Loading...
HomeMy WebLinkAbout5C1 Budget Request (Leeper Ave Bridge Repair)_signedRedevelopment Commission Agenda Item DATE: 4/8/2024 FROM: Chana Roschyk, Project Engineer SUBJECT: 124-008 Leeper Ave Bridge Repairs Which TIF? (circle one) River West; River East; South Side; Douglas Road; West Washington PURPOSE OF REQUEST: Request additional funding of $120,000 for the construction of the repairs for the Leeper Ave Bridge. Specifics: The portion of the East Bank Trail that goes over the Leeper St. Bridge is currently closed due to safety concerns for the bridge decking. This bridge is a critical part of the East Bank Trail, which will remain impacted until the work is complete. The initial Request of $300,000 on 1/11/24 was to design and replace in kind materials. In lieu of replacing in kind timber decking, concrete decking was chosen for longevity. As such, the concrete decking will require additional design and construction funds totaling $120,000.00. INTERNAL USE ONLY: Project Code: __ ____________ ________________; Total Amount new/change ( inc/dec) in budget: _______; Break down: Costs: Engineering Amt: ______________; Other Prof Serv Amt_________________; Acquisition of Land/Bldg (circle one) Amt: ___________; Street Const Amt ________________; Building Imp Amt_________; Sewers Amt_________; Other (specify) Amt: ________________ ___________________________________________. Going to BPW for Contracting? Y/N Is this item ready to encumber now? __ Existing PO#______ Inc/Dec $______ _________________________Pres/V-Pres ATTEST: __________________Secretary Date: _4.11.24___________________ APPROVED Not Approved SOUTH BEND REDEVELOPMENT COMMISSION X