DATE: 4/8/2024
FROM: Chana Roschyk, Project Engineer
SUBJECT: 124-008 Leeper Ave Bridge Repairs
Which TIF? (circle one) River West; River East; South Side; Douglas Road; West Washington
PURPOSE OF REQUEST:
Request additional funding of $120,000 for the construction of the repairs for the Leeper Ave
Bridge.
Specifics:
The portion of the East Bank Trail that goes over the Leeper St. Bridge is currently closed
due to safety concerns for the bridge decking. This bridge is a critical part of the East
Bank Trail, which will remain impacted until the work is complete.
The initial Request of $300,000 on 1/11/24 was to design and replace in kind materials.
In lieu of replacing in kind timber decking, concrete decking was chosen for longevity. As
such, the concrete decking will require additional design and construction funds totaling
$120,000.00.
INTERNAL USE ONLY: Project Code: __ ____________ ________________;
Total Amount new/change ( inc/dec) in budget: _______; Break down:
Costs: Engineering Amt: ______________; Other Prof Serv Amt_________________;
Acquisition of Land/Bldg (circle one) Amt: ___________; Street Const Amt ________________;
Building Imp Amt_________; Sewers Amt_________; Other (specify) Amt: ________________
___________________________________________. Going to BPW for Contracting? Y/N
Is this item ready to encumber now? __ Existing PO#______ Inc/Dec $______
_________________________Pres/V-Pres
ATTEST: __________________Secretary
Date: _4.11.24___________________
APPROVED Not Approved
SOUTH BEND REDEVELOPMENT COMMISSION
X