HomeMy WebLinkAbout5A7 Budget Request (Amendment Bendix Dr Imp Lathrop to Voorde)_signedCITY OF SOUTHBEND
REDEVELOPMENT COMMISSION
Redevelopment Commission Agenda Item Pres/V-Pres
ATTEST: + ecretary
DATE: 1/11/2024
FROM: Leslie Biek, PE, Assistant City Engineer
Date: January 11, 2024
FK1 APPROVED ❑ Not Approved
SUBJECT: Amendment to design services for Bendix Ph 2 SOUTH BEND REDEVELOPMENT COMMISSION
Which TIF? (circle one fiver Wes River East: South Side; Douglas Road: West Washington
PURPOSE OF REQUEST: Amendment #1 to Bendix Dr Improvements (Lathrop to Voorde)
Specifics: The original agreement approved the work for around 60% completion of the design.
This was due to funding constraints and approval timing due to the federal fiscal year. This
agreement brings the design to 100% as needed to complete the design.
The project is expected to bid late 2026 with construction starting in 2027. The construction
limits are Bendix from Lathrop to Voorde. The project will continue the roadway reduction
from Ph 1, reducing the travel lanes from 4 to 3 (two through lanes with a center turn lane) and
adding a separated path on the east side.
INTERNAL USE ONLY: Project Code: PIN 121-047; PROJ 338
Total Amount new/change (inc/dec) in budget: $271,000 ; Break down:
Costs: Engineering Amt: $271,000 ; Other Prof Sery Amt
Acquisition of Land/Bldg (circle one) Amt: ; Street Const Amt
Building Imp Amt ; Sewers Amt ; Other (specify) Amt:
Going to BPW for Contracting?
Is this item ready to encumber now? Existing PO# 15848 Inc/Dec $
Y/ N