Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment No 3 to OEA - SBMF Demolition - Madison Lifestyle District – American Structurepoint, Inc.
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS August 13, 2024 Mr. Cash E. Canfield American Structurepoint, Inc. 9025 River Road, Suite 200 Indianapolis, IN 46240 ccanfield@structurepoint.com RE: Amendment No. 3 to Owner-Engineer Agreement Dear Mr. Canfield: At its August 13, 2024 meeting, the Board of Public Works approved the above referenced amendment for adding conceptual layout and schematic design for the South Bend Medical Foundation Demolition - Madison Lifestyle District, and New Parking, Project No. 123-076 in the amount of $155,740 with a new total adjusted amount of $629,250. Enclosed please find a copy of the amendment for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh Page 1 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. This is EXHIBIT K, consisting of 3 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated 02/13, 2024. AMENDMENT TO OWNER-ENGINEER AGREEMENT Amendment No. 3 1. Background Data: a. Effective Date of Owner-Engineer Agreement: 02/13/2024 b. Owner: Board of Public Works, City of South Bend, Indiana c. Engineer: American Structurepoint, Inc. d. Project: South Bend Medical Foundation / New Parking / Madison Lifestyle Dist. 2. Description of Modifications: a. Engineer shall perform or furnish the following Additional Services: 1) ADD Conceptual Layout for Madison Lifestyle District. Docusign Envelope ID: 55C657C5-A2A0-4025-8185-A71178A75441 Page 2 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 2) ADD Schematic Design for Madison Lifestyle District. 1. American Structurepoint would cover the Architecture, Interior Design, Structural (scope below) and Civil/Site (garage footprint only) with consultants handling MEP/FP (Millies Engineering Group – scope below) and Functional Parking (THA) a. Structural – Schematic Design: i. Participate in regularly scheduled design team meetings and/or work sessions, including a project kickoff meeting with design team members to coordinate the project requirements virtually or within 50 miles of American Structurepoint’s office ii. Perform a review of project specific design requirements iii. Prepare loading data and design criteria. iv. Review the recommendations from the project geotechnical investigation and coordinate review with the project geotechnical consultant (if available, otherwise scope moved to later phase) v. Work with Design-Assist Precast Manufacturer to develop pre-cast bid package vi. Provide a design deliverable at the conclusion of Schematic Design to convey the structural framing system for consideration by the project team. This deliverable will be comprised of a written Basis of Design and Structural Narrative supplemented with sketches or drawings as necessary. vii. Assist with cost estimate (if conducted) by coordinating the requirements of the Schematic Design Deliverable with the cost estimator and provide a review of the completed cost estimate. b. MEP/FP – Millies Engineering: b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: c. The responsibilities of Owner are modified as follows: Docusign Envelope ID: 55C657C5-A2A0-4025-8185-A71178A75441 Page 3 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. d. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: 1) Conceptual Layout:$27,000 2)Schematic Design:$128,740 e.The schedule for rendering services is modified as follows: f.Other portions of the Agreement (including previous amendments, if any) are modified as follows: 5. Agreement Summary (Reference only) a. Original Agreement amount:$329,040 b. Net change for prior amendments:$144,470 c. This amendment amount:$155,740 d. Adjusted Agreement amount:$629,250 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above-referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is 08/13/2024. OWNER: ENGINEER: By: By: Title: Title: Date Signed: Date Signed: Docusign Envelope ID: 55C657C5-A2A0-4025-8185-A71178A75441 7/30/2024 Cash E. Canfield President August 13, 2024 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 07/30/2024 Name Zach Hurst Department DPW BPW Date 08/13/2024 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name American Structurepoint New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name SBMF Demo / Madison Lifestyle District Project Number 123-076 Funding Source River West DA TIF Account No. PO-0029313 Amount This Change: $155,740; Revised Amount: $629,250 Terms of Contract Purpose/Description This amendment adds in conceptual layout and schematic design for the Madison Lifestyle District project. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: