Loading...
HomeMy WebLinkAboutChange Order No. 1 - SBMF Demolition Proj No. 123-076 - The MRD Group ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS October 8, 2024 Mr. Joseph Gozelski The MRD Group, Inc. 4777 W. Lincoln Ave. West Milwaukee, WI 53219 gozelski@themrdgroup.net RE: Change Order No. 1 – South Bend Medical Foundation Demolition – Project No. 123- 076 Dear Mr. Gozelski: At its October 8, 2024 meeting, the Board of Public Works approved the above referenced Change Order be increased by $39,562.50, bringing the revised contract amount to $1,802,562.50 with an additional thirty (30) days and with a new completion date of January 19, 2025. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/hh October 8, 2024 Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Zach Hurst, PE, Sr. Project Engineer SUBJECT: Change Order No. 1 - Project No. 123-076 Demolition of South Bend Medical Foundation DATE: 09/30/2024 During the course of decommissioning the South Bend Medical Foundation to be prepared for demolition, additional costs were incurred for asbestos removal and universal waste disposal. The contract includes a $100,000 allowance for these specific items, but that limit was exceeded. The cost breakdown is as follows: • Additional Asbestos Removal (unforeseen): $38,940.00 o This includes wall mastic that was hidden during the original asbestos survey and uncovered once wall coverings were removed. • Additional Asbestos Removal (unforeseen): $13,172.50 o This includes transite panels that were hidden during the original asbestos survey and uncovered after removing exterior siding. • Universal Waste Removal (anticipated cost): $74,250.00 o This includes removal of all universal waste found in the building: computers, batteries, monitors, fluorescent lights, mercury-containing equipment. • Waste Oil / Sludge Removal (anticipated cost): $13,200.00 o This includes removal of all waste oil and sludge found in diesel tanks on the site. • Total of all added costs: $139,562.50 • Apply existing $100k allowance: ($100,000) • This change order: $39,562.50 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 09/30/2024 Name Zach Hurst Department DPW BPW Date 10/08/2024 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name The MRD Group New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Demolition of South Bend Medical Foundation (531 N. Main St.) Project Number 123-076 Funding Source River West DA TIF Account No. PO-00031911 Amount This change: $39,562.50; Revised Amt.: $1,802,562.50 Terms of Contract Lump Sum Purpose/Description Change Order No. 1 addresses unforeseen asbestos removal and universal waste disposal. For Change Orders Only Amount of Increase Decrease $ 39,562.50 ($ ) Previous Amount $ 1,763,000 Current Percent of Change: Increase Decrease 2.2% ( %) New Amount $ 1,802,562.50 Total Percent of Change: Increase Decrease 2.2% ( %) Time Extension Amount: 30 days New Completion Date: 1/19/2025