Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Upper Decks Bid Tabulation
City of South Bend Date: June 7, 2024 FOUR WINDS FIELD EXPANSION & RENOVATION Bidder Financial Statement Bid Bond Addendum Rcd Apparent Low Bid MBE % WBE % VBE %Total with All AlternatesBase BidAlternate 1Seating Alternated 1Alternate 2Seating Alternate 2Alternate 3Radiant HeatersAlternate 4Color Changing LightsBP1-Architectural & Structural Demolition Larson-Danielson x 807,355$ 807,355$ BP2-Cast-in-Place Concrete Larson-Danielson x 343,568$ 343,568$ Ziolkowski 431,000$ 431,000$ BP5-Masonry Ziolkowski x 1,104,160$ 1,104,160$ Larson-Danielson 1,210,262$ 1,210,262$ BP6-Structural & Misc. Metal Helgeson x 2,422,000$ 2,422,000$ Waukegan Steel 2,598,000$ 2,598,000$ Evans Metals 2,604,846$ 2,604,846$ Structural Steel Services 2,698,500$ 2,698,500$ Geiger & Peters 2,849,000$ 2,849,000$ Stephens Machine 3,021,247$ 3,021,247$ Duke and Duke 3,455,000$ 3,455,000$ BP7-Casework Precision Wood Products x 105,500$ 105,500$ Custom Millwork and Display 321,789$ 321,789$ Bid Tabulation Page 1 of 4 City of South Bend Date: June 7, 2024 FOUR WINDS FIELD EXPANSION & RENOVATION Bidder Financial Statement Bid Bond Addendum Rcd Apparent Low Bid MBE % WBE % VBE %Total with All AlternatesBase BidAlternate 1Seating Alternated 1Alternate 2Seating Alternate 2Alternate 3Radiant HeatersAlternate 4Color Changing LightsBid Tabulation BP8-General Trades Larson-Danielson x 356,282$ 356,282$ Ziolkowski 443,600$ 443,600$ Gibson-Lewis 489,905$ 489,905$ BP9-Roofing Midland Engineering x 745,600$ 745,600$ Dudeck Roofing 897,775$ 897,775$ Sealtight Exteriors 908,400$ 908,400$ E.C. Babilla 982,960$ 982,960$ BP10-Doors, Frames, and Hardware Lazzaro x 66,287$ 66,287$ LaForce 117,874$ 117,874$ BP11-Aluminum, Doors, and Glazing Trout Glass & Mirror x 554,430$ 554,430$ Precision Wall Systems 610,000$ 610,000$ BP12-Walls, Ceilings, and Paint Kleckner Interior Systems x 1,533,770$ 1,533,770$ Gibson-Lewis 4,895,000$ 4,895,000$ Page 2 of 4 City of South Bend Date: June 7, 2024 FOUR WINDS FIELD EXPANSION & RENOVATION Bidder Financial Statement Bid Bond Addendum Rcd Apparent Low Bid MBE % WBE % VBE %Total with All AlternatesBase BidAlternate 1Seating Alternated 1Alternate 2Seating Alternate 2Alternate 3Radiant HeatersAlternate 4Color Changing LightsBid Tabulation BP15-Food Service Equipment Stafford-Smith x 370,236$ 370,236$ Kamran Cullnex 374,418$ 374,418$ Great Lakes Supply 492,480$ 492,480$ BP17-Fixed Audience Seating Dreamseat x 408,110$ 291,694$ 54,784$ 61,632$ Irwin Seating 452,962$ 398,461$ 36,701$ 17,800$ BP18-Elevators Otis Elevator x 380,345$ 380,345$ BP19-Fire Sprinklers Hill Mechanical x 339,871$ 339,871$ BP20-Plumbing B.C. Mechanical x 1,357,500$ 1,315,000$ 42,500$ D.A. Dodd 2,202,223$ 2,069,354$ 132,869$ BP21-Mechanical/HVAC D.A. Dodd x 5,200,049$ 5,063,221$ 136,828$ Page 3 of 4 City of South Bend Date: June 7, 2024 FOUR WINDS FIELD EXPANSION & RENOVATION Bidder Financial Statement Bid Bond Addendum Rcd Apparent Low Bid MBE % WBE % VBE %Total with All AlternatesBase BidAlternate 1Seating Alternated 1Alternate 2Seating Alternate 2Alternate 3Radiant HeatersAlternate 4Color Changing LightsBid Tabulation BP22-Electrical Martell Electric x 5,504,670$ 4,995,230$ 32,015$ 477,425$ BP24-Furniture Office Interiors x 424,697$ 424,697$ Larson-Danielson 461,400$ 461,400$ BP25-Field Exterior Signage U.S. Sign Crafters x 139,600$ 139,600$ Legacy Sign Group 520,117$ 520,117$ Footnotes * Complete bid submissions are still to be reviewed. The "apparent low bid" may not be the "lowest responsive and responsible" bid. This bid tabulation should be interpreted as preliminary. Page 4 of 4