HomeMy WebLinkAboutOpening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Walsh ConstructionCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Bend, IN Project No. 123-076 Date Address: For Bids Due 28 May 2024 PART I (Must be completed for all bids. Please type or print) 5/28/2024 Bidder (Firm): Walsh Construction Com 929 West Adams Street City/State/Zip: Chicago/IL/60607 Telephone Number: ( 312) 735 - 1658 II. LLC Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Demolition of the South Bend Medical Foundation building and site as described in the documents and exhibits. the City of South Bend, Indiana, in accordance with plans and specifications prepared by: American Structurepoint. Inc. and dated 4/12/2024 for the sum of (enter the Total Bid as shown on the Proposal) two million nine hundred and thirty two thousand dollars ($2,932,000 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. By (Signature) The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member Eric Radloff (Printed Name of Person Signing) ACCEPTANCE day of 20 Joseph R. Molnar, Vice President Briana N. Micou, Member Version 07/19/2023 Contractor's Bid for Public Works - 3 AIA Document A310TM - 2010 CONTRACTOR: SURETY: (Name, legal status and address) (Name, legal status and principal place Walsh Concoction Company U. LLC ofbusiness) 929 W. Adams Street Travelers Casualty and Surety Company of America Chicago, IL 60607 One Tower Square This document has important legal Hartford, Cr 06183 consequences. Consultation with OWNER: an attorney is encouraged with (Name, legal status andnddress) airyofSouth Bend,Indiana respect to as completion orm sires` Itself oJeffmc Woks 227 W, reRerson Blvd. Any singular reference to southaaM, Evzi Contractor, Surety, owner or BOND AMOUNT: Five Percent (5%) of the Total Amount Bid other pant anall be considered plural where applicable. PROJECT: (Name, location or address, and project number, ifarry) Demolition of the South Bend Medical Foundation 531 N. Main Street, South Bend, IN Project No. 123-076 The Contractor and Surety are bound to the Owner in the anennt set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, adrninishalors, successors and assigns, jointly and severally, as provided herein The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner ant Contractor, and Ue Contractor eidner (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Dosraeats, with a snuety, admitted in the junsdiclion of the project and otherwise acceptable to the Owner, for the faithful performance of well Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faidn con inam with another parry to perform the work covered by said bid, then this obligation shall be null and void otherwise to remain in full force and effect. The Surety hereby waives arty notice of an agreement between the Owner and Contractor to expend the time in which the Ownermay accept the bid Waivu of notice by the Surety shall not apply to any a demion exceeding sway (60) days in the aggregate beyond the time for acceptance of bids specified in the bid doctwents, and the Owner and Contractor shall obtain the Surety's cement for an extension beyond Sony (60) days. if this Bond is issued in connection with a subcontractor's bid to a Contractor. the tern Contractor in this Bond shall be deemed to be Subcontractor and the temp Owner shall be deemed to be Contractor. - When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any prevision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted 1,ferefroff and _ provisions conforming to such statutory or other legal requirement shall be located incorporated herein; When so -7-- - firmjshed, the intent is that this Bond shall be construed as a statutory bond and not as a common law blind; - SignedAr, day of May, 2024.////����� W xaL 1t constnlCtirfWC lnfanv TT. LLC and Skety Comiumv of AIAeocument A910`a-MO. CopytOht®1993, 19mant3010 by The Anwenan Institute of AnIAe & All althea reserved. '�` Travelers Casualty and Surety Company of America TRAVELERS J Travelers Casualty and Surety Company SL Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Tmvelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of Me State of Connecticut (herein collectively called the'Companiee), and that the Companies do hereby make, constitute and appoint Patricia Collin of SARASOTA . Florida , Moir true and lawful Attorney(s)min-Fad to sign, execute, seal and acknowledge any and all bonds, moognlzances, conditional undertakings and other writings obligatory in the nature thereof on behalf of Me Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of con0acs; and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceadings allowed bylaw. IN MNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. 7/�,�. State of Connecticut City of Hartford as. By: Robed L Ran , nior ace Prewoem On this the 21st day of April, 2021, before me personally appeared Robert L Repay, who acknowledged himsett to m the Senior Yore President of each of Me Companies, and Drat he, as such, being auixor¢ed W to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. a My Commission expires Me 30th day of June, 2016 Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the ollming resolutions adopted by Me Board. of Directors of each of Me Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that Me Chairman, Me President. any Vim Chairman, any Executive Vice President, any Senior Vice President, any Vim President, any Second Vice President, the Treasurer, any Assistant Treasurer, Me Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact and Agents to act for and on behalf of Me Company and may give such appointee such authority as his or her mfmte of authority may prescribe to sign with the Company's name and seal with Me Company's seal bonds, recognizanms, contracts of indemnity, and other writings obligatory in Me nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke Me powergivan him or her; and it is FURTHER RESOLVED, Mal One Chairman, the President, any Vice Chairmen, any Executive Vim President, any Senior Vice President or any Vim Presitlent may delegate all or any pad of the foregoing authority to one or more officers or employees of this Company, provided Mal each such delegation is in writing and a copy thereof is filed in the oAm of Me Secretary; and it is FURTHER RESOLVED, Mal any bond, recognizance, contract of indemnity, or writing obligatory In the nature of a bond, recognizance, or conditional undertaking shall biz valid and binding upon the Company when (a) signed by Me President. any Vice Chairman, any Executive Vice President. any Senior Vice President or any Vice President, any Second Vim President. the Treasurer, any Assistant Treasurer, Me Corporate Secretary or any Assistant Secretary and duly attested and sealed with Me Company's seal by a Secretary or Assistant Secretary; or (b) duly exerted (under seal, If required) by one or more AftomeysJn-Fact and Agents pursuant to Me power prescribed In his or her mrtlficals or their ceriificeles of authority or by one or more Company officers pursuant to a written delegation of authority; and It is FURTHER RESOLVED, that Me signature of each of Me following officers: President, any Executive Vice President, any Senior Vice President, any Vim President, any Assistant Vim President, any Secretary, any Assistant Secretary, and the seal of Me Company may be affixed by facsimile to any Power of Attorney or fo any certificate relating thereto appointing Resident Vim Presidents, Resident Assistant Secretaries or Ahomeys-in- Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in Me nature thereof, and any such Power of Attorney or mrtifimte bedding such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so exerted and cerilfied by such famintile signature and facsimile seal shall be valid and binding on Me Company in the future with respect to any bond or understanding to which it is attached. 1, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby mrtdy Mat Me above and foregoing is a true and correct copy of the Power of Attorney exerted by said Companies, which remains In full force and effect. Dated his 2M day of MAY 202a max+. ,,•' "^t afM t 4�dl err Ff�-, O Kevin�iltanl Secretary To verify, the authenficityofthys PowerofArtomey, please miiusat 1.800-021-3880. Florio referW the above -named Aftomey(s)-in-Fa&and the detalis ofthe bond whych Mys FowerofAttnmey is attached. Murray L. Miller, Member Attest: Theresa Heffner, Clerk PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial Version 07/19/2023 Contractor's Bid for Public Works - 4 statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 07/19/2023 Contractor's Bid for Public Works - 5 Project Name: Project Number: For Bids Due: Contractor Name: BASE BID BID/PROPOSAL CITY OF SOUTH BEND Demolition of the South Bend Medical Foundation 123-076 28 May 2024 Walsh Construction Companv II. LLC Item No. Description Quantity Unit Unit Price Total Amount Demolition of the South Bend Medical 1 Foundation building and site as 1 LSUM $2,832,000 $2,832,000 described in the documents and exhibits. 2 Allowance for unforeseen Hazardous 1 LSUM $100,000 $100,000 Materials not including Asbestos BASE BID TOTAL $2,932,000 Bidder (Firm): Walsh Construction Company 11, LLC Address: 929 West Adams Street City/State/Zip: Chicago/IL/60607 Telephone Number: ( 312) 735 - 1658 By reL (Signature) Eric Radloff (Printed Name of Person Signing) Version 07/19/2023 Contractor's Bid for Public Works - 9 • Proof of contractor's break-out of contract items into units feasible for performance by WMBE's; • Proof of communications between the contractor and MWBE regarding negotiations for agreements, and why agreement could not be reached, as stated more specifically in above Subsection (b) (3); • Proof of bids or quotes from MWBE's and those from non MWBE's when non MWBE's bid or quote is used; • Proof of efforts made by contractor to assist MWBE to participate in contract, where appropriate; and • Any other information tending to show that Contractor made active, aggressive efforts to meet the MWBE participation goal but despite good faith efforts was unable to do so. Version 07/19/2023 General Conditions - 10 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) ) SS: St. Joseph COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 07/19/2023 Contractor's Bid for Public Works - 6 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). 1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that Version 07/19/2023 Contractor's Bid for Public Works - 7 violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 13th day of May 2024 State of Illinois County of Cook Subscribed and sworn to before me this 13th My Commission Expires September 15, 2025 County of Residence Walsh Construction Company II, LLC Contractor/Bidder (Firm Signature of Contractor/Bidder or Its Agent Sean C. Walsh, President Printed Name and Title ,,f May 20 24 p11FRUAL SEAL. HILDA RODRIGUEZ E ARY PLiBL1C, STATE Of ILLINOIS mission Expires September 15. 2025 Version 07/19/2023 Contractor's Bid for Public Works - 8 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN ,?l FORM MBE-1.0 MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Project Number: 123-076 Project Name: Bend, IN Bidder: Walsh Construction Company II, LLC Total Bid Amount: $2,932,000 MBE Goal: 1.4% Page of Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal 1ST CLASS LOGISTICS 2213 ST CHARLES AVE SOUTH BEND,IN 46614 BENARD COUTEE 574-993-0071 TRUCKING/HAULING $160,000 5% Submitted by: Carl Jackson Print Name C, Q� Signature ***Goals should be calculated based on the Base Bid only.*** Version 07/19/2023 Contractor's Bid for Public Works - 10 Date 5/24/2024 l)l. lff. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 123-076 Date: Project Name: Bidder: Contact Person 5/24/2024 Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Bend, IN Walsh Construction Company II, LLC Carl Jackson Telephone: 312-434-2940 Address: 929 Adams Street City: Chicago State: Illinois Zip: 60607 Email: cjacksontc�walsh�roup.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: http://www.in.ggvL/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business V Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be V performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. V I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. V I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications V concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a V manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. V I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such V MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining V bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 07/19/2023 Contractor's Bid for Public Works - 12 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested MBEs in obtaining V necessary equipment, supplies, materials, or related assistances or services, where appropriate. V I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. "Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 07/19/2023 Contractor's Bid for Public Works - 13 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 123-076 MBE Participation Goal 1.4% Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Project Name: Bend, IN Bidder: Walsh Construction Company II, LLC By: (Signature) Pro t Man (Title) r 5/24/2024 (Date) MBE Firm 1ST CLASS LOGISTICS Owner or Contact at MBE Firm BENARD COUTEE Telephone: 574-993-0071 Fax: N/A Email: lstclasslogistics20l3@gmail.com TYPE OF WORK SOLICITED FOR THIS PROJECT: TRUCKING/HAULING RESULTS OF CONTACT WITH THE MBE FIRM: RECIEVED PROPOSAL, IF AWARDED PROJECT, THEY WILL BE USED TO FULFILL MBE REQUIREMENTS MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: indyfixx@gmail.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Fencing RESULTS OF CONTACT WITH THE MBE FIRM: Emailed on 5/22, no response received. Version 07/19/2023 Contractor's Bid for Public Works - 16 m DEPARTMENT OF ADMINISTRATION STATE OF INDIANA Division of Supplier Diversity Eric J. Holcomb, Governor Indiana Government Center South 402 West Washington Street, Room W462 Indianapolis, IN 46204 (317) 232 - 3061 October 16, 2023 Mr. Bernard Comee Ist Class Logisdcs LL C. 2213 Saint Charles Ave South Bend, IN 46614 Subject: Request for amendment to MBE certification Dear Mr. Comee, A request for amendment of the UNSPSC code(s) assigned to 1st Class Logistics L.L.C. was received on October 5, 2023. After a thorough review, the Indiana Department of Administration, Division of Supplier Diversity has determined the firm is eligible for an amendment to the previously granted UNSPSC code(s). This determination is based on information submitted to us, which indicates that the company provides a commercially useful function in the areas fisted below, which will be added to its certification listing. Below is a frill listing of the UNSPSC code(s) it is now currently certified in: UNSPSC CODE(S) Code Desc ' don 25101600 Product and material transport vehicles 25101601 Dump trucks 25101604 Delivery trucks 30111800 Amegates 72153507 Construction site haul away service 78101801 Local am trucking services 78101802 Regional or national trucking services 78101808 Road transport of dry bulk This certification is valid through November 30, 2025. Although your certification is valid for a three -yea period, you are required to submit an annual Affidavit of Continued Eligibility, which reflects updates regarding the issues critical to maintaining your certification. However, you must notify us immediately if any changes occur. Failure to notify us of changes or to provide the Affidavit of Continued Eligibility form annually will result in the revocation of your certification. Changes include, but are not limited to: • Change in location m contact information (address, phone number, e-mail address, etc.) • Change in services provided (amendment to certification) • Change in ownership • Change in control Page 1 of 2 Reference: 1st Class Logistics L.L.C. While this letter serves as notification of certification, it does not serve to prove continued eligibility. Please visit http://w .in.gov/idoa/mwbe/2743.htm to verify your certification status. Please contact our office at (317) 232-3061 or mwbe®idoa.in.gov if you have any questions or concerns about your letter. if you have any other questions. Sincerely, Pam, Sa6aVP Peter Sobun, Director of Certification Indiana Department of Administration Division of Supplier Diversity PS Page 2 of 2 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN ,?l FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Project Number: 123-076 Project Name: Bend, IN Bidder: Walsh Construction Company II, LLC Total Bid Amount: $2,932,000 WBE Goal: 4.7% Page of Name & Address of WBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of WBE Component Percentage of Total Bid/Proposal RITCHARD BROS,INC 1204 W. SAMPLE STREET SOUTH BEND, IN 46619 RACHELLE DOLNIAK 574-288-4777 TRUCKING/HAULING, BACKF ILL, SITE UTILITIES $560,000 19% Submitted by: Carl Jackson Print Name Signature ***Goals should be calculated based on the Base Bid only.*** Version 07/19/2023 Contractor's Bid for Public Works - 11 Date 5/24/2024 l)l. lff. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 123-076 Date: 5/24/2024 Demolition of the South Bend Medical Foundation, 531 N. Main Street, Project Name: South Bend, IN Bidder: Walsh Construction Company II, LLC Contact Person: Carl Jackson Telephone: 312-434-2940 Address: 929 Adams Street City: Chicago State: Illinois zip: 60607 Email: cjackson@walshgroup.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: http://www.in.ggy/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's V certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). V I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. V I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. V I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications V concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a V manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. V I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such V WBEs with adequate information about the plans, specifications and other requirements of the subcontract. Version 07/19/2023 Contractor's Bid for Public Works - 14 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS V I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. I affirm that I have made good faith efforts to assist interested WBEs in obtaining V necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons V based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. "Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 07/19/2023 Contractor's Bid for Public Works - 15 'ti.;v J. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN - FORM MBE-2.1 - H - --N WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 123-076 WBE Participation Goal 4.7% Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Project Name: Bend, IN Bidder: alsh Construction Company II, LLC By: Project Manager 5/24/2024 (Signature) (Title) (Date) WBE Firm RITSCHARD BROS, INC Owner or Contact at WBE Firm RACHELLD DOLNIAK Telephone: 317-232-3061 Fax: N/A Email: Ritl204@datacruz.com TYPE OF WORK SOLICITED FOR THIS PROJECT: SITE UTILITIES, TRUCKING/HAULING,BACKFILL RESULTS OF CONTACT WITH THE WBE FIRM: IF AWARDED PROJECT, THEY WILL BE USED TO FULFILL WBE REQUIREMENTS. WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 07/19/2023 Contractor's Bid for Public Works - 17 STATE OF INDIANA Eric J. Holcomb, Governor August 24, 2021 Ivfs. Rachelle Dolniak Rltvchard Bros., Inc 1204 W. Sample St South Bend, IN 46619 Subject: Application for WBE Certification Dear Ms. Dolniak, DEPARTMENT OF ADMINISTRATION Division of Supplier Diversity Indiana Government Center South 402 West Washington Street, Room W462 Indianapolis, IN 46204 (317) 232 - 3061 Congrarularions! The Indiana Department of Administration, Division of Supplier Diversity is pleased to inform you that Ritschard Bros., Inc is hereby certified as a Women's Business Enterprise (WEE). Your company provides a commercially useful function in the areas listed below. Only work performed in these areas will be counted towards Women s Business Enterprise (WBE) participation: UNSPSC CODE(S) 72103001 Load clewing services 72103003 Demolition services 72141102 Land grading services 72141120 Sewer Line Construction Services This certification is valid through August 31, 2024 Although you certification is valid for a three -yew period, you are required to submit an annual Affidavit of Continued Eligibility (ACE) form, located at httos://www.in.gov/idoa/wbt/DSDCert ACFlindexhtnl. Please remember you must notify us immediately if any changes occur. Failure to notify u of changes or to provide the ACE form annually will result in revocation of your certification. Changes include, but are not limited to, changes in location, contact information, ownership or control. We encourage you to visit IDOA's procurement website, http:!/www in.gov/idoa2464 htm and update you Business Registration Profile. It is important that you review and update you profile regularly, because state purchasing agents and prime contractors may use Eris information to contact you for business opportunities. For questions regarding your registration profile, you may contact our office at 317-232- 3061 Page 1 of Refaco= Ritsdiard Bros., Ina This letter serves as notification of certification, it does not serve to prove continued eligibility. Please visit htto://www.in.eov/idoa/mwbe2743 htm to verify certification status. We ask that you please contact our office at (317) 232-3061 or mwbe(alidoa in eov if you have any questions or concerns about your letter. Sincerely, /%a& lel/ Kesha Rich, Director of Certification Indiana Department of Administration Division of Supplier Diversity Lam Bidder Registration No. 0000023294 Page 2 of 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS April 26, 2024 All Planholders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 1 Project Name: Demolition of South Bend Medical Foundation (531 N. Main St.) Project Number: 123-076 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: April 26th, 2024 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Walsh Construction Company II Authorized Signature: Date: ri11Pkie owl ON Version 8/11/2020 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS May 6, 2024 All Planholders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 2 Project Name: Demolition of South Bend Medical Foundation (531 N. Main St.) Project Number: 123-076 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: May 6th, 2024 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Walsh Construction Company II Authorized Signature: Date: May 6th, 2024 Version 8/11/2020 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: May 13, 2024 To: All Planholders From Theresa Heffner, Clerk, Board of Public Works Subject Addendum Number: 3 Project Name Project Number: Demolition of South Bend Medical Foundation (531 N. Main St.) 123-076 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: May 13th, 2024 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Walsh Construction Company II Authorized Signature: l� Date: Mav 13th, 2024 Version 8/11/2020 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS May 22, 2024 All Planholders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 4 Project Name: Demolition of South Bend Medical Foundation (531 N. Main St.) Project Number: 123-076 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 5/22/2024 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Walsh Construction Company II Authorized Signature: Date: 5/22/2024 Version 8/11/2020 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Bend. IN Project No. 123-076 For Bids Due 28 May 2024 Contractor Name: Walsh Construction ComDanv II. LLC The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 311t for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 07/19/2023 General Conditions - 11 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 07/19/2023 General Conditions - 12 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) V By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) V By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) V Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) V Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) V List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) V For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 07/19/2023 General Conditions - 13 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) NIA By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) N/A By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) N/A By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) N/A By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub- contractors have the necessary licenses to undertake the work called for in this bid. If a sub -contractor loses their license at any point, it is the responsibility of that sub -contractor to notify the City. (b) Attachments: (i) N/A Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) N/A List identifying all former business names. (iii) N[A Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) NSA Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) N/A Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) N/A For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) N/A Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) N/A Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 07/19/2023 General Conditions - 14 (ix) N/A Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) N/A List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: 5/28/2024 (Sign Here) Eric Radloff (Print Name Here) Walsh Construction Company II, LLC (Name of Company) 929 West Adams Street (Address of Company) Chicago (City) Illinois (State) 312-563-5400 (Telephone Number) Version 07/19/2023 General Conditions - 15 WALSH CONSTRUCTION COMPANY II, LLC A1t**1i DEMOLITION OF THE SOUTH BEND MEDICAL FOUNDATION 'Request for Proposal ' Date: Project No. 2023.03157 May 28, 2024 i South Bend Medical Foundation Demolition I City of South Bend May 28,2024 COVER LETTER May 28, 2024 Theresa Heffner City of South Bend, Board of Public Works 227 West Jefferson Blvd South Bend, IN 46601 Re: Demolition of the South Bend Medical Foundation, Project No.123-07 Dear Ms. Heffner, Walsh Construction is pleased to submitthe Demolition of the South Bend Medical Foundation project. We understand the excitement and importance that this new project brings to the city of South Bend. We are committed to offering the best available services to collaborate and challenge existing methods to maximize efficiencies and cost savings. Walsh is consistently listed among the nation's Top 20 Contractors in Engineering News-Record's Top 400 and ranked the 4th largest among the country's Top Healthcare Builders by Modern Healthcare Magazine. As a national healthcare leader, we bring our best practices and innovation to all projects no matter where they are located. Our team is highly qualified to address the challenges that may arise with this project for the following reasons: Local Presence: Walsh currently has numerous current projects as well as two regional offices in Indiana. Experience in Indiana: Walsh is redeveloping the campus system at Beacon Memorial in South Bend, which currently consists of 30 tradespeople onsite. Beacon redevelopment includes multiple projects all requiring demolition. Walsh has maintained a great relationship throughout the entirety of the project Experience Building and Working in Active Areas: We understand the challenges of building and working on healthcare projects that are located in active areas of their communities. We have seen exactly what is successful and what may not be in these environments, so we are equipped to quickly and accurately find the right solution to any challenges that could arise. We would be honored to have the opportunity to discuss our proposal further and demonstrate why Walsh Construction is the best choice for your project. Thank you for considering Walsh Construction for your project. We look forward to the possibility of working with you to create a hospital that will serve as a beacon of healthcare excellence in South Bend, Indiana. Sincerely, --/Z-/ �;"- Tom Caplis Senior Vice President, Healthcare Walsh Construction Company 312-617-0006 tcaplis@walshgroup.com re-L )24,1� Eric Radloff Program Manager, Midwest Region Walsh Construction Company 312-735-1658 eradloff@walshgroup.com i COVER LETTER SECTION I - EXPERIENCE QUESTIONNAIRE SECTION II - PLAN & EQUIPMENT QUESTIONNAIRE SECTION III - CONTRACTOR'S FINANCIAL STATEMENT SECTION IV - FORMS & AGREEMENTS ;ilft \%1i \%11 1 \N \N vt* South Bend Medical Foundation Demolition I City of South Bend 1. COMPLETED PROJECTS May 28, 2024 1 Page 1 Founded in 1898, The Walsh Group is a fourth -generation family -owned company providing design, build, finance, operation and activation services. We are the 15th largest contractor in the United States, and 4th Largest Healthcare General Contractor, operating out of 21 strategically -located regional offices across North America. Our three companies, Walsh Construction, Archer Western and Walsh Canada are united by a shared dedication to deliver exceptional customer service, while upholding the highest standards of ethics, quality and safety. Walsh Construction operates out of multiple regions, working with union labor and union subcontractors. Archer Western is an open shop contractor that primarily operates in the southern and western regions of the United States. In 2009, we entered the Canadian market and expanded our track record of success in the building, civil, transportation and water sectors. With more than 8,000 employees and annual revenues in excess of $4 billion, we deliver some of the most complex building and infrastructure projects in North America. Our market focus spans a vast range of project types - each one demanding unique, client focused solutions. We integrate the lessons learned from our diverse portfolio, applying this superior knowledge base from one project to the next. The result: a cross -market approach offering multifaceted, highly informed solutions. 2023 EXPERIENCE UChicago Micro -hospital & Cancer Beacon Hospital Pharmacy Center Owner: Beacon Memorial Hospital Owner: Northwestern Medicine Location: South Bend, IN Location: Crown Point, IN Size: 10,000 SF Size: 130,000 SF Cost: $19 million Cost: $96 million !=01 Beacon Hospital 6th Floor Renovation Beacon Hospital Energy Center Owner: Beacon Memorial Hospital " Owner: Beacon Memorial Hospi Location: South Bend, IN Location: South Bend, IN Size: 23,000 SF Size: 5,000 SF Cost: $9.5 million Cost: $10 million Aircraft Apron Expansion Loyola Ambulatory Care Center Owner: Fed Ex Owner: Loyola University Location: Indianapolis, IN Location: Tinley Park, IL Size: 400,000 SF r— Size: 70,000 SF Cost: $98 million Cost: $45 million South Shore Double Track Salesforce Tower Owner: Northern Indiana Commuter Owner: Hines Wolf Point South Transportation District Location: Chicago, IL Location: Gary, IN Size: 1,420,000 SF Size: 16.9 miles Cost: $378 million Cost: $650 million Whirlpool St Joseph's Tech Center Merchants Bridge Owner: Northwestern Memorial Owner: Terminal R Location: St. Joseph, MI of St. Louis Size: 185,000 SF iw Location: Granite Cost: $62 million Size: 0.61 miles Cost: $185 million tal ailroad Association City, IL 1-294 Mile Long Bridge VA Long Beach Mental Health Owner: Northwestern Memorial Owner: US Army Corps of Engineers Location: Justice, IL Location: Long Beach, CA Size: 1.8 miles �i. Size: 158,000 SF Cost: $195 million Cost: $162 million South Bend Medical Foundation Demolition I City of South Bend 2. CURRENT PUBLIC WORKS PROJECTS May 28, 2024 1 Page 2 Design -Build improvements on CTA's Red Line on the north side of Chicago. This project is the largest capital improvement in CTA's history. Work includes train control systems (signals, communications, and traction control) improvements from Belmont to Howard, construction of a new "fly -over" structure to carry the Brown Line over the Red and Purple lines just north of Belmont Avenue, as well as 0.3 miles of staged mainline track structure replacement beneath the new fly -over bridge, and reconstruction of 1.3 miles of new elevated track structure between Lawrence and Ardmore, as well as the complete reconstruction of the Lawrence, Argyle, Berwyn and Bryn Mawr Stations. Total Project Cost $1,360,000,000 Size N/A Timeline February 2019 - August 2024 1-69 Section 6 Contract 5 is the pivotal, last connecting piece of the 1-69 Evansville to Indianapolis program. Walsh is leading the design -build team to design and construct this best -value project in Marion and Johnson Counties, Indiana. The project will improve the safety and operations of the corridor and includes 40 new or replacement bridges, seven rehabilitation or preventative maintenance bridges, and replacement of approximately 168 lane miles of pavement. Total Project Cost $723,000,000 Size 15 miles Timeline November 2020 - April 2025 The Brent Spence Bridge Corridor Project is designed to improve approximately eight miles of Interstates 71 and 75 through Kentucky and Ohio, including the addition of a new companion bridge to the west of the existing Brent Spence Bridge to reduce congestion, improve traffic flow and safety, and maintain key regional and national transportation corridors. Total Project Cost $3,600,000,000 Size 8 miles Timeline August 2023 - June 2025 EL I South Bend Medical Foundation Demolition I City of South Bend 2. CURRENT PUBLIC WORKS PROJECTS May 28, 2024 1 Page 3 Reconstruction of 1-496 roadway, drainage and bridge rehab from Lansing Road to the bridges over the Grand River. Bridge rehabilitation of 12 bridges along the corridor including bridge deck removal and replacement on three bridges and structural steel substructure repairs of all 17 bridges. Mainline roadway removal and replacement including asphalt pavement, barrier wall, trunk line drainage, signage, noise wall, lighting and guardrail. Total Project Cost $81,000,000 Size N/A Timeline October 2021 - October 2024 The Northeast Flow Control Facility (NE FCF), a flow control facility rated for 200 million gallons per day (mgd), and large diameter (42-inch to 96-inch) welded steel pipe (WSP) water transmission mains were constructed to provide finished water to the Northeast Water Treatment Plant (NE WTP) to supplement flows treated at the NE WTP. Challenges included working around existing utilities and process piping including live tapping into the plant's current treatment systems and piping. Total Project Cost $25,000,000 Size N/A Timeline September 2019 - December 2024 26-mile design -build double -tracked commuter rail line between DFW International Airport (DFW) and Shiloh Road in Plano, Texas with 10 stations and traverses seven cities, interfaces with three DART light rail lines (Red, Orange, and Green Lines) and connects with both the Trinity Metro TEXRail commuter rail line and the airport Sky Link People Mover at DFW. Total Project Cost $1,400,000,000 Size 26 miles Timeline January 2019 - December 2025 South Bend Medical Foundation Demolition I City of South Bend 3. FAILURE TO COMPLETE WORK May 28, 2024 1 Page 4 Walsh Construction Company II, LLC has not failed to complete any work awarded. South Bend Medical Foundation Demolition I City of South Bend 4. REFERENCE LETTERS May 28, 2024 1 Page 5 September 13, 2023 Greetings, _I r BEACON HEALTH SYSTEM My name is Helen Sookradge, and I am an Infection Preventionist with the Beacon Health System, more specifically, with Memorial Hospital. I have been in Infection Prevention over ten years. In April 2022, a new demolition and rebuild of our 6th Floor started. We had no idea the turn of events that we would encounter along the way. Having to work in phases to restructure the plumbing system for the 6th floor to align with both floors 5 and 7, and the coordination with Facilities for the numerous water shutdowns, uncounted, resulted in a total of 24 PCRAs or Pre -Construction Risk Assessments and 24 ICRA permits that were issued. I have to say that this is more permits for one project than I have ever had to issue in my career to date. This project quickly became extremely complicated, this team with their subcontractors had to sister in the new plumbing with the old. A great undertaking at best. Walsh always kept me apprised of the timelines, with new drawings as the actual phasing diagrams changed multiple times weekly, and at times daily. Walsh had excellent communication both via email and voice calls including text messaging as quick communication was needed at times to either change an existing permit phase number, or to update and extend current permits. I must say it is not always a pleasure to work with individuals under such pressure situations. However, that was not the case with Walsh. They always communicated in a calm and precise manner. If Walsh did not have the answers needed, they would seek out the answer and return that to me quickly. Recently, another Walsh project has come about as a result of the Tower Project in which, due to the excellent working relationship I had on the 6th Floor project with Walsh, I reached out to Don Gee, Director Projects and Construction here at Memorial Hospital to ask if Walsh could be involved on this 3HV renovation project. I was fortunate that Don was able to make this happen. I had said to Don at one point, "I do not know what strings you pulled, but I am happy that you could make this happen." I have to say that Walsh is an asset and has made my job as an RN, in Infection Prevention a joy in a potentially frenzied situation in the continuously changing project that the 6th Floor project became. I want to say that I am truly grateful to have the opportunity to work with such a caliber of company as Walsh. I know the project will be handled appropriately, and corrections made immediately. Thank you. Respectfully, Ilele7 yooll-+, Helen Sookradge, Infection Preventionist South Bend Medical Foundation Demolition I City of South Bend 4. REFERENCE LETTERS May 28, 2024 1 Page 6 'j Al BEA��N HEALTH SYSTEM September 13, 2023 Subject: Project Evaluation - Safety To Whom it May Concern: As the Executive Director of Facilities, Construction and Properties for Beacon Health System, I am pleased to note that Walsh's performance in safety to date is certainly noteworthy. Through almost 2 years of progress and 113,000 man-hours on campus, the Walsh team has experienced no lost time incidents. The Walsh project team, Project Executive Mary Ann Lukowicz, Senior PM Jason Cipowski, PM Jeff Cerney and Sr. Superintendent Joe Livsey and the entire Walsh team have demonstrated exemplary support of safety as their number one priority on campus. The Walsh team is deserving of recognition for safety excellence, a commitment to safety which includes minimizing the adverse impact upon the Beacon Memorial operations and patient care, and for their clear communication to sending every employee home safely to their families. Sincerely, �141_Ad 615 N. Michigan St. I South Bend, IN 46601 1 BeaconHealth5ystem.org South Bend Medical Foundation Demolition I City of South Bend 4. REFERENCE LETTERS May 28, 2024 1 Page 7 NMNorthwestern Medicine Date 5/12/20 To Whom It May Concern, Kishwaukee Hospital 1 Kish Hospital Drive De Kalb, Illinois 60115 815,756.1521 nm.org It Is my pleasure to share with you my recent experience with Walsh Construction Company. Kishwaukee Hospital, part of Northwestern Medicine Network, hired Walsh Construction in September 2019 to complete a renovation project within our existing main laboratory department. The project was completed in six phases and included renovation to the laboratory department to facilitate new equipment and layouts. Walsh was selected to construct this project based on best overall value. Construction in an operating hospital can be a stressful process. Walsh, along with team members Eric Had€off (Sr. Project Manager) and Luke Oberhelman (Superintendent), alleviated a lot of the stressors. They worked well with patients and staff to ensure they had as little impact as possible, communicated well to all hospital departments involved in the project, kept competent staff onsite to oversee the work and stood behind ensuring the initial budget and schedule were maintained throughout the course of the project. The team was extremely professional, knowledgeable, responded promptly to questions, and kept the job site clean and free of clutter. It was a real joy to work with them. Representing Kishwaukee Hospital, I can say that we could not be happier with the work provided to us. We would express our confidence in Walsh Construction and our desire to work with them again on future projects. Please feel free to contact me if you have any further questions. Sincerely, Jill Miller Laboratory Manager, NM Kishwaukee Hospital Phone:815-766-9528 South Bend Medical Foundation Demolition I City of South Bend May 28, 2024 1 Page 8 5. PRE -APPRENTICE PROGRAM Walsh has created and implemented a Pre -Apprentice Program at a variety of projects throughout Chicago, including the Old Cook County Hospital Redevelopment, the Red -Purple Line Modernization project, the Wilson Red Line Renovation project and the Lawson House. The goal of this program is to teach basic technical and job -readiness skills for a designated occupation or occupational sector that prepared participants for Registered Apprenticeship training. This program was in concert with Communities Empowered through Construction (CEC) and The Target Group. Benefits for Participants in the Pre -Apprentice Program: • Hands on experience in the field of construction. Qualify to meet the minimum standards for a Registered Apprentice Program. • Benefit from management and tradesmen training while building communication and work -readiness skills. • Assistance in exposing participants to Registered Apprentice Programs to help advance into registered apprenticeship programs. Program Overview: • Week 1: Selected participants shadow Walsh management staff to get an overview of how construction projects are managed. • Week 2: Selected participants shadow our superintendents and experience the different onsite trades and the scopes of work being performed. • Weeks 3-8: Boots to the ground. Selected participants are assigned to a specific trade, of his or her choice and shadow the foreman who will train and delegate specific minimal work tasks for hands-on experience. During these weeks, participants will also take training classes (OSHA 10-Hour; Flagging Certification; Fall Protection; Confined Space; First Aid, etc.). • Week 8: Participants will present on their experience with the program and will receive a certificate of completion. Program Selection Criteria: • A resident of a target ward (refer to the map down below) • Valid Driver's License • Meet physical requirements to perform construction work • Pre -drug screening • Must be at least 18 years old with a High School diploma or equivalent • Self-motivated/willingness to learn with a positive attitude @h TARGET WARDS Walsh focused on target wards when creating the Pre -Apprentice Program. All participants in the Pre -Apprentice Program must be a resident of a target ward in order to be selected for the program. This ensured Walsh is committed to growing and developing local talent from the surrounding communities. I 37 am 8 1d09 CEWAK R 22008 earn sT 25002 mat g, Lr 26 28 27 r, 24 1 25 22 r-� - South Bend Medical Foundation Demolition I City of South Bend 5. PRE -APPRENTICE PROGRAM May 28, 2024 1 Page 9 OLD COOK COUNTY HOSPITAL REDEVELOPMENT How Walsh Incorporated Diversity & Inclusion Plans: At the redevelopment of the old Cook County Hospital, Walsh created and implemented a Pre -Apprentice Program. Each Pre -Apprentice from the first class was sponsored by a subcontractor into a union. They later returned to work as apprentices on the Cook County jobsite. Results: Walsh exceed the initial goals by achieving 37% MBE participation and 15% WBE participation. The original goals were 30% for MBE participation and 10% for WBE participation. !V1 RED LINE WILSON STOP How Walsh Incorporated Diversity & Inclusion Plans: The planned reconstruction of the Wilson Red Line station began in 2014, and replaced the badly deteriorated facility that was built in 1923. The completely rebuilt, modern and accessible station serves as a new transfer point between Red and Purple Line Express train service. Results: Walsh met the DBE goal of 27.5%. The station opened to the public ahead of schedule in September 2017 even though the Wilson Station Reconstruction Project was one of the largest CTA'L' station projects in the agency's history. RED -PURPLE LINE MODERNIZATION How Walsh Incorporated Diversity & Inclusion Plans: Despite many opportunities for internships and jobs that offer stable careers and growth, the Chicago Transit Authority (CTA) observed there was a disproportionate lack of candidates from economically disadvantaged and minority neighborhoods. In response, the Walsh -Fluor joint venture team that worked on the Red -Purple Line Modernization project teamed up with the CTA and Chicago Public Schools to create the CTA Elevating Futures Scholarship Fund. Results: The new program targeted STEM -focused Chicago high school students that expressed interest in the pursuit of careers in engineering or construction. Walsh -Fluor committed to contributing $250,000 towards the new scholarship, which will award three students with $25,000 in each of the programs first two years. In the final two years of the fund, two students will be awarded the scholarship. AWARDS & ACHIEVEMENTS • Federation of Women Contractors' Award, 6th Annual Day at the Races and Awards Banquet • Thomas H. Madigan Outstanding Small Business Achievement Award for University of Illinois at Chicago • Black Contractors United Majority Contractor of the Year Award • WBE/MBE Advocacy Award presented by the State of Illinois Capital Development Board ALI 4511 \ i m once Gate je 00 0- IL Ally d hRellu'u's Bren',,)ant,Brennan 5 PC,.. (Dennis... Li m0k M W mall Demolition of SB Medical Foundation Activity ID Activity Name Original Duration Start Finish 2024 2025 pr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Ju Demolition of SB Medical Foundation Pricing Phase PR-100 City of South Bend Bid Issue 161 12-Apr-24A 25 12-Apr-24A 0 12-Apr-24 A 20-Dec-24 11-Jun-24 20-Dec-24, Demolition of SB Medical Foundation v 20-0ec-24, Demolition of SB Medical Foundation 11-Ju'n-24, Pricing Phase City pf South Bernd Bid Issue ♦ Mandatory Pre -Bid WalkThru ----'----------------------------------------'-------------------------------------------------- -- ♦:Addendurri 01 Issued 0 Pricing SB' Medical Bldg Demolition GMP Package - WCC ; ♦ Addendum 02 Issued -ACM Report ♦ Addendum 03 Issued M Owner Review &Approve SB' Medical Bldg Demolition GMP - Beacon ------' ----------------------'----------;--------------------;--------- ;- - -- ♦ Owner NTP SB Medical Bldg l Demolition 06-Aug 24, Permitting Phase SB Medical Bldg Demolition SubcorltractorAwerd & Contracts Ml Receive City of South Bend Demolition Permit IDNRINotificationl -- - - -, --------------:--- � City of y SB to Coordinate Utility Service Termination (Qas/Electric) 20-0ec-24, Constructiori Phase ■ Install Site Fencing &' SWPP Provisions Remove Remaining Fumiture &User 6ebris 0 Waters&Sewer Shutdowns&:DisoJnnedlcns ---------------------- ; MENEEME Abatement Remoyal iN Salvage Generators for Owner Reuse Demolish Entire Building, Including Above Grade Structure ■ Remove Above Ground Storage Tank Remove Foundations and Basement Slab ---------- ; ;--------------------- Backfill Site w/ Crushed Stone to Leve[ Grade ■ Remove Site ,Fencing &;SWPP Provisions ♦ Cbnstruction Substantial Completion / OwnerAcceptance PR-160 Mandatory Pre -Bid WalkThru 0 23-Apr-24A PR-140 Addendum 01 Issued 0 26-Apr-24A PR-110 Pricing SB Medical Bldg Demolition GMP Package - WCC 16 06-May-24 28-May-24 PR-150 Addendum 02 Issued -ACM Report 0 06-May-24A PR-170 Addendum 03 Issued 0 13-May-24A PR-120 Owner Review & Approve SB Medical Bldg Demolition GMP - 10 28-May-24 10,Jun-24 PR-130 Owner NTP SB Medical Bldg Demolition 0 11,Jun-24 Permitting Phase PP-100 PP-110 SB Medical Bldg Demolition SubcontractorAward &Contract; Receive City of South Bend Demolition Permit 0 11,Jun-24 06Aug-Aug 30 11tilun-24 23,1u1-24 10 11,Jun-24 24,Jun-24 PP-120 IDNR Notification PP-150 Ci of SB to Coordinate Utili Service Termination Gas /Elei City Utility ( Construction Phase CP-100 Install Site Fencing &SWPP Provisions CP-110 Remove Remaining Furniture & User Debris 20 11tilun-24 09,1u1-24 30 25 Jun-24 06 Au 24 g- 126 25-Jun716-Jul-24 5 25tiJun 10 02-Jul- CP-120 Water&SewerShutdowns&Disconnections 5 02-Jul- CP-210 Abatement Removal 26 02-Jul-24 07 Aug-24 CP-130 Salvage Generators for Owner Reuse 5 08-Aug-24 14 Aug-24 CP-140 Demolish Entire Building, Inducting Above Grade Structure 70 08-Aug-24 14-Nov-24I CP-150 Remove Above Ground Storage Tank 5 15-Aug-24 21Aug-24 CP-160 Remove Foundations and Basement Slab 10 15-Nov-24 29-Nov-24 CP-180 Backfill Site w/ Crushed Stone to Level Grade 10 02-Dec24 13-Deo-24 CP-190 Remove Site Fencing & SWPP Provisions 5 16-Deo-24 20-Deo-24 CP-200 Construction Substantial Completion / OwnerAcceptance 01 120-Deo-24 r_ Remaining Level of Effort V0000mI Summary Actual Work O Remaining Work Critical Remaining Work ♦ ♦ Milestone ■ Demolition of SB Medical Foundation 15-May-24 1 of 1 CM DIEML 7Ia» $EAL �Eb DBEJI+VB1v/FBEertifeci May 24, 2024 Re: Demolition Plan- South Bend Medical Building South Bend, IN Subject: Alpine Demolition Services, LLC (Alpine) demolition plan of the existing buildings at the above location. 1. Existing Conditions: • 7 story building with multiple additions and a basement. • Standalone chiller Enclosure 2. Safety and Site Security: • All personnel on site have been trained by Alpine Demolition on safety and OSHA rules regarding demolition. • Proper PPE to be worn by all personnel on site. o Hard hats, safety glasses, highly visible safety vests, steel toe work shoes. o Dust masks or half face respirators in dusty conditions. 3. Mobilization/Construction Access: • Equipment will be delivered via semi low boys and stored on site within the work area for the duration of the specific demolition activities. • All deliveries will access the jobsite via the assigned gate. • Access to the work zone to be limited to Construction personnel only. 4. Traffic Control o Excavator and skid steer will be kept on site within project limits. Dump truck loading will be handled within project limits. Flagman will be present when trucks are entering and leaving the job site. 5. Emergency Response: • Emergency services on this project can be accessed by 911 • Clinic: TBD • All personnel to sign in at beginning of shift. 6. Alpine Demolition Project Team: • Karsten Pawlik - Vice President of Operations 630.918.3906 Karsten@knockitdown.com • John Moore - General Superintendent 630.973.0600 iohn@knockitdown.com • Zach Krueger - Project Engineer 630-675-7783 zach@knockitdown.com • Eduardo Torres - Safety Director 630-297-0777 eduardo@knockitdown.com ""N n DOWK.ccm CM U l: M} L 1 71 U 1a S E RV CES DBE/WBE/FBE certified 7. Protection during demolition: • Chain link fence to be set up around the perimeter. • Signs to be posted on fence "Danger do not enter" by Alpine Demolition. • Alpine Demolition will spray water on demolition debris to keep dust down. • Spotters will be utilized during demolition preventing pedestrians from entering the demolition zone. • Site to be left clean at end of shift with no loose debris. 8. Engineer Controls o Alpine demolition will hook up to a hydrant to utilize water for dust control. o Garbage trucks will cover the trailer prior to transport out of the work area to prevent spillage. 9. Equipment: • Volvo EC750E Hi Reach Excavator w/ Hydraulic Attachments • CAT 349 Hydraulic Excavator w/ Hydraulic Attachments • CAT 262 skid steer with grapple and sweeper attachment 10. Building Demolition o Temp fence and erosion control measured are installed o Conduct OSHA Engineering Survey o Mobilize ACM contractor onsite and begin abatement. o Once all ACM have been removed from an area, universal waste will be collected and disposed of. o Interior strip out of the building will commence, utilizing interior shafts as debris chutes. o Debris will be removed as it demoed to reduce accumulation of materials onsite. o Once Asbestos Abatement and Interior strip out has been completed in a portion of the building, structural demolition will begin. o Starting from the south, Excavators will begin demoing the building using hydraulic attachments. o Building materials will be separated onsite and loaded into trucks for disposal. o All debris will be sprayed with a fire hose throughout the process to reduce dust. o Trucks to be loaded within work area for removal of material off site per contract specifications. o Foundations and slab will be processed and loaded offsite as demolition progresses. o North and East foundation walls to remain in place to support adjacent grade. o Backfill to be brought to the site, compacted per specs, and fill basement voids. o Affected streets to be swept clean. The above plan may be modified and change as job conditions warrant. Please call me should there be any questions regarding the above. Respectfully Submitted, Fad �We9m Project Engineer Alpine Demolition Services, LLC 630-675-7783 zach@knockitdown.com (i) Fla... Fee: (708)562-7295 Edell: FinanEdIlck owlco BOARD OF TRUSTEES ACm/nlebabr CATHERINE WENSKUS secnNry DAVID H. LORIG PENSION FUND Appahmedby Labor Anthony Cannon James P. Connolly Paul P. Connolly She. Fdageend Joseph V. Healy Doeler R. Zlemenn ForEmplsyms. Brad Carter Cahn M. Ham Ragan G. "a Dove H. Lang Dennis P. Merin Nkeholas N. Nan WELFARE FUND IN RETIREE WELFARE FUND Appolnmd by Labsr James P. Connolly Memo T. Flanagan Joseph V. Healy RlchaM Kucrk kl Fronk P. TMara Loyd D. Vaughn FarEmplayers Kevin A. Co.., Mail. Gela,har Semual F. Handmade Chase M. Hem Dank H. Long Donald P. McNln in tha Chicago & Vicinity Laborers' District Council Health & Welfare Fund • Retiree Health & Welfare Fund • Pension Fund 12465 W. Carl Road, Westchester, It 60154-57681 W chicaaolabnrersfundsconh Toll Free:(8661906-0200 s Telephone: l7081562-02M December 28, 2023 ALPINE DEMOLMON SERV LLC 3515 STERN AVE ST CHARLES IL 60174-5407 Re: Alpine Demolition Sery Llc To Whom It May Concern: MUNA! Feelthe Pave. This letter is to inform you that Alpine Demolition Sery Llc is signatory to a collective bargaining agreement with the Construction and General Laborers' District Council of Chicago which incorporates and adopts the Laborers' Funds' Trost Agreements. Both the bargaining agreement and Trust Agreements provide benefits for covered employees. Alpine Demolition Sery Lie has submitted reports and monies on a timely basis in accordance with the riles in effect through November 2023 to the Laborers' Welfare & Pension Funds. Please be advised that this letter does not address any issues pending with the Construction and General Laborers' District Council of Chicago and Vicinity including, but not limited to, the submission of current dues reports, the pendency of any wage grievance or any outstanding liquidated damages or shortages owed to the Dues Fund. If you have any questions regarding the Company's reporting status with the District Council, please contact Mrs. Kate Hughes at 630-655-8289. If you need any additional information or have questions, please feel free to contact this office. Sincerely, Laboress' PPeensionn & Welfare Funds �lii� rl�/KiL�Q� irra Hm ass, Financial Operations Director GH:ag Iginoh Read and Tonsponallon Besides AssotlMNn, Whom ply AswclNlon, Chleapa Area Independenl Conaaue on AssoahMl 1 WIII and Grandy Counties, Commele Cohmadem AWannumn of Gmel Small Payer AssoclObn, L.. ell Mona Me employ Laborers Engaged a m ti m X 0 0 ram+' tY rip : INTERNATIONAL UNION OF OPERATING ENGINEERS LOCAL UNION NO, IW. 1508, ISOA, ISOC, I80XA. 1500, 1.., 18OM JAMES M. SWEENEY "\-` J1. a5zs5xs-IA. noel ASa4156 vSssloeNraxs,xess m.xrrsex %T _# courvmrsio5 Lo c one a �sos25a5xz December 19, 2023 Alpine Demolition Services, LLC. 3515 Stern Ave St. Charles, I1 60174 Re: Proof of Compliance with 30 ILCS 500/30-22(6) Our File No. MI-00321 Dear Sir or Madam: At the request of Alpine Demolition Services, LLC, I am providing you with evidence of the Company's compliance with the apprenticeship requirements in 30 ILCS 500/30- 22(6) of the Illinois Procurement Code. I am submitting this letter along with apprenticeship certificates (Nos.II012020003 and IL008780173). As a signatory contractor with the International Union of Operating Engineers, Local 150, AFL-CIO, Alpine Demolition Services, LLC, is required by Collective Bargaining Agreement to participate in an applicable apprenticeship and training program approved by and registered with the United States Department of Labor's Bureau of Apprenticeship and Training. The attached certificates are evidence of compliance with the U.S. Department of Labor's apprenticeship requirements. Thank you for you cooperation in this matter. If you have any questions or concerns, please do not hesitate to contact me. Very truly yours, IUOE, Local 150, AFL-CIO (District 1 dispatch office Maribe HI ematidez Enclosures: Certificates INTERNATIONAL UNION OF OPERATING ENGINEERS LOCAL UNION NO. 150, 150B, 150A, I50C. 150RA, 1500. I Mr, 150M AFRUASED WBP ME AFL CC AND BUILONGVADES WAF WW JAMES M. SWEENEY - (]03I482-B800• rex(7081482-ZIB6 -Y^ PRESIDENT -BUSINESS M6200 Joun xoAD ANhGER COUMnOEIL60525-3992 January 15, 2024 Alpine Demolition Services, LLC 3515 Stem Ave Saint Charles, IL 60174 Employer 438196 To Whom It May Concern: The Administrative Dues office has received administrative dues reports and accompanying payments from your company through the work month of November 2023 If you have any questions or concerns regarding this matter, please contact the Administrative Dues Office at 708 579-6639. Sincerely, Alicia Schnell Administrative Dues Department AS/ap ƒ � [' J 7 {} \ \\ § A � M APPROVED AND FILED DIEGO MORALES INDIANA SECRETARY OF STATE 03/06/202412:36 PM I:syi :i 0 NAMEANDPRINCIPALOFFICEADDRESS BUSINESS m 2008030700232 BUSINESS TYPE Foreign For -Profit Corporation BUSINESS NAME ALPINE DEMOLITION SERVICES, LLC ENTITY CREATION DATE 03/07/2008 JDRODICTION OF FORMATION Illinois PRINCIPAL OFFICE ADDRESS 3515 STERN AVENUE, ST. CHARLES, IL, 60174 - 5407, USA YEARS FILED YEARS ERFECIM DATE 2024/2025 EFFECTIVE DATE 03/06/2024 EFFECTIVE TIME 12:36 PM REGISTERED OFFICE AND ADDRESS REGISTERED AGENT TYPE Individual NAME GREGORY W BROWN ADDRESS 7448 BROADWAY. MERRBLVILLE, IN, 46410, USA GOVERNING PERSON INFORMATION _ TITLE President NAME ADDRESS Eelli Pawlik 3515 Stern Avenue, St. Charles, IL, 60174 - 54M. USA APPROVED AND FII.ED DIEGO MORALES AIDIANA SECRETARY OF STATE 03/06/202412:36 PM IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY March 6.2024. THE UNDERSIGNED ACKNOWLEDGES THAT A PERSON COMMITS A CLASS A MISDEMEANOR BY SIGNING A DOCUMENT THAT THE PERSON KNOWS IS FALSE IN A MATERIAL RESPECT W17H THE INTENT THAT THE DOCUMENT BE DELIVERED TO THE SECRETARY OF STATE FOR FE7NG. SIGNATURE Ke➢i A Pawlik TITLE Pmsideut Busims ID: 20OB030700232 Filing No.: 10249673 1. NFRLUX-2HW Ew/IISaMIGMA 111. ALAI WP4ENVNE BSIM3N 5 RE.. 0/WAI9 MWSI EMIHNi. LEE WUI'x MdYXBPHM711.IFFry 3 SE/1]/]O191NIE6PWWN'M"AE 6TiJs1. $ Wp'L'W ill6hulf xl11 FSiESNoENE iVBgWNRIM j z3AWW AIWEBII WuLlrtxFuul 1psMnLTxsIOOP E115 o[MrsrtnnnEEi AUrnpN 5 VtE/SBI9 MEBIuiFARM I MFv Ml 5 1w,Wo.W 6N'.. F.�NFEELF FFFNI VE HnEELCPFA LLZPKTpX 41�E1AE5A6 S iW,%B.pl WlI ,B MEDICAL wNSMWUM XBSIAEEi LIXXPoNL R B S 0.5MI9.M..... IIK�NFARM. A $ 30sOWW 9l". mMMF.Al ..l. 16E616EB X WLsiEB MR. 2.- uvAITIgRAY ALa4jPoo $ 'Aa3 9mFAMI., s133 x uouE EE. s IFI... CED6ty3/m19 uEARA. El�lNonvE NMLYBEMBEP 5 S4pA.W wFLAI 69 P ]9/CM:RFPEA xA�EEgile3 $ arys H RCIH.L UMB4lEAFNA Ass E, $ yDMl9 in MA A ES.,IlKF. Mr GARiw[AY 5 ElF."xoUREs E MBIXGUMPSBI A MiPVU �1$A".,. 5/Eo19 KRMA. lll�WE FEANXRFM 1WSMR, UNM-K nRS $ a/M9 WnlE6iPXR 74 [TONPpUBE &MRRGRFi wRMµEo 5 GxCEL NFRARNI wCMN.. OFF3mno IL VWAUEBEBPEEwwsSMXMc . $ F'.. ANMFI xculE FAIR i 5ETAExGPWP .flioAN% $ a/EAMI9 CWAMEKML n Naus Eim 3TIEFF nlMlzm., s ullMl9 wusF IOSIAEE EpCpXsiAurnUX 333. sFspoco w W2.RBA MTApR IxE.1511ERMnpVPN EED uB1 5 a45w.m .11.1s mE ]siw IIgL wEEANBRAOW a IAMMEMI W SnS 1,,, 5 IW$B.W VA/Au IpUSEl IwuzE-WlxpW lfNpusE LEAINGENH M� su 5 Fi,Cw.W IIA AK HMLRE IfEVIN MBRukY 6U311a713 5 IajW.W n/E -NRURE Esmuipx j "..W 4Nm wusE W B.,.. , lasso 5 u;3sam iAVEBm WimwR ARKARE a.11A'Nani a 5P.. VEll3oroenlocE MIME1150 AMNQEAN ROAD j E/VEOIV IpWF FAR,MASNARRSEIFMENTAR1.1 Sw XGMPRMAVE CMKWMo� S 16Swm lmmMl PNvcMUNB S% RANI-llM2..l BWFM9290 $ %I,ASS.Po 1AR OM MIWE MFN WATAT]wEAWIWFULLERNENAME CEECAW IL AdMGFFCDAAU N $ 112MXW 6/16M19 MAMMN WFA SCREAKE I 5 3; 6.T.W 49MII mMMEKAl INNI z ONASHWIDAVE a)D15 A9NLWBnvEM WLWOED IL sRIFAQ AWFEM IMEXpP WAREBwEFROnB siWrnlw s Eau3mI mMMEN. UAMwNFLmxsAUClpx 5 NVEOA ME¢ ',E. f R/ A. M. 1A% UNRE08lpC UNGFOx NE1BM5 jM141..VSVA30 CIXnMERCNL XWIBIXG s $ 35AWW 'A"ll %IIYC CXER, MENKE W $ 129,M M 9/lV.) WY,Fs UErtPPYSIOEMmmA pSMnrymNIAUCMX 5 ]R/E1/SOI9 IXTRMP IEOI OALW%i WIUm TC..i IL MADRDCOMPARN $ IOMMII IMERMA FEKESi. N[IOAPMISX GLEENIY $ 3a;15RW W1,019 U. PFPMPCOY2MNA ON $ "=O INFERIOR u4 w MIARpXBLME ABOEYMW. 5 21R5E,. NAME9 EMEFRM, F. o'WAFPUXWAY9N47LERi N Il ENCAxLBWMERF IMO $ 74A,.. WF.. cMMS. IEExMM PnnRsaxwnr 4 5 EVUMU nnMAEAY NINM�}pPPiN[E.1 .N ANE aWs]6J3W $ EVEVMEI a1R MnSMA, EH. IL S n-a111 5 1W VaW EF. AINN ]u MWPUSFKME(OWRmXIVM IL IHCCONSIAUCHUry $ 3w3.w 3/L/b1a KW14 EO C.. mXsiRYCT ]E $ 19. 1Nyb11I ,AMEEEM [NE IH2M A9XKrtMPU[X AVE AUFF). L CM OF AURORA o3..3 $ 1V3A019 <CMMEMNL IKFE Ann. AV AWHMEn acm IL TOMANOFCCERO MR... s V". mM.. 6u ppx/nEA ps MVE NBMH HNxMxml mwNERRG. R FEE.. waAss soNOL 15 BUN OAWRS LTH HMx KO L H36 NERELI.TAFEE WWNE.. CM:WOM s WAR. 1ahsAol9 SEAML sBm&.1 RE Ivam+Rx s ASPono IOAMSOU wNB L PIRI:E-1719 SAMN nv➢x.FWWRW ANIp Pl9 5 11 ww Iw1l.F9 BMWE 5[MM 9 5 ... 1E/SaM19 RMWE MEAN REAM ...'ANx�E GIUL'B $ l.Nq.W 1W30MII CCMMEwML YNIEWAVE 1-N139W $ N;R4.W U X¢L E6EI WFNmYWIWsi01ERMN5F3 %SWKREREARI nNKmHTPix oX 1613698W $ I y I9 WMMEMUL ]AMInSRIiRL1NWE55 MKIm R MowN1.UN $ N$WW WFQI19...A W W W0...A IER. CIA; IXC %+ $ 1F3ry5w 1V6/SOU IMEFMR ctsEREFEEM Sn E,PANEMM Ex A4 s A El .. SBxmL oMFE)..v Ina s v/FFMII.1.1 um EwnmeRlwEUs apwo R EE.. $ 11R..W u/6/mI9 RAIR E U.1 6Fw EFREET wrK.o i33mussla 5 EVF" eAIWE m� UFME6MYIpIPE00ME WUIX MW M $ VZVIOiOYINBL i]61nM.FR, PMIpFVIEW ERERttGVAAN 5 3AAOlO XOUY wNGUI ..MAR. j A/IMPOAi 1 5 BLcMX M'FA F. VLVn RNRIVAOR0.A ZJR $ MMAMWW pi IL RYAXCEMPI3 IYI.P mM KAIWEfO v.1vnx 6UnwMWPCA wMIH ALAN0 x13�)05 Aw SAMa;SWwUMMEMIAL<xlUm Fx PAmIER >liM1-ISA s A6,WWMMEWAL4WIAwEPAVEAV S�MfM MUDKEx .1�3EA.. 5 BC% MWInOWEIFERAwWE qW FMIWMsnIFEi IL IHl.X AUC. 5 93R...1ACw IIEMIHGZOXPeM s EPpA P. K..OWAY-VInBUM 615A565a NxRMOWnY IL $ .1 1 LIMOS 53XB6M FLLVM MRAINUMN M-361-Z)60 $ S6APoO0 l/ IvGBG PAR.. LAKE OEMMENEABYSCNWL s PERANA VE u s Mi6/AIG SCHOOL 31iJ5f S6n $ W GNCEL cOMMERCLLL zMl Wpsrom [OxsipUCNOX m $ SLSw.ro WARM. ..L 16i5 A. P4 WIUOW RopO, SURE N .1111 $ IhMGM RLI INAL EP oiW6 $ 5/mhom.., MAKE Wxnws ROWINGVnRXgWO LAN EAR. 1-BPE— N.RRO Nu4X5wREYUNNEWG $ rzssOW 9/m/zGA m4M,wu IMER NE, WRiPGEPARK LL¢BPXMLNS $ 4V2020 [OMMEANl PARE R,,IRLIwlznoan B3-PW s WL6hGiG EAu3 ONELL.LXKXECXWL :AIRIER $ E',.GE ShiMZI SA.L wu3EPMIM1nLSCGREELEUM .1ELWMAF1GT.. rn 5 9h1/]Gz1 AIRPORT THESTRAMB9J,98}m IN1f OPYR090 GLVMM fiel439N $ )SB,Npm GNcfl16H B NMIGFxX¢ EAGLAG 311 f HUAL.. ]/3/AA GCHOOL4P.1 p6LiPVIW4PR BUMWMmONGEtt f 91/zoID mMMEMLL EVERGREEN PARK PO NUNGLO EXG Ml I.F7393)9 $ VEL ¢1.5.. uwl�WS..1 w0. lm RE AE-NA) $ 4/LmA CNUIKX sO AGE. ruTxWw.. In AV AMA HARAWN MnvWxoMNvoE pwNo L..1 CM: GlwxE �] $ 4LE5PAW IANGro.. X mICRX 1. WEA, }GIE.-11 OLYMM Ill., CM'. PVRq $ 11 SCX]OL ¢LIBMPV I4RIE5 A'.. $ PswA.LEE A,/BIE, Y". WL3UPPY,,11 lf¢ 9 5 5/BMm.MM.. ]G6l YWU-EVPXSmN XOUSf{M. 730 PIOGEAVERFEi LLLENNY XOFFMME GG NG $ 6/1Gh40 XOU5E YIWOMN 'GEAT UPNAMCWXXELL 5 1ryE6hoi0 CCMMEBON Rp1WNOMMEd MpM P& C So155BIM.ME PVE OMSIR.N 5 6h1MI. 5Cx00I EVOmmuxY c05 C31PmE LL N.. mN ,KA 5 51 COMMEREAL f4E W WV AEAIEt MEUOSE PARR IItYBMioMVs VSl/1EI SHEWON 366E RI MMLXI-ET.EM 6W WSW RG ALI. 63od3)Iw $BM F1'A"BI0 WHOOL NNDO(VMHNNMCFNRT n 5 PUBLN 9 OINAOONORIxmMEo 1. x GUWMIICNPVE dIGGOXILLE IL P[cOBE $ 1 IWNIR)O..EWPL O`HAPEAIPPoFT WIwA FH Ptl[IIEx 31.1.1. $ 1011CREAoo Iha/)o)i..N.L w xSHREG E. U¢MENT LAE,WEAPGA aas5e3x 5 ESR.)90GER U3/wlo EAHLAL MNs GAEN 4GEHGG �SwMLARKAVE IL lOXv15 $ IIAo/z011 NI RAEEWECRNT SSWSGPPMAENBET xWOME MOMX 5 LW1.W AAKKIG.1. LAI O O'IUGIARE t CNYAG9 FREKCXEX $ A1,11. )h)/N11 COMMEKUL 1x(1N LAAAiURXNUPE 915E f 00I HER eM SRINER..fMG1P .B VA 3IS¢W 5 BBA.GG 41No]o mMMEACW L. ATDVEHILIBLE L fG . $ y1E GH..EHNL GN sHGPNMO IL MPPo CXNGGR.OM Aa15M 5 6/EiMiO..I. EOF NDDM $ I AGGG.1 1660 WRM AUWPAGA, x0111H WMM $ 7/3MZO PWUC HARE AREGI IL GI OPOUP 5 SylS6 G �lN/AzO 'ANTHEM ERAR 6 $ ARMRR 3 UBFpry EWMFMNVsgpT i&MM OJIB. 5cH0]L U UAEAXAKKNLMUY MEPlpll[igN 3BM MehON NNCOL ALL45 MIEINGGxEYO5Ws60 UIEHREEE YEAVILI IL LnXSERUAIOx s 21.00 7/L1ARG mM..L IGHI IL s AR,.A. 70"M COMMERa.. PXERPIpNS[ENRq CHI I M1KIIW 03)0 MbAN 41B/]0E11NR L. f00XMEPOPRC'gIXiGLL1I11O u)-33nYm $ 13a,pAltl 1/AMA SCIwOL om/HPNwxsEXVIaS S EMMA Hou" a5WF5EERNAVE BFECHEp IWT/HPMWXHRVICFS 9 5 EG,,,m. HOUSE RWw4 I.ERE WEMANPoXSEBVNES f B AHIPAG HOUSE 3ASp OxOEROu IB MANSONENRV.G MBssc4e3 s WIVAiU NOUN[ wilwxsOxsERn¢s h ssw)e3 $ 41e/z01 xwzE ]GNMMI4C.AIE ODUMwpO II wERmrvAxu[mx 5 VZ)hoA COMMEAVI HLE 3BS1 N MLPRERICK CMUm LL Wi ENERGI¢ as)Mo 5 So/9MA'IG,.B[ILL SWO.'E'',"IlMBURS 6ESWIXWARRSRFEE dIGGO 5 3h1Mzl GPIUOE Nr MNoWHILE. IL MLIRGARELP 47-z311403 s VI m.AHMCRL MER 0 HARE TAG µR H AUAMPGRT dHIYAAO AmLmxsmurnOn s BApoo.m Ivumzl mmMI w1xO "EG, SAVE LLMwm s sosW.w MAM1. CGMI wLEAEMGmHS,BXCPEGESmuX mwREMRPORr CHEI tL IN MANI 17B.1A sHILIMEDER LVWiom PCMMENAL L. EGA TESHCHI 285115FACHUTEW PE.E oorMnt3sOXxmlrsS rofiasfic/u s .... IWIazoA NI S,,TAAAaRI R l.71RU50 K01ONE IWEMWS.' CIESEAl. $ A'.. l/zNolI HI LEGAL 1MILOE `AVOOSGEER G5WMGONWINIWAO IL PULTEGPOUP 5 B."Am 9h1/Nio WARRA l 1A.,5HENUH Sll501UMN5]PEEiEKANETON IL WBCLLA0N .,I., 5 ]/31hGM fAMMEq[NL MP Plll.. m., 4> 36]-z)w ". S .. R I6Mm M.E.LEEK m IFYI GAMGE NGSREfi 631 LET ETIER� EIRALL, IL WPLSWNOVION XE EGIMGLG. $ 'EEL. NS/AA WMOE LEGN +MPFRNLIF % $ 3µ9o.W ALEGI CKHRA 4 1)G9 GEW.BEREGIAPA.. )IOL LLES S 2]IM AVENUE $ ALL.. IohywlG mM.. m0 • WpH(.M ... 630E s z%I... LLLAZG...L E+f 1. 4WREEr smE GROUP ,A,. s Eamm AI GMMG, 1712 ME wKER ARE GAME NNGW R s wM H. MI.., 1)ll PAP¢LGBUIEHIG UNVIA NXNL Wl.". $ AGAING, lyYAlo [OMN.I LIE,93A.... 11.1. S I¢SPoFV LJAI REENER. )w,A.E. IEET HAARGKH IL EA. ]W9MA EMM 6 CSXMlo BPIEGEPbGBAM 59MME¢RPMMPL CXIUGI IL $ IB."Am ]Vi/1020 MINE 1)I) HINHURICARIVIRAXIAWEADALL mE.. $ 111. LGI mMMEMANI HANAHiRA550OniF5 $ IYI3MA INTERIOR RMIOdOXRNEG Gullf IL DWNMUCIpX $ 9/.". BMW, BY¢XNN.A,N 36 ESPPINGR00D ELEG. $ 6.5000E vGIARGo EPME x, I.E. G,T . 1— $ shIM31 cOMMFAOAI UX 7.7..SERIAI $ lo/NAGG..IN. MOpryEFHXIRNSNnRTMEHR L3NWWMROPAVE LH.G. LL ONN M.$ 36UPo.W 'Pl/. IXI , IbuSEdUVFS@EEi WMA IL PREIREEMAILYKEE 71111GAGI 5 "1 1.1. WUSE MElM4MY1PXO5iPTCN&BPIWES ELBWPxPVE Ni1C N, Is ]i)pM.m R NmREIWI FmuIN s]. Mg. FNiMFXGVPTN4 M13i6- , Is 3m.W WC mMMfOfNL v]] Me M14N5uwOtNI I MR, RIME JIL I MINE ND 207 EM'. PEPPER D.NI5 �in]Rom XlKol irze na4orpFwxG 6EamuxFnullmnG UETON 5 sa.e0om I W3WOM lll3EZOp 4wvE $ N,6Mw 1DRD:E. IEFRER 5Od6soE. ORENIIOM CXICWO NARFROXFH $ ]VWmm ME MRK MUUEXEPESIPYRPM EFXVILLFWPU Il/N10L mMMEMNL IM'356ALLgXG'rtIX3lPEE} 'NERI OW .P m.i{m owsoco UCDEMOsmrzXSW Mw llsiuiOlW N ] 204ERE Vln/m33,OINFLZINS)PEE3 DE'Ro IL PI .. cooD L RI mp nFmNg4O 1/3/m31 OlUP[NdIPEEWWRO ... ..ILE.N. ollo-4. M 1U10noii9DONI LRT AERN OF.E DUNDFPIMX �z3ms 3/WID3333o3W WPI.. WM 6/14noll.,IEAGO XEWMS MGPnV 61pEE) EMEADD HE4M5 O3VNT[WNSULiPNR 53S69i1 WN@3DERNER LUPpp llo. COnIMLOXG )YIPM 7 7 •NWPY4WPX U301 N MIlWP X IL VIWOE OF NNFS Flo". 6WEEElm MEfKUL 1165 NW OP No.. 630]IS)313 $ 341MM VI/ 2l MI15E ON, EW MIEP I., PENWn Ml AVNI. RDPD s1DEEMRD .NXEN/N]RFNFI ELD IL N. TFIEP 7HNC mad: FEND. 5 SM,mo.w ]/mn011 YMWL ill d: PEPRP $ 1. 0/13/M]I.1 IEDINOIII [Ill. JIL mN5MUE110X 313-]6NM $ ]/m/IDID F;;F;.R VE BVfl11XGwIwEM 113-u35m9 5 I,W,,, mmMEI 11m PP sERrtmEFi wmN W M S V3/loll IMERM, mI& loll E loon SRFFL CM11JEEE. 33R6 j ooI$OOED "Woo,'OM.MDFL loo BUIL'OIw4A59F5303MPoa Sw GfTDEWNSMERE IL OPMWNSFPYEIIOX 5 "F/3031 [qAM EMNL loll )IONMIDDLMD.4 XAVE Ad: FORD 5 6/1ym35 YXOOL Om9FPWW WT p]1stMP W MEERNF #MW $ N56pw,w NI XXWL BEofCP➢PPPR IX6REgOXW� f 3n1lm3a d,M@tyL I.N. GIDWELLiPna 3@-%1-E.1 5 ]1MDED 9/P/m31 WARN.N 1]5) H WIpWMXEFnYF RWROMIOWFS] $ 10/S/m33I.I. ]mwN]9]3 $ Nx3.1M_ VmnOR WUNX6CEV SSW BRMWONPYAAEEn CXIEAGO H UN 31336a510D S 1.3EGAW.W 10n,/m33 MORRI PXSm37-NGI OA AM YA9W IL POISROM<IXAPPXY mi�m-]131 $ 9jWm 3/1],.E GW06E IEWXOUSF SOWNUN]WR $ FAME. oCHML No - ]3JB 1 PXMON FAPF Mit]b0 $ 6/Is/m3350aOL NMEifflMIXPLiT lIXNOMNEDPGR [MIVWO MVENNRE]W 5 1, 1]/3/m91MFNM 1]6G ¢4IN3W BPWRSIpEEi EWIX IIL sWL NVFSM1. S 1Wjm.m NOROx1 E0MMEwau 1)65 < c4WMELEE. 94 GRR.Or R H!&COM.1 5 ]/W211MRPIOP GVRLnIRWOiFRI EEI5 s15.150.W 7119/201 COMM RML NED �ARLESSi.0UP16 FMNIIEP OEVR ENNEM $ E/9/g111XRMO1 17. mB11W1NlIYCSCUPT'PMONG OIAPIFS XX NmMP 5 33,366.m 9n,/m31 WMMEP4PL 1. PNUW1ONHMEMNOMETOP£/f&M IGHR IL V6mX51 RED $ l/39/mxl WMMEP¢N rn WFOs1EPN N. ..DPVENWMINIIXPVE rzHE03i)< S;F,j]M.Po Bh/1011772 E BPIWF luaobwxe mMMv NNEw $ Nn]/3mI FAMn R'T.NsnEn lDERN. 31NRSS1 $ P;dw.w 9/15noR mMMEMIPt 1]]3 w sOSNOMANAVE Unu MMFIFS,IxC 5 NRO311XnnwN 1R6 I ,NNNEEUfnmMExna FV NIWXDEEF, 6n FpEEMW flOM pwl[IXC w 5 <3,Fm�m FOJODE ns uxoRs,, vmonxe,ONE. mxslnurn,n s MzmD.W z/1Norz lraEplDR I PEPpMmfESIPLC110H $ ]/6/d,311NIfltloO I"D n 4¢EOP6lm GfIXE LEpGCMSIPUCIpX 31 $ 6nWm311NRNOwsOMI. P XmROOLN L s1NEEt IL 5)PUCmN 1p- ,,I fRI Do 6n3nDi1501WL 0 EREFORE MW IllW.4 5 FI 9A/mli IMMnI n3 1 Ue OOl FORD DOIFLENES YSW mN3MVnpN ZA $ 7/W. LpnMGML P4Op FGN4p-0WX ]5]5}gEE7 NIMCFOM 9 $ OW.w 5/i3/3@]MOp IOWM ,6E/IPrvER .O/UWOISflMN R EDxSIPURpN s 117..m M9R0]l NGPdWN LWNY M&REMrI xmwwEcsuxmnOE won $ 1795 d MMI]mN1EEnCaVAnN4 .. s .W EFFM MMMENEL 17.6 LMTHDUENE D nMHCEHIMI CONOLKNS Bl3.,DR, s 3nND31NDE,E XEQEEN soon NUE,., nla .PMR RNEwwAMRR s 1B].3N.m mtRDE smoOL lRS oNTFNKMPE IEMOM N mx51PI1ME DDux1FMONW IS "llZEmmMEMAL ccxl3caXlYuxFmFO Fxxa. MRINAVE NIDI $ E. S181 NED I,m ESN 6ERFEE DR. MIWnD $ sry/3M1 M4CE GxwRW wM,,EPv, a LLEI mE 5 3DOmm 1RIO. canMER. AUOEMt ]9o30.vWxXE DPXF IERLXCNIGtE ..A.1 5 15IRMOD Gns/Aiv snwOt 1]E3. npEP ZIR -xPXaF ERRI PBmrvSRUETIONd 5 6n5M31 ,nxx Il M MNOMMEHR Y3nlN F. MEP, SnPWEG5Om1d:NNOx ].]a4N3x $ 6nno31 %HWL NNmIPUL wpulw 9UIWFM Mawmm 5 MREFRI EI x0usF muuxEatewflsrtN ERRM,i. E an,pvwd 5 3m0.W s/—MW 11w XRpEP l WMMOXSIIORMKw NVETIILLE %1}IEGMUEp 1 $ 02.1mMMERNL l,DFF UN . ORENOFFEREEiMO pwIEP WXSINUCIwX $ 1pu.lMISC FWO3 WNLMOPW% 1£XELLYNP,PO IL IMmXS,PYE,IOR f mD,moo. M/]Oxi mMMEMML VERDONNEPOEXILLS VWXIUS MYSµOEg50X $ 133AW.W m/V303I m... -SEOMRWm NEENENIGW N[NEWO WL) $ Sn1/mL"-I WEPPFMOVPL WIVLO LL NISThY PTYEM..IN, 6/m/M]FEE OSR LiF. 5®M ssow 41Lm31.1. i6 MRN WAM 3d033 $ MIMI srlN K Noo M.�A..'� N PVFw� mXSIPULT,n S u9, M vW101i IMfRMER E455]RMN� OW6,IFORo5,RFEi wMWUX1YWI ni5-131441E s v]p3.N vl/naN1 c,MMEnEN1 rt ,xFS lxc m0 5 1n650.w 115lool X3LEpwP REERNR YE, OOO PLAINFIELD mm mXRPLMOR 5 )n3/m31 mMMMML BEIMOD, ABxn MNx6 d5]@a s 9nvm311EY$E MID i HYMN ME,TNGSW II. . PGSESipEEi FWKCN PARK KMM W DIMS' XIpOL =Xl= Wn1iA.N,.S,HRO bsxSHEEPENPYE 5 SIDIVIGll WPrtp TANK ncWxNELLE $ lw"/W llJ I.NL G-cFMMLXS SGMMsipEEi NXSOLnIE I ]LiE6j)W $ lLIS/SW]XHWL ssMcnu rEwxuG wAo >.maanR s 3wls/Wzv coMMERCAL w.p¢INc l We9]58I. s ]/IWmR IvrzMOP MBEpPWO HORNINME 5 MWLIll iPRM MKRO50RUR31,LTRC., 5 y3IC.TG.W VH MDI1]/NL YL UPMIEIpX TpMp GMXIrt Cm t $ WOGE M0W0.5GOGSE ISWO $ )Jjf30E11X1EPpx AIN/SNWEISEN 1)Sa430m 5 213000 0 6ILS/ 331MEROM Nll—. MNH25 . 5 Km/mzx 1pUC3]31WpGLELAKERCID N.., nwKLITCREs z $ my/mx10VX ]xbiwowBUW UNE xmSUE 171a1Id363 5 twllAov N.C. VC. x 3 $ WV." HOUSE ... M1E GPN. STAKE tlS.IRSSW. NIGIMITY aWTE,LNC 841HIM3.S S{mw wIPLM 1. .21 VGN.CTUMNYCLLS EIMXUXn 31N. 5 MISKW YNWx COMMERCIAL mME0ix81 wuTEO CCII V MREff G Gua3 11M3 5 SISODS.W u/30ACK3 mMMEwu ICII➢ERs $ 8440000 Wl/.M WUSFS HIM XAPI VOIMSwMiC PPUTNE .1.E 5 W3L/TILL K.E.N. .IS IS iaTW.DS 6UmIfW lICT, EIXGMMVIUPGE U..121 5 CANCEL w✓r¢MER W 5 I'M. W3/mn cID" LSSS ee0.5w IL coxsinucNOx $ 10/ 2L COMMERCIAL ELMGROVEnLWE Iz11. $ .. VIN022 MEDICAL DID] $ eI... Iy3lROII CVMMEm^1 SLISKFN£MGUSFSGEVOXPVE iHS E OEVONAVE A.VIR IAIR H iEl 21N496RC3 $ I).Mow ]ty/N. HOUSE WEWXGMN ezpWxwTrwsHGURNN.L TUN. $ il/W3011 MOUSE eM aX.VMv MCI IL CURMN CONTRIMN6 GWM116T1M 5 XaWm Lww/SIW MIX DIM Ml.l. GFP-WNiNdME0.K6 UG 51G 5 ]S/tWS /I MIX SID FBRrt0.SWEE} IL LENEXMP.viN $ ;IGyew.W nlnlMxl. 1. V iiI.. O�]]611M $ ,—. 4ryIR Gry ...I PI .1 H.C.NOPVEMXAI.&D GIIaML. IL ISHII. b14S)56x5] 5 5/LID22 MIME MRS PtK kESSRRsiA]IGX unIOH 5 5>AW.W cRx V=VWxox=WTEX3sXx niEflipHEEM W]N XKISmfo 50 5 N300m um OUSEI SCAD. 5 1IDRC.w LWm3l HOUSES lea6 dxMEiERMIxALSnorvxW i1E41 WTWMPVE 5 M. uRTXUILLD ML4N,M s X12WOM WTERDMA RMC R s =t oro TURD.. mMMEROu appvwpGE KEUYRIOGEwnrT wrnGo wOGEE IENINDI lasvm $ snlazx.m Wlwull SHE wnRR Mcmwmsmwry woEvoNAVE <x. GEMSURnINGm -ziw 5 M.nom LwanpW IxreflKR uCSEEGIOWffli MR... COMPM1OP5 s lull/AV C➢MMEACML MOMMn MOMPm MEpLWIGL 5 Sl/1w10xl COMMERCUI OLAWvxYPFfpVPR WPMEPESWs SNNGEIFW IL $ )63.ao1W 5/i1/LO3E MIEPIOp 1X50 GUMSIT MDhxFW 1N SiREFT OxGGO $ IyE/IDS31MFPo0R V/PE PIRD.-.IS 3 5 wv.. MHC N`OESTpIKTUA4 1 3 MEflnfl ] MMXE]WSIHNN) IMKRKGE MAIMH50A]P.I: RFPP $ ww-1e R/1w101 5N"CL B Iu:NNOmVMRYCwO ErvnmNPVE InMING IL SPAOXnOPmTE3 ] TRTRICK.5 ,wO l.VSOSI cwnMVCNL r>mpWEWMxK K caHSTRUCTOX Mwsu50TS 5 lG/iwbl3 INTERlGR o Wo EL NDEROR .I V., LID I CRISPROADSMITMEw nuv MURGT u $ W l CI L`R nNGICKI �Glnceeodt $ LmILK'S't . 6GON KVPAKKPVE 771-.S. $ .3.350M G/33/DOSS IMERpR HAAHURTICUSDaM FIEUDMPM xsBx EMMIAVE GIaMMOM N 5 25.75ow 11111012 SCHOOL MCFAft.N. KGILVFM.K IL W.SLKI HISSID. 5 WMll. IMISTS TDRSCESSLICHIIIHILCMICKETE.11 OUINc 1xd0 3i.1. 5 11..1.. I VDMN NIEWORK zwzxMGORIVEV araGoS. C.MSTI C. s 3nvan lMERlop ILLS MRS I.. L PccElmxSTRURIOX $ .1 WHIM SDI sUrt EMY OHWleAKSON.D CNIGGo $ =W.. G/1L3033 IMNTEPpR .. 5 SHR KM OAp .lR05 $ 1/W"IS I.S.R Tell W m. COM LUCENTWE 5 3/IOMl3 Cd. 1,10I 1.11 OKKVVUWMOEs $ 2.9500) e M1X MIS OWCMAINMSXPOEiQEHAMME HRCRINNNT pYgm NLANNNGMGTx4 $ RICKS,RICKS, M. fnOWxmRTMISI OLYMwAIDSIS 3F MS, $ 11S. GMMSl XOOLRCM DinM. Ll�STRRCCTIL v�XwHICIMP L $ KIIRMzx MSC T=1G 5� IWUNT K MH)FlE[MICORP t YNILOz1 M1X MII xomE51LOHMnEnx SIM IIII o SOUTH ELKIn IL STDCAUSS ]] s RM/..... uE&DIHOROLK St.. W.FMCNSTI.. ss.ss.+>I $ ST,00M.n wILTXx0O1 .CRRIUOwN G1 5 i222DOM ]MM1R I XxOOMOEmMMM510N�TIOMMSIREV SRRI M.MPRLENMWM $ VMVISII.... ILLI ...CAM AnR LL ¢OiLM:iX PAxxtX $ s 9ACS3 MIX MRST O1i.I.Ls@EEi �ON ME. 9>3.31anG5 $ Nls/WSLm .I. w MA,MCN,REti x.CN mMSThUCTIox n 5 SACHICID INTERIOR ISM NFENSMUEWmSUMM..I VMIOUSIIXATOM MVER PARK MSE KEENMIOFSoxOCM: IN PPXHEX NC G VL NLHORSL TRID XEPROMIX S)RER 5 b,R1m0 111VICT, INT R Sum cINEZSHORDwxo yxlsiws 5 e/l/IDU COMMERML ...ISwtt.....VTHE IN MI CROUP 5 mm O"N".— ISM ISTwuBUMIVI FPM ENIPANCE ARAM.. c IL KIRCHEX $ UNIT. mMMExuL M. XxEYHIGXXNWL-TM'6 19HOMW NUNTLV IL 5 3RVIDl3 MIK MIDAX WIIMiiIPPIMEXRVEXEG PVECHICKDO L VERNMECONSTRUCTON 70A"w $ l/3]/10E1 MIX 58MR PERmNS)0.ULTON MWCH553 $ JCDMICG21 I.R.1 lea jamTMQ pIwX z,Nop U.,,.IMME wATsx caxSmGrnon s 4m/m1 IwGGE NeuumExe nx OR, LL RGROM GO, $ VUGMl VAx roweRRonD INK n.., 35d INL ASTREET WMMM[N ON UUANNURNX $pKK 1/3/1011 IMEn NAN BC-SUWMYUMP I%GROK VIHnGE IL WpISH WNnRURNX Ba15 $ MWIGl SMrtsiREET xnprtsmEFi M1 $ WMMERCML rniNu-xpPEmnuE ]gUBPcompLE waD Mlsspu WXsnlU.M1 s lMFwonam MAGEIwM.G SUrtEs Os®µ R ssEucwnRUOMN 3mMe 5 1; wm WMM1. IDGESISI OUND XPpXXW 5 6MD6f5ORUAMaUSUrtEBNM5M5 MESWLUNW6 f J4L MT5[fARM ACEMPpI 6NSOBi16] $ .RSm.WEPXMINK.6GIXe IL .WGB11B] S 1e150A0Ml5Ce06 m 3]WILIEWFLL ROAD WNs3RUCTIOX s TbUYEXECUINF WPY®ONTO DESPWXES IL MIIpMES dh $ JS;OpyGG AIEWDGK DDGSIIXNfE MARA 3TYlmxsuXNGNMM puPOM M)-1M1 f 44mu XOusE NING601i5UNnGOEMI NOUN RNWInGv]N R. GOO (311W IE.WOgUDEMV $ Bpm.W 6M/m]S BONER comawwonvEuulEMlaE M s %`MIT lnzrzozx OnlwE Wuvfxr 111. n MMOICRSEOECHWGO 7.i 111]1 $ IV1V011 XTNOL F.nNTEv.au NDGEuxD X NGK EW)q lxc ,,. s J/m/mll nrzMnRx UxesreecNU6o IwxnVE cx�wO nRL . $ AN400. "IN." NDGR NWWD IL RYPN<fHTML 14. $ W$m.W AWZM WEW0RR WNryU EMWdS NUFSi MSiPINNH 63oM3-15W $ 1]L150.W. 1/19/3M3 MIWE UNA0.GM-SHIPoINGFVpXSNX [o xry UxF0.pn0 rni s q;EDD.W 5/3)/1Ni mMMM[W XBPAOk XOSpNptNl RmxSmhTpN $ 41Gry01 M[oIU4 GWUDXTNOUSEREGOENCES GCy U6XTxoUIIMIDENM MB.]Ml $ 6/.M13 MINING IR.]FFugV1FNWUM MOIAMMO¢AVET SWME )1[M:iRFRRKROUIX GIGGSBeYA 5 311pSO.W 4EVm]3 XND]L OELLWOW3EHpRpPpRTMEMS Sb SaSINpVE G INIANORA f )hVIDu mmMFNON IMNAMMGMANPoMIM Mg ..L 5 SN/ml HWSES SRsrR YIWpOVEPMEIM c1. s 1 UMA,,AMNgRWIN6 UGMNGEWPO 5 GIN20zi WU:1 MON BIOU.N�WMPOWnR000MS 1EDMUNN.0 $ 1.)]B.W RPM, I. 19 [WME.11 erR)s HOn. MULN$N WHICH $ 1/la/m31 HOUSES xGW M1 $ EDGGG.W ]ry5M1z MIX 3a1 GLEHUGI£s GOU WUMF OMttuNlnwap DvmE/vewnU¢cwnVE PULUU6RCII1 5 MM'AI 6OUPORGUss Ppu/OFEMEmuISSKI w3DNDEERFALO iNsov3 w:PFlroewxsmurno w $ lµMom ANDY'. 5aoOL NPRARMro XCROFN. LRGlpUP 5 s55Wi00 716 2. OM1oIxIGLI 1.1. 1853 $ Sv35OW 1nM1 WMMEKUL lel N IISI.MRLEmpo m4ERGPo s 10/2NODII HOUSE ssw11G5pMUMIE wNSNxD s waml3 MmaL Mlwnmxsmucmx mBMoes s n;N)s,W NNhum IWENIOO XG301 MIWW DRAW T6M 1/V1013 BNME pPOMEORopo FRERWNSipIKrp M)�-l1W $ 7MM315CNDOL le6 U� Jmow AOOUUGNNAIKlmN I.,MG s illaim 6/1711 MR leJ a AGIDU wI $ VS.MS.No USM111 .aGFW POWP MO,,Nl WRREHOUSF .ISS XxXOPVf $ IMSPo.W NO �URCRR UNGUMFIGIN SM[TFpXBLVO 3fJi531EX s 3L1WLO 1M/m3i W.M. 9W IWIE)ON PCRSCHE PAGG0 SmWMOXROESIRU ORKAGO P3 s 5;7W.W ]N/10M IMFRbR E SLNWEIRER mAO N". UNDMAK, l/1MSS 1Nl B¢iOnF1m . $ 710M35 n UA iw [pGrtA R]HSTREETGFAGl.PERA V N3HSSllEEi CHK/iGO IL � 133069M0 $ MIWF aH HOUXLNIEnEPVE ]3361TIEr)EpVE IL =cMINC $ mNX21 HODU IN, K651 xvLVEPIXEORWE RURCRA LEGGIN 5 s i1BNDON 1/16/3U15rt1 MBUW SCHPUMBUR6 6UOM NING I., $ 1]0.G00.W 1 1/n/3W3 COMMMCVL 15.1 LMMGNx�mWmlDV .IUAI ro WpppEM. I M .. $ "W m/Vm MR. M ROSnNGMO ]EOT O'NMEOMIE U AGO iX PpXHEN $ mUNAGGIV13M331MENDN ING CWLUAGE. M 1 $ 11/11Mn mmMEMNL WSIGr Ws)FRHnu NAU.RGMOX51R. DAN. N ...KOPLUAIIM: MORTENSO M $ IDP-00 DIII/11.... 155E N uSIMUDDIOpO4eURN roGIURORo EL6U0.x n MMGNSREMVAIPDXS A"PIAM. $ IM11011 HOUSE M/INMES s IM110]3 FARM w INRUAGTPAIL AURORA ANINCONSTRc ONGROU. s NANDIN snwml-M.. -NGHNAuRM.RGIN N ANUAUw 1 KW HOSMTAL DRIVE n rGvwmnsmuETwN 5 17;BMW Teo MEDICAL MIUNE5IMNIWFMEM3 NWHGX01>p A`AOLPoN $ W 1W lGN x GRLBR£ET Il PAPNP EnpvE s W"21IpOPIRRMc UX sS. DAUM, ROAD GIENNUV .6 NOMFs s MUDDW WI.N U. D xcOWGRGENKARMIM 5 s m33 a/V WMME...N.AN IOMN, , MANSOMER WI OURUNO}OHRMD SOMMS .CUTNLL .11174M5 $ 415/N. Po1EMRX ROOMVELrNom wmmw xf1LM lxc amle.lm s M.DOGO lW1/xW0 WMMfnfa.L IpTDIwyUc $ 141W.W v/z OP GOMMGmML 1%p f MMFROADBPXEE.INT MORRNWN NORGUN WM/M. WMMERCNL MN AAXN ]SDSWISrE]SMn 5ANG. 43Vm31..L DRAD WMETRIGEWUNMCUIB 3llp I.NMIGIGINUM LD IL ONOPURRIDERS s BSpLON ID/m/m11 WMMERRAL ..AIR.. me s vmIW IPAK012mMMEMMI IGAK nGURNIMARTHURNaRIS IL rowNINII Kilau 321.7P24389 $ nAjg.M IWVZXU RwF sJ WNDGBEsxMM5F1am cIIIUW Kf®IXW , 1.31S 3-% $ l".. 1V16/z01 MUSEUM O AK 1 .4 $ 3WDW 12/No22 WMIeN ME lel MD X SNMIUIRMNAVE X5A MAPP COUc N i\M ]W., m MMMCNI SBfNXNGTAIRT IGIwmXHUMB 84.01 EM m1M313NE 913 BENnEV PINGM1FSMNXNELD pWNfIFN WNNEW PARK DMICT E... $MFW6 1Vrym31 NOUN e>. NEE,NE s 1E/zs/m1z WR6AL MME IMOAKI FIVE MrvE wEsrOXUAO IL E3m AU.INTUGpvSORrvi LLCM s NOR"D, GR KKRER RULIGNBEMORIDUMBIXG iBM60 10/3NIDR WMMMOM la1 MMe[MLBWG NNMANIN 9 ONAT NWAWIEW IL R6iW3 $ 34WDW ShhOm WMMEPNI 1 1. IDESW ILLIXINPLL IL GgfALONFIrt>MEMBUPED 5 y031,OW.W 3A1/i0x3 YNWNPDAS 39A WUSF.STSsREAOEWUM FI➢IERDSO 6ENNAm 0. NENOMES 63032E321 f LLIs/Eo3E xoU5E 59ABPiPVNAVE OMU $ ll/30/MR XWSE OPf X/S3PNXINGRWM px5/MmWA $ ]q 50.00 ]B NOR 1i63 MGO 3A'SONWEPFPPIR MSGSSRnVEAVE TTA LA noa6LM33 $ ]3N MFPRPGECMILIM-WAE53O5 WPWSFVEti MM 11M3 IV4:033 ASBF5104 x6]6]X SiPEFi 5 ADE iB .1 ISnNG EMMATHWOR NAVE pUWNFADALVE IL $ DAEAD�ID Sol"3..'DO moNAVE 3 5 3LLxaxx I.A., n001WXAW nPUrnox mHlA 5 AL MUSE W FULLUTONANE cxR!w Ex r $ HPLSRH3N NxR . HOLL5FGSTSIDE0PM n $ IYllNxx IWUN 90 XFXV300011B0.0XYf4MMUX1IYCEMG HI0NW000 AVE IL BBMYCM:WBaLWX N 5 BAVM]3 P. MS-FASTIIAWIIONFMIBrt Ya¢ MUSENMWOp AIFXW AINOUSRY $ 33]$W.00 3B INRNIOR 1 pcEW 1. N ATS 1. REARANDALL EEiwP R 3xxd63AM' $ Is'.OR I'D TWO UNNIN. TOWERSdx06pI MIWSWX0RES0PVECLADMIAKNI ANOR 5EARN 3MNWAmNS NWIx xR, 5 WILD, XlarnMX GMREW BLVO EMERPASES L $ L/SR033 MW IMEA I. CA NI POWOEx AVE $ MHLW "ASE311MERIOR WIFE] U. DIEWCOIAIINITCLA A. .4 111 $ 10/wDA NBIR, RED SATEEDRAIDERAO LINEAMENT. DE. ARDENSPHISOCRAMEAL MI $ I'.. L35/IDx3 AALC HAS HOURSEASONSPOOLCHICARD -s6)c536 $ W.I. w0L WAS xOIS.I.DDExxrtp NHILLSEp¢m uOWSHADWIDDROMENTELARD TLASENHDA S ST... ""I. aWAI SMA 3MOURE,AAWOFWER .S.I ND LWARE HARDER MOFEARENAL DOORD5, 1 s TAW, IDVIZA HOUSE .I BEEOIEp S A. WEASED WISEARD ZRAL PEW51SEET ]ES W F'u. VS DHICAGO IL WYBERWWTI.CIA. x36]n. $ TRADS IRITSOR WNL DRESPflIMInXaIRiAxx $ IAID. VI"II DNW WUATIVIA RE51M0M FENIAN ]W30WUHARES., oLDW, ILLLLLL F I OWNER $ AIMED I 31MFNOR WAS W ] ITSz WR.NTSRAT vI-556<BA 5 vWSESS MIS: DOW SASBFSTOSIIN NSIFCTWN H IL 1.11.1 3 $ UESNI3 M. AREA OXIORMATHAPPARWUM 15 RMPGWFURT IL WWFRWNSTPUCTIOX $ M;ttA.W TIRE I. DERES 15nNG EAST EMPY-SURI.EMEMAL BUTEDEAR DIED, WUEN AVE DOWNERS GROVE IL FX FASGIEN $ ISLAS 97 vvx011 INIEIRIR SHO 11bp 330B WEST CORD STREET SLIMAR ILARGO CHAD 5 2011 6RI WIOw O XOOL—A ROD TUNA EN Ox63 EIW EMERY HOLLOW ROAD ALGONQUIN IL M1U,AW 5 1 6/L5/MxDWCOL SEES UNGFAY 6MPCNIUWCUT SOD MES]ERFIELO0.0.ACH I.A.',EVIWGE IL IGCNIN6 W6O:CRETECI)111NG B $ IUMUt ^UW`M15[ xE AVE a .IRDEST 5 T/3NIx3 aasranox ROLE I.wrs GEMOOOSWEOO WO"INEsRN6. UMWUMYRGDIN6 T-ISR, S IMIS.. RTSE/IDT3 NOUWS DESS RANuwOEMYapMIXBIW 1W]OUNDEE AVE ELGIN IL BUTEY&ANDREWS III-5]EHx $ MoRESE. I WHOOL SLID I GAVE WHIALL-LESS ECLHOSERNATION SENTRATINFRAVE pNgGIWE I CEXIMLIAv,6COWTRUCIKKI MIA21,7162 $ TASSELED WSIZEUWHOOL 2017 MF BR WOIS O XEIGNENVINWws W OnAEEr GWO HEATTE $ iI.. 3nnon MlSc s OM2I BPIWE B HOUOSE1llpB IURRM1f MULIM RD IOTSAi�331 s SRB/]Ox3 XOUSF wA_DS,REE DW WLIAs[xIN 3 ]MRpv BALE m HTsmEET®®scxlGw AVE la.I EII $ ATMA. WAI"A, OlAc mm CRIDEW ESTIONSTRUCTEDIN Aw..AALA 5 IITPo.Po Tom. OHARA . TA.,.A ulfESlpREnFGYNW Ws]EMs 15T11x. 5 3/3S/10x3 MItt DOW oUANTIMcws5x65WAARKADE ONSTAAT OIId00 DUPNNMaO5ANo5 S 21..W AIM. MENM IUSEI DO 5SEASON 3Ln/xnll ScwOL MIS AUSTIN DOOPER POWER STICKERS YESTRAWNHE AS. MILWAURF III 5 WASN.W 5/N/Nz3 MIS, m ax-Iles s x6,.. VDWRO, MN: 1. O SITTHE RewM .IflIMARTs WAUKEGAN WAD LOW S, HE I. TOMS] SIR RE, R3 s MLUIR L SSA FIRE O W $ 6x,Om QTEOEA HOUSE ZRASE OU. .1 U'RANINAT DRAWN BPRNNOTw X $ WXDNO0 THENOWDWLL M31 ANDERIONARAUREAR IST IROAD $ 3vamw WOODS WAN III A NWRR2xIGtA SEARS ."A"Am [BEGF lLLC B 5 B, ]v3B/Mil WMMfP[W. OwnoorrrnvEpvuxr ARMAETHATIEET rltnSeuT AAAI Al ...I 5 3/LEA. SRE I.' NNTLEMFNWARRPMN END N AMENOWE NEIRWARIUS u RU 251 $ m,ND.m 0 SUW IRS W fp BULDS $ ELAIII033 dGOVEP MEL WHE 6EORI— HEAD DO P WNNELL $ 5/➢/E011 REMIP 3N] WOOD OVARY MUSEUM RPMNWAY ELHWMBUPO MCWNTRUCNO MPOIS &I TZ11 $ ILDIZE131UBLC WAD.IOG]bx5 IL ,VRMWIMOFVEWFMFM N 5 HAD O HIS., nw]IOXM WANDEP USLATHDAND IN.. 'E. AS, $ EN'L W LED WEND ARS L.,INOUIIp SNNOF AN 1.11HIMANDROAD SERWA IL ON"MRS",.IXc SERSERITICS $ ISISHIALI LED WERE ttt3 ST. RATHEMNItlEA 14REARCOMAS WAD 1NMpW11E LJOSIOOxATERJE N M5 $ I WR/All I I. 5DESIR.BRIWE MR.-LAW W MAON UEYANxOpEWS WX[PFlER6i 313-EM1I $ 65,650Po B/AIWA,I xlA3 LOSSURDESTAINERSORSTSELSIRED 3 $ T,WO.Po TEA SUS WAR XMEDNNOUSE SWER".. VVINFIND AD.W. 31,..I S III.. 30I5/N13 W., M RY NCFMPN 3 5 IIIHISTO .1WILRAA 5. W 13BW SREEi NPPENntE 1 5 SHARES <M'. GIWNE SSVy3 $ 13NIDx3 YWOL 3W6 MAWNNEAUIFNEWBEOIOWfP ASONS WALSN NI S 3EM=UN n [CMMRLN ..H.XPVF MESTURNMXAVEaVF MORIOXEGROVE IEUATTOX NOMFS 11.1. $ 111 TED OWIMERREAL SEA pIV@MTUDITS ASAVERESPIAME STLEHARAU IL FRINTERDENOWART RWSRR72D $ N, 15Om 00 INTERIOR DOES EFIREWUSE 33ll XBN]CNS, ORKARSO IL HAPARDO 2x6L3iWI $ TRIED. 6 PSES 1MERpR MflMBMLKWILAWMM6PX51NEEi FORCE ISLAND DISTRICT IL lIOO.N SUISSE ISEE 5 DERS RNRS IO IOUNOE LNRCXW 31 WO.A.MMAD OESNANMS IL WNRODIMUS $ WELL RICGRATH ASA-ST GIARLES SIRULT WAFS 15 $ W.,EMEMVI AIR RAIMENT FAGMFIOEWMIMRMVFMEWIS AN COUNTY LINE MAD SUNNI IT PEARERMAN TN3nm13 $ 6 MVORIAND f4OMERl SSWtIGMW ASSOORREED RYANIxcRMML 3 $ W TWO MAN DIET FISHER STREET ERPANSION - SR0.1N p MUNSTEP ix93 $ WILD. NOu 5F5 INS N]RTXAUMA AREW PfE[]pNATION NOT NX A NCCCIXWAA xOMNAUWPA IL NES. WMW FIRE IMPORT BT $ ANAW MA011 E. ALI 4511 \ i South Bend Medical Foundation Demolition I City of South Bend FINANCIAL STATEMENT May 28,2024 Due to company policy, the financial statement will be coming directly from the Walsh finance department. ALI 4511 \ i BUSINESS INFORMATION DIEGO MORALES INDIANA SECRETARY OF STATE 05/20/2024 09:58 AM B�iaess Details Business Name: LWACLSH CONSTRUCTION COMPANY H, Business ID: 2010051700549 Entity Type: Domestic Limited Liability Company Creation Date: 05/17/2010 Principal Office Address: 929 West Adams Street, Chicago, IL, 60607, USA Jurisdiction of Formation: Indiana Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due 05/31/2026 Date: Years Due: Governing Person Information, Title Name Address Treasurer Timothy Gerken 929 West Adams Street, Chicago, IL, 60607, USA Registered Agent Information Type: Business Commercial Registered Agent Name: CORPORATION SERVICE COMPANY Address: 135 North Pennsylvania Street, Suite 1610, Indianapolis, IN, 46204, USA South Bend Medical Foundation Demolition I City of South Bend STAFFING STATEMENT May 28,2024 Walsh Construction maintains a flexible staffing approach, with over 8,000 employees nationwide and 200 healthcare -dedicated management professionals. Many team members are cross -trained in multiple management roles if the validation phase extends or preconstruction is delayed. Walsh Construction is fully able to allocate the right staffing resources to this project. If the award timeframe changes, we will adjust staff assignments accordingly. If necessary, Walsh has the ability to increase onsite staff due to the current Beacon Memorial Campus redevelopment in South Bend. Walsh managers are directed to maintain continuous communication with subcontractors. Project changes, RFI and submittal deadline reminders, and other notices are shared constantly with subcontractors to ensure that they are aware and on top of their responsibilities. We listen to and work through subcontractor issues to minimize schedule and cost impacts. WALSH CONSTRUCTION COMPANY 11, LLC 4 �i