Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Opening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Adamo Demolition Co.
CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Bend, IN Project No. 123-076 For Bids Due 28 May 2024 PART I (Must be completed for all bids. Please type or print) Date: 05/28/2024 Address: 320 E. 7 Mile Rd Bidder (Firm): Adamo Demolition Co. City/State/Zip: Detroit,Ml 48203 Telephone Number: ( 313 ) 892-7330 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Demolition of the South Bend Medical Foundation building and site as described in the documents and exhibits. the City of South Bend, Indiana, in accordance with plans and specifications prepared by: American Structurepoint. Inc. and dated 4/12/2024 for the sum of (enter the Total Bid as shown on the Proposal) (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. By (Signature) Richard M. Adamo The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member 28th (Printed Name of Person Signing) ACCEPTANCE day of May 20 24 Joseph R. Molnar, Vice President Briana N. Micou, Member Version 07/19/2023 Contractor's Bid for Public Works - 3 Murray L. Miller, Member Attest: Theresa Heffner, Clerk PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial Version 07/19/2023 Contractor's Bid for Public Works - 4 statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 07/19/2023 Contractor's Bid for Public Works - 5 When the prospective Contractor is rumble to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COi%ILVIITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Michigan ) ) SS: Wayne COUNTY } The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: Y 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has. have or will receive directly or indirectly, any rebate, fee, gift. commission or thing of va€uc on account of such sale: and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency: and i. Contractor has not, nor has any Successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification. "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8. as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars (S20,000,000) or more in value in the energy sector of Iran: or Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more. if that person will (1) use the credit to provides goods and services in the energy sector in Iran: and (ii) at the time the financial institution extends credit, is a person identified on list published bN the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien. nor retain any employee or contract with a person that the Contractor subsequently- learns is an unauthorized alien. Version 07/19/2023 Contractor's Bid for Public Works - 6 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien. and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender idcntity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest. responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfitlly discriminate against said MBE/WBE. On goal -eligible contracts. Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the Cite of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment. or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender idcntity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16 S-1). I hereby certify that 1 and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. 1 understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to re%iew and approaal, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that Version 07/19/2023 Contractor's Bid for Public Works - 7 violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foreeoine bid for public works are true and correct. Dated this 14th day of May . 20 24 Adamo Demolition Co. Contractor/Bidder (Firm) Si.monkwe of Contractor/Bidder or Its Aeent Richard M. Adamo Printed Name and Title Subscribed and sworn to before me this 14th day of May .20 24 My Commission Expires Q 2-U0 20 30 C 4—) Notary Public County of Residence t_.o -O(Lnd EActingffithe ARON L DANIS blic - State of Michigan nty of Oakland on Expires J 26, 2030 County of Version 07/19/2023 Contractor's Bid for Public Works - 8 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Demolition of the South Bend Medical Foundation Project Number: 123-076 For Bids Due: 28 May 2024 Contractor Name: BASE BID Item No. Description Quantity Unit Unit Price Total Amount Demolition of the South Bend Medical 1 Foundation building and site as 1 LSUM $3,099,000.00 $3,099,000.00 described in the documents and exhibits. 2 Allowance for unforeseen Hazardous 1 LSUM $100,000 $100,000 Materials (not including Asbestos) BASE BID TOTAL $3,199,000 Bidder (Firm): Adamo Demolition Company Address: 320 E. 7 Mile Rd City/State/Zip: Detroit, MI 48203 Telephone Number: ( 313 ) 892-7330 Y (Signature) Richard M. Adamo (Printed Name of Person Signing) Version 07/19/2023 Contractor's Bid for Public Works - 9 L CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN -;a FORM MBE-1.0 " 1865 MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number Bidder: 123-076 Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Project Name: Bend, IN Adamo Demolition Company Total Bid Amount: $1,045,000.00 MBE Goal: 1.4% Page 1 of 2 Name &Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of TotalBid/Proposal National Environmental Group LLC 5048 Pilgrim Rd g Tim Niles 810-736-7911 Asbestos and Abatement $545,000.00 17.6% Flint, MI 48507 1st Class Logistics LLC Bernard Coutee 517-993-0071 Trucking/Material Supply $500,000.00 ° 16.0/o Submitted by: Richard M. Adamo Print Name qw���Mzz 05/28/2024 Jig`re Date ***Goals should be calculated based on the Base Bid only.*** Version 07/19/2023 Contractor's Bid for Public Works - 10 O G , CITY OF SOUTH BEND`, MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANS FORM WBE-1,01865 M WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number Bidder: Demolition of the South Bend Medical Foundation, 531 N. Main Street, South 123-076 Project Name: Bend, IN Total Bid Amount: WBE Goal: 4.7% Page of Name &Address of WBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scopelscheduie if you need additional space) Dollar Amount of WBE Component Percentage of Total Bid/Proposal TBD > $146,000.00 > 4.7 Submitted by: Richard A Adamo Print Name q,t_ Mzz Sign re ***Goals should be calculated based on the Base Bid only.*** Version 07/19/2023 Contractor's Bid for Public Works - 11 05/28/2024 Date �OUTH CITY OF SOUTH BEND�A 'z MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN 1A. FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 123-076 Date: Project Name: Bidder: Contact Person Address: City. Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Bend, IN Adamo Demolition Co Richard M. Adamo Telephone: 313-892-7300 320 E. 7 Mile Rd Detroit State: MI Zip: 48203 Email: Radamo@adamogroup.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below': EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: http://www.in.ggy/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's RA certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.govlidoa). I affirm that I have made good faith efforts to select portions of the contract work to be RA performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available RA means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to RA inform MBEs of contracting and subcontracting opportunities. affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to RA such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and RA allowed sufficient time for MBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. RA I affirm that I negotiated with interested MBEs in good faith, including providing such NA MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where RA appropriate. Version 07/19/2023 Contractor's Bid for Public Works - 12 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested MBEs in obtaining I�A necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. RA CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 07/19/2023 Contractor's Bid for Public Works - 13 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 123-076 Date: Dernolition of the South Bend Medical Foundation, 531 N. Main Street, Project Name: South Bend, IN Bidder: Adamo Demolition Co. Contact Person: Richard M. Adamo Telephone: 313-892-7330 Address: 320 E. 7 Mile Rd City: _Detroit_ _ State: MI Zip: 48203 Email: To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: http:/Iwww.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business RA Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be RA performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available RA means the interest of all WBEs in the scopes of work of the contract. affirm that I attended all pre -bid meetings scheduled by the City of South Bend to RA inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications NA concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and RA allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. RA I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements RA of the subcontract. Version 07/19/2023 Contractor's Bid for Public Works - 14 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS $pUPH B x I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where NA appropriate. I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where NA appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons RA based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not. why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 07/19/2023 Contractor's Bid for Public Works - 15 `Y 50uTH �E�d CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN ?': FACE {'$. FORM MBE-2.1 w revs MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 123-076 MBE Participation Goal 1.4% Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Project Name: Bend, IN Bidder: Adamo Demolition Co. By: President 05/14/2024 (Si�n�dte) (Title) (Date) MBE Firm National Environmental Group LLC Owner or Contact at MBE Firm Tim Niles Telephone: 810-736-7911 Fax: Email: tniles@negllc.us TYPE OF WORK SOLICITED FOR THIS PROJECT: as estos abatement RESULTS OF CONTACT WITH THE MBE FIRM: Considered for abatement contract MBE Firm 1st Class Logistics LLC Owner or Contact at MBE Firm Bernard Coutee Telephone: 574-993-0071 Fax: Email: lstclasslogistics2013@gmail.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Trucking and material supply RESULTS OF CONTACT WITH THE MBE FIRM: Considered for trucking and sub -contract Version 07/19/2023 Contractor's Bid for Public Works - 16 . UTFI p CITY OF SOUTH BEND d 1 MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 Y Iecs WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE OF Project Number: 123-076 WBE Participation Goal 4.7% Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Project Name: Bend, IN Bidder. Adamo Demolition Co. By: WBE Firm Ritschard Brothers Inc. Owner or Contact at WBE Firm Dori Telephone: 574-288-4777 Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: President 05/14/2024 (Title) (Date) Email: rit12040datacruz.corn RESULTS OF CONTACT WITH THE WBE FIRM: Pendinu further rnnvPrcation WBE Firm Driven by Love LLC Owner or Contact at WBE Firm Carlos Telephone: 574-300-7105 Fax: Email: drivenhvlovellc@_gmail.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Trucking - RESULTS OF CONTACT WITH THE WBE FIRM: Pending further conversation Version 07/19/2023 Contractor's Bid for Public Works - 17 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: April 26, 2024 To: All Planholders From Theresa Heffner, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name Project Number: Demolition of South Bend Medical Foundation (531 N. Main St.) 123-076 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 04/26/2024 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Adamo Demolition Co. Authorized Signature: Date: 05/28/2024 Version 8/11/2020 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS May 6, 2024 All Planholders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 2 Project Name: Demolition of South Bend Medical Foundation (531 N. Main St.) Project Number: 123-076 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 05/06/2024 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Adamo Demolition Company Authorized Signature: Date: 05/06/2024 Version 8/11/2020 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS May 13, 2024 All Planholders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 3 Project Name: Demolition of South Bend Medical Foundation (531 N. Main St.) Project Number: 123-076 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 05/13/2024 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Adamo Demolition Co. Authorized Signature: Date: 05/13/2024 Version 8/11/2020 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA46601-1830 Date: To: From Subject PHONE 574/235-9251 FAX 5741235-9171 TDD 5741235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS May 22, 2024 All Planholders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 4 Project Name: Demolition of South Bend Medical Foundation (531 N. Main St.) Project Number: 123-076 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 05/22/2024 This addendum is being, forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by including with your electronic bid submission. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Author Date: Version 8/11/2020 Adamo Demolition Company PROJECT NAME: DEMOLITION OF SOUTH BEND MEDICAL FOUNDATION ADDENDUM NO. 4 Date: May 22, 2024 To: All Plan Holders From: Theresa Heffner, Clerk of the Board of Public Works Enclosed please find: • Questions and Answers submitted prior to deadline. • Revised Responsible Bidder application o These pages replace General Conditions Pages 11-15 You must acknowledge receipt of this addendum by signing the first page, and including with your electronic bid submission. — This addendum consists of a total of 9 pages — Version 8/11/2020 South Bend Medical Foundation Questions: Should we consider the perimeter fence as shown on the drawings the limits of demolition? a. The building footprint plus any damaged asphalt should be considered the limits of demolition. 2. There are erosion control requirements in the spec. It states that we are required to develop and follow an erosion and sedimentation plan and submit periodic inspection reports. What are the requirements for this plan? a. Contractor shall follow the general requirements outlined in IDEM's Indiana Storm Water Quality Manual. The disturbance is below the threshold requiring a Construction Stormwater General Permit (CSGP), however it is incumbent upon the contractor to maintain a "clean" site and prevent the discharge of any pollutants (sediment, chemical, or otherwise) from the site. Contractor shall be responsible for reporting any spills as applicable. 3. In regard to erosion control, nothing is shown on the drawings. Is the contractor simply required to protect the storm drains with inlet protection as required and install sit logs around the perimeter fence to ensure no run-off occurs? What other requirements are there? a. See response to question above. Contractor shall be responsible for any applicable measures necessary to prevent sediment runoff from the site. This typically occurs via silt fence or silt logs around the perimeter (based on surface type) and inlet protection measures to prevent runoff from entering the storm sewer system. In addition, any land that is left undisturbed for more than 7 days shall have temporary or permanent (depending on stage of construction) seeding applied to prevent sediment runoff. 4. The documents state that fuel/oil tanks that feed the generators are to be removed. Is there decommissioning required on these fuel tanks? Where are they located? a. The tank is above ground just south of the building on the west border of the property. Unknown if decommissioning is required. 5. Do you have any reports on the UST? a. No. 6. During the last walk, the owner was mentioned as potentially completing some refrigerant recovery. Please clarify what refrigerant will be left on -site for the contractor to recover and what will be removed prior to the contractor arriving onsite. a. Beacon will not be recovering any refrigerant. 7. Can durable demolition debris be crushed to spec and re -used as structural backfill material? Can this be provided as a VE alternate? a. No. No. 8. If the above question is not allowed for the base bid, can the contractor be allowed to provide the cost savings to the owner as a voluntary alternate on the bid form? a. No. 9. Since we are to leave the North and East basement walls in place, can we leave a portion or all of the basement slab on grade and foundations in place in order to maintain structural support and punch holes in the slab for drainage? a. No. 10. Please confirm that the collection and disposal of glycol, which is considered hazardous in some states but not a universal waste, is to be included and billed against the $100,000 allowance identified in the addenda bid documents. a. Confirmed as allowable. CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Demolition of South Bend Medical Foundation Project No. For Bids Due 123-076 May 28, 2024 Contractor Name: Adamo Demolition Company The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. **THIS FORM ONLY APPLIES TO BIDS GREATER THAN $250,000. ** INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 71 of The Responsible Bidding Ordinance No. 10975-23 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") within twelve (12) months of obtaining pre -qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre - qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-71 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-71 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 5/20/2024 General Conditions - 11 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-72 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least two -hundred fifty thousand dollars ($250,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder for projects greater than $250,000 and all subcontractors performing work greater than $250,000 on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 5/20/2024 General Conditions - 12 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (iii) _ By checking this box, I hereby acknowledge that apprenticeship and training programs that I participate in have graduated at least five (5) apprentices in each of the past five (5) years. (iv) _ By checking this box, I hereby acknowledge that all subcontractors performing work greater than $250,000 also meet the qualifications of the Responsible Bidder Ordinance. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) _ Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) _ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) — For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. This includes, but may not be limited to, letters from apprenticeship coordinators detailing the bidder's association with the program, and the United States Department of Labor Office of Apprenticeship Certificates of Registration of Apprenticeship Programs for each type of work to be performed on the project. Version 5/20/2024 General Conditions - 13 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) x By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) x By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) x By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) x By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (v) x By checking this box, I hereby acknowledge that apprenticeship and training programs that I participate in have graduated at least five (5) apprentices in each of the past five (5) years. (vi) x By checking this box, I hereby acknowledge that all subcontractors performing work greater than $250,000 also meet the qualifications of the Responsible Bidder Ordinance. (b) Attachments: (i) x Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) x List identifying all former business names. (iii) x Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) x Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) x Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (v) x For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. This includes, but may not be limited to, letters from apprenticeship coordinators detailing the bidder's association with Version 5/20/2024 General Conditions - 14 the program, and the United States Department of Labor Office of Apprenticeship Certificates of Registration of Apprenticeship Programs for each type of work to be performed on the project. (vi) X Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (vii) x Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. (viii) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (ix) x List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: 05/28/24 (Sign He Richard M. Adamo (Print Name Here) Adamo Demolition Company (Name of Company) 302 E. 7 Mile Rd (Address of Company) Detroit (City) MI (State) 313-892-7330 (Telephone Number) Version 5/20/2024 General Conditions - 15 Pre -Bid Meeting: 123-076 Demolition of South Bend Med. Found. Sign In Sheet NAME Zach Hurst 'Z aA J m cNAto •����• �ff car w COMPANY City of South Bend VliE —S� �.J Gi l.S Ff Ce�n) SiQJI���r•�J PHONE 574.235.5888 x3057 -Atf g �I1-7 -7Z/Z_ 3) 3 9Gq vL3o � 2�00 753 EMAIL zhurst@southbendin.gov ►�7c�x�.-, aTs�C�f���^"cJl�i<<�1.Cp:Z (0 +a�► V'd a,+ �'1 J�`✓���SS ��c�•2 G_,�.S�(rec�, C6rn n/11 C&EeN 90 kdL r((�°rjN 12 i 4 �1 E)G,, a rr3-t & a Q Q W1A i/UC =`d (� Pre -Bid Meeting: 123-076 Demolition of South Bend Med. Found. Sign In Sheet NAME Zach Hurst J 4 S11W COMPANY City of South Bend iJrre ��.s�socia�Qs PHONE 574.235.5888 x3057 — `I _ S— 93SK 3ia- oao1 EMAIL zhurst@south bend in.gov 0 M� 'l CONTRACT DOCUMENTS AND SPECIFICATIONS FOR Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Bend, IN 531 N. Main Street, South Bend, IN Project No. 123-076 American Structurepoint Project No. 2023.03157 Prepared for CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS M American Structurepoint Inc. Robert S. Bray Registered Professional Architect State of Indiana No. AR10900003 28 May 2024 FOR BIDS DUE: 44 May 2 . 9:00 AM (EDT) via email to BPWbids(o-)-southbend in.gov NOTICE TO BIDDERS Notice is hereby given that the City of South Bend, Indiana, Board of Public Works will receive sealed electronic bids at bpwbids(a�southbendin.gov until 9:00 a.m., Local Time, on 14 May 2824 for the following: 28 May 2024 Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Bend, IN Project No.123-076 The Title of the Bid and Project Number (where applicable) as described above must be included in the subject line of the email to which you have attached your bid. The name of the company/vendor, address, contact email address and phone number must be included in the body of the email. Detailed instructions and information, including the link to the Reserved Mailbox for electronic bid submittals, is available at southbendin.gov/bids. Work includes demolition of the building and associated site elements at 531 N. Main Street in South Bend, all more particularly described in plans and specifications prepared by American Structurepoint, Inc, phone 317.547.5580. The Contract Documents are on file and available for public inspection or purchase commencing on the first advertise date during regular working hours at American Reprographics Company ("ARC", located at 1303 Northside Blvd., South Bend, Indiana, 46615), www.e-arc.com/location/south.bend/ (574) 287-2944, toll free at (800) 783-7231. There will be a non-refundable charge for reproduction as set by ARC for every set of documents for all bidders. Additionally, the Contract Documents will be available that same day for inspection at MACIAF, 212 W. Colfax Ave. South Bend, IN 46601. Electronic bids must be on the City of South Bend Contractor's Bid for Public Work Form, accompanied by an electronic copy of a Bid Bond or Certified Check in the amount of not less than five percent (5%) of the base bid plus any alternates. The awarded bidder will be required to send the original check or bid bond via USPS. Each bidder or contractor (hereinafter the contractor) must comply with "City of South Bend EEO Contracting Provision Diversity Utilization" included in the specifications as to each construction trade it intends to use on this construction contract and all other construction work (both federal and non-federal) in the St. Joseph County area during the performance of this contract or subcontract. The contractor commits itself to the goals for minority manpower and all other requirements, terms and conditions of these bid conditions by submitting a properly sealed bid. Woman and Minority -Owned Business Enterprises (W/MBE) are encouraged to respond to this notification. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidder Ordinance no later than the date of the public bid opening. Please note: The City reserves the right to request supplemental information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre - qualified status. A mandatory pre -bid meeting was held on 4/23/2024. For those contractors who attended the mandatory meeting, an additional Open House will be held from 10am-1 pm local time on Friday, May 10 at the building. The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be to the best interests of the City of South Bend. If the Board elects to award the base bid plus any alternate(s), the Board will look at the totality of the cost when determining the lowest, responsive and responsible bid. Version 02/23/2022 Notice to Bidders BOARD OF PUBLIC WORKS Theresa Heffner, Clerk Publish two (2) times: First advertisement in South Bend Tribune: Friday, May 3 Second advertisement in SBT: Friday, May 10 Version 02/23/2022 Notice to Bidders CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Bend. IN Project No. 123-076 For Bids Due 28 May 2024 Contractor Name: Adamo Demolition Co. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 311t for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 07/19/2023 General Conditions - 11 B. Additions: 1. The project will have a completion date of 20 December 2024 for all work. The contract time will start when the Notice to Proceed is delivered and signed. 2. The City, Architect, and Contractor will hold a pre -construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. XIV. CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 B. Additions: The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor's subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XV. DEFAULT AND TERMINATION A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 B. Additions: 1. Events of Default shall include Contractor's failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. Version 07/19/2023 Special Provisions - 5 � _ d U C b CITY OF SOUTH BEND, INDIANA 1865 CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Demolition of the South Bend Medical Foundation, 531 N. Main Street, South Bend, IN Project No. 123-076 For Bids Due 28 May 2024 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and X WBE-2.1]. X Acknowledge Receipt of 4 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Adamo Demolition Co. By Authorized Representative: Signature: � � •/- Print Name & Title: Richard M. Adamo Date: 05/28/2024 Version 07/19/2023 Contractor's Bid for Public Works - 1 O 4-% ro V ro 4— O Adamo Demolition Co. 320 East Seven Mile Rd. Detroit, Michigan 48203 Statement of Qualifications Contractor: May 14th, 2024 Adamo Demolition Co. 320 East Seven Mile Rd. Detroit, Michigan 48203 /--i` JDAMO This Statement of Qualifications (SOQ) is submitted for your consideration of Adamo for your anticipated future projects. Thank you for the opportunity to provide this information for your review and consideration. Statement of Qualifications - Novermber 3, 2023 �DAMO Adamo Demolition Co. 320 E. Seven Mile Rd., Detroit, MI 48203 (313) 892-7330 rick.c@adamogroup.com www.adamogroup.com May 14th, 2024 Reference: Qualification Information Good Afternoon: Adamo Demolition Co. is pleased to present its qualifications to your company. Adamo is captained by its President, Richard M. Adamo, who has a team of industry experts attending to the variety of project details and management, completing an average of $40M decommissioning and demolition work per year. Our Project Managers and Estimators average 22 years of experience and our key Operating Engineers average over 15 years of experience, vastly enhancing the quality of work Adamo affords its clients. Adamo has performed decommissioning and demolition projects throughout the U.S. since 1964. Demolition projects typically involve complexities of working in a variety of environments, which are addressed by Adamo through in-house authored project specific plans. These plans address all facets of the projects, which may include managing work zone safety, pedestrian traffic, transportation safety routes, soil erosion and sedimentation, fugitive dust, noise and vibration, environmental cleaning, work zone air monitoring, among many other subjects. Adamo understands the economic advantage of maximizing the recycling efforts on large scale decommissioning and demolition projects. Our clients benefit from the firms Adamo partners with across the U.S. to maximize the value of the ferrous and non-ferrous materials to the project. Adamo has provided its specialty services to a variety of commercial, municipal, private and heavy industrial customers, completing a great number of demolition projects in its 59+ year history. Adamo has demolished thousands of structures totaling over 200 million square feet of building area. Adamo's strength has been the ability to employ and utilize only the most skilled workers and latest equipment. Adamo currently owns two (2) CAT Ultra -High Reach Demolition (UHD) excavators. These machines can be configured to reach 85' to 140' and carry tool weights in excess of 15,000 lbs. allowing for precise, controlled demolition of large heavy structural members. In addition, our fleet of primary demolition equipment exceeds 200 pieces in total. Statement of Qualifications • November 3, 2023 We are confident in our ability to deliver the safest, most cost-effective solutions to your projects. We have compiled this information to demonstrate the capabilities of our firm. We would welcome the opportunity to meet with you to discuss your anticipated project needs and the expert service we are prepared to provide to you. Thank you for reviewing our qualification information. We look forward to working together on future projects. Best Regards, Rick Cuppetilli Executive Vice President Statement of Qualifications • November 3, 2023 General Company Introduction Company Name: Adamo Demolition Co., dba Adamo Group Company Type: S-Corp, Privately Held Headquarters: 320 East Seven Mile Rd., Detroit, Michigan 48203 Phone: (313) 892-7330 DUNS No.: 84-708-0405 CAGE Code: 3CGV9 NAICS: 238910 The Adamo family, whose name is synonymous with both demolition and environmental abatement on some of Michigan's highest profile projects, has been active throughout the U.S. performing demolition, decontamination, asset recovery, and related services since 1964. Our team of support personnel has a combination of higher education and hands-on field experience to enhance the services we offer. This combination allows us to address problems our industry presents by applying practical engineering knowledge. Adamo's technical ability within the desired scope of work consists of its ability to deliver an end - to -end solution which consists of a full facility decommissioning process from the remediation of environmental concerns, to the facility demolition and restoration of the site and surrounding landscape to a marketable quality. State of Michigan Licensing Michigan Residential Builders License No. 2102128736, expires 05/31/2026. General Information Adamo Demolition Co. (Adamo) is a privately held corporation, 100% owned by Richard M. Adamo, who is the President of the Corporation. Also serving as executives of the company are Tim Gunn, CPA, who serves as our Chief Financial Officer, and Rick Cuppetilli, our Executive Vice President. Adamo is a Florida corporation, with a date of incorporation of 10/21/92. Staffing Adamo had 74 employees on staff as of January 1, 2020 and 34 employees on staff as of May 1, 2020. Between May 1, 2020 and the date of this qualification our staff has increased and is back to 75 employees as more of our projects are continually being released for continued operations following the recent temporary shutdowns. Statement of Qualifications • November 3, 2023 Equipment The heavy equipment required for demolition is generally equipped with specialty attachments not readily available in a rental fleet. For this reason, Adamo primarily utilizes owned equipment, supplementing its fleet as required with rental equipment, locally sourced when practical. Adamo is also proud of its partnerships with Michigan CAT and Alta equipment, which have resulted in an in-house maintenance program, utilizing Caterpillar and Volvo trained mechanics, optimizing the up -time for our equipment. We are equally proud of our real-time equipment tracking program designed and developed by our team of professionals. Adamo also uses this state of -the -art technology to track the location of valuable reclaimed materials during transit from the demolition site to the scrap yard. Adamo's total equipment value is $27,927,976.00. Type of Compactors 3 Cranes 1 Dozers 8 Excavators 42 Forklifts 2 Loaders 26 Material Handlers 5 Trailers 48 Off -Road Trucks 2 Trucks 24 Attachments 240 Statement of Qualifications - November 3, 2023 Demolition Experience Experience and Ability to Perform the Work Adamo has performed decommissioning and demolition projects throughout the Midwest since 1964. We understand the complexities of working in a variety of environments and will prepare project specific plans for managing asbestos abatement, site decommissioning, work zone safety, pedestrian traffic, transportation safety routes, soil erosion and sedimentation, fugitive dust, noise and vibration and other facets of the work, tailored specifically to the project specific scope of work. Through our history we have been called upon to design and perform workable solutions to many challenging projects. We have been called upon to demolish grain elevators with head houses 280 feet in height in a tight urban setting. We have designed and implemented critical lift plans for vessels and structures inside active operating manufacturing facilities. We have removed an eight -story precast parking structure immediately adjacent to a one-story church building. We have performed the safe and successful removal of a fifteen -story commercial building immediately adjacent to a three story, downtown building housing an active business. We have designed and implemented the safe felling of water towers, stacks, powerhouses, coal hoppers, slab mills, foundry cupolas and melt shops, conveyors, silos, and various high-rise commercial structures. Our staff has the capabilities to design and implement demolition work plans that combine our engineering knowledge and practical application experience into proven solutions. When working at any site, whether it is inside an active facility such as a utility, manufacturing facility, petrochemical plant, or industrial foundry; or in an urban environment, on a university campus, inside a hospital complex or other operation, we take every precaution to avoid interrupting the activities essential to our client's operation and the local environment. Adamo has completed a great number of demolition projects in its history and it is not uncommon for those projects to include the remediation of hazardous or regulated materials, such as asbestos, PCBs and other regulated wastes. We pre-screen and employ the services of reputable subcontractors experienced in their specialty for the handling of such regulated materials. We manage their work and foster accountability through the project -specific plans designed for every Adamo project. Our subcontractors' task -specific work plans are incorporated into the overall project documents, and every subcontractor is held to the same level of standards that Adamo demands of its own workforce. Statement of Qualifications • November 3, 2023 We do have a great deal of experience with explosive demolition, with the actual explosion performed by the experts in that field, with our assistance with the building preparation. More common than explosive demolition is the controlled felling or tipping of large structures, which is common practice on many of our industrial projects. In addition to cost considerations, a structure's location on the work site, proximity to other structures and the building structure are all deciding factors when considering whether to use conventional or explosive demolition. We currently have ongoing projects in Michigan, Ohio, and Texas. Many of these projects are immediately adjacent to or within active facilities, and we have not interfered with or hindered active client operations in any way through the performance of our work. Statement of Qualifications • November 3, 2023 Corporate Safety Program Safety Program Adamo is committed to the health and safety of its employees, the employees of our client, our subcontractors, and the public. Safety is of paramount importance, and is the first consideration in the operation of our business. It is our goal to establish and maintain safety policies and practices which afford our employees a safe and healthy work environment, and are in full compliance with all applicable federal, state and local laws. To ensure that the Adamo Work - Safe CHSP is a success, Adamo management is dedicated to providing constant scrutiny and interpretation of Federal, State, Local and the client's health and safety regulations, so that a safe work environment can be maintained for all parties. However, Adamo does not relieve any contractor or subcontractor from their responsibility and obligation to provide for their own employees and the public's safety. Our ultimate Work -Safe goal is zero accidents and injuries. Adamo is proud to maintain a health and safety program that meets or exceeds the best current practices in our field. For the Work - Safe Corporate Health and Safety Program (CHSP) to continually succeed, we must all remain constantly alert to working conditions that can have an impact on health and safety, and we must all be active participants in monitoring and correcting safety concerns. This means that proper attitudes regarding illness and injury prevention must be developed and maintained with all personnel. This requires constant daily communication and cooperation between all team members, not only from and between the employer and employees, but between all participants on a job site team, including contractors and subcontractors. Site Safety The safety team on a typical demolition project is fulfilled by both onsite personnel as well as office personnel. The onsite personnel include the Site Project Manager, Site Superintendent and a Site -Safety Representative. The corporate Executive Vice President, Project Manager and Safety Director perform periodic inspections of the site prior to and during the operations phase right up through the demobilization phase. The site -safety representative is responsible for the site orientation training, site badging, assisting in the daily pre -task plan review, making certain the onsite personnel are tested as required prior to arrival onsite, weekly tool -box talks, and safety data recording and reporting. Statement of Qualifications • November 3, 2023 The testing includes but is not limited to drug screening, respirator fit testing, medical physical testing, hearing testing, blood lead level and ZPP testing and any other site -specific testing required. It should be noted no individuals can be onsite without first having had a passing 10 panel drug screening completed. The site -safety representative typically has only site safety responsibilities and performs very few, if any, non -safety related responsibilities. The Site Project Manager oversees the site -safety representative and site superintendent and does periodic safety inspections during each shift. The superintendent performs the daily pre -task plan review, completes the weekly toolbox talks, acts as the competent individual for such things as confined space, man -lift operations, scaffolding use and any other specialized operation required. Safety Data Sheet (SDS) information is kept onsite in the offices and has the specific reference documents for all chemicals in use on the project. Corporate Safety Adamo employs a Corporate Safety Director, Mark St. Cyr, who has been with the company for six years. Mark oversees the adherence to corporate safety standards on all of our projects and plays a pivotal role in the development and implementation of on -site demolition work plans and safety protocols. He performs planned and random safety audits at our project sites. We train all supervisors as safety representatives for our safety program. On small to mid -size projects, the site superintendent may act as the site -safety representative, but on large scale, complex projects a dedicated site -safety representative is assigned, and can be an on -staff site - safety representative or a safety professional from a third -party agency. On large-scale projects, or in conformance with contract requirements, it is common for us to employ the services of third -party safety professionals for implementing and monitoring adherence to the safety standards and protocols in place for the project. During the planning phase of a project a site specific Health, Safety and Operations Plan (HSOP) will be developed through the collaboration of the team members. The document will outline specific guidelines for tasks such as jobsite safety management and administration, a task based risk assessment and hazard control plan, demolition work plan, site and building preparation, spill prevention plan, fugitive dust control plan, removal, handling and consolidation of waste materials plan, loading, off -site transportation and disposal plan, universal wastes, lighting and signage. The site staff will also refine and finalize the Method Statements for anticipated project tasks. These statements will be shared with all project team members to provide a clear understanding of the objectives for the project. Pre -Task Plans, Job Safety Analysis Plans and Daily Safe Cards will be prepared by the Site Safety Manager with input from the On -Site PM and Superintendent. These documents for an integral part of our Site Safety Management. Statement of Qualifications • November 3, 2023 Adamo encourages safety communication in all forms. Safety policies and procedures are defined in writing and expressed verbally through training and tool -box talk sessions. In addition, Adamo understands and promotes all communication methods for raising safety awareness. These standards include the use of daily and weekly toolbox talks, one-on-one jobsite contact, the use of specialized training venues and opportunities, and other types of media when appropriate. Additionally, all employees are encouraged to use whatever means necessary to communicate concerns regarding immediate danger, including all verbal and physical methods that are available. Organization Chart — Internal Health & Safety Safety of Subcontractors Adamo addresses the program for managing the safety of subcontractors in our Corporate Health and Safety manual. Our subcontractors must go through safety clearance before allowed on site, and it is supplemented by safety audits and notices of safety non-compliance. Statement of Qualifications • November 3, 2023 Financial & Insurance Information Bonding We have attached a letter from our bonding company, confirming our bonding capacity of $60M per single project, $120M aggregate. Insurance We have attached a sample certificate of insurance indicating evidence of current coverages held by Adamo. Limits in excess of those currently carried by Adamo can be obtained as required by contract. Financials Our total revenues over the past four years are: 2019 $40,042,385 2020 $37,970,952 2021 $37,929,066 2022 $31,191,940 DUNS# 84-708-0405 Credit References Michigan Gas 5825 WyomingAve. Dearborn, MI 48126 Contact Name: Rick Hartwick/Plant Manager Michigan Cat 12550 23 Mile Rd. ShelbyTwp., M148315 Contact Name: Greg Schneider Dependable Wholesale 12300 Stephens Warren, MI 48089 Contact Name: Kyersten Helsel Fax: (313) 891-0033 Telephone: (313) 891-0022 Fax: Telephone: (586) 997-5300 Fax: (586) 755-7570 Telephone (586) 755-7800 Statement of Qualifications • November 3, 2023 Client References American Axle & Manufacturing Detroit Manufacturing Sam Hooper, Mgr. Corp. Facilities Complex Decommissioning, (313) 758-4740 Abatement and Demolition Sampson.hooper@aam.com Hunt, Holder, Russell & Moody, a JV Georgia Dome Demolition Brad Hutto, Project Mgr. (404) 581-1342 bhutto@hhrmiv.com DTE Energy DTE St. Clair Power Plant Neil Mortensen, Project Mgr. Precipitator Demolition (313) 580-8602 mortensenn@dteenergV.com Wayne County Airport Authority Detroit Metropolitan Airport Paul Swift, Sr. Project Mgr. L.C. Smith Terminal Demolition (734) 818-9410 Package A & B Paul.swift@wcaa.us City of Detroit Joe Louis Arena Demolition Donna Rice, Detroit Bldg. Authority (313) 224-4599 riced@detroitmi.gov Financial Institution & Line of Credit Comerica Bank Bank Officer: Robert Tull 500 Woodward Ave. Telephone: (313) 222-4811 Detroit, MI 48226 Adamo Demolition Co. has been a customer of Comerica Bank since 2002. Comerica Bank provides a line of credit to Adamo totaling $10,000,000.00 Adamo Demolition Co. currently has no outstanding balance under our line of credit. The line of credit is readily available and can be drawn upon within one business day. Statement of Qualifications • November 3, 2023 Licensing Evidence of Authority to do Business Adamo Demolition is licensed in Michigan, Indiana,Georgia, Louisiana, Tennessee, Virginia, West Virginia, and District of Columbia. Contractor's License Michigan Residential Builders License No. 2102128736, expires 05/31/2026 Statement of Qualifications • November 3, 2023 NORTHVILLE PSYCHIATRIC HOSPITAL DEMOLITION This project was a highly complex, 400,000 sf, $8.4million, multi -story, multiple building medical facility demolition. The project demolished Buildings A and B, which comprised the main hospital and had multiple wings ranging from two (2) to nine (9) stories. Also included was the removal of universal wastes, asset recovery for recycling and asbestos abatement. The height of the structures required specialized, hi -reach demolition excavators. The demolition plan was developed with stringent safety standards/practices. The project employed full-time site security. The property has multiple subgrade tunnels and vaults that were constantly monitored for integrity and marked to ensure no equipment traveled over the structures, which avoided collapse of the structures. x The 12-acre site restoration included topping the site with topsoil, fine grading and hydro seeding. The project was successfully completed with no injuries or incidents, on time and within the planned budget. GM WTC (Warren Technology Center) 2020 VEC TRANSFORMATION This project was - located in Warren . , Michigan at General - _ T Motors Technology Center. This project - consisted of abatement and complete demolition of three (3) research _ buildings, totaling 110,000 square feet. One of the buildings was known for its use h of research on hi g speed car crash tests J. using animals as test dummies. More than 25 years ago, PETA's intense campaign essentially ended the automotive industry's cruel practice of smashing live animals into walls at high speeds as part of deadly and barbaric car -crash testing. Time was of the essence in the execution of this project. Therefore, sufficient labor _ and materials were provided at all times to meet the _ project schedule. The schedule was based on seven (7) 12 hour days.kIL Precautions were taken as to - -_ not disturb the ongoing, business and to keep vehicle, pedestrian, and construction dirt and dust. out of occupied building areas, lobbies, hallways and passenger elevators. Approximately 1,000 gross tons (GT) of ferrous scrap was removed from the properties. This project was completed in six (6) weeks, with a contract value of $4,046,854.58. American Axle & Manufacturing Detroit Manufacturing Complex Decommissioning, Decontamination & Demolition This project, located in Detroit, Michigan was for the sale of all assets, plant decommissioning, decontamination and demolition of the 1.6M sf manufacturing facility. The work included asbestos abatement, universal waste removal, demolition of multiple structures of varying heights and the installation of new perimeter fencing to secure the site. Adamo purchased the project from the Owner, exclusive of the land. There was a fee paid to the Owner at the outset of the project with a guarantee of completion with no fees to the Owner. The project produced very little in the way of debris. All non-ferrous metals, 2.5M pounds and ferrous metals, 30,000 tons, were recycled and the concrete produced by the demolition was crushed onsite by Adamo and used as fill in machine pits, trenches and other voids on the site. The work was completed ahead of schedule. L Adamo's key personnel for the project were Project Executive, Rick Cuppetilli, Project Manager and Superintendents Ray Scully, Dan Stewart and Odie Danneels. The project Owner contact is Sampson Hooper who can be reached at 1840 Holbrook Ave., Detroit, MI 48212, and via e-mail at sampson.hooper@aam.com or by phone at (313)758-4740. ST. JOSEPH MERCY OAKLAND HOSPITAL j This project was the demolition of the 5- story, 135,000 sf North Tower at St. Joseph Mercy Hospital. The nursing units, pediatric and mother/baby units formerly housed here had been moved to the newly refurbished South Tower. Months of planning, coordination with hospital operations and preparatory work went into the process. The 5-story tower was demolished using Adamo's 345 Apex High Reach Excavator equipped with an MP 30 multi- processing tool. The project also involved the demolition of a 2-story material handling building 9 — - r p :fit W adjacent to the tower. The tower was demolished in sections rather than implosion due to its proximity to active parts of the hospital and surrounding neighborhoods. With proper, timely coordination with the hospital staff, Adamo avoided any disturbances to hospital operations due to vibration and noise. The project was completed safely and to the hospital's complete satisfaction. ACORO� CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 7/18/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER VTC Insurance Group 1175 W. Long Lake Rd. Suite 200 Troy MI 48098 CONTACT LeAnne Bushon NAME: g A/CNNo Ext: (248)373-5343 FAX,(AIC NU: (298)828-3791 AIL ADDRESS: lbushong@vtcins.com INSURERS AFFORDING COVERAGE NAIC # INSURER A: Nautilus Insurance Company 17370 INSURED Adamo Demolition Company dba Adamo Group, Inc. 320 East Seven Mile Road Detroit MI 48203-2022 INSURER B : Great Divide Insurance Company 25224 INSURERC:LM Insurance Corporation 33600 INSURER D: Charter Oak Fire Insurance Co m an 25615 INSURER E:Vantage Risk Specialty Ins Co 16275 INSURERF:Axis Surplus Insurance Companv 126620 COVERAGES CERTIFICATE NUMBER:23-24 Master REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF MM/DD/YYYY POLICY EXP MM/DD/YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A CLAIMS -MADE OCCUR DAMAGE TO RENTED PREMISES Ea occurrence $ 100,000 X MED EXP (Any one person) $ 10,000 XCU X Y ECP2029386-14 6/30/2023 6/30/2024 X Incl poll/prof PERSONAL &ADV INJURY $ 1,000,000 GEN'LAGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY � PEA ❑ LOC PRODUCTS-COMP/OPAGG $ 2,000,000 Employee Benefits $ 1,000,000 OTHER: AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident $ 1,000,000 X BODILY INJURY (Per person) $ B ANYAUTO ALL OWNED SCHEDULED AUTOS AUTOS X y BAP2032392-13 6/30/2023 6/30/2024 BODILY INJURY (Per accident) $ X PROPERTY DAMAGE Per accident)$ NON -OWNED HIRED AUTOS X AUTOS Uninsured motorist BI-single limit $ 1,000,000 UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 15,000,000 X AGGREGATE $ 15, 000, 000 A EXCESS LAB CLAIMS -MADE DED I I RETENTION $ $ FFX202938714 6/30/2023 6/30/2024 WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y / N X PER OTH- STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $ 1,000,000 C OFFICER/MEMBER EXCLUDED? ❑ (Mandatory in NH) N / A WC534S542505 6/30/2023 6/30/2024 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE- POLICY LIMIT $ 1,000,000 D Inland Marine - Leased/Rented 6603K988077 6/30/2023 6/30/2024 $1,000,000 limit,$5,000 deductible Excess Liability -see attached DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Where required by written contract, City of Detroit & the Detroit Building Authority are add'l insureds for General Liability (GL) as respects ongoing & completed operations on a primary & non-contributory basis and add'1 insured with respects to Automobile liability on a primary & non-contributory basis. GL & Auto policies include waiver of subrogation on behalf of additional insureds as required by written contract and where allowed by law. Umbrella/Excess liability coverage follows form over GL, Auto & Employers Liability. Contractual liability is provided subject to the terms, conditions and exclusions of the policy. Insurer will endeavor to mail 30 days written notice of cancellation to the certificate CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Detroit THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Office Of Contracting and Procurement ACCORDANCE WITH THE POLICY PROVISIONS. Coleman A. Young Municipal Cntr AUTHORIZED REPRESENTATIVE 2 Woodward Ave Ste 1008 Detroit, MI 48226 Alan Chandler/V27 ACORD 25 (2014/01) INS025 (201401) © 1988-2014 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD COMMENTS/REMARKS Excess Liability Insurer E: Vantage Risk Specialty Ins Co Policy No. P03XC0000037850 Term: 6/30/2023 to 6/30/2024 $6,500,000 occurrence $6,500,000 aggregate Excess Liability Insurer F: Axis Insurance Company Policy No. P-001-001163711-01 Term: 6/30/2023 to 6/30/2024 $6,500,000 occurrence $6,500,000 aggregate I OFREMARK COPYRIGHT 2000, AMS SERVICES INC. I COMMENTS/REMARKS holder; however, failure to do so will impose no liability of any kind upon the insurer or its agents or representatives. Richard Adamo is excluded. OFREMARK COPYRIGHT 2000, AMS SERVICES INC. THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, that we Adamo Demolition Company 320 East Seven Mile Road,Detroit, MI 48203 as Principal, hereinafter called Principal, and Liberty Mutual Insurance Company 175 Berkeley Street,Boston, MA 02116 a corporation duly organized under the laws of the State of Massachusetts as Surety, hereinafter called Surety, are held and firmly bound unto City of South Bend 1316 County City Building,South Bend, MI 48226 as Obligee, hereinafter called Obligee, in the sum of Five Percent of Accompanying Bid Dollars (5% of Bid for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, uur heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for (Here insert full name, address and description of project) Demolition of the South Bend Medical Foundation NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 28th day of May , 2024 . Adamo Demolition Company f (Principal) (Seal) Witnes) president (Title) Liberty Mutual Insurance Company (Surety) (Seal) (Witnes Holly Nichols (Title) ,Attorney in Fact AIA DOCUMENT A310 - BID BOND - AIA ®- FEBRUARY 1970 ED -THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006 N r6 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company SURETY POWER OF ATTORNEY Cerfificate No: 8198086-013068 KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Anne Patrick, Holly Nichols; Jason Rogers; Mark Madden, Michael D. Lechner; Nicholas Ashburn, Paul M. Hurley, Richard S. McGregor; Robert D. Heuer all of the city of Rochester Hills state of MI each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 30th day of November , 2018 . Liberty Mutual Insurance Company PyrtaelNsb pa 1"NsoU,pg2 The Ohio Casualty Insurance Company (ac)e y eo °^+,RYy oo w,West American Insurance Company c3 `Pen� 3 eo rn 1919 �s 1991 °S P ° N4YPSY'aaYS WOu"P da Shl x Sty '7M • F� By: `)avid M faray. Assistant Secretary of PENNSYLVANIA ss On this 30th dayof November , 2018 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written. asr CanmomseeMdPdmaylvene-Notary Sear Teresa Pasleh, Notary Public- s Monyomery Counry r My oammiaaion expires AUrrt, 213.2o25 B i v Camm,ssim numbm 1126a94 Y Peeoaymn.. A6o w, or Nolaeas Teresa Pastels, Notary Public This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV —OFFICERS: Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporaton by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII -Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such allomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, reoognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attomeys-in- fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization -By unanimous consent of the Companys Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked, IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 28th dayof May , 2024 . SY INSU p \NSU/� J ooa¢oyr'Pgy OP'opavoq,r/qyn 3 ``o t+ y x eoT P 1919 n s 1991 °.kj� s ra p a g (0(90 �`"+Ness?aaa�Ys r"01PM" aa3 YRenee C. Llewellyn, Assistant Secretary shl • g� �M a 1•� LMS-12873 LMIC OCIC WAIC Multi Co 02121 ck► GUY HURLEY 1 INSURANCE & SURETY SERVICES January 5, 2023 RE: Principal: Adamo Group Inc. To Whom It May Concern: Adamo Group Inc. is a highly regarded and valued client of Liberty Mutual Insurance Company and has been for over 21 years. Liberty Mutual Insurance Company has a $60,000,000 single project and $120,000,000 aggregate backlog line of credit in place. Individual projects or work programs in excess of these amounts would be favorably considered subject to current and satisfactory underwriting information at the time of such request. If awarded a contract it is the present intention of Liberty Mutual Insurance Company to provide required performance & payment bonds conditioned upon a satisfactory review of the contract terms and conditions and receipt of current and acceptable underwriting information from our client. Liberty Mutual Insurance Company is listed on the U.S. Treasury Department's Listing of Approved Sureties and is rated A (FSC XV) by A.M. Best Company. Sincerely, LIBERTY MUTUAL INSURANCE COMPANY Nich Ashburn, Attorney -in -Fact DIRECT 248.519.1400 1 FAX 248.519.1401 1 989 E. South Boulevard, Suite 200 1 Rochester Hills, MI 48307 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Liberty Mutual Insurance Company Mutual. The Ohio Casualty Insurance Company Certificate No: 8198086-013068 West American Insurance Company SURETY POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Anne Barick; Holly Nichols; Jason Rogers: Mark Madden, Michael D. Lechner, Nicholas Ashburn; Paul M. Hurley; Richard S. McGregor; Robert D. Heuer ail of the city of Rochester Hills state of MI each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 30th day of November , 2018 Liberty Mutual Insurance Company P� 1NS&R� P'11 INS& 1NSUpq The Ohio Casualty Insurance Company ,�J Boa°Oq+� yn yJ �OaPOA+J�y `.IP pop°OR�� �'C West American Insurance Company "o to 1912 0 1919 1991 (D rdJ1'JJ4CHU`'da IrAMVS� By: 3 to ro David M. Carey, Assistant Secretary Cr M State of PENNSYLVANIA — County of MONTGOMERY ss o ICY)a) On this 30th day of November 2018 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance (D To Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes G > therein contained by sionino on behalf of the corporations by himself as a duly authorized officer. a) N � _-p c •N N O N C Zp � N m m `) t_ — O.0 IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written. 'N PAST Q�G as1�11w F1 Commonwealth of Pennsylvania - Notary Seal o �c, Teresa Paslella. Notary Public Montgomery County ClF My commission expires March 28 2025 �P By. Commission number 1126044 t-N Rlenr a Pennsywama As —tan of War— eresa Paste 4Ry i This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV— OFFICERS: Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in - fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. 1, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 5th day of January , 2023 1NSUR 1_0 INS&,p a \NSUg4 �,P oa°ae�r 9ti JP oa°oR�� qy VP oagr lC, J 3� Fo g� Fo m 1912 0 1919 o 1991 By. d�es�cmng�aaa "AmpS�ds� fs rNb1AN* da Renee C. Llewellyn, Assistant Secretary rn O C E O N Opi OC4 00 O M l� `ot —ao -a— Co U LMS-12873 LMIC CCIC WAIC Multi Co 02/21 "TRION ISOLUTIONS January 22, 2024 Adamo Group 320 East Seven Mile Rd. Detroit, MI 48203 RE: Experience Modification Rating ("EMR") — Adamo Group To Whom It May Concern: Please be advised that based on a standard review of the currently valued loss runs for the subject time periods listed below, the Interstate & Intrastate EMR for Adamo Group was promulgated as follows: 0 01/01/2019 — 12/31/2019 0.68 0 01 /01 /2020 —12/31 /2020 0.67 0 01 /01 /2021 — 12/31 /2021 0.85 0 01 /01 /2022 — 12/31 /2022 0.78 0 01 /01 /2023 — 12/31 /2023 0.71 • 01 /01 /2024 — 12/3 1/2024 0.74 As noted above, the EMR remain overall exemplary. Should you require further with regard to the foregoing, please feel free to contact me at the listed address or phone number. Sincerely, Kristi Garcia Manager of Workers' Compensation Phone: (248) 498-8486 HR Administration I Payrott & Taxes I Workers' Compensation I Benefits Administration I Regulatory Compliance reLyontrion.Com 888 W. Big Beaver Road, Suite x000, Troy, MI 48084 State of Indiana Office of the Secretary of State CERTIFICATE OF EXISTENCE To Whom These Presents Come, Greeting: I, DIEGO MORALES, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records and the proper official to execute this certificate. I further certify that records of this office disclose that ADAMO DEMOLITION COMPANY duly filed the requisite documents to commence business activities under the laws of the State of Indiana on January 24, 2003, and was in existence or authorized to transact business in the State of Indiana on April 17, 2024. I further certify this Foreign For -Profit Corporation has filed its most recent report required by Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of withdrawal, dissolution, or expiration has been filed or taken place. All fees, taxes, interest, and penalties owed to Indiana by the domestic or foreign entity and collected by the Secretary of State have been paid. In Witness Whereof, I have caused to be affixed my signature and the seal of the State of Indiana, at the City of Indianapolis, April 17, 2024 DIEGO MORALES SECRETARY OF STATE 2003021100267 / 20243724582 All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate Expires on May 17, 2024.