Loading...
HomeMy WebLinkAboutChange Order No 5 - Fire Station No. 8 Replacement Proj No. 122-034 - R Yoder Construction ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS June 25, 2024 Mr. Brad Yoder R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, IN 46550 shelly@ryoderconstruction.com RE: Change Order No. 5 – Fire Station No. 8 Replacement – Project No. 122-034 Dear Mr. Yoder: At its June 25, 2024 meeting, the Board of Public Works approved the above referenced Change Order be increased by $61,506, bringing the revised contract amount to $4,054,728.70. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: CONTRACTOR RECOMMENDED FOR APPROVAL 6/25/2024 122-034 Fire Station No. 8 Replacement 9/12/2023 5 PCR #28-Deduct Garden Shed Power from Project PCR #29-Card Access Readers PCR #30-Fire Dampers Needed in Overbuild Framing PCR #31-Changes in ASI 14 PCR #32-Second Floor Interior Wall Insulation PCR #33-Add Twyckenham Porch Insulation PCR #34-ASI_16 HVAC Changes PCR #35-Install Cameras PCR #36-Landscape Changes The original contract sum $ 3,703,850.00 Net change by previously authorized change orders $ 289,372.70 The contract sum prior to this change order $ 3,993,222.70 By this Change Order, the project amount is X Increased 61,506.00Decreased $ The new contract sum including this change order $ 4,054,728.70 This Change Order represents a total change of 1.54 % Total change for entire project 9.47 % Original contracted completion date/time 9/19/2024 Extension of date/time by previous change orders 0 days Date/time extension by this change order 0 days New completion date/time 9/19/2024 Contractor Signature Printed Name and Title CONSTRUCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: June 25, 2024 R. Yoder Construction, Inc. Company Name President Station # 8, 2402 S. Twyckenham Dr. Address Member South Bend, IN 46614 City, State, Zip Member Member Member Erik Parcell, Project Manager June 25, 2024 Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Zach Hurst, PE, Sr. Project Engineer SUBJECT: Change Order No. 5 - Project No. 122-034 Fire Station #8 Replacement DATE: 06/04/2024 Change Order No. 5 for the subject project addresses the following items: • Change Hand Dryers: ($1,020.00) o Fire Department changed hand dryers to save cost. • Deduct Garden Shed Power: ($1,053.00)o Fire Department has decided shed does not need power. • Card Access Readers: $604.00oFire Department decided to add card access security to five (5) doors. •Overbuild Fire Dampers:$1,803.00 o Plan omission – fire dampers are required in a small overbuild area. •Kitchen & Work Room Changes:$11,343.00 o Various changes at Fire Department’s request: add shelving, add metal cabinets,upgrade counter. •Second-floor Insulation:$2,757.00 o Plan omission – insulation missing from second floor wall. •Porch Insulation:$1,103.00 o Plan omission – insulation missing from above porch area, under living area. •HVAC Changes:$4,084.00 o Plan omission – various HVAC changes in Apparatus Bay •Camera Installation:$824.00 o Contract omission – missing camera installation costs. •Landscaping Changes:$41,061.00 o These landscaping changes are comprehensive, covering all changes to theproject including tree removal and relocation, finalizing fence layout withneighbor, and additional sidewalk. • TOTAL: $61,506.00 This change order does not affect the existing contract completion date of September 19, 2024. Funding for this change order is available through the Fire Department’s capital fund. DATE: March 21, 2024 TO: D.A. Dodd, LLC. ATTN: Bill Graham FROM: Jamie Miller CHANGE ORDER QUOTE: South Bend Fire Station #8 – Additional Fire Dampers in over-framing wall PROJECT LOCATION: South Bend, IN D.A. Dodd, LLC. is pleased to submit the following Sheet Metal Change Order Proposal for your consideration. INCLUSIONS: a) Furnish labor and materials for (2) added fire dampers serving second floor over-framing wall PRICING: a) BASE BID: these items for the sum of…………………..……$1,803.00 PRICING BREAKDOWNS: a)Materials =.............................. $40.00 b)Fire Dampers =......................$700.00 c)Shop Labor =.........................$185.00 (2.5 hrs @ $74 per) d)Shop Supervision =.................$25.82 (.33 hrs @ $78.25 per) e)Field Labor =.........................$592.00 (8 hrs @ $74 per) f)Field Foreman =......................$18.20 (4 hrs @ $4.55 premium adder) _____________ Costs =.................................$1,561.02 X 10% OH ______________ $1,717.12 X 5% Profit _______________ Total =...............................$1,802.98 Sheet Metal Division 14 E. Michigan Street, P.O. Box 430, Rolling Prairie, IN 46371 – Phone (219) 778-4302 / FAX (219) 778-2981 2516 N. Home Street, Mishawaka, IN 46545 – Phone (574) 968-0589 / Fax (574) 968-0590 R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, Indiana 46550 Phone: 5747733502 Project: 2307GO08 - South Bend Fire Station #8 2402 Twyckenham Drive South Bend, Indiana 46614 Prime Contract Potential Change Order #034: CE #043 - Deduct Garden Shed Power from Project TO: City of South Bend - Public 227 W. Jefferson Blvd South Bend, Indiana 46601 FROM: R. Yoder Construction Inc. 27453 County Road 150 Nappanee, Indiana 46550 PCO NUMBER/REVISION:  034 / 0 CONTRACT:1 - 122-034: Fire Station No. 8 Replacement   REQUEST RECEIVED FROM:  Todd Skwarcan (South Bend Fire Department) CREATED BY: Erik Parcell (R. Yoder Construction Inc.) STATUS: Pending - In Review CREATED DATE:  4/9/2024 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None  FIELD CHANGE: No LOCATION: ACCOUNTING METHOD:  Amount Based  SCHEDULE IMPACT: PAID IN FULL: No  EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT:  ($1,053.00) POTENTIAL CHANGE ORDER TITLE: CE #043 - Deduct Garden Shed Power from Project CHANGE REASON: Client Request POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #043 - Deduct Garden Shed Power from Project Owner elected to remove the garden shed from the project. RYC to stub conduit for garden shed outside of solid surface and cap underground. ATTACHMENTS: #Budget Code Description Amount 1 Div 26-26-001.S Electrical.Commitment $(1,053.00) Grand Total: $(1,053.00) Daniel Spake (Shive-Hattery)R. Yoder Construction Inc. 27453 County Road 150 Nappanee, Indiana 46550 ProcoreArchitectSignHere ProcoreArchitectSignedDate  PoceOwnerSignHere ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE R. Yoder Construction, Inc.Page 1 of 1 Printed On: 4/9/2024  07:04 AM PCO #034 04/15/2024 June 25, 2024 R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, Indiana 46550 Phone: 5747733502 Project: 2307GO08 - South Bend Fire Station #8 2402 Twyckenham Drive South Bend, Indiana 46614 Prime Contract Potential Change Order #035: CE #044 - Card Access TO: City of South Bend - Public 227 W. Jefferson Blvd South Bend, Indiana 46601 FROM: R. Yoder Construction Inc. 27453 County Road 150 Nappanee, Indiana 46550 PCO NUMBER/REVISION: 035 / 0 CONTRACT:1 - 122-034: Fire Station No. 8 Replacement   REQUEST RECEIVED FROM: CREATED BY: Erik Parcell (R. Yoder Construction Inc.) STATUS: Pending - Proceeding CREATED DATE: 4/10/2024 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None  FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based  SCHEDULE IMPACT: PAID IN FULL: No  EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $604.00 POTENTIAL CHANGE ORDER TITLE: CE #044 - Card Access CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #044 - Card Access Hardware sets 1, 1.1, and 2 were modified to allow for card access at doors 100B, 104, 114, 123A, and 123B. New card access will meet same standard as other department entrance doors. City is to supply keypad/proxy readers and door controllers. ATTACHMENTS: #Budget Code Description Amount 1 Div 8-08-001.M Doors Frames and Hardware.Materials Updated Sets 1, 1.1, and 2 $(403.00) 2 Div 26-26-001.S Electrical.Commitment Electrical Labor $750.00 3 Div 26-26-001.S Electrical.Commitment Electrical Material $250.00 4 Div 1-01-038.S Bonds.Commitment Increase in Bond $7.00 Grand Total:$604.00 Daniel Spake (Shive-Hattery)R. Yoder Construction Inc. 27453 County Road 150 Nappanee, Indiana 46550 ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE R. Yoder Construction, Inc.Page 1 of 1 Printed On: 4/10/2024  08:23 AM PCO #035 04/15/2024 June 25, 2024 R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, Indiana 46550 Phone: 5747733502 Project: 2307GO08 - South Bend Fire Station #8 2402 Twyckenham Drive South Bend, Indiana 46614 Prime Contract Potential Change Order #036: CE #045 - Fire Dampers Needed in Overbuild Framing TO: City of South Bend - Public 227 W. Jefferson Blvd South Bend, Indiana 46601 FROM: R. Yoder Construction Inc. 27453 County Road 150 Nappanee, Indiana 46550 PCO NUMBER/REVISION: 036 / 0 CONTRACT:1 - 122-034: Fire Station No. 8 Replacement   REQUEST RECEIVED FROM: CREATED BY: Erik Parcell (R. Yoder Construction Inc.) STATUS: Pending - In Review CREATED DATE: 4/11/2024 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None  FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based  SCHEDULE IMPACT: PAID IN FULL: No  EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $1,803.00 POTENTIAL CHANGE ORDER TITLE: CE #045 - Fire Dampers Needed in Overbuild Framing CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #045 - Fire Dampers Needed in Overbuild Framing Furnish labor and materials for (2) added fire dampers serving second floor over-framing wall ATTACHMENTS: #Budget Code Description Amount 1 Div 22-22-001.S Plumbing.Commitment F&I Fire Dampers $1,803.00 Grand Total:$1,803.00 Daniel Spake (Shive-Hattery)City of South Bend - Public R. Yoder Construction Inc. 227 W. Jefferson Blvd 27453 County Road 150 South Bend, Indiana 46601 Nappanee, Indiana 46550 ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE R. Yoder Construction, Inc.Page 1 of 1 Printed On: 4/11/2024  10:08 AM PCO #036 04/15/2024 June 25, 2024 EXCLUSIONS: a) External ductwrap insulation (lagging/cladding also excluded) b) Wall cutting c) Fire, smoke or combination fire/smoke dampers not shown d) Wall, floor, ceiling and roof patching e) Painting of ductwork exterior or associated air devices f) Air test or balance g) Structural framework or reinforcements (lintels & H-frames also excluded) h) Duct Cleaning i) Coordination drawings (BIM modeling also excluded) j) Premium time labor k) Bonds, permits or fees l) Sales tax Sincerely, Jamie Miller Sheet Metal Division Estimator/Project Manager Office: (219) 778-4302 extension 213 Cell: (574) 780-8314 Email: johnhudkins@dadodd.com R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, Indiana 46550 Phone: 5747733502 Project: 2307GO08 - South Bend Fire Station #8 2402 Twyckenham Drive South Bend, Indiana 46614 Prime Contract Potential Change Order #038: CE #047 - Changes in ASI_014 TO: City of South Bend - Public 227 W. Jefferson Blvd South Bend, Indiana 46601 FROM: R. Yoder Construction Inc. 27453 County Road 150 Nappanee, Indiana 46550 PCO NUMBER/REVISION: 038 / 0 CONTRACT:1 - 122-034: Fire Station No. 8 Replacement   REQUEST RECEIVED FROM: CREATED BY: Erik Parcell (R. Yoder Construction Inc.) STATUS: Pending - In Review CREATED DATE: 5/13/2024 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None  FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based  SCHEDULE IMPACT: PAID IN FULL: No  EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $11,343.00 POTENTIAL CHANGE ORDER TITLE: CE #047 - Changes in ASI_014 CHANGE REASON: Client Request POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #047 - Changes in ASI_014 Changes per ASI_014 received on 4/12/24 ATTACHMENTS: #Budget Code Description Amount 1 Div 9-09-005.M ACT.Materials ACT Material Deduct 119/105 $(300.00) 2 Div 9-09-005.L ACT.Labor ACT Labor Deduct 119/105 $(350.00) 3 Div 12-12-004.S Cabinets.Commitment Deduct Countertop and Cabinets $(4,987.00) 4 Div 12-12-004.S Cabinets.Commitment Add Shelves $1,060.00 5 Div 12-12-004.M Cabinets.Materials Metal Cabinets and Peg Board in Work Room Material $7,933.00 6 Div 12-12-004.L Cabinets.Labor Metal Cabinets and Peg Board Install Labor $1,115.00 7 Div 26-26-001.S Electrical.Commitment Additional Fan Material $975.00 8 Div 26-26-001.S Electrical.Commitment Additional Fan Labor $911.00 9 Div 26-26-001.S Electrical.Commitment Additional Phone Material $546.00 10 Div 26-26-001.S Electrical.Commitment Additional Phone Labor $937.00 11 Div 12-12-004.S Cabinets.Commitment Butcher Block Counter $3,319.00 12 Div 1-01-038.S Bonds.Commitment Increase in Bond $184.00 Grand Total:$11,343.00 R. Yoder Construction, Inc.Page 1 of 2 Printed On: 5/13/2024  08:12 AM PCO #038 Daniel Spake (Shive-Hattery)City of South Bend - Public R. Yoder Construction Inc. 227 W. Jefferson Blvd 27453 County Road 150 South Bend, Indiana 46601 Nappanee, Indiana 46550 ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE R. Yoder Construction, Inc.Page 2 of 2 Printed On: 5/13/2024  08:12 AM PCO #038 05/13/2024 June 25, 2024 R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, Indiana 46550 Phone: 5747733502 Project: 2307GO08 - South Bend Fire Station #8 2402 Twyckenham Drive South Bend, Indiana 46614 Prime Contract Potential Change Order #039: CE #049 - Second Floor Interior Wall Insulation TO: City of South Bend - Public 227 W. Jefferson Blvd South Bend, Indiana 46601 FROM: R. Yoder Construction Inc. 27453 County Road 150 Nappanee, Indiana 46550 PCO NUMBER/REVISION: 039 / 0 CONTRACT:1 - 122-034: Fire Station No. 8 Replacement   REQUEST RECEIVED FROM: CREATED BY: Erik Parcell (R. Yoder Construction Inc.) STATUS: Pending - In Review CREATED DATE: 5/20/2024 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None  FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based  SCHEDULE IMPACT: PAID IN FULL: No  EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $2,757.00 POTENTIAL CHANGE ORDER TITLE: CE #049 - Second Floor Interior Wall Insulation CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #049 - Second Floor Interior Wall Insulation The second floor is entirely comprised of wall type W4B, which is not shown in the wall types on A320. Our insulators do not have any interior insulation on the second floor because of this drawing error. ATTACHMENTS: #Budget Code Description Amount 1 Div 7-07-002.S Thermal Insulation.Commitment 2nd floor sound insualtion $2,757.00 Grand Total:$2,757.00 Daniel Spake (Shive-Hattery)City of South Bend - Public R. Yoder Construction Inc. 227 W. Jefferson Blvd 27453 County Road 150 South Bend, Indiana 46601 Nappanee, Indiana 46550 ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE R. Yoder Construction, Inc.Page 1 of 1 Printed On: 5/20/2024  08:33 AM EDT PCO #039 05/29/2024 June 25, 2024 R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, Indiana 46550 Phone: 5747733502 Project: 2307GO08 - South Bend Fire Station #8 2402 Twyckenham Drive South Bend, Indiana 46614 Prime Contract Potential Change Order #040: CE #050 - Twyckenham Porch Insulation TO: City of South Bend - Public 227 W. Jefferson Blvd South Bend, Indiana 46601 FROM: R. Yoder Construction Inc. 27453 County Road 150 Nappanee, Indiana 46550 PCO NUMBER/REVISION: 040 / 0 CONTRACT:1 - 122-034: Fire Station No. 8 Replacement   REQUEST RECEIVED FROM: CREATED BY: Erik Parcell (R. Yoder Construction Inc.) STATUS: Pending - Proceeding CREATED DATE: 5/20/2024 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None  FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based  SCHEDULE IMPACT: PAID IN FULL: No  EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $1,103.00 POTENTIAL CHANGE ORDER TITLE: CE #050 - Twyckenham Porch Insulation CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #050 - Twyckenham Porch Insulation The porch on the Twyckenham side has second floor living quarters over the top of it that was not called out to be insulated in the plans. This needs to be completed to complete the insulating of the building envelope. ATTACHMENTS: #Budget Code Description Amount 1 Div 7-07-002.S Thermal Insulation.Commitment Porch Spray Foam Insulation $1,103.00 Grand Total:$1,103.00 Daniel Spake (Shive-Hattery)City of South Bend - Public R. Yoder Construction Inc. 227 W. Jefferson Blvd 27453 County Road 150 South Bend, Indiana 46601 Nappanee, Indiana 46550 ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE R. Yoder Construction, Inc.Page 1 of 1 Printed On: 5/20/2024  08:49 AM EDT PCO #040 05/29/2024 June 25, 2024 R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, Indiana 46550 Phone: 5747733502 Project: 2307GO08 - South Bend Fire Station #8 2402 Twyckenham Drive South Bend, Indiana 46614 Prime Contract Potential Change Order #041: CE #051 - ASI_016 HVAC Changes TO: City of South Bend - Public 227 W. Jefferson Blvd South Bend, Indiana 46601 FROM: R. Yoder Construction Inc. 27453 County Road 150 Nappanee, Indiana 46550 PCO NUMBER/REVISION: 041 / 0 CONTRACT:1 - 122-034: Fire Station No. 8 Replacement   REQUEST RECEIVED FROM: Daniel Spake (Shive-Hattery)CREATED BY: Erik Parcell (R. Yoder Construction Inc.) STATUS: Pending - Proceeding CREATED DATE: 5/29/2024 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None  FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based  SCHEDULE IMPACT: PAID IN FULL: No  EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $4,084.00 POTENTIAL CHANGE ORDER TITLE: CE #051 - ASI_016 HVAC Changes CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #051 - ASI_016 HVAC Changes HVAC changes per ASI_016 ATTACHMENTS: #Budget Code Description Amount 1 Div 22-22-001.S Plumbing.Commitment Material $533.00 2 Div 22-22-001.S Plumbing.Commitment Labor $2,042.00 3 Div 22-22-001.S Plumbing.Commitment Equipment $1,464.00 4 Div 1-01-038.S Bonds.Commitment Bond Increase $45.00 Grand Total:$4,084.00 Daniel Spake (Shive-Hattery)City of South Bend - Public R. Yoder Construction Inc. 227 W. Jefferson Blvd 27453 County Road 150 South Bend, Indiana 46601 Nappanee, Indiana 46550 ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE R. Yoder Construction, Inc.Page 1 of 1 Printed On: 5/29/2024  04:03 PM EDT PCO #041 05/31/2024 June 25, 2024 R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, Indiana 46550 Phone: 5747733502 Project: 2307GO08 - South Bend Fire Station #8 2402 Twyckenham Drive South Bend, Indiana 46614 Prime Contract Potential Change Order #043: CE #054 - Updated Landscape Plan TO:City of South Bend - Public 227 W. Jefferson BlvdSouth Bend, Indiana 46601 FROM:R. Yoder Construction Inc. 27453 County Road 150Nappanee, Indiana 46550 PCO NUMBER/REVISION:043 / 0 CONTRACT:1 - 122-034: Fire Station No. 8Replacement REQUEST RECEIVED FROM:CREATED BY:Erik Parcell (R. Yoder Construction Inc.) STATUS:Pending - Proceeding CREATED DATE:6/6/2024 REFERENCE:PRIME CONTRACTCHANGE ORDER:None FIELD CHANGE:No LOCATION: ACCOUNTING METHOD:Amount Based SCHEDULE IMPACT:PAID IN FULL:No EXECUTED:No SIGNED CHANGE ORDERRECEIVED DATE: TOTAL AMOUNT:$41,061.00 POTENTIAL CHANGE ORDER TITLE: CE #054 - Updated Landscape Plan CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract Is Changed As Follows) CE #054 - Updated Landscape Plan Additional costs due to the revised landscape plan dated 5/24/24 ATTACHMENTS: 2024-05-24 Revised Landscape Plan with Parking.pdf # Budget Code Description Amount 1 Div 1-01-038.S Bonds.Commitment Bond increase $440.00 2 Div 10-10-007.L Signage & Street Numbers.Labor Signage - Labor $563.00 3 Div 10-10-007.M Signage & Street Numbers.Materials Signage - Material $1,605.00 4 Div 32-32-001.S Landscaping.Commitment Landscape/Irrigation - Labor $6,084.00 5 Div 32-32-001.S Landscaping.Commitment Landscape/Irrigation - Mateial $8,140.00 6 Div 31-31-001.S Sitework.Commitment Tree Removal/Sidewalk Prep - Labor $7,788.00 7 Div 31-31-001.S Sitework.Commitment Tree Removal/Sidewalk Prep - Material $2,164.00 8 Div 3-03-002.S Concrete Flatwork.Commitment Sidewalk - Labor $10,387.00 9 Div 3-03-002.S Concrete Flatwork.Commitment Sidewalk - Mateial $3,890.00 Grand Total: $41,061.00 R. Yoder Construction, Inc.Page 1 of 2 Printed On: 6/6/2024 08:57 AM EDT PCO #043 Daniel Spake (Shive-Hattery)City of South Bend - Public R. Yoder Construction Inc. 227 W. Jefferson Blvd 27453 County Road 150 South Bend, Indiana 46601 Nappanee, Indiana 46550 ate ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE SIGNATURE DATE R. Yoder Construction, Inc.Page 2 of 2 Printed On: 6/6/2024 08:57 AM EDT PCO #043 ProcorrocorocoocProcorrococorProcorProcorProcProProcorcoProcorrocorProcorrocorrProcooocorocoocorrocoProcorProcorProcoocoPooPPPPcoPoeArchichihhhhihhhhihhhitectSiececececectecteccctccctttcttecctctetecttctectteegnHereHeHeHHeHeHeHenHHHHeHHHHHHHHHHH ProcorrorcororororProcorororororororrrrorProcorrProcoorPPPeArchieArchieArchieArcheAeeAeArchieArchieAeArchieAeArcheArchieAeeAeAeeArcheArchieeAeArchAeArchieeArchiArchAAAAAtectSitectSictectectectcttectStectSStectStectStStectectSiteccctStecectStectStectctSitectSStectSitectSeetectSitectSitectSitSectSignedDagngnegngngnggnegngngngngngnggggggggnngnenne SIGNATURE 06/07/2024 June 25, 2024 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 06/17/2024 Name Zach Hurst Department DPW BPW Date 06/25/2024 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 5 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name R Yoder Construction New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Fire Station 8 Replacement Project Number 122-034 Funding Source FD Capital Account No. PO-0026318 Amount Change: $61,506.00; Revised Amount: $4,054,728.70 Terms of Contract Purpose/Description Change Order addresses several miscellaneous issues as outlined in attached memo. For Change Orders Only Amount of Increase Decrease $ 61,506.00 ($ ) Previous Amount $ 3,993,222.70 Current Percent of Change: Increase Decrease 1.54% ( %) New Amount $ 4,054,728.70 Total Percent of Change: Increase Decrease 9.47% ( %) Time Extension Amount: New Completion Date: