Loading...
HomeMy WebLinkAboutOpening of Bids - East Bank Trail Over Leeper Ave. Deck Replacement Project No. 124-008 - LaPorte Construction Co, Inc.Version 07/19/2023 Contractor’s Bid for Public Works - 1 CITY OF SOUTH BEND, INDIANA CONTRACTOR’S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor’s Bid for Public Work Form, completely executed. Contractor’s Non-Collusion and Non-Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non-Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and WBE-2.1]. Acknowledge Receipt of _____ Addendum(s) included with the bid. All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. This checklist submitted with the Bid. This checklist is provided for bidder’s use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Date: By Authorized Representative: Signature: Print Name & Title: Project Name East Bank Trail over Leeper Avenue Deck Replacement Project No. 124-008 For Bids Due June 25, 2024 LaPorte Construction Co., Inc. Lori Schrad, President June 25, 2024 1 X X X X X X X X Version 07/19/2023 Contractor’s Bid for Public Works - 2 CITY OF SOUTH BEND, INDIANA CONTRACTOR’S BID FOR PUBLIC WORK Project Name East Bank Trail over Leeper Avenue Deck Replacement Project No. 124-008 For Bids Due June 25, 2024 PART I (Must be completed for all bids. Please type or print) Date: Bidder (Firm): Address: City/State/Zip: Telephone Number: ( ) Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: and dated for the sum of (enter the Total Bid as shown on the Proposal) ($ ) (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. ACCEPTANCE The above bid is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Joseph R. Molnar, Vice President Gary A. Gilot, Member Breana N. Micou, Member Murray L. Miller, Member Attest: Theresa Heffner, Clerk By (Signature) (Printed Name of Person Signing) June 25, 2024 LaPorte Construction Co., Inc. PO Box 577 LaPorte, IN 46352 574 876-2772 East Bank Trail over Leeper Avenue Deck Replacement - Project 124-008 5/9/2024 American Structurepoint, Inc., 9025 River Road Suite 200, Indianapolis, IN 46240 Lori Schrad, President 578,627.20Five hundred seventy-eight thousand six hundred twenty-seven dollars and twenty cents Version 07/19/2023 General Conditions - 11 CITY OF SOUTH BEND, INDIANA CONTRACTOR’S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name East Bank Trail over Leeper Avenue Deck Replacement Project No. 124-008 For Bids Due June 25, 2024 Contractor Name: The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. **THIS FORM ONLY APPLIES TO BIDS GREATER THAN $250,000** INSTRUCTIONS: If you are a pre-qualified bidder, complete Section I only. If you are not a pre-qualified bidder, complete Section II only. Section II acts as an application for pre-qualification. Submission of Section II will allow the bidder to be considered for pre-qualification for bids with the City of South Bend Department of Public Works. Pre- qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 6371 of The Responsible Bidding Ordinance No. 10594-18 10975-23 (hereinafter, “Responsible Bidding Ordinance”) for a period of twelve (12) months. Thereafter, contractors who are pre-qualified must submit a complete application for continuation of “pre- qualified” standing, on a form provided by the City (“Responsible Bidder Checklist (1) Pre-Qualified Bidders”) by December 31st for the upcoming calendar year, or within twelve (12) months of obtaining pre- qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre-qualified contractor to submit its complete application for continuation of “pre-qualified” standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre-qualified standing. However, the “removed” contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-6371 until “pre-qualified” status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder’s current and previous customers regardless of pre-qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-6371 of the Responsible Bidding Ordinance no later than the date of the public bid opening. LaPorte Construction Co., Inc. Version 07/19/2023 General Conditions - 12 POST BID SUBMISSIONS: Post-bid submissions must be submitted in accordance with Section 6-6472 of the Responsible Bidding Ordinance. The post-bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least onetwo-hundred fifty thousand dollars ($1250,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list (“Disclosed Subcontractor(s)”) to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder for projects greater than $250,000 and all subcontractors performing work greater than $250,000 on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre-Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor’s submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 07/19/2023 General Conditions - 13 I. PRE-QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) ___ By checking this box, I hereby acknowledge that I am a pre-qualified bidder with the City of South Bend and that I have met the pre-qualification requirements within the last twelve (12) months. A copy of my Pre-Qualification verification letter is attached. (ii) ___ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (iii) ___ By checking this box, I hereby acknowledge that apprenticeship and training programs that I participate in have graduated at least five (5) apprentices in each of the past five (5) years. (iv) ___ By checking this box, I hereby acknowledge that all subcontractors performing work greater than $250,000 also meet the qualifications of the Responsible Bidder Ordinance. (b) Attachments: (i) ___ Indiana Secretary of State’s on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State’s Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) ___ Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) ___ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) ___ For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor’s Office of Apprenticeship, or its successor organization. This includes, but may not be limited to, letters from apprenticeship coordinators detailing the bidder’s association with the program, and the United States Department of Labor Office of Apprenticeship Certificates of Registration of Apprenticeship Programs for each type of work to be performed on the project. X X X X X X X X Version 07/19/2023 General Conditions - 14 II. PRE-QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE-QUALIFIED) (a) Acknowledgements: (i) ___ By checking this box, I hereby acknowledge that I am not a pre-qualified bidder with the City of South Bend. (ii) ___ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) ___ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) ___ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub-contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (v) ___ By checking this box, I hereby acknowledge that apprenticeship and training programs that I participate in have graduated at least five (5) apprentices in each of the past five (5) years. (vi) ___ By checking this box, I hereby acknowledge that all subcontractors performing work greater than $250,000 also meet the qualifications of the Responsible Bidder Ordinance. (b) Attachments: (i) ___ Indiana Secretary of State’s on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State’s Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) ___ List identifying all former business names. (iii) ___ Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis-Bacon and related Acts, within the preceding five (5) years. (iv) ___ Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) ___ Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) ___ For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor’s Office of Apprenticeship, or its successor organization. This includes, but may not be limited to, letters from apprenticeship coordinators detailing the bidder’s association with Version 07/19/2023 General Conditions - 15 the program, and the United States Department of Labor Office of Apprenticeship Certificates of Registration of Apprenticeship Programs for each type of work to be performed on the project. (vii) ___ Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) ___ Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service “Department of Treasury’s Listing of Approved Sureties” as required in the bid specifications or contract. (ix) ___ Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) ___ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: ___________________________________________ ________________________________________________ (Sign Here) ________________________________________________ (Print Name Here) ________________________________________________ (Name of Company) ________________________________________________ (Address of Company) ________________________________________________ (City) ________________________________________________ (State) ________________________________________________ (Telephone Number) 574-876-2772 Indiana LaPorte PO Box 577 LaPorte Construction Co., Inc. Lori Schrad June 25, 2024 Version 07/19/2023 Special Provisions - 5 B. Additions: 1. The project will have a completion date of ninety (90) calendar days from notice to proceed (NTP) for all work. The contract time will start when the Notice to Proceed is delivered and signed. November 1, 2024. The East Bank Trail and Leeper Avenue shall not be closed for more than 60 calendar days. 2. The City, Engineer, and Contractor will hold a pre-construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. XIV. CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 B. Additions: 1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor’s subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XV. DEFAULT AND TERMINATION A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 B. Additions: 1. Events of Default shall include Contractor’s failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. Version 07/19/2023 Special Provisions - 12 i. Post spacing. ii. Post to rail connections. iii. Posts mounted to the bridge deck shall include the connection to the bridge deck. If post installed anchors are used, they shall be chemical anchors in accordance with the State Specifications Section 702.25. iv. Posts mounted on the ground shall include foundation details. v. Design calculations signed and sealed by a registered Professional Engineering in the State of Indiana. 9. The chain link fence not on the bridge deck will be paid for as Fence, Chain Link, 42 IN., Ground Mounted. The chain link fence on the bridge deck will be paid for as Fence, Chain Link, 42 IN., Bridge Mounted. 10. The cost of design shall be included in the cost of Fence, Chain Link, 42 IN., Bridge Mounted. The cost of hardware, inserts, and any other connection devices to attach the chain link fence post to the bridge deck shall be included in the cost of Fence, Chain Link, 42 IN, Bridge Mounted. XXXII. SIDEWALK, 6 IN. REINFORCED A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 604 B. Additions: 1. Sidewalk, 6 IN. Reinforced will be measured by the square yard of the finished surface. 2. The accepted quantities of reinforced concrete sidewalk will be paid for at the unit price per square yard for Sidewalk, 6 IN., Reinforced. 3. All concrete testing shall be performed by a third party. The third-party testing agency shall be determined by the Contractor for approval by the Owner. The testing will be in accordance with the INDOT Frequency Manual. The cost of all concrete testing shall be included in the cost of the Sidewalk, 6 IN. Reinforced. 4. The cost of welded wire reinforcement will be included in the cost of Sidewalk, 6 IN. Reinforced. XXXIII. DECK DRAINAGE SPLASHPAD A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 605 B. Additions: 1. Concrete materials for this work shall be in accordance with Section 702. 2. Reinforcing steel materials for this work shall be in accordance with Section 703. 3. Deck Drainage Splashpad will not be measured for Payment. 4. All concrete testing shall be performed by a third party. The third-party testing agency shall be determined by the Contractor for approval by the Owner. The testing will be in accordance with the INDOT Frequency Manual. The cost of all concrete testing shall be included in the cost of Deck Drainage Splashpad. 5. Deck drainage splashpad will be paid for at the contract lump sum price for Deck Drainage Splashpad. The cost of excavation, existing curb cuts, reinforcing steel, and Version 07/19/2023 Special Provisions - 14 B. Additions: None XL. STRUCTURAL STEEL A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 711 B. Additions: 1. Stud shear connectors, or an approved equal, will not be paid for directly and shall be included in the cost of Structural Steel. 2. See the Appendix for modification of the prevailing specification. XLI. PIPE, BRIDGE DECK DRAIN SYSTEM A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 715 B. Additions: 1. See the Appendix for modification of the prevailing specification. XLII. RESTORATION OF TREE LAWN A. Prevailing Specifications: City of South Bend Design and Construction Standards Section 8 B. Additions: 1. There will be no direct payment for this work. XLIII. ELECTRIC LINE AND CONDUIT A. Prevailing Specifications: City of South Bend Design and Construction Standards Section 6 B. Additions: 1. See the utility Work Plan for the City of South Bend Electric Utility in the Appendix for additional information. 2. Coordination with the City of South Bend Electric Utility designated contact shall occur before any work that may affect the conduit begins. The Contractor shall provide the utility three (3) working days notice of the proposed work. This does not preclude any requirements of the utility work plan in the Appendix. 3. Any ground disturbed as a part of this work shall be restored in accordance with these Special Provisions Section XLIV RESTORATION OF TREE LAWN. 4. Remove and Reset Electric Utility on the bridge will not be measured. 5. The removal and resetting of the electric utility on the bridge deck will be paid for at the contract lump sum price for Remove and Reset Electric Utility. The cost of excavation, conduit, wire, wire splicing, ground restoration, and all other materials, labor, equipment and necessary incidentals shall be included in the cost of Remove and Reset Electric Utility. Version 07/19/2023 Contractor’s Bid for Public Works - 3 PART II (For projects of $100,000 or more – IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one(1)year prior to the date of the current bid.2. Attach a listing of public works projects currently in process of construction by yourorganization.3. Attach information regarding any failure to complete any work awarded to you and thelocation thereof.4. Attach references from private firms for which you have performed work.SECTIO N II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples couldinclude a narrative of when you could begin work, complete the project, number of workers,etc. and any other information which you believe would enable the City of South Bend toconsider your bid.)2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outsideyour own firm who have performed part of the work) that you have used on public worksprojects during the past five (5) years along with a brief description of the work done by eachsubcontractor.3. If you intend to sublet any portion of the work, attach the name and address of eachsubcontractor, equipment to be used by the subcontractor, and whether you will require abond. However, if you are unable to currently provide a listing, please understand a listingmust be provided prior to contract approval. Until the completion of the proposed project, youare under a continuing obligation to immediately notify the City of South Bend in the event thatyou subsequently determine that you will use a subcontractor on the proposed project.4. Attach a listing of equipment you have available to use for the proposed project.5.Have you entered into contracts or received offers for all materials which substantiate theprices used in preparing your proposal? If not, attach an explanation for the rationale usedwhich would corroborate the prices listed.SECTIO N III CONTRACTOR’S FINANCIAL STATEMENT Attachment of bidder’s financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder’s capability for completing the project if awarded. FORM 96 ATTACHMENT Section II: PLAN AND EQUIPMENT QUESTIONNAIRE 1.Our plan for performing the proposed work is as prescribed by the plan and bid documents as developed through reviewing the plans, standard specifications and having previously completed similar work. 2.We have used the following subcontractors on public works projects during the past five years: Slusser’s Green Thumb P.O. Box 33 Landscape, Sod Items Logansport, IN 46947 Traffic Control Specialists, Inc 1810 W. Pacific Ave. Traffic Items Knox, IN 46534 C-Tech Corporation, Inc. 5300 West 100 Norte Guardrail Items Boggstown, IN 46110 Brooks Construction Co., Inc P.O. Box 9560 HMA Items Fort Wayne, IN 46899 3.It is not known at this time if any portion of the work will be sublet or if a bond would be required. 4.We have the following equipment available to use: American Crane 50 Ton Case Skidsteer Case 550 Dozer Gehl Mini Excavator Gehl RS5-19 Telehandler Ground Heater (2) Hamm 3305 Roller JD 650JC Dozer JD 790 D Excavator w/hydraulic thumb JD 270 Excavator JD 200 LC Excavator Kobelco Blade Runner Komatsu CK30 Track Skidsteer (2) Service Trucks, Kruz Dump Trailer and various other trailers Semi-Truck and 50 Ton Lowboy Mack Hook Truck Various Pick-up Trucks and small tools 5.We have solicited and received material prices for this job. Lori Schrad, President Version 07/19/2023 Contractor’s Bid for Public Works - 4 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company,corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and3.Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, asamended from time-to-time.b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran;orii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain anyem ployee or contract with a person that the Contractor subsequently learns is an unauthorized alien. INDIANA LAPORTE Version 07/19/2023 Contractor’s Bid for Public Works - 5 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform thework.In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor’s good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal-eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 07/19/2023 Contractor’s Bid for Public Works - 6 may result in forfeiture of contractual payments. *** I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this day of , 20__ Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title Subs cribed and sworn to before me this day of , 20 My Co mmission Expires Notary Public County of Residence St. Joseph Lori Schrad, President LaPorte Construction Co., Inc. 25th June 24 25th June 24 November 19, 2031 , Danisha L. Marable BID/PROPOSAL CITY OF SOUTH BEND Project Name: East Bank Trail over Leeper Avenue Deck Replacement Project Number: 124-008 For Bids Due: June 25, 2024 Contractor Name: Version 07/19/2023 Contractor’s Bid for Public Works - 7 BASE BID Item No. Description Quantity Unit Unit Price Total Amount 1 Mobilization and Demobilization 1 LS 2 Present Structure, Remove Portion, Structure 1 LS 3 Fence, Chain Link, Remove 423 LFT 4 Excavation, Common 6 CYS 5 Subgrade Treatment, Type III 44 SYS 6 Compacted Aggregate, No. 53 8 CYS 7 Sidewalk, 6 IN. Reinforced 44 SYS 8 Fence, Chain Link, 42 IN., Ground Mounted 184 LFT 9 Fence, Chain Link, 42 IN., Bridge Mounted 240 LFT 10 Clean Steel Bridge, Partial, QP-2 1 LS 11 Disposal of Cleaning Waste Hazardous 1 LS 12 Paint Steel Bridge, Partial 1 LS 13 Grates, Basins, and Fittings, Cast Iron 1 EA 14 Field Drilled Hole in Concrete 10 EA 15 Reinforcing Bars, Epoxy Coated 14,027 LB 16 Concrete, C, Superstructure 32.7 CYS 17 Patching Concrete Structures 50 SFT 18 Structural Steel 1 LS 19 Pipe, Bridge Deck Drain System 1 LS 20 Maintaining Traffic 1 LS 21 Remove and Reset Electric Utility 1 LS 22 Deck Drainage Splashpad 1 LS BASE BID TOTAL ALTERNATE #1 Item No. Description Quantity Unit Unit Price Total Amount 23 Fence, Chain Link, PVC, 42 IN., Ground Mounted 184 LFT LaPorte Construction Co., Inc. 28,600.00 28,600.00 82,000.00 82,000.00 25.00 10,575.00 430.00 2,580.00 135.00 5,940.00 800.00 6,400.00 300.00 13,200.00 240.00 44,160.00 280.00 67,200.00 60,000.00 60,000.00 1,000.00 1,000.00 7,000.00 7,000.00 3,000.00 3,000.00 35.00 350.00 1.60 22,443.20 3,500.00 114,450.00 200.00 10,000.00 53,000.00 53,000.00 10,000.00 10,000.00 15,000.00 15,000.00 16,729.00 16,729.00 5,000.00 5,000.00 $ 578,627.20 255.00 46,920.00 BID/PROPOSAL CITY OF SOUTH BEND Project Name: East Bank Trail over Leeper Avenue Deck Replacement Project Number: 124-008 For Bids Due: June 25, 2024 Contractor Name: Version 07/19/2023 Contractor’s Bid for Public Works - 8 ALTERNATE #1 24 Fence, Chain Link, PVC, 42 IN., Bridge Mounted 240 LFT ALTERNATE #1 TOTAL Bidder (Firm): Address: City/State/Zip: Telephone Number: ( ) By (Signature) (Printed Name of Person Signing) LaPorte Construction Co., Inc. PO Box 577 LaPorte, IN 46352 574 876-2772 Lori Schrad, President LaPorte Construction Co., Inc. 295.00 70,800.00 $ 117,720.00 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 MBE UTILIZATION PLAN Version 07/19/2023 Contractor’s Bid for Public Works - 9 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder’s sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. ***Goals should be calculated based on the Base Bid only.*** ***Goals should be calculated based on the Base Bid only.*** Project Number: 124-008Project Name: East Bank Trail over Leeper Avenue Deck Replacement Bidder: Total Bid Amount: MBE Goal: Page_______of___ ____ Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal Submitted by: Print Name Signature Date LaPorte Construction Co., Inc.Lori Schrad, PresidentJune 25, 2024N.I Spanos Painting, LLCDalia SpanosClean & Paint Steel Bridge, Partial, QP-2$ 68,000.0012 %1 1$ 578,627.20 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN Version 07/19/2023 Contractor’s Bid for Public Works - 10 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder’s sole responsibility to verify whether any listed woman-owned business meets the WBE qualifications. ***Goals should be calculated based on the Base Bid only.*** ***Goals should be calculated based on the Base Bid only.*** Project Number: 124-008Project Name: East Bank Trail over Leeper Avenue Deck Replacement Bidder: Total Bid Amount: WBE Goal: Page_______of___ ____ Name & Address of WBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of WBE Component Percentage of Total Bid/Proposal Submitted by: Print Name Signature Date LaPorte Construction Co., Inc.Lori Schrad, PresidentJune 25, 2024State BarricadingJames MichalskiMaintenance of Traffic (see attached quote)$ 12,727.00$ 578,624.201 1 2 % CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 07/19/2023 Contractor’s Bid for Public Works - 11 This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 124-008 Date: Project Name: East Bank Trail over Leeper Avenue Deck Replacement Bidder: Contact Person: Telephone: Address: City: State: Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. LaPorte Construction Co., Inc. PO Box 577 LaPorte IN 46352 574-876-2772 June 25, 2024 LS LS LS LS LS LS LS LS LS lschrad@laporteconstruction.com Lori Schrad, President CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 07/19/2023 Contractor’s Bid for Public Works - 12 I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number;2. A description of information provided by the bidder or subcontractor; and3. A statement of whether an agreement was reached, and if not, why not, including any reasons forconcluding that the MBE was unqualified to perform the job.*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Anyomissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City ofSouth Bend reserves the right to request additional information.LS LS CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 07/19/2023 Contractor’s Bid for Public Works - 13 This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 124-008 Date: Project Name: East Bank Trail over Leeper Avenue Deck Replacement Bidder: Contact Person: Telephone: Address: City: State: Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. LaPorte Construction Co., Inc. Lori Schrad, President PO Box 577 LaPorte IN 46352 June 25, 2024 574-876-2772 lschrad@laporteconstruction.com LS LS LS LS LS LS LS LS LS CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 07/19/2023 Contractor’s Bid for Public Works - 14 I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number;2. A description of information provided by the bidder or subcontractor; and3. A statement of whether an agreement was reached, and if not, why not, including any reasons forconcluding that the MWBE was unqualified to perform the job.*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Anyomissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City ofSouth Bend reserves the right to request additional information.LS LS CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 MBE CONTACTED Version 07/19/2023 Contractor’s Bid for Public Works - 15 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder’s sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE_______OF________ Project Number: 124-008MBE Parti cipation Goal Project Name: East Bank Trail over Leeper Avenue Deck Replacement Bidder: By: (Signature) (Title) (Date) MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: LaPorte Construction Co., Inc. Lori Schad, President June 25, 2024 11 V & R Trucking, Inc. Veda Godette 574-234-1268 574-234-0748 rfightingirish@aol.com Hauling Services Quote Received (see attached) N.I. Spanos Painting, Inc. Dalia Spanos 219-662-9092 daliaspanos@comcast.net Clean & Paint Steel Bridge Partial, QP-2 Quote Received (see attached) N.I. SPANOS PAINTING INC. General Sandblasting and Painting P.O. Box 10908 Merrillville, IN 46411 (219) 662-9092 MBE, WBE, and DBE Certified Contractor June 24, 2024 Letting Date: 06/25/2024 Location: East Bank Trail over Leeper Avenue City of South Bend Department of Public Works Clean and Paint Steel Bridge, Partial, QP-2 $68,000.00 Note 1: above price does not include any traffic control Note 2: above price is based on 2 mobilizations. One mobilization to sandblast areas where angle steel will be welded and a second mobilization to sandblast and paint those same areas and the angle steel itself after installation. Note 3: above price includes the cost to sandblast and re-paint per partial painting the outside face of the exterior girders if the weld work affects the outside paint. Thank you, John Spanos, Estimator N.I. Spanos Painting Inc. Cell Phone: 219-793-2172 V & R Trucking Inc. Certified DBE-MBE-WBE State of Indiana 1845 N. Elmer Street Phone:574-234-1268 Ce.II: 574-514-9418 / Fax: 574-234-0748 Date: 6/24/2024 Attn: Lori Schrad Subject: 2024 Trucking and Hauling Rates DBE-MBE-WBE Rates for 2024Triaxle Straight Time $130.00 /Hour Triaxle Overtime & Saturday $147.00/ Hour Non-DBE-MBE-WBE Rates for 2024 Triaxle Straight Time$ 128.00 /Hour Triaxle Overtime & Saturday $145.00 Guarantees 2, 41 & 8 hours would apply per Teamster's Contract Show-up/rain-out 2 hours. TRAVEL TIME TO BE DETERMINED PER JOB. DOES NOT INCLUDE MATERIALS DELIVERED TO JOBS. Thank you for your time and assistance. Have a great day! V e.dc;,, L. G o-i;;l.,e.tt;e, CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 WBE CONTACTED Version 07/19/2023 Contractor’s Bid for Public Works - 16 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder’s sole responsibility to verify whether any listed woman-owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE_______OF________ Project Number: 124-008WBE Participation Goal Project Name: East Bank Trail over Leeper Avenue Deck Replacement Bidder: By: (Signature) (Title) (Date) WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: 1 1 Laporte Construction Company Inc. June 25, 2024Lori Schrad, President V & R Trucking, Inc. Veda Godette 574-234-1268 rfightingirish@aol.com Hauling Services Quote Received (see attached) 574-234-0748 State Barricading, Inc. James Michalski 574-287-2078 574-287-1744 statebarricade1@aol.com Maintaining Traffic Quote Received (see attached) V & R Trucking Inc. Certified DBE-MBE-WBE State of Indiana 1845 N. Elmer Street Phone:574-234-1268 Ce.II: 574-514-9418 / Fax: 574-234-0748 Date: 6/24/2024 Attn: Lori Schrad Subject: 2024 Trucking and Hauling Rates DBE-MBE-WBE Rates for 2024Triaxle Straight Time $130.00 /Hour Triaxle Overtime & Saturday $147.00/ Hour Non-DBE-MBE-WBE Rates for 2024 Triaxle Straight Time$ 128.00 /Hour Triaxle Overtime & Saturday $145.00 Guarantees 2, 41 & 8 hours would apply per Teamster's Contract Show-up/rain-out 2 hours. TRAVEL TIME TO BE DETERMINED PER JOB. DOES NOT INCLUDE MATERIALS DELIVERED TO JOBS. Thank you for your time and assistance. Have a great day! V e.dc;,, L. G o-i;;l.,e.tt;e, State Barricading, Inc. Quote “The Road To Success Is Always Under Construction” 24963 US 20 West South Bend, Indiana, 46628 Phone: 574-287-2078 Fax: 574-287-1744 Date: 6/17/2024 Job East Bank Trail Over Leeper Avenue Deck Replacement. Project Number: 124-008. City Of South Bend, IN. TO All Bidders Qty Line Item # Description Unit Price Line Total 1 LS Maintenance Of Traffic- As Shown On Plan, Consists Of: $12,727.00 Lump Sum $12,727.00 2 EA- Construction Sign, A 10 EA- Construction Sign, B 116 LFT- Barricade, III-A 16 LFT- Barricade. III-B 3 EA- Road Closure Sign Assembly 6 EA- Detour Route Marker Assembly 120 LFT- Pedestrian Channelizer Labor For One (1) Initial Set Up & One (1) Final Pick Up. Daily Rental Items, If Needed: Drums, Daily Rental, If Needed $1.15 Per Day, Each WBE/DBE*Equal Opportunity Employers*Indiana Laborers*ATSSA Certified* Subtotal Thank you for your business! Quotation prepared by: _______________________________________________________________________________________________ This is a quotation on the goods named, subject to the conditions noted below: (Quotation Valid For 60C/D’s From Initial Quotation, Any Equipment Not Listed Herein, Or Requested By Contractor Will Be Charged Out As Extra, At Contractors Expense.) To accept this quotation, sign here and return: Name: ________________________________ Company_______________________________ INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Tara Bussell, Permit Manager Department of Public Works FROM: Leslie Biek, Assistant City Engineer SUBJECT: Project No.: 122-043R 2023 Guardrail and Handrail Installation and Replacement DATE: April 17, 2024 On December 12, 2023, the contractor listed below submitted a bid to the Board of Public Works for the 2023 Guardrail and Handrail Installation and Replacement project (122-043R). The following contractor submitted bids on the project and have the following qualifications status: As of April 17, 2024, the Engineering Division considers the above listed contractor as pre-qualified through April 17, 2025 for the following type(s) of work: •Construction Craft Laborer Bidder Responsible Bidder Pre-Qualified Status LaPorte Construction Col, Inc. Pre-Qualified June 25, 2024 TO: Board of Public Works of the City of South Bend, Indiana RE: Laporte Construction Company’s Staffing Capabilities Since its incorporation in 1973, LaPorte Construction Company Inc. has always maintained accurate staffing to initiate, and complete, all the projects we bid and are awarded. As of the date of this letter, Laporte Construction Company has an extensive list of employees who are adequately trained to complete the work and projects we bid. As a part of our Good Faith Efforts with the Indiana Department of Transportation, LaPorte Construction Company, solicits candidates for hire, several times every year, from numerous recruitment agencies, social organizations, local colleges & training facilities, and Workforce Development Services of Northern Indiana and throughout the state of Indiana. Very Kindly, Lori Schrad President LaPorte Construction Company Inc.