July 9, 2024
Ms. Amy E. Smitley, PE
Arcadis U.S., Inc.
150 W. Market St., Suite 728
Indianapolis, IN 46204
Amy.smitley@arcadis.com
RE: Amendment No. 1 to Professional Services Agreement
Dear Ms. Smitley:
At its July 9, 2024 meeting, the Board of Public Works approved the above referenced
amendment to develop engineering plans for the hydraulic improvements at the Wastewater
Treatment Plant, upsizing the secondary clarifier and the primary effluent channel expansion,
Project No. 119-069 in the amount of $130,220.
Enclosed please find a copy of the amendment for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/lh
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 07-01-2024
Name: Jacob M. Klosinski Department of Public Works – Engineering Division
BPW Date: 07-09-2024 Phone Extension: 9496
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney Attorney Name Michael Schmidt
Purchasing Mickey Lovy / Ron O'Connor
Check the Appropriate Item Type –Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Arcadis US Inc (V-00000135)
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name WWTP Secondary and Disinfection Improvements
Project Number 119-069 (PO-0000413)
Funding Source Wastewater Capital
Account No. Fund 642
Amount $130,220
Terms of Contract Lum Sum Fee (Task List included Amendment No. 2, attached)
Special Contract Provisions
Purpose/Description The Division of Engineering and Wastewater requests the Board of Public
Works approval of Amendment No. 2 to a professional services agreement
with Arcadis US Inc to develop engineering plans for hydraulic improvements
at the Wastewater Treatment Plant, upsizing Secondary Clarifier influent
piping and Primary effluent channel expansion (Long Term Control Plan
improvement).
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
(%)
New Amount $
Total Percent of Change:
Increase
Decrease
%
(%)
Time Extension Amount:
New Completion Date:
INTER-OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Members of the Board of Public Works
Michael Schmidt, Assistant City Attorney Public Works
Theresa Heffner, Clerk of Board of Public Works
FROM: Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: Agenda Request – Amendment to Professional Services Agreement
119-069 WWTP Secondary and Disinfection Improvements
Amendment No. 2 (PO-0000413)
DATE: July 1, 2024
The Division of Engineering and Division of Wastewater request the Board of Public Works
approval of an Amendment to a Professional Services Agreement with Arcadis US, Inc. for
additional engineering services related to hydraulic improvements at the Wastewater Treatment
Plant.
Project Background
In conjunction with Long Term Control Plan and Consent Decree objectives as well as the
hydraulic analysis from the 2013 Wastewater Treatment Plant Facilities Plan, the scope of work
for this Amendment addresses Primary Clarifier and Secondary Treatment hydraulic
improvements to convey 100 MGD wet weather flows through Secondary Treatment.
Item 1: Primary Clarifier Effluent Channel Improvements
This work includes the expansion of the effluent channel Parshall flumes and removes an
existing, non-functional flow meter that has created a restriction in the Primary effluent piping.
Item 2: Upsizing Secondary Clarifier Influent Pipe to Final Clarifier 6 & Final Clarifier 7
This work includes the replacement of a 66-inch diameter pipe with an 84-inch diameter pipe as
well as structural improvements to junction chambers to carry flow from the Final Clarifier
Influent Channel at the Aeration Gallery to Final Clarifier 6 and Final Clarifier 7.
The contract amounts will change as follows:
Original agreement amount: $793,770.00
Net change for prior amendments: $175,100.00
Amendment No. 2 amount: $130,200.00
Adjusted agreement amount: $1,099,090.00
This project is funded through Wastewater Capital Account: 641-06-605-514-431002.
For questions regarding the subject agenda request, contact Jacob M. Klosinski, P.E. (Ext.
9496) at the Division of Engineering.
https://arcadiso365.sharepoint.com/teams/SouthBendWWTPSecondaryDisinfectionImprovements/Shared Documents/PM/Amendment 2/SB WWTP Hydraulic
Improvements_Amendment No. 2 Ltr.docx
Arcadis U.S., Inc.
150 W. Market Street
Suite 728
Indianapolis
Indiana 46204
Tel 317 231 6500
Fax 317 231 6514
www.arcadis.com
Page:
1/1
Jacob Klosinski
Assistant City Engineer
City of South Bend
1316 County-City Building
227 West Jefferson Boulevard
South Bend, IN 46601
Subject:
Project 119-069 WWTP Secondary and Disinfection Improvements
Amendment No. 2, Hydraulic Improvements Design and CA
Dear Jacob:
Enclosed are signed copies of Amendment No. 2 for Professional Services
associated with the additional design and construction administration (CA)
engineering services for WWTP Hydraulic Improvements, as part of the 119-069
WWTP Secondary and Disinfection Improvements project. If the Amendment is
acceptable to the Board, please return one fully executed copy for our files.
Sincerely,
Arcadis U.S., Inc.
Amy Smitley, PE Ben Burroughs, PE
Vice President Project Manager
Date:
July 8, 2024
Contact:
Ben Burroughs
Phone:
317-236-2839
Email:
benjamin.burroughs@arcadis.com
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 1 of 7
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 2
119-069 WWTP Secondary and Disinfection Improvements Amendment No. 2
An Agreement was executed on July 23, 2019 between the City of South Bend, Indiana [Client], having its principal place of
business at 1316 County-City Building, 227 West Jefferson Boulevard, South Bend, Indiana 46601, and Arcadis U.S., Inc.
[Arcadis], having its principal place of business at 630 Plaza Drive, Highlands Ranch, Colorado 80129 and having an office at
55 Monument Circle, Suite 300B, Indianapolis, Indiana 46204.
Under the Agreement, Arcadis provides certain professional engineering services related to design, bid and construction
administration engineering services for Final Clarifier Nos. 1 through 5 rehabilitation, Aeration Tank Nos. 1 through 4
modifications and effluent disinfection chemical expansion.
Client and Arcadis now desire to amend the Agreement to include the amended Services as described below.
In consideration of the mutual promises in the Agreement, Client and Arcadis agree to amend the Agreement as the following:
1.Schedule A-1,Scope of Amended Services.
2.Schedule B-1,Compensation for Amended Services.
Other Provisions. Except as amended herein, all other provisions, terms and conditions in the Agreement shall remain in full
force and effect.
Execution Authority. This Amendment to the Agreement is a valid and authorized undertaking of Client and Arcadis. The
representatives of Client and Arcadis who have signed below have been authorized to do so.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment to the Agreement as of this date:
_______________, 2024.
CITY OF SOUTH BEND Arcadis U.S., Inc.
By: ___________________________________
Title: Vice President
July 9,
July 9, 2024
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 2 of 7
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 2
119-069 WWTP Secondary and Disinfection Improvements Amendment No. 2
Schedule A-1
Scope of Amended Services and Related Matters
ENGINEERING SERVICES BY ARCADIS
WWTP Hydraulic Improvements. The City of South Bend desires to continue its efforts to rehabilitate, modify and
expand the WWTP to work towards achieving the CSO Long-Term Control Plan requirement, which requires an increase
in the peak wet weather capacity from 77 MGD to 100 MGD.
The South Bend WWTP is a Class IV activated sludge treatment facility required to provide preliminary treatment, primary
and secondary treatment, phosphorous removal, and disinfection throughout all seasons. The NPDES permit lists a rated
average flow of 48 MGD and a rated peak flow of 77 MGD. The plant’s current average flow is approximately 36 MGD
and it can treat a peak flow up to 77 MGD. Liquid treatment processes include screening, grit removal, raw sewage
pumping, primary treatment, activated sludge, final clarifiers, and chlorination / dechlorination. Sludge treatment
processes include gravity thickening of primary sludge, dissolved air floatation thickening of waste activated sludge, two-
stage anaerobic digestion, and belt filter press dewatering. Class B biosolids are reused by land application on farmland.
As part of Arcadis’ prior planning projects, a hydraulic model was created for the plant and used to model different flow
conditions through each process at the plant to achieve the plant’s future 100 MGD peak flow requirement as part of the
CSO Long-Term Control Plan. The hydraulic model was calibrated using recorded plant flows and water surface
elevations around the plant. Limiting hydraulic elements, also called bottlenecks, were identified and analyzed further
under peak flow and other hydraulic conditions. The City has addressed all bottlenecks except two major areas require
hydraulic improvements at the WWTP to achieve the future 100 MGD flow: (1) Primary Effluent and (2) Final Clarifier Nos.
6 and 7 Influent, as further described below. In addition, there are abandoned structures within these areas that may be
demolished.
Primary Effluent Hydraulic Improvements. The preliminary and primary treatment process consists of the headworks
facility (screening, grit removal), raw sewage pumping and the primary clarifiers. After the plant flow leaves the
headworks, the raw sewage pumps (located in the Compressor Building) pump flow into the primary influent channel
which discharges into eight primary clarifiers. The flow from each individual primary clarifier goes into a common primary
effluent conduit and the common primary effluent conduit is a hydraulic bottleneck.
The primary clarifier effluent conduit restricts flow leaving the primary clarifiers such that at flows equal to or greater than
approximately 65 MGD, the primary clarifier effluent flumes are submerged. At 100 MGD flow, the model predicts that this
bottleneck results in no freeboard in the primary clarifiers. Modifying the effluent conduit and primary clarifier effluent
Parshall flumes would alleviate this bottleneck. The abandoned in place 48-inch primary effluent meter has also been
identified as a hydraulic bottleneck in the primary effluent piping.
The following is proposed to alleviate the primary effluent bottleneck. A new open channel located parallel to the existing
primary effluent conduit along Primary Clarifier Nos. 1 through 4 only, north of the Primary Scum Building, and utilizing the
abandoned east-west bypass channel located above the primary effluent conduit is recommended. The new channel and
the existing conduit will flow into the existing east-west conduit and into the re-utilized abandoned bypass channel. Flow
from the bypass channel will flow into the primary effluent structure, similar to the existing primary effluent conduit, by
removing the bypass channel gates and demolishing a portion of the primary effluent structure wall. With all primary
clarifiers in service (with a return sludge flow of 72 MGD and all other tanks in service), these improvements will un-
submerge the weirs up to 80 MGD and the flumes up to 100 MGD and provide approximately 12-inches of freeboard in
the primary clarifiers up to 100 MGD. The abandoned in place 48-inch primary effluent meter and 48”x72” reducers will be
replaced with 72-inch pipe.
Final Clarifier Nos. 6 and 7 Influent Hydraulic Improvements. The Final Clarifier Nos. 6 and 7 influent pipe was
identified as another plant hydraulic bottleneck. The 60-inch pipe located between the south end of the Final Clarifier
Influent Channel and Junction Box NT1 that feeds Final Clarifier Nos. 6 and 7 is the source of the hydraulic bottleneck
under peak flow conditions. At the current peak capacity of 77 MGD and at the FEMA 100-year flood elevation, the 60-
inch pipe has inadequate flow capacity and can cause flow overtopping upstream within the plant. This pipe segment has
been modeled to show inadequate capacity at the future peak flow of 100 MGD under normal river conditions.
Replacing the existing 60-inch pipe with a larger size pipe would alleviate this hydraulic bottleneck. As part of the prior
planning, upsizing the existing 60-inch pipe in the segment indicated above to 84-inch pipe is recommended. However,
another alternative for consideration is instead to provide a new channel from the south end of the Final Clarifier Influent
Channel to Junction Box NT1 or potentially to Junction Box NT. This would require channel mixing. The benefits include
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 3 of 7
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 2
119-069 WWTP Secondary and Disinfection Improvements Amendment No. 2
less dewatering during construction and an open channel for visual inspection. The pipe and channel alternatives for this
segment will be evaluated at a high-level.
Miscellaneous Demolition Near Hydraulic Improvements. An abandoned concrete pad east of the primary clarifiers and
north of the Primary Scum Building will be demolished. The existing Parshall flumes will be evaluated during preliminary design
if modification of the flumes is cost effective when the primary effluent hydraulic improvements are constructed.
Arcadis will prepare design drawings and specifications as a supplement to the Final Clarifier Nos. 1-3 Improvements project,
which is being delivered through a Guaranteed Savings Contract between the City and Bowen Engineering. The City will
coordinate with Bowen Engineering to provide associated construction cost estimates for this project. Arcadis will also perform
construction administration services. The City will perform construction inspection. A SharePoint site will be established for use
during design.
The scope of engineering services shall include the following:
1. Project Management. Provide project management including scope, budget and schedule control; project coordination;
maintenance of records; project setup, invoicing, and close-out.
2. Kick-off and Design Review Meetings. Meet with the City to kick-off the project including a site visit to perform initial
above-ground field investigations. Meet in-person with the City monthly to share progress, resolve outstanding items,
perform additional field needs, and review deliverables and design progress for 60% and final designs. In addition to these
in-person meetings, up to four conference calls are included.
3. Survey. A survey may be required during design for key spot elevations. Any survey will be provided via subcontract
services. A $5,000 allowance, currently not included in the fee pricing, shall be added if survey is needed.
4. Basis of Design. Conduct a preliminary design including the following tasks.
a. During the kick-off meeting, inspect the abandoned primary effluent channel from the surface to determine structural
rehabilitation needs of the channel for future use.
b. Confirm hydraulics to determine extent of hydraulic improvements.
c. Confirm structural needs including rehabilitation for all areas.
d. Obtain manufacturers’ cut sheets including materials of construction, cost quotes, delivery schedules, and
dimensions from vendors for piping and equipment.
e. Develop preliminary requirements for construction phasing and for coordination with Owner’s operations including
allowable pipe/tank shutdowns and scheduling.
f. Perform a constructability review of the design at this time.
g. Develop preliminary engineer’s opinion of probable construction costs.
h. Prepare preliminary drawings and major equipment specifications.
i. Summarize the above tasks in a Basis of Design Meeting.
5. Construction Drawings. Prepare detailed drawings to supplement the Final Clarifier Nos. 1-3 Improvements drawings to
show the general scope, extent and character of the work to be furnished and performed by Contractor. The plans will show
civil piping configuration and layout, structural components and detail. Record drawings will be recreated in AutoCAD for use
as the base sheets.
6. Specifications. Prepare specifications to supplement the Final Clarifier Nos. 1-3 Improvements project manual. The
technical specifications will be prepared in conformance with the fifty-division format of the Construction Specifications
Institute.
7. Industrial Treatment Evaluation. Arcadis evaluated digestion alternatives for providing treatment to a potential industrial
user’s discharge that was proposing to discharge high loads of BOD to the South Bend WWTP. Alternative evaluations
included: (1) evaluating the treatment capacity of the existing processes at the South Bend WWTP to treat higher BOD loads
and (2) sizing and providing a high-level construction cost estimates of a remote digester facility to treat proposed BOD loads
from a new industrial discharger.
8. Construction Schedule. Prepare construction schedule establishing advertisement dates, bid opening, notice-to-proceed,
and critical milestone dates for each design deliverable.
9. Guaranteed Maximum Price Assistance. Assist the City in reviewing the guaranteed maximum price.
Upon successful completion of the design phase, the following construction services apply.
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 4 of 7
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 2
119-069 WWTP Secondary and Disinfection Improvements Amendment No. 2
10. General Administration of Construction Contract. Consult with Owner and act as Owner’s representative as provided
in the Construction Contract. The extent and limitations of the duties, responsibilities, and authority of Engineer as
assigned in the Construction Contract shall not be modified, except as Engineer may otherwise agree in writing. All of
Owner’s instructions to Contractor will be issued through Engineer, which shall have authority to act on behalf of Owner in
dealings with Contractor to the extent provided in this Agreement and the Construction Contract except as otherwise
provided in writing.
11. Pre-Construction Conference. Participate in a Pre-Construction Conference prior to commencement of Work at the Site.
The conference will be attended by Engineer.
12. Schedules. Receive, review, and determine the acceptability of schedules that Contractor is required to submit to
Engineer, including the Progress Schedule, Schedule of Submittals, and Schedule of Values.
13. Visits to Site and Observation of Construction. In connection with observations of Contractor’s Work while it is in
progress:
• Make visits to the Site at intervals appropriate to the various stages of construction, as Engineer deems necessary, to
observe as an experienced and qualified design professional the progress of Contractor’s executed Work. Such visits
and observations by Engineer are not intended to be exhaustive or to extend to every aspect of Contractor’s Work in
progress or to involve detailed inspections of Contractor’s Work in progress beyond the responsibilities specifically
assigned to Engineer in this Agreement and the Contract Documents, but rather are to be limited to spot checking,
selective sampling, and similar methods of general observation of the Work based on Engineer’s exercise of
professional judgment, as assisted by the Owner’s Resident Project Representative. Based on information obtained
during such visits and observations, Engineer will determine in general if the Work is proceeding in accordance with
the Contract Documents, and Engineer shall keep Owner informed of the progress of the Work. Engineer will visit the
Site on the same day of each construction progress meeting. The scope of these engineering services is based on up
to 10 months of construction progress meetings.
• The purpose of Engineer’s visits to the Site will be to enable Engineer to better carry out the duties and responsibilities
assigned to and undertaken by Engineer during the Construction Phase, and, in addition, by the exercise of
Engineer’s efforts as an experienced and qualified design professional, to provide for Owner a greater degree of
confidence that the completed Work will conform in general to the Contract Documents and that Contractor has
implemented and maintained the integrity of the design concept of the completed Project as a functioning whole as
indicated in the Contract Documents. Engineer shall not, during such visits or as a result of such observations of
Contractor’s Work in progress, supervise, direct, or have control over Contractor’s Work, nor shall Engineer have
authority over or responsibility for the means, methods, techniques, sequences, or procedures of construction selected
or used by Contractor, for security or safety at the Site, for safety precautions and programs incident to Contractor’s
Work, nor for any failure of Contractor to comply with Laws and Regulations applicable to Contractor’s furnishing and
performing the Work. Accordingly, Engineer neither guarantees the performance of any Contractor nor assumes
responsibility for any Contractor’s failure to furnish or perform the Work in accordance with the Contract Documents.
14. Defective Work. Reject Work if, on the basis of Engineer’s observations, Engineer believes that such Work (a) is
defective under the standards set forth in the Contract Documents, (b) will not produce a completed Project that conforms
to the Contract Documents, or (c) will imperil the integrity of the design concept of the completed Project as a functioning
whole as indicated by the Contract Documents.
15. Clarifications and Interpretations; Field Orders. Issue necessary clarifications and interpretations of the Contract
Documents as appropriate to the orderly completion of Contractor’s work. Such clarifications and interpretations will be
consistent with the intent of and reasonably inferable from the Contract Documents. Subject to any limitations in the
Contract Documents, Engineer may issue field orders authorizing minor variations in the Work from the requirements of
the Contract Documents. Coordinate a tracking log for clarifications and interpretations as part of the electronic data
information system developed by Engineer.
16. Change Orders and Work Change Directives. Recommend change orders and work change directives to Owner, as
appropriate, and prepare change orders and work change directives as required.
17. Shop Drawings and Samples. Review and approve or take other appropriate action in respect to Shop Drawings and
Samples and other data which Contractor is required to submit, but only for conformance with the information given in the
Contract Documents and compatibility with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. Such reviews and approvals or other action will not extend to means, methods,
techniques, sequences, or procedures of construction or to safety precautions and programs incident thereto. Engineer
shall meet any Contractor’s submittal schedule that Engineer has accepted. Coordinate a tracking log for submittals as
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 5 of 7
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 2
119-069 WWTP Secondary and Disinfection Improvements Amendment No. 2
part of the electronic data information system developed by Engineer.
18. Substitutes and “or-equal” Requests. Review the Contractor’s requests for product substitutions and “or equal”;
Engineer will separately track the time and expense required for such reviews and invoice the Client for such reviews as
Additional Services.
19. Inspections and Tests. The Owner’s Resident Project Representative will require such special inspections or tests of
Contractor’s work as deemed reasonably necessary, and receive and review all certificates of inspections, tests, and
approvals required by Laws and Regulations or the Contract Documents. Any review by Engineer of such certificates will
be for the purpose of determining that the results certified indicate compliance with the Contract Documents and will not
constitute an independent evaluation that the content or procedures of such inspections, tests, or approvals comply with
the requirements of the Contract Documents. Engineer shall be entitled to rely on the results of such tests.
20. Change Proposals and Claims. (a) Review and respond to Change Proposals. Review each duly submitted Change
Proposal from Contractor and, within 30 days after receipt of the Contractor’s supporting data, either deny the Change
Proposal in whole, approve it in whole, or deny it in part and approve it in part. Such actions shall be in writing, with a
copy provided to Owner and Contractor. If the Change Proposal does not involve the design (as set forth in the Drawings,
Specifications, or otherwise), the acceptability of the Work, or other engineering or technical matters, then Engineer will
notify the parties that the Engineer will not resolve the Change Proposal. (b) Provide information or data to Owner
regarding engineering or technical matters pertaining to Claims.
21. Contractor’s Completion Documents. Receive, review, and transmit to Owner maintenance and operating instructions,
schedules, guarantees, bonds, certificates or other evidence of insurance required by the Contract Documents, certificates
of inspection, tests and approvals, Shop Drawings, Samples and other data approved, and transmit the annotated record
documents which are to be assembled by Contractor in accordance with the Contract Documents to obtain final payment.
22. Substantial Completion. Promptly after notice from Contractor that Contractor considers the entire Work ready for its
intended use, in company with Owner and Contractor, visit the Project to determine if the Work is substantially complete. If
after considering any objections of Owner, Engineer considers the Work substantially complete, Engineer shall deliver a
certificate of Substantial Completion to Owner and Contractor.
22. Record Drawings. Prepare Record Drawings showing appropriate record information based on Project annotated record
documents received from Contractor and furnishing such Record Drawings to Owner. A hard copy (full size drawings) and
electronic copy (in AutoCAD and pdf file format) will be submitted to the Owner. AutoCAD version shall be based on the
Owner’s standards.
23. Final Notice of Acceptability of the Work. Conduct a final visit to the Project to determine if the completed Work of
Contractor is acceptable so that Engineer may recommend, in writing, final payment to Contractor. Accompanying the
recommendation for final payment, Engineer shall also provide a notice in the form attached hereto as Exhibit E (the
“Notice of Acceptability of Work”) that the Work is acceptable to the best of Engineer’s knowledge, information, and belief
and based on the extent of the services provided by Engineer under this Agreement. The scope of these engineering
services is based on the final visit conducted during the regular progress meeting.
DELIVERABLES
This project includes the following deliverables.
1. Preliminary (60%) Design. This submittal includes documents that communicate the results of the preliminary design
and establishes the scope of the construction work.
Preliminary drawings showing layouts
Preliminary construction phasing
Technical specifications
Preliminary construction schedule
2. Final Design Submittal. This submittal includes documents that communicate the detailed design approach and
intent of all disciplines.
Design drawings showing required demolitions, layouts, structural details as a supplement to the Final Clarifier 1-3
Improvement Drawings
Project specifications: technical specifications as a supplement to the Final Clarifier 1-3 Improvement Project
Manual
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 6 of 7
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 2
119-069 WWTP Secondary and Disinfection Improvements Amendment No. 2
Opinion of probable construction cost
Preliminary construction schedule
One electronic copy (pdf, searchable format)
Schedule
Arcadis is prepared to begin work immediately upon written authorization to proceed, which is anticipated to be no later
than July 2024. Design services shall be completed in sufficient time for the City to get a GMP from the guaranteed
savings provider and within three months from notice-to-proceed. This assumes the City will provide comments on
design deliverables within two weeks. It is anticipated construction will be completed within a 10-month period.
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 7 of 7
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 2
119-069 WWTP Secondary and Disinfection Improvements Amendment No. 2
Schedule B-1
Amended Pricing Schedule
The estimated budget for services under this Amendment No. 2 is indicated below and as estimated in the attached table.
The overall limit of compensation under this Agreement is as follows:
Original Agreement $793,770
Amendment No. 1 $175,100
Amendment No. 2 $130,220
Overall Limit of Compensation $1,099,090
Hourly rates for services performed for this amended scope of work are as follows:
Category Hourly Rate
Project/Program Director $313
Principal Engineer/Scientist/Architect II $286
Principal Engineer/Scientist/Architect I $254
Senior Engineer/Scientist/Architect II $196
Senior Engineer/ Scientist/Architect I $180
Project Engineer/ Scientist/Architect $170
Staff Engineer/Scientist/Architect $159
Engineer/Scientist $138
Technician/Project Assistant IV $170
Technician/Project Assistant III $142
Technician/Project Assistant II $127
Technician/Project Assistant I $117
Design Tech / Field Technician $71
Amy Smitley(Technical Advisor)John Huston (QAQC)Ben Burroughs(Project Manager)Brett Schnur(Engineer)Joe Bartos(Engineer)Matt Hemmelgarn(Structural Engineer)Matt Palte(Structural Engineer)CAD DrafterShelly Baxter(Assistant)SubconsultantTOTAL LABOR
TASK DESCRIPTION HOURS COST EXPENSES TOTAL
PM Project Management 4 16 26 46 7,980 7,980
1. Basis of Design 4 2 18 24 8 16 4 40 116 14,680 400 15,080
2. 60% Design 8 2 28 76 16 28 8 80 246 30,620 30,620
3. Final Design 8 2 24 40 8 24 8 80 194 22,660 22,660
4. General Construction Administration 4 4 20 40 8 12 8 96 15,980 400 16,380
5. Meetings and Inspections 4 24 16 4 16 64 11,390 982 12,372
6. Submittals 8 24 4 16 4 56 9,230 9,230
7. Record Drawings 2 8 16 8 40 74 6,610 300 6,910
8 Allowance No. 1: Survey Allowance 5,000 5,000
9 Industrial Treatment Evaluations 5 13 18 3,980 3,980
TOTAL ESTIMATED HOURS 37 12 159 236 48 120 24 240 34 910 128,130
HOURLY RATES $286 $196 $196 $138 $196 $159 $254 $29 $142
TOTAL 10,582$ 2,352$ 31,164$ 32,568$ 9,408$ 19,080$ 6,096$ 7,018$ 4,828$ 128,130$ 2,082$ 130,220$
ESTIMATED NOT-TO-EXCEED COMPENSATION:130,220$
Estimated Compensation - ARCADIS U.S., Inc.
07/08/24
CITY OF SOUTH BEND
WWTP Hydraulic Improvements Design and Construction Services
DIVISION OF ENVIRONMENTAL SERVICES
Wastewater Treatment Plant