC0000001 CONVEYOR 2005-03-31 1.080.00 972.00 108.00 USED PCC0000002 CONVEYOR 2005-03-31 19,750.00 17,775.00 1,975.00 USED PCC0000003 CONVEYOR RECYCLE 2005-03-31 16,700.00 15,030.00 1,670.00 USED PCC0000004 CONVEYOR COLD FEED 2009-04-01 52,811.50 52,811.50 - NEW PCC0000005 CONVEYOR 1980-03-29 14,350.00 14,350.00 NEW PCCO000006 CONVEYOR RECYCLE 1991-06-22 19,487.37 19,487.37 - NEW PCCOOOOD07 CONVEYOR FEED BIN 1992-06-01 32,569.95 32,569.95 - NEW PCCOOD0008 CONVEYOR VIRGIN AGGREGATE 2000-02-25 65,626.64 57,423.31 8,203.33 NEW P000000009 CONVEYOR 1966-11-03 10,892.80 10,892.80 - NEW PCC0000010 CONVEYOR 1966-11-03 10,892.80 10,892.80 - NEW P000000011 CONVEYOR 1966-11-03 10,892.80 10,892.80 - NEW PCC0000012 CONVEYOR RECYCLE 1982-09-30 22,626.84 22.626.84 - NEW PCC0000016 CONVEYOR FEED BIN 2003-02-04 5,300.00 4,770.00• 630.00 USED PCC0000017 CONVEYOR COLLECTING 2009703-16 15,500.00 13,950.00 1,550.00 USED PCCOOOOO18 CONVEYOR COLLECTING 2009-03-16 15,500.00 13,950.00 1,550.00 USED P000000019 CONVEYOR 2009-03-16 20,000.00 18,000.00 2,000.00 USED PCC0000021 CONVEYOR COLLECTING 2009-03-16 7,750.00 6,975.00 775.00 USED PCC0000022 CONVEYOR COLLECTING 2009-03-16 7,750.00 6.975.00 775.00 USED PCC0000023 CONVEYOR COLLECTING 2009-03-16 5,250.00 4,725.00 525.00 USED PCC0000024 CONVEYOR COLLECTING 2009-03-16 5,250.00 4,725.00 525.00 USED PCCO000025 CONVEYOR COLD FEED 2005-03-31 83,500.00 70,975.00 12,525.00 USED PCC0000028 CONVEYOR 2005-03-31 15,285.00 13.756.50 1,528.50 USED PCC0000029 CONVEYOR RECYCLE PCC0000030 CONVEYOR VIRGIN AGGREGATE 2005-03-31 28,750.00 25,875.00 2.875.00 USED PCD0000001 MIXING DRUM CONCRETE PLANT 1999-09-21 2011-07-03 21.929.26 150,213.00 21,929.26 150,213.00 - USED PCDOO00002 REX MODELS MIXING DRUM CONCRETE PLANT 1966-11-03 122,199.00 122,199.00 - NEW NEW PCF0000001 BIN COLD FEED 2009-12-21 57,247.09 48,660.03 8,587.06 NEW PCF0000002 BIN COLD FEED 2009-12-21 57.247.10 48,660.03 8,587.07 NEW PCF0000003 BIN COLD FEED (6) 2010-12-14 111,638.24 111.638.24 - USED PCF0000O04 BIN COLD FEED 1996-04-01 42.588.74 42.588.74 - NEW PCF0000005 BIN COLD FEED 1998-05-02 33,230.37 33,230.37 - NEW PCF0000006 BIN COLD FEED 1985.04-01 15,502.27 13,952.04 1,550.23 NEW PCF0000007 BIN COLD FEED 1985-04-01 15.502.27 13,952.04 1,550.23 NEW PCF0000008 BIN COLD FEED 1987-07-01 110,103.73 99,093.36 11,010.37 NEW PCF0000009 BIN COLD FEED 1989-04-04 35,409.06 31,868.15 3,540.91 NEW PCF0000010 BIN COLD FEED 1995-05-06 34.992.82 31,493.54 3,499.28 NEW PCF0000011 BIN COLD FEED (6) 2012-03-03 93.180.00 93,180.00 - USED PCFCOOOO12 BIN COLD FEED (6) 2012-03-03 99.195.00 99,195.00 - USED PCF0000013 BIN COLD FEED 14' 2018-04-01 46,221.64 46,221.64 - NEW PCF0000014 BIN COLD FEED (4) 2007-07-21 279.235.47 279.235.47 - NEW PCFOODOO15 BIN COLD FEED (6) 1999-04-23 102,791.86 102,701.86 - USED PCFOD00016 BIN COLD FEED 1982-07-31 41,583.98 373425.58 4,158.40 NEW PCF0000017 BIN COLD FEED 1998.06-24 30,233.95 27,210.55 3,023.40 NEW PCF0000018 BIN COLD FEED 1987-04-03 143,997.77 129,597.99 14.399.78 NEW PCF0000019 BIN COLD FEED 1989.04-04 3,184.29 2,865.86 318.43 NEW PCF0000020 BIN COLD FEED 1985-04-01 12,861.14 11,575.03 1.286.11 NEW PCF0000021 BIN COLD FEED 1985-04-01 12,861.14 11,575.03 1,286.11 NEW PCF0000022 BIN COLD FEED 1985-04-01 12,86-IJ4 11.575.03 1,286.11 NEW PCF0000023 BIN COLD FEED 1985-04-01 12,861.14 11,575.03 1.286.11 NEW POF0000024 BIN COLD FEED 1996-04-15 43,689,95 39,320.95 4.369.00 NEW PCF0000025 BIN COLD FEED SYSTEM (5) BINS 1995-OS-06 34.992.81 31.493.53 3,499.28 NEW 100 120 180 240 240 240 96 120 120 120 120 120 120 96 120 120 120 120 180 180 180 120 120 120 120 120 120 180 120 120 120 120 120 36 240 240 240 240 240 240 240 240 240 240 240 240 240 240 180 0 120 120 120 120 120 120 120 180 120 180 180 ISO 180 180 180 180 180 180 120 120 120 120 120 180 180 120 120 120 120 120 120 120 120 180 180 120 180 120 96 120 120 120 120 120 120 120 120 120 PCF0000026 BIN COLD FEED (6) 2007-04-01 95,680.59 60,243.34 35,437,25 NEW 108 PCF0000028 BIN COLD FEED (3) 2008-02-19 117,758.67 117,758.67 - NEW 120 PCF0000029 BIN COLD FEED (5) 2014-03-28 56,812.43 51,131.19 5,681.24 NEW 75 PCF0000031 BIN COLD FEED (6) 2006-04-01 81,710.00 69,453.50 12,256.50 USED 180 PCF0000032 BIN COLD FEED 2017-04-30 59,587.50 41,525.28 18,062.22 NEW 120 PCF0090033 BIN COLD FEED 2017-04-30 59,587.50 41,525.28 18,062.22 NEW 120 PCF0000034 BIN COLD FEED 10 2009-03-16 226,100.00 203,490.00 22,610.00 USED 180 PCF0000035 BIN COLD FEED 1981-03-30 60,703.86 54,633.47 6,070.39 NEW 120 PCF0000036 BIN COLD FEED 1985-04-01 12,861.14 11,575.03 1,286.11 NEW 120 PCF0000037 BIN COLD FEED 1985-04-01 12,881.14 11,575.03 1,286.11 NEW 120 PCF0000038 BIN COLD FEED 1989-04-04 23,936.27 21.542.64 2,393.63 NEW 120 PCF0000039 BIN COLD FEED (6) 1999-05-08 238,381.41 214,543.27 23,838.14 NEW 120 PCF0000042 BIN COLD FEED (10) 2009-03-16 141,000.00 126,900.00 14,100.00 USED 180 PCF0000043 BIN COLD FEED (4) 1999-09-21 72,631.93 65,368.74 7,263.19 USED 120 PCF0000044 BIN COLD FEED (4) 2005-08-09 35,658.48 35,658.48 - USED 120 PCF0000045 BIN COLD FEED (9) 2009-03-16 136,1o0.00 122,490.00 13,610.00 USED 180 PCF0000046 BIN COLD FEED 1983-07-27 108,433.50 973590.15 10,843.35 NEW 120 PCF0000047 BIN COLD FEED 1984-06-24 13,165.70 11,849.13 1,316.57 NEW 120 PCF0000048 BIN COLD FEED 1984-06-24 13,165.69 11,849.12 1.316.57 NEW 120 PCF0000050 BIN COLD FEED 1979-07-10 30,000.00 30,000.00 - NEW 120 PCF0000051 BIN COLD FEED 1992-04-01 25,780.42 25,780.42 - NEW 120 PCF0000052 BIN COLD FEED 1992-04-01 25,780.42 25,780.42 - NEW 120 PCF0000053 BIN COLD FEED (4) 1998-05-30 100,670.13 100,670.13 - NEW 120 PCF0000054 BIN COLD FEED 1984-06-24 13,165.70 13,165.70 - NEW 120 PCF0000055 BIN COLD FEED 1984-06-24 13,165.70 13,165.70 - NEW 120 PCF0000056 BIN COLD FEED 1988-08-29 6,642A4 6,642.14 - NEW 120 PCF0000057 BIN COLD FEED 1993-05-13 30,111.27 30,111.27 - NEW 120 PCF0000058 HARTMAN FABCO BIN HOPPER 2005-03-31 19,500.00 17.550.00 1.960.00 USED 120 PCF0000074 COLD FEED SYSTEM STARTING GEAR 2002-05-18 45,885.05 45,885.05 - NEW p PCF0000077 2020 ENPROTECH FABRICATED HOPPER 2021-02-27 64,193.53 64,193.53 - NEW 120 . PCH0000001 TRAILER CONTROL 2005-03-31 20,200.00 %180.00 2,020.00 USED p PCH0000002 CONTROLHOUSE 1992-05-02 177,577.00 159,819.30 17,757.70 NEW 0 PCH0000003 CONTROLHOUSE 2008-11-29 3,405.00 3,405.00 - USED p PCH0000004 CONTROLHOUSE 2000-02-25 125,645.49 111,570.71 14.074.78 NEW 0 PCH0000005 1990 WHI TRAILER CONTROL HOUSE 1990-04-02 15,161.87 15,161.87 - NEW 0 PCH0000010 CONTROLHOUSE 2009-03-16 85,000.00 76,500.00 8,500.00 USED 0 PCH000001I CONTROL HOUSE 1986-10-14 18,813.60 16,932.24 1,881.36 NEW 0 PCH0000013 CONTROLHOUSE 2009-0346 20,000.00 18,000.00 2,000.00 USED p PCH0000014 CONTROLHOUSE 2005-08-09 16,682.07 16.682.07 - USED p PCH0000015 CONTROLHOUSE 2009-03-16 20,000.00 18,000.00 2,000.00 USED 0 PCH0000016 1983 H&B DM108 CONTROL HOUSE 1983-07-27 13.350.00 12,015.00 1.335.00 NEW p PCH0060017 CONTROLHOUSE 1983-07-27 193230.75 17,307.67 1,923.08 NEW 0 PCH0000019 CONTROL HOUSE WIENERGY CENTER 1999-09-21 44,330.29 44.330.29 - USED 0 PCH0000021 TRAILER CONTROL 2007-04-02 21,734.21 21,734.21 - USED 0 PCH0000022 TRAILER CONTROL 2005-03-31 6,000.00 4,500.00 500.00 NEW 0 PCH0000023 TRAILER CONTROL 2006-04-18 19,538.18 19,538.18 - USED p PCH0000037 2020 RBS TRAILER CONTROL HOUSE 2020-04-01 93.119.36 37,247.52 55,871.84 NEW i20 PCM0000001 COMPRESSORAIR 2005-03-31 320.00 288.00 32.00 USED 0 PCM0000002 COMPRESSORAIR 2010-06-21 11,100.00 11,100.00 - NEW 0 PCM0000003 UNKNOWN QUINCY QSI-370175 HP AIR COMPRESSOR 2013-03-04 28,195.07 28,195.07 - NEW 0 PCM0000004 2017 SULLAIR 55008 75 HP AIR COMPRESSOR 2017-06-02 28,632.00 19.658.00 8,974.00 NEW 0 PCM0000005 COMPRESSORAIR 1996-0442 8,532.10 8,532A0 - NEW 0 PCM0000006 2016 SULLAIR 5500B 75 HP AIR COMPRESSOR 2016-04-01 27,850.00 27.850.00 - NEW 0 PCM0000007 2018 SULLAIR 55098 75 HP AIR COMPRESSOR 2018-07-05 25,215.00 14,708.50 10,506.50 NEW p PCM0000008 2017 SULLAIR 5509E 75 HP AIR COMPRESSOR 2017-04-01 26,965.00 18,875.64 8.089.36 NEW 0 PCM0000009 SULLAIR LS10-40H COMPRESSOR AIR 2010-04-28 4,040.00 4,040.00 - NEW p PCM0000011 2017 SULLAIR 55095 75 HP AIR COMPRESSOR 2018-04-01 32,734.59 19,640.88 13,093.71 NEW 0 PCM0000012 UNKNOWN 75 HP AIR COMPRESSOR 2009-0346 2,000.00 1,800.00 200.00 USED 0 PCM0000014 UNKNOWN 75 HP AIR COMPRESSOR 2009-03-16 1,000.00 900.00 100.00 USED 0 PCM0000015 2017 SULLAIR 55098 75 HP AIR COMPRESSOR 2017-04-30 27.714.37 19,313.45 8,400.92 NEW 0 PCM0000016 UNKNOWN AIR COMPRESSOR 2009-03-16 700.00 630.00 70.00 USED 0 PGM0000019 2018 SULLAIR 5509E 75 HP AIR COMPRESSOR 2019-01-01 32,826.58 17,233.65 15,592.93 NEW 0 PCM0000020 REGENERATIVE AIR DRYER 2001-07-31 8,388.51 7,549.65 838.86 NEW 0 PCM0000021 2019 SULLAIR 5509E AIR COMPRESSOR 2019-03-08 32,032.35 15,749.46 16,282.89 NEW 120 PCM0000022 2020 QUINCY QSI-125 AIR COMPRESSOR 2020-09-16 40,560.83 13,182.39 27,378.44 NEW 120 PCR0000002 CRUSHER SYSTEM 2000-06-30 621.392.22 559,253.00 62,139.22 NEW 120 PCR0000003 BREAKER RECYCLE 2018-04-30 73,611.29 73.611.29 - NEW 120 PCR0000005 BREAKER RECYCLE 2016-04-01 41,395.87 33,116.52 8.279.35 NEW 120 PCR0000006 BREAKER RECYCLE 2016-04-01 50,548.09 50,548.09 - NEW 120 PCR0000007 BREAKER RECYCLE 2016-04-01 42.778.78 42,778.78 - NEW 120 PCR0000009 BREAKER RECYCLE 2018-04-01 47,907.55 47,907.55 - NEW 120 PCR0000010 2018 RAPTOR RECYCLE BREAKER 2018-06-03 43.282.87 25,248.30 18,034.57 NEW 120 PCR0000012 CRUSHER 2006-04-01 18,000.00 16,200.00 1.800.00 USED 180 PCR0000013 CRUSHER RECYCLE 1992-04-01 18,365.00 16.528.50 1,836.50 NEW 120 PCR0000015 2018 RAPTOR RAP2350-B RECYCLE BREAKER 2019-02-18 87,200.32 42,873.53 44.326.79 NEW 120 PCR0000016 2019 RAPTOR RAP3250-8 RECYCLE BREAKER 2019-02-18 49,318.57 24,248.41 25,070A6 NEW 120 PDC0000002 DRAG CONVEYOR 2010-0445 77,402A0 77,402.10 - NEW 120 PDC0000003 DRAG CONVEYOR 2005-04-22 171,735A9 171.735.19 - NEW 120 P000000005 DRAG CONVEYOR 2009-03-16 89,000.00 80,100.00 8,900.00 USED 180 PDC0000006 SLAT CROSS DRAG CONVEYOR 2018-04-30 73,988.00 44,119.07 29,868.93 NEW 120 PDC0000007 DRAG CONVEYOR 2009-03-16 42.000.00 37,800.00 4,200.00 USED 160 PDC0000008 DRAG CONVEYOR 2009-0346 69,000.00 62,100.00 6.900.00 USED 180 PDC0000009 DRAG CONVEYOR 2002-0548 136,530.61 136,530.61 - NEW 180 PDC0000010 STAIRIHANDRAIL 1994-06-16 7,980.00 7,980.00 - NEW 120 PD00000001 DRYER DRUM 2012-03-03 266,225.00 206,225.00 - USED 180 PDS0000002 BURNERFUELTANK 2005-03-31 13,500.00 12,150.00 1.350.00 USED 120 PDS0000003 FUELTANK 1980-03-06 70,884.32 70,884.32 - NEW 120 PD80000004 FUELTANK 1997-04-26 13,846.22 13,846.22 - NEW 120 PDS0000005 FUELTANK(3) 2008-04-29 121,014.71 12l,014.7i - NEW 120 PDS0000006 CALIBRATION TANK 2003-04-01 47,214.00 42,492.60 4.721.40 NEW 180 PDS0000007 BURNER 2012-03-03 22,484.00 22,484.00 - USED 180 PDS0000009 BURNER 2009-04-18 89.000.00 89,000.00 - NEW 120 PDS0000010 FUELTANK 1997-04-01 54,303.74 48,873.37 5,430.37 NEW 120 PDS0000011 2016 HAUCK MEGASTAR 100 DRYER BURNER 2016-07-02 107,623.00 83,686.24 23,936.76 NEW 120 PDS0000012 FUELTANK 1970-04-14 1,315.60 1,213.30 102.30 NEW 120 PDS0000013 CALIBRATION TANK 2000.02-25 21.293.83 18,866.72 2,427.11 NEW 180 PDS0000014 FUELTANK 2014-03-28 18,449.87 16.604.88 1,844.99 NEW 75 PDS0000015 CALIBRATION TANK 2014-03-28 4,829.92 4,346.93 482.99 NEW 75 PDS0000016 BURNER 2014-05-03 103,000.00 68,382.60 34.617.40 NEW 180 PDS0000017 BURNER 2009-03-16 25,000.00 22,500.00 2,500.00 USED 180 PDS0000018 CALIBRATION TANK 2009-0346 8,000.00 7,200.00 800.00 USED 180 PD80000019 FUELTANK 2009-03-16 18,000.00 16,200.00 1,800.00 USED 180 PDS0000020 BURNER 1994-05-07 33.611.47 30,250.32 3,361.15 NEW 120 PDS0000021 FUELTANK 1998-05-02 33.448.30 30,103.47 3,344.83 NEW 120 PDS0000022 FUELTANK 1979-06-01 3,842.00 3,457.80 384.20 NEW 120 PDS0000023 BURNER 2017-0445 150,499.42 105,349.44 45,149.98 NEW 120 PD80000024 CALIBRATION TANK 2009-0346 8,000.00 7,200.00 800.00 USED 180 PDS0000025 FUELTANK 1999-09-21 42.215.47 37,993.92 4,221.55 USED 120 PD80000026 FUELTANK 2005-OS-09 20,726.23 20,726,23 - USED 120 PDS0000027 CALIBRATION TANK 2009-03-16 8,000.00 7,200.00 800.00 USED 180 PD80000028 BURNER 2009-03-16 15.300.00 13,770.00 1,530.00 USED 180 PDS0000029 RUO TANK 2005-03-31 10,000.00 8,500.00 1,500.00 USED 180 PD30000030 RUO TANK 2005-03-31 19,325.00 16,426.25 2,898.75 USED 180 PDS0000031 RUO TANK 2005-03-31 10,000.00 8,500.00 1,500.00 USED 180 PD80000032 BURNER 2005-03-31 9,780.00 8,802.00 978.00 USED 120 PDSOD00033 PROPANE TANK 2005-03-31 2,950.00 2.655.00 295.00 USED 120 PDS0000034 FUELTANK 1979-0648 60,630.25 60,630.25 - NEW 120 PD80000035 FUELTANK 1992-04-01 19.606.52 19,606.52 - NEW 120 PDS0000036 FUELTANK 1998-05-02 33,634.85 33,634.85 - NEW 120 PD80000038 GAS TRAIN & REGULATOR 2009-04-01 17,705.28 17,705.26 - NEW PD60000039 CONVERT BURNER TO NATURAL GAS 2009-04-01 15,440.47 15,440.47 - NEW 120 PDS0000042 BURNER DRYER CONY TO NATL GAS 2012-09-02 47,235.93 47,235.93 - NEW 120 POSO000043 BURNER DRYER CONY TO NATL GAS 2012-08-01 31,578.23 31,578.23 - NEW 120 PDS0000044 BURNER DRYER DRUM CONVERSION 2009-05-02 49,574.29 49,574.29 - NEW 120 PD80000045 BURNER DRYER CONY TO NAT'L GAS 2012-08-11 94,214.47 94,214.47 - NEW 120 PDSOO00046 BURNER DRYER CONY TO NATL GAS 2012.OMI 61,076.49 61,076.49 - NEW 120 PFR0000002 FUME COLLECTION SYSTEM 2007-04-01 14,174.52 9,449.68 4,724.84 NEW 120 120 PFR0000003 FUME COLLECTION SYSTEM 2008-04-28 99,532.09 99,532.09 - NEW PFR0000004 FUME COLLECTION SYSTEM 2015-05-02 109,741.03 98,015.20 11,725.75 NEW 108 120 PFR0000005 FUME COLLECTION SYSTEM 2009-03-16 250.000.00 225,000.00 25,000.00 USED 180 PFR0000006 FUME COLLECTION SYSTEM 1999-04-24 20.370.48 18,333.43 2,037.05 NEW 120 PFR0000007 FUME COLLECTION SYSTEM 2009-03-16 180,600.00 162,540.00 18,060.00 USED 180 PFR0000008 FUME COLLECTION SYSTEM 2006-04-15 318,034.71 318,034.71 - NEW PFR0000009 FUME COLLECTION SYSTEM 1994-04-30 21,501.60 19,351.44 2,150.16 NEW 120 120 PFR0000010 FUME COLLECTION SYSTEM 2007-05-29 169,258.95 169,258.95 - NEW PFR0000011 FUME COLLECTION SYSTEM 2002-0548 169,220.39 169,220.39 NEW 1 20 PFR0000012 .FUME COLLECTION SYSTEM 1995-07-29 16.382.16 16,382.16 - NEW 120 PFR0000013 FUME COLLECTION SYSTEM 1997-07-01 40,019.78 40,019.78 - NEW 120 PFR0000014 FUME COLLECTION SYSTEM 1998-05-02 3.505.10 3,505.10 - NEW 120 PFR0000015 SILO AIR POLLUTION 1993-10-23 11,913.94 10,722.55 1,191.39 NEW 120 120 PFROOOOO16 TANK ASPHALT CONDENSOR 2003.08-02 15,671.25 15,671.25 - NEW PHOOOD0007 HOT OIL TANK 2005.03-31 9,700.00 8,730.00 970.00 USED 120 120 PH00000008 HEATER HOT OIL 2015-01-03 18,676.80 18,676.80 - USED PHOOOOOO10 HEATER INLINE FUEL 2001-07-07 10,683.00 10,683.00 - NEW 48 PH00000011 HOT OIL HEATER 2008-04-01 35,922.18 35,922.18 - NEW 148 20 120 PHC0000012 HOT OIL HEATER 2016-01-03 49.012.51 49,012.51 - NEW PH00000013 HOT OIL HEATER 1992-04-01 44,315.35 39,883.81 4,431.54 NEW 120 120 PHOODOOO14 HOT OIL HEATER 1998-10-07 27,825.00 253042150 2.782.50 NEW 120 PH00000015 HOT OIL HEATER 2000-02-25 18,651.58 16,488.69 2.162.89 NEW 180 PHOOOOOD16 HOT OIL HEATER 1999-09-21 13,532.20 12,178.98 1.353.22 USED 120 PHOOOOGO17 HOT OIL HEATER 2018-07-01 161.643.60 92,945.07 68,698.53 NEW 12 0 PH00000018 HOT OIL HEATER 2009-03-16 15,000.00 13'500.00 1,500.00 USED 12 80 PH00000019 PREHEATER OIL 1979-09-20 3,784.56 3,406.10 378.46 NEW 1120 PH00000020 HOT OIL HEATER 1999-10-15 31,581.75 28,423.57 3,158.18 NEW 12 PHOOD00021 HOT OIL HEATER 2018-06-03 82.127.32 47.907.30 34,220.02 NEW 120 PH00000022 HOT OIL HEATER 2009-03-16 10,000.00 9,000.00 1,000.00 USED 180 PH00000023 HOT OIL HEATER 2005-08-09 6,643.60 6,643.60 - USED 120 PH00000024 HOT FUEL OIL STORAGE 1988-08-29 12,064.78 10,858,30 1,206.48 NEW 120 PH00000026 HEATER ASPHALT 2005-03-31 5,000.00 4,250.00 750.00 USED 180 PH00000027 PREHEATER OIL 2005-03-31 3,000.00 2,550.00 450.00 USED 180 PH00000028 HOT OIL HEATER 2000-04-29 41,757.95 41,757.95 - NEW 120 PH00000029 HOT OIL HEATER 1975-08-13 44,809.28 44,809.28 - NEW 120 PH00000030 BURNER HOT OIL CONVERSION 2009-04-01 53,180.40 53,180.40 - NEW PH00000031 INSULATION HOT OIL LINES 2001-09-11 22,420.00 20,178.00 2,242.00 NEW 120 120 PH00000032 BURNER HOT OIL CONVERSION 2009-05-31 26,341.67 26,341.67 - NEW 120 PH00000033 BURNER HOT OIL CONY NAT'L GAS 2012-08-11 7,859.12 7,859,12 - NEW PHOOO00034 BURNER HOT OIL CONY NATL GAS 2012-08-01 7,080.92 7,080.92 - NEW 120 PH00000038 2019 STANSTEEL HOT OIL HEATER 2019-03-27 65,832.67 31,819.38 34,013.29 NEW 120 120 PLS0000005 TANKLIQUIDAC 2005-03-31 13,500.00 12,150.00 1,350.00 USED 12 0 PLS0000006 TANKS (3) 2007-07-21 81,387.70 81,387.70 - NEW 120 PL80000007 LIQUID ASPHALT SYSTEM 2010-12-14 178,552.71 178,552.71 - USED 120 PLS0000008 PUMP AC UNLOADING 2010-11-27 5,048.12 5,048.12 - NEW 120 PLS0000009 TANKASPHALT 1971-04-06 5,559.00 5,559.00 - NEW 120 PLS0000010 TANKASPHALT 1972-08-OS 2,500.00 2,500.00 - NEW 120 PLS0000011 TANK AC 1997-04-19 69,248.69 62,323.82 6,924.87 NEW 120 PLS0000012 TANK LIQUID AC 2000-09-06 123,133.75 110,820.37 12,313.38 NEW 120 PLS0000013 TANK 1979-06-20 14,638.00 13,174.20 1.463.80 NEW 120 PLS0000014 TANK 1980-06-03 14,736.80 13,263.12 1,473.68 NEW 120 PLS0000015 TANKASPHALT 1981-02-17 18,621.20 16,759.08 1.862.12 NEW 120 PLS0000016 STORAGE ASPHALT 1987-07-01 39,120A1 35,208.10 3,912.01 NEW 120 PLS0000017 LATEX IN -LINE BLENDING 2009-06-06 16,037.59 16,037.59 - NEW 120 PLS0000018 LIQUID ASPHALT SYSTEM 1989-04-04 3,534.89 3,181.40 353.49 NEW 120 PL30000020 LIQUID STORAGE SYSTEM 2012-03-03 198,385.00 142,837.32 55,547.68 USED 180 PLS0000021 TANK AC 2009-12-21 111,700.00 94,945.00 16,755.00 NEW 180 PLS0000022 LIQUID ASPHALT SYSTEM 1999-04-23 95,720.73 86.148.66 9.572.07 USED 120 PL80000023 LIQUID ASPHALT SYSTEM 1999-04-23 90,791.87 81,712.68 9,079.19 USED 120 PL80000025 TANK AC 30000 GALLON 2018-06-03 223,190.86 130,194.40 92,996.46 NEW 120 PL80000026 TANK AC 30000 GALLON 2018-06-03 223,190.85 130,194.40 92,996.45 NEW 120 PL80000030 2015 PUMP AC W/METER STANSTEEL 500-PMP-10007 2015-05-30 67,901.22 60,545.48 7,355.74 NEW 120 PLS0000031 TANK LIQUID AC 2002-04-29 71,023.41 63,921.07 7,102.34 NEW 120 PLSOOCO032 LIQUID ASPHALT SYSTEM 2007-04-01 126,689.96 84,459.97 42,229.99 NEW jpg PLS0000033 TANK 1970-02-26 5,236.40 4,829.22 407A8 NEW 120 PL80000034 TANKASPHALT 1973.04-06 5,954.00 5,491.04 462.96 NEW 12p PL80000035 TANK AC 2000-02-25 80,098.24 71.790.69 8,307.55 NEW 180 PL80000036 TANKAC 2002-04-13 95,959.63 86,363.67 9,595.96 NEW 120 PLS0000037 TANKASPHALT 1999.09-21 45,658.10 41,092.29 4,565.81 USED 120 PLS0000038 PUMP AC METERING 2014-03-28 8,733.25 8,733.25 - NEW 75 PLS0000039 TANK AC 2014-03-28 36,229.26 32,606.33 3,622.93 NEW 75 PLS0000040 TANK AC 2014-03-28 27.744.30 24,969.87 2,774.43 NEW 75 PLS0000041 PUMP UNLOADING 2014-03-28 2.644.35 2,644.35 - NEW 75 PL80000042 TANK ASPHALT CONDENSOR & PUMP 2007-04-01 7,663.35 7,663.35 - USED 120 PLS0000043 TANKAC 2007-05-19 37,100.00 37,100.00 - USED 60 PLS0000044 TANKAC 2007-05-19 31.800.00 31,800.00 - USED 60 PL80000045 TANK AC 2006-04-01 38,097.50 34,922.80 3,174.70 USED 120 PLS0000047 2017 ALMIX VCT-30 VERTICAL AC TANK 2017-10-28 198,184.48 128,820.12 69,364.36 NEW 120 PLS0000048 TANKAC 2009-03-16 56,000.00 60,400.00 5,600.00 USED 180 PL80000049 TANKAC 2009-03-16 66,000.00 50,400.00 5,600.00 USED 180 PL80000050 TANK AC 2009-03-16 $6,000.00 50.400.00 5.600.00 USED 180 PLSOOOOO51 TANK TACK 2009-03A6 15,000.00 13,500,00 1,500.00 USED 180 PLS0000052 METERING SYSTEM LIQUID AC 2009-03-16 15,000.00 13,500.00 1,500.00 USED 180 PLS0000053 TANK PLSOO00054 TANK 1980-03-27 76,499.03 68,849.13 7,649.90 NEW 120 PLS0000055 TANK LIQUID AC 1986-10-14 2003-05-24 67,108.15 60,397.33 6,710.82 NEW 120 PL80000056 PUMP AC METERING 2012-0349 46,609.47 34,468.67 46,609.47 NEW 120 PLS0000057 TANK PLS0000O58 TANK AC 1991-07-18 20,600.00 34,468.67 18,720.00 NEW 2,080.00 USED 120 120 PLSOO00059 TANK AC 1991-07-18 2001-08-04 1,040.00 102,174.05 936.00 104.00 USED 120 PLS0000060 TANK PORTABLE 30000 GAL SPLIT 2018-05-11 41,708.52 91,956.64 24,677.47 10,217,41 NEW 17,031.05 USED 120 PL80000061 TANK ASPHALT PLS0000062 TANK AC 1967-08-23 3,950.00 3,642.85 307.15 NEW 120 120 PL80000063 PUMP AC METERING 1967-08-23 2008-10-25 4,750.00 4,380.64 369.36 NEW 120 PLS0000064 2017 ALMIX VCT 30 VERTICAL AC TANK 2017-0543 5,156,48 148,868.29 - 5,156.48 102,967.31 - NEW 45,900.98 NEW 120 PL80000065 2017 ALMIX TACK TANK PLSOOOD066 TANK ASPHALT 2017-05-13 125,866.27 87,057.27 38.809.00 NEW 120 120 PL80000068 TANK AC 1967-08-23 2009-03-16 4,750.00 42,000.00 4,380.64 369.36 NEW 120 PLS0000069 TANK AC PL8000007G METERING SYSTEM LIQUID AC 2009-03-16 33,000.00 37,800.00 29,700.00 4,200.00 USED 3,300.00 USED 180 180 PLS0000071 PUMP AC UNLOADING 2009-03-16 2004-05-08 15,000.00 13,500.00 1,500.00 USED 180 PLS0000072 TANK LIQUID AC 200S-O6-18 5,413.03 137,419.06 5,413.03 137,419.06 - NEW USED 120 PLS0000073 TANKAC PLS0000074 TANK AC 2005-08-09 22.415.79 22,415.79 - USED 120 120 PLS0000075 TANK AC 2015-05-02 2015-05-02 102,983.23 102,983.22 91,979.52 11,003.71 NEW 120 PLSO000076 HEATEC VERTICAL AC TANK 35000 GAL 2009-03-18 51.000.00 91,979.52 45,900.00 11,003.70 NEW 120 PLS000D078 METERING SYSTEM LIQUID AC 2009-03-16 15,OOD.00 13,500.OD 5,100.00 USED 1,500.00 USED 180 PLS0000079 TANK PLS0000080 TANK 1983-09-12 86,933.65 78,240.28 8,693.37 NEW 180 120 PLS0000082 PUMP UNLOADING 1983-0942 2008-04-01 48,472.56 43,625.30 4.847.26 NEW 120 PLS0000083 TANK ASPHALT 2005-03-31 50,090.73 13,455.00 50,090.73 11.436.75 NEW 2,018.25 USED 120 PLS0000084 TANK LIQUID ASPHALT PLS0000087 TANK 2005-03-31 25,000.00 21,250.00 3,750.00 USED igp igp PLS0000088 TANK ASPHALT 2006.03-31 1979-06-18 9,075.00 47,886.75 8;167,50 907.50 USED 120 PL80000089 METER MASS FLOW 1999-09.21 20,000.00 47,886.75 20,000.00 NEW NEW 120 PLSOOOOO90 TANK LIQUID AC PL80000091 PUMP ASPHALT 2002.05-18 277,586.76 277,586.76 NEW 1122 0 02007-04-14 PLSOOOGO92 PUMP AC 1970-02-05 4,153.51 1,474.10 4,153.51 1,359.47 NEW 120 PLS0000093 TANK 1975-08.13 24,887.60 24,887.60 114.63 NEW NEW 120 PLS0000094 LIQUID ASPHALT SYSTEM 1989-04-04 5,654.19 5,654.19 NEW 120 PLSOOOOO95 LIQUID ASPHALT SYSTEM PLS0000096 PUMP AC UNLOADING 1993-05-13 23,407.35 23,407.35 - NEW 120 120 PL50000097 TANK AC 2004-07-24 1999-09-21 28,231,85 53,779.47 28,231.85 48,401.52 NEW 120 PLS0000115 TANK AC STORAGE INSULATION 1997-09-22 10,049.41 10,049.41 5,377.95 NEW 120 PLS0000116 TANK INSULATE A/C PLS0000117 ASPHALT TANK INSULATION 1988-11-22 25,854.73 23,269,26 - NEW 2.585.47 NEW 120 120 PLS0000118 PIPING & INSULATION 1992.04-01 2010-08 23 13,542.00 99,267.91 12,187.80 1,354.20 NEW 120 PLS0000120 PIPING SYSTEM ASPHALT 2014-03-26 10,232.18 99.267.91 10,232.18 NEW NEW 120 PL80000121 TANK AC INSULLATION 2017-12-12 18,247.68 18,247.68 - NEW 75 PLS0000122 AC SYSTEM RECONFIGURATION PLS0000124 AC TANK INSTALL 2320 2015-05-30 148,266.73 132,204.32 16,062.41 NEW 60 120 PL80000125 LIQUID ASPHALT PUMP CONVERSION 2015-05-30 2012-08-01 38,947.41 8,369.48 34,727.92 4,219.49 NEW 120 PLS0000133 1986 HEATEC HT-30P PORTABLE A/C SPLIT TANK 2021-02-02 69,050.51 8,369.48 21,290.54 - USED 47,759.97 USED 120 PMC0000002 ELECTRICAL POWER HOOK UP PMC0000003 ELECTRICAL SYSTEM 2000-10-17 6,765.00 6,088.50 676.50 NEW 120 120 PMC0000005 ENERGY CENTER 2010-1244 2007-07-21 42,917.34 120,299.87 42,917,34 102,254.89 - USED 18,044.98 NEW igp PMC0000007 ELECTRICAL SYSTEM PMC0000009 ELECTRICAL SYSTEM 1998-06-24 244,451.05 220,005.94 24,445.11 NEW 180 igp PMC0000010 ENERGY CENTER 2007-04-01 2000-02-25 21,345.40 40,599.08 14,230.27 36,136.34 7.115.13 NEW 4,462.74 NEW 108 PMC0000012 ELECTRICAL SYSTEM PMCOOGOO13 ELECTRICAL SYSTEM 2006-04-01 71,275.00 60,583.75 10,691.25 USED 180 180 PMO0000014 CONTROLHOUSE 2009-0346 19864044 131.000.00 15.080.00 117,900.00 13,100.00 USED igp PMO0000015 PLANT TOWER ASPHALT 1991-07-ia 50,000.00 13,572.00 45,000.00 1.508.00 NEW 5,000,00 USED 120 PMCDOOOO17 ELECTRICAL SYSTEM PMC0000018 ELECTRICAL SYSTEM 2009-0346 95.000.00 85,500.00 9.500.00 USED igp 180 PMC0000020 ELECTRICAL SYSTEM 2009-0346 1993-0543 91.000.00 41,660.60 81,900.00 41,660.60 9,100.00 USED igp PMC0000024 ELECTRICAL UPGRADE 1989-04-04 8,580.51 7,722.46 NEW 858.05 NEW 120 PMC0000031 2020 RBS MOTOR CONTROL CENTER PMC0000032 2020 SERVICE ONE MOTOR CONTROL CENTER 2020.04-01 485,473.90 194,189.76 291,284.14 NEW 120 120 PMC0000033 2020 PRIMARY POWER UPGRADE 2020.04-01 2021-02-27 406,228.13 259,558.45 162,491.04 53,353,63 243.737.09 NEW 206,204.82 120 PMF0000001 BIN SILO MINERAL FILLER 2005-06-04 54,855.00 64,855.00 NEW - USED 180 PMF0000002 BIN SILO MINERAL FILLER 2009-04-01 114,001.40 114,001.40 - NEW 180 PMF0000003 FLY ASH SYSTEM PMF0000005 BIN SILO MINERAL FILLER 1992-06-01 58,227.46 58,227.46 - NEW 120 120 PMF0000006 BIN SILO MINERAL FILLER 2005-08-09 2014-03-28 16,128.09 33,891.64 16.128.09 30,502.48 USED 3,389.16 120 PMF0000007 BIN SILO MINERAL FILLER 2009-03-16 45,000.00 40,500.00 NEW 4,500.00 USED 75 PMF0000008 BIN SILO MINERAL FILLER PMF0000009 BIN SILO MINERAL FILLER 1989-04-04 15,600.00 14,040.00 1,560.00 NEW 120 12 0 PMFOOOOOiO BIN SILO MINERAL FILLER 1975-04-04 1989-04-04 16,090.09 34,144.26 14,838.96 1.251.13 NEW 120 PMF0000011 BIN SILO MINERAL FILLER 2009-03-16 35,000.00 30,729.83 31,500.00 3,414.43 NEW 3,500.00 USED 180 PMF0000012 BIN SILO MINERAL FILLER 1989-04-02 31,571.91 28,415.62 3,156.29 NEW 180 PMF0000013 BIN SILO MINERAL FILLER 1979-07-10 52,000.00 52,000.00 - NEW igp PMS0000001 MIX STORAGE SILO PMS0000002 MIX STORAGE SILO 2005-03-31 77,950.00 70,155.00 7,795.00 USED 120 120 PMSOO00003 MIX STORAGE SILO 2008-09-29 2008-09-29 93,700.00 93,650.00 93,700.00 93,650.00 NEW 120 PMS000000MIX STORAGE SILO 2008-09-29 93,650.00 93,650.00 NEW NEW 120 PMS0000005 MIX STORAGE SILO 2010-12-14 128,804,16 128,804.16 - USED 120 PMS0000006 MIX STORAGE SILO (2) PMS0000007 MIX STORAGE SILO 1985-04-25 189,050.22 189,050.22 NEW 120 120 PMS0000008 MIX STORAGE SILO 1990.04-01 1998-05-02 110,444.42 162,860.54 110,444.42 162,860.54 NEW 120 PMS0000009 MIX STORAGE SILO PMSOOOODIO MIX STORAGE SILO 1987-07-01 314,488,18 283,039,38 - NEW 31,448.82 NEW 120 120 PMS000001 i MIX STORAGE SILO (3) 2003-04-01 2012-03-03 140,088.45 297,580.00 126,079.60 214,257,60 14.008.85 NEW 83.322.40 180 PM50000013 MIX STORAGE SILO (3) 2007.07-21 386,21SA5 328,283.73 USED 57,932.42 NEW 180 PMS0000015 MIX STORAGE SILO PMS0000016 MIX STORAGE SILO (2) 1987-04-03 314,168.57 282,751.71 31,416.86 NEW i80 120 PMS0000017 MIX STORAGE SILO 1979-OS-01 1996-04-15 110,720.00 114,916.85 99,648,00 11,072.00 NEW 120 PMS0000018 MIX STORAGE SILO 2009.04-11 138,209.12 103,42516 138,209.12 11,491.69 NEW 120 PMS0000019 MIX STORAGE SILO 2018-06-03 196,471 A3 114,608.20 NEW 81.862.93 NEW 120 PMS0000020 MIX STORAGE SILO PM80000023 MIX STORAGE MIX (3) 2007-04-01 136,246.08 90,830.73 45.415.35 NEW i2o 108 PMS0000024 MIX STORAGE SILO 2008-04-28 2006-04-01 920,013.95 213,795.00 920,013.95 181 NEW 32,069.25 USED 120,725.75 PMS0000025 MIX STORAGE SILO PM30000026 2017 DILLMAN D-300T150 MIX STORAGE SILO 2016-05-29 211,535.91 166,947.60 44,588.31 NEW 180 18 0 PM80000027 MIX STORAGE SILO 2017-04-01 2009-03-16 352,091.67 133,750,00 246,464.40 105,627.27 NEW 120 PMS0000028 MIX STORAGE SILO 2009-0346 133,750.00 120,375.00 120,375.00 13,375.00 USED 13,375.00 USED 180 PMS0000029 MIX STORAGE SILO PMS0000030 MIX STORAGE SILO 2009-03-16 133,750.00 120,375.00 13,375.00 USED 180 160 2009-03-16 133.750.00 120,375,00 13,375.00 USED 160 PMS0000031 MIX STORAGE SILO 1975-06-07 117,288.94 108,168.60 9,120.34 NEW 120 PMS0000032 MIX STORAGE SILO 1986-10-14 133,180.34 119,862.31 13,318.03 NEW 120 PMS0000033 MIX STORAGE SILO 1999-04-24 189,189.43 170,270.49 18,918.94 NEW 120 PMS0000034 MIX STORAGE SILO 1998-05-27 79,637.19 71,673.47 7,963.72 NEW 120 PMS0000035 MIX STORAGE SILO 2017-06-17 241,096.75 164,749.48 76,347.27 NEW 120 PMS0000036 MIX STORAGE SILO 2013-05-11 212,825.63 212,825.63 - NEW 120 PMS0000037 300TMIX STORAGE SILO 2018-04-30 264,117.17 157,492.38 106,624.79 NEW 120 PMS0000038 MIX STORAGE SILO 2009-03-16 88,200.00 79,380.00 8,820.00 USED 180 PMS0000039 MIX STORAGE SILO 2009-03-16 75,600.00 68,040.00 7,560.00 USED 180 PMS0000040 MIX STORAGE SILO 2009-03-16 75,600.00 68,040.00 7,560.00 USED 180 PMS0000044 MIX STORAGE SILO 2009-03-16 77,750.00 69,975.00 7,775.00 USED 180 PMS0000045 MIX STORAGE SILO 2009-03-16 77,750.00 69,976.00 7,775.00 USED 180 PMS0000046 MIX STORAGE SILO 2009-03-16 77,750.00 69,975.00 7,775.00 USED 180 PMS0000047 MIX STORAGE SILO 2009-03-16 77,750.00 69,975.00 7,775.00 USED 180 PMS0000048 MIX STORAGE SILO 1980-04-21 146,131.25 131,518.12 14,613.13 NEW 120 PMS0000049 MIX STORAGE SILO 1990-04-01 120,726.76 108.654.09 12,072.67 NEW 120 PMS0000050 MIX STORAGE SILO (4) 2005-03-31 300,000.00 255,000.00 45,000.00 USED 180 PMS0000051 MIX STORAGE SILO (2) 2005-03-31 64,355.00 57,919.50 6.435.50 USED 120 PMS0000052 MIX STORAGE SILO 1979-07-10 67,000.00 67,000.00 - NEW 120 PMS0000053 MIX STORAGE SILO 1991-08-03 130,177.05 130,177.05 - NEW 120 PMS0000054 MIX STORAGE SILO 1993-05-13 151,315.64 151,315.64 - NEW 120 PMS0000055 MIX STORAGE SILO 1998-05-02 135,093.67 135,093.67 - NEW 120 PMS0000056 MIX STORAGE SILO 2000-09-30 136,157.64 136,157.64 - NEW 120 PMS0000057 MIX STORAGE SILO 2005-03-31 22,320.00 20,088.00 2,232.00 USED 120 PMS0000058 BATCHER SILO (3) 2012-03-03 206,325.00 206,325.00 - USED 180 PM80000059 BATCHER SILO (3) 2006-04-01 43,850.69 43,850.69 - NEW 120 PMS0000060 MIX STORAGE IMPROVEMENT 1993-10-23 7,242.15 6.517.94 724.21 NEW 120 PRB0000001 USED 2018 RECYCLE BIN 2010-08-02 28,538.84 16,171.76 12,367.08 USED 120 PRB0000002 RECYCLE BIN 2010-12-14 50,331.57 50,331.57 - USED 120 PR80000003 RECYCLE BIN 1982-09-30 21,032.08 21,032.08 . - NEW 120 PRB0000004 RECYCLE BIN 1993-0513 3,237.77 3,237.77 - NEW 120 PRB0000005 RECYCLE BIN 2015-04-01 79,704.14 79,704.14 - NEW 120 PR90000006 RECYCLE BIN 1987-07-01 64,516.98 58,065.28 6,451.70 NEW 120 PRB0000007 RECYCLE BIN 1983-12-22 20,785.32 20,785.32 - NEW 120 PRB0000008 RECYCLE BIN 2012-03-03 47,900.00 47,900.00 - USED 180 PRB0000010 RECYCLE BIN 1980-09-19 18,20818 18,208A8 - NEW 120 PRB0000011 RECYCLE BIN 2007-07-21 221,996.94 188,697.40 33,299.54 NEW 180 PRB0000012 RECYCLE BIN 1987-04-03 73,241.01 65,916.91 7,324.10 NEW 120 PRB0000013 RECYCLE BIN 2011-07-03 78,147.69 78,147.69 - NEW 120 PRB0000014 RECYCLE BIN 1982-03-22 18,108.00 16,297.20 1,810.80 NEW 120 PRB0000015 RECYCLE CONVEYOR 1982-03-22 14,958.14 13,462.33 1,495.81 NEW 120 PRB0000016 2017 CWMF BINS-RP-1 RECYCLE BIN 2017-04-01 74,585.71 52,210.20 22,375.51 NEW 120 PRB0000017 RECYCLE CONVEYOR 1992-06-01 32,569.95 32,569.95 - NEW 120 PRB0000018 SHINGLE BIN 1995-09 20 28,145.00 25,330.50 2,814.50 NEW 120 PRB0000019 SHINGLE BIN 2002-11-02 7,394.24 7,394.24 - NEW 120 PRB0000020 RECYCLE BIN 2007-04-01 60.212.15 403141.43 20,070.72 NEW 108 PRB0000021 RECYCLE FEEDER 1989-04-04 4,696.84 4.227.16 469.68 NEW 120 PR80000022 RECYCLE CONVEYOR 2000-02-25 37,146.92 32,041.76 5,105A6 NEW 180 PRB0000023 RECYCLE BIN 2009-05-02 17,460.07 17,460.07 - NEW 120 PR80000024 RECYCLE BIN 2014-03-28 43.113.37 38,802.03 4,311.34 NEW 75 PR80000025 RECYCLE BIN 2009-03-16 15,000.00 13.500.00 1,500.00 USED 180 PRE0000026 RECYCLE BIN 2006-04-01 55,095.00 46.830.75 8,264.25 USED 180 PRB0000028 RECYCLE BIN 2009-03-16 31,000.00 27,900.00 3,100.00 USED 180 PRB0000029 RECYCLE BIN 1986-10-14 58,936.80 53,043.12 5,893.68 NEW 120 PRB0000030 RECYCLE BIN 1989-04-04 21,542.48 19,388.23 2,154.25 NEW 120 PRB0000031 RECYCLE BIN 1983-07-27 20,000..00 18,000.00 2,000.00 NEW 120 PRB0000033 RECYCLE BIN 2017-0445 55,409.52 38,787.00 16,622.52 NEW 120 PRB0000034 RECYCLE CONVEYOR 2005-08-09 14,355.12 14,355.12 - USED 120 PR80000035 RECYCLE BIN 2005-OS-09 25.711.14 28,711A4 - USED 120 PRB0000036 RECYCLE CONVEYOR 1981-11 23 13,433.13 12,089.82 1.343.31 NEW 120 PRB0000037 RECYCLE BIN 1981-11-23 15,714.09 14,142.68 1.571.41 NEW 10 PRB0000038 RECYCLE CONVEYOR 2005-03-31 75,000.00 63,750,00 11,250.00 USED 1880 PRB0000039 RECYCLE CONVEYOR 1981-07-20 13,806.60 13,806.60 - NEW 120 PRB0000040 RECYCLE BIN 1981-07-20 14,397A8 14,397A8 - NEW 120 PRB0000041 RECYCLE BIN 1979-07-10 52.000.00 52,000.00 - NEW 120 PR80000042 BIN RECYCLE 1999-09-21 58,481.55 52,633.39 5,848,16 USED 120 PR80000043 PLT IMPROVE CONVEYOR HOT MIX 1993-10-23 9,631.60 8,668.44 963.16 NEW 120 PR80000057 2020 RELIABLE ASPHALT 9 X 14 RECYCLE BIN 2020-04-01 80,154.17 32,061.60 48.092.57 NEW 120 PSA0000001 CONVEYOR STACKING 2003-02-04 14,300.00 12,870.00 1,430.00 USED 180 PSA0000002 CONVEYOR STACKING 2003-02-04 5,000.00 4,500.00 500.00 USED 180 PSA0000003 CONVEYOR STACKING 2003-02-04 14,300.00 12,870.00 1,430.00 USED 180 PSA0000004 CONVEYOR STACKING 2003-02-04 14,300.00 12,870.00 1,430,00 USED 180 PSA0000005 CONVEYOR STACKING 2003-02-04 30,000.00 27.000.00 3,000.00 USED 180 PSA0000006 CONVEYOR STACKING 2009-04-01 2,500.00 2,500.00 - USED 36 PSA0000007 CONVEYOR STACKING 2003-02-04 18,300.00 16,470.00 1.830.00 USED 180 PSA0000008 2016 HOOVER RST30400 CONVEYOR STACKER RADIAL 2016-09-21 37,369.75 28,338.91 9,030.84 NEW 120 PSA0000009 CONVEYOR STACKING 2006-04-01 6,000.00 6,000.00 - USED 180 PSA0000010 CONVEYOR STACKING 2002-08-03 40,038.64 40,038.64 - NEW 120 PSA0000011 CONVEYOR STACKING 2006-04-01 3.500.00 3,150.00 350.00 USED 180 PSA0000012 CONVEYOR STACKING 2005-03-31 71.250.00 64,125.00 7,125.00 USED 120 PSA0000013 CONVEYOR STACKING 2005-03-31 3,015.00 2,713.50 301.50 USED 120 PSA0000015 CONVEYOR STACKING 2009-04-01 2,500.00 2,500.00 - USED 36 PSADDDD016 CONVEYOR STACKING 2003-02-04 38,300.00 34,470.00 3,830.00 USED 18p PSA0000017 CONVEYOR STACKING 2003-02-04 48.300.00 43,470.00 4.830.00 USED 180 PSA0000018 CONVEYOR STACKING 2008-07-31 38,000.00 38.000.00 - NEW 180 PSA0000019 CONVEYOR STACKER LATTICE 2016-07-01 7,500.00 2,928.50 4,571.50 USED 240 PSA0000020 CONVEYOR STACKER RADIAL 2016-07-01 30,000.00 11,714.00 18,286.00 USED 240 PSA0000021 CONVEYOR STACKER 2016-07-01 5,000.00 1,952.02 3,047.98 USED 240 PSA0000022 CONVEYOR STACKER RADIAL 2016-07-01 15.500.00 6,051.92 %448.08 USED 240 PSA0000023 CONVEYOR STACKER RADIAL 2016-07-01 20,000.00 7,809.02 12,190.98 USED 240 PSA0000024 CONVEYOR STACKER RADIAL 2016-07-01 8,000.00 3.123.42 4.876.58 USED 240 PSA0000025 CONVEYOR STACKING 36 X 125 2017-07-01 147,170.00 66,735.62 80,434.38 NEW 18p PSA0000026 CONVEYOR STACKER RADIAL 2016-07-01 45,000.00 17,570.40 27,429.60 USED 240 PSA0000027 CONVEYOR STACKER RADIAL 2016-07-01 8,500.00 3,319.28 5080,72 USED 240 PSB0000003 BINS SURGE (5) 2016-07-01 7.500.00 7,500.00 - USED 240 P580000004 SURGE BINS (2) 2016-07-01 2,000.00 780.62 1,219.38 USED 240 PSC0000001 SCREW CONVEYOR 2006-12-29 3,420.00 3,420.00 - USED 96 PSCp000004 SCREW CONVEYOR 2006-12-29 2,280.00 2,280.00 - USED 96 PSC0000006 SCREW CONVEYOR 2006-12-29 11,400,00 11,400.00 - USED 96 PSSCOO0004 SCREEN DECK DOUBLE 2005-03-31 44,000.00 39,600.00 4,400.00 USED 10 PSS0000005 SCREEN TRIPLE DECK 2016-07-01 18,000,00 7,028.40 10,971.60 USED 240 PSS0000006 SCREEN RECYCLE 2010-01-04 18,000.00 18,000.00 - NEW 180 PSS0000007 SCREEN RECYCLE 1991-06-22 16,806.72 16,806.72 - NEW 120 PSS0000008 SCREEN DECK DOUBLE 1998-05-30 50,868.16 50,868.16 - NEW 120 PSS0000009 SCREEN AGGREGATE UNDERFEED 1992-04-01 4,419.44 3,977.50 441.94 NEW 120 PSS0000010 SCREEN DECK DOUBLE 2003-04-01 47,424.09 42,681.68 4,742.41 NEW i B0 PSS0000011 SCREEN RECYCLE 4 X 8 2018-04-01 25,041.17 25,041.17 - NEW 120 PSSOOOOO13 SCREEN SYSTEM 1998-06-24 105,484.80 94,936.32 10,548.48 NEW 120 PSSOOOOO14 SCREEN SINGLE DECK 2007-07-21 7,000.00 5,950.00 1,050.00 NEW 180 PSS0000015 SCREEN S/D CMI SET UP #7893 2011-07-03 13,535.62 13,535.62 - NEW 120 PSSOOOOOi6 SCREEN COLD FEED 4 X 12 2018-04-01 34,973.42 20,983.80 13,989.62 NEW 120 PSSOOOOO17 SCREEN COLD FEED 5'X12' 2017-04-01 38,500.20 26,949.96 11,550.24 NEW 120 PSS0000018 SCREEN VIRGIN AGGRREGATE 2013-04-M 41,904.01 41.904.01 - NEW 120 PSS0000019 CHUTE RECYCLE CALIBRATION 1996-05-20 17,836.77 16,047.69 1,789.08 NEW 120 PSSOO00020 SCREEN DECK DOUBLE 2014-03-28 31,136.81 28.023.13 3,113.68 NEW 75 PSS0000022 SCREEN SCALPING COLD FEED 2009-03-16 25,400.00 22.860.00 2.540.00 USED 180 PSS0000023 SCREEN SCALPING RECYCLE 2009-03-16 25,000.00 22,500.00 2,500.00 USED 180 PSS0000024 SCREEN AGGR DOUBLE DECK 2017-04-01 50,162.84 35,113.68 15,049.16 NEW 120 PSS0000025 SCREEN SCALPING RECYCLE 2009-03-16 25,000.00 22.500.00 2,500.00 USED 180 PSS0000026 SCREEN DECK DOUBLE 2000-06-12 24,879.52 22,391.57 2,487.95 NEW 120 PS80000029 SCREEN DECK 2005-03-31 1,165.00 1,039.50 115.50 USED 120 P880000030 SCREEN DECK DOUBLE 1983-07-11 8,933.60 8,933.60 - NEW 120 PSSOO00031 SCREEN TRIPLE DECK 2005-03-31 47,500.00 42,750.00 4,750.00 USED 120 PBS0000032 SCREEN DECK DOUBLE 2012-03-19 60,128.00 60,128.00 - USED 120 PSSOD00034 2018 KPI/JCI 7203-38 SCREEN TRIPLE DECK 2018-07-07 582,012.78 223,104.60 358,908.18 NEW 180 PSS0000035 SCREEN TRIPLE DECK 2005-03-31 40,500.00 36,450.00 4,050.00 USED 120 PS80000036 SCREEN TRIPLE DECK 2005-03-31 24,980.00 22,482.00 2,498.00 USED 120 PSS0000037 SCREEN TRIPLE DECK 2005-03-31 35,000.00 31,500.00 3,500.00 USED 120 PSS0000039 SCREEN DECK TRIPLE 2006-12-29 5,700.00 5,700.00 - USED 96 PSS0000040 SCREEN DECK TRIPLE 2016-07-01 25,000.00 25,000.00 - USED 240 PSS0000041 SCREEN DECK TRIPLE 2016-07-01 25,000.00 25,000.00 - USED 240 PSSOO00042 SCREEN DECK TRIPLE 2016.07-01 5.000.00 5,000.00 - USED 240 PSGO000043 SCREEN DECK TRIPLE 7 X 20 2018-05-31 485,129.70 176,956.62 308.173.08 USED 180 PSS0000044 SCREEN DECK TRIPLE 2016-07-01 30,000.00 11,714.00 18,286.00 USED 240 PS80000047 2019 CWMF TREMOR SHAKER 4X8-SKH SCREEN 2019-01-17 37,314.81 18,346.64 18,968.17 NEW 120 PS00000003 PLTIMPROVE-KENTYAVE 1986-08-08 96,750.15 96,750.15 - NEW 120 PS00000004 PLT IMPROVEMENT-KTCY AVE 1987-08-29 105,667.06 105,667.06 - NEW 120 PSUOD00005 INSPECTION SAMPLING RACK 2001-04-13 5,058.56 4,552.76 505.80 NEW 120 PS00000006 RACK TRUCK SPRAY DOWN 2001-04-13 5,194.00 4,674.60 519.40 NEW 120 PSUOOG0007 PLANT ADD'L COST AFTER LEASE 2001-04-15 32,755.63 27,459.93 5,295.70 NEW 120 PS00000008 PLANTSET UP #367 2000-02-25 516,046.61 465,161.95 51.684.66 NEW 180 PS00000009 SILO MINERAL FILLER (SETUP) 2002-04 29 104,713.62 94,242.26 10,471.36 NEW 120 PS00000010 PLANT MODIFICATIONS 1986-07-31 82,657.01 82,657.01 - NEW 120 PS00000011 PLANTSETUP 1989-04-04 11,676.09 10,508.48 1,167.61 NEW 120 PSUOOOOO12 INSPECTION SAMPLING RACK 2000-05-22 5,835.00 5,251.50 583.50 NEW 120 PS00000014 INSPECTION SAMPLING RACK 2002-07-01 5.349.82 6,349.82 - NEW 120 PSUOOOOO15 PLT IMPROVEMENT-B-G DRUM 1987-08-29 .49,125.72 49,125.72 - NEW 120 PS00000016 PLATFORM 20' AND 40' WALKOVER 1998-05-05 9,860.00 9,860.00 - NEW 120 PS00000019 FREIGHT PORTABLEPLANT#42 2005-06-17 34,700.00 34,700.00 - NEW 0 PTC0000001 CONVEYOR TRANSFER 2003-02-04 9,300.00 8.370.00 930.00 USED 180 PTC0000002 CONVEYOR TRANSFER 2003-02-04 9,300.00 8,370.00 930.00 USED 180 PTC0000003 CONVEYOR TRANSFER 2003-02-04 9,300.00 8,370.00 930.00 USED 180 PTC0000004 CONVEYOR TRANSFER 2003-02-04 8,300.00 7,470.00 830.00 USED 180 PTC0000005 MIX CONVEYOR SYSTEM 2010-12-14 93,822.14 93,822.14 - USED 120 PTCOOOOD07 MIX CONVEYOR SYSTEM 2007-07-21 140.785.08 119,667.32 21,117.76 NEW 180 PTC0000008 CONVEYOR TRANSFER 2015-04-01 136,104.40 122.494.20 13,610.20 NEW 120 PTC0000011 MIX CONVEYOR SYSTEM 2007-04-01 77,020.84 51.347.23 25,673.61 NEW 108 PTC0000012 MIX CONVEYOR SYSTEM 2006-04-01 96,810.00 82,288.50 14.521.50 USED 180 PTC0000013 CONVEYOR TRANSFER INCLINE 14' 2016-05-29 55,810.44 44,046.66 11,763.78 NEW 120 PTC0000014 CONVEYOR TRANSFER CROSSOVER 2009-03-16 35,000.00 31,500.00 3,500.00 USED 180 PTC0000015 CONVEYOR SILO 2009-03-16 35,000.00 31,500.00 3,500.00 USED 180 PTC0000016 CONVEYOR SILO 2009-03-16 35.000.00 31,500.00 3,500.00 USED 180 PTCOOOOO17 CONVEYOR TRANSFER 1988-11 22 38,678.00 33.880.96 4,795.04 NEW 120 PTC0000018 CONVEYOR TRANSFER 2017-06-17 84,709.68 57.884.62 26,825.06 NEW 120 PTCOOOOO19 CONVEYOR SILO 2009-03-16 22,000.00 19.800.00 2,200.00 USED 180 PTC0000020 CONVEYOR SILO 2009-03-16 28,000.00 25,200.00 2,800.00 USED 180 PTC0000021 CONVEYOR SILO 2009-03-16 22,000.00 19,800.00 2,200.00 USED 180 PTC0000022 CONVEYOR SILO 2009-03-16 23,000.00 20,700.00 2,300.00 USED 180 PTC0000023 CONVEYOR SILO 2009-03-16 29,000.00 26,100.00 2,900.00 USED 180 PTC0000024 CONVEYOR SILO 2009-03-16 23,000.00 20,700.00 2.300.00 USED 180 PTC0000025 CONVEYOR TRANSFER 2005-03-31 6,680.00 6,994.00 666.00 USED 120 PTC0000026 CONVEYOR TRANSFER SAND 2003-02-04 9,300.00 8,370.00 930.00 USED 180 PTC0000027 CONVEYOR TRANSFER 2016-07-01 1,000.00 390.78 609.22 USED 240 PTSO000002 2018 TRUCK SCALE 8 X 10 2018-12-01 61.850.00 33,235.30 28,614.70 NEW 0 PTS0000003 SCALE TRUCK 2004-04-29 52.538.30 52,538.30 - NEW 120 PTS0000004 TRUCK SCALE 2006-05-30 65.895.62 65.895.62 - USED 180 PTS0000005 SCALE TRUCK 2006-06-03 85,663.88 85,663.88 - NEW 120 PTSOOOOD06 SCALE TRUCK 2008-09-29 17.000.00 17,000.00 - NEW 120 PTSC000007 SCALE TRUCK SET UP 2010-12-14 24.754.85 24,754.85 - USED 120 PTS0000011 SCALE TRUCK 1987-07-08 44.458.52 40,012.67 4,445.85 NEW 120 PTS0000012 SCALE TRUCK 2007-07-21 59,173.26 50,297427 8,875.99 NEW 180 PTSODOOO13 SCALE TRUCK END SECTIONS (2) 2010.04-15 50,865.86 50,865.86 - NEW 120 PTSOOOOO14 SCALE TRUCK 100 TON 2016-04-01 57,160.19 45,728.28 11,431.91 NEW 120 PTS0000015 SCALE TRUCK 1963-08-09 5,265.21 4.855.79 409.42 NEW 120 PTSODOOO16 SCALE TRUCK 1964.04-16 5,498.82 5,071.24 427.58 NEW 120 PTS0000019 TRUCK SCALE 2001-09-21 39,380.19 39,380,19 - NEW 120 PTS0000020 SCALE TRUCK 2007-04-01 21,363.14 14,242.09 7.121.05 NEW 108 PTS0000025 SCALE TRUCK 2008-04-28 85,704.95 85,704.95 - NEW 120 PTS0000026 SCALE TRUCK 2006.04-01 48,110.00 40,893.50 7,216.50 USED 180 PTSOO00027 SCALE TRUCK SECTION 20 X 10 2018.04-01 42,697.09 25,618.32 17,078.77 NEW 120 PTS0000028 SCALE TRUCK EXTENSION 20' 2017-04-01 30.672.62 21,470.B4 9.201.98 NEW 120 PTS0000029 SCALE TRUCK 2009.03-16 34,000.00 30.600.00 3.400.00 USED 180 PTS0000030 SCALE TRUCK 2009-03-16 34,000.00 30.600.00 3.400.00 USED 180 PTS0000031 SCALETRUCK 1995.04-29 60,791.31 54,712A8 6,079.13 NEW 120 PT50000032 SCALE TRUCK ADDITION 1999.04-24 16,950.88 15,255.79 1,695.09 NEW 120 PT50000033 SCALE TRUCK 1993-10-23 30,660.35 27,594,32 3,066.03 NEW 120 PTS0000034 SCALE TRUCK ADDITION 1998-05-02 13,731.66 12.358.49 1,373.17 NEW 120 PTS0000035 SCALE TRUCK SECTION 160' 2018-04-01 115,426.88 69.256.08 46,170.80 NEW 120 PTS0000037 SCALE TRUCK 2009-03-16 37,200.00 33,480.00 3.720.00 USED 180 PT90000043 SCALE TRUCK 2005-03-31 24,790.00 21,071.50 3,718.50 USED 1 0 PTS0000045 SCALE TRUCK 2005-03-31 2,660.00 2,394.00 266.00 USED 1220 PTS0000047 SCALE TRUCK 1988.09-29 51,795.55 51,795.55 - NEW 120 PTS0000048 SCALE TRUCK 1993-05-13 37,312.70 37,312.70 - NEW 120 PTS0000049 SCALE TRUCK ADDITION 1996-05-02 11,532.43 11,532.43 - NEW 120 PTS0000050 FABRICATED TRUCK SCALE 2018-06-30 56,540.17 21.987.70 34,552.47 NEW 180 PTS0000055 TRUCK SCALE 1983-08-19 27,539.90 24,785.91 2,753.99 NEW 120 PTSOODO056 TRUCK SCALE 1977-06-03 29,417.64 29,417.64 - NEW 120 PTS0000059 INTERCOM AND TICKET 1997-05-17 11.591,75 10,432.57 1059.18 NEW 120 PTS0000060 TICKET SENDING UNIT 2007-08-31 4,166.41 4,166.41 - NEW 120 PTS0000061 TICKET SENDING UNIT (2) 2009-08-29 13.880.62 13,880.62 - NEW 120 PTS0000062 TICKET SENDING UNIT PTS0000082 2020 THURMAN DIAMONDBACK STEEL TRUCK SCALE 160' X 2009-06-24 10' 9,968.50 9,968.50 - USED 120 PTS0000084 2020 CARDINAL ARMOR TRUCK SCALE 90' X 10' 2020-04-01 2020-04-16 153,807.76 61,523.04 92,284.72 NEW 120 PUD0000002 UNIFIED DRUM 2010-12-14 2010-12-01 119,257.02 119,257.02 27,826.fi8 91,430.34 NEW 180 PUDOD00003 UNIFIED DRUM 49,872.40 127,826.68 49,872.40 - USED 120 PUD0000005 UNIFIED DRUM PUD0000006 UNIFIED DRUM 2016-04-01 228,976.34 183,180.84 - NEW 45,795.50 NEW 120 120 PUD0000007 UNIFIED DRUM 2015-05-02 2013-04 27 331,992.75 33i,992.75 NEW 120 PUD0000009 UNIFIED DRUM 2013-04-01 358,311.66 331,99 .75 - NEW 120 PUD0000010 UNIFIED DRUM 2014-03-28 358,311.66 122,301,09 358,311.66 NEW 120 PUD0000011 UNIFIED DRUM 2014-05-03 744,765.26 110,070.98 445,012.80 12,230.11 NEW 299,752.46 75 PUD0000012 UNIFIED DRUM PUD0000013 UNIFIED DRUM 2009-03-16 60i,000,00 540,900.00 NEW 60,100.00 USED 180 PUD0000014 UNIFIED DRUM 1986-10-14 2013-05-11 368,817.29 331.935.56 36,881.73 NEW 180 120 PUD0000015 UNIFIED DRUM 2012-07-01 360,192.92 3fi0,192.92 360,192.92 360,192.92 NEW 120 PUD0000018 UNIFIED DRUM PUD0000020 UNIFIED DRUM 2005-03-31 44,000.00 39,600.00 - NEW 4,400.00 USED 120 120 PUD0000021 DRUM REBUILD PORTABLE PTD400 1999-09-21 2008-04-26 148,329.03 195,968.86 148,329.03 USED 120 PUD0000021 UNIFIED DRUM 1979-07-10 300,000.00 195,968.86 300,000.00 - USED 120 PUD0000022 UNIFIED DRUM PUD0000023 DRYER SHELL REPLACEMENT 2005-03-31 32,000.00 28,800.00 NEW 3,200.00 USED 120 120 PUD0000024 DRUM IMPROVEMENT 1999-05.08 1993-0543 50,952.86 50,952.86 45,857.57 45,857.57 5,095.29 NEW 120 PUD0000025 DRYER DRUM DISCHARGE HOOD 2003-04-26 31,917.77 6,696.29 - NEW 120 PUD0000026 ASPHALT DRUM IMPROVEMENT 2009-03-16 31,917.77 - NEW 120 PUD0000037 2019 ASTEC D8-9640 UNIFIED DRUM 2019-12-14 817,596.19 4,500.00 500,00 USED 180 PWM0000001 WARM MIX BLENDING SYSTEM 2012-08-01 21,208.20 395,171.40 422,424.79 NEW 120 PWM0000002 WARM MIX SYSTEM 2016-04-19 18,500.00 21,208.20 18,500.00 - USED 120 PWM0000003 WARM MIX BLENDING SYSTEM 2012-03-19 65,621.00 64,987.86 NEW 60 PWM0000004 WARM MIX SYSTEM 2012-03-03 5,627.00 5,621.00 _ NEW 120 PWM0000005 WARM MIX BLENDING SYSTEM 2012-03-19 67,886.02 67,886.02 - USED 180 PWM0000006 WARM MIX BLENDING SYSTEM 2012-03-19 67,185.67 67,185.67 67,185,87 61,185.67 - NEW 120 PWM0000007 WARM MIX SYSTEM PWM0000008 WARM MIX BLENDING SYSTEM 2016-07-02 NEW 3,40 - NEW 120 120 PWM0000009 WARM MIX BLENDING SYSTEM 2015-06 27 2013-06-27 15,288.97 19,392.09 11,888.34 19,392.09 NEW 60 PWM0000010 WARM MIX BLENDING SYSTEM 2013-06-02 24,915.94 24,445.94 _ 60 PWM0000011 WARM MIX BLENDING SYSTEM 2013-05-04 32,379.55 NEW 60 PWM0000012 WARM MIX BLENDING SYSTEM 2013-06-15 36,388,90 32,379.55 32,379.55 NEW 60 PWM0000013 WARM MIX BLENDING SYSTEM 2013-06-01 23,127.80 23,127 80 _ 60 PWM0000014 WARM MIX BLENDING SYSTEM 2012-03-19 65,687.62 65,687.62 - NEW 60 PWM0000015 WARM MIX BLENDING SYSTEM 2015-05-30 - NEW 120 PWM0000016 WARM MIX BLENDING SYSTEM 2015-06-27 25,352.96 25,362.96 - NEW 60 PWM0000017 WARM MIX BLENDING SYSTEM 2015-06-27 19,558.38 19,558.38 19,668.38 19,558.38 NEW 60 PWM0000018 WARM MIX BLENDING SYSTEM 2012-03-19 66,257.97 60,257.97 NEW 60 PWS0000002 PLANT WASH AGGREGATE PWS0000003 PLANT WASH AGGREGATE 2006-04-01 233,722.68 175,292.01 75.292.01 58,430.67 NEW 120 180 PWS0000004 WASHER LOG 2009-09-21 2004-11-20 85,530,86 85,530.86 85,530.86 NEW 60 PWS0000008 WASHER SAND 2005-03-31 10,000.00 USED 120 PWS0000008 WATER PUMP SYSTEM 1998-06-24 33,109.14 9,000.00 1,000.00 USED 120 PW80000009 WASHER COURSE MATERIAL 2000-05-20 34,093.63 29,798.23 3,310.91 NEW 120 PWS0000010 WASHER COURSE MATERIAL 2000-06-17 7,311.93 27,311.93 30,684.18 3,409.35 NEW 120 PWS0000012 PUMP 2005-05-18 24,580.74 4,580.74 2,731.19 NEW 120 PWS0000013 PUMP SLURRY PW80000022 WASHER MATERIAL FINE 2012-12 02 29,800.09 29,800.09 NEW NEW 120 PWS0000023 WASHER MATERIAL FINE 2016-07-01 2016-07-01 25,000.00 9,761.38 15,238.62 USED 60 240 PWS0000024 PUMPS WATER S"(2) 2016-07-01 35,000.00 13,666.02 21,333.98 USED 240 PWS0000027 PUMP UPGRADE (2) PUMPS - PEERLESS 81 El5G & ITT A/C 2000 2020-10-01 3,OOD.00 1,171.40 1,828.60 USED RACI7622 SAMPLING INSPECTION RACK 2007-07-21 106.043.37 10,695.00 37,114.98 68,928.39 NEW 120 120 TFD0000014 1989 DORSEY 45' FLAT DECK TRAILER 2005-03-31 630.00 10,695.00 - NEW p TQA0000002 WILLIAMS MOBILE QUALITY CONTROL TRAILER 1988-06-26 43,198.70 477.00 53.00 USED 120 TQA0000014 COACH MF125612 X 56 QUALITY CONTROL TRAILER 2016-04-21 47,191.28 43,198.70 NEW 120 TQA0000017 2018 MFE MF140-17-2 QUALITY CONTROL TRAILER 2018-09-01 37,359.38 37,359,38 37,752.96 9,438.32 NEW 120 TRTL000046 TOOL TRAILER 2012-03-03 21,004.84 21,004.84 16,354.54 NEW 120 TRTL000047 TOOL TRAILER TRTL000048 TOOLTRAILER 2012-03-03 13,310.00 13,310.00 - USED - USED 180 180 TRTLD00084 1978 FRUEHAUF TOOL TRAILER 2005-03-31 2005-03-31 13.225.00 13,225.00 USED 180 TRTL000085 1977 GREAT DANE TOOL TRAILER 2005-03-31 159.00 1,446.90 143.10 15.90 USED 120 TRTL000092 1976 GREAT DANE TOOL TRAILER 2005-03-31 1,325,00 1,302.21 144.69 USED 120 TTMS000016 TRAILER GEN0000033 1999 CATERPILLAR 3306 GENERATOR SET 230KW 2005-03-31 159,00 1,192.50 143,10 132.50 USED 32.50 USED 120 i20 GEN0000034 2000 CUMMINS DFHD4489338 GENERATOR 2021-02-11 2021-04-M 30,159.00 130,000.00 125,744.62 8,143.10 21,915.90 USED 120 GEN0000035 1993 CATERPILLAR 3512 MUI GENERATOR SET 125OKW 2021-07-22 232.250.00 128,100.00 2 - 120 PAB0000054 2021 MINDS DRUMTRONIC CONTROL SYSTEM 2021-07-22 ,744.62 61,933.44 170,31 NEW 120 PA80000055 2014 SYSTEMS ADP-100 CONTROL SYSTEM 2022-02-01 172,114.55 124,304.96 170,316.56 NEW 120 PAC0000021 2014 KPI-JCI K300/6203 CCPM SCREEN PLANT W/CRUSHER 2021-04-01 748,918.29 149,783.76 47,809.59 NEW 36 PAC0000022 2011 NORBERG METSO HP200 CONE CRUSHER 2021-04-01 266,494.21 53,298.72 699,134.53 USED 180 PAS0000012 2020 KPI JCI 6203 SCREENING PLANT 2021-04-01 241,512.20 48,302.28 213,195.49 USED 180 P13F0000004 2020 SUPERIOR 42" X iT BELT FEEDER CONVEYOR W/HOPPER 2021-11-01 93,215.05 193,209.92 NEW 180 PBH0000058 2020 BAGHOUSE MAXAM KLEEN AIRE 100000 CFM 2021-04-01 792.644.42 15,017.94 78,107.11 NEW 180 PBH0000060 2020 BAGHOUSE MAXAM KLEEN AIRE 80000 CFM 2021-04-01 586,464.37 237,793.32 175,939.20 554,851.10 NEW 120 PSHOO00062 20i4 CWMF 8-100-840 BAGHOUSE 2022-02-01 262,566.82 189,63i,52 410.525.17 NEW 120 PBS0000023 1997 DILLMAN COLD FEED SCALE CONVEYOR 30" X 71' 2022-02-01 19,415.44 14,022.32 72.935.30 NEW 36 PBSOOOOD24 1997 DILLMAN RECYCLE SCALE CONVEYOR 30" X 60' 2022-02-01 7,442.88 5,375.50 5,393A2 USED 36 PCA0000086 2020 CONVEYOR SLIDE -PAC 36 X 80 2021-04-01 151,516,51 30.303.36 2,067.38 USED 36 PCA0000087 2020 CONVEYOR SLIDE -PAC 36 X 80 2021-04-01 151,516.51 30,303.36 121.213.15 NEW 180 PCA0000088 2020 SUPERIOR 30X400ZL ZIPLINE OVERLAND CONVEYOR 2021-11-01 112,845,46 18,180.68 121.213.15 NEW 180 PCA0000089 2020 SUPERIOR 30X400ZL ZIPLINE OVERLAND CONVEYOR 2021-11-01 112,845.46 112,845.46 18,180.68 94,664.78 NEW 180 PCA0000090 2020 SUPERIOR 3OX400ZL ZIPLINE OVERLAND CONVEYOR 2021-11-01 2,84 18,180.68 94,664.78 NEW 180 PCC0000031 1997 DILLMAN COLD FEED COLLECTING CONVEYOR 30" X 65' 2022-02-01 94,664.78 NEW 180 PCF0000079 2020 ASTEC CFS-1-14-5-A COLD FEED BIN SECTION (5) 2021-04-01 .46 416,883.62 3,850.60 1,664.78 USED 36 PCF0000080 2020 ASTEC CFS4-14-5-B COLD FEED BIN SECTION (5) 2021-04-01 416.883.63 125,065.08 291.818.64 NEW 120 PCF0000083 2021 RELIABLE 10 X 14 COLD FEED BIN 2021-04-01 74,857.39 125,065.08 291,818.55 . NEW 120 PCH0000039 2021 FABRICATED CONTROL HOUSE 2021-04-01 174,857.39 22,457.16 115,028,73 52,400.23 NEW 120 PCH0000040 1997 SYSTEMS CCSP-1230 CONTROL HOUSE 2022-02-01 115,028.73 115,028.73 NEW 46,17 - 120 PCM0000024 2020 SULLAIR 3707E AIR COMPRESSOR 2021-04-01 20,542.54 6,162.84 USED 36 PCM0000025 2014 QUINCY QSI-3001 AIR COMPRESSOR 2022-02-01 32,690.80 14.379.70 NEW 120 P000000014 2021 ASTEC D-DC102-500 DRAG CONVEYOR 2021-06-01 364,963.28 64,963.28 23,610.08 9,080.72 NEW 36 PDC0000015 1997 DILLMAN DTE50OTPH DRAG SLAT CONVEYOR 2022-02-01 03,406.24 iD3,d06,24 261,557.Od NEW 61,657.04 120 PDS0000052 2021 VULCAN RV100-8 DRYER BURNER 2021-07-19 128,963.26 USED 36 POS0000053 2014 HAUCK ECO-STAR II DRYER BURNER 2022-02-01 81,369.89 35,464.77 93,498.49 NEW 120 PFR0000022 2021 DILLMAN FUME EVAC SYSTEM WIPMS-80 2021-06A5 52,398.85 58,767.02 14,846.44 22,602.87 NEW 36 PFR0000023 2021 DILLMAN PSB-4T FUME EVAC SYSTEM W/PMS-81 2021-06-01 d9,793,90 14,108.30 37,552.41 NEW 120 PFR0000024 2021 DILLMAN PSB-4T FUME EVAC SYSTEM WIPMS-83 2021-06-01 49,79390 14,108.30 35.685.60 NEW 120 PFR0000025 2021 DILLMAN PSB-4T FUME EVAC SYSTEM WIPMS-85 2021-06-01 49,793.91 14,108.30 35.685.60 NEW 120 PFR0000026 2021 DILLMAN PSB-4T FUME EVAC SYSTEM W/PMS-87 2021-06-01 49.793.91 49,793.91 14,108,30 35.685.61 NEW 120 PFR0000027 2014 DILLMAN FUME EVAC SYSTEM W/FAN 2022-02-01 35,685.61 35,685,61 NEW i2o 43,820,92 NEW PLS0000136 2021 HEATEC TAV-35D VERTICAL A/C TANK 35000 GAL 2021-05-01 269,289.50 78,542.80 190,746.70 NEW PLS0000138 2021 HEATEC TAV-35D VERTICAL A/C TANK 35000 GAL 2021-05-01 269,289.50 78,542.80 190,746.70 NEW PLS0000140 2021 HEATEC TAV-35D VERTICAL A/C TANK 35000 GAL 2021-06-14 226,283.40 64,113.80 162,169.60 NEW PLS0000141 1997 HEATEC LIQUID ASPHALT PUMPS PLS0000142 1997 FABRICATED CALIBRATION TANK 1000 GALLON 2022-02-01 5,233A4 3,779.62 1.453.52 NEW PMC0000035 2021 RAF ELECTRIC MOTOR CONTROL CENTER 2022-02-01 2021-06-15 6,279.76 342,804.11 4,535.44 1,744.32 USED PMC0000036 2014 ELECTRIC MOTOR CONTROL CENTER 2022-02-01 71,395.10 97,127.80 51,563,20 245,676.31 NEW 19,831.90 NEW PMS0000080 2021 DILLMAN D-300T150 MIX STORAGE SILO PMS0000081 2021 DILLMAN D-300T150 MIX STORAGE SILO 2021-06-15 292,835.26 82,969.86 209.865.40 NEW PMS0000083 2021 DILLMAN D-300T150 MIX STORAGE SILO 2021-06-01 2021-06-01 272,760.49 77,282.00 195,478.49 NEW PMS0000085 2021 DILLMAN D-300T150 MIX STORAGE SILO 2021-06-01 272,760.49 272,760.49 77,282.00 77,282.00 195,478.49 NEW PMS0000087 2021 DILLMAN D-300T150 MIX STORAGE SILO 2021-06-01 272,760.50 77,282.00 195,478.49 NEW 195,478.50 NEW PMS0000089 1997 DILLMAN DE30OT--15OW STORAGE SILO 2022-02-01 49,976.34 36,093.98 13,882.36 NEW PMS0000090 1997 DILLMAN DE30OT--150W STORAGE SILO PMS0000091 1997 DILLMAN DE30OT--15OW STORAGE SILO 2022-02-01 49,977.34 36,094.76 13.882.58 USED PSA0000028 2020 SUPERIOR RADIAL STACKING CONVEYOR 2022-02-01 2021-04-01 49,977.34 36,094.76 13,882.58 NEW PSA0000029 2020 SUPERIOR RADIAL STACKING CONVEYOR 2021-04-01 42,249.44 42,249A4 8,449.92 33.799.52 NEW PSA0000030 2020 SUPERIOR RADIAL STACKING CONVEYOR 2021-04-01 42,249.44 8,449.92 8.449.92 33,799.52 NEW 33,799.52 PSA0000031 2020 SUPERIOR RADIAL STACKING CONVEYOR 2021-04-01 42,249.44 8,449.92 NEW 33,799.52 NEW PSA0000033 2020 SUPERIOR 24X60PRSC STACKING CONVEYOR 2021-04-W 36,000.00 7.200.00 28,800.00 NEW PSA0000034 2020 SUPERIOR 24X60PRSC STACKING CONVEYOR PSA0000035 2020 SUPERIOR 36X125PC PINNACLE STACKING CONVEYOR 2021-04-01 36,000.00 7,200.00 28,800.00 NEW PSA0000036 2020 SUPERIOR 36X125PC PINNACLE STACKING CONVEYOR 2021-11-01 2021-11-01 203,709.57 203,709.57 32,819.88 170,889.69 NEW PSA0000037 2020 SUPERIOR 36X125PC PINNACLE STACKING CONVEYOR 2021-11-01 196,891.83 32,819.88 31.721.36 170,889.69 NEW 165,170.47 PSA0000038 2020 SUPERIOR 36X60PRSC RADIAL STACKING CONVEYOR 2021-11-01 46,431.21 7,480.55 NEW 38,950.66 PSA0000039 2020 SUPERIOR 36X60PRSC RADIAL STACKING CONVEYOR 2021-11-01 46,431.21 7,480.65 NEW 38,950.66 PSA0000040 2020 SUPERIOR 36X100PRSC RADIAL STACKING CONVEYOR 2021-11-01 101,560.92 16,382.67 NEW 85,198.25 NEW P380000048 2021 CWMF TREMOR SHAKER SS-4X8 SINGLE DECK CF SCREEN 2021-05-01 27,870.90 8,129.10 19,741.80 NEW PS80000049 2021 CWMF TREMOR SHAKER SS-4X8 SINGLE DECK RAP SCREEI2021-05-01 27,185.61 7,929.25 19,256.36 NEW PSS0000050 2021 CWMF SS-SX120D VIRGIN SCREEN 2021-04-01 58,908.92 17,672.76 41,236.16 NEW P850000051 2021 CWMF SS-480 RAP SCREEN PSS0000052 2020 KPI-JCI 7203-32 SCREEN TRIPLE DECK W/CONVEYOR 2021-04-01 29,314.93 8,794A4 20,520.49 NEW PSS0000054 1997 DEISTER USM2516 DOUBLE DECK COLD FEED SCREEN 2021-11-01 2022-02-01 406,851.90 15,990.70 65,548.41 341,303.49 NEW PSS0000055 1997 DEISTER USM1512 SINGLE DECK RECYCLE SCREEN 2022-02-M 10,420.03 11,548.94 4,441.76 USED PS00000020 2014 7301 INSTALLATION OF EXISTING ASSETS (LIST IN "NOTES') 2022-02-01 264,603.27 7,525.70 191,102.34 2,894.33 USED 73,500.93 PTC0000030 2021 ASTEC RIC-3665 INCLINE TRANSFER CONVEYOR 2021-04-01 86,560.00 25,967.88 USED 60,592.12 NEW PTC0000031 2020 DILLMAN D-TC-5H16-2W TRANSFER CONVEYOR PTC0000032 2021 DILLMAN D-TC-51-116-2W TRANSFER CONVEYOR 2021-05-01 120,259.93 35,075.95 85,183.98 NEW PTC0000033 2021 DILLMAN D TC-4H16-2W TRANSFER CONVEYOR 2021-06-15 2021-06-01 112,956.74 88,280.21 32,004.54 80,952.20 NEW PTC0000034 2021 DILLMAN D-TC-4H16-2W TRANSFER CONVEYOR 2021-06-01 88,280.22 25,012.78 63,267.43 NEW PTC0000035 2021 DILLMAN D TC-4H16-2W TRANSFER CONVEYOR 2021-06-01 88,280.22 25,012.78 25,012.78 63.267.44 NEW 63,267.44 PTC0000036 1997 DILLMAN DE500TPH TRANSFER CONVEYOR 2022-02-01 56,216.56 40,600.82 NEW 15,615.74 USED PTC0000037 1999 DILLMAN DTE50OTPH INCLINE TRANSFER CONVEYOR 2022-02-01 12,661.65 9.144.46 3,517.19 USED PTC0000038 1997 DILLMAN DE50OTPH TRANSFER CONVEYOR 2022-02-01 25,547.39 18,450.90 7,096.49 USED PTS0000086 2020 CARDINAL ARMOR STEEL DECK TRUCK SCALE 120' X 10- 2021-04-01 141,547.71 42,464.16 99,083.55 NEW PTS0000088 2021 METTLER-TOLEDO VT5231 20 11 B TRUCK SCALE SECTION 2021-05-01 28,281.23 8,248.80 20,032.43 NEW PTS0000090 2014 RICE LAKE EZ04010STOTR TRUCK SCALE 2022-02-01 72,530.33 52,382.98 20,147.35 NEW PTS0000091 2014 RICE LAKE EZ14010STOTR TRUCK SCALE PUD0000039 2020 CWMF DRUMRET-8-P-CW-108-37-T UNIFIED MIXING DRUM 2022-02-01 72.530.33 52,382.98 20,147.35 NEW PUD0000040 2020 CWMF DRUMRET-S-C-CW-10144-T UNIFIED MIXING DRUM 2021-04-01 2021-04-01 251,984.52 246,346.50 75,595.32 176,389.20 NEW PUD0000041 2014 CWMF UNIFIED MIXING DRUM 10' X 59 2022-02-01 257.300.73 73,904.04 185,828.24 172,442.46 NEW 71,472.49 NEW PWS0000028 2021 EAGLE IW 36X18 COARSE MATERIAL WASHER 2021-09-14 76,428.27 12,738.00 63,690.27 NEW TQA0000024 2021 MFE 111-20-212 X 54 MOBILE LAB TRAILER 2021-04-01 61,416.56 61,416.56 - NEW GEN0000036 2001 CUMMINS KTA50-G91500 KW GENSET 2023-02-07 200,020.00 23,335,62 176.684.38 USED PAB0000056 2021 SYSTEMS ADP-100 BLENDING CONTROLS 2022-04-01 76,781.43 76,781.43 NEW PAS0000057 2022 MINDS DRUMTRONIC BLENDING CONTROL SYSTEM 2022-05-01 454,819.91 87,173.91 367,646.00 PAS0000058 2022 MINDS DRUMTRONIC BLENDING CONTROL SYSTEM 2022-05-01 171,063.84 32,787.19 138,276.65 NEW PBH0000063 2022 CWMF KNOCK OUT BOX & DUCTWORK 2022-05-01 182,259.59 34,933.09 147,326.50 NEW PCC0000033 2022 ASTEC 30" X 14' SLINGER CONVEYOR 2022-05-01 76,718.70 14,704.36 62,014.34 NEW PCH0000041 2022 ROAD BUILDERS CONTROL HOUSE PCH0000042 2022 FOUNDATION CONTROL HOUSE W/PCH-41 2022-05-01 122,313.73 23,443.44 98,870.29 NEW PCR0000017 2021 RAPTOR RAP3250-B LUMP BREAKER 2022-06-01 2022-04-01 42,351.88 69,666.30 8,117.39 34,234.49 NEW PDS0000054 2022 VULCAN DRYER BURNER 2022-05-01 218,003.24 59,666.30 41,783.87 - NEW 176,219.37 NEW PLS0000143 2022 BROCK VAT-35.6SB A/C TANK 35000 GALLON 2022-08-01 272,053.55 45,342.20 226,711.35 NEW PMC0000037 2022 SERVICE ONE ELECTRIC MOTOR CONTROL CENTER 2022-05-01 315,240.56 60,421.00 254,819.56 PMC0000038 2022 SERVICE ONE ELECTRIC MOTOR CONTROL CENTER 2022-05-01 443.041.28 84,916.23 358,125.05 NEW PMD0000003 2022 BROCK DRM029 MISER DRUM SHELL 2022-04-01 201,175.57 40,235.04 160.940.53 NEW PMT0000001 2022 MAXAM TRANSPORTER BINTOP CONVEYING SYSTEM 2022-05-01 635.336.72 121,772.81 513.563.91 NEW PUD0000042 2022 BROCK 8' X 50' UNIFIED MIXING DRUM 2022-05-01 768,647.94 147,324.20 621.323.74 NEW PAB0000060 2023 MINDS DRUMTRONIC BLENDING CONTROL SYSTEM 2023-04-01 68,729.25 68,729.25 NEW PAB0000062 2023 MINDS DRUMTRONIC V4 CONTROL SYSTEM 2023-07-01 212.791.40 15,959.34 196,832.06 NEW PAB0000063 2022 MINDS DRUMTRONIC CONTROL SYSTEM 2023-08-01 190,092.82 12,672.88 177,419.94 NEW PAC0000024 2022 KPI-JCI K350 CONE CRUSHER W/STRUCTURE 2023-08-01 767,288.61 25,576.32 741.712.29 NEW PA00000026 2022 MCCLOSKEY J50V2 50X29 PORTABLE JAW CRUSHER 2024-03-01 660,000.00 3.666.67 656,333.33 USED PAC0000027 2022 MCCLOSKEY 300C HP300 METSO CONE CRUSHER 2024-03-01 725,000.00 4.027.78 720,972.22 USED PAC000011A 2023 DEISTERTFU-2620 AGGREGATE SCREEN 2023-09-01 135,078.00 4,465.09 130,612.91 NEW PAS0000013 2022 KPI-JC17203-38LB SCREENING PLANT 2023-08-01 529,818.55 17,660.64 512,157.91 NEW PBF0000005 2022 KAF 12' X 12' BELT FEEDER W/BIN 2023-07-01 161,945.32 8,097.30 153,848.02 NEW PBF0000006 2023 SUPERIOR 8' X 16' BELT FEEDER WBIN 2023-08-01 115,681.04 5,141.36 110.539.68 NEW PBF0000007 2021 KAFKA'8Xi6' BELT FEEDER WBIN PBH0000064 2020 BAGHOUSE 2022-08-01 224.817.46 24,979.80 1993837.66 NEW PBH0000065 2023 MAXAM KLEEN AIRE BAGHOUSE 2023-04-01 2023-04-01 1,278,984.49 948,276.31 115,108.56 94,827.60 1,163,875.93 USED PSH0000067 2016 ASTEC PEBH-07 BAGHOUSE W/KNOCK OUT BOX 2023-05-01 200,000.00 55.000.00 853,448.71 NEW 145,000.00 USED PBH0000068 2020 PRIMARY COLLECTOR (KNOCK OUT BOX) 2023-04-01 172,906.62 15,561.60 157.345.02 USED PBH0000070 2023 MAXAM BAGHOUSE STACK EXTENSION 8' 2023-07-01 31,645.00 2,373.39 2%271.61 NEW PBS0000025 2020 COLD FEED SCALE CONVEYOR 2023-04-01 206,575.03 18,591.72 187.983.31 USED PBS0600026 2020 RECYCLE SCALE CONVEYOR PCA0000091 2022 FABRICATED 42" X 200' OVERHEAD CONVEYOR 2023-04-01 213,636.98 19,227.36 194,409.60 USED PCA0000092 2022 SUPERIOR 30X1000ZL ZIPLINE CONVEYOR 2023-08-01 2023-08-01 186,420.06 206,027.46 8,285.36 9.156.80 178,134.70 NEW 196.870.66 NEW POA0000093 2022 SUPERIOR 30X500ZLZIPLINE CONVEYOR 2023-08-01 206,027AS 9,156.80 196,870.66 NEW PCF0000085 2020 COLD FEED BIN PCF0000086 2020 COLD FEED BIN 2023-04-01 119,294.27 10,736.52 108,557.75 USED PCF0000087 2020 COLD FEED BIN 2023-04-01 2023-04-01 119,294.27 119.294.27 10.736.52 108,557.76 USED PCF0000088 2020 COLD FEED BIN 2023-04-01 119,294.27 10,736.52 10,736.52 108,557.75 USED 108,557.75 USED PCF0000089 2020 COLD FEED BIN PCF0000090 2020 COLD FEED BIN 2023-04-01 119,294.27 10,736.52 108.557.75 USED PCF0000091 2020 COLD FEED BIN 2023-04-01 2023-04-01 119,294.27 119,294.27 10,736.52 108,557.76 USED PCF0000092 2020 COLD FEED BIN 2023-04-01 119,294.27 10.736.52 10,736.52 108,557.75 USED 108.557.75 USED PCF0000093 2020 COLD FEED BIN PCF0000094 2023 RELIABLE COLD FEED BIN 10X14 2023-04-01 119,294.23 10,736.52 108.557.71 USED PCF0000095 2023 RELIABLE COLD FEED BIN 10X14 2023-04-01 2023-04-01 67,309.56 67,309.56 6,730.92 60,578.64 NEW PCF0000096 2023 RELIABLE COLD FEED BIN 1OX14 2023-04-01 67,309.56 6,730.92 6.730.92 60,578.64 NEW 60,578.64 NEW PCF0000097 2023 RELIABLE COLD FEED BIN 10X14 2023-04-01 67,309.56 6,730.92 60,578.64 NEW PCF0000098 2023 RELIABLE COLD FEED BIN 10X14 2023-04-01 67,309.55 6.730.92 60,578.63 NEW PCF0000099 2023 RELIABLE COLD FEED BIN 10X14 2023-04-01 67,309.55 6,730.92 60,578.63 NEW 120 120 120 36 36 120 36 120 120 120 120 120 36 180 180 180 180 180 180 180 180 180 180 180 180 120 120 120 120 180 120 120 120 120 120 120 120 120 36 36 120 120 36 180 120 120 10 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 180 180 180 180 180 180 180 180 120 120 120 120 120 120 180 180 180 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 PCF0000100 2023 RELIABLE COLD FEED BIN 10X14 PCF0000101 2023 RELIABLE COLD FEED BIN 10X14 2023.04-01 67,309.65 6,730.92 60,578.63 NEW 120 PCF0000102 2016 ASTEC PCF-1014-5 COLD FEED BIN SECTION (5) 2023-04-01 2023-05-01 67,309.55 75,000.00 6,730.92 60,578.63 NEW 120 PCH0000043 2010 PLANT CONTROL BUILDING 2023.04-01 147,392.28 20,625.00 54,375.00 USED 36 PCH0000044 2016 ASTEC CHP-1232 CONTROL CENTER 2023-05-01 50,719.10 13,265.28 13,947.78 134,127,00 USED 120 PDCOOOOO16 2020 DRAG CONVEYOR 500 TPH 2O23.04-01 725,657.33 65,309.16 36,771.32 USED 660,348.17 36 PD00000017 2016 ASTEC SEB-10030 SURGE BIN W/DRAG CONVEYOR 2023-05-01 200.000.00 55,000.00 USED 120 PDD0000005 2020 DRYER DRUM 500 TPH 2O23-04-01 2,285,050.79 205,654.56 145,000.00 USED 2,079,396.23 USED 36 PDS0000055 2023 WHISPER JET WJ-125 DRYER BURNER 2023-04-01 226,265.29 22,626.48 203,638.81 NEW 120 PDS0000056 2023 BROCK VULCAN DRYER BURNER PFR0000028 2019 FUME EVAC SYSTEM 2023.08-01 136,608.00 9,107.20 127,500.80 NEW 120 120 PH00000041 2016 HEATEC AFT-25P FUEL OIL TANK 25000 GALLON 2023-04-01 2023-05-01 309,864.10 50,000.00 27,887.76 281,976.34 USED 120 PLS0000144 2009 VERTICAL A/C TANK 30000 GALLON 2023-04-01 186,604.24 13,760.00 16,794.36 36,250.00 USED 36 PLS0000145 2009 VERTICAL A/C TANK 30000 GALLON 2023-04-01 186,653.63 16,798.80 169,809.88 USED 169,854.83 USED 120 PLSOCOO146 2020 VERTICAL A/C TANK 30000 GALLON PL80000147 2023 HEATEC TAV-35D A/C TANK 35000 GAL 2023-04-01 331,701.57 29,853.12 301,848.45 USED 120 120 PLSOOOO149 2023 HEATEC TAV-35D A/C TANK 35000 GAL 2023-04-01 2023.04-01 276,630.00 247,336.79 27,663.00 248,967.00 NEW 120 PLS0000150 2023 HEATEC TAV-35D A/C TANK 35000 GAL 2023-04-01 247,336.78 24,733.68 24.733.68 222,603.11 NEW 120 PLS0000151 2023 HEATEC TAV-35D A/C TANK 35000 GAL 2023-04-01 247,336.78 24,733.68 222,603.10 NEW 222,603.10 120 PLSOOOOI52 2023 HEATEC TAV-35D A/C TANK 35000 GAL 2023-04-01 247,336.78 24,733.68 NEW 222,603.10 NEW 120 PLS0000154 2016 HEATEC HT-30DP HELI-TANK A/C TANK 30000 GALLON PLS0000155 2016 HEATEC TA-30P A/C TANK 30000 GALLON 2023-05-01 50,000,00 13,75D.00 36,250.00 USED 120 36 PMC0000039 2020 MOTOR CONTROL CENTER 2023-05-01 2023-04-01 50,000.00 250,000.00 13,750.00 36,250.00 USED PMC0O00040 2016 ASTEC PH-1030 MOTOR CONTROL CENTER 2023-05-01 150,000.00 22,500.00 41,250.00 227,500.00 USED 120 PMS0000092 2010 SILO MIX STORAGE 200 TON 2023-04-01 280,706.09 25,263.60 108,750.00 USED 255,442.49 USED 36 PMSOOOOO93 2010 SILO MIX STORAGE 200 TON PMSOO00094 2010 SILO MIX STORAGE 200 TON 2023-04-01 280,706.09 25,263.60 255.442.49 USED 120 120 PM80000095 2010 SILO MIX STORAGE 200 TON 2023-04-01 2023-04-01 280,706.09 280,706.09 25,263.60 255,442.49 USED 120 PMS0000096 2019 SILO MIX STORAGE 2023-04-01 352,549.97 25,263.60 31,729.44 255,442.49 USED 320,820.53 USED 120 PM80000097 2019 SILO MIX STORAGE PR80000060 2020 RECYCLE BIN 2023-04-01 352,549,97 31,729.44 320,820.53 USED 120 120 PRB0O00061 2020 RECYCLE BIN 2023-04-01 2023-04-01 235,759.66 21,218.40 214,541.26 USED 120 PRB0000062 2022 RELIABLE 9X14 ASPHALT RAP BIN 2023-04-01 235,759,66 94 772.96 21,218.40 214,541.26 NEW 120 PRB0000063 2016 ASTEC PRB-814-50 RECYCLE BIN 2023-05-01 50,000.00 9,477.24 13,750.00 85,295.72 NEW 36,250.00 USED 120 PSA0000044 2022 SUPERIOR 36X125PC PINNACLE STACKING CONVEYOR 2023-08-01 226,659.60 10,073.76 216,585.84 NEW 36 PSA0000045 2022 SUPERIOR 36X125PC PINNACLE STACKING CONVEYOR 2023-08-01 226,659.60 10,073.76 216,585.84 NEW 180 PSA0000046 2022 SUPERIOR 3SX125PC PINNACLE STACKING CONVEYOR 2023-08-01 226,659.60 10,073.76 216,585.84 NEW 180 PSA0000047 2022 SUPERIOR 3695PRSC RADIAL STACKING CONVEYOR 2023-08-01 67,363.04 2,993.92 64,369.12 NEW 180 PSA0000048 2022 SUPERIOR 36XBOPRSC RADIAL STACKING CONVEYOR 2023-08-01 67,363.04 2,993,92 64,369.12 NEW 180 PSA0000049 2022 SUPERIOR 3SX70PRSC RADIAL STACKING CONVEYOR 2023-08-01 67,363.04 2,993.92 64,369.12 180 PSA0000050 2023 SUPERIOR 36X130TSFD TELESTACKER CONVEYOR 2023-09-01 267,363.04 11,993.92 NEW 264,369.12 180 PBACO00051 2022 MCCLOSKEY ST80 STACKING CONVEYOR 2024-03-01 100,000.00 833.33 NEW 120 PSAOOOOO52 2022 MCCLOSKEY 36X100 STi 00 RADIAL STACKING CONVEYOR 2024-03-01 125,000.00 1,041.67 99,166.67 USED 12 0 PSAD000053 2016 MCCLOSKEY ST100V 36X100 RADIAL STACKING CONVEYOR 2024-03-01 120,000.00 1,000.00 123,958.33 USED 120 PSA0000054 UNKNOWN KAFKA 36 X 80 RADIAL STACKER 2024-03-01 50,000.00 416.67 119,000.00 USED 120 PSCOOO0007 2022 SUPERIOR BMFD4420 BLADE MILL WASHER 2023-08-01 169,785.20 7,546.00 49,583.33 USED 162,239.20 NEW 180 PSC0000008 2022 SUPERIOR F606121WHFADS AGGREDRY WASHER 2023-08-01 229.686.82 10,208.32 219,478.50 NEW 180 PSSOC00056 2020 RECYCLE SCREEN PS50000057 2020 SCREEN COLD FEED 2023-04-W 121.849.51 10,966.44 110,883.07 USED 120 120 PSSO000058 2020 RECYCLE DIVERT Y CHUTE 2023-04-01 2023-04-01 219,921.30 105,414.24 19,792.92 9.487.32 200,128.38 USED 120 PSS0000059 2016 ASTEC PSS-512-60 SCALPING SCREEN W/AGGR CONVEYOR2023-05-01 10,000.00 95,926.92 USED 136 PSS0000060 2023 DEISTER USM-2516 DOUBLE DECK VIRGIN SCREEN 2023-0643 61,089.00 2,750.00 4,581.72 7,250.00 USED 36 P880000061. 2016 MCCLOSKEY 8190.2DT 5X20 DOUBLE DECK SCREEN 2024-03-01 310,000.00 1,722.22 56.507.28 NEW 120 PS80000062 2022 MCCLOSKEY 8190.3DT 5X20 TRIPLE DECK SCREEN 2024-03-01 410,000.00 308,277,78 USED 180 PTC0000039 2019 TRANSFER CONVEYOR 500 TPH 16' 2023-04-01 142,221.67 2,277.78 12,799.92 407,722.22 USED 129,421.75 USED 120 PTC0000040 2019 3-WAY CONVEYOR 500 TPH PTC0000041 2019 INCLINE CONVEYOR 500 TPH 17' 2O23-04-01 2993382.51 26,944.44 272,438.07 USED 12 0 120 PTC0000042 2019 TRANSFER CONVEYOR 500 TPH 16' 2023-04-01 2023-04-01 160,870.05 142,221.67 13,578.36 137.291.69 USED 120 PTC0000043 2022 MAXAM 18' X 36" TRANSFER CONVEYOR 2023-04-01 136,933.88 12,799.92 13.693.44 129,421.75 USED 120 PTC0000044 2016 ASTEC DTS-1432 TRANSFER SCREW CONVEYOR 2023-05-01 10,000.00 2,750.00 123,240.44 NEW 120 PUD0000044 2023 BROCK 9' UNIFIED DRUM SHELL 2023-04-01 777,316.79 77,731.68 7,250,00 USED 699,585.11 NEW 36 PUD0000045 2016 ASTEC D-PUCF10250 COUNTERFLOW DRUM W/BURNER 2023-05-01 206,000.00 56,650.00 149,350.00 USED 136 PUD0000046 2023 BROCK 9' PARRELL FLOW CENTER INLET DRUM ASPHI6187 PUMP UNDERSEAL ASPHALT 2023-08-01 440,062.00 29.337.44 410,724.56 NEW 36 120 ATT6720 ATTACHMENT SCALE BUCKET 1996-11-12 2011-12-05 13,020,00 12,021.96 13.020.00 12,021.96 NEW 0 A777720 CUTTER EXTRACTOR FOR MANHOLE 2008-07-29 16,039.30 16.039.30 NEW NEW 0 BLD17199 PUMP UNDERSEAL ASPHALT BLSI10044 TANK FUEL 2005-03-04 26,981.19 26.981.19 - NEW 0 0 BL8I1990 PRESS HYDRAULIC-DAKE 2016-03-02 1992-03-23 2.508.12 2.065.50 2,508.12 1,904.89 - USED 160.61 p BLS13344 TANK FUEL BLS14647 MOBILE DRILL MODEL B-31 1992-05-03 2,865.20 2.642.41 NEW 222.79 NEW p p BL815914 LUBRICATION SYSTEM -ELKS 2017-11-02 1995.07-21 19.713.73 7,642.56 19,713.73 0 BLSI6814 LUBRICATION SYSTEM - LAPOR 2001-05-09 6,606.53 7,642.56 6,606.53 - NEW 0 BLS17039 LUBRICATION SYSTEM -GARY 2003-08-04 10,686.23 10,686.23 - NEW 0 BLSI7464 SNOWPLOW POLY C150000001 150 AIR COMPRESSOR 2008-11-02 5,292.36 5.292.36 NEW p C175000001 INGERSOLL RAND P175 AIR COMPRESSOR 2000-04-01 2009-04-30 400.00 750.00 400.00 - NEW 36 CWKT600001 MSC BARRIER MOLD 1996-08-31 10,890.00 750.00 10,890.00 - USED 36 CWKT700001 TERRAMITE CONCRETE POWER SCREED 1993-04-28 11,602.50 11,602.50 NEW 60 CWKT700002 TERRAMITE CONCRETE POWER SCREED 1994-09-09 10,733.54 10,733.54 NEW 60 CWKT700003 16 HP CONCRETE POWER SCREED 1995-03-23 5,000.00 5,000.00 NEW 60 CWKT7a0004 MBW BLITZSCREED 2890JP CONCRETE SCREED 1995-05-31 7,575.46 7,575.46 - USED 60 CWKT700005 MBW BLITZSCREED CONCRETE ATTACHMENT SCREED 2000-10-01 7,491.31 7,491.31 - NEW 80 CWKT700006 WHITEMAN ATTACHMENT CONCRETE SCREED 2001-10-18 6,962.25 6,962.25 NEW 60 CWKT700007 METAL FORMS CORPORATION CONCRETE SCREED 2007-08-23 5,950.58 5,950.58 - NEW 60 D035000004 2006 WACKER RD11V 35" VIBRATORY COMPACTOR 2006-07-05 14,500.00 14,500.00 - NEW 60 DD35000006 2014 WACKER RD12A-90 35" VIBRATORY COMPACTOR 2014-04-01 17,819.66 17,819.66 - NEW 60 DD35000007 2014 WACKER RD12A-90 35" VIBRATORY COMPACTOR 2014-04-01 17.819.66 17,819.66 - NEW 36 DD35000010 WACKER RD11A 35" VIBRATORY COMPACTOR 2005-03-31 2,000.00 2,000.00 NEW 36 DD35000011 WACKER RD11A 35" VIBRATORY COMPACTOR 2005-03-31 5,000.00 5,000.00 USED USED 36 0035000012 WACKER RD11A 35" VIBRATORY COMPACTOR 2005-03-31 5,000.00 5,000.00 - USED 60 DPT0000005 UNKNOWN LEEBOY L250 TOWABLE DISTRIBUTOR 2005-03-31 625.00 625.00 - 60 FKL0000002 i996 MITSUBISHI FGC-25B FORKLIFT 1999-02-01 14,175.00 14,175.00 USED 36 FKL0000004 1997 MITSUBISHI FGC-25 FORKLIFT 2007-12-17 7,208.00 7,208.00 - USED USED 60 FKL0000005 KOMATSU FG25GT-11 FORKLIFT 2p08-01 29 15,500,00 15,500.00 - USED 60 FRK4000002 CATERPILLAR ATTACHMENT FORKS SKID STEER 2009-04-30 3,000.00 3,000.00 USED 36 FUEL6457 TANK FUEL GEN0000019 GENERATOR 1998-05-01 17.160.00 17,160.00 - NEW 60 0 JOBT000001 2019 WACKER NEUSON DPU6555HEH PLATE COMPACTOR 2008-01-29 2019-03-27 1,125.00 1,125.00 - USED 36 JOBT10320 TRENCH BOX JOBT104O8 TACK SPRAYER LEEBOY L250 1999-04-23 2000.04-01 1,412.88 1,412.88 - USED 0 60 JOBT10422 SAW WALK BEHIND 2000-04-01 3,200.00 1,200.00 3,200.00 1,200.00 - USED 36 JOBT105345 ATTACHMENT CONVEYOR 2006-04-01 1.000.00 1,000.00 - USED - USED 36 JOBT105354 MIXER CEMENT JOBT105400 HEATER PAVEMENT 2006-04-01 500,00 500,00 - USED p 36 2006-04-01 1,000.00 1,000.00 - USED 0 JOBT11503 DRILL GANG 50# 2016-05-26 14,338.00 14,338.00 - NEW B0 JOBT5459 DRILL UNIT FOR UNDERSEAL P 1992-04-01 11,698.93 11,698.93 - NEW 0 JOBTS497 FORMS CURB METAFORM 1992-04-01 8,197.85 8,197.85 - NEW 0 JOBT6498 FORMS CURB METAFORM 1992-04-01 7,061.08 7,081.08 - NEW 0 JOST5529 HOPPER CMI 1992-11-09 2,625.00 2,625.00 - USED 0 JOBT5632 HONDA CONCRETE STRIKER SCREED 1993-09-29 6,942.77 6,942.77 - NEW 60 JOBT5645 EXTRACTOR MANHOLE 1993-05-07 11,536.36 11,536.36 - USED 0 JOBT5673 TRENCH BOX EFFICIENCY 1994-05-01 8,143.57 8,143.57 - NEW 60 JOBT5705 TRENCH BOX EFFICIENCY 1994-05-27 8,143.57 8,143.57 - NEW 60 JOBT5756 DRILL UNIT FOR UNDERSEAL P 1994-06-10 3,900.77 3,900.77 - NEW 0 JOBT6152 COMPACTOR WALK BEHIND 1996-05-17 6,300.00 6,300.00 - USED 60 JOBT6279 WASHER PRESSURE KEW 2540CA 1997-04-11 1,890.00 1.890.00 - NEW 0 JOBT6280 WASHER PRESSURE KEW 2540CA 1997-07-11 1,890.00 1,890.00 - NEW 0 JOBT6294 SEALER INJECTION EPDXY 1997-10-15 14,675.84 14,675.84 - NEW 60 JOBT6642 DRILL GANG 2000-Ot-31 14,574.00 14,574.00 - NEW 60 JOBT6705 FORM SYSTEM 2000-06-13 82,901.62 82,901,62 - NEW 0 JOBT6721 FORMS CURB METAFORM 2000-07-07 7,185.25 7,185.25 - NEW 0 JOST6794 COMPRESSOR AIR 2001-04-19 5,889.45 5,889.45 - NEW 0 JOBT6931 TRENCH BOX TITAN PLUS 2002-08-06 8,723.24 8.723.24 - NEW 60 JOBT6932 TRENCH BOX TITAN PLUS 2002-08-06 8,723.24 8,723,24 - NEW 60 JOBT6933 TRENCH BOX TITAN PLUS 2002-08-06 8.723.25 8,723.25 - NEW 80 JOST6934 PRO TEC 9 YARD STONE BOX 2002-08-06 6,475.34 6,475.34 - NEW 0 JOBT7121 FORM SIDEWALK 2004-0443 5,199.79 6,199.79 - NEW 0 JOBT7141 DRILL GANG 2004-06-23 10,070.00 10,070.00 - NEW 60 JOBT7441 PUMP WATER 2006-06-09 11,448.00 11,448.00 - NEW 84 JOST7538 TRENCH BOX PR06 W/SPREADER 2006-05-26 14,688.47 14,688,47 - NEW 60 JOBT7557 DRILL GANG 2007-03-30 38,706.00 38,706.00 - NEW 60 JOBT7561 SAW CONCRETE HUSQVARNA 2007-03-31 15,249.16 15,249.16 - NEW 60 JOBT7904 DRILL GANG 2010-07-27 14,411.50 14,411.50 - NEW 60 JOBT792839 COMPACTOR VIBRATORY 2005-03-31 1,750.00 1,750.00 - USED 0 JOBT794470 STREET PRINT FORMS 2005-03-31 9,375.00 9,375.00 - USED 36 LGPL000003 COLEMAN LIGHT PLANT 1992-04-01 9,450.00 9,450.00 - NEW 60 LGPL000004 2007 TEREX AL4060D4MH LIGHT PLANT 2007-06-05 7,246.27 7,246.27 - NEW 60 LGPL000005 WACKER LIGHT PLANT 2007-09-19 7,900A8 7,900.18 - NEW 60 PCH0000024 TRAILER CONTROL TOWER 2017-04-01 17,722.52 17,722.52 - NEW 0 PCH0000025 TRAILER CONTROL TOWER 2017-04-01 28,852.53 28,852.53 - NEW 0 PCM0000010 ATLAS COPCO GA-22-125-5460 COMPRESSOR AIR 1997-04-01 9.682.00 9,882,00 - NEW 0 PCM0000013 UNKNOWN QUINCY QHA-75 ANA-3 75 HP AIR COMPRESSOR 2014-12-01 16,643.95 15,643.95 - NEW 0 PSS0000002 SCREEN DECK 2009-04-01 15,000.00 15,000.00 - USED B0 PTS0000046 SCALES TRUCK 1967-08-17 5,650.29 5,650.29 - NEW 60 PTS0000051 TRUCK SCALE 2008-04-10 3,672.58 3,672.58 - USED 60 PTS0000052 TRUCK SCALE 2008-01-29 9,000.00 9,000.00 - USED 60 QAE5422 PROFILE READER 1991-05-10 9,450.00 9,450.00 - NEW 60 QAE7946891 TRAILER DRILL CORE GAS FAB 2005-03-31 8,000.00 8,000.00 - USED 36 SHOP10416 WASHER POWER 2000-04-01 800.00 800.00 - USED 0 SHOP7060 CRANE -OVERHEAD 2003-09-01 27,655.00 27,655.00 - NEW 0 TCN0000001 1998 SHOP FABRICATED CONE TRAILER 1998-06-03 8,412.70 8,412.70 - NEW 60 TCN0000002 2005 BNM BNM8218CT7 CONE TRAILER 2005-04-20 4,309.96 4,309.96 - NEW 60 TCN0000003 2005 AMERICAN CONE TRAILER 2005-04-11 1,902.70 1,902.70 - USED 60 TCN0000004 2005 GOLDSTAR 16' CONE TRAILER 2005-05-23 1,372.70 1,372.70 - NEW 84 TCN0000005 2005 BNM BNM8218CT7 CONE TRAILER 2005-05-23 3,963.36 3,963.36 - NEW 60 TCN0000006 2005 BNM BNM8218CT7 CONE TRAILER 2005-06-16 4,193.36 4,193.36 - NEW 60 TCN0000007 2007 NOVAE CORP SURE-TRAC 16' CONE TRAILER 2008-07-11 5,405.80 5,405.80 - NEW 60 TCN0000008 2010 BNM BNM8218CT7 CONE TRAILER 2010-03-16 5,777.00 5,777.00 - NEW 60 TCN0000009 2010 BNM BNM8218CT7 CONE TRAILER 2010-07-08 5,893.60 5,893.60 - NEW 60 TFD0000009 2007 ROLLS RITE 30' FLAT DECK TRAILER 2017-11-15 16,408.80 16,408.80 - USED 60 TG04000001 1989 HUDSON BROS HT 16 TAG TRAILER 1989-04-08 4,016.28 4,016.28 - NEW 60 TG06000005 1979 SUPREME TAG TRAILER 1979-05-02 3,380.00 3,380.00 - NEW 60 TGO6000006 1979 SHOP FABRICATED TAG TRAILER 1979-12-06 3,924.00 3,924.00 - NEW 80 TG06000007 1980 SHOP FABRICATED TAG TRAILER 1980-07 24 3,784.29 3,784.29 - NEW 60 TG06000008 1981 SHOP FABRICATED TAG TRAILER 1981-03-30 3,816.57 3,816.57 - NEW 60 TG06000009 1994 SUPREME SH34096 TAG TRAILER 1994-11-08 5.456.85 5,456.85 - NEW 60 TG06000010 1996 BECK C20-82-6U12TTAG TRAILER 1996-04-15 4,407.90 4.407.90 - NEW 60 TG06000011 1997 BECK C20-82-6U12T TAG TRAILER 1996-06-04 4,407.90 4,407.90 - NEW 60 TG06000012 1997 BECK C20-82-6U12T TAG TRAILER 1996-06-04 4,407.90 4,407.90 - NEW 60 TG06000013 1997 BECK C20-82-6U12T TAG TRAILER 1997-03-31 4,567.50 4,567.50 - NEW 60 TG06006014 1998 BECK C20-82-6U12T TAG TRAILER 1998-05-15 4,882.50 4.882.50 - NEW 60 TG06000015 1998 BECK C20-82-6U12TTAG TRAILER 1998-05-15 4,882.50 4,882.50 - NEW 60 TG06000016 HOLDEN HUT-12TAG TRAILER 2005-04-18 2,120.00 2,120.00 - USED 36 TG06000019 2006 AMERICAN U16TA2BN TAG TRAILER 2007-05-23 1,556.54 1.556.54 - NEW 60 TG06006022 1997 MSC TAG TRAILER 1997-03-26 2,946.00 2,946.00 - USED 60 TGO600D023 1979 SHOP FABRICATED TAG TRAILER 2000-04-01 600.00 600.00 - USED 36 TGb6000025 2005 LOAD TRAIL TAG TRAILER 2009-03A6 2.120.00 2.120.00 - USED 12 TG06000028 TAG TRAILER 2005-03-31 500.00 500.00 - USED 36 TG08000001 2000 INTERSTATE 24TDA TAG TRAILER 2000-09-18 10,330.00 10,330.00 - NEW 60 TG10000002 2005 TRAIL KING TK20LP TAG TRAILER 2009-0346 4,980.00 4,980.00 - USED 36 TG20000006 1994 TRAIL BOSS PA20DTE DOVETAIL TAG TRAILER 2005-03-31 1,656.78 1,656.78 - USED 36 TGM8000003 MSC PIPE TRAILER 1993-05-01 11,363.85 11.363.85 - USED 60 TGMS000004 2005 ETNYRE INSULATED UNDERSEAL TRAILER 2004-05-24 2,808.20 2,808.20 - NEW 60 TGMSOO0005 1997 BOOTHEEL TAG TRAILER 1999-04-23 13668.65 i,66B,65 - USED 60 TGMS000006 2016 RJTRL SUT 3.5K-08 UTILITY CORE DRILL RIG TRAILER 2016-08-29 24.302.04 24,302.04 - NEW 60 TGMS000010 TAG TRAILER 2005-03-31 938.00 938.00 - USED 36 TGMS000011 1991 LONG CHIH UTILITY TAG TRAILER 2005-03-31 188.00 188.00 - USED 36 TGMS000012 MSC TAG TRAILER 2005-03-31 500.00 500.00 - USED 36 TMF0000001 1998 DYNAWELD FORM TRAILER 1998-05-08 4,637.50 4,637.50 - NEW 60 TMF0000002 1972 SHOP FABRICATED CURE & FORM OIL TRAILER 1999-10-28 8.146.28 8,146.28 - NEW 60 TMF0000003 2011 BUTLER LT 1618-W FORM TRAILER 2011-07-03 14,876.21 14,876.21 - NEW 60 TMO0000001 1978 WILLIAMS 36 X 8 MOBILE OFFICE TRAILER 1983-11-23 4,830.00 4,830.00 - NEW 60 TMO0000003 1990 JOBSITE MOBILE OFFICE TRAILER 1998-07-22 4,807.10 4,807.10 - NEW 60 TMO0000004 2001 WILLIAMS SCOTSMAN 8 X 8 MOBILE OFFICE TRAILER 2001-06-30 4,929.75 4,929.76 - NEW 60 TMS0000001 40' STORAGE CONTAINER 1995-12-11 2,677.50 2.677.50 - NEW 60 TMS0000002 40' STORAGE CONTAINER 1999-01-15 3.695.00 3,695.00 - NEW 60 TQA0000006 1990 PACE AMERICAN CARGO QUALITY CONTROL TRAILER 1991-09-16 1.935.59 1,935.59 - USED 60 TQA0000007 1995 WELLS CARGO MC1015TE QUALITY CONTROL TRAILER 1995-06-26 2,395.60 2,395.60 - USED 60 TQA0000009 1999 UNITED EXPRESS U714TA2T QUALITY CONTROL TRAILER 1999-05-25 3,915.45 3,915.45 - NEW 60 TQA0000010 QUALITY CONTROL TRAILER 1999-07-30 28,440.25 28,440.25 - NEW 60 TQA0000011 2005 QUALITY CONTROL TRAILER 2005-07-20 32,186.90 32,186.90 - NEW 60 TQAOOOOb15 2017 MFE 10 X 36 QUALITY CONTROL TRAILER 2017-04-01 24,874.23 24.874.23 - NEW 60 TQA0000016 2017 MFE QUALITY CONTROL TRAILER 2017-06-04 102,663.09 102,663.09 - NEW 60 TRTL000012 1969 TRAILMOBILE TOOL TRAILER 1978-0541 4,160.00 4,160.00 - NEW 60 TRTL000013 1981 SHOP FABRICATED TOOL TRAILER 1981-06-09 4,881.99 4,881.99 - NEW 60 TRTL000014 1973 TRAILMOBILE TOOL TRAILER 1983-07-05 4,200.00 4,200.00 - NEW 60 TRTL000015 1990 WELLS CARGO TW142-V TOOL TRAILER 1990-04-02 4,254.65 4,264.65 - NEW 60 TRTL000016 1990 WELLS CARGO TW142-V TOOL TRAILER 1990-04-02 4.254.65 4,254.65 - NEW 60 TRTL000017 1990 WELLS CARGO TW142-V TOOL TRAILER 1990-04-02 4,268.84 4,268,84 - NEW 60 TRTL000018 1968 KENTUCKEY TOOL TRAILER 1993-05-13 6,675.00 6,675.00 TRTL000019 1978 DORSEY TOOL TRAILER 1995-OS-28 4,725.00 4,725,00 - NEW 60 TRTL000021 1997 UNITED EXPRESS LINE 78-516TA2TTOOLTRAILER 1997-04-17 3,543.75 3,543.75 - USED 60 TRTL000022 1979 KENTUCKY TOOL TRAILER W/GENERATOR GEN-03 1997-04-21 5,460.00 5,460.00 NEW 60 TRTL000024 1983KENTUCKY48'TOOLTRAILER 1998-03-20 6,300.00 6,300.00 - USED 60 TRTL000025 1983 KENTUCKY 48' TOOL TRAILER 1998-05-14 6,300.00 USED 60 TRTL000026 1986 KENTUCKY 52' TOOL TRAILER W/GENERATOR GEN-09 2000-03-01 5,101.43 6,0. 5,101.4343 - USED 60 TRTL000027 2001 UNITED EXPRESS LINE U8.516TA2T TOOL TRAILER 2001-0347 3,601.50 USED 60 TRTL000029 1986 KENTUCKY 52' TOOL TRAILER 2002-12-10 5,830.00 3,601.50 5,830.00 NEW 60 TRTL000030 2004 FOREST RIVER CONTINENTAL TOOL TRAILER 2004-03-01 3,736.50 3,736.50 - USED 60 TRTL000031 2004 FOREST RIVER CONTINENTAL TOOL TRAILER 2004-03-15 2,012.94 2,012.94 NEW 60 TRTL000032 1990 WABASH NATIONAL 48' TOOL TRAILER 2005-03-04 4,770.00 4,770.00 - NEW 60 TRTL000033 1994 FRUEHAUF 53' TOOL TRAILER 2005-06-08 4,770.00 4,770.00 - NEW USED 60 TRTL000034 2006 FOREST RIVER CONTINENTAL CC716TAS TOOL TRAILER 2006-04-28 4,943.84 - 60 TRTL000035 2007 ROADMASTER 8 X 16 CARGO TRAILER 2007-04-03 ,4,943.84 4,943.84 4,943.84 NEW 84 TRTL000036 TOOL TRAILER TRTL000037 1994 WABASH NATIONAL 53' TOOL TRAILER 2007-07-21 14,107.20 14,107.20 NEW 60 60 TRTL000038 1997 GREAT DANE 53' TOOL TRAILER 2007-12-03 2007-12-03 11,990.34 11,990.34 11,112.93 - USED 120 TRTL000039 1997 STOUGHTON 53' TOOL TRAILER 2008-04-01 16,966.74 3,938.92 11,990.34 16,966.74 3,938.94 USED 120 TRTL000040 2009 ROADMASTER 8 X 16 TOOL TRAILER 2008-03-21 USED 120 TRTL000041 2009 ROADMASTER 6 X 10 TOOL TRAILER 2008-04-27 2,450.30 2,450.30 - NEW 60 TRTL000042 1987 TRAILMOBILE 45' TOOL TRAILER 2009-04-15 5,075.48 5,075.48 5,075,48 5,075,48 USED 60 TRTL000044 2010 INTERSTATE WD712SAFS TOOL TRAILER 2010-06-18 60 TRTL000045 1993 HAULMARK HD4X8DS2 TOOL TRAILER 1009-04-01 2,002.39 2.002.39 - NEW 60 TRTL000052 2006 UNITED UEH610SA30-3 TOOL TRAILER 2009-04-01 530.D0 - USED 60 TRTL000065 2004 FOREST RIVER TOOL TRAILER 2005-03-31 1,590.00 530.00 1,590.00 - USED 60 TRTL000082 1996 VAN CARGO TOOL TRAILER 2005-03-31 1, 1,0 USED 36 TRTL000086 2000 FOREST RIVER 14' TOOL TRAILER 2005-03-31 1,325325..00 1,325325 - USED 36 TRTL000087 2000 FOREST RIVER TOOL TRAILER 2005-03-31 1.590.00 .0.0 1,590.00 - USED0 36 TRTL000088 1995 TOWLINE TOOL TRAILER 2005-03-31 1,192.50 1,i92,50 USED 36 TRTL000089 2001 FOREST RIVER TOOL TRAILER 2005-03-31 1,192.50 1,192.50 USED 36 TRTL000090 1984 FRUEHAUF TOOL TRAILER 2005-03-31 331.28 331.78 331.78 USED 36 TRTL000091 1997 HAULMARK TOOL TRAILER 2005-03-31 531.78 - USED 36 TRTL000093 2003 FOREST RIVER CONTINENTAL TOOL TRAILER 2005-03-31 1,530.00 855.00 1,530.00 855.00 36 TRTL000094 2005 ATLAS SPECIALTY PRODUCTS TOOL TRAILER 2005-03-31 USED 36 TRWT000002 1972 SHOP FABRICATED WATER TRAILER 1972-03-29 1,455.07 1,341.90 - USED 36 TRWT000003 1968 SHOP FABRICATED WATER TRAILER 1999-08-02 7,450.12 7,450.12 113.17 NEW 60 TRWT000004 1979 SHOP FABRICATED WATER TRAILER 1999-OB-02 7,375.66 7,375.66 _ NEW 60 TRWT000005 1988 SHOP FABRICATED WATER TRAILER 2001-06-16 8,307.96 8,307.96 NEW 60 TRWT000006 1968 SHOP FABRICATED WATER TRAILER 2001-08-31 8,307.96 8,307.96 - NEW 60 TT06000003 1972 SHOP FABRICATED TILTTAG TRAILER 1972-OS-31 2,948.23 2,948.23 2,719,05 2,719.05 NEW 229.18 60 TT06000004 1995 DYNAWELD TILT TAG TRAILER 1996-05-31 NEW 60 TT06000005 1995 DYNAWELD TILT TAG TRAILER 1996-06-28 4,593.75 4,593.75 NEW 60 TT0BOO0006 1997 DYNAWELD TILT TAG TRAILER 1997-03-18 4,593.75 4,593.75 - NEW 60 TTO6000009 1998 DYNAWELD TILT TAG TRAILER 1998-05-08 4,637.50 4,637.50 NEW 60 TT06000011 1999 DYNAWELD TILT TAG TRAILER 1999-03-04 4,803.75 4.803.75 _ NEW fip TT06000013 1996 KARAVAN TILTTAG TRAILER 2000-04-01 1,400.00 1,400.00 NEW 60 TT06000014 2015 FELLING FT6T1 TILT TAG TRAILER 2015-05-02 5,246.90 5,246.90 USED 36 TT06000015 2015 FELLING FT6T1 TILT TAG TRAILER 2015-05-02 5,246.90 5,246.90 - NEW 36 TT06000016 2015 FELLING FT6T1 TILT TAG TRAILER 2015-05-02 9,198,50 9,198.50 NEW 36 TT06000017 2016 FELLING FT TILT TAG TRAILER 2015-05-02 9,948.98 9,198.50 NEW 36 TT06000018 2004 FELLING 6T TILT TAG TRAILER 2008-Oi-29 2,915.00 2,915.00 - NEW 30 TT06000019 2005 TRAIL KING TKT12U TILTTAG TRAILER 2009-03-16 1,060.00 954.00 - USED 36 TT06000020 2005 TRAIL KING TKT12U TILT TAG TRAILER 2009-03-16 4,560.00 4,560.00 106,00 USED 36 T1706000022 1994 TOWMASTER TILT TAG TRAILER 2005-03-31 994.28 - USED 36 TT06000023 2005 TRAIL KING TKT12U 6 TON TILT TAG TRAILER 2009-03-16 7,370.00 994.28 7,370.00 - USED 36 TT08000001 2001 BUTLER LT-1618-W TILT TAG TRAILER 2001-04-30 7,192.50 7,192.50 - USED 36 TT08000002 2001 BUTLER LT-1618-W TILT TAG TRAILER 2001-04-30 7,261.00 7,261.00 NEW 60 1 T08000003 2001 BUTLER LT-1618-W TILTTAG TRAILER 2001-04-30 7,261.00 7,261.00 NEW 60 TT08000005 2004 BUTLER LT-1618-W TILT TAG TRAILER 2004-04-08 7,526.O0 7,526.00 - NEW 60 TT08000006 2004 BUTLER LT-1618-W TILT TAG TRAILER 2004-04-08 7,526.00 7,526.00 NEW 60 TT0BODO007 2004 BUTLER LT-1618-W TILT TAG TRAILER 2004-04-08 7.526.00 7,526.00 NEW 60 TT08000008 2004 BUTLER LT-1618-W TILT TAG TRAILER 2004-04-08 7,526.00 7,526.00 - NEW 60 TT08000009 2004 BUTLER LT-1618-W TILTTAG TRAILER 2004-05-11 7.526.00 7,526.00 NEW 60 TT08000010 2004 BUTLER LT-1618-W TILT TAG TRAILER 2004-05-1 i 7,526.00 7,526.00 NEW 60 TT08000011 2006 BUTLER LT TILT TAG TRAILER 2006-02-17 8,427.00 8,427.00 - NEW 60 TT08000012 2006 BUTLER LT-1618-W TILT TAG TRAILER 2006-02-17 8,427.00 8,427.00 NEW 60 TT0BOOOO13 2006 BUTLER LT-1618-W TILTTAG TRAILER 2006-02-17 8,427.00 8,427.00 NEW 60 TT08000014 2006 BUTLER LT-1618-W TILT TAG TRAILER 2006-02-17 83427.00 8,427.00 - NEW 60 TT08000015 2006 BUTLER LT-1618-W TILT TAG TRAILER 2006-04-04 8,427.00 8.427.O0 NEW 60 7T08000016 2007 BUTLER LT 1618-W TILT TAG TRAILER 2007-03-28 8,586.00 8,586.00 NEW 60 TT08000017 2007 BUTLER LT 1618-W TILT TAG TRAILER 2007-06-07 8,586,00 8,586.00 NEW 60 TT08000018 2007 BUTLER LT 1618-W TILT TAG TRAILER 2007-06-07 8,586.00 8,586.00 NEW gp 7708000019 2008 BUTLER LT-1618-W TILT TAG TRAILER 2008-02-05 8,851.00 8,851.00 NEW 60 TT08000020 2008 BUTLER LT 1618-W TILT TAG TRAILER 2008-02-05 8,851.00 8,851.00 - NEW B0 TT08000021 2008 BUTLER LT 1618-W TILT TAG TRAILER 2008-02-05 8,851.00 8,851.00 NEW 60 TT08000022 2008 BUTLER LT-1618-W TILT TAG TRAILER 2008-02-05 8,851.00 8,851.00 NEW 60 T708000023 2009 BUTLER LT 1618-W TILTTAG TRAILER 2009-03-02 9,095.00 9,095,O0 - NEW 60 TT08000024 2009 BUTLER LT 1618-W TILT TAG TRAILER *2009 2009-03-02 9,095.00 9,095.00 NEW 60 1708000025 BUTLER LT-1618-W TILT TAG TRAILER 2009-03-02 9,095.00 9,095.00 NEW 60 7T08000026 2009 BUTLER LT 1618-W TILT TAG TRAILER 2009-03-02 9,095,00 9,095.00 - NEW 60 TT08000D27 2009 BUTLER LT-1618-W TILT TAG TRAILER 2009-03-02 9,095.00 9,095.00 NEW 60 7708000028 2009 BUTLER LT i6i8-W TILTTAG TRAILER 2009-03-02 9,095.00 9,095.OD NEW 60 TT08000029 2010 BUTLER LT 1618-W TILT TAG TRAILER 2010-04-22 9,537.88 9,537.88 - NEW 60 T708000030 2010 BUTLER LT-1618-W TILTTAG TRAILER 2010-05-29 9,537.88 9,537.88 NEW 60 TT08000031 2010 BUTLER LT-1618-W TILTTAG TRAILER 2010-05-29 9,537.88 9,627.86 NEW 60 TT08000032 1994 BUTLER LT-1618-W TILTTAG TRAILER 1999-04-23 1,891.14 1,891.14 - NEW 60 TT08000033 1996 MCK TILTTAG TRAILER 1999-04-23 3,003.58 3,003.58 - USED - USED 60 TTMS000001 1994 MSC CONCRETE CORE DRILL TRAILER 1995-11-01 19,268.50 19,268.50 60 TTMSOC0002 1996 KARAVAN T4000 TILTTAG TRAILER 1998-04-01 1,874.87 1.874.87 USED 60 TTMS000003 1999 HUDSON BROS HDA0 TILT TAG TRAILER 1999-05-03 3,753.75 3.753.75 - 60 TTMS000004 1999 HUDSON BROS HD-10 TILT TAG TRAILER 1999-OB-02 4,053.99 4,053,99 - NEW 60 TTMS000005 1995 HUDSON BROS HD14 TILTTAG TRAILER 2006-04-01 1,590.00 1,590.00 NEW 60 TTM8000006 2002 HUDSON BROS HDI4TILT TAG TRAILER 2006-04-01 2,120.00 2,120,00 - USED 36 TTMS000013 2005 HUDSON BROS HD10 TILT TAG TRAILER 2005-03-31 1,590.00 1,590.00 - USED 36 TTMS000014 2005 HUDSON BROS HD10 TILTTAG TRAILER 2005-03-31 1,590.00 1.590.00 - USED 36 TTM8000017 2000 TOWMASTER T12T-16 TILT TAG TRAILER 2005-03-31 1,590.00 1,590.00 - USED 36 UTF000000i 2004 KUBOTA FARM TRACTOR 2005-03-18 18,179.00 18,179.00 - USED 36 UTF0000004 KUBOTA L3760 FARM TRACTOR 2006-04-01 3.000.00 3,000.00 3,000.00 NEW 60 UTF0000005 2007 CASE DX55 FARM TRACTOR 2009-03-i6 8,000,00 USED 36 UTF0000006 KUBOTA M4800 FARM TRACTOR 2009-0346 10,000.00 18,000.00 USED 36 WEL14697 WELDER WLDOOO0002 HOSARTWELDER 1984-04-25 4,510,00 4,510,00 - USED 36 0 WLD0000003 MILLER WELDER 1964-09-16 1995-05-23 845,00 8,477.70 779,29 65.T7 NEW 60 WLD0000004 MILLER WELDER 1996-04-23 8,480.00 8,477.70 NEW 60 8,480,00 - NEW 60 WLD0000005 1998 MILLER WELDER 1996-04-23 8,999.71 8,99y 71 WLD0000006 MILLER 250 WELDER 1999-04-10 - NEW 60 WLD0000007 2000 TRI-STATE IND TRAILER + WELDER 2005-04-03 4,456.00 4,456.00 - NEW 60 WLD0000008 BOBCAT WELDER 2005-06-03 3,512.75 3,Si2.75 3,512.75 3,512.75 NEW 60 WLD0000009 2005 KUBOTA 250DNT WELDER 2005-06-06 6,336.61 NEW 60 WLD0000010 2006 MILLER WELDER 2006-02-i6 6,336.61 _ 60 WLD0000014 INGERSOLL RAND 400 AMP WELDER 2009-04-30 2,411,2D 2,411.20 2.411.20 60 WLD0000028 BOSCAT250 WELDER 2010-03-05 1,411.20 3,795.54 - USED 36 WRKT110001 ALITEC ATTACHMENT PLANER 1997-0 -01 3,937.50 3,795.54 - NEW 60 WRKT110002 1996 ALITEC ATTACHMENT PLANER 1007-03-2 5,565,00 3,937.50 - NEW 60 WRKTii00o52007CONEQTECAP450HD18"ATTACHMENT PLANER 2007-03-28 13,250.00 5,565.00 USED 60 WRKT110007 2009 CONEQTEC AP450HD ATTACHMENT PLANER 2009-03-02 13,250.00 13,250.00 NEW 60 WRKT110009 2010ALITECCP30ADTATTACHMENT PLANER 2010-03-25 18,735.70 13,250.00 - NEW fi0 WRKT110011 2001 CATERPILLAR PC20624"ATTACHMENT PLANER 2010-0625 16,852.50 i8,735.70 - NEW 60 WRKT110012 2014 CATERPILLAR PC306B ATTACHMENT 24" PLANER 2015-03-05 19,738.56 19,738.56 - NEW 60 WRKTIIOO13 2015 CATERPILLAR PC310S ATTACHMENT PLANER 20i5-04 20 24.910.00 19,738.56 - NEW 36 WRKTIIOO14 2016 CATERPILLAR PC305B ATTACHMENT 18" PLANER 2016-05-16 14,840.00 24,910.00 14,840.00 NEW 36 WRKTIIGO15 2016 CATERPILLAR PC306B ATTACHMENT 24" PLANER 2016-05-16 17,808.00 17,808.00 NEW 60 WRKTI10016 2003 ALITEC ATTACHMENT 18" PLANER 2006-04-01 3,000,00 60 WRKTIIOO17 CATERPILLAR ATTACHMENT PLANER 2009-04-30 13,500.00 3,000.00 - USED 36 WRKT110023 2013 CATERPILLAR ATTACHMENT PLANER 2014-06-06 24,910.00 13,500.00 - USED 60 WRKT170002 2016 CATERPILLAR SW360-8 ATTACHMENT WHEEL SAW 2016-06 20 27,817.22 24,910.00 NEW 36 WRKT170003 2016 CATERPILLAR SW360.8 ATTACHMENT WHEEL SAW 2016-06-20 27,817.22 27,817.22 NEW 60 WRKT300001 1998 INDECO MES351 ATTACHMENT BREAKER 27,817.22 - NEW 60 WRKT300002 2011 ATLAS COPCO ATTACHMENT BREAKER 2011-04-01 2D11-07-03 0,017.00 10,Oi7.00 - NEW 60 WRKT400002 1998 CASE ATTACHMENT BROOM 1998-04-01 6,191.85 0,017.00 10,017,00 NEW 60 WRKT400003 CATERPILLAR ATTACHMENT BROOM 2009-04-30 12,000.00 6,191.85 12,000,00 - NEW 60 WRKT700003 2014 MOBILE TRACK SOLUTIONS DISK HARROW 2014-12-22 35,256.80 5,256.80 35,256.80 - USED 60 INRKT900001 1997 VAN BOH 800 ATTACHMENT GRADER 1998-04-15 NEW 60 AP08000014 2018 CATERPILLAR AP555F PAVER ASPHALTS, TRACK 2023-06-01 104,935.00 24,935.00 - 60 AP08000018 2019 CATERPILLAR AP555F PAVER ASPHALT 8' TRACK 2023-11-27• 133,852.56 8.923.52 NNEW EW 74,03 36 APICO00036 2017 CATERPILLAR API055F PAVER ASPHALT IO' TRACK 2023-06-01 87,516.00 124,929.04 USED 60 AP10000037 2018 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2023-06-01 131,473.92 24,310.00 36,520.50 63,206.00 NEW 36 APIOOOOD38 2018 CATERPILLAR API055F PAVER ASPHALT 10' TRACK 2023-00-01 131,473.92 36,520.50 94.953.42 NEW 36 APICO00039 2018 CATERPILLAR API 055F PAVER ASPHALT 10' TRACK 2023-06-01 124.032.00 34,453.30 94,953.42 NEW 36 AP10000040 2017 CATERPILLAR API055F PAVER ASPHALT 10' TRACK 2023-08-01 109,201.20 30,333.70 89.578.70 NEW 36 AP10000041 2018 CATERPILLAR API055F PAVER ASPHALT I O' TRACK 2023-06-01 124,032.00 78,867.50 NEW 36 AP10000042 2017 CATERPILLAR AP1055F PAVER ASPHALT IO' TRACK 2023-06-01 87,516,00 34.453.30 89,578.70 NEW 36 AP10000053 2019 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2023-ii-27 152,881.68 24,3i0.00 63,206,00 NEW 36 AP10000054 2020 CATERPILLAR AP1055F PAVER ASPHALT 10' TRACK 2023-11 27 182,172.00 10,192.12 142,689.56 USED 60 APIOOOOO55 2020CATERPILLAR API 055FPAVER ASPHALT IO'TRACK 2023-1127 193,102.32 12,144.80 170,027.20 USED SO AP10000056 2020 CATERPILLAR AP1055F PAVER ASPHALT 1 O' TRACK 2023-11-27 193,102.32SED 12,873.48 180,228.84 USED 60 AP10000057 2020 CATERPILLAR AP1055F SPRAY PAVER ASPHALT IO' TRACK 2023-11-27 182.172.00 60 SSLISO0003 2017 CATERPILLAR 226D SKID STEER LOADER 2017-05-04 13,405.87 12,144 80 170,027.20 USED 60 SSLI500004 2017 CATERPILLAR 226D SKID STEER LOADER 2017-05-04 13,405.87 13,405.87 NEW 36 88LI600005 2017 CATERPILLAR 226D SKID STEER LOADER 2017-05-04 13,405.87 NEW 36 ROLLSTKPB PHEND & BROWN ROLLING STOCK 2022-01-Oi 81,634.78 1,00 81,634.78 1,081,634.78 NEW 36 SUPBLUESKY SUPERIOR BLUE SKY PAC0000023 2015 EAGLE ULTRAMAX 1200-25CC CRUSHER 2023-02-23 ,934.00 16,000,934.00 600,093.44 1,600,093.44 14,400,840.56 400,840.56 96 120 PBH0000057 2009 ADM BAGHOUSE W/COMPRESSOR 2021-02-05 2021-02-05 580,000.00 580,000.00 USED 396,333.46 120 PCFOOD0078 2009 ADM COLD FEED SYSTEM 2021-02-05 325,000.00 183,6 6.54 02,916.54 USED 120 PCH0000038 2009 CONTROL TRAILER W1MCC 2021-02-05 325,000.00 102,916.54 205,000A6 USED 120 PDC0000013 2009 ADM DRAG CONVEYOR W/TRANSFER CONV 2021-02-05 200.000.00 6 63,333.46 222,083.46 USED 120 POD0000004 2009 ADM DRYER DRUM W/BURNER 2021-02-05 225,000.00 136,666.54 USED 120 PHO0000039 2002 HEATEC HCS-100 HOT OIL HEATER 2021-02-05 30,000.00 ,333.46 136,666.54 USED 120 PLS0000134 2009 ADM LIQUID A/C TANK 15000 GALLON 2021-02-05 60,000.00 9,500.00 20,500.00 USED 120 PL80000135 2009 ADM LIQUID A/C TANK 15000 GALLON 2021-02-05 15,833.46 15,833.46 34,166.54 USED 12050,000.00 PMF0000016 2009 ADM MINERAL FILLER SILO 2021-02-05 50,000.00 15.833.46 15,833.46 34,166.54 USED 120 PM80000078 2009 ADM 100 TON MIX STORAGE SILO 2021-02-05 100,000.00 34,166.54 34,166.54 USED 120 PMS0000079 2009 ADM 100 TON MIX STORAGE SILO 2021-02-05 100,O00.00 31.666.54 31,666.54 USED 120 PRB0000058 2010 ADM RAP FEED SYSTEM 2021-02-05 100,000.00 58,583.46 68,333.46 USED 120 PSA0000032 2015 MCCLOSKEY ST100 HEAVY DUTY STACKING CONVEYOR 2021-02-05 185,000.00 50,000.00 47,500.00 168.333.46 USED 120 PTS0000087 TRUCK SCALES 2021-D2-O5 25,333.00 106.416.54 USED 120 PUD0000038 2009 ADM MIXING DRUM PLTAGGRPB LEESBURG PHEND & BROWN AGGREGATE PLANT 2021-02-05 180,000.00 165,000.00 52,250.00 54,666.54 USED i54,666.00 USED 112.750.00 120 120 PLTASPHPB1 LEESBURG PHEND & BROWN ASPHALT PLANT 2022-01-01 2022-01-01 NEW 120 PLTASPHPB2 DISKO PHEND & BROWN ASPHALT PLANT 2022-01-01 2,420,960.35 830,232.37 694,716.00 63 193,430.0 2,326,244.35 NEW 120 ,802.29 NEW 84 Total Rleth-Riley 222,331,428.26 131,304,255.01 91,027,173.25 Part of State Form 52414 (R2 / 2-13) / Form 96 (Revised 2013) BID OF Rieth-Riley Construction Co., Inc. (Contractor) 25200 State Road 23 (Address) South Bend, IN 46614 FOR PUBLIC WORKS PROJECTS OF 2024 Community Crossings Round 2 Project No. 124-047 Filed November 12 2024 Action taken £ srar CONTRACTOR'S BID FOR PUBLIC WORK - FORM 96 State Form 52414 (R2 / 2-13) / Form 96 (Revised 2013) Prescribed by State Board of Accounts PART I (To be completed for all bids. Please type or print) Date (month, day, year): November 12, 2024 Governmental Unit (Owner): City of South Bend, Indiana 2. County: St. Joseph County, Indiana 3. Bidder (Firm): Rieth-Riley Construction Co., Inc. Address: 25200 State Road 23 City/State/ZlPcode: South Bend, IN 46614 4. Telephone Number: 574-288-8321 5. Agent of Bidder (if applicable): Ruben Alvarado, Sales Manager Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of 2024 Community Crossings Round 2 Project No. 124-047 (Governmental Unit) in accordance with plans and specifications prepared by and dated See Itemized Proposal n/a n/a for the sum of See Itemized Proposal The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the governmental unit. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. The contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee, or applicant for employment, to be employed in the performance of this contract, with respect to any matter directly or indirectly related to employment because of race, religion, color, sex, national origin or ancestry. Breach of this covenant may be regarded as a material breach of the contract. CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS (If applicable) I, the undersigned bidder or agent as a contractor on a public works project, understand my statutory obligation to use steel products made in the United States (I.C. 5-16-8-2). 1 hereby certify that I and all subcontractors employed by me for this project will use U.S. steel products on this project if awarded. understand that violations hereunder may result in forfeiture of contractual payments. ACCEPTANCE The above bid is accepted this day of following conditions: Contracting Authority Members: PART II (For projects of $150, 000 or more — IC 36-1-12-4) Governmental Unit: City of South Bend, Indiana Bidder (Firm) Rieth-Riley Construction Co., Inc. Date (month, day, year): November 12, 2024 subject to the These statements to be submitted under oath by each bidder with and as a part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? Contract Amount Class of Work Completion Date Name and Address of Owner 22111,665.00 HVY HWY 2023 SIB Int'I Airport, South Bend, IN 2,315,275.00 HVY HWY 2023 Campeau St, South Bend, IN 6,965,020.00 HVY HWY 2023 R-37647 INDOT, Goshen, IN 5,336,073.00 HVY HWY 2023 R-42477 INDOT, Elkhart County, IN 2. What public works projects are now in process of construction by your organization? Contract Amount Class of Work Expected Completion Date Name and Address of Owner 2,481,655.00 HVY HWY 2024 Lakeville Water Distribution Improvements 24,128,347.00 HVY HWY 2024 SB Int'I Airport, South Bend, IN 3,326,372.00 HVY HWY 2024 Thrive Subdivision, South Bend, IN 13,371,377.00 HVY HWY 2024 R-34221 McKinley Ave, St. Joseph County, IN 3. Have you ever failed tocomplete any work awarded toyou? No Ifso, where and why? 4. List references from private firms for which you have performed work. /\MGeneral - Mishawaka, |N 574-284-2728 Nmviotar-SVuthBend IN 574-654-2400 |TRConcessions LLC 574-674-5836 University of Notre Dame 574-631-7356 SECTION || PLAN AND EQUIPMENT QUESTIONNAIRE 1. Explain your plan orlayout for performing proposed work. (Examples could include anarrative ofwhen you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the governmental unit to consider your bbt) "According to planifi ti " 2. P|eema ||mt the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the pexd five (5) years along with o brief description of the work done by each subcontractor. Roodsofe Traffic Systems 3518 Harding St Indianapolis, IN Traffic Maint/Markings \/0,Fi Trucking 1845 North Elmer Street, South Bend, IN Trucking Hawk Enterprises 1850 E North StCrown Point, IN Electrical/Signage S|uaseno Green Thumb PC) Box 33 Logansport, IN Landscaping/Erosion Control CTeoh Corporation 5300 W. 100 North, Boggatovvn, |yJ Guard rail/Fencing 3. If you intend to sublet any portion of the work, state the name and address ofeach subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, ifyou are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the governmental unit in the event that you subsequently determine that you will use a subcontractor onthe proposed project. "Subcontractor list will beprovided upon award" 4. What equipment doyou have available touse for the proposed project? Any equipment tobeused by subcontractors may also berequired tobelisted bythe governmental unit. "\4mrequired" 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? |fnot, please explain the rationale used which would corroborate the prices listed. "As necessary" SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute ahoU thereby be rendered invalid. The financial statement provided hereunder to the governing body awarding the contract must bespecific enough |ndetail sothat said governing body can make SECTION |VCONTRACTOR'S NON — COLLUSION AFFIDAVIT The undersigned bidder oragent, being duly sworn on oath, says that he has not, nor has any other member, representative, or agent of the Dnn, company, corporation or partnership represented by h|nn. entered into any combination, collusion oragreement with any person no|oUve to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to include anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. He further says that no person or ponyono' Unmm' or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale. SECTION V OATH AND AFFIRMATION I HEREBY AFFIRM UNDER THE PENALTIES FOR PERJURY THAT THE FACTS AND INFORMATION CONTAINED IN THE FOREGOING BID FOR PUBLIC WORKS ARE TRUE AND CORRECT. Dated at South Bend, IN this )mo COUNTY OF St. Joseph ) day of November (Title of Person Signing) ACKNOWLEDGEMENT Before me, oNotary Public, personally appeared the above -named Ruben Alvarado and swore that the statements contained in the foregoing document are true and correct. Subscribed and sworn tobefore methis 12th day of November ' 2024 . Notary Pubric yWyCommission Expires: 3-27-2030 County ofResidence: Fulton County, Indiana 100 % Quality 100% Employee Owned ® Over 100 Years CERTIFICATE OF AUTHORITY KNOW ALL MEN BY THESE PRESENTS, that the undersigned President of Rieth-Riley Construction Co., Inc., a corporation duly organized and existing under the laws of the State of Indiana, hereby represents and confirms that Ruben Alvarado, Sales Manager, has full power and authority to make, execute, seal, if required by law, and deliver for and on its behalf, and as its act and deed any and all bids, proposals or contracts, said bids, proposals or contracts not to exceed $2,000,000.00 which bids, proposals or contracts call for work, services, or materials to be furnished by Rieth-Riley Construction Co., Inc., whether such bids, proposals or contracts are being submitted to an individual or entity, public or private, and to bind Rieth-Riley Construction Co., Inc. thereby as fully and to the same extent as if such bids, proposals or contracts were signed by an Executive Officer of Rieth-Riley Construction Co., Inc., and sealed, if required by law, and attested by one of such officers, and hereby ratifies and confirms all that the above named designee may do in pursuance hereof. The authority granted to the above named designee is pursuant to Section 6.03 of the Amended and Restated Code of By -Laws of Rieth-Riley Construction Co., Inc., as amended, effective April 26, 2019 (the "Restated By -Laws"), and which Restated By -Laws, as amended, and the authority granted to the above named designee continue in full force and effect. This Certificate of Authority is issued, signed and sealed, if required by law, by facsimile under and by authority of the following standing resolutions adopted by the Board of Directors of Rieth-Riley Construction Co., Inc., at a meeting held on the 16th day of February, 1996, at which a quorum was present, and which resolutions have not been amended or repealed and continue -in full force and effect: "Resolved that for purposes of clarification and in furtherance of the intent of Section 6.03 of the By -Laws of the Company the authority granted in Section 6.03 shall extend to the making, execution, sealing, if required by law, and delivery on behalf of the Company of all documents required as part of any bid, proposal or contract, which is for work, services or materials to be furnished by Company and which is being submitted to an individual or entity, public or private." "Resolved that in carrying out the provisions of Section 6.03 of the By -Laws of the Company the signatures of such directors and officers and, if required by law, the seal of the Company may be affixed to any such Certificate of Authority or any certificate relating thereto by facsimile, and any such Certificate of Authority or certificate bearing such -facsimile signatures or facsimile seal shall be valid and binding upon the Company and any such Certificate of Authority so executed and certified by facsimile signature and facsimile seal shall be valid and binding upon the Company, with respect to any bid, proposal or contract to which it is attached." IN WITNESS WHEREOF, Rieth-Riley Construction Co., Inc., has caused these presents to be signed by its President and its corporate seal to be hereto affixed, this 5th day of April, 2024. cpl SEAL STATE OF INDIANA ) )SS: COUNTY OF ELKHART ) RIETH-RILEY CONSTRUCTION CO., INC. A. Keith Rose, President On this 5th day of April, 2024, before me personally came A. Keith Rose, to me known, who, being by me sworn, did depose and say: that he is President of Rieth-Riley Construction Co., Inc., the corporation described in and which executed the above instrument; that he knows the seal. of said corporation; that the seal affixed to the said instrument is such corporate seal; and that he executed the said instrument on behalf of the corporation by authority of his office pursuant to corporation's Restated By -Laws and standing. resolutions. My Commission Expires: May 16, 2027 oy pU� SEAL n C%dPit L%�4t�t Traci L. Adams, Notary Public Residing in Elkhart County, Indiana I, Robert L. Konopinski, do hereby certify that I am the duly appointed and acting Secretary of Rieth-Riley Construction Co., Inc., a corporation duly organized, validly existing and in good standing under the laws of the State of Indiana; that the foregoing Certificate of Authority has neither been amended or rescinded and remains in full force and effect; and furthermore, that the Restated By -Laws and standing resolutions of the corporation, as referred to and set forth in this Certificate of Authority, continue in full force and effect. Si ned and Sealed at the Corporate Office of Rieth-Riley Construction Co., Inc., in the Cityof Goshen State of Indiana. D i " Dated this day of 20. SEAL Robert L. Konopinski, Secretary April 1, 2024 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 A certified hot mix asphalt producer is one who has complied with the requirements set out in the above referenced specification. A producer accepted into this program may supply asphalt mix for all projects beginning with the date approved as a certified hot mix asphalt producer. Source Producer Name Code Location Comments 3342 API CONSTRUCTION CORP HUNTERTOWN, IN 3390 API CONSTRUCTION CORP ANGOLA, IN 3321 ASPHALT SUPPLY CO. SELLERSBURG, IN 3391 BABCOCK PAVING, INC DEMOTTE, IN 3396 BARRETT PAVING MATERIALS, INC CLEVES, OH 3560 BITUMEN SUPPLY, LLC CHARLESTOWN, IN 3303 BROOKS CONSTRUCTION CO INC AUBURN, IN 3324 BROOKS CONSTRUCTION CO INC FT WAYNE, IN 3360 BROOKS CONSTRUCTION CO INC FT WAYNE, IN 3359 BROOKS CONSTRUCTION CO INC HOAGLAND, IN 3372 BROOKS CONSTRUCTION CO INC MARION, IN 3291 BROOKS CONSTRUCTION CO INC WARSAW, IN 3220 CALCAR PAVING, INC PAOLI, IN 3119 CENTRAL PAVING LOGANSPORT, IN 3381 C G S SERVICES, INC MORRISTOWN, IN 1 of 7 Comments A = Water Injection System Installed B = In -Line Blending System Installed April 1, 2024 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3407 C & R CONSTRUCTION CORYDON, IN 3393 DAVE O'MARA CONTRACTORS INC FLATROCK, IN 3377 DAVE O'MARA CONTRACTORS INC HAYDEN, IN 3192 DAVE O'MARA CONTRACTORS INC LEXINGTON, IN 3344 DAVE O'MARA CONTRACTORS INC NEW POINT, IN 3546 DAVE O'MARA CONTRACTORS INC ST. PAUL, IN 3326 DAVE O'MARA CONTRACTORS INC VERSAILLES, IN 3285 E & B PAVING LLC ANGOLA, IN 3373 E & B PAVING LLC BLOOMINGTON, IN 3349 E & B PAVING LLC CHANDLER, IN 3387 E & B PAVING, LLC CORYDON, IN 3375 E & B PAVING LLC FT WAYNE, IN 3355 E & B PAVING LLC HUNTINGTON, IN 3340 E & B PAVING LLC INDIANAPOLIS, IN 3279 E & B PAVING LLC PLYMOUTH, IN 3366 E & B PAVING LLC KOKOMO, IN 3348 E & B PAVING, LLC MARTINSVILLE, IN 3368 E & B PAVING LLC MUNCIE, IN 2 of 7 Comments B = In -Line Blending System Installed April 1, 2024 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3246 E & B PAVING LLC NOBLESVILLE, IN - SR 38 3339 E & B PAVING LLC NOBLESVILLE, IN - RIVER RD 3257 E & B PAVING LLC PENDLETON, IN 3302 E & B PAVING LLC PERU, IN 3389 E & B PAVING, LLC (I) ROCKPORT, IN 3298 E & B PAVING, LLC SELLERSBURG, IN 3361 E & B PAVING, LLC (I) SWITZ CITY, IN 3341 E & B PAVING, LLC WASHINGTON, IN 3371 GALLAGHER ASPHALT CORP., THORNTON, IL 3196 GAUNT & SON ASPHALT INC WABASH, IN 3367 GOHMANN ASPHALT & CONSTRUCTION INC (I) DALE, IN 3145 HOWARD MATERIALS, LLC INDIANAPOLIS, IN 3404 HOWARD MATERIALS, LLC INDIANAPOLIS, IN (TIBBS AVE.) 3383 HOT MIX INC GREENSBURG, IN 3550 JENSTAR ASPHALT LLC GARY, IN 3403 JERRY DAVID ENTERPRISES, INC EVANSVILLE, IN 3405 JH RUDOLPH & CO, INC DALE, IN 3 of 7 Comments B = In -Line Blending System Installed April 1, 2024 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3378 JH RUDOLPH & CO INC ENGLISH, IN 3308 JH RUDOLPH & CO INC EVANSVILLE, IN 3555 LOUSIVILLE PAVING CO CRESTWOOD, KY 3398 LOUSIVILLE PAVING CO LOUSSVILLE, KY 3384 MAC CONSTRUCTION & EXCAVATION, INC JEFFERSONVILLE, IN 3249 METZGER CONSTRUCTION CO INC BOONVILLE, IN 3251 METZGER CONSTRUCTION CO INC BOONVILLE, IN 3332 MILESTONE CONTRACTORS LP BLOOMFIELD, IN 3232 MILESTONE CONTRACTORS LP (I) CAMBRIDGE CITY, IN 3315 MILESTONE CONTRACTORS LP COLUMBUS, IN 3394 MILESTONE CONTRACTORS LP (I) CRAWFORDSVILLE, IN 3397 MILESTONE CONTRACTORS LP DALEVILLE, IN 3309 MILESTONE CONTRACTORS LP (I) DECATUR, IN 3304 MILESTONE CONTRACTORS LP INDIANAPOLIS, IN - HARDING ST {PLANT #11) 3317 MILESTONE CONTRACTORS LP INDIANAPOLIS, IN - 96TH ST 3273 MILESTONE CONTRACTORS LP KENTLAND, IN 3323 MILESTONE CONTRACTORS LP LAFAYETTE, IN 4 of 7 Comments B = In -Line Blending System Installed April 1, 2024 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3347 MILESTONE CONTRACTORS LP PLAINFIELD, IN 3345 MILESTONE CONTRACTORS LP PORTLAND, IN 3248 MILESTONE CONTRACTORS LP RICHMOND, IN 3333 MILESTONE CONTRACTORS LP VEEDERSBURG, IN 3363 MILESTONE CONTRACTORS LP WHITESTOWN, IN 3336 MILESTONE CONTRACTORS NORTH, INC GRIFFITH, IN 3406 MILESTONE CONTRACTORS NORTH, INC (I) LAPORTE, IN A 3388 MILESTONE CONTRACTORS NORTH, INC LOWELL, IN 3351 MILESTONE CONTRACTORS NORTH, INC SOUTH BEND, IN 3382 MILESTONE CONTRACTORS NORTH, INC VALPARAISO, IN 3392 MILESTONE CONTRACTORS SOUTH, INC CLOVERDALE, IN 3350 MILESTONE CONTRACTORS SOUTH, INC TERRE HAUTE, IN 3334 NIBLOCK EXCAVATING INC BRISTOL, IN 3296 NIBLOCK EXCAVATING INC KIMMEL, IN 3402 OWENSBORO PAVING (I) OWENSBORO, KY - (PLANT #1) 3533 OWENSBORO PAVING (I) OWENSBORO, KY - (PLANT #2) 3137 PHEND & BROWN INC DISKO, IN 5 of 7 Comments B = In -Line Blending System Installed April 1, 2024 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3171 PHEND & BROWN INC LEESBURG, IN 3399 RIETH-RILEY CONSTRUCTION CO INC (I) MOORESVILLE, IN 3395 RIETH-RILEY CONSTRUCTION CO INC DANVILLE, IN 3173 RIETH-RILEY CONSTRUCTION CO INC ELKHART, IN 3353 RIETH-RILEY CONSTRUCTION CO INC GARY, IN 3511 RIETH-RILEY CONSTRUCTION CO INC (I) HOWE, IN 3330 RIETH-RILEY CONSTRUCTION CO INC INDIANAPOLIS, IN.- KY AVE "B" 3184 .RIETH-RILEY CONSTRUCTION CO INC INDIANAPOLIS, IN - KY AVE "A" 3316 RIETH-RILEY CONSTRUCTION CO INC INDIANAPOLIS, IN - 96TH ST 3386 RIETH-RILEY CONSTRUCTION CO INC LAFAYETTE, IN 3365 RIETH-RILEY CONSTRUCTION CO INC LAPORTE, IN 3300 RIETH-RILEY CONSTRUCTION CO INC NOBLESVILLE, IN - (RIVER AVE) 3290 RIETH-RILEY CONSTRUCTION CO INC SOUTH BEND, IN 3379 RIETH-RILEY CONSTRUCTION CO INC VALPARAISO, IN 3288 TEMPLE & TEMPLE PAVING SALEM, IN 3154 TRI-COUNTY ASPHALT OTWELL, IN 3534 VALLEY ASPHALT CORP CLEVES, OH-----------------------------------------B 6 of 7 Comments B = In -Line Blending System Installed April 1, 2024 CERTIFIED HOT MIX ASPHALT PRODUCERS Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA Producer ITM 583 SM Material Code: 401M34500 to 41OM34600 3510 VALLEY ASPHALT CORP (I) ROSS, OH 3543 WALLS MANUFACTURING CO (X) BROOKVILLE, OH 3544 WALLS MANUFACTURING CO (I) GREENVILLE, OH 3343 WAYNE ASPHALT AND CONST. CO INC FORT WAYNE, IN 7 of 7 Comments B = In -Line Blending System Installed RIETH-RILEY CONSTRUCTION CO., INC. GOSHEN, IN as rtrrlpard a ontracto r"S Slatem ant of Exerrerce a.rt,d Fir:ancial Cond[46n e4E ��"��[Ilr d �lr der indlana: Code 8 23-102 t� h'rereby pia.l.Med to big at at 'y 1"itlent h3tl pr r Iettirt In -Classes or Work and withurl the arnount and othe r limitation: of e' ach -cla:saifiastion sb1sloIrate: Wy fcf Slach perkud, -as tie unwrtipletiedwork on hansd frorri all urcpaa dom rNA e ceed thA grergate Wn unt Classifficadon refereacie.. by rrarna -or 4y r irrsl ire irr accordance ��iitir the �f�ttr�itren� .it`r: tt'r rrtr t r� ten�ent rE r r e r l irrai i l onditjo ' I�J.i: i iu raa e ra r edeswiy wrtlfito pro usly is au-ed', but is subject to rv�viaiort r:re oczat r� :J�q:>�wdin t�r.the lay If .ard w' i�;lerr ja lft rn t te. tin.'ancial to-cmdditien oftrt contracting firm or odder fa. ts-, ju:i(y zauch revi�l r� r r�����:�t r r-r.. Valid September 22, 2023 Thru July 31, 2024 Aggregate Bidding Capacity: 0085 CLEAN AND SEAL CRACKS /JOINTS IN PCCP/HMA PVMT........................:........ 0155 TEMPORARY EROSION AND SEDIMENT CONTROL .............................. . ...................... 0250 DRIVEN PILING....................................:.:.................................................................... 0333 SOUND BARRIER WALL INSTALLATION........................................................................ 0400 WATER AND WASTEWATER TREATMENT SYSTEMS ............................... .................... A(A) CONCRETE PAVEMENT: GENERAL.................................................................,. .............. B(A) ASPHALT PAVEMENT: W/INDOT CERTIFIED HMA PLANT ................................... .......... C(A) HEAVY GRADING.................................................:......................... .................................... D(A) HIGHWAY OR RAILROAD BRIDGE OVER WATER.......................................................... D(B) HIGHWAY OR RAILROAD BRIDGE OVER HIGHWAY ..................................... D(C) HWY/RR BRIDGE REQ RR TRACK PROTECTION ........................... .............................. E(C) BRIDGE DECK OVERLAYAND MINOR BRIDGE REPAIR .......................................:....... E(E) SMALL STRUCTURES AND DRAINAGE ITEMS ...................... E(F) SURFACE MASONRYAND MISCELLANEOUS CONCRETE .......................................... E(H) DEEP SEWER AND/OR EXCAVATION.................................................... .......................... E(R) ASPHALT PAVEMENT MILLING................................:............................... ....................... E(T) DEMOLITION...................................................................................................................... PREQUALIF[CAX. ON ENGINEER 2"M� ram. n, ::0k'!�. ,[r 5-05t 917,495,000.00 '"�M $10,000,000.00~"a $10,000,000.00"``' $10,000,000.00' $10,000,000.00' $10,000,000.00 $99,999,999.00 $99,999,999.00 $99,999:999.00 = = $99,999,999.00 $99,999,999.00 to $99,999,999.00 ~=A $10,000,000.00 t $10,000,000.00 „= $99,999,999.00`" $99,999,999.00 $99,999999.00=� :- $99,999:999.00 : COMMISSIONER iTi�I�(i7P' 'J1 �i�ial arfi�,Il� �I$�i•li� '�rIII� .� 91I��1� 1� �=m �,'���,�',�,�.� � ��.�,i.J{.�' 3 �.I,��t><1 ., li���r(.. 1>ia3t1� ..:•1�t:§ii���. �[r,ioi��i .. u�l„'���.�: CERTIFICATE OF QUALIFICATION to provide CONSTRUCTION SERVICES for ]PUBLIC WORKS ]PROJECTS to the STATE OF INDIANA This Certification Board, having duly considered application for qualification in terms of apparent experience and financial resources; and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to: RIETH RILEY CONSTRUCTION CO INC 3626 ELKHART RD PO BOX 477 GOSHEN IN 46527-0477 Phone 574-875-5183 Fax 574-875-8405 Company Official KEITH ROSE for the twenty-seven month period stated herein, unless revoked by -this Board for cause, and in the classifications of services stated below. This certificate supercedes any previous certificate. 1611.01 Concrete Construction of Roads & Curbing 1611.02 Asphalt Construction of Roads and Parking Lots 1622.01 Gen Contr-brdgs,vdcts,elvd hwys,rlwy,tnis 1623.03 Sewers and/or Water Lines 1771.01 Concrete Construction 1794.01 Earthmoving and Land Clearing 1794.02 Excavation 1796.02 Demolition of Pavements and Roads CERTIFICATION DATE 6/2012022 EXPIRATION DATE 9120/2024 THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD, 402-WEST WASHINGTON STREET, ROOM W467, INDIANA.POLIS, INDIANA 46204, ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION. Tracy L. Cross, Executive Secretary Certification Board DAPW PQ2 State Form 3983R Rev. 07106 1316 COUNTY -CITY BUILDING -X' � PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD FAX 574/ 235-9171 SOUTH BEND, INDIANA 46601-1830 Ywncw ' TDD 574/ 235-5567 try �� ��.✓' 1t Fp'I, CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: To: From Subj ect November 6, 2024 All Planholders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 1 Project Name: 2024 Community Crossings Round 2 Project No.: 124-047 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: ///c 0 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: R; e Authorized Signature: IVDate: ll��/ ZoZq- 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject PHONE 574/ 235-9251 FAx 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS November 7, 2024 All Planholders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 2 Project Name: 2024 Community Crossings Round 2 Project No.: 124-047 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: IV7120Z This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy M_ also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Y Com an o e h —1jjgl oki.-7'L rmc �l'oh Co, Company: Authorized Signature: Date: 1117ZO02 sZ kC. 1316 COUtvTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAx 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: November 8, 2024 To: All Planholders From Theresa Heffner, Clerk, Board of Public Works Subj ect Addendum Number: 3 Project Name: 2024 Community Crossings Round 2 Project No.: 124-047 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received:'' This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: c ell ` l ,` 16? Z �Lo;l.�' /&l 6 �,'&k Co. 6 Authorized Signature: Date: � 0 Z 4 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/1/2024 Department Public Name Scott BPW Date 11/12/2024 Phone Extension 9245 Required Prior to Submittal to Board BPW Attorney ❑ Attorney Name Michael Schmidt Dept. Attorney ❑ Attorney Name Purchasing ❑ Mickey Low Check the Appropriate Item Type — Required. for All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA ® Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution ❑ Other: ❑ Ease./Encroach Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Information ❑ Yes ❑ If Yes, Approved by Purchasing ❑ No E] MBE ❑ WBE Completed E-Verify Form Attached ❑❑ Nos 2024 Community Crossings Round 2 124-047 Local Road & Street, River West TIF 265-06-600-506-436008, 324-10-102-121-442001 For Change Orders Only Amount of ❑ Increase $ ❑ Decrease ($ ) Previous Amount Current Percent of Change: New Amount Total Percent of Change: Time Extension Amount: New Completion Date: Increase Decrease Increase Decrease