HomeMy WebLinkAboutAward Bid - Fellows Booster Pump Station Improvements - Contract A Proj No. 121-070A - EFI Solutions, Inc.1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
June 11, 2024
Mr. Dave Ealy
EFI-Solutions Inc.
PO Box 723, 1221 N. Elm St.
Centralia, IL 62801
fog ster(ii�efi-solutions.com
RE: Award Bid — Fellows Booster Pump Station Improvements - Contract A
Project No. 121-070A
Dear Mr. Ealy:
At its June 11, 2024 meeting, the Board of Public Works awarded the above referenced
bid to you in the amount of $2,529,025; Subject to Loan Closing on June 4, 2024 with the
Indiana Finance Authority. Enclosed please find a signed Bid/Proposal form.
Please forward the following documents in one submittal by June 25, 2024 to my
attention for Board of Public Works approval at lhensley(ksouthbendin.gov:
1) One (1) signed original of the Public Works Contract (enclosed)
2) Labor & Material Payment Bond
3) Performance Bond (125% of Bid Amount)
4) Certificate of Insurance naming the City of South Bend as an additional insured
5) Item #4 for all subcontractors that you use
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/lh
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MIcou
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENVIRONMENTAL SERVICES
TO: Members of the Board of Public Works
Michael Schmidt, Assistant City Attorney Public Works
Theresa Heffner, Clerk of the Board of Public Works
FROM: Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: 121-070A Fellows Booster Pump Station - Contract A (Pump Station
Procurement)
Agenda Request — Bid Award Recommendation
DATE: May 28, 2024
Public Works, the Divisions of Engineering and Division of Water Works have reviewed the subject
Waste Treatment Chemicals Wastewater 2024-2025 bids and provides its recommendations as
noted below for the Board of Public Works review. The lone bid submitted was complete and meets
all bidding requirements for materials supply. Refer to Bid Tabulation and Recommendation Letter
from Donohue & Associates (Engineer of Record), attached.
Base Bid(s) submitted ranked as follows:
BID SUMMARY
Bidder / Vendor
BASE BID
1. EFI Solutions, Inc. Centralia, Illinois
$2,529,025.00
Bid Award Recommendation:
Public Works, the Division of Engineering and Division of Water Works recommends the Board of
Public Works award Project No. 121-070A Fellow Booster Pump Station — Contract A (Pump
Station Procurement) to the lone, lowest, responsive, and responsible bidder, EFI Solutions, Inc.
(Centralia, Illinois) in the amount of $2,529,025.00.
Funding: Indiana Finance Authority — State Revolving Fund Loan / Bond.
This award is recommended subject to the City of South Bend, Indiana closing its loan with the
Indiana Finance Authority — State Revolving Fund. The bond / loan closing is currently
scheduled for June 4, 2024, and all financing should be secure prior to the Board of Public
Works Regular Meeting on June 11, 2024.
Contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering regarding questions.
D3DONOHUE
April 24, 2024
City of South Bend
Attn: Mr. Jacob Klosinski, PE
227 W. Jefferson Boulevard
South Bend, IN 46601
Re: Fellows Booster Station — Contract A Procurement
City Project No. 121-070A
Dear Mr. Klosinski,
Donohue & Associates, Inc.
209 N. Main Street, Suite 206 1 South Bend, IN 46601
574.288.4580 1 donohue-associates.com
Pursuant to the Proposal Invitation, sealed proposals for the above referenced project were received by
the City of South Bend's Board of Public Works on April 9, 2024 at 9:00 am and then publicly opened and
read aloud. We have reviewed all the proposals received for the work and have enclosed a copy of the
prepared Proposal Tabulation for your information and consideration.
One (1) sealed proposal was received. The sole proposal was submitted by EFI-Solutions Inc. of
Centralia, IL in the amount of $2,592,025.00. Donohue's opinion of probable construction costs for the
project was $2,700,000.00. The proposal was approximately $107,975.00 (4%) less than the opinion of
probable construction cost. Please refer to the enclosed Proposal Tabulation and Proposal Review
Summary for information on the Proposer and the proposal amounts.
It is our opinion that the low proposer, EFI-Solutions Inc., submitted a responsive bid and is qualified and
capable of performing the work as specified. It is therefore recommended that the City of South Bend's
Board of Public Works award the procurement contract to EFI-Solutions Inc. in the amount of
$2,592,025.00, and with the condition of the City's closing of the State Revolving Fund Loan.
We respectfully present these recommendations for review and consideration and will be pleased to
answer any questions you have concerning the information provided herein.
Sincerely,
Jeffrey L. McKean, P.E.
Project Manager
Enclosures: As noted
PROPOSAL TABULATION
CITY OF SOUTH BEND, INDIANA
FELLOWS STREET BOOSTER STATION CONTRACT A - STATION PROCUREMENT
CITY PROJECT NO. 121-070A
Proposals Received: April 9, 2024
BASE PROPOSAL
Engineer's Estimate
EFI - Solutions Inc.
Item No.
Description
I Quantityl
Unit
Unit Price
Extension
Unit Price
Extension
1
Pre -Packaged Booster Pump Station
1 1
1 LS
$2,700,000.00
$2,700,000.00
$2,592,025.00
$2,592,025.00
BASE BID TOTAL:
$2,700,000.00
$2,592,025.00
Certified:
Jeffrey L. McKean, PE
Date: April 24, 2024
PROPOSAL REVIEW SUMMARY
CITY OF SOUTH BEND, INDIANA
FELLOWS STREET BOOSTER STATION CONTRACT A - STATION PROCUREMENT
CITY PROJECT NO. 121-070A
Proposals Received: April 9, 2024
Contractor
EFI - Solutions Inc.
Addenda Acknowledged
N/A
Exceptions
None
Certified Check or Bid Bond equal to 5% of Bid Price
Yes (')
Proposal Form Signed & Sealed
Yes
City of South Bend - Proposer's Checklist
Yes
City of South Bend - Contractor's Proposal For Public Works (Incorporates Indiana Form 96)
Yes
Contractor's Experience
Yes
Contractor's Affidavit (2)
Yes
Contractor's Financial Statement (4)
Yes (3)
Warranty Statement
Yes
Certified Welding and Steel Statement
Yes
Corrosion Protection Statement
Yes
Factory Start -Up and Service Statement
Yes
Applicable Standards and Listings Statement
Yes
Certification of Compliance
Yes
Certification of Nonsegregated Facilities (Form OEE-1)
Yes (3)
Notice to Labor Unions or Other Oragnizations of Works Nondiscrimination in Employment (Form
OEE-2)
Yes (3)
Form MBE 1.0 - MBE Utilization Plan
N/A (5)
Form MBE 2.0 - Evidence of Good Faith Efforts
N/A (5)
Form MBE 2.1 - WBE Contacted
N/A (5)
SRF - MBE/WBE Documents / Good Faith Effort Worksheet
N/A (3)(5)
GPR Bid Breakdown (SRF Attachment G)
Yes (3)
American Iron and Steel Certification (SRF Attachment J)
Yes (3)
Donohue Associates, Inc. Proposal Review
Project No. 13985 Page 1 of 2
PROPOSAL REVIEW SUMMARY
CITY OF SOUTH BEND, INDIANA
FELLOWS STREET BOOSTER STATION CONTRACT A - STATION PROCUREMENT
CITY PROJECT NO. 121-070A
Proposals Received: April 9, 2024
Contractor
EFI - Solutions Inc.
Written Plan for Company Drug Testing Policy
Yes (3)
Booster Station Design Signed & Sealed by a Professional Engineer registered in Indiana
Yes
Miscellaneous/Comments
None
NOTES:
1 Received ammended version post bid.
2 Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investment with Iran, Employment Eligibility Verification, E-Verify Certification, Non -
Discrimination Commitment and Certification of Use of United States Steel Products or Foundary Products.
3 Received Post Bid.
4 Financial Statement was reviewed by the City.
5 Bidder claims this to be not applicable as thay are an original equipment manufacturer (OEM), they purchase their material factory direct.
Certified:
Jeffrey L. McKean, PE
Date: April 24, 2024
Donohue Associates, Inc. Proposal Review
Project No. 13985 Page 2 of 2
CITY OF SOUTH BEND, INDIANA
SELLER'S PROPOSAL FOR PUBLIC WORK
Project Name Fellows Street Booster Station Contract A —Station Procurement
Project No. 121-070A
For Proposals Due April 9, 2024
PART I
(Must be completed for all Proposals. Please type or print)
Proposer
Date: 04-08-2024 (Firm): EFI-SOLUTIONS INC
Address: P.O. BOX 723 1221 N. ELM ST.
City/State/Zip: CENTRALIA, IL 62801 Telephone Number: ( 618 ) 533-1351
Agent of Proposer (if Applicable): DAVE EALY
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works
project of:
Fellows Street Booster Station Contract A — Station Procurement 121-070A
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
DONOHUE AND ASSOCIATES
and dated APRIL 08, 2024 for the sum of (enter the Total Proposal as shown on the Proposal)
Two Million Five Hundred Ninety -Two Thousand Twenty -Five Dollars ($ 2,592,025.00 )
(Enter sum of Total Base Proposal plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this Proposal for an amount specified in the
notice of the letting. If alternative Proposals apply, the undersigned submits a proposal for each in accordance with the
notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown in
the original contract if accepted by the City of South Bend. If the Proposal is to be awarded on a unit basis, the
itemization of the units shall be shown on a separate attach
By
( re)
DAVE EALY C.B.O. / ER
The above Proposal is
accepted this
Subject to the following conditions:
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
Murray L. Miller, Member
(Printed Name of Person Signing)
ACCEPTANCE
day of
Joseph R. Molnar, Vice President
Briana Micou, Member
Attest: Theresa M. Heffner, Clerk
Date: June 11, 2024
20
BOARD OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
This Agreement is made and entered into this IIth Day of June, 2024, by and between EFI
Solutions, Inc., (the "Contractor"), and the Board of Public Works (the "Board").
The Contractor covenants and agrees to make the following improvement, as fully set out in the
Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all
of which are set forth as a part of this Contract, for:
PROJECT NO.
DESCRIPTION:
COMPLETION DATE:
AMOUNT:
FT TNTNNC:-
121-070A
FELLOWS BOOSTER PUMP
CONTRACT A
SEE SPECIFICATIONS
$2,529,025
STATE REVOLVING FUND
STATION IMPROVEMENTS -
The unit prices for this improvement were those prices as received and accepted by the Board on
the 9th Day of April, 2024.
The Contractor further agrees to notify the assigned Engineer when this improvement is
completed. This notification shall be in the form of a Project Completion Affidavit, signed by the
Contractor. Upon final acceptance of the improvement by the Engineer, the Contractor's final
estimate will be presented to the Board for final Payment with one (1) copy of the Project
Completion Affidavit and one (1) copy of a Waiver of Lien.
Each of the Parties, by signing below, represents and warrants to the other Party that he/she/it has
the authority to bind the named person or entity to this Agreement.
CITY OF SOUTH BEND, INDIANA EFI SOLUTIONS, INC.
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
Murray L. Miller, Member
�m
Joseph R. Molnar, Vice President
Briana Micou, Member
�4
Attest: Theresa M. Heffner, Clerk
Date: June 11, 2024
Printed Name
Signature
CITY OF SOUTH BEND, INDIANA
SELLER'S PROPOSAL FOR PUBLIC WORK
CHECKLIST FOR PROPOSALS
Project Name Fellows Street Booster Station Contract A — Procurement
Project No. 121-070A
For Proposals Due April 9, 2024
From time to time the South Bend Board of Public Works finds it necessary to reject a Proposal because it
does not comply with statutory requirements. In preparing your Proposal, please use the following checklist
in order to make sure that your Proposal is done in the proper manner.
Proper Proposal security included. The Proposer has the option of providing either a Certified Check or
X Proposal (Bid) Bond.
X City of South Bend Responsible Proposer Checklist.
Proposal prepared on the City of South Bend Seller's Proposal for Public Work Form, completely
X executed.
Seller's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran,
Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United
X States Steel Products or Foundry Products.
Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts
X Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and WBE-2.1].
X Acknowledge Receipt of 0 Addendum(s) included with the Proposal.
All required additional information is included with the Proposal, required SRF Forms (including OEE-1,
X OEE-2, MWE/WBE Good Faith Effort Worksheet, American Iron and Steel Certificate, etc.)
X Performance based certified design submittal and quality control certifications.
Proposal statements and other affidavits all signed by the proper party with name either printed or typed
X underneath signature.
X This checklist submitted with the Proposal.
This checklist is provided for Proposer's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the Proposer of the need to read and comply with the specifications.
Proposer: EFI-SOLUTIONS INC
By Authorized Representative:
Signature:
Print Name & Title: DAVE EALY C.B.O. / V a—.- TOWNER
Version 09/29/2021 Seller's Proposal for Public Works - 1
Date: 04-08-24
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each Proposer with and as part of his/her/its
Proposal.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current Proposal.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your Proposal.)
2. Attach a listing of the names and addresses of all sub -sellers (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
sub -Seller.
3. If you intend to sublet any portion of the work, attach the name and address of each sub -seller,
equipment to be used by the sub -seller, and whether you will require a bond. However, if you
are unable to currently provide a listing, please understand a listing must be provided prior to
contract approval. Until the completion of the proposed project, you are under a continuing
obligation to immediately notify the City of South Bend in the event that you subsequently
determine that you will use a sub -seller on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III SELLER'S FINANCIAL STATEMENT
Attachment of Proposer's financial statement is mandatory. Any Proposal submitted
without said financial statement as required by statute shall thereby be rendered invalid. The
financial statement provided hereunder to the City of South Bend awarding the contract must be
specific enough in detail so that said City of South Bend can make a proper determination of the
Proposer's capability for completing the project if awarded.
Version 09/29/2021 Seller's Proposal for Public Works - 3
When the prospective Seller is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
SELLER'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING
INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION
COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR
FOUNDRY PRODUCTS
(Must be completed for all quotes and Proposals. Please type or print)
STATE OF ILLINOIS )
) SS:
MARION COUNTY )
The undersigned Seller, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that:
1. Seller has not, nor has any other member, representative, or agent of the firm, company, corporation
or partnership represented by him, entered into any combination, collusion or agreement with any person
relative to the price to be Proposal by anyone at such letting nor to prevent any person from Proposing nor
to induce anyone to refrain from Proposing, and that this Proposal is made without reference to any other
Proposal and without any agreement, understanding or combination with any other person in reference to
such Proposing. Seller further says that no person or persons, firms, or corporation has, have or will receive
directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Seller certifies by submission of this proposal that neither Seller nor any of its principals are
presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Seller has not, nor has any successor to, nor an affiliate of, Seller, engaged in investment
activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Seller is
engaged in investment activities in Iran if either:
i. Seller, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Seller, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Seller does not knowingly employ or contract with an unauthorized alien, nor retain any employee
or contract with a person that the Seller subsequently learns is an unauthorized alien. Seller agrees that
he/she/it shall enroll in and verify the work eligibility status of all of Seller's newly hired employees through
Version 09/29/2021 Seller's Proposal for Public Works - 4
the E-Verify Program as defined by I.C. 22-5-1.7-3. Seller's documentation of enrollment and participation
in the E-Verify Program is included and attached as part of this Proposal/quote; and
5. Seller shall require his/her/its sub -sellers performing work under this public contract to certify that
the sub -sellers do not knowingly employ or contract with an unauthorized alien, nor retain any employee or
contract with a person that the sub -seller subsequently learns is an unauthorized alien, and that the sub -seller
has enrolled in and is participating in the E-Verify Program. The Seller agrees to maintain this certification
throughout the term of the contract with the City of South Bend, and understands that the City may terminate
the contract for default if the Seller fails to cure a breach of this provision no later than thirty (30) days after
being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
Proposing laws or other contracts in which public Proposals are not required by law, the City, its agencies,
boards, or commissions will consider the Seller's good faith efforts to obtain participation by those sub -
sellers certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive Proposer.
Sellers seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however,
they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Sellers are
required to either meet both MBE and WBE utilization goals or demonstrate that the Seller has made good
faith efforts to obtain participation from MBE and WBE sub -sellers. A finding of noncompliance or a
discriminatory practice shall prohibit that Seller from being awarded a City contract for a period of one (1)
year from the date of such determination, and such determination may also be grounds for terminating the
contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Seller agrees that the following nondiscrimination commitment shall be made a
part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Seller agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned Proposer or agent as Seller on a public works project, understand my statutory obligations
to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify
that I and all sub -sellers employed by me for this project will use steel products or foundry products made in
the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my
Proposal that my proposal does not include the use of steel products or foundry products made in the United
States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject
to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior
to award and upon submission of Proposal which does not use steel products or foundry products made in
the United States, the City, through its director of public works, shall make a determination if the price of
United States made steel or foundry is unreasonable. I understand that violations hereunder may result in
forfeiture of contractual payments.
Version 09/29/2021 Seller's Proposal for Public Works - 5
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing
Proposal for public works are true and correct.
Dated this 8TH day of APRIL , 20 24
Subscribed and sworn to before me this 8TH
My Commission Expires
02-26-2026
EFI-SOLUTIONS INC
Seller/Pro o Firm)
Signature o e ler/Pro o s Agent
DAVE EALY C.B.O. / V. P . / OWNER
Printed Name and Title
day f APRIL 20 24
Notary Public
County of Residence CLINTON, IL
Official Seal
Gina Marie Fos(e
Notary Public State of H, :•^,is
My Commission Xnir S L �' _:�26
Version 09/29/2021 Seller's Proposal for Public Works - 6
PROPOSAL
CITY OF SOUTH BEND
Project Name: Fellows Street Booster Station Contract A — Station Procurement
Project Number: 121-070A
For Proposals Aril 9, 2024
Due: p
Seller Name: ENGINEERED FLUID INC. D.B.A. EFI-SOLUTIONS INC.
BASE PROPOSAL
Item
Description
Quantity
Unit
Unit Price
Total Amount
No.
1
PRE -PACKAGED BOOSTER PUMP
1
LS
215927025000
21592,025400
STATION
Proposer
(Firm):
Address:
City/State/Zip
BASE PROPOSAL TOTAL 2,592,025.00
EFI-SOLUTIONS INC.
PO BOX 723 1221 N ELM ST.
CENTRALIA, IL 62801 Telephone Number:
618) 533-1351
(Sig
DAVE EALY C.B.O. / V.P /OWNER
(Printed Name of Person Signing)
Version 09/29/2021 Seller's Proposal for Public Works - 7
O
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN r PEACE,z
FORM MBE-1.0 - x
MBE UTILIZATION PLAN 1865
This completed form should be supplied with Proposals that pertain to City of South Bend Public Works Projects involving MBE participation.
It is the Proposer's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
Project Number:
Proposer:
121-070A
Project Name: Fellows Booster Station Contract A -Station Procurement
Total Proposal
EFI-SOLUTIONS INC. Amount. -
0 MBE Goal:
Page_
0
of
Name & Address of MBE
Primary Contact Person
(Name/Telephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of MBE
Component
Percentage of
Total
Proposal/ roosal
Submitted by: MICHAEL ENGLISH dLWz , 6�
Print Name Signature
Version 09/29/2021 Seller's Proposal for Public Works - 8
04-08-2024
Date
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Proposals documents related to City of South Bend
Public Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 121-070A Date: 04-08-2024
Project Name: Fellows Booster Station Contract A — Station Procurement
Proposer: EFI-SOLUTIONS INC
Contact Person: Michael English Telephone: 618-533-1351
Address: 1221 N. Elm St.,
City: Centralia, State: ILLINOIS Zip: 62801
Email: menglish@efi-solutions.com
To determine whether a Proposer has demonstrated good faith efforts to reach the MBE utilization goals set forth
in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The Proposer reviewed 1) the City of South Bend's Minority and Women Business
Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana
Department of Administration list of Minority and Women Owned Businesses (both certified and non -
certified) found at: http://www.in.gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The Proposer shall initial each item below, as evidence of its good faith efforts to obtain MBE
participation in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
ME
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
ME
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
ME
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre -Proposal meetings scheduled by the City of South Bend to
ME
inform MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
ME
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
ME
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MBEs to participate effectively.
ME
I affirm that I followed up on initial solicitations with interested MBEs.
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
ME
with adequate information about the plans, specifications and other requirements of the
subcontract.
Version 09/29/2021 Seller's Proposal for Public Works - 9
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
ME
lines of credit, or insurance as required by the City or the Proposer, where appropriate.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
ME
equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
ME
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The Proposer has maintained the following records for each MBE that has
Proposal on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the Proposer or sub -seller; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
`Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the Proposal by the Board of Public Works. The City
of South Bend reserves the right to request additional information.
4"_4� L'�Lj
Version 09/29/2021 Seller's Proposal for Public Works - 10
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN Vt.AVF. -yam
FORM MBE-2.1 it sus x
WBE CONTACTED
This completed form should be supplied with Proposals that pertain to City of South Bend Public Works
Projects requiring Good Faith Efforts to contact MBEs. It is the Proposer's sole responsibility to verify whether
any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 1
Project Number: 121-070A MBE Participation Goal O
Project Name: Fellows Street Booster Station Contract A — Station Procurement
Proposer: EFI-SOLUTIONS INC.
By: MICHAEL ENGLISH E.V.P. / OWNER 04-08-2024
(Signature) (Title) (Date)
MBE Firm N/A
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT. -
RESULTS OF CONTACT WITH THE MBE FIRM:
MBE Firm N/A
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 09/29/2021 Seller's Proposal for Public Works - 11
WARRANTY STATEMENT
The warranty for the booster pumping system is the sole responsibility of the booster
pumping system manufacturer and includes the following:
1. The warranty shall be for a period of three (3) years commencing upon station
startup.
2. The three (3) year warranty period shall be inviolate regardless of any component
manufacturer's warranty for equipment and components within the station.
3. The warranty shall cover all equipment, components and controls, provided under
this contract by the booster pumping system manufacturer, exclusive of those
components supplied by and/or installed by others independent of the control of
the booster pumping system manufacturer.
4. The booster pumping system manufacturer shall bear the full cost of labor and
materials for replacement and/or repair of faulty or defective components, or
controls, supplied by the booster pumping system manufacturer on site as required
so there shall be no cost incurred by the Owner for this work during the warranty
period.
5. No assumption of contingent liabilities for any component failure during warranty
is made.
This warranty is provided by the booster pumping system manufacturer as the single party
responsible for warranting all components included with the booster pumping system on
site and all aspects of performance as specified. The booster pumping system
manufacturer does not utilize "Second Party" or "pass through" warranties. All warranty
service will be provided by factory direct booster pumping system manufacturer
employees.
Dated: 04-08-2024
State of IL
County of MARION
EFI-SOLUTIONS INC.
Company Name
Company Officer' ure
The above WARRANTY STATEMENT was signed and acknowledged before me on this
8T1-iflay of APRIL , 202 4 by DAVE EALY (Officer), acting in the
aforesaid capacity for EFI-SOLUTIONS INC. (Company).
official Se7ter
NotaryPublic <:;na Marie F
Lt vt�Ya; y tlublic Stat,,p
Seller's roposal for Public Works 12
CERTIFIED WELDING AND STEEL STATEMENT
All capsule, skid, structural, transmission piping, pipe and equipment supports, and
restraint, welding; shall only be performed by certified welders.
All transmission piping or pressure vessel welding shall be performed by individuals
certified to weld carbon steel pipe under ASME CODE SECTION IX.
All other welding shall be performed by individuals certified under ASME CODE SECTION
IX or by the American Welding Society (AWS) Structural Welding Code, Section 9.10.
Prior to welding all structural supports, transmission piping, pipe and equipment supports,
and restraints, shall be grit blasted to near white blast cleaning (SSPC-SP10).
All steel used for fabrication of the booster pumping system shall be domestic. This
includes, but is not limited to, all steel used in fabricating the capsules, skids, all structural
steel, all supports and bracing, and all transmission piping, flanges, and fittings.
Dated: 04-08-2024 EFI-SOLUTIONS INC.
State of I L
County of
MARIOf�
Company Officer'
Company Name
The above CERTIFIED WELDING
aDAVE IEALY before me on this
(Officer), acting
EFI-SOLUTIONS INC. (Company).
i°r6tu re
AND STEEL STATEMENT
8TH day of APRIL
in the aforesaid
� Official Seal
UbIIC - Gina Marie Foster
Notary Public State of Illinois
My Commission ExPires2/26)2026
Seller's Proposal for Public Works 13
was
signed and
202 4 by
capacity for
CORROSION PROTECTION STATEMENT
Detailed in this submittal is a complete manufacturing methodology for corrosion protection to be utilized
by the booster pumping system manufacturer. Key components of that manufacturing methodology are
listed below.
SURFACE PREPARATION AND EXTERIOR COATING
All surfaces of the entire structure including the entire skid and base plate shall be grit blasted equal to near
white blast cleaning (SSPC-SP10).
Following blasting and directly before full painting, all weldments will be hand primed with a covering primer
coating.
The protective coating shall take place immediately after surface preparation. The protective coating shall
consist of a two component, high solids, amide -cured epoxy system formulated for high build application
having excellent chemical and corrosion resistant properties. The epoxy system shall be self -priming and
require no intermediate coatings. The protective coating shall provide in two (2) applications a total dry mil
thickness of 8.0 mils minimum, 11 mils maximum.
FUSION BONDED EPDXY INTERNAL PIPE COATING
The internal surfaces of piping to be fusion bonded coated shall be grit blasted to an SP-10 finish
with the finish profile required by the coating material manufacturer.
The internal, wetted surfaces of the steel transmission piping shall have applied to it a Fusion
Bonded Epoxy Coating on the interior pipe surface. The coating shall be applied and meet the testing
requirements of Table 1 and Table 2 with the exception of Table 2 section 7 per AWWA C-213.
The powder coating product shall be National Sanitation Foundation (NSF) Standard 61 certified
material.
Prior to shipment of the station, the station manufacturer shall provide in writing to the Engineer
certification that the fusion bonded epoxy coating has been applied to all internal surfaces of the steel piping
using the proper method. Said certification shall show under the station manufacturer's letterhead:
- Date of application;
- Material manufacturer and product designation including a product data sheet for the coating;
- Applier of the fusion bonded coating, name, address and phone number;
- Notarized signature of an officer of the station manufacturing company stating the fusion
bonded epoxy coating was applied to AWWA Standard C213-91 or the latest revision.
PIPING
Piping shall be steel and conform to material specification ASTM A-53 (CW) for nominal pipe size
four (4) inch and smaller and ASTM A-53 (ERW) Grade B for nominal pipe size five (5) inches and larger.
Steel butt -welding fittings shall conform to material specification ASTM A-234 Grade WPB and to the
dimensions and tolerances of ANSI Standards B1.9 and B16.28 respectively.
Forged steel flanges shall conform to material specification ASTM A-105 Class 60 and/or ASTM A-
181 for carbon steel forgings and to the dimensions and tolerances of ANSI Standards B16.5 as amended
in 1992 for Class 150 and Class 300 flanges.
The piping sizes shall be as shown on the drawing.
Size 10 inch and below - Schedule 40
Size 12 inch and above - Standard weight (.375" wall)
Seller's Proposal for Public Works 14
All pipe welds shall be performed by certified welders employed by the booster pumping system
manufacturer. As part of the equipment submittal, the pumping system manufacturer shall provide copies
of the welding certificates of the employees who are to perform the pipe welds.
All piping surfaces shall be prepared by sandblasting, or other abrasive blasting, prior to any welds
taking place. Piping or 5" diameter and smaller may be cut by saw. Piping of 6" diameter and larger shall
be bevel cut, and Oxyfuel or Plasma -arc cutting techniques shall be used to assure and facilitate bevel pipe
cuts. No saw cuts or other form of abrasive cut-offs are allowed on 6" and larger diameter pipe.
In all cases, short circuit transfer, spray transfer or pulse -arc transfer modes of the gas metal arc
welding process shall be applied semi -automatically. When utilizing the short circuit mode, shielding gas
shall be used. When utilizing the short circuit mode, shielding gas consisting of 50% carbon dioxide and
50% argon gas shall be used. When utilizing the spray or pulse -arc transfer modes, a shielding gas
consisting of 5% carbon dioxide and 95% argon shall be used. In all cases, welding wire with a minimum
tensile strength of 70,000 psi shall be employed. All tensile strength of 60,000 psi shall be employed. All
flange welds and butt welds of equal size pipe shall be a single continuous nonstop weld around the
complete circumference of the pipe. Whenever possible, vertical up weld passes will be applied to all pipe
welds. No vertical down weld passes will be allowed. Completed welding assemblies shall create no
internal obstruction, restriction or create any unintended sources of water deflection.
Piping of six (6) inch diameter and larger shall require a minimum of two (2) weld passes to
complete each weld. The first pass, or root pass, shall be applied at the bottom of the bevel cut using the
short circuit transfer welding mode, and the second pass, or cap pass, shall be applied over the root pass
using the spray or pulse arc transfer welding modes to insure that at a minimum the total weld thickness
shall be equal to thinnest of the two (2) pieces being welded together.
Dated: APRIL 8. 2024
State of ILLINOIS
County of MARION
EFI-SOLUTIONS, INC.
Company Name
The above CORROSION
acknowledged before me o
DAVID A. EALY (Officer),
EFI-SOLUTIONS. INC.(Company).
Notary Public
PROTECTION
I this WSJ-{
acting in
re
SYSTEM STATEMENT was signed
day of APRIL 2024
the aforesaid capacity
Official Seal
Gina Marie Foster
Notary Public State of Illinois
rviy Commission Expires 212612026
Seller's Proposal for Public Works 15
and
by
for
FACTORY START-UP AND SERVICE STATEMENT
Start-up Cl"d warranty service shall be performed by the booster pumping system manufacturer factory
direct employees. No representative, contract service organization or third party of any sort shall be
directed to perform such services by the booster pumping system manufacturer.
1. Start-up and warranty service technicians shall be regular factory direct employees.
2. At least one of the following factory direct employees will perform all services and warranty
work as required on the booster pump station:
EMPLOYEE NAME POSITION YEAR OF SERVICE
CHARLES WAGGONER SERVICE MANAGER
CODY KEEN
SCOTT MOORE
ASST. SERVICE MANAGER
SERVICE TECHNICIAN
SERVICE TECHNICIAN
32
22
LINCOLN DICKINSON SERVICE TECHNICIAN 05
3. One (1) or more of the Service Technicians listed above will perform the required start-up
and warranty service on the booster pumping system.
4. A total of two (2) days for start-up and training on site shall be provided.
5. Start-up service to include two (2) bound O&M Manuals for the booster pumping system
and one (1) SSD drive with all O&M Manual and approved submittal documents.
6. All start-up or service reports shall be attested to by start-up technician and representatives
of Owner or Engineer.
7. Service reports shall be distributed to:
a. Manufacturer's File
b. Engineer's File
c. Contractor's File
d. Owner's File
Dated: APRIL 8, 2024
State of ILLINOIS
County of MA ION
EFI-SOLUTIONS
Company Name
Company Officer's Sign
The above FACTORY START-UP AND SERVICE STATEMENT was signed and acknowledged
before me on this 8TH day of APRIL 2024 by DAVID A. EALY (Officer), acting in the
aforesaid capacity for EFI-SOLUTIONS. INC.(Company),
Notary Public -_
Official Seal
Gina Marie Faster
Notary Public State of Illinois
My Commission Expires 2/2612026
Seller's Proposal for Public Works 16
APPLICABLE STANDARDS AND LISTINGS
This booster pumping system will be manufactured to pertinent sections of the following
standards and listings:
1) Underwriters Laboratories, Inc. (UL) ULQCZJ7 UL5081 UL508SE3 UL58.
2) National Electric Code (NEC) Compliance
3) American Water Works Association
4) Electrical Testing Laboratory (ETL)
5) American National Standards Institute (ANSI)
6) American Society for Testing and Materials (ASTM)
7) American Welding Society (AWS)
8) American Society of Mechanical Engineers (ASME)
9) Society For Protective Coatings (SSPC)
(formally Steel Structures Painting Council)
10) National Sanitation Foundation (NSF)
11) Ten States Standard
Dated: APRIL 8, 2024
State of ILLINOIS
County of MARION
EFI-SOLUTIONS, INC.
Company Name
Company
ignature
The above APPLICABLE STANDARDS AND LISTING STATEMENT was signed
and acknowledged before me on this 8TH day of APRIL 2024 by
DAVID A. EALY (Officer), acting in the aforesaid capacity for
EFI-SOLUTIONS, INC.(Company).
` Official Seal
_ _ Gina Marie Faster
Notary Pub is Notary Public State of lilinois
My Commission Expires 2126/2026
Seller's Proposal for Public Works 17
CERTIFICATION OF COMPLIANCE
We the undersigned booster pumping system manufacturer have reviewed the plans and
specifications and herein certify we will bid the project as specified without exception or deviation.
We the undersigned booster pumping system manufacturer understand conditional
proposals will not be accepted and submission of a proposal by a booster pumping system
manufacturer, will constitute an incontrovertible representation by the booster pumping system
manufacturer that without exception the proposal is premised upon all work as required by these
plans and specifications and will be completed fully as specified.
We the undersigned booster pumping system manufacturer understand the Contract
Documents are the final authority for acceptance of the work provided. We understand the
booster pumping system manufacturer is required to provide the required design with bid
submittals.
We the undersigned booster pumping system manufacturer understand the Engineer and
Owner shall be considered the sole judge of the merits of the manufacturers design with bid
submittal.
We the undersigned booster pumping system manufacturer understand we are eligible to
offer equipment proposals for this work provided no exceptions of deviations are taken to the plan
design and product specifications and provided we strictly abide by the requirements set forth in
the complete design with bid submittal.
We the undersigned booster pumping system manufacturer, understand award of the
contract for this work will not be based solely on price. Overall booster pumping system design,
price, qualification of the bidder, qualification(s) of subcontractors, and the demonstrated intent
by the bidder to adhere to all aspects of these performance plans and specifications will all be
factors in determining the award.
We the undersigned booster pumping system manufacturer understand this is a
performance specification format. Liability for the design and performance of the booster pumping
system, telemetry, and SCADA controls as specified herein will remain with the booster system
manufacturer. It is the responsibility of the booster system manufacturer to fully understand the
application as specified herein and to design and manufacture, the booster pumping system and
telemetry / SCADA controls to the specified quality standard, to perform as required by the
Engineer and Owner.
Dated: APRIL 8. 2024
State of ILLINOIS
County of
MARION
EFI-SOLUTIONS. INC.
Company Name
Company Offi
nature
The above Certification of
Compliance was signed and acknowledged before me on this
8THday of APRIL 2024 by DAVID A. EALY (Officer), acting in the aforesaid
capacity for EFI-SOLUTIONS, INC (Company),
Notary Nublic
Official Seal
Gina Marie Foster
Notary public State of Illinois
My Commission Expires 2/2612026
Seller's Proposal for Public Works 18
EFI—SOLUTIONS
e��-sa����a�s �om
CERTIFICATE OF AUTHORIZATION
00
O
I, Michael Neudecker, President of EFI-Solutions, a corporation organized under the laws
of the State of Delaware, do hereby certify that Michael English, as Vice President of said
corporation, is authorized to sign contract documents and act on behalf of Engineered Fluid, Inc.
and all its subsidiaries including Applied Hydro Sales and Engineered Solutions Midwest, Inc.
ATTEST:
Michael Neudecker, President
Engineered Fluid, Inc.
LISA KOGER
Official Seal
� NaCary Publie -State of Illinois
N1r commission Expires Jul 21, 2025
P.O. Box 723, 1221 N. Elm St., Centralia, IL 62801 ♦ Ph: (618) 533-1351 ♦ Fax: (618) 533-1459
EFI-SOLUTIONS
solUtions.com
CERTIFICATE OF AUTHORIZATION
00
O
I, Michael Neudecl<er, President of EFI-Solutions, a corporation organized under the laws
of the State of Delaware, do hereby certify that David Ealy, as Vice President of said
corporation, is authorized to sign contract documents and act on behalf of Engineered Fluid,
Inc. and all its subsidiaries including Applied Hydro Sales and Engineered Solutions Midwest,
Inc.
ATTEST:
Michael Neudecker, President
Engineered Fluid, Inc.
LISA KOGER
Official Seal
N�tarV Public -State of Illinois
My Oornmission Expires Jul 21, 2025
P.O. Box 723, 1221 N. Elm St., Centralia, IL 62801 ♦ Ph: (618) 533-1351 ♦ Fax: (618) 533-1459
Engineered Fluid, Inc. is now operating under the d. b. a. of
P.O. 723
1311 N. Maple R
Centralia, IL 62801
(618) 533 1351
info@engineeredfluid.com
www.engineeredfluld.com
EFI-SOLUTIONSDO
eII"SUIutions.com
P rof Engineered Fluid Inc. (EFI) is a privately
heldI solely employee -owned company headquartered in
Centralia, Illinois. EFI specializes in design, manufacture,
service and support of custom, packaged equipment for
various utility industries including Municipal, Industrial,
Electrical, Mining, Power Generation, etc... Serving all
industries that can benefit from intelligent designed,
Mechanical & Electrical Packages.
Innovator. In EFI's early days the main focus was
on the Potable Water Industry, where EFI is the leader
and innovator in providing quality to packaged equipment.
EFI has made numerous improvements to industry
standards to provide its customers with the best solution
for their need. Some of these features/methods seem
small but they serve a significant function.
Single Source Responsibility — No more vendors
pointing their fingers at each other. No matter the
component included in the package equipment, there
is just one call.
Polyurea Coating —Applied on steel floors and steel
doors. This product is far superior to the epoxy
typically used. For moisture insensitive applications, this
coating contains a strong chemical resistance
that protects various substrates against moisture.
UL Electrical Panels —EFI was the first in the
industry with a UL shop.
Designing Factory -Built Quality iEqui��,�.,�- �����
LEADER/INNOVATOR
Fusion Bonded Interior Steel Pipe Coating — This baked -on
product outperforms the standard two-part epoxy.
Lap Joint Steel Vault Construction —While this joint is as strong
as "T" weld, the use of the Lap Joint is all about corrosion protec-
tion, by keeping the weld above the floor of the capsule.
Welded, Steel Supports —Are more sturdy and have less move-
ment than the industry standard clamp bracing.
EPC &Motor Pads —Cushion the vibration of motors and lessen
the torque on the pipeline.
Pressure Gauges —Secured on steel plate, off the pipeline for
accurate reading and subsequent proper operation.
Working Area — EFI's designs always include necessary ample
working area.
EFI was founded in 1964 by Jack Goodspeed when a customer had
a need for packaged equipment. Jack met that customer's need
and EFI continues the tradition today. The corporation is
headquartered in Centralia, Illinois, where it was originated. A
second manufacturing site was added to accommodate EFI's
increased product line.
EFI started in the Potable Water industry providing custom valve
stations, meter stations, and pump stations. Since its conception,
EFI has added:
- Telemetry and Controls
Process Equipment Stations
Modular Buildings
Multi -Unit Stations
- Design/Build
- Electrical Enclosures
Off -Campus Rapid Response Centers
Water Distribution & Other for the Mining Equipment
EFI-SOLUTIONS
efi-
solutions.com
00
O
UL 508
ETLW
NEC
State Building Codes Certifications
MSHA
OSHA
CSA Certified
ANSI/AWS
ASME
Design — EFI's design team of roughly 25 personnel consists
of Mechanical, Civil, Electrical, Nuclear Engineers, Designers and
Drafters. EFI includes comprehensive submittals and Operational
k Maintenance Manuals.
Manufacturing —EFI employs about 100 production employees
fully trained in their trade. With two manufacturing locations in
Centralia, EFI has 151,000 square feet under roof. Production
areas include:
1
UL Panel Lab Welding Shop
Electric Panel Shop Building Shop`; *•;�
Fusion Bonding Shop Telemetry & Controls Shop
3 Paint Bays 8 Fabrication Baysall
S{
Welder Areas Tank Build Shop
Phosphate Wash Bay Sand Blast Shop
Delivery — 97% of EFI's equipment is delivered by EFI person-
nel. This means the responsibility of the equipment remains with '
EFI through transport. Installing Contractors have readily avail-
able to them, at the job site, a knowledgeable person who has f
seen hundreds of installations.
Site Project Managers —Where site work is part of EFI's
scope, EFI will assign a dedicated Project Manager.
Start-up Services/Warranty/Service/Maintenance —Over
a dozen Service Personnel are based in various locations across \.-=��.
the U.S. with more locations to come.
Rai
Im
EFI -SOLUTIONS
efi-solutions.com
VAO
EFI SOLUTIONS
of i-
solutI ns.com
00
O
Engineered Fluid Inc. dba EFI-Solutions
POTABLE WATER SERVICE INSTALLATIONS
WESTMORELAND, PA EFI JOB #91814, 92637
DATE OF INSTALLATION: 12/17/15 BOOSTER PUMP STATION
DATE OF INSTALLATION: 01/12/16
OWNER: MUNICIPAL AUTHORITY OF WESTMORELAND
P. O. BOX 730
GREENSBURG, PA 15601
CONTACT: MR. BRUCE REBRECHT (724) 755 5969
ENGINEER: GIBBON & THOMAS ENGINEERING CO INC
1004 LIGONIER ST
LATROBE, PA 15650
CONTACT: BRUCE GRAHAM (724)539 8562
2778 GPM @ 18117DH
ER PUMP STATION
BOOST
2778 GPM @ 218'TDH
LORAIN COUNTY, OH EFI JOB #91895 & 92685
DATE OF INSTALLATION: 08/12/16 WATER -SHED° BOOSTER PUMP STN.
2600 GPM @ 162'TDH
DATE OF INSTALLATION: 10/27/16 WATER -SHED° BP/CHEM FEED STN,
1400 GPM @ 120'TDH
OWNER: RURAL LORAIN COUNTY WATER AUTHORITY
P.O. BOX 567
LAGRANGE, OH 28594
MR. TIM MAHONEY
CONTACT: (440) 355-5121
ENGINEER: GRW ENGINEERS
100 E CAMPUS VIEW BLVD
COLUMBUS, OH 43235
CONTACT: CRAIG FARRELL (317)347 3650
Page 1
WESTCHESTER, NY
DATE OF INSTALLATION:
12/12/2016
OWNER: WESTCHESTER JOINT WATER WORKS
1625 MAMARONECK AVE
MAMARONECK, NY 10543
MR. FRANK ACARA
CONTACT: (914)698 3500
ENGINEER: H2M ARCHITECTS &ENGINEERS
538 BROAD HOLLOW RD
MELVILLE, NY 11747
CONTACT: TIRA MCGUIRE (631)756 8000
AVON LAKE, OH
DATE OF INSTALLATION: 11-15-2018
OWNER: AVON LAKE REGIONAL WATER
201 MILLER RD
AVON LAKE, OH 44012
CONTACT: RICK EBERLE (440)933 6226
ENGINEER: BURGESS & NIPLE INC
100 WEST ERIE STREET
PAINESVILLE, OH 44077
WATER -SHED° BOOSTER PUMP STN,
4167 GPM @ 255'TDH
EFI JOB
WATER -SHED° BOOSTER PUMP STN.
CONTACT: TIMOTHY M. ANTOS P.E. (440)354 9700
AVON LAKE, OH
3000 GPM @ 126'TDH
I JOB NO: 93315
DATE OF INSTALLATION: 08/10/2017 WATER -SHED° BOOSTER PUMP STN.
'
2900 GPM 280 @ TDH
OWNER: AVON LAKE MUNICIPAL UTILITIES
201 MILLER RD.
AVON LAKE, OH 44012
CONTACT: RICK EBERLE (440)933 6226
ENGINEER: GRW ENGINEERS
801 CORPORATE DR.
LEXINGTON, KY 40503
CONTACT: MR. MR. MICHAEL JACOBS, P.E. (859)223 3999
PROPOSAL SECURITY
(BID BOND)
DocuSign Envelope ID: 93698938-95BE-4883-84A3-DE66A8D303C3
BID BOND (PENAL SUM FORM)
Bidder
Name: Engineered Fluid, Inc DBA EFI-Solutions
Address (principal place of business):
PO Box 723, 1221 N Elm, Centralia, IL 62801
Owner
Name: City of South Bend, IN
Address (principal place of business):
227 West Jefferson Blvd, Suite 1300 N
South Bend, Indiana 46601
Bond
Penal Sum
Date• of Bond:
$100,000
May Sth, 2024
Surety
Name: Travelers Casualty and Surety Company
of America
Address (principal place of business):
One Tower Square, Hartford, CT 06183
Bid
Project (name and location):
Fellow Street Booster Station Contract A -
Station Procurement
Project No. 121-070A
City of South Bend, Indiana
Bid Due Date:
04/02/2024
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this Bid Bond,
do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representativef:
Bidder
Engineered Fluid, Inc DBA EFI-Solutions
Bpi �:' ��•
Name: Dave Ealy
(Printed or typed)
Title: C.B.O. / V.P. / Owner
MOF
Name: Gina Foster
(Prin
Title: Senior Sales Coordin
Surety
Travelers Casualty and Surety Company*of America
(F II forif
emurety) (ccrporate sea!)
By:
1 nature Attach Power of Atiorney)
Name: Chelsea Eilers 11
(Printed or typed)••..,..•...._.•..
Attorney -in -Fact
Title: ,,,,„„�,„„ �,,,,.
Attest: I
Official Seal
Gina Marie Foster Name:
or f>fp.�rdj'y Public State of Illinois
Commission Expires 212�'i�Fp 6
J' ...(Signature)
Scott Voellinger
(Printed or typed)
anaging Director
Notes: (1) Note: Addresses are to be used for giving any required notice. (2) Provide execution by any additional parties, such as
joint venturers, if necessary.
EJCDCm C-430, Bid Bond (Penal Sum Form).
Copyright° 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 2
DocuSign -nvelope ID: 93698938-95BE-4883-84A3-DE66A8D303C3
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors,
and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond.
Payment of the penal sum is the extent of Bidder's and Surety's liability. Recovery of such penal sum under
the terms of this Bond will be Owner's sole and exclusive remedy upon default of Bidder.
2. Default of Bidder occurs upon the failure of Bidder to deliver within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by
the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation will be null and void if:
3.1. Owner accepts Bidder's Bid and Bidder delivers within the time required by the Bidding Documents
(or any extension thereof agreed to in writing by Owner) the executed Agreement required by the
Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2. All Bids are rejected by Owner, or
3.3. Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents
(or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety
when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after
receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with
reasonable promptness, identifying this Bond and the Project and including a statement of the amount
due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice
of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award
including extensions does not in the aggregate exceed 120 days from the Bid due date without Surety's
written consent.
6. No suit or action will be commenced under this Bond prior to 30 calendar days after the notice of default
required in Paragraph 4 above is received by Bidder and Surety, and in no case later than one year after
the Bid due date.
7. Any suit or action under this Bond will be commenced only in a court of competent jurisdiction located in
the state in which the Project is located.
8. Notices required hereunder must be in writing and sent to Bidder and Surety at their respective addresses
shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by
United States Postal Service registered or certified mail, return receipt requested, postage pre -paid, and
will be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the
authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute,
seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of
any applicable statute that has been omitted from this Bond will be deemed to be included herein as if set
forth at length. if any provision of this Bond conflicts with any applicable statute, then the provision of said
statute governs and the remainder of this Bond that is not in conflict therewith continues in full force and
effect.
11. The term "Bid" as used herein includes a Bid, offer, or proposal as applicable.
EJCDC° C-430, Bid Bond (Penal Sum Form).
Copyright° 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 2
ATTACHMENT "A"
THE LIABILITY OF THE SURETY UNDER ANY WARRANTY PROVISIONS OF THE
CONTRACT IS LIMITED TO CORRECTING DEFECTIVE WORKMANSHIP AND
MATERIALS FOR A PERIOD OF ONE YEAR FROM THE ACCEPTANCE DATE OF
THE PROJECT. NO OTHER IMPLIED OR WRITTEN WARRANTIES ARE EXTENDED
BY THE SURETY.
�`� CERTIFICATE OF LIABILITY INSURANCE DAT/29/2D/YYYY)
11/29/2023
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT
SRM GROUP, LLC
NAME:
DBA STRATEGIC RISK MANAGEMENT AIc° No Ext: FAX No:
E-MAIL
P O BOX 445 ADDRESS:
Belleville IL 62220 INSURERS AFFORDING COVERAGE NAIC #
INSURERA: TRAVELERS INDEMNITY CO.
INSURED ENGINEERED FLUID, INC. INSURERB: TRAVELERS INDEMNITY CO.
INSURERC: TRAVELER'S PROPERTY CASUALTY COMPAIt
DBA EFI-SOLUTIONS, INC. INSURER D : TRAVELERS INDEMNITY CO.
1221 N. ELM ST INSURERE: ILLINOIS UNION INSURANCE COMPANY
Centralia IL 62801 INSURERF: TRAVELER'S PROPERTY CASUALTY COMPANY
COVERAGES CERTIFICATE NUMBER: LIBERTY SURPLUS INSURAREVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
ADDL
INS
SUBR
WVD
POLICY NUMBER
POLICY EFF
MMIDD/YYYY
POLICY EXP
MMIDDIYYYY
LIMITS
A
GENERAL LIABILITY
X COMMERCIAL GENERAL LIABILITY
CLAIMS -MADE I —XI OCCUR
Y-630-5X292933-TIA-23
12/1/2023
12/1/2024
EACH OCCURRENCE
$ 1,000,000
DAMAGE TO RENTED
PREMISES Ea occurrence
$ 300,000
MED EXP (Any one person)
$ 5,000
PERSONAL & ADV INJURY
$ 1,000,000
GENERAL AGGREGATE
$ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG
$ 2,000,000
X I POLICY PRO JECT LOC
$
B
AUTOMOBILE
LIABILITY
ANY AUTO
810-5X252609-23-14-G
12/1/2023
12/1/2024
COMBINED SINGLE LIMIT
Ea accident
1000
$ , ,000
X
BODILY INJURY (Per person)
$
ALL OWNED SCHEDULED
AUTOS AUTOS
BODILY INJURY (Per accident)
$
X
PROPERTY DAMAGE
Per accident
$
NON -OWNED
HIRED AUTOS X AUTOS
C
X
UMBRELLA LIAB
EXCESS LIAB
OCCUR
CLAIMS -MADE
CUP-5X294742-23-14
12/1 /2023
12/1 /2024
EACH OCCURRENCE
$ 10,000,000
AGGREGATE
$ 10,000,000
DED—F7 RETENTION $
$
WORKERS COMPENSATION
WC STATU- OTH-
D
AND EMPLOYERS' LIABILITY YIN
ANY PROPRIETOR/PARTNER/EXECUTIVE
UB-5X29224A-23-14-G
12/1/2023
12/1/2024
E.L. EACH ACCIDENT
$ 1,000,000
OFFICER/MEMBER EXCLUDED? ❑
(Mandatory in NH)
NIA
E.L. DISEASE - EA EMPLOYE
$ 1,000,000
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
E
POLLUTION LIAB
CPY G27169156 010
12/1/2023
12/1/2024
$1M/$1M
G
INSTALLATION FLTR
QT-660-5X357905-TIL-23
12/1/2023
12/1/2024
$500,000
H
PROFESSIONAL LIAB
SAE5NAANB82012
04/25/2023
04/25/2024
$2M/$2M
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101. Additional Remarks Schedule, if more space is required)
***FOR BIDDING PURPOSES*** - PROOF OF INSURANCE
CFRTIFICATF HOI nFR CANCELLATION
ENGINEERED FLUID, INC.
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
PO BOX 723
ACCORDANCE WITH THE POLICY PROVISIONS.
Centralia IL 62801
AUTHORIZED REPRESENTATIVE
9)1988-2010 ACORD CORPORATION. All rights reserved.
ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD
Travelers Casualty and Surety Company of America
Aftk Travelers Casualty and Surety Company
TRAVELERS J St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and
St. Faul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein
collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Chelsea Eilers of
BELLEVILLE , Illinois , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and
acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of
the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or
guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WETNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April,
2021.
�eS��fYp� g+�ASTr gyas
FA
p Gy
w
" a HAHTFORD, ,
� CONN. c �fi 1:ti
vy yDi
State of Connecticut
By:
City ci Hartford ss. Robert L. Rane , enior Vice President
On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior
Vice 'resident of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the
purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer.
IN W[rNESS WHEREOF, I hereunto set my hand and official seal.
� NQfiAgY #i.
My Commission expires the 30th day of June, 2026 =�
Anna P. Nowik, Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of
the CDmpanies, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint
Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority
my prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings
obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may
renove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or
anv Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided
that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance,
or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive
Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the
Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;
or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her
certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President,
an-i Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to
an-; Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-
Fa--t for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of
Atbrney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed
anj certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or
unlerstanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a
true End correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect.
Dated this 03 day of March , 2023
4
�NiC $LgFyy gJ�l[Y AHD
s
"0,
W t
Kevin E. Hughes, Assi tant Secretary
To verify the authenticity of this Power ofAttorney, please call us at 1-800-421-3880.
Please refer to the above-namedAttorney(s)-in-Fact and the details of the bond to which this PowerofAttorney is attached.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 03-29-2024
Name: Jacob M. Klosinski Department of Public Works — Engineering Division
BPW Date: 04-09-2024 Phone Extension: 9496
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney ® Attorney Name
Michael Schmidt
Purchasing ® Mickey Low / Ron O'Connor
Check the Appropriate Item Type — Required. for All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
® Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Information
❑ Yes❑ If Yes, Approved by Purchasing
❑ No
❑❑ WBE Completed E-Verify Form Attached ❑❑ Nos
Fellows Booster Pump Station — Contract A (Pump Station Procurement)
121-070A / PROJ00000032
State Revolving Fund & Water Capital Fund 622
PR/PO #
Special Contract Provisions Indiana Finance Authority Special Provisions and MWBE Goals
Purpose/Description Public Works, the Division of Engineering and Division of Water Works
requests the Board of Public Works receive and open Public Bids for the
Project 121-070A Fellows Booster Pump Station — Contract A (Pump Station
Procurement) at its regular meetinL- on 04/09/2024.
Amount of
Previous Amount
❑ Increase
❑ Decrease
Current Percent of Change
New Amount
Total Percent of Change:
Time Extension Amount:
New Comnletion Date:
For Change Orders
Increase %
Decrease ( %)
Increase %
Decrease ( %)
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 05-28-2024
Name: Jacob M. Klosinski Department of Public Works — Engineering Division
BPW Date: 06-11-2024 Phone Extension: 9496
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney ® Attorney Name
Michael Schmidt
Purchasing ® Mickey Low / Ron O'Connor
Check the Appropriate Item Type — Required. for All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ® Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Information
Company or Vendor Name
New Vendor ❑ Yes❑ If Yes, Approved by Purchasing
❑ No
MBE/WBE Contractor ❑ WBE Completed E-Verify Form Attached ❑❑ Nos
Project Name Fellows Booster Pump Station — Contract A (Pump Station Procurement)
Project Number 121-070A / PROJ00000032
Funding Source State Revolving Fund & Water Capital Fund 622
Account No. *Indiana Finance Authority — State Revolving Fund Bond
Amount
Terms of Contract $2.592.025.00
Special Contract Provisions Indiana Finance Authority Special Provisions and MWBE Goals
Purpose/Description Public Works, the Division of Engineering and Division of Water Works
requests the Board of Public Works award Project No. 121-070A Fellows
Booster Pump Station — Contract A (Pump Station Procurement) to EFI
Solutions, Inc. (Centralia, Illinois) as the lone, lowest, responsive, and
responsible bidder. IFA-SRF Loan is scheduled to close on June 4, 2024.
For Change Orders Onl
Amount of ❑ Increase $
❑ Decrease ($ )
Previous Amount $
Current Percent of Change
New Amount
Increase %
Decrease ( %)
Increase %
Total Percent of Change: Decrease
Time Extension Amount:
New Completion Date: