HomeMy WebLinkAboutFinal Recommendation of Acceptance - Coal Line Trail IIB – INDOT & UCI Consultant ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS July 9, 2024 UCI Consultant 824 Lincolnway, Suite 3 LaPorte, IN 46350 cholth@usiconsultant.com INDOT LaPorte District 315 East Boyd Blvd. LaPorte, IN 46350 RE: Final Recommendation of Acceptance To Mr. Christopher Holth: At its July 9, 2024 meeting, the Board of Public Works approved the above referenced agreement for the report of contract final inspection and recommendation for acceptance for the Coal Line Trail, Phase IIB Project No. 122-035 in the amount of $3,508,535.51. Enclosed please find the original of the agreement for your signature. Please sign and return the original agreement to lhensley@southbendin.gov. Please retain a copy for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS TO: Board of Public Works FROM: Gemma Stanton, Project Engineer SUBJECT: Final Acceptance for Coal Line Trail Phase 2B DATE: 6/28/2024 Attached is the Recommendation of Acceptance for Phase 2B of the Coal Line Trail project. UCI served as construction inspector for this project and performed a pre-final inspection with the contractor and with Engineering. Engineering recommends acceptance of this project. Thank you for your consideration of this request. Please call with your questions at extension 9083. 12/08/2023 10/09/2023 Contract B -44292 Date Construction Substantially Completed: 12/08/2023 (The contract is sufficiently completed so that it can be used for its intended purpose.) All Contract Work Complete Date Pre-Final Inspection made by on Date Punch List Items Completed: Sod Maintenance Expired on : Final Inspection made by: on and all work was found to be satisfactory from Station to Date Construction Signs and Temporary Traffic Control Devices Removed: Pavement Markings (have) (have not) been placed in accordance with the IMUTCD manual or as directed by the District Traffic Engineer. Right-of-Way (is) (is not) clear of all encroachments. Date of Last Work:12/08/2023 12/06/2023 12/08/2023 10/13/2023 00/00/0000Date Failed Material Replaced: and all work was found to be satisfactory from Station Pre-Final Inspection made by on 12/06/2023 Date Punch List Items Completed:12/08/2023 Sod Maintenance Expired on :10/09/2023 00/00/0000Date Failed Material Replaced: Final Inspection made by: on 12/08/2023 (The date all items were complete, except punchlist and removal of traffic control devices.) 12/08/2023 Report of Contract Final Inspection and Indiana Department Of Transportation SMIC 639 Recommendation for Acceptance RECOMMEND ACCEPTANCE DISTRICT CONSTRUCTION ENGINEER LOCAL PUBLIC AGENCY *County or City signatures when required (at least two). * By: * By: * By: Chris Holth, Carl Tungate, Jeremy Zalas, Adam Schell, Justin Sherman, Kyle Ludlow N/A July 9, 2024 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 6/28/2024 Name Gemma Stanton Department PW BPW Date 7/9/2024 Phone Extension 9083 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 16 and Final Traffic Control Resolution Other: Final acceptance Ease./Encroach Required Information Company or Vendor Name INDOT (Contractor is Milestone) New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Coal Line Trail Ph 2B Project Number 122-035, PROJ 18, DES#2200199 Funding Source 324-444000 Account No. PO-25244 Amount $3,508,535.51 Terms of Contract Purpose/Description Final acceptance. For Change Orders Only Amount of Increase Decrease ($ ) Previous Amount Current Percent of Change: Increase Decrease ( %) New Amount Total Percent of Change: Increase Decrease ( %) Time Extension Amount: New Completion Date: