HomeMy WebLinkAboutContract - Odor Control Pilot Study Test - Premier Magnesia
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MICOU
1316 COUNTY-CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
October 8, 2024
Mr. Andrew Rupprecht
Premier Magnesia, LLC
75 Giles Place
Waynesville, NC 28786
arupprecht@premiermagnesia.com
RE: Contract
Dear Mr. Rupprecht:
At its October 8, 2024 meeting, the Board of Public Works approved the above
referenced contract for Odor Control Pilot Study Test in an amount Not to Exceed $30,000.
Enclosed please find the original of the contract for your signature. Please sign and return the
original contract to hhorvath@southbendin.gov.
Enclosed please find a copy of the contract for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/hh
BOARD OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
This Agreement is made and entered into this 8th Day of October 2024, by and between Premier
Magnesia, LLC., and the Board of Public Works (the "Board”).
PROJECT NO.
DESCRIPTION: CONTRACT ODOR CONTROL PILOT STUDY TEST
COMPLETION DATE: SEE SPECIFICATIONS
AMOUNT: NOT TO EXCEED $30,000
FUNDING: PR-00036435
Each of the Parties, by signing below, represents and warrants to the other Party that he/she/it has
the authority to bind the named person or entity to this Agreement.
BOARD OF PUBLIC WORKS PREMIER MAGNESIA, LLC
President Member Printed Name
Member Member Signature
Member Attest: Clerk
October 8, 2024
INTER-OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENVIRONMENTAL SERVICES
TO: Members of the Board of Public Works
Michael Schmidt, Assistant City Attorney Public Works
Theresa Heffner, Clerk of the Board of Public Works
FROM: Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: Agenda Request – Professional Services
Odor Control Study – Pilot Test
(PROJ00000434, PR-00036435)
DATE: September 30, 2024
The Division of Engineering and Division of Wastewater recommend the Board of Public
Works approval of an Odor Control Study – Pilot Test scope of work to be performed by
Premier Magnesia from mid-October 2024 through late October 2024.
Background
In 2014, the City of South Bend Division of Environmental Services installed a calcium
nitrate (Bioxide) system at the Geyer Ditch Pump Station and Sage Road Pump Station to
reduce hydrogen sulfide levels, control sulfides, and provide odor control. The two pump
stations are part of the IN Tek and IN Kote Sanitary Trunk Sewers that were built between
1988 – 1992 that carry residential and industrial wastewater from New Carlisle, IN.
After a decade of using calcium nitrate, the effectiveness of the product has decreased,
and we have documented an increase in hydrogen sulfide levels through odolog sampling.
This poses three key concerns (1) exposure of personnel to hydrogen sulfide, (2) odor
issues, and (3) deterioration of pipes, structures, and equipment due to prolonged exposure
to hydrogen sulfide.
Follow-up sampling and dosage adjustments in 2023 and 2024 provided enough data for
the City to investigate different products that may be better suited for the chemical addition
application for this sanitary sewer system.
To provide a better understanding of alternate products and confirm their effectiveness,
City Engineering and Wastewater have been working with Webster Environmental
Associates (consultant) and Premier Magnesia (a Product Supplier) to develop an
alternative pilot test for testing a different chemical called Magnesium Hydroxide for
hydrogen sulfide reduction in the IN Tek Sanitary Trunk Sewer.
Premier Magnesia has provided a unit price quotation to provide temporary equipment and
conduct the pilot test over a two-week trial period beginning in mid-October through the end
of October 2024 to dose the sanitary trunk sewer with magnesium hydroxide. The goal of
this pilot test is to collect dosage data to determine whether magnesium hydroxide is
effective for hydrogen sulfide reduction in the IN Tek Sanitary Trunk Sewer.
During the study, odologs (metering equipment capable of collecting air quality
concentration data over a period of time) will be deployed in the IN Tek sanitary trunk sewer
to test for hydrogen sulfide concentrations upstream and downstream of the dosage point.
By the end of the study, the collected data collection should provide the City with enough
information to assess whether Magnesium Hydroxide is an effective alternative product to
calcium nitrate. The success of the pilot test will be evaluated over a few parameters
including, but not limited to, dosing rates, a comparison of annual costs for chemical dosing
alternative products, equipment evaluation, operation and maintenance between the
existing and alternative product, and power usage.
This pilot test may drive the basis of design for a new chemical feed system for the IN Tek
Sanitary Trunk Sewer. A similar evaluation may be considered for the IN Kote Sanitary
Trunk Sewer in the future, but a dosage study for that sewer would be premature given the
increased flows expected by the developments at the Indiana Enterprise Center area.
Funding for this project was provided through Sewage Works Capital – Wastewater
Capital, Account 642-06-605-514-442005. For questions regarding the subject Agenda
Request, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering.
Premier Magnesia Trial Price Quote
To: City of South Bend
3113 Riverside Drive
South Bend, IN 46628
Jacob, Klosinski-
jklosins@southbendin.gov
September 24, 2024
From: Andrew Rupprecht
Premier Magnesia, LLC
arupprecht@premiermagnesia.com
Re: THIOGUARD® Pricing – City of South Bend – Thioguard, Magnesium Hydroxide Odor Control 14-day Trial Proposal
Product Estimated
Usage:
THIOGUARD ® (Magnesium Hydroxide Tote Slurry)
Total delivered gallons range: 825-900 gallons
Estimated Slurry
FOB Terminal: $ 3.39 per gallon of Slurry FOB Aspers, PA
Estimated Freight/FSC: $4.80 per gallon delivery including fuel service charge
Trial Equipment/
Support/Installation:
Equipment/Installation, $495/day: (3) 330/275 gallon totes, (1) Pump: Watson Marlow Bredel 10,
(1) Standard Control panel-120V 30 Amp (remote if available, at no additional charge), generator to
provide power for pump and panel, tubing and fittings from tank to pump. Installation by Premier
Application Advisor and/or Field Tech. Application Support, $4840: includes two calendar weeks, 3
business days on site, as deemed by Premier, per week, of a Premier Application Advisor for equipment
operation and dosage optimization.
Tax: Must provide Premier Magnesia with Tax Exemption Certificate
Terminal Location: Aspers, PA
Payment Terms: Net 30 Days
•Freight is added to the slurry FOB pricing for total delivered cost. Freight rates are good faith estimates for a reasonable
period (about 30 days) around this quote and are not guaranteed. All freight rates will be confirmed at the time of carrier
booking. Fuel service charges fluctuate and are based on current market at the time of quotation.
•Premier is not liable for any site costs resulting from delay of shipment(s). Products ship via third-party common carrier
freight. No returns of excess quantity material without prior agreement or incident.
•Premier disclaims any express or implied warranty against infringement of any patent(s), pertaining to patents not held by or
licensed to Premier, which may cover the use of the purchased product(s) or material(s) in conjunction with other materials,
products, or applications.
•Client provides all required utilities, to the best of their ability. To be confirmed before equipment delivery.
•Client will fuel and provide fuel for the generator and provide 120V 15A outlet for air compressor mixing system (12.5 A).
•To their best, client will provide equipment monitoring in the absence of the Premier Advisor or Technician.
•Further documentation regarding trial planning and coordination between client and Premier will augment these terms.
Signature to this quote signifies that you have read and understand the statements above.
Name (Print): Date:
Signature: Position:
Please return signed document via email to: arupprecht@premiermagnesia.com
75 Giles Place
Waynesville, NC 28786
October 8, 2024
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 09-30-2024
Name: Jacob M. Klosinski Department of Public Works – Engineering Division
BPW Date: 10-08-2024 Phone Extension: 9496
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney Attorney Name Michael Schmidt
Purchasing Mickey Lovy / Ron O'Connor
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Premier Magnesia (V-________)
)New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name IN TEK Sanitary Trunk Sewer – Odor Control Pilot Test
Project Number PROJ00000434 / PR-00036435
Funding Source Sewage Works – Wastewater Capital
Account No. 642-06-605-514-442005 Sewage Works Capital
Amount $30,000.00 (Not to Exceed)
Terms of Contract Base Rate and Unit Pricing (Based on Quantity Usage)
Special Contract Provisions Refer to Contract Document for unit pricing structure
Purpose/Description The Division of Engineering and Division of Wastewater recommends the
Board of Public Works approval of an Odor Control Pilot Study Test contract
with Premier Magnesia to provide equipment and magnesium hydroxide for
an alternative chemical analysis for hydrogen sulfide reduction in the IN Tek
Sanitary Trunk Sewer. The Pilot Test will be a 2-week trial evaluation.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: