Loading...
HomeMy WebLinkAboutRejection of Bids & Title Sheet - East Bank Trail Over Leeper Ave. Deck Replacement Proj No. 124-008 - TABLEDWe deliver services that empower everyone to thrive!! CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Board of Public Works Members FROM: Chana Roschyk, Project Engineer SUBJECT: Agenda Request – Reject Bids and Re-Advertise 124-008 Leeper Ave Bridge Repairs Concrete Decking; PR- 00033344 DATE: July 9, 2024 On June 25, 2024, the Board of Public Works received, opened and entered into the record public bids for Project No. 124-008 Leeper Ave Bridge Repairs Concrete Decking. Two bids were received. One bid from Milestone Contractors, L.P. for a base bid total of $486,328.10 and an alternate bid total of $43,795.20; and one bid from LaPorte Construction Co.,inc. for a base bid of $578,627.20 and an alternate bid total of $46,920.00. After reviewing the bids, the Division of Engineering recommends that the Board of Public Works reject the bids received for the subject project since the bids received exceeded the available budget for the project. In addition, The Division of Engineering would like to re-advertise with a revised Bid Package. For questions regarding the above recommendation or the subject project, contact Chana Roschyk (Ext. 5922) at the Division of Engineering. sdias 4/26/2024 ' PROJECT □SEWER □WATER □TRAFFIC □STREET ■OTHER WESTERN AVE. � rt,"J 5.i•� EWING VJ ::.::: � IRELAND � ST. ��VJ :3§ � ROAD PROJECT LOCATION McKINLEY HWY. BLVD. � ::; ::J i3 CITY OF SOUTH BEND, IN DIANA PREVAILING SPECIFICATIONS LATEST EDITION, AND IN DIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS DATED 2024 TO BE USED WITH THESE PLANS. 5:12:35 PM P:\2021\01526\D. Drawings\2021.01526.BR.0002.COVER SHEET.dgn PROJECT NUMBER: 124-008 MAY, 2024 BOARD OF PUBLIC WORKS ELIZABETH A. MARADIK PRESIDENT DATE JOSEPH R. MOLNAR VICE PRESIDENT DATE JORDAN V. GATHERS MEMBER DATE GARY A. GILOT MEMBER DATE MURRAY L. MILLER MEMBER DATE THERESA HEFFNER CLERK DATE TABLE OF CONTENTS SHEET 1 COVER SHEET SHEET 2 UTILITIES AN D GENERAL NOTES SHEET 3 DETOUR PLAN SHEET 5-6 GENERAL PLAN SHEET 7 FRAMING PLAN SHEET 8-11 SUPER STRUCTURE DETAILS SHEET 4 LAYOUT PLANS PREPARED BY: AMERICAN •• • 0. •• ■ STRUCTURE POINT INC. SHEET 12 BR IDGE SUMMAR Y OF QUANTITIES 9025 RIVER ROAD, SUITE 200 INDIANAPOLIS, IN 46240 TEL 317.647.6680 FAX 317.543.0270 www.structurepoint.com PLANS PREPARED FOR: CI TY OF SOU TH BEND ENGINEERING DIVISION 1316 COUNTY-CITY BUILDING SOU TH BEND, IN 46601 RECOMMENDATIONS OF CITY STAFF Chana Roschyk CITY ENGINEER Kyle Ludlow CONSTRUCTION MANAGER STANDARD DRAWINGS CERTIFIED BY: -----------...,,.,.=-I DATE APPROVED FOR BIDDING: CITY OF SOUTH BEND DATE DATE DATE DATE DATE DATE SHEETS 1 OF 13 Project Engineeer KARA M. BOYLES, PHO, PE 5/6/24 5/6/2024 5/14/2024 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 7/3/24 Name: Chana Roschyk Department of Public Works – Engineering Division BPW Date: July 9, 2024 Phone Extension: 5922 Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name Darius Lipsey BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Leeper Avenue Bridge Repairs Project Number 124-008 DFO: PROJ00000521 : Leeper Avenue Bridge Repairs Concrete Decking Funding Source Fund 429 Account No. PR:00033344 Amount Terms of Contract Purpose/Description Request that the Board of Public Works reject the bids and provide approval to rebid the subject project. Two bids were received and two bids were above the engineer’s estimate and City budget for the work. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: X X