Loading...
HomeMy WebLinkAboutChange Order No. 1 - 2024 Community Crossings - Proj No 124-006 - Milestone Contractors L.P ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS September 10, 2024 Mr. Ed Pilipow Milestone Contractors, L.P. 24358 State Road 23 South Bend, Indiana 46614 epilipow@milestonelp.com RE: Change Order No. 1 – 2024 Community Crossings – Charles Black Center Parking Lot Paving – Project No. 124-006 Dear Mr. Pilipow: At its September 10, 2024 meeting, the Board of Public Works approved the above referenced Change Order be increased by $108,965.32, bringing the revised contract amount to $2,332,465.32 and an additional sixty (60) days. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/hh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Scott Kreeger, Project Engineer SUBJECT: Change Order #1 – Charles Black Center Parking Lot 2024 Community Crossings Proj#124-006 DATE: August 30, 2024 This change order includes the additional work to mill and resurface the parking lot at Charles Black Center (CBC). Milestone Contractors has provided Engineering with a cost breakdown of $108,965.32 to perform the work at the CBC while working in the area for the 2024 Community Crossings project. A complete cost breakdown for the work can be found below. Please feel free to contact me with any questions at x9245. September 10, 2024 GRIFFITH 1700 E. Main St. Griffith, IN 46319 Phone: (219) 924-5900 Fax (219) 924-8768 Line Item Line Item Quantity Unit Unit Price Cost 1 Mobilization/DeMobilization 1 LS 4,800.00 $4,800.00 2 Milling, Asphalt, 1.5 in.5480 SYS 4.50 $24,660.00 3 HMA Surface, Type B 452 TONS 138.00 $62,376.00 4 Asphalt for Tack Coat 3 TONS 1.00 $3.00 5 Joint Adhesive, Surface 3322 LFT 0.01 $33.22 6 Manhole Structure, Adjust 2 EA 1,400.00 $2,800.00 7 Line, Paint, Solid, White, 4 in.2648 LFT 0.45 $1,191.60 8 Line, Paint, Solid, Blue, 4 in.525 LFT 0.90 $472.50 9 Pavement Marking, Handicap Parking 11 EA 25.00 $275.00 TOTAL $96,611.32 FULL DEPTH ASPHALT PARKING LOT EXTENSION** 10 Mobilization/Demobilization 1 LS 2,900.00 $2,900.00 11 Excavation, Common 10 CYD 240.00 $2,400.00 12 No. 53 Compacted Agg. Base 12 TONS 220.00 $2,640.00 13 HMA Intermediate, Type B 5 TONS 800.00 $4,000.00 14 HMA Surface, Type B 3 TONS 138.00 $414.00 $12,354.00 **This does not include any additional costs due to added pavement markings. Please call if you have any questions. Thank You for your consideration. Ed Pilipow, P.E. 574-288-4811 office 574-274-5545 mobile epilipow@milestonelp.com Charles Black Center Milestone Contractors, L.P. SOUTH BEND 24358 SR 23 South Bend, IN 46614 Phone: (574) 288-4811 Fax (574) 289-7174 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 8/27/2024 Name Scott Kreeger Department Public Works BPW Date 9/10/2024 Phone Extension 9245 Required Prior to Submittal to Board BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Mickey Lovy Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Milestone Contractors, L.P. New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name 2024 Community Crossings Project Number 124-006 Funding Source Parks Bond Capital, Parks & Recreation Account No. 201-11-206-273-445003, 471-11-206-285-443001 Amount $108,965.32, 60 Days Terms of Contract Purpose/Description _Paving of the Charles Black Center parking lot__________ For Change Orders Only Amount of Increase Decrease $ 108,965.32 ($ ) Previous Amount $ $2,223,500 Current Percent of Change: Increase Decrease 5% ( %) New Amount $ 2,332,465.32 Total Percent of Change: Increase Decrease 5% ( %) Time Extension Amount: 60 New Completion Date: 10/30/2024