HomeMy WebLinkAbout09-04-2024 Personnel and Finace Meeting MinutesOFFICE OF I~HE CrrY CLERK
BIANCA L. TIRADO, CITY CLERK
PERSONNEL & FINANCE
Committee Members Present:
Councilmembers Present:
Councilmembers Absent:
Others Present:
Agenda:
SEPTEMBER 4, 2024 5:30 P.M.
Shei la Niezgodski, Canneth Lee, Rachel
Tomas Morgan, Angela Smith, Ross Deal,
Karen White, Troy Warner*
Ophelia Gooden-Rodgers
Sharon McBride, Sherry Bolden-Simpson,
Dr. Oliver Davis
Bianca Tirado, Matthew Neal, Samuel Turck,
Talia Thorton, Bob Palmer
Public Works Budget Presentation
Members marked with an asterisk (*) are in virtual attendance.
Please note the attached link for the meeting recording:
https://docs.southbendin.gov/WebLink/browse.aspx?mediaid=382881&dbid=0
Please note the attached link for the meeting presentation:
https://docs.southbendin.gov/WebLink/0/fol/385129/Rowl.aspx
Committee Chair Sheila Niezgodski called to order the Personnel & Finance Committee meeting
at 5:30 p.m.
Committee Chair Sheila Niezgodski provided information regarding the 2025 Budget Overview
process. City Residents can access the City Budget Survey to provide their input using the
following link: https: 1southbendin.gov budget . Additional questions pertaining to this meeting or
the budget hearing can be emailed to the Personnel and Finance Committee Chair, Sheila
Niezgodski, at sneizgodski ll'southbendin.gov and they will be directed to the appropriate
department. The Final Budget Hearing is scheduled for October 14, 2024.
Elivel Quijada-Nawu-ro
Ci 111-:I' D1-:PLTY Crn · C1.1-:iu,
INTEGRITY I SERVICE I ACCESSIBILITY
Matthew Neal
1)1-:PLTY/ Dm1-:cTOll OF l'OI.IC:Y
Samuel Turck
DIIUcC:TOll OF SPl •:CI.\I. OF PROJFC:Ts
EXCEL LEN CE I ACCOUNTABILITY I INNOVATION I INCLUSION I EMPOWERMENT
455 County-City Building 1227 W. Jefferson Blvd. I South Bend, Indiana 46601 Ip 574.235.9221 If. 574.235.9173 1 www.southbendin.gov
• CITY OF SOUTH BEND OFF ICE OF THE CLERK
2025 Public Works Budget Presentation
Erik Horvath, Director of Public Works with offices on the l 3th floor of the County-City Building
gave an overview of the budget plan for 2025. Erik Horvath introduced Deputy Director Ji tin Kain,
Director of Wastewater Kim Thompson, City Engineer Dr. Kara Boyles, Assistant City Attorney
Michael Schmidt, Director of Water Utilities Matt Bussell, Marketing Director Cara Grabowski-
Brown, and Director of Solid Waste Management Kelly Smith. Erik Horvath thanked Kyle Willis,
Terry Swift, and Ron O'Connor for their work in putting this budget together.
The presentation will be structured into seven (7) parts, an overview of the Public Works
Department, highlighting the Common Councilmember's priorities, and then breaking down each
budget for the five (5) divisions within Public Works. Sean Ward is the Director of Streets &
Sewers. Streets & Sewer is primarily funded by Motor Vehicle Highway (MVH) and the gas and
wheel tax known as the Local Road and Street (LRS) formula. Engineering is primarily funded by
Fund 101 , the General Fund but also has allocations from many different departments. Water,
Wastewater, and Solid waste are all funded by Enterprise funds, the revenues from these
departments completely fund themselves.
Public Work's mission is building the foundation for a thriving city. This includes providing
essential services such as snow removal, street sweeping, clean water, treating the wastewater
before it goes into the St. Joseph River. Developing sustainable assets and infrastructure which
will enhance the community's quality of life.
Erik Horvath gave an overview of the Common Councilmember's priorities. Investment into
repairing the City's streets is the top priority, which has seen unprecedented investment in the last
three (3) years from the City 's administration. The Streets Plan has brought more investment into
the City's infrastructure in the last five (5) years than in history of the City. The Common Council
would like more traffic calming and speed reduction in the City. Erik Horvath stated that this is
very difficult as the funding for traffic calming and speed reduction comes from the same places
as paving streets, sewers, traffic calming, and lighting. The Police Department increasing speed
enforcement has been a large help in speed reduction. Increasing funding for curbs and sidewalk
repairs will happen, it will be about the same amount of funding from 2024 which was an increase
from 2023. The budget will see investment in modernizing the water and wastewater systems. The
regulatory goals will be met in accordance with the City's Combined Sewer System (CSO) consent
decree and specific provisions in the Safe Drinking Water Act. Increasing funding for street
cleaning will not happen, street cleaning funding will remain at a similar level to 2024. Every street
gets swept twice a year. Automatic Vehicle Location (AVL) will be added to the sweepers which
will track them to ensure every street will be swept twice a year. If there are cars parked on the
street it makes it difficult to clean them, also large items of trash cannot be cleaned by the street
sweepers. Public Works will have a marketing campaign next year to highlight the importance of
bagging all of your trash. If loose trash is in the bin, when the garbage trucks pick up the bins,
wind could scatter it on the street if it is not properly bagged.
The Engineering Division manages over two hundred (200) projects across all of the essential
services the City offers. Salaries and wages for the Engineering Division in 2025 will be two
EXCELLENCE ACCOUNTABILITY INNOVATION INCLUSION EMPOWER MENT
455 County-City Building 227 W. Jefferson Blvd. South Bend, Indiana 46601 p. 574.235.9221 f. 574.235.9173 www.southbendin.gov
CITY OF SO UTH BEND OFFICE OF THE CLE RK
million five hundred thousand dollars ($2,500,000). This is a six percent (6%) increase from 2024.
This increase is due to a three percent (3%) increase for all individuals in Engineering and one (1)
position receiving a higher than standard increase. Fringe benefits will increase nine percent (9%)
due to healthcare costs increasing. This will be a common theme across all of the divisions in
Public Works. Professional Services will increase two percent (2%) despite a seeming decrease of
seven million dollars ($7,000,000). That seven million dollars ($7 ,000,000) came from the
University of Notre Dame and the Hotel Motel Tax which was for one (1) specific project the
South Bend Ave and Northern Ave project. Fifty thousand dollars ($50,000) of the Repairs and
Maintenance budget is for alley repairs and maintenance. The Capital Budget of one thousand and
seventy-eight dollars ($1 ,078) is for repairing the City's fuel site, which every department in the
City is contributing funds towards. Interfund Allocations increased eleven percent (11 %) which
will be similar among all of the divisions. Those are allocations to IT and Adm in. Other programs
managed in Engineering include paving and the Light Up South Bend project. Paving in 2025 will
be four million and one hundred thousand dollars ($4,100,000). There will be zero (0) dollars
coming out of the Major Moves Fund or Fund 412 which was money from a toll road operated by
Public Works which saw little success in 2024. Some of the money out of Fund 412 was loaned
for the Eddy Commons project so the fund will be payed back over the next two (2) years. Total
Paving in 2025 will be nine million dollars ($9,000,000), in 2024 it was eight million dollars
($8,000,000). The Light Up South Bend project will see a two percent (2%) increase in 2025.
Every area in town has been mapped for lighting needs. The Lampost Reimbursement program
has been successful, the cost shares will remain the same as in previous years, fifty dollars ($50)
for targeted areas and two hundred and fifty dollars ($250) for other areas of the City.
In 2023 Traffic Calming was partly subsidized by American Rescue Plan (ARP) funds which
brought it to nine hundred thousand dollars ($900,000). Traffic Calming and Signals will total fi ve
hundred and fifty thousand dollars ($550,000) in 2025. Two hundred and fifty thousand dollars
($250,000) will be used for traffic calming, three hundred thousand dollars ($300,000) will be used
for traffic signal upgrades. Fund 251 known as Local Road and Street Fund will be used for traffic
calming and signal upgrades. Curb and Sidewalk repairs will total one million six hundred
thousand dollars ($1,600,000). Council allocations will be similar to 2024 totaling either one
thousand (1 ,000) feet of curb repair or two thousand fi ve hundred (2 ,500) feet of sidewalk repair.
Erik Horvath stated that the Common Council should get their selections in early on Geographic
Information System (GIS) to help Public Works get bids out earlier to ensure a better price for the
City. The Curb and Sidewalk Reimbursement program has different reimbursement rates on a case-
by-case basis.
Personnel changes include one (1) new Full Time Employee (FTE) which is a Project Inspector.
This will save money due to inspections being done by the City compared to outsourcing them.
The Fire Station Eight inspection would have cost the City three hundred thousand dollars
($300,000) if it was outsourced. The title of the Director of CSO Project Management position will
be changed to the Director of Project Management to give the position a broader range of
responsibilities. The title of Manager Public Construction will change to the Director of Project
Management. This change includes a higher than standard increase in salary. This is an individual
EXC ELLENCE ACCOUNTABILITY INNOVATION INCLUSION EMPOWERMENT
455 County-City Building 227 W. Jefferson Blvd. South Bend, Indiana 46601 p. 574.235.9221 f. 574.235.9173 www.southbendin.gov
CITY OF SO UTH BEND OFFICE OF THE CLERK
who is personally responsible for all of the parks projects which totals to over thirty (30) projects
citywide.
Streets & Sewers also include Traffic & Lighting. They maintain over seven hundred (700) miles
of sewer, one thousand two hundred and sixty-two (262) lane miles that need to be swept, plowed,
repaved, and repaired. One hundred and sixty ( 160) signaled intersections, thousands ( 1,000s) of
street signs, thousands (1 ,000s) of feet of street I ines, three thousand (3,000) street lights, and four
hundred (400) miles of alleys. Leaf pickup is also conducted by this staff. This division is primarily
funded by MVH and the gas and wheel tax. MVH generates six million, five hundred thousand
dollars ($6,500,000) of revenue per year. LRS generates a couple of million dollars per year. This
is subsidized close to ten million dollars ($10,000,000) per year through LIT. Erik Horvath stated
that road funding is hard to come by, and it is a nationwide problem. Salaries and Wages will go
up seventeen percent (17%). This is due to a nine percent (9%) increase in Teamsters salaries and
a three percent (3%) increase in non-barging employees. Two new positions will be added that are
both Teamsters positions. Repairs & Maintenance will go up eight percent (8%) this increase is
due to inflation. Fringe Benefits will increase due to the price of health insurance increasing. Debt
Service Interest and Fees and Debt Service Principal is up considerably due to the repairs needed
for the City's fuel site. The Internal Paving Budget will be from Fund 266 or the MVH Restricted
Fund. The State restricted MVH funds so that they could only be used for certain capital paving
projects. Signals and Streetlight Maintenance funding will be divided from Fund 202 and Fund
266 as the dollars from Fund 266 cannot be used for certain streetlight maintenance. Most of this
maintenance is caused by distracted drivers. There will be two (2) new FTEs with the title of OP-
Techs -T &L. These positions will do sign repair and manufacturing as well as working special
events. There will be a title change for a Operator III -Sewers to Job Leader. This title change will
have a three (3%) percent pay increase.
Water Utilities pumps over five (5) billion gallons of water every year. They are responsible for
operating and maintaining over six hundred (600) miles of water mains, as well as all of the fire
hydrants in the City. Salaries and Wages are increasing six percent (6%). Other Charges and
Services went up eleven percent (11 %) due to compliance with the American Water Infrastructure
Act's requirements and cybersecurity upgrades. PILOT went down. Professional Services went up.
Repairs and Maintenance went up thirteen percent ( 13 % ) due to repairs needed at the water
treatment facility. lnterfund Allocations increased eight percent (8%). Interfund Transfers Out
went down significantly due to the ongoing obligation to move money from Fund 620 to the Debt
Service Sinking Fund. In addition four hundred thousand dollars ($400,000) will be moved to the
Capital fund named Fund 622. Erik Horvath stated improving cybersecurity is increasingly
important to the water and wastewater industry. The wastewater industry is becoming more and
more reliant on automation and system controls at wastewater treatment plants. Sixty thousand
dollars ($60,000) of additional funding for cybersecurity has been added. Twenty-five thousand
dollars ($25,000) for a study to enact the American Water Infrastructure Act will also be added.
There is one (1) change in personnel which is a title change/promotion of a Project Manager to the
Director of Water Quality & Laboratory. The City operates a Class four ( 4) wastewater treatment
plant which processes forty-eight million (48,000,000) gallons of wastewater per day. The plant
can handle peak flows of up to seventy-seven million (77,000,000) gallons of wastewater per day.
EXCELLENCE ACCOUNTABILITY INNOVATION INCLUSION EMPOWERMENT
455 County-City Building 227 W. Jefferson Blvd. Sou th Bend. Indiana 46601 p. 574.235.9221 f. 574.235.9173 www.southbendin.gov
CITY OF SOUTH BEND OFFICE OF THE CLE RK
They are currently working to get the plant to be able to handle one hundred million (100,000,000)
gallons of wastewater per day. There is a new three million (3 ,000,000) gallon storage tank
currently under construction which wi ll allow the plant to take combined sewage rather than send
it into the St. Joseph River. This treatment plant treats about thirteen billion (13 ,000,000,000)
gallons of wastewater every year. There are forty-nine ( 49) lift stations throughout the system. The
system works on gravity the majority of the time, but at a certain point they have to pump it up
and let gravity take it again. Salaries and Wages are increasing six percent (6%) due to two (2)
higher than standard increases and all other wages increasing. Fringe Benefits went up six percent
(6%). Supplies went up twenty-three percent (23%) due to chemical price increases, and the plant
completing some internal projects. Rather than do a large capital project the division decided to
keep the cost in supplies. These projects include check valves and vacum mixers which the staff
will install. Other Services & Charges increased thirteen percent (13 %). Professional Services went
up due to increased consulting costs. Repairs and Maintenance increased fifteen percent (15%).
Travel went down slightly. Utilities increased two percent (2%). Bad Debt is staying the same.
Interfund All ocations increased six percent (6%). Interfund Transfers Out increased twenty-seven
percent (27%). Eight million, four hundred thousand dollars ($8,400,000) of that transfer goes to
support debt service and the other ten million dollars ($10,000,000) goes to support capital. They
decided to cover the cost of these projects due to the projects being too small to bond. The
Department had the cash to cover these projects. The Repairs and Maintenance increase is due to
additional sensors for the plant and collection system. A digital twin of the plant is being developed
to give the operators a better understanding of how the plant works. Lift station repairs are required
on a regular basis. The National Pollutant Discharge Elimination System (NPDES) permit will be
renewed as is required every five (5) years. The Interceptor Line will be cleaned. This is the largest
line bringing wastewater into the plant, it is nine-six (96) inches in diameter. The Interceptor Line
is too large to be cleaned by the City staff. CSO repairs will be completed in 2025. There will be
a Risk Management Plan onsite evaluation which is required by the EPA due to chlorine sulphur
dioxide being at the plant. The CSO tank will be bonded, but the design services will be paid for
using the Capital Fund. That first payment will be three million, two hundred and fifty thousand
dollars ($3 ,250,000). The Sage Road lift station requires two million, five hundred thousand
dollars ($2,500,000) of maintenance. CS O 035 Outfall repair will be five hundred thousand dollars
($500,000). There will be one mill ion, one hundred thousand dollars ($1 ,100,000) of repairs on
hydraulic improvements at the wastewater plant.
Personnel changes include changing the Maintenance Electrician position to an Electrical and
Instrumentation Manager. This includes a raise to eighty-three thousand and two hundred dollars
($83 ,200) a year. This position will be a licensed electrician and a Teamster position. The plant
recently lost an electrician to another municipality due to a pay increase. Erik Horvath stated that
the City must remain competitive with salaries to retain employees. The Director of SCAD A Info
Systems will receive a seven percent (7%) raise.
The Solid Waste division picks up over sixty million (60,000,000) pounds of trash every year, and
over eleven million (11,000,000) pounds of yard waste a year. Erik Horvath stated that there had
been a large amount of turnover of staff in Solid Waste. This has been fixed by increasing wages
even outside of the collective bargaining agreement process. Salaries and wages are increasing
EXCELLENCE ACCOUNTABILITY INNOVATION INCLUSION EMPOWERMENT
455 County-City Building 227 W. Jefferson Blvd. South Bend, Indiana 46601 p. 574.235.9221 f. 574.235.9173 www.southbendin.gov
CITY OF SO UTH BEND OFFICE OF THE CLERK
seven percent (7%). Fringe Positions are increasing eight percent due to healthcare costs
increasing. Supplies are increasing three percent (3%). Education Training is increasing two
percent (2%). Other Services and Charges are increasing slightly due to increased costs in trash
disposal. Travel is increasing due to the supervisors attending industry trainings in 2025. Bad Debt
has gone up considerably, which is what is written off when the City doesn 't receive trash pickup
payments from the residents. Interfund Allocations will be increasing by seven percent (7%).
Interfund Transfers Out will increase by twenty-one percent (21 %). This is due to the purchasing
of trash trucks which can take up to two (2) years to receive. At the beginning of 2024 Solid Waste
purchased the trucks for 2024 and 2025. The increase in 2025 is due to those lease payments . . mcreasmg.
Committee Chair Niezgodski looked to the Committee for questions.
Citizen Member Ross Deal asked where the Public Works Department is in their effort to reduce
CSOs.
Erik Horvath stated that the City's plan to separate the sewer system is ongoing and as of
September 4, 2024 fifty percent (50%) of the system is separated. One hundred and fifty million
dollars ($150,000,000) has currently been spent on this project. The project was going to be too
expensive moving forward, so the decision was made to wait and look for a better path forward.
The City has implemented the Smart Sewer System that gave them additional flexibility, which
allowed the consent decree to be renegotiated to two hundred and seventy-five million dollars
($275,000,000) over twenty (20) years. Most of this funding will go into overflow storage, some
will go into sewer and plant modifications. The next project will be fifty million dollars
($50,000,000) at Randolph Sampson. This is at the beginning stages as the renegotiations ended
two (2) years ago on the new twenty (20) year plan. Erik Horvath stated this plan will save half a
billion dollars ($500,000,000), and is also better for the environment.
Citizen Member Deal asked what is the number of CSOs before the new plan was implemented
and after it was implemented.
Erik Horvath stated that the City has the same number of CSOs, but has decreased the amount of
overflow by eighty percent (80%). Before the implementation there was about two billion
(2,000,000,000) gallons of overflow a year. After the implementation in a typical year of rainfall
which is around sixty (60) inches of rain per year is four hundred million (400,000,000) gallons of
overflow
Committee Member Canneth Lee thanked the Public Works staff for their work. Committee
Member Lee asked how much traffic calming can be done with two hundred and fifty thousand
dollars ($250,000).
Erik Horvath stated that much more money than two hundred and fifty thousand dollars ($250,000)
will go into traffic calming through other efforts such as redesigning intersections and streets. That
two hundred and fifty thousand dollars ($250,000) will net two speed humps per Common Council
District.
EXCELLENCE ACCOUNTABILITY INNOVATION INCLUSION EMPOWERMENT
455 County-City Building 227 W. Jefferson Blvd. South Bend. Indiana 46601 p. 574.235.9221 f. 574.235.9173 www.southbendin.gov
CITY OF SOUTH BEND OFFICE OF THE CLERK
Committee Member Lee asked how can the City better address streets that have gone unpaved for
over thirty (30) years.
Erik Horvath stated that the City has put unprecedented amounts of funding into restoring the
City's streets. The City uses the Pavement Conditions Index (PCI) to rate what streets should be
repaved next. Roads are repaved based on condition not age. The PCI ratings are done every year.
Committee Member Rachel Tomas Morgan asked what is the status of the rebuilding our streets
plan. The first ( ist) goal was to repave all of the failed streets, what percentage of those failed
streets have been repaved.
Erik Horvath stated that it is a slow process. All of the failed streets have been repaved. The PCI
score for streets currently being repaved is in the mid thirties (30s) out of one hundred (100).
Maintenance of the streets has also increased some examples are crack sealing and micro-
surfacing. In 2024 so far there has been over sixty (60) miles of crack sealing. This is an
inexpensive approach to increase the longevity of the roads. The PCI rating will slowly increase
over time.
Committee Member Tomas Morgan can the number of miles of roads paved and repaired each year
be made available.
Erik Horvath stated that information is on GIS and he will look into it and get back to the Council.
Citizen Member Angela Smith asked if the City will continue providing wastewater services to
new developments outside of the City with the maintenance problems that already exist in the
largest wastewater line going to the water treatment plant.
Erik Horvath stated that it helps the City as the developments are paying for the upgrades that
bring those services to the developments. The problems with the large line comes from hydrogen
sulfide build-up, and additional flow would reduce that.
Citizen Member Smith stated that the sidewalk repair reimbursement program cannot currently be
used in areas that do not have a sidewalk. She suggested that the City fund a program to install
sidewalks in older areas of the City that have never had sidewalks.
Erik Horvath stated that the policy is not to allow reimbursement to areas without sidewalks, but
in certain cases they do. There are specific projects to install new sidewalks, one (1) of these
projects was done in 2024 on Ironwood Drive.
Councilmember Ophelia Gooden-Rodgers asked how the streets on the west side can be improved,
and what materials are being used to repave the roads.
Erik Horvath stated that the process of using the PCI rating is designed to take out any bias or
subjectivity in the repaving process. The PCI rating is fairly consistent across the City. The
materials used are mainly asphalt which lasts fifteen (15) to twenty (20) years. Concrete roads can
last forty ( 40) to fifty (50) years.
EXCELLENCE ACCOUNTABILITY INNOVATION INCLUSION EMPOWERMENT
455 County-City Building 227 W. Jefferson Blvd. South Bend, Indiana 46601 p. 574.235.9221 f. 574.235.9173 www.southbendin.gov
CITY OF SOUT H BEN D OFFICE OF THE CL ERK
Committee Member Karen White thanked the Public Works staff for their work. Committee
Member White asked about the progress on the Pilot Alley Program to address concerns from
residents regarding alley maintenance.
Erik Horvath stated that maintenance is ongoing. Paving the alleys has been looked at to help with
maintenance.
Committee Member Troy Warner asked how many lane miles where paved in 2024 and how many
are planned for 2025.
Erik Horvath stated thirty-five (35) miles in 2024 and the same is expected for 2025.
Committee Member Warner asked what has been the increase in PCI rating since the beginning of
the three (3) year plan.
Erik Horvath stated that it has increased slightly and the average PCI rating is sixty (60).
Committee Chair Niezgodski asked if the Wastewater plant has a cybersecurity plan and if they do
is there a time limit.
Erik Horvath stated that the plan is updated every year, and the budget is changed to reflect that
with sixty thousand dollars ($60,000) being added to the cybersecurity budget.
Committee Chair Niezgodski asked how many lift stations are there and how much do they cost.
Erik Horvath stated that there are forty-nine ( 49) lift stations and they vary in price. The Sage Road
lift station will cost two million five hundred thousand dollars ($2,500,000) in 2025. A brand new
lift station can cost over ten million dollars ($10,000,000).
Committee Chair Niezgodski opened the public hearing.
Sue Kesim 4022 Kennedy Drive, South Bend IN 46614 asked how many miles will nine million
dollars ($9,000,000) pave.
Erik Horvath stated thirty-five (35) miles.
Sue Kesim asked how the City will account for new regulations on chemicals.
Erik Horvath stated that he is not aware of grants that can help with that. The wells are being
actively tested and how the plant can remove those chemicals. There are settlements currently in
court against the companies that sell chemicals and that should fund much of this work.
Citizen Member Smith stated there should be education made available that it is the responsibility
of the homeowners to maintain the alleys.
Council Member Gooden-Rodgers asked what is the procedure on knowing what streets have been
swept and what is still waiting to be swept.
Erik Horvath stated that is tracked internally to allow every street to be swept twice a year. Later
in 2024 this will be made available to the public.
EXCELLENCE ACCOUNTABILITY INNOVATION INCLUSION EMPOWERMENT
455 County-City Building 227 W. Jefferson Blvd. South Bend, Indiana 46601 p. 574.235.9221 f. 574.235.9173 www.southbendin.gov
CITY OF SOUTH BEND OFFI CE OF THE CL ERK
With no further business, Committee Chair Niezgodski adjourned the Personnel & Finance
Committee meeting at 7:44p.m.
Respectfully Submitted,
Sheila Niezgodski, Committee Chair
NOTICE FOR HEARING AND SIGHT ll\•IPAIRED PERSONS
Auiiliar~· Aid or Other Scniccs maJ be Available u1M1n Request al No Chall,!C.
Plclilst.' !!in.· Reasonable Adrnncc Rcqucsl whcn Possiblc
EXCELLENCE ACCOUNTABILITY INNOVATION INCLUSION EMPOWERMENT
455 County-City Building 227 W. Jefferson Blvd. South Bend, Indiana 46601 p. 574.235.9221 f. 574.235.9173 www.southbendin.gov