Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment No 1 to OEA - SBFD Central Fire Proj No. 124-032 – WDi Architecture, Inc.
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS July 9, 2024 Ms. Daryl William-Dotson WDi Architecture, Inc. 15 W. 28th St. Indianapolis, IN 46208 daryl_wd@wdiarchitecture.com RE: Amendment No. 1 to Owner-Engineer Agreement Dear Ms. William-Dotson: At its July 9, 2024 meeting, the Board of Public Works approved the above referenced amendment for adding nuclear testing to determine the amount of saturated insulation for the SBFD Central Fire Station Roof Replacement, Project No. 124-032 in the amount of $4,600 with a new adjusted total of $49,800. Enclosed please find the original of the amendment for your signature. Please sign and return the original amendment to lhensley@southbendin.gov. Please retain a copy for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh Page 1 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. This is EXHIBIT K, consisting of three (3) pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated May 14, 2024. AMENDMENT TO OWNER-ENGINEER AGREEMENT Amendment No. 1 1. Background Data: a. Effective Date of Owner-Engineer Agreement: May 14, 2024 b. Owner: Board of Public Works, City of South Bend c. Engineer: WDi Architecture, Inc. d. Project: 124-032 SBFD Central Roof Replacement (Task 1) 2. Description of Modifications: a. Engineer shall perform or furnish the following Additional Services: 1) ADD nuclear analysis of existing insulation to Task 1 (South Bend Fire Department Central Station Roof Replacement). b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: c. The responsibilities of Owner are modified as follows: d. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: 1) $4,600 for nuclear analysis of existing insulation. e. The schedule for rendering services is modified as follows: f. Other portions of the Agreement (including previous amendments, if any) are modified as follows: 5. Agreement Summary (Reference only) a. Original Agreement amount: $45,200 b. Net change for prior amendments: $__________________ c. This amendment amount: $4,600 d. Adjusted Agreement amount: $49,800 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Page 2 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. Owner and Engineer hereby agree to modify the above-referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is July 9, 2024. OWNER: ENGINEER: By: By: Title: Title: Date Signed: Date Signed: July 9, 2024 Department of Public Works City of South Bend 227 W. Jefferson Blvd., Ste. 1316 South Bend, IN 46601 Attn: Lidya Abreha Project Engineer — Division of Engineering We are requesting authorization to incur additional reimbursable expenses beyond those outlined in our initial proposal. The additional expenses include a fee of approximately $4,000.00 for conducting a non-destructive nuclear analysis of the existing roofing system at the Central Fire Station plus our normal 15% service charge for a total of approximately $4,600.00. Thank you for your consideration, Ms. Daryl William-Dotson AIA ULI IIDA - Authorized Representative WDi Architecture, Inc. | daryl_wd@wdiarchitecture.com | 317 251 6172 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 07/02/2024 Name Lidya Abreha Department Public Works BPW Date 07/09/2024 Phone Extension 5961 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Mickey Lovy Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name WDi Architecture, Inc. New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name SBFD Central Fire Station Roof Replacement (task 1) Project Number 124-032 Funding Source Fire Departmental Capital Account No. PO-0031387 Amount Change: $4,600; Revised Amount: $49,800 Terms of Contract Purpose/Description Add nuclear testing to determine amount of saturated insulation. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: