HomeMy WebLinkAboutWSMainStreetsPlan2014west side mAin streets
the reVitAliZAtion PlAn for lincoln wAy, western AVenue, And
west side neighborhoods
City of South Bend - Department of Community Investment I Urban Enterprise Associati on of South Bend
Torti Gallas and Partners, Inc.
Acknowledgments
CITY OF SOUTH BEND
Pete Buttigieg, Mayor
South Bend Common Council
District 1: Tim Scott
District 2: Henry Davis Jr.
District 3: Valerie Schey
District 4: Dr. Fred Ferlic
District 5: Dr. David Varner
District 6: Oliver Davis
At Large: Derek Dieter
At Large: Gavin Ferlic
At Large: Karen White
Department of Community Investment
Scott Ford, Executive Director
Pamela C. Meyer, Director of
Neighborhood Engagement
Jitin Kain, Director of Planning
Michael Divita, Planner
Christopher Dressel, Planner
Elizabeth Maradik, Planner
SOUTH BEND REDEVELOPMENT COMMISSION
Marcia I. Jones, President
David Varner, Vice President
Gregory Downes
Don Inks
Valerie Schey
Stan Wruble
URBAN ENTERPRISE ASSOCIATION OF SOUTH BEND
B. Patrick Bauer
David Behr
Dan Brewer
Matt Buczolich
Sanita Davis
Scott Ford
Amy Le
Linus Slavinskas
Karen White
WEST SIDE CORRIDORS ADVISORY COMMITTEE
Sam Centellas
Juan M. Hernandez, Jr.
Consuella Hopkins
Wendell Johnson
Marcia Jones
Gladys Muhammad
Jerry Niezgodski
Andre Northern
Kathy Schuth
Tim Scott
Viola Sims
Jack St. Pierre
Karen White
CONSULTANT TEAM
Torti Gallas and Partners
John Torti, President
Erik Aulestia, Principal
Elena Romero, Associate
Timothy Zork, Associate
Gibbs Planning Group
Robert Gibbs, President
Zimmerman / Volk Associates
Laurie Volk, Principal
tAble of contents
4. Lincoln Way West
4.1 Corridor Plan and Strategies ........................................54
4.2 Lincoln Way Nodes .......................................................56
4.3 Streets, Bicycles, and Buses .........................................74
5. Western Avenue
5.1 Corridor Plan and Strategies ........................................90
5.2 Western Avenue Nodes ...............................................92
5.3 Streets, Bicycles, and Buses .......................................108
6. Implementation Tools and Matrix
6.1 Implementation Tools ................................................130
6.2 Strategic Implementation Matrix ...............................132
1. Executive Summary
1.1 General Strategy ............................................................7
1.2 Summary of General Proposals for the West Side Neigh-
borhoods ......................................................................10
1.3 Summary of Proposals for Lincoln Way West Corridor 12
1.4 Summary of Proposals for Western Avenue Corridor ..14
1.5 Implementation Tools ..................................................16
2. Public Process
2.1 Process .........................................................................18
2.2 Strengths, Weaknesses, Opportunities, and Threats ...20
2.3 City Voice ......................................................................24
3. West Side Neighborhoods
3.1 Regional and City Analysis ............................................26
3.2 Study Area Analysis ......................................................28
3.3 Opportunities and Constraints .....................................30
3.4 Residential Market Analysis .........................................34
3.5 Retail, Office, and Industrial Market Analysis ...............36
3.6 West Side Neighborhood Plan ......................................40
3.7 Zoning (Existing and Proposed) ....................................50
1. executive
summary
This strategic revitalization plan is for two corridors, Lincoln Way West and Western Avenue, that
have had an important historic role in the life and economy of South Bend, Indiana. Over the past
several decades, these two streets have seen an erosion from a walkable character to an auto
oriented character. At the same time, the neighborhoods have seen a loss in population, a rise in
commercial and residential vacancy, and a rise in crime. This strategic revitalization plan seeks to
restore the historic walkable development pattern allowing Lincoln Way West and Western Avenue
to reassert themselves as vital primary streets that give new life to the neighborhoods they run
through. At the same time, immediate and long-term urban design, retail, residential, industrial, and
economic development strategies are defined that can revitalize the West Side Corridors Study Area.
Context Diagram
7
1. The streets themselves must
be reframed.
Lincoln Way West and Western
Avenue must transform their
character and connect their
neighborhoods, rather than
maintain their current char-
acter as state roads that carry
commerce throughout the
state. This is a transformation
from state highway to walkable
neighborhood connector.
4. The neighborhoods must
attract new residents.
Families from other parts of the
city and the region must come
to live on the West Side. The
West Side is currently at less
than one-half its capacity. It was
once one of the best-looking
neighborhoods in South Bend
and it can be that again. It has a
great built environment. More
people, with a greater diversity
of age, race, and incomes, will
make the West Side better than
it ever was and one of the best
neighborhoods in the city.
2. The corridors must focus uses
and create destinations.
Transforming from undifferen-
tiated sprawl and disconnected
uses to concentrated retail/
commercial nodes with gather-
ing places that create a strong
identity will both improve retail
viability and create a gathering
place that attracts residents
and visitors.
3. The residential neighborhoods
must be revitalized.
City and private sector efforts
must insure that every existing
family that wants to stay on the
West Side will have a decent
home and a thriving neighbor-
hood.
1.1 generAl strAtegy
In seeking a strategy to revitalize the West Side corridors, four things must happen at the same time:
Active Mixed-Use Street Precedent Residential Square Precedent
8
WEST SIDE MAIN STREETS REVITALIZATION PLAN
LINCOLN WAY WEST AND WESTERN AVENUE AS CITY STREETS
Historically, three state roads—Lincoln Way
West, Western Avenue and Michigan Street—
have connected South Bend to the region and
points beyond in all directions of the compass.
South Bend’s population has been in decline for
the past 50 years. More recently, the St. Joseph
Valley Parkway (US 20/31 Bypass) has allowed
these three major roads to be reclassified
from state routes carrying a large truck traffic
load through the city to city streets that carry
no through truck traffic. This change has, by
definition, made Lincoln Way West and Western
Avenue gentler, at least in the type and amount
of traffic. Their scale, however, is set for another
time and much more intense usage. How to re-
store the role of the streets is a primary charge
of this plan. We have here an exciting opportu-
nity for change. The streets themselves are the
connective tissue of many neighborhoods and
are the defining public spaces that can be “sad
and gray as they are today,” or can be symbols
of the good and prosperous neighborhoods they
connect and symbols of the city they represent.
Street with Bike Lanes Precedent
9 1. ExEcutivE SummaryWEST SIDE MAIN STREETS REVITALIZATION PLAN
LIFE IS MORE THAN ONE HOUSE DEEP: THE NEIgHBORHOODS ALONg THE CORRIDOR
Together, Lincoln Way West and Western Avenue represent over six miles
of major corridors that run through most of the West Side of South Bend.
While impossible to paint the West Side with a single stroke, the following
are some of its characteristics:
Historically, the West Side contained the great industrial engine that
ran South Bend: Studebaker, Singer Sewing, and Bendix were a few
of the great industries that were the heart of South Bend’s economy.
With most of the factories located on the West Side, one could also
find there the beautiful, well-kept, blue-collar neighborhoods and
residents that filled the area and worked in those factories.
On the east end of the West Side exists one of South Bend’s best
historic neighborhoods. Just northwest of this West Washington
historic district lie neighborhoods that contain residents in poverty,
the largest amount of vacant homes and the largest number of
homes slated to be demolished.
The South Bend International Airport is located on the west end of
Lincoln Way West at the city limits.
The existing rail lines that divide the West Side reinforce a Lincoln
Way West set of neighborhoods to the north of the tracks and a
Western Avenue set of neighborhoods to the south of the tracks.
Former Bendix Factory Residential Neighborhood Precedent
10
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Differentiate Between North of Tracks
and South of Tracks, as well as Between
the Lincoln Way and Western Avenue
Corridors
Build on and Encourage Airport Related
West End Uses
Build on Historic Nature of Lincoln Way
Create an Arts and Design District at the
East End of Western Avenue and Connect
1.2 summAry of generAl ProPosAls for the west side
neighborhoods
to the West Washington Historic District
Create Destinations and Focus Retail into
Nodes Rather than Strip Development
Enhance and Connect the Historic Neigh-
borhoods and Create the “Downtown
West District”
Create a New and Infill Housing Focus
around Kennedy Academy
West Side Neighborhood Plan
111. ExEcutivE SummaryWEST SIDE MAIN STREETS REVITALIZATION PLAN
Expand City Cemetery, Provide Improved
Visibility, Provide Distinguished Entry, and
Reduce Number of Vacant Parcels (North
of Tracks)
Consolidate Properties Along Tracks to
Meet Needs of New Industrial Tenants
to Leverage Proximity to Rail in Order
to Bring New Jobs to the Area (South of
Tracks)
Expand LaSalle Park (South of Tracks)
Create Magnet Schools Priority for
Qualifying Students Living in Focus Zones
Through a “Reverse Commute” Strategy
Create West Side Greenway Recreational
Path Linking the Riverside Trail/St. Joseph
River at Angela Boulevard to the Western
Avenue Arts and Design District
Acquire and Consolidate Vacant Parcels
and Homes to Create Larger Development
Parcels that will Attract New Home Devel-
opers, Address Recreational Needs, and
Provide Urban Agriculture opportunities
Address Crime Through Additional Pro-
grams
Reconceive Lincoln Way and Western Ave-
nue by Reconfiguring Road Lanes, Adding
Bike Lanes, and Improving Sidewalks with
Pedestrian Streetscapes Including Street
Lights, Benches, and Street Trees
Farmer’s Market Precedent Trail Precedent
12
WEST SIDE MAIN STREETS REVITALIZATION PLAN
The character of Lincoln Way West has histor-
ically been a tree-lined, residential street with
houses set far back from the street and retail
nodes at major intersections. The plan for
Lincoln Way West is to reinforce the historic
pattern of residential with retail nodes. The
primary difference is that the new residential
coming to Lincoln Way West should be slightly
higher density, such as townhomes or small
four-unit, manor home condominiums.
Re-stripe Lincoln Way West for its entire
length to include a turn lane in the center,
1.3 summAry of ProPosAls for lincoln wAy west corridor
one lane of traffic in each direction, bike
lanes in each direction, and curb parking
for its entire length.
Add street trees along the entire length of
Lincoln Way West.
Using volunteer and bicycle club
members, paint the bike lanes green to
increase safety and to visually make the
street section appear more narrow and
more human scaled.
Dr. Martin Luther King, Jr. Drive Node: This
node and the neighborhood to the north
comprise the pilot project area for Lincoln
Way. A roundabout at Lincoln Way West
and Dr. Martin Luther King, Jr. Drive is
created to address this complicated
intersection. Leveraging the construction
of the roundabout, at the same time,
residential incentive programs should
be implemented to connect the Chapin
Park (Park Avenue) Historic District to the
north and the West Washington Historic
Outdoor Dining Precedent Illustration of MLK Node
131. executiVe summAryDistrict to the south of Lincoln Way West.
The high vacancy area north of Lincoln
Way, west of Dr. Marti n Luther King,
Jr. Drive, and east of Harrison Avenue
should be targeted for lot acquisiti on
and consolidati on in preparati on for
private sector development. Once the
“eastern front” is established, a westward
thrust for revitalizati on should be easier.
Streetscape improvement along Lincoln
Way West should be implemented. Lots
along Lincoln Way should be acquired and
consolidated for multi -family rental devel-
opment. This program will prove the point
that homeownership with mixed-income,
mixed-race and mixed-aged families can
coexist amicably in the same area and will
act as a catalyst to move revitalizati on to
the north, south, east, and west.
Diamond Avenue: Take advantage of the
recently completed street and streetscape
improvements along Diamond Avenue
from Lincoln Way West to Portage Av-
enue. Implementi ng a program to help
residents rehab houses along that street
will be a great demonstrati on of how the
rest of the neighborhood can look in ti me.
Wilber Street Node: This node along
Lincoln Way West is possibly the most
complex and, at the same ti me, has
the most potenti al. It is the confl uence
of Holy Cross Church and School, the
abandoned railroad line, an underuti lized
and historic brewery, and other retail
buildings along Lincoln Way West, and
several blocks of small-scale industrial
uses south of Lincoln Way West. Bett er
development parcels can be created by
combining blocks. The future recreati onal
path should be leveraged and could be a
great locati on for a bike shop.
Revitalize the Olive Street Node: This
node is important because of its north to
south connecti on to the rest of the city
via Olive Street. Historically, this has been,
and should conti nue to be, a retail node.
The existi ng suburban retail/commercial
along Lincoln Way should provide land-
scaping along the streetscape to screen
parking lots.
Bendix Node: In this area the character
changes from traditi onal urban to subur-
ban. A stronger streetscape is required
that also screens parking, along with an
evergreen buff er around large industrial
parcels.
Lincoln Way Corridor Plan
Colfax District
MLK Node
14
WEST SIDE MAIN STREETS REVITALIZATION PLAN
1.4 summAry of ProPosAls for western AVenue corridor
Re-stripe Western Avenue for its enti re
length to include a left -hand turn lane
in the center, one lane of traffi c in each
directi on, bike lanes in each directi on as
the street widths allow, and curb parking
for its enti re length.
Add street trees and corner accessible
ramps along the enti re length of Western
Avenue. In the most narrow secti on of
Western Avenue where buildings are very
close to the curb, some curb work will
be required to create street tree islands
between on-street parking stalls.
Paint the bike lanes green using volunteer
resident and bicycle club assistance.
Olive Cultural District Node (Locati on
of Pilot Project): Extend LaSalle Park
to Western Avenue to include new
recreati on fi elds and courts, create an
ellipti cal median to act as a gateway and
to calm traffi c, build a gathering space on
Western Avenue that will include a splash
fountain that will allow acti viti es for the
multi -cultural populati on in the area. The
perimeter of the space should include
restaurants. This Square will be a central
focus for the neighborhood. “Behind” the
corridor, lots should be consolidated to
provide a larger development parcel for
private sector development.
Arts and Design District: Establish an arts
and design district east of the viaduct
near Walnut Street. Allow for parking on
the half-block to the north and south of
Western Avenue. This area should also
be linked to the other existi ng historic
districts.
Belleville Place Node: Repurpose the
former K-Mart building at the Belleville
shopping center for another use, such
as an indoor hydroponic farm or charter
school. Alternately, demolish that building
to provide space for a larger commercial
user, such as an expanded grocery store/
pharmacy. In the long term, the excess
parking lots and land can be used to
create a town green with new retail
buildings surrounding it and opportuniti es
for multi family residenti al development.Interactive Fountain Precedent
Western Avenue Corridor Plan
Olive Cultural DistrictOlive Cultural
District Node
Pilot Project
151. ExEcutivE SummaryIllustration of Liberty Square
16
WEST SIDE MAIN STREETS REVITALIZATION PLAN
1.5 imPlementAtion tools
The revitalization of the West Side Corridors, and the West Side in its entirety, is challenging as
evidenced by the last 50 years. Implementation tools are required to make many of the recommen-
dations possible. Recommended tools include:
• Land Consolidation
• TIF (Tax Increment Financing)
• Tax Abatement
• Tax Credits
• Development Subsidies
• Individual Rental Subsidies
• Individual Homeownership Subsidies
• Employee Assisted Housing - Institutional Development District
• Employee Assisted Housing - Police, Firefighter, and City Employee Geographic Subsidies
• Facade Grants
• Brownfield Redevelopment Assistance
• Small Business Development Assistance
171. ExEcutivE SummaryWEST SIDE MAIN STREETS REVITALIZATION PLAN
Land Consolidation through Home Relocation Plaza Precedent
Neighborhood Square Precedent Urban Agriculture Precedent
2. Public
Process
Building on previous planning efforts, the City of South Bend is currently focused on developing
a market-based strategic revitalization plan for the West Side Corridors that will generate private
investment dollars and that will improve the lives of current and future residents. While Lincoln Way
West and Western Avenue are distinct corridors, each with their own character, a coordinated West
Side plan is key to the West Side’s success. An open and transparent process was created to include
as many residents, agencies, and departments as possible. The input is summarized in this document
and the input in its entirety can be accessed on the City web site. The key steps in the process are
enumerated below:
2.1 Process
Community Presentation
19
1. Stakeholder & Advisory Committee Meetings Feb. 5-6, 2014
2. Neighborhood and Demographic Analysis Feb. 5-April 17, 2014
3. Streets Analysis Feb. 5-April 22, 2014
4. Retail, Office, Industrial, and Residential Market Analysis Feb. 5-April 16, 2014
5. Public Charrette
a. Place Making Presentation & Community Intake Sessions April 23, 2014
One for Lincoln Way West, One English Speaking for
Western Avenue and One Spanish Speaking for Western Avenue
b. Stakeholder Meetings April 24–25, 2014
c. Work Sessions April 24–25, 2014
d. Preliminary Plan Presentation April 26, 2014
e. Community Feedback April 26, 2014
6. Draft Corridors Plan June 2014
7. Community Presentation of Draft Final Plan June 24, 2014
8. Final Corridors Plan and Design Guidelines August 2014
In addition to the general
community, meetings were
held with the following
stakeholder groups:
City of South Bend
₋ Public Works
₋ Mayor and Staff
₋ Police
₋Code Enforcement
₋ Building Department
₋Community
Investment
South Bend Heritage
Foundation
South Bend Housing
Authority
South Bend Communi-
ty Schools – Facilities
Management
Area Plan Commission
Transpo
Council Member Oliver
Davis
Local Developers
Near Northwest
Neighborhood, Inc.
An Advisory Committee, comprised of business owners, institutional representatives, elected officials, and
neighborhood residents, was formed in order to provide representation for the West Side, the Lincoln Way
Corridor, and the Western Avenue Corridor. This committee has:
Provided information and insight into existing conditions
Provided ideas that have been incorporated into the Revitalization Plan
Provided advice regarding priorities
Encouraged public participation in the planning process, including sharing details about the progress
of the planning process with their respective organizations, and
Championed the development and adoption of this plan.
20
WEST SIDE MAIN STREETS REVITALIZATION PLAN
LINCOLN WAY
A summary of strengths, weaknesses, opportunities, and threats for the corridors is found below.
This summary is compiled from community input via City Voice (phone survey) and public meetings.Location
Proximity to airport; Gateway from airport; Corridor connects airport to Downtown and nodes along the way
History
Historic Lincoln Highway; Historic architecture on east end
Community
People who are here want to stay
strengths2.2 strengths, weAknesses, oPPortunities, And threAts
West Side Neighborhoods and Lincoln Way West Map
212. Public ProcessCity
Revitalization will be a long-term process and
will need sufficient attention form the City;
Cheap housing or other development – new
development should be upscale
Amenities
LaSalle Branch Library closing would leave a
desert of community space
Displacement
People being displaced as a result of tax sales
is a concern – Where will they go? Goal should
be minimum relocation
Perception
Perception of area is a problem – Doesn’t always match reality
Safety
Crime is a threat and consistent Police presence should be provided
City
Entire City needs help, not just the West Side;
Lack of programs or lack of knowledge about
programs to assist businesses
Physical Condition
Lack of maintenance of properties; City
resources should be used on the West Side
Community
Residents have moved to Granger and other
areas – How do you get them to move back?;
Not a strong belief in the viability of revitaliza-
tion
Tax Sales
Process is complicated and should be simpli-fied; Currently most sales are for individual parcels and there is no way to consolidate larger parcels for a larger scale redevelopment
Streets
Need to provide bicycle lanes and/or paths; Sidewalks are needed
Snow Removal
Paths and sidewalks for bikes and pedestrians are not well cleared so one cannot bike or walk in the winter – Suggestion that City plow bike paths and sidewalks on Lincoln Way
City
Concentrate and coordinate efforts rather
than piecemeal, pool resources; Teach how
to maintain and improve homes; Continue
community outreach; Provide programs to
support housing and businesses
Housing
Improvement of existing housing conditions
Community
Keep current residents who may choose
to move to other areas; Institutions could
participate/assist in revitalization
Physical Condition
Create development at nodes and infill “be-hind” in neighborhoods; Improve commercial buildings; Replace unused asphalt with grass/park/market
Hire Local
Hire local labor to support community jobs
History
In concert with historic Lincoln Highway, keep theme of diversity and unity
Streets
Should not be a highway – Should be slow speed, have parking, and have sidewalks
Retail
Establish bike shop on Lincoln Way West
weAknesses threAtsoPPortunities
22
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Institutions
Schools, Notre Dame, IUSB, Ivy Tech; Churches and their ability to mobilize the community; Libraries; Airport
Community
Diversity (provides both richness and conflict); Sense of community and pride; Children
Housing
Available/vacant land; Affordable; Variety of housing types and prices; Historic buildings
Retail
Variety; Convenient fast food; Spending power of community
Location
Proximity to highways and airport
Abandoned Railroad
Potential to transform into a recreational path
strengthsWESTERN AVENUE
West Side Neighborhoods and Western Avenue Map
232. Public ProcessweAknesses threAtsoPPortunities
Physical Condition
Many car lots; Condition of properties – Need to demolish some; Little greenery; dirty, trash; lack of maintenance; Lack of code enforcement, Lack of retail diversity; Limited parking; Large trucks park on Western Ave.; Unclear traffic patterns (no striping); No “Main Street” atmosphere; No destination with multiple things to do; lack of walkability (no density and mix of uses); Lack of pocket parks/neighborhood parks; Disconnect created by cul-de-sacs
Housing
Concentration of public housing on west side; Vacant and abandoned homes; Lower resale values due to context; while housing is affordable, it is not of a high quality
City
Lack of attention by City; Limited resources to improve existing structures; When improve-ments are made then higher taxes result
Crime
High crime rates; Negative attitude toward West Side
Amenities
Kroc Center is very expensive; there are few opportunities for winter recreation; LaSalle has no water for bathrooms, etc.; No parking at Pulaski Park
Housing
Homeownership Grants; Tax credits for home rehab.; Homeowner assistance to buy vacant lots
City
New administration appears to be interested
in corridor; Business owners need help
in understanding approval process for
improvements; Communication with code
enforcement
Investment
Build on success of Four Winds, Kroc, Stude-
baker by starting there and moving west; Tap
corporations like KFC, McDonald’s to help;
Build on investment at Martin’s shopping
center
Community
Spend shopping dollars on West Side; Com-
munity belief/inspiration; Seek out age 18-35
representation; Have a “Taste of Western”
Physical Condition
Change zoning to prevent car lots/undesirable uses; Create small pockets of dense uses to create a destination/draw; Fitness center on Western with indoor walking in winter; Plaza as gathering space; Indoor soccer; Celebrate heritage with gathering space; Splash Park
Streets
Add bus stops and shelter with English and Spanish; Add way-finding signs; provide lighting; Clarify viaduct movements (provide better signage); Make more bike-friendly; Add landscaping; Add striping
Community
Drugs; No belief that things can change;
Self-interest among business owners; Over-
growth of vacant lots; Trash dumping (code
enforcement not effective)
Jobs
Concentration in industrial jobs and lack of
professional jobs; “Brain Drain” – There is no
reason for young people to stay/return; Not
enough focus on employment for West Side
residents; Unfair hiring practices
City
Property taxes collected from West Side
are spent elsewhere; City needs to make an
honest effort; Insufficient police presence/
response; Cumbersome approval process
Mishawaka
Competition; They are more business-friendly; West Side community goes to shop in Misha-waka
Physical Condition
Sample Street potholes/condition; Western is a key entry/exit – need to address traffic needs; Semi-trucks at Olive
Housing
Homes are transitioning from ownership to rental
24
WEST SIDE MAIN STREETS REVITALIZATION PLAN
2.3 city Voice
Feedback Summary
Survey active for one month
52 people called in
221 people visited the website
1,200 page views of the website
City Voice is a community sharing and feedback
platform developed by the City of South Bend
and Code for America. Designed as a phone-
based call in system, City Voice allows people
in the community to be heard on a variety of
important issues. For the West Side Corridors
study, citizens responded to a number of
questions about both their current use and
interactions with Lincoln Way and Western
Avenue, and what they wished to see in the
future. A summary of the input and answers to
the questions follows:
YES NO
Do you eat at restaurants along Western Avenue? 23 17
Do you shop along Western Avenue? 25 15
Do you do any other leisure or recreational activities along Western Avenue? 17 23
Do you eat at restaurants along Lincoln Way West? 27 13
Do you shop along Lincoln Way West? 21 19
Do you do any other leisure or recreational activities along Lincoln Way West? 12 28
What shops, restaurants, or other activities do you visit along Lincoln Way or Western
Avenue?
Restaurants
Pizza Hut, Long John Silvers, Volcanos, Lacopo, Taco Bell, Arby’s, McDonalds, JJ’s Fish,
Sunrise Café, Rosales, King Gyro, Burger King, Chicos, Taste of Chicago, Lincoln Way
Grill, Lincoln Way Café, Little Caesars, Taqueria Chicago, Taste of Mexico, Bendix Family
Restaurant, Subway, Pariso Tropical
Stores
Dollar Store, Martins, Gene’s Camera, TCU, Auto Zone, O’Reilly, Auto Repair, Walgreens,
Gas, Consignment, DC Auto, Sherman Beauty Supply, CVS
Other Activities
WUBS, Airport, Charles Martin Center, Colfax Center, MLK Center, South Bend Heritage,
Kroc Center
whAt do you currently do?
252. Public ProcessWhat shops, restaurants, or other activities do you want to bring to Lincoln Way West or
Western Avenue?
Restaurants: Cracker Barrel, Casual Dining, Family Dining, Golden Corral, White Castle,
Old Country Buffet, Fine Dining
Stores: Farmer’s Market, Clothing Store, Grocery Stores, Family Fun Center/Chuck E.
Cheese’s, Athletic Shop, Dry Cleaner, Pharmacy, Mini Outlet Mall, Chic Boutiques, Pawn
Shops, Massage Parlor, Bike Shop, Athletic Gym, Hair Salon, Anchor Stores, Walmart,
Movie Theater, Home Improvement, Laundromat, Rite Aid, 7-11
Other: Bus Shelters, Bike Path, Parks, Trees, Art, Art Studios, Youth Activities, Skating
Rink, All Age Activities, Arcade, Social Services Locations, Make destination cultural cen-
ters based on existing cultural communities, Fewer chains and more local restaurants,
Smaller than big box stores, Chapin could be an arts district
What other ideas do you have to improve Lincoln Way West or Western Avenue?
Themes: Streetlights, Storefront/façade improvements, Crack down on dumping, Bike
Lanes, Remove vacant houses along corridors, Pedestrian improvements, Bus shelters,
Farmer’s Markets, Children’s Amusement Amenities, Improved Western Avenue Traffic
Flow
TIF or Tax Abatement to Rehab Houses, Public Artwork, Rehab Historic Buildings
whAt would you like to see?
3. west side
neighborhoods
Regional Analysis Map
3.1 regionAl And city
AnAlysis
The west side has a rich cultural history and
has always been a working class neighborhood
intermingled with industrial employment. Part
of the reason for the industrial is the proximity
to the Norfolk Southern Railroad line that
continues to serve the existing industrial space
on the west side. This rail line is crossed only in
a few places by Chapin Street, Walnut Street,
Olive Street, Meade Street, Grandview Avenue,
and Mayflower Road (of which Walnut Street,
Meade Street, and Grandview Avenue are
indirect connections and/or minor streets). As
a result, the rail line is a neighborhood divider.
While no line is absolute, the area north and
east of the tracks is primarily African American,
the area south and southwest has transitioned
from Polish to predominately Latino.
The areas at the edge of Downtown are historic
in nature. Moving west, the homes transition
from 1950’s to 1970’s to 1980’s. While the ma-
jority of the area is characterized by traditional
urban neighborhoods, the westernmost areas
are characterized by conventional strip retail
and suburban housing patterns. The eastern ar-
eas have suffered many years of disinvestment
and this is reflected in high retail and residential
vacancy rates, with residential vacancy creep-
ing westward as time passes. In addition, an
oversupply of retail space has resulted in vacant
large format retail on the west ends of both
corridors. The eastern areas have some of the
highest crime rates in the City.
27
Context Analysis Map
28
WEST SIDE MAIN STREETS REVITALIZATION PLAN
The West Side Neighborhoods study area is +/- 3,170 acres
The Lincoln Way corridor is 2.9 miles long, measured from the South
Bend city limits at the west to William Street at the east
The Western Avenue corridor is 3.4 miles long, measured from the
South Bend city limits (Mayflower Road) at the west to William
Street at the east
The railroad line divides the area in two.
Lincoln Way and Western Avenue are the main east-west connectors
Mayflower Road, Olive Street and Dr. Martin Luther King, Jr. Drive/
Chapin Street are the main north-south connectors
Secondary roads such as Bendix Drive, Sheridan Street, Orange
Street, and Walnut Street are an important part of the neighbor-
hood’s framework
Bus routes serve Lincoln Way and Western Avenue. There is a need
for bus stops and bus shelters along the corridors
Existing and proposed bike lanes are an essential part of the trans-
portation system in the West Side Neighborhoods area
3.2 study AreA AnAlysis
corridors trAnsPortAtion
293. West side Neighborhoods The West Side Neighborhoods area is mostly residential. The
neighborhood is composed of mostly single-family houses
Industrial uses extend along the railroad line
Lincoln Way has a mix of residential and retail uses
Retail is the predominant use along Western Avenue
Both corridors have suburban retail on the western end; the retail
becomes more urban as it gets closer to downtown
The area is well served with schools, parks and civic uses such as
libraries and recreation centers
There are areas of vacant homes along Lincoln Way and Western
Avenue
The highest vacancy areas are located south of LaSalle Park, north
of Lincoln Way between Olive Street and Dr. Martin Luther King, Jr.
Drive and south of Lincoln Way between Olive Street and Cottage
Grove Avenue
High vacancy areas have high crime rates and are unsafe for resi-
dents. Programs need to be developed to stabilize these areas
lAnd use VAcAncy
30
WEST SIDE MAIN STREETS REVITALIZATION PLAN
NEIgHBORHOODS
Constraints
Railroad is a neighborhood divider, only a
few streets provide a north-south connec-
tion
Areas of high vacancy have a negative
impact on property values and make
neighborhoods unstable
Vacant industrial uses have a negative
impact on the neighborhoods
Several Industrial Parcels are too small to
meet contemporary needs
Some areas are not within walking
distance to a park
Areas with a high child population may be
underserved for their needs
Areas with a high population approaching
senior age may be underserved for their
needs
Sidewalks missing in some areas
Opportunities
High vacancy areas provide opportunities
for new housing, urban agriculture, and
additional parks
Vacant industrial uses provide opportu-
nities for redevelopment and employment
Vacant industrial buildings provide
opportunities for business incubators and
low rents for new enterprises
Existing industrial uses provide employ-
ment opportunities
Pocket parks should be considered in
areas that are not within walking distance
to a park
Areas with a high percentage of children
provide opportunities for amenities and
activities tailored for this segment of the
population
Areas with a high percentage of senior
citizens provide opportunities for services
tailored to this segment of the population
Magnet schools provide a community
asset
Civic buildings such as libraries and
recreation centers provide a community
asset
Diversity provides opportunities to
celebrate cultural heritages
Amtrak station is an asset for the neigh-
borhood
3.3 oPPortunities And constrAints
313. West side NeighborhoodsLEGEND
High % of Younger Population
High % of Senior Population
Areas of High Vacancy
Neighborhoods Opportunities and Constraints Map
32
WEST SIDE MAIN STREETS REVITALIZATION PLAN
CORRIDORS
Constraints
Dispersed retail creates a weak retail
environment
An oversupply of retail space results in
vacant space
Obsolete retail buildings are difficult to
lease
Residents have to shop outside of the
west side for some goods
The west side corridors are not pedestrian
friendly (overly wide roads, discontinuous
sidewalks, limited on-street parking, and
few street trees)
Shallow lots along the corridor make it
difficult to provide sufficient parking
Current retail trends integrate gathering
spaces that are lacking along corridors
Opportunities
Major intersections with north/south
streets provide opportunities for im-
proved retail and/or mixed-use nodes
Wide streets provide opportunities to
reconfigure for bikes lanes, parking, and
bus stops to support retail
Current external shopping could be
captured on the west side
Vacant lots and/or buildings have po-
tential to be transformed into gathering
spaces
Local architecture and arts programs
could provide creative low cost solutions
and provide educational opportunities for
students
333. West side NeighborhoodsCorridors Opportunities and Constraints Map
34
WEST SIDE MAIN STREETS REVITALIZATION PLAN
A market analysis was performed for residential
uses by Zimmerman/Volk Associates and for
retail, office, and industrial uses by Gibbs
Planning Group. The full market analysis reports
are available from the City of South Bend, but a
summary of findings is found below.
RESIDENTIAL MARkET ANALYSIS BY ZIMMERMAN/VOLk ASSOCIATES, INC.
Key recommendations include: New rental
apartments should be developed as quickly as
possible at key intersections with Lincoln Way.
These units are likely to be occupied by younger
singles and couples, who, once they become
comfortable living in the neighborhood, would
be potential buyers of new condominiums,
rowhouses or small detached houses in the
future. Larger vacant lots or parcels in the West
Side Corridors Study Area could be infilled with
four-unit condominium buildings, or three or
four new rowhouses, instead of one or two
single-family houses. It would be a tremendous
asset to the marketing of new homes in the
Study Area if, each year, a certain percentage
of places at the top-rated Kennedy Primary
Academy on Olive Street and LaSalle Interme-
diate Academy on Elwood Avenue were made
available to qualified students living in the Study
Area.
Zimmerman/Volk Associates has determined
that, over the near term, those households that
prefer new construction, rather than previously
occupied units, currently represent 10 percent
3.4 residentiAl mArket AnAlysis
Townhouse Precedent Duplex Precedent
353. West side Neighborhoodsof the potential rental market, and five percent
of the potential for-sale market for new housing
in the Study Area, assuming the production of
appropriately positioned new housing. Over the
longer term, as the housing market continues to
improve, the rental capture rate should rise to
12 percent and the for-sale capture rate should
rise to 8.5 percent. Based on a capture of 10 to
12 percent of the potential market for the lower
rents of new rental housing, and a 5 to 8.5
percent capture of the potential market for the
lower ranges of new for-sale housing units, the
West Side Corridors Study Area should be able
to absorb 85 new units per year over the short
term, and, potentially, up to 113 new housing
units per year over the longer term.
HOUSINg TYPE PERCENT OF TOTAL NUMBER OF UNITS
Multi-family for-rent
(lofts/apartments, leaseholder)56.9%128
Multi-family for-sale
(lofts/apartments, condo/co-op owner-
ship)
10.7%24
Single-family attached for sale
(townhouses/rowhouses, fee-simple/
condominium ownership)
16.2%36
Low-range single-family detached
(houses, fee-simple ownership)16.2%36
TOTAL 100.0%224
Target Markets:
The household groups that comprise the
potential market for new housing units in the
West Side Corridors Study Area are:
Younger singles and childless couples—65
percent;
Urban traditional and non-traditional
families —21 percent; and
Empty nesters and retirees—14 percent.
Optimum Market Position for the Study Area:
Market-entry rents and prices for the first
phases of new units in the Study Area should
be targeted to the lower ranges of affordability
to respond to the largest segments of annual
market potential. A mix of 224 new dwelling
units (the number of new dwelling units that
could be absorbed in the Study Area over the
next five years), distributed according to the
percentages in the target residential mix, is
shown in the following table:
Single Family Detached Precedent
36
WEST SIDE MAIN STREETS REVITALIZATION PLAN
USES 2014 2019 2024
Retail 62,000 sf 62,000 sf 62,000 sf
Office 5,000 sf 52,000 sf 110,700 sf
Industrial N/A N/A 12,000 sf
Summary of Findings
This market analysis finds that the West Side
Corridors Study Area has an existing demand
for 62,000 square feet (sf) of additional retail
development, 5,000 sf of additional office
development and no demonstrated demand
for additional industrial space. The retail
demand could be absorbed by existing busi-
nesses in the study area or with the opening of
20-25 new restaurants and retailers producing
up to $18.0 million in new retail sales. By
2019, this demand could increase to capture
approximately $20.1 million in consumer ex-
penditure. Class B office demand will grow to
support 52,000 sf of new office development
by 2019. By 2024, due to job growth and the
obsolescence of existing space, the West Side
Corridors could support an additional 58,700 sf
of office, totaling 110,700 sf over the ten-year
period. While there is presently no demand
for new industrial space in the study area
and none expected by 2019, 12,000 sf of new
space will be viable by 2024, solely because of
industrial building inventory becoming func-
tionally obsolete over the next 10 years. Below
is a summary of the statistically supportable
uses in 2014, 2019, and 2024:
Retail
This analysis estimates that the West Side Corri-
dors Study Area has an approximate two-to-six-
mile primary trade area, limited by the Indiana
Toll Road to the north, Downtown South Bend/
Main Street to the east, and the more rural ar-
eas to the west and south, which could account
for approximately 60 to 70 percent of the new
retail’s households. The remainder of retail sales
captured by new and existing retailers in the
study area will likely be drawn from consumers
living within the city of South Bend.
3.5 retAil, office, And industriAl mArket AnAlysis
Due to its geographical location, the West Side
Corridors Study Area is surrounded by four
main regional routes: the Indiana Toll Road, the
St. Joseph Valley Parkway, Western Avenue,
and Main Street, all of which carry at least
20,000 cars per day. Locally, Western Avenue,
Colfax Avenue/Orange Street and Lincoln
Way are the primary east-west routes, while
Mayflower Road, Bendix Drive, Olive Street and
Chapin Street carry motorists north and south.
Centrally located within these regional routes,
and well-served by local roads, nearly every
resident and daytime employee of the primary
BY gIBBS PLANNINg gROUP, INC.
Retail Elements Diagram
373. West side Neighborhoodstrade area and the City of South Bend can reach
the study site within a 15-minute drive time.
This advantageous location and access to over
55,000 primary trade area residents create the
captive effect necessary for new retailers to
enter the market or existing retailers to expand
their local presence. Existing concentrations of
retail within the study area include the Belleville
Center anchored by Kroger, Western Avenue
Plaza anchored by Martin’s Super Market and
several stand-alone retailers located on primary
local routes. Regional shopping destinations
include Erskine Village, a 500,000 sf shopping
center featuring Target, Famous Footwear, Old
Navy, Dress Barn and several other retailers;
and University Park Mall, an 820,000 sf enclosed
shopping mall anchored by Macy’s, JC Penney,
Barnes & Noble, and Sears. Additionally, Meijer,
Target, and Walmart each have locations within
five miles of the study area.
The West Side Corridors primary trade area
includes 55,100 people and is expected to
decrease to 54,900 by 2018, at an annual rate
of -0.08 percent. Current 2013 households
include 20,100 declining to 20,000 by 2018, at
an annual rate of -0.08 percent. The primary
trade area’s 2013 average household income is
$45,000 and is estimated to increase to $51,400
by 2018. Median household income in the
trade area in 2013 is $34,300 and estimated to
increase to $38,900 by 2018. Moreover, 14.7
percent of the households earn above $75,000
per year. The average household size of 2.65
persons in 2013 is expected to remain the same
by 2018; the 2013 median age is 33.8 years old.
38
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Office
Gibbs Planning Group, Inc. (GPG) predicates
these projections on a stabilized vacancy factor
of 9.0 percent, a market average of 213 sf per
general office employee and an annualized em-
ployment growth range of 0.25 percent to 0.50
percent. This new class B type office space will
primarily serve the needs of local medical, legal,
sales and financial services providers. Class
A office space needs for regional or national
companies will primarily be met at alternative
sites in the marketplace, with superior access to
the industrial and commercial centers in both
the Downtown South Bend and Mishawaka
submarkets.
Small Scale Office Precedent
393. West side Neighborhoods Industrial
This industrial space market study finds that the
West Side Corridors Study Area cannot currently
support any additional space in 2014, nor is
growth supportable through 2019. However,
12,000 square feet (sf) of new space will be via-
ble by 2024, solely because of industrial building
inventory becoming functionally obsolete over
the next 10 years. GPG bases these projections
on a stabilized vacancy factor of 8.25 percent,
which is significantly lower than the current
10.4 percent level at a negative industrial labor
annual growth rate of 0.03 percent, and a
market average of 1,437 sf per general industrial
sector employee. This new space should be
flex space, and will primarily serve the needs
of distribution, research & development, and
sales-service providers. The key factors in the
lack of significant demand over the next five
years are: (1) a decline in industrial sector
employment, and (2) absorption of existing
vacant space, to get down to the stabilized
vacancy rate of 8.25 percent from today’s level
of 10.4 percent.
Warehouse space needs for the study area will
likely be met by the existing 17.8 million sf of
warehouse space in the Greater South Bend
industrial space submarket. However, GPG has
not physically inventoried the existing supply
of industrial space, and it is possible and even
likely that some of the 2014-1019 potential de-
mand of 18.3 million sf of gross may not find the
existing inventory suitable, creating a potential
demand for significant amounts of industrial
space. City staff has reported a demand for over
200,000 sf of logistical space located along a rail
spur in the study area.
Warehouse Precedent Former Bendix Factory
40
WEST SIDE MAIN STREETS REVITALIZATION PLAN
The West Side Corridors Area is approximately
3.4 miles long and covers about 3,170 acres
(approximately 5 square miles). There are over
eleven neighborhoods in this area each with
unique identi ti es, strengths, and challenges. A
plan and strategy for an area this size must fi rst
begin with an overall framework and a set of
broad big-picture strategies that work together
to create a well-coordinated approach that
leverages the strengths of each neighborhood
and minimizes competi ti on between the two
corridors so that each may succeed. First
and foremost, the goal is to create a series of
“neighborhoods of choice.” When residents
or future residents of South Bend think about
where they want to live, the West Side should
be at the top of the list.
Having identi fi ed the strengths, weaknesses,
opportuniti es, and threats discussed above, the
plan for the West Side leverages the existi ng
strengths and seeks to transform the weakness-
es into assets. The neighborhood framework
plan is based on the following strategies (addi-
ti onal strategies more focused on the corridors
themselves are found in the following secti ons).
One of the goals of this planning eff ort is to
identi fy priority areas for redevelopment. Two
districts have been identi fi ed as priority areas;
the MLK District and the Olive Cultural District.
These are discussed in more detail in subse-
quent secti ons.
Sheridan Node
Belleville Place
Node
3.6 west side neighborhood PlAn
MAIN STREETS REVITALIZATION PLAN: HISTORIC LINCOLN WAY, WESTERN AVENUE, AND WEST SIDE NEIGHBORHOODS
413. west side neighborhoodsMAIN STREETS REVITALIZATION PLAN: HISTORIC LINCOLN WAY, WESTERN AVENUE, AND WEST SIDE NEIGHBORHOODS
Olive Cultural District NodeOlive Cultural
District
Near West Arts and
Design District Node
MLK Node
Colfax District
Bendix Node
Olive Node
Wilber Node
LEGEND
Corridor Nodes
Residential Areas Along Corridors
Residential Priority Areas for Redevelopment
Open Spaces
Historic Neighborhoods
Industrial Uses
42
WEST SIDE MAIN STREETS REVITALIZATION PLAN
1. Differentiate Between North of Tracks and South of Tracks, as well
as Between the Lincoln Way and Western Avenue Corridors
It is well recognized that cities compete with each other for limited
retail demand, as well as residents and other uses, but it is also true
that neighborhoods within a city compete with each other. With two
major corridors on the west side and limited additional retail, office,
and residential demand, it is important that each corridor define a
niche so that they are not competing with each other. It is also im-
portant to note that the majority of historic era buildings occur north
of the tracks. Building on the unique characteristics of each corridor,
at a broad scale, several of the following strategies contribute to this
differentiation.
2. Build on and Encourage Airport Related West End Uses (North of
Tracks and Lincoln Way Corridor)
Given the close proximity to the airport and existing hotels, this area
should promote airport related uses that are compatible with the
surrounding residential neighborhoods.
Areas North and South of Tracks South Bend International Airport
433. West side Neighborhoods3. Build on Historic Nature of Lincoln Way
(North of Tracks and Lincoln Way Corridor)
The first transcontinental highway in the United States was the Lin-
coln Highway, which linked Times Square in New York City to Lincoln
Park in San Francisco. The highway was also the first national memo-
rial to President Lincoln. Historic and historic-era buildings should
be preserved and revitalized and new building should be compatible
with the historic character. Additionally, historic interpretation and
facilities should be encouraged.
4. Create Destinations and Focus Retail into Nodes Rather than Strip
Development (North and South of Tracks)
Community comments are consistent with contemporary retail
strategies; destinations with a pedestrian-friendly format and gath-
ering spaces for the community is the better formula that patrons
are seeking out. When undifferentiated retail is strung out along a
corridor, each retail shop must stand on its own, but when aggregated
in a pedestrian-friendly format, each retail shop can support each
other. Where existing retail nodes occur with residential between (as
is common along Lincoln Way) this pattern should continue. Where
retail nodes do not occur (as is common along Western Avenue)
policies should be implemented to promote the development of
nodes to support the success of retail in the corridors.
Colfax Cultural Center Active Commercial Streetscape Precedent
44
WEST SIDE MAIN STREETS REVITALIZATION PLAN
6. Enhance and Connect the Historic East End Neighborhoods and
Create the “Downtown West District” (North of Tracks)
The east end of the Study Area is adjacent to Downtown and is char-
acterized by historic residential, retail, and industrial buildings. These
historic assets should be leveraged to their fullest extent to create
a unique district. A connection between the Riverside Drive and
Chapin Park Districts with the West Washington Historic District in the
central portion, and with the east end of Western Avenue should be
strengthened through an emphasis on restoring historic homes and
building new homes, where appropriate, that are compatible with the
existing historic homes in order to create a continuous north-south
necklace. This new district, the Downtown West District, should be
branded and marketed and should be supported by design guidelines
to protect and enhance the unique character.
Arts and Design District Diagram Downtown West District Diagram
5. Create an Arts and Design District at the East End of Western Ave-
nue and Connect to the West Washington Historic District (North of
Tracks)
While located on the eastern end of Western Avenue, this area is
located north of the tracks (and is therefore perceived as connected
to downtown), is contiguous to Chapin Street/Dr. Martin Luther King
Jr. Drive, and has several existing historic/historic era buildings which
have an architectural character that is difficult to replicate today.
Building on this character and the potentially lower rents, these types
of areas can be a natural fit for antique vendors who seek out lower
rent areas with historic architecture, design shops such as those
producing furniture, and other types of designers. These types of
shops do best when they are consolidated together since patrons are
seeking to go to more than one store. There does not appear to be
this type of district in the region, so this could fill that gap. Connec-
tions to the West Washington Historic District should be strengthened
and are discussed in more detail below.
453. West side Neighborhoods7. Create a New and Infill Housing Focus Around Kennedy Academy
(North of Tracks)
While there has been significant disinvestment in the area, South
Bend’s magnet schools are highly regarded and attract pupils from
across the city. When determining where to focus resources in order
to leverage public investment with private investment, a great place
to start is building on the neighborhood’s assets. Focusing resources
around Kennedy Primary Academy for infill and new housing will
build on this recognized asset. For a further discussion about Magnet
Schools Priority, see below.
8. Expand City Cemetery to Provide Improved Visibility, to Provide a
Distinguished Entry, and to Reduce the Number of Vacant Parcels
(North of Tracks)
The high number of vacant properties and homes adjacent to the
cemetery coupled with the need for additional cemetery space
provides an opportunity to enlarge the City Cemetery, to give it
some presence on Lincoln Way and Colfax Avenue, and to provide a
gracious addition for loved ones to visit in the tradition of park-like
cemeteries. A more detailed study of vacant parcels can indicate the
direction and extents of potential expansion, but it is recommended
that the few houses along the southern edge be purchased/added
to the cemetery and that the cemetery be expanded to the north
reaching Lincoln Way.
Housing Infill Around Kennedy Primary Academy Cemetery Expansion Diagram
46
WEST SIDE MAIN STREETS REVITALIZATION PLAN
9. Consolidate Properties Along Tracks to Meet Needs of New Industri-
al Tenants to Leverage Proximity to Rail in Order to Bring New Jobs
to the Area (South of Tracks)
The Norfolk Southern Railroad line is an asset that is very valuable to
industrial employers. With a demand for industrial land with rail line
access, the underutilized and vacant parcels lining the tracks should
be consolidated to provide sites for these potential tenants that can
provide jobs for the city and local residents. This converts the weak-
ness of vacant properties and proximity to the rail line into a strength.
10. Expand LaSalle Park (South of Tracks)
The need for additional active recreation fields and courts such
as soccer fields and basketball courts can be accommodated by
expanding LaSalle Park. With the high number of vacant parcels and/
or homes surrounding the park, an expansion to the south would
help to consolidate and stabilize the neighborhood, as well as provide
visibility and a front door for LaSalle Park on Western Avenue.
Industrial Use Diagram La Salle Park Expansion Diagram
473. West side Neighborhoods12. Create West Side Greenway Recreational Path Linking the St. Joseph
River at Angela Boulevard to The Western Avenue Arts and Design
District
The St. Joseph River is one of the largest recreational amenities
in the area. An abandoned rail spur that used to connect to Notre
Dame provides a unique opportunity to create a recreational path
that serves not only the local neighborhoods, but the entire City. This
off-street path will connect across the river at Angela Boulevard, to
the Riverside Trail, to the Wilber Node, south to Martin Luther King,
Jr. Park, and continuing south to near the intersection of Kosciuszko
Street and Western Avenue at the west end of the new Western Av-
enue Arts and Design District. At this point, pedestrians can continue
along sidewalks and cyclists can continue along the Western Avenue
bike facilities, serving connections to the Kroc Center, Downtown, and
other locations.
11. Create Magnet Schools Priority Attendance Zones for Qualifying
Students Living in the Study Area
Schools are one of the biggest drivers in home location decisions.
Other cities have employed a strategy which gives preference to
qualified students that live in the particular school’s neighborhood
as a means of attracting residents and stabilizing neighborhoods. In
South Bend the top magnet schools are found within the study area.
It is recommended that qualifying students living in newly designated
Focus Zones on the west side be given preference to the magnet
schools in the Study Area as a means of attracting residents and
stabilizing neighborhoods.
Recreation Field Precedent West Side Greenway Diagram
48
WEST SIDE MAIN STREETS REVITALIZATION PLAN
13. Acquire and Consolidate Vacant Parcels and Homes to Create Larger
Development Parcels That Will Attract New Home Developers,
Recreational Needs, and Urban Agriculture
One of the most challenging questions in an area of extensive disin-
vestment is what to do with the significant number of vacant parcels
and homes that are under individual ownership. In addition, it is most
common that a few occupied houses are remaining in a block resulting in
high infrastructure maintenance costs compared to the number of homes,
highly visible disinvestment leading to an unwillingness by others to
invest or move into the neighborhood, and a barrier to private investment
dollars which could make a large enough impact to change perceptions
and spur additional redevelopment.
Recommendations to address this complex problem include:
a. Redevelopment Commission should declare the area(s) a
“redevelopment area” in order to buy blighted land, clear it,
and make it available for private development
b. Create a five step program to consolidate parcels. First, identify
target areas in high vacancy areas for larger scale redevel-
opment potential. Second, acquire and hold properties until
consolidation is completed. Third, purchase occupied homes in
target area or provide alternative to relocate residents to other
existing homes. Fourth, demolish remaining structures. Fifth,
issue RFP for private development of consolidated property. In
addition to the above, it will be important to either provide or
require developer to provide common open space within the
development.
c. Identify and consolidate additional parcels in high vacancy areas
to address community needs, such as expanded parks/new
recreational fields.
d. Identify and consolidate additional parcels in high vacancy
areas for urban agriculture. These could be either City owned
community gardens (smaller consolidation) or private revenue
generating endeavors (larger consolidations).
Urban Agriculture Precedent
Open Space Precedent
493. West side Neighborhoods14. Address Crime Through Additional Programs
Both crime and the perception of high crime are significant deterrents
to revitalization and must be addressed hand-in-hand with other
strategies. Some on-the-ground strategies used in other cities include
bike patrols in the neighborhoods and providing free to low-cost
housing in targeted neighborhoods, or higher salaries, for police
officers living there.
15. Add Bike Lanes
Cycling has great health benefits, is an economical method of trans-
portation, and also boosts retail sales. Bicycle and bicycle parking
studies have shown greater retail sales when bike lanes are present.
It is also recommended that lanes are painted a solid green to aid
drivers in identifying traffic patterns. Additional detail is provided in
subsequent sections of this document.
Bike Patrol Precedent Bike Lane Precedent
50
WEST SIDE MAIN STREETS REVITALIZATION PLAN
In order to implement revitalization, it is import-
ant to ensure that policies are in place that are
consistent with the overall vision. The vision for
the West Side Corridors is one of vibrant walk-
able nodes that are destinations and gathering
places for the community. This is consistent
with current trends throughout the country. As
a result, current trends in zoning seek to create
an urbane, pedestrian-friendly environment.
This is being accomplished through a) new
zones; b) new form-based zoning codes; c)
parallel codes; and d) overlay zones with design
guidelines. All of these approaches have one
thing in common: They place greater emphasis
on the form of development and less emphasis
on the use. As an example, a conventional car
dealership may place a parking lot with cars for
sale along the street and the building further
back into the site thereby creating an auto
dominated environment, but other models for
car dealers place the building/showroom along
the street and the majority of cars behind that
building. In the first scenario, the form detracts
from an urban walkable environment while in
the second scenario, the form contributes to a
walkable environment. The use is not inherently
unfriendly to a walkable environment, but it is
the form that the use takes which detracts or
contributes to the desired goal.
Is a new code, new zone, parallel code, or an
overlay zone the best approach? Each approach
has its pros and cons and the choice is made
depending on the particular schedule, political
will, resistance or acceptance of owners, ease of
implementation, and other considerations.
New Code: An entire new code is the most
involved and time consuming. A new code often
takes multiple years to implement.
New Zone(s): A new zone can create an inte-
grated set of uses and standards that can be
effective. This takes less time than a new code,
but still could take 6 months to a year or more.
It also requires changing the zoning of individual
properties.
Parallel Code: A parallel code (whether for
a new code or a new zone) takes the same
amount of time as those already mentioned,
but is typically more easily accepted since it
provides a choice to current owners, but also
loses some of its ability to implement the vision
when owners choose not to follow the parallel
code.
Overlay Zone: An overlay zone leaves the
current zoning in place, but supersedes stan-
dards in the underlying zone. The benefit of this
method is that the existing zoning of individual
parcels does not have to be changed.
REZONINg COMPARISON
New Code
Longest time to write/implement
Most complicated and involved public process
Can take multiple years
New Zone
Shorter than writing a new Code
Less complicated adoption
process
Six months to a year
Requires changing zone of
properties
Parallel
Code/Zone
Same amount of time to write as a new Code or Zone
Voluntary, easier to adopt
Because it is voluntary, it can’t necessarily deliver vision
Overlay
Zone
Leaves underlying Code/Zoning in place
Supersedes regulations for new buildings and/or significant renovations
Simpler to approve and implement
Does not require changing zone of properties
3.7 Zoning (existing And ProPosed)
513. West side NeighborhoodsMixed-Use Node Zone Western Avenue Corridor Residential Zone
Lincoln Way Corridor Residential ZoneIndustrial Zone
52
WEST SIDE MAIN STREETS REVITALIZATION PLAN
ExISTINg ZONINg MAP
LEGEND
SF1 - Single Family and Two Family District
SF2 - Single Family and Two Family District
MF1- Urban Corridor Multifamily District
MF2 - High Density Multifamily District
CB - Community Business District
MU - Mixed Use District
CBD - Central Business District
GB - General Business District
GI - General Industrial District
LI - Light Industrial District
OB - Office Buffer District
O - Office District
533. west side neighborhoodsWEST SIDE NEIgHBORHOOD OVERLAY ZONE
Sub-Zones
MUN - Mixed-Use Node
IND - Industrial
WCR - Western Ave. Corridor Residential
LCR - Lincoln Way Corridor Residential
RN - Residential Neighborhood
Colfax District
Olive Cultural District
4. lincoln way
west
4.1 corridor PlAn And
strAtegies
Lincoln Way West composes a secti on of the
fi rst transconti nental highway in the United
States. The Lincoln Highway linked Times Square
in New York City to Lincoln Park in San Francisco
and is the fi rst nati onal memorial to President
Lincoln.
Both ends of Lincoln Way West are anchored by
major regional assets. The west end is anchored
by South Bend Internati onal Airport and the
east end is anchored by Downtown South
Bend and the Riverside Drive, Chapin Park,
and West Washington historic districts. These
two powerful anchors should be the driving
elements for the corresponding Sheridan Node
and the MLK Node. In between these two nodes
there are three major cross streets and one
potenti al cross-path where nodes have already
developed. A series of nodes, rather than a
conti nuous strip, is a more desirable patt ern of
development because it can create pedestri-
an-friendly desti nati ons with unique identi ti es
that have the greatest chance of competi ng
in the regional marketplace. Fortunately, in
contrast to Western Avenue, Lincoln Way gen-
erally already follows this development patt ern.
However, it is evident that there is some erosion
to this clear patt ern as some homes between
nodes have been adapted to commercial use. A
shortage of commercial space is not the driver
for this conversion given that there are several
vacant buildings along the corridor. This change
should be halted before these changes negati ve-
ly impact the corridor.
Sheridan Node
Bendix Node
Lincoln Way Corridor Plan
55
The character of Lincoln Way West has histor-
ically been a tree-lined, residenti al street with
houses set far back from the street and retail
nodes at major intersecti ons. The plan for
Lincoln Way West is to reinforce the historic
patt ern of residenti al with retail nodes. The
primary diff erence is that the new residenti al
coming to Lincoln Way West should be slightly
higher density, such as townhomes or small
(ex. four-unit) manor home apartments and
condominiums.
Following are general strategies followed by a
descripti on of the individual nodes, including
the proposed pilot project.
Re-stripe/Reconfi gure Lincoln Way West
The enti re length of Lincoln Way West is to be
re-striped to include a center turn lane, one
lane of traffi c in each directi on, bike lanes,
and on-street parking. The bike lanes should
be painted green using volunteers, such as
residents and bicycle clubs. This is discussed in
more detail in “Streets, Bicycles, and Buses.”
The enti re length is to be planted with street
trees on both sides of the street. Trees should
be planted at about 40’ spacing. This would be
approximately 600 trees. This is discussed in
more detail in “Sidewalks and Street Trees.”
Areas Between Nodes
As discussed above, it is important to support
and enhance the existi ng nodes. It is equally
important to ensure that development does not
creep into the zones that are, and should be,
predominately residenti al between the nodes.
Where current uses are consistent with policy,
the existi ng zoning should be enforced and
changes of zoning to individual parcels should
not be permitt ed. In additi on, the zoning should
create incenti ves to change from commercial
use to residenti al use by providing the incenti ve
of a higher density residenti al use.
Diamond Avenue
Take advantage of the recently completed street
and streetscape improvements along Diamond
Avenue between Lincoln Way West and Portage
Avenue. Developing a program to help residents
rehabilitate houses along that street can be
a great demonstrati on of how the rest of the
neighborhood can look in ti me.
Olive Node
Wilber Node
MLK Node
Pilot Project Colfax District
LEGEND
Residential Areas Along Corridors
Residential Priority Areas for Redevelopment
Historic Neighborhoods
56
WEST SIDE MAIN STREETS REVITALIZATION PLAN
In order to adequately compete in the regional economy and to avoid
competing with other nodes along Lincoln Way and Western Avenue, each
node should have a unique identity and focus that is also supported by the
marketplace. Following is a discussion of each node:
MLk NODE
The MLK node is centered at the intersection of Lincoln Way and Dr. Mar-
tin Luther King, Jr. Boulevard (MLK) and extends east towards downtown
and west to Allen Street within a newly designated Colfax District. This
area is characterized by several historic era buildings with storefronts that
face the street. While some suburban style development has crept into
the area, there are still many older intact buildings. “Behind” Lincoln Way,
4.2 lincoln wAy nodes
to both the north and the south, there is a high number of vacant lots and
homes.
Within the Colfax District, a section of the MLK Node and a section of the
neighborhoods to the north and south has been selected as pilot projects
to illustrate implementation tools and patterns that can be applied to the
other nodes and neighborhoods. The MLK Node has been selected be-
cause of its location adjacent to Downtown and the historic districts, the
high number of vacant lots, the planned work to create the roundabout,
and the potential to create a significant, visible, and replicable revitaliza-
tion. The elements of this district include the following:
Illustration of MLK Node
574. LincoLn Way WestRoundabout
The strategy here is to create a roundabout at the intersection of Lincoln
Way West and Dr. Martin Luther King Jr. Drive. This accomplishes two ma-
jor goals; it creates a monumental gateway for the corridor and urbanizes
the currently oversized intersection. As the roundabout is implemented,
incentives should be created to connect the Chapin Park Historic District
to the north with the West Washington Historic District to the south. Once
the “eastern front” is established, a westward thrust for revitalization
should be easier.
Corners of Roundabout
The lots surrounding the roundabout are key elements in the image that is
created for the pilot project. Each quadrant is discussed below:
Northwest Corner of Roundabout
The lots north of Lincoln Way, south of Marion Street, east of Scott
Street, and west of MLK should be acquired. In addition, Marion
between Scott Street and Leland Avenue should be removed and
incorporated into the new parcel to the south of Marion Street for
new development.
Southwest Corner of Roundabout
The existing building should have the side façade facing the street
converted into a more attractive façade with windows to animate
the street. Alternatively, the building could be acquired for redevel-
opment.
Southeast Corner of Roundabout
In order to define the edge of the circle a colonnade should be
designed to follow the sidewalk and provide benches for seating and
viewing of the new memorial to be placed in the roundabout.
Northeast Corner of Roundabout
This lot should be acquired for new development
Illustrative Plan of Roundabout
58
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Lincoln Way Residential
The residential market study highlights a need for rental housing. The
vacant/infill parcels along Lincoln Way provide a great opportunity to
provide this type of housing at a higher density and will support the pilot
project efforts. Implementation tools discussed later will likely be required
to implement.
Streetscape - Road Configuration and Sidewalks
The street should be designed as much for the pedestrian and cyclist as
for the car. The current lane configuration will be changed to demarcate a
center turn lane, one driving lane in each direction, bike lanes, and on-
street parking on both sides of the street. Painted crosswalks and street
trees will also contribute to the walkable character (discussed in further
detail in a subsequent section).
The sidewalks should be designed to provide a gracious pedestrian
experience that can accommodate walking, seating, outdoor dining, and
landscaping (discussed in further detail in a subsequent section).
Multi-Family Residential Buildings Precedent Residential Streetscape Precedent
594. LincoLn Way WestColfax Triangle
A gathering place can create a strong identity for a community while
bringing activity and “life” to a street. While the roundabout creates a
civic anchor to the east, a new community open space to the west along
Lincoln Way is created called the Colfax Triangle. This space is created by
closing a section of Harrison Avenue south of Lincoln Way and extending
the existing space in front of the Colfax building to the west. The Colfax
Triangle creates a new and highly visible common space for the commu-
nity that should be designed to accommodate both daily and seasonal
activities. Water is a great draw to public spaces and a water feature, such
as a splash fountain, is recommended for this space.
Parking
The existing parcel sizes along this section of the corridor are small. While
a small building increment can produce a lively and varied architectural
streetscape, it most often means that parking is limited and contributes
to the lack of viability of commercial establishments. As noted, the streets
will be re-striped to provide on-street parking. In addition, making use of
the vacant lots behind the commercial lots can help address this limiting
factor through conversion to parking that is City owned and serves the
corridor commercial uses. It is recommended that this parking be signed
with a time limit to help in driving sales and to ensure that the spaces are
used for the commercial rather than adjacent residential.
Colfax Triangle Illustrative Site Plan Precedent of Parking Located Behind Buildings
Colfax
Cultural
Center
60
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Vacant Residential Lots
Behind the commercial lots there are many vacant parcels and homes,
Rather than a weakness, this is a strength, since it allows for easier con-
solidation of land into single-entity ownership which can more easily be
developed by the private sector. The diagram below illustrates targeted
areas for lot acquisition and consolidation in the residential areas sur-
rounding Lincoln Way, and a smaller boundary illustrating the first phase
for redevelopment. It is also recommended that some of the consolidated
lots be turned into neighborhood green spaces - Cottage Grove Square,
Harrison Square, and Sherman Square can be privately owned and man-
aged. Existing homes to remain should be rehabilitated. Given the proxim-
ity to the historic districts, it is also important that the new architecture be
reflective of the historic styles found in those neighborhoods.
Tactical Urbanism
Even seemingly small interventions can have a somewhat significant
expense and can take time to coordinate. Tactical Urbanism relies on grass
roots efforts and person-power (community, neighborhood organizations,
clubs, individuals, etc.) to implement inexpensive, creative, and temporary
interventions that improve neighborhoods and foster activity. Some
Tactical Urbanism approaches here may include street painting, temporary
parks and seating, interactive installations, and locations for vendors and
food trucks. A diagram illustrating the possible interventions follows.
Pilot Project Diagram Tactical Urbanism Precedent - Outdoor Seating
614. LincoLn Way WestLEGEND
Street Pavement Painting
Temporary Bus Stop Seating
Food Trucks Location
Pop-Up Park - May include an outdoor
reading room, seating areas, sand
areas, and games such as chess, twister
or connect 4
Tactical Urbanism Diagram Outdoor Games Precedent
Street Painting PrecedentOutdoor Chess Precedent
62
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Memorial/Historic Art
Memorial/Historic Art can act as a landmark
and can provide a strong identity to a commu-
nity. The new roundabout provides a significant
opportunity for this type of feature. Given the
historic nature of Lincoln Way, the memorial
could reflect a significant historical event or
person, such as President Lincoln or Dr. Martin
Luther King, Jr. This memorial would also act as
a gateway to Downtown and as a link between
historic districts.
Statue Precedent
Interactive Art - Fountain Precedent
Interactive Art - Bench Precedent Interactive Art - Playground Precedent
634. LincoLn Way WestMural Precedent
Enhanced Boarded-Up Buildings - Precedent
Blank Facades
Blank walls with few windows that are exposed
to view along Lincoln Way contribute to a
feeling of vacancy and unfriendliness. Buildings
at street corners should be redesigned as a front
facade and incorporate windows and entries.
As a temporary solution, or for buildings not
located at street corners, the blank side facades
can be painted with murals, or even tasteful
advertisements, to provide color, a pedestrian
scale, and visual interest along the corridor.
These locations also provide opportunities
to work with local university art programs to
implement these efforts.
Boarded-Up Buildings Along Lincoln Way
There are existing commercial buildings that
are currently being used as residential. Some
have boarded up windows and doors - In these
conditions, boarded up windows and doors
should not be permitted.
Vacant buildings with boarded up windows
or doors should have the temporary panels
painted to look like occupied facades to convey
a sense of care and upkeep.
64
WEST SIDE MAIN STREETS REVITALIZATION PLAN
MLK NODE PILOT PROJECTS
The MLK Node has been selected as a Pilot
Project area due to its proximity to downtown,
proximity to two historic districts, opportunity
to consolidate parcels due to high vacancy,
existi ng retail buildings, and proximity to several
civic buildings along Lincoln Way.
The adjacent concept plan illustrates a potenti al
multi -phase redevelopment scenario with three
disti nct parts:
1. Pilot Project Phase 1 – Residenti al Pro-
gram (5-Year Timeline) North of Lincoln
Way
2. Pilot Project Phase 2 – Colfax Triangle/
Retail Buildings/Required Parking
3. Phase 3 - Follow-on Residenti al Program
Pilot Projects
Boundary
Colfax Triangle
LEGEND
Residential Areas Along Corridors
Residential Priority Areas for Redevelopment
MLK Node
654. lincoln wAy westWater Feature Precedent
Small Scale Retail Street Precedent
Phase 1
Phase 2
Phase 3 Sherman AveHarrison AveCottage Grove AveLindsay St
Fuerbringer St
Van Buren St
Allen StLincol
n
W
a
y
66
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Pilot Project Phase 1 – Residential Program North of Lincoln Way
While a new proposed roundabout at the intersection of Lincoln Way and
MLK anchors the east end of the node, the Phase 1 Pilot Project seeks to
transform an area of high vacancy into a residential anchor for the west
end of the MLK Node. This transformation focuses on the provision of
multi-family, townhouses, infill single-family, and rehabilitation of existing
homes. The creation of interspersed and integrated open space provides
multiple focus points for the neighborhood and new desirable amenities
for new and existing residents. The market study completed by Zimmer-
man Volk Associates estimates demand and proposes a residential pro-
gram for the first five years for the West Side that includes 128 multi-fam-
ily rental units, 24 multi-family for-sale units, 36 townhouses, and 36
single-family homes. Approximately half of the residential program is
proposed for the Western Avenue Corridor and half for the Lincoln Way
Corridor. A retail study undertaken by Gibbs Planning Group estimates a
demand of 64,000 SF of retail and 5,000 SF of office. The illustrative plans
below illustrates how an area with high vacancy can be transformed into a
desirable neighborhood concept that:
1. Makes use of high vacancy areas to create a catalytic project.
2. Reinforces the creation of the MLK Node with higher density
residential along Lincoln Way.
3. Consolidates parcels to allow for realistic development projects.
4. Reconfigures blocks to accommodate multi-family and its required
parking.
5. Creates open spaces for uses such as tot-lots, seating, etc. that are
desirable residential amenities.
6. Along with Phase 2 and 3, creates a defined zone of public and
private investment.LEGEND
Proposed Buildings
Existing Buildings
PHASE 1 PROGRAM
New Retail: 6,000 sf
Townhouses: 27 Units
Apartments: 84 Units
Single Family D.: 37 Units
Lincoln
W
a
ySherman AveHarrison AveCottage Grove AveAllen StLindsay St
Van Buren St
Church
Church
Harrison
Square
Sherman Square
674. lincoln wAy westPilot Project Phase 2 – Colfax Triangle/Retail Buildings/Required Parking
The Phase 2 Pilot Project seeks to capitalize on the existi ng historic
Colfax Cultural Center building and create an expanded open space for
community gathering. This new Colfax Triangle is linked to a rich heritage
represented by the Colfax building, yet looks to the future with new retail
buildings that will serve to defi ne and acti vate this new space. The new
Triangle is made possible through the closing of a porti on of Harrison
Avenue while the acquisiti on of several lots makes possible new retail
buildings and their required parking. Colfax Triangle is envisioned to pre-
serve the existi ng large trees, create a new fl exible paved space that can
accommodate various uses, and a small water feature that is a signifi cant
draw for both patrons and residents.
Plaza Precedent
Lincol
n
W
a
y
Sherman AveAllen StHarrison AveCottage Grove AveSherman Square
Colfax
Triangle
LEGEND
Proposed Buildings
Existing Buildings
PHASE 2 PROGRAM
New Retail: 22,200 sf
68
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Phase 3 - Follow-on Residential Program
In concert with South Bend Mutual Homes who is seeking to develop 24
new infill homes south of Lincoln Way, the illustrative plan depicts how
both new townhomes and single-family infill and rehab can be integrated
into the neighborhood to support the MLK Node.
Park Precedent Sherman AveAllen StHarrison AveOak St
Lincol
n
W
a
y
Cottage Grove AveLEGEND
Proposed Buildings
Existing Buildings
PHASE 3 PROGRAM
Townhouses: 33 Units
Single Family D: 5 Units
694. LincoLn Way WestPilot Projects Implementation Tasks
1. Corridor/Pilot Project Head Identi-
fication
2. Zoning Changes
3. Corridor Road Striping
a. Typical Street Sections
b. Intersection Striping Designs
c. Striping
d. Community Painting of Bike
Lanes
4. North Side of Lincoln Way
a. Property Acquisition for
Multi-Family
b. Develop and Issue RFP for
Consolidated Parcels
5. Sherman Square
a. Property Acquisition for Square
b. Design
c. Construction
6. Single-Family North of Lincoln Way
a. Property Acquisition
b. Develop and Issue RFP for
Consolidated Parcels
7. Roundabout
a. Property Acquisition
b. Design
c. Construction
8. Streetscape/Sidewalks/Curbs
a. Design
b. Construction
9. Memorial
a. Procure Funding
b. Design
c. Construction
10. Marketing
a. Brand and Create a Marketing
Strategy
11. Financing and Coordination
a. Create a Business Owners
Association
b. Create a TIF and other tools to
assist in financing
c. Consider Creating a BID (Busi-
ness Improvement District)
Retail Streetscape Precedent
70
WEST SIDE MAIN STREETS REVITALIZATION PLAN
WILBER NODE
This node is possibly the most complex and, at
the same ti me, may have the most potenti al.
Key elements of this node include the aban-
doned railroad line (potenti al to become part
of the city’s network of trails), an underuti lized
historic brewery, additi onal retail buildings
along Lincoln Way, several blocks of small-scale
industrial uses south of Lincoln Way, and the
nearby Holy Cross Church and School. As with
most historic corridors, the depth of parcels are
shallow and are a limiti ng factor for revitaliza-
ti on because it limits the potenti al parking. The
depth of the industrial parcels provides more
feasible development parcels. In additi on, two
blocks could be combined to create a larger
development parcel (for example, the blocks
north and south of Rupel Street between Col-
lege Street and Wilber Street, or the two blocks
east and west of College Street between Lincoln
Way and Rupel Street). Development here
should capitalize on the presence of the future
recreati onal path and could be a good locati on
for a bike shop. The locati on of the recreati onal
path will require special treatment in the street
design, and must have a well-marked crosswalk
and a traffi c signal or HAWK beacon.
Wilber Node Plan
Pedestrian Plaza Precedent
Outdoor Dining on Pedestrian Plaza
Proposed Plaza
Proposed
Recreational Path
LEGEND
Wilber Node
Residential
714. LincoLn Way WestOLIVE NODE
This node is important because of its north to
south connection to the rest of the city via Olive
Street. Historically, this has been, and should
continue to be, a retail node. The present
character of the retail is partially suburban
and partially urban, but it should transition
over time to a traditional urban character. The
existing suburban retail/commercial uses along
Lincoln Way West should provide landscaping
(a hedge and shade trees along the sidewalk) to
screen parking lots while retaining visibility for
the existing suburban retail uses.
Olive Node Plan
Outdoor Dining Precedent
Retail Street Precedent Retail Street Precedent
LEGEND
Olive Node
Residential
72
WEST SIDE MAIN STREETS REVITALIZATION PLAN
BENDIx NODE
At the Bendix Drive/Lincoln Way intersecti on,
the character of Lincoln Way approaching from
the east begins to change from traditi onal
urban to suburban. The street changes from a
residenti al/small retail format to a residenti al/
industrial format. First and foremost, a stronger
streetscape with street trees on both Lincoln
Way West and Bendix Drive will help defi ne
both streets. The large industrial parcels should
have an evergreen buff er planted around the
perimeter so that the large parking areas,
SHERIDAN NODE
The Sheridan Node extends west from the
intersecti on of Sheridan Street and Lincoln Way
towards the airport. As one would expect, the
close proximity to the airport has led to the
development of airport related uses, such as ho-
tels. Airport related uses should be encouraged
in this area, but the form of the development
should transiti on to a more urban character
where building fronts line the street and parking
is located to the rear where it is not visible from
the street.
Sheridan Node
Surface Parking Landscape Precedent
LEGEND
Sheridan Node
Bendix Node
Residential
Sheridan and Bendix Node Plan
734. lincoln wAy westservice areas, etc. are screened from the street.
The existi ng suburban retail/commercial along
Lincoln Way should provide landscaping along
the streetscape to screen parking lots. A hedge
and shade trees will screen the asphalt and cars
while retaining visibility for the existi ng subur-
ban retail uses.
The triangle between Lincoln Way, Bendix
Drive and Ardmore Trail can be thought of as a
future neighborhood center. Building upon the
walkability of the homes and senior apartments
in the neighborhood, convenience retail and
doctor’s offi ces may be established in the
triangle as the new Bendix/Ardmore center. This
would also be a convenient walk from the new
center to the library. The plan also recommends
looking at incorporati ng the southern porti on of
LaSalle Square into the industrial land south of
Prast Boulevard and connecti ng it to the former
Bendix factory group, which in turn, will put
many new acres into close proximity of the ma-
jor rail lines. Minor street adjustments on Prast
Boulevard and Westmoor Street can add to the
industrial footprint adjacent to the railroads. If
this comes to pass, appropriate buff ers along
Ardmore Trail and Sheridan Street would need
to be established.
Trading the existi ng urban agricultural land in
this sector for large, job-producing land could
be a strategic trade-off , provided the urban agri-
cultural land is replaced acre-for-acre elsewhere
in the neighborhood (another potenti al area for
urban agriculture is the Olive Cultural District
that has signifi cant vacant land).
Bendix Node
74
WEST SIDE MAIN STREETS REVITALIZATION PLAN
4.3 streets, bicycles, And buses
Traffic and Turn Lanes
The general traffic pattern changes the two lanes of traffic in
each direction to a center turn lane and one lane of traffic in
each direction. This configuration is more efficient in moving
traffic since turns occur from a turn lane resulting in less
“friction” since traffic does not have to stop to accommodate
left hand turns. Since actual pavement width varies, the lane
widths may also vary, but, in general, lanes are changed from
the existing 12’ wide State highway width to a more appropri-
ate 11’ urban width.
STREETS AND BICYCLES
Great places have great streets; they are an important part of the
public realm and the daily lives of residents, and they feel comfort-
able and safe for pedestrians. As is the case with Western Avenue,
in its previous life as a State highway (with higher traffic counts than
exist today) the Lincoln Way street width was generally composed of
two traffic lanes in each direction with shoulders and no on-street
parking. Given the lower traffic volumes, a significant opportunity
exists to reconfigure the streets to support the needs of the commu-
nity.
Changing street widths can be a very expensive undertaking as it
also involves moving related infrastructure. As such, the premise
for the reconfiguration of Lincoln Way starts with the idea that the
actual width of the street should not have to change, except in a se-
lect few locations, but that the configuration (lanes) can be changed
to meet both traffic needs and to support commercial properties
while creating a pedestrian-friendly environment. The general lane
configuration is discussed below.
Snow is a large impediment to the use of bike lanes and sidewalks.
The City can plow the bike lanes as it clears the streets and should
consider plowing the sidewalks along Lincoln Way (this is important
as Transpo changes from a flag system to fixed bus stops).
Street Diagram
754. LincoLn Way West On-Street Parking
The existing small and shallow lots limit the amount of park-
ing that can be provided for retail and other commercial uses.
The proposed provision of on-street parking helps to support
retailers to make them more viable enterprises. It also creates
a barrier between the car and bike traffic and the sidewalk to
create a public realm/sidewalk that feels more protected and
safe.
Bike Lanes
Cycling has great health benefits, is an economical method of
transportation, and also boosts retail sales. Bicycle and bicycle
parking studies have shown a boost in retail sales when bike
lanes are present.
a. With the exception of Lincoln Way west of Bendix Drive,
bike lanes along Lincoln Way are on-street and the goal is
to provide a bike lane on each side of the street between
the traffic lane and the on-street parking. Where dimen-
sion permits, a 2’ buffer between the bike lane and the
traffic lane is provided to provide a safer environment.
b. West of the study area, an off-street recreational path
exists on the south side of the street. As a transition to
the on-street bike lanes along Lincoln Way, the section
west of Bendix Drive is configured with a cycletrack (two-
way protected bike lanes on one side of the street).
c. Painted bike lanes provide a visual cue for drivers and
pedestrians leading to greater awareness, especially at
intersections. In addition, the perceived width/expanse of
paving of the overall road feels more narrow, leading to
traffic calming. This type of painting can be expensive, but
painting of the bike lane can also be a great community
building event where bike advocacy groups, residents,
and business owners get together over a few weekends to
paint the lanes block by block.
Street with On-Street Parking
76
WEST SIDE MAIN STREETS REVITALIZATION PLAN
STREET SECTIONS
The street sections illustrated on the following
pages represent the reconfiguration of lanes
within the existing curbs only. For a description
of streetscapes (zone from the curb to the face
of buildings), see “West Side Neighborhood
Overlay Zone: Colfax District & Olive Cultural
District.”
774. LincoLn Way WestExisting: Between Maplewood Avenue and Bendix Drive
Existing: Between Bendix Drive and Meade Street
Existing: Between Meade Street and William Street
78
WEST SIDE MAIN STREETS REVITALIZATION PLAN
existing section A - between mAPlewood AVenue And bendix driVe (looking west)
*All dimensions are approximate
794. LincoLn Way WestProPosed section A - between mAPlewood AVenue And bendix driVe (looking west)
*All dimensions are approximate
80
WEST SIDE MAIN STREETS REVITALIZATION PLAN
existing section b - between bendix driVe And meAde street (looking west)
*All dimensions are approximate
814. LincoLn Way WestProPosed section b - between bendix driVe And meAde street (looking west)
*All dimensions are approximate
82
WEST SIDE MAIN STREETS REVITALIZATION PLAN
existing section c - between meAde street And williAm street (looking west)
*All dimensions are approximate
834. LincoLn Way WestProPosed section c - between meAde street And williAm street (looking west)
*All dimensions are approximate
84
WEST SIDE MAIN STREETS REVITALIZATION PLAN
STREETSCAPES/SIDEWALkS
1. Urban Mixed-Use Areas/Nodes
a. Sidewalk should extend from the curb to the face of the retail building
b. Street trees should be planted at regular spacing along the curb in tree pits and spaced no
more than 40’ apart and no less than 30’ apart
c. Where existing dimensions do not permit tree pits in the sidewalk, tree planting islands
with a street tree should be provided in the on-street parking zone between parking
spaces
d. Large shade tree species should be selected
e. Ornamental pedestrian scale street lighting should be provided
Urban Mixed-Use Streetscape Precedent Urban Mixed-Use Streetscape Precedent
854. LincoLn Way West2. Suburban Retail Areas/Node (Interim Improvements)
a. A continuous tree planting strip should occur along the edge
of the curb with a 6’ minimum width, but a 12’ – 15’ width is
preferred. The remaining dimension to the right-of-way line
should be grass (except sidewalks), but a low evergreen hedge
should occur along the right-of-way line to provide screening of
parking pavement and cars, but still provide visibility to retail
buildings.
b. Street trees should be planted at regular spacing centered in
the tree planting strip spaced no more than 40’ apart and no
less than 30’ apart.
c. Large shade tree species should be selected
d. A 5’ minimum width sidewalk should be provided along the
outside edge of the tree planting strip
3. Lincoln Way Residential Areas (Outside of Nodes)
a. The existing tree planting strip should remain and should be
planted with regularly spaced street trees centered in the tree
planting strip spaced no more than 40’ apart and no less than
30’ apart
b. Large shade tree species should be selected
Suburban Retail Streetscape Precedent Residential Streetscape Precedent
86
WEST SIDE MAIN STREETS REVITALIZATION PLAN
STREETSCAPE/SIDEWALk TYPE LOCATION PLAN
874. LincoLn Way WestLEGEND
Urban Mixed-Use Areas/Nodes
Suburban Retail Areas
(Interim Improvements)
Lincoln Way Residential Areas
(Outside of Nodes)
88
WEST SIDE MAIN STREETS REVITALIZATION PLAN
BUSES
In addition to providing transportation options,
transit also helps to support retail and other
uses by bringing people to a central location.
The greatest benefits are seen from fixed
transit, such at streetcars, since the stations are
fixed and investments can be made with relative
assurance that there will not be a change in
the foreseeable future. Non-fixed transit, such
as buses, can still aid in supporting uses, but
works best when stops are more permanent
in nature. Hubs, crossing route locations, and
fixed shelters provide more assured long term
commitment to transit stops in a particular
location. Zoning should reflect this investment
and commitment with corresponding land use
policy (uses and density). Bus stops and shelters
should support the West Side Corridors Plan
policies. Based on the most recent Transpo bus
stop and shelter plan, recommendations for
adjustments are shown on the accompanying
plan.
Designated Stop Map Provided by Transpo
894. LincoLn Way WestLEGEND
Transpo Proposed Inbound Bus Stop
Transpo Proposed Outbound Bus Stop
Recommended Shelter
5. western
Avenue
5.1 corridor PlAn And
strAtegies
Western Avenue represents the American
phenomenon of the strip retail and industrial
corridor at the edge of most American citi es.
It is also a representati on of the various eras
in American history. The east end closest to
Downtown is characterized by historic buildings,
the middle is characterized by older buildings
set close to the street in a traditi onal urban
character, but has been eroded by parking
lots, then transiti ons to post-1940s suburban
strip development with parking lots lining the
street. To the north and south of the corridor
are primarily single-family residenti al neighbor-
hoods. The east and central neighborhoods
suff er from signifi cant disinvestment and high
vacancy while the western neighborhoods are
more stable, but are threatened by creeping
instability. The east end of Western Avenue is
anchored by the south end of Downtown, Four
Winds Field at Coveleski Stadium, and the new
Kroc Community Center, while the west end is
composed of the Belleville strip retail center
with a vacant big-box, as well as truck focused
industrial buildings. Demographically, what used
to be primarily Polish and African American
neighborhoods has transiti oned into Lati no and
African American neighborhoods.
Unlike Lincoln Way West with its nodes sepa-
rated by residenti al uses, the enti re length of
the corridor is composed of undiff erenti ated
Olive Cultural
District
Belleville Place Node
Western Avenue Corridor Plan
91
commercial. As noted previously, a node versus
conti nuous strip development patt ern is the
most desirable patt ern of development because
it can create pedestrian-friendly desti nati ons
with unique identi ti es that have the greatest
chance of competi ng in the regional market-
place. One of the primary recommendati ons
for this corridor is to transiti on to a node-based
patt ern of development to support a healthy
retail environment. As a result of the Norfolk
Southern Railroad tracks that divide the north
from the south, there are only three streets
that make a direct connecti on to Lincoln Way
– Mayfl ower Road, Olive Street, and Dr. Marti n
Luther King Jr. Drive/Chapin Street. Building on
these traffi c patt erns, existi ng businesses, and
existi ng parcels, three key nodes are proposed
to focus revitalizati on eff orts and to promote a
patt ern of development that will bett er support
both retail and community needs. These nodes
are Belleville Place, Olive Cultural District, and
the Near West Arts and Design District. These
are described in more detail below:
Olive Cultural District Node
Pilot Projects
Near West Arts and
Design District Node
LEGEND
Residential Areas Along Corridors
Residential Priority Areas for Redevelopment
92
WEST SIDE MAIN STREETS REVITALIZATION PLAN
OLIVE CULTURAL NODE
Centrally located along Western Avenue, a newly defined Olive Cultural
District has been defined with the Olive Cultural Node which has the
potential to be a primary gathering place not only for the surrounding
residential neighborhoods, but also for the City and the region. Histori-
cally, the roots of this area have been strong African American and Polish
5.2 western AVenue nodes
communities. More recently, a Latino community has grown and added
to the cultural diversity of the area. This rich cultural diversity is an asset
to the City and provides an opportunity to leverage these characteristics
into a cultural destination. Unique restaurants and retail that celebrate
this diverse heritage should be encouraged and a gathering place should
be created where community events, both large and small, can take place.
The following pages contain both general principles and an illustrative
concept plan with potential phasing.
Illustration of Olive Cultural District Node
935. Western AvenueLiberty Square
Generally located in the central portion of this district, a new square is
created. While the LaSalle Park extension provides green fields and active
recreational opportunities, this square provides opportunities for activities
such as outdoor markets, splash fountain, small outdoor music perfor-
mances, etc. The uses of the surrounding buildings are very important to
ensure an active gathering space. Retail and restaurant/food establish-
ments are the uses that best activate these types of spaces. As a result, it
is important to ensure that the surrounding parcels are developed with
the appropriate uses. Use is not enough, though, and the configuration
of the surrounding uses must be urban/pedestrian-friendly where active
storefronts face the streets and squares and the parking is located to the
rear where it is not visible. The character of the architecture is also critical
in making a pedestrian-friendly environment and can also be designed to
support the cultural focus of the district.
West End – LaSalle Park Extension and Memorial Place
The west end of this district is anchored by an expanded LaSalle Park
which extends to Western Avenue. This extension provides new active
recreation fields and courts and a site for future indoor recreation. These
fields create a draw that brings users to support the District. The west end
is further defined through the creation of a memorial ellipse/median. This
provides for the opportunity to memorialize a person or event and also
creates a sense of arrival and identity while providing traffic calming.
LaSalle Park Expansion Diagram Liberty Square Illustrative Plan
94
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Olive Street Gateway
The east end of the Cultural District occurs at the intersection of Olive
Street and Western Avenue. This intersection is currently known for its
traffic problems, in particular with truck traffic and turning movements.
This intersection should be addressed to create a safe environment. Strat-
egies to solve this problem could include a) enforcing no-truck traffic rules;
b) reconfiguring the intersection to have larger curb-return-radii; or c)
creating a roundabout. This location also offers the opportunity to create
a gateway that spans Western Avenue. Examples of gateways include La
Villita in Chicago and Chinatown in Chicago. These types of features aid in
defining and providing a unique identity and sense of arrival.
Streetscape - Road Configuration and Sidewalks
The street should be designed as much for the pedestrian and cyclist as for
the car. The currently un-striped street will be striped to demarcate driving
lanes, bike lanes, and on-street parking lanes on both sides of the street,
sidewalks, painted crosswalks, and street trees (discussed in further detail
in a subsequent section).
The sidewalks should be designed to provide a gracious pedestrian
experience that can accommodate walking, seating, outdoor dining, and
landscaping (discussed in further detail in a subsequent section).
Gateway Precedent Retail Street Precedent
955. western AVenueParking
The existi ng parcel sizes along this secti on of the corridor are small. While
a small building increment can produce a lively and varied architectural
streetscape, it most oft en means that parking is limited and contributes
to the lack of viability of commercial establishments. As noted, the streets
will be re-striped to provide on-street parking. In additi on, making use of
the vacant lots behind the commercial lots can help address this limiti ng
factor through conversion to parking that is City owned and serves the
corridor commercial uses. It is recommended that this parking be signed
for limited ti me use since this will help to drive sales and ensure that
spaces are used for the commercial rather than adjacent residenti al uses.
Vacant Residenti al Lots
Behind the commercial lots there are many vacant parcels and homes,
parti cularly on the north side of this District. These vacant parcels repre-
sent not only an opportunity to address parking needs as noted previously,
but also opportuniti es to stabilize the existi ng neighborhoods with addi-
ti onal new residenti al and/or rehabilitated residenti al. It is important to
acquire and consolidate lots to make redevelopment more feasible.
Vacant parcels also provide an opportunity for urban agriculture, whether
as an interim or permanent use.
Parking Location Illustrative Plan High Vacancy Diagram
Retail Parking
Retail Parking
Retail Parking
Retail Parking
Retail Parking
Residential Parking
Residential
Parking
96
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Mural Precedent
Enhanced Boarded-Up Buildings - Precedents
Blank Facades
Blank walls with few windows that are exposed
to view along Western Avenue contribute to a
feeling of vacancy and unfriendliness. Buildings
at street corners should be redesigned as a front
facade and incorporate windows and entries.
As a temporary solution, or for buildings not
located at street corners, the blank side facades
can be painted with murals, or even tasteful
advertisements, to provide color, a pedestrian
scale, and visual interest along the corridor.
These locations also provide opportunities
to work with local university art programs to
implement these efforts.
Boarded-Up Buildings Along Western Avenue
There are existing commercial buildings that
are currently being used as residential. Some
have boarded up windows and doors. In these
conditions, boarded up windows and doors
should not be permitted.
Vacant buildings with boarded up windows
or doors should have the temporary panels
painted to look like occupied facades to convey
a sense of care and upkeep.
975. Western AvenueArt
Art can be a key element adding a sense of fun,
creativity, and identity to an area. Creating a
pedestrian environment adjacent to the new
square is important and this can be reinforced
through an artistic treatment of the street
surface along the edges of the square. This
could be as simple as a painted surface in the
short term, but changing to a more permanent
condition with pavers at a later date. The art
should be reflective of the surrounding culture
and community and could even be imple-
mented by the residents and business owners
themselves through a community activity.
Other methods of incorporating art throughout
the corridor should be explored. For example,
the Notre Dame Art School could be used to
contribute ideas, designs, and opportunities for
implementation by the students.
Interactive Art - Bus Shelter Precedent
Interactive Art - Playground Precedent
Sculpture PrecedentSculpture Precedent
Interactive Art - Fountain Precedent
98
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Tactical Urbanism
Even seemingly small interventions can have a
somewhat significant expense and can take time
to coordinate. Tactical Urbanism relies on grass
roots efforts and person-power (community,
neighborhood organizations, clubs, individuals,
etc.) to implement inexpensive, creative, and
temporary interventions that improve neighbor-
hoods and foster activity.
LEGEND
Street Pavement Painting
Dining Decks (Optional)
Food Trucks Location
Pop-Up Park - May include an outdoor
reading room, seating areas, sanded
areas and games such as chess, twister
or connect 4
Tactical Urbanism Diagram
Outdoor Dining in Parking Lane Precedent Outdoor Reading Room Precedent Street Painting Precedent
995. Western AvenueOutdoor Game Precedent Outdoor Seating Precedent
Food Truck PrecedentTactical Urbanism Precedent - Sand on the Streets
100
WEST SIDE MAIN STREETS REVITALIZATION PLAN
OLIVE CULTURAL DISTRICT NODE PILOT PROJECTS
The Western Avenue Cultural District has
been selected as a Pilot Project area due to its
central locati on in the corridor, opportunity to
consolidate parcels due to high vacancy, existi ng
unique businesses that are a City and regional
draw, and proximity to recreati onal opportuni-
ti es.
The adjacent concept plan illustrates a potenti al
multi -phase redevelopment scenario with four
disti nct parts:
1. Pilot Project Phase 1 - Liberty Square/
Retail Buildings/Required Parking
2. Pilot Project Phase 2 - Residenti al Pro-
gram (5-Year Timeline)
3. Phase 3 – Parti al LaSalle Park Expansion
4. Phase 4 - Follow-on Residenti al Program
Pilot Projects
Boundary
Liberty Square
Olive Cul-
tural District
Boundary
LEGEND
Residential Areas Along Corridors
Residential Priority Areas for Redevelopment
Olive Cultural District Node
Urban
Agriculture
Memorial Place
New Active
Recreation Park
1015. Western AvenuePilot Project Phase 1 Liberty Square/Retail
Buildings/Required Parking
The Phase 1 Pilot Project seeks to create
a strong identity, a gathering place for the
community, and a highly visible project that
illustrates what is to come. The acquisition of
a few lots would permit the creation of Liberty
Square, retail buildings to define and activate
it, and associated required parking to support
the retail. This pilot project would also include
artwork in the form of extended paving
patterns, or paint, into the street which will
provide a sense of arrival and traffic calming
while traveling along Western Avenue.
Liberty Square
+/- 102
Spaces Bendix Dr.Western Avenue
Church
Jefferson Boulevard
Liberty StreetCamden StDundee StKentucky StIowa StLEGEND
Proposed Buildings
PHASE 1 PROGRAM
Retail: 20,200 sf
Office: 8,700 sf
102
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Pilot Project Phase 2 - Residential Program
(5-Year Timeline)
As summarized earlier in this document, a
market study completed by Zimmerman Volk
Associates estimates demand and proposes a
residential program for the first five years for
the West Side that includes 128 multi-family
rental units, 24 multi-family for-sale units,
36 townhouses, and 36 single-family homes.
Approximately half of the residential program is
proposed for the Western Avenue Corridor and
half for the Lincoln Way Corridor. A retail study
undertaken by Gibbs Planning Group estimates
a demand of 64,000 SF of retail and 5,000 SF of
office. The illustrative plans below illustrate how
an area with high vacancy can be transformed
into a desirable neighborhood concept that:
1. Accommodates a market-based program
2. Makes use of high vacancy areas to
create a catalytic project.
3. Reinforces the creation of the Olive
Cultural District Node with an intensity of
uses at the core.
4. Provides necessary parking to support
uses along Western Avenue.
5. Consolidates parcels to allow for realistic
New Neighbor-
hood Square
Western Avenue
Church
Jefferson Boulevard
Liberty StreetBendix Dr.Dundee St+/- 115 Spaces
+/- 68 Spaces +/- 48
Spaces
development projects.
6. Reconfigures blocks to accommodate
multi-family and its required parking.
7. Creates open spaces for uses such as
tot-lots, seating, etc. that are desirable
residential amenities.
8. Along with Phase 1,3, and 4 creates
a defined zone of public and private
investment.
LEGEND
Proposed Buildings
Existing Buildings
PHASE 2 PROGRAM
New Retail: 20,400 sf
Townhouses: 18 Units
Apartments: 72 Units
1035. Western AvenuePhase 3 - Partial LaSalle Park Expansion
As a first step towards creating the proposed
LaSalle Park expansion, one neighborhood block
can be targeted for a partial implementation
that will define the edge of the Olive Cultural
District Node, provide needed active recre-
ational fields/courts, and provide an additional
amenity for future redevelopment.
Saints
Mem.
Church
of God in
Christ Bendix Dr.Western Avenue
Jefferson Boulevard
Liberty StreetDundee StKentucky StIowa StLEGEND
Proposed Buildings
Existing Buildings
PHASE 3 PROGRAM
1 Retail or Picnic Pavilion
1 Soccer Field
2 Basketball Courts
1 Playground
104
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Phase 4 - Follow-on Residential Program
As a natural extension of Phase 1, 2, and 3, this
Phase builds on prior investments and com-
pletes a focused zone of redevelopment that
additionally supports the creation of the Olive
Node and brings more residents to support the
retail along Western Avenue.
Memorial
Place Western Avenue
Saints
Mem.
Church
of God in
Christ
Jefferson Boulevard
Liberty StreetBendix Dr.Dundee StKentucky StIowa StLEGEND
Proposed Buildings
Existing Buildings
PHASE 4 PROGRAM
New Retail: 40,500 sf
Single Family : 9 Units
Townhouses: 62 Units
1055. Western AvenuePilot Project Implementation Tasks
1. Corridor/Pilot Project Head Identifi-
cation
2. Zoning Changes
3. LaSalle Park Expansion
a. Property Acquisition
b. Memorial Ellipse Coordination/
Agreement with Schools
c. Western Avenue Ellipse and
Recreational Field Design
d. Memorial Subject Determina-
tion
e. Construction
4. Square
a. Property Acquisition for Square,
New Buildings, Parking
b. Design
c. Reach Out to University for Art
Components
d. Construction
5. Corridor Road Striping
a. Typical Street Sections
b. Intersection Striping Designs
c. Striping
d. Community Painting of Bike
Lanes
6. Residential Neighborhood North
of Western Avenue and South of
LaSalle Park
a. Identify Blocks to be Cleared
and Blocks to be In-filled
b. Identify Public Parking Lot
Locations
c. Property Acquisition
d. Design Parking Lots
e. Construct Parking Lots
f. Develop and Issue RFP for
Consolidated Parcels
7. Western Avenue and Olive Street
Intersection
a. Assess Intersection Problems
b. Design Intersection
c. Property Acquisition, if Required
d. Define Source of Gateway
Funding
e. Gateway Design
f. Gateway Construction
8. Streetscape/Sidewalks/Curbs
a. Design
b. Construction
9. Art
a. Identify Art Coordinator
b. Explore Relationship with
University
c. Identify Potential Art Projects/
Arts Master Plan
10. Marketing
a. Brand and Create a Marketing
Strategy
b. Create a “Taste of Western
Avenue” Event
c. Host a Local and Regional Soccer
Championship with the new
Soccer Fields
11. Financing and Coordination
a. Create a Business Owners
Association
b. Create/Expand a TIF to assist in
financing
c. Consider creating a BID (Busi-
ness Improvement District)
106
WEST SIDE MAIN STREETS REVITALIZATION PLAN
BELLEVILLE PLACE NODE
The Belleville Place Node is composed of
the largest parcels anywhere along Western
Avenue. These properties are occupied by large
conventional retail centers and industrial sites.
The retail centers on the south side of Western
Avenue are composed of a vacant K-Mart site,
Belleville Center, Kroger grocery, and a gas
station. The north side of Western Avenue
is composed of industrial sites, the Martin’s
anchored retail center, and additional stand-
alone retail. Because of the small size of most
lots along Western Avenue, they are difficult
to redevelop. As a result, the large size of the
lots in the Belleville Place Node offer the most
potential for a significant redevelopment or
revitalization project.
As noted earlier, the strip retail center model
is no longer the most competitive retail model.
The adjacent site plan illustrates how the
existing structures could be retained, additional
structures added, and a green space/gathering
space created to create a destination that better
attracts users. The Belleville Center parcel has
excess land available that accommodates this
new gathering space lined with new retail build-
ings, while providing adequate parking for both
new and existing buildings. Additional pad sites
along Western Avenue are available and can be
used to screen the large parking fields from the
Western Avenue view. The existing facades of
the Belleville Center can also be upgraded to
play a role in the creation of the green space/
gathering space.
Belleville Place Illustrative Plan
1075. western AVenueNEAR WEST ARTS AND DESIgN DISTRICT NODE
As a transiti on to Downtown South Bend, the
Near West Arts and Design District anchors the
east end of Western Avenue, but its locati on
north of the railroad tracks means that it is a
part of the neighborhood just west of Down-
town and shares many of the historical charac-
teristi cs of this area. Building on this character
and the potenti ally lower rents, these types of
areas can be a natural fi t for anti que vendors
who seek out lower rent areas with historic ar-
chitecture. This also lends itself to design shops
such as furniture and other types of designers.
Creati ng and marketi ng a design and anti ques
district leverages the neighborhood strengths
since these types of shops do best when they
are consolidated together where patrons are
seeking to go to more than one store. There
does not appear to be this type of district in
the region, so this could fi ll that gap. The large
number of historic era buildings, as well as its
proximity to the Studebaker Nati onal Museum,
Northern Indiana Center for History, and
Downtown should be recognized and marketed
as a single desti nati on.
Since art is a principal focus of this district, art
projects should be an important component of
the streetscape. Currently, the viaduct is seen
as a liability to the neighborhood, but the train
bridge and the new open space created by
the new exit ramps provides a large canvas to
transform this liability into an iconic element.
Western Avenue and Chapin Street is a key
intersecti on in the City and acts as a gateway to
Downtown to the east, the West Washington
Historic District to the north, and Western Ave-
nue to the west. Much like the proposed round-
about at Lincoln Way and Dr. Marti n Luther King
Jr. Drive, this intersecti on could be designed
with a roundabout to mark this important
intersecti on (and reinforce the connecti on of Dr.
Marti n Luther King Jr. Drive/Chapin Street from
Lincoln Way to Western Avenue, with its archi-
tectural richness). In conjuncti on with this inter-
secti on, the undeveloped sites on the northwest
corner of the intersecti on of Western Avenue
and Chapin Street provides an opportunity for
new development that leverages the proximity
to the several ameniti es across the street and in
the area. Multi -family development with retail
on the ground fl oor may be a good opti on for
this site or else another insti tuti onal building
with a citywide or regional draw. Any new
development in this district should be designed
with a walkable urban character that is sensiti ve
to the architectural history of the area. Parking
should be located behind buildings and acti ve
facades with windows should face the street.
Existi ng parking lots lining the streets should
be bett er screened while providing visibility.
Strategies include planti ng a low hedge along
the property line with “street trees” or building
a low brick knee wall/pier/fence combinati on.
Near West Arts and Design District Plan
Proposed Plaza
Proposed
Recreational Path LEGEND
Arts and Design District
108
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Traffic and Turn Lanes
The general traffic pattern changes from the one-to-two
lanes of traffic in each direction to a center turn lane and one
lane of traffic in each direction. This configuration is more
efficient in moving traffic since turns occur from a turn lane,
resulting in less “friction” since traffic does not have to stop to
accommodate left-hand turns. Since actual pavement width
varies, the lane widths may also vary, but, in general, lanes are
changed from the existing 12’ wide State highway width to a
more appropriate 11’ width.
5.3 streets, bicycles, And buses
STREETS AND BICYCLES
Great places have great streets. Streets are an important part of
the public realm and the daily lives of residents, and they must be
designed to feel comfortable and safe for pedestrians. Due to its
previous life as a State highway with higher traffic counts than exist
today, the Western Avenue corridor has sections of varied width and
character; beginning as a four-lane (two lanes in each direction) di-
vided highway at the western boundary of South Bend, transitioning
through a variety of commercial, industrial, and residential frontag-
es, and maneuvering under a railroad overpass. Now, as a local city
street with lower traffic volumes, Western Avenue lacks lane striping
and is well-recognized as being very confusing for drivers. Given the
lower traffic volumes, a significant opportunity exists to reconfigure
the streets to support the needs of the community.
Changing street widths can be a very expensive undertaking as it
also involves moving related infrastructure. As such, the premise for
the reconfiguration of Western Avenue starts with the idea that the
actual width of the street should not have to change, except in a se-
lect few locations, but that the configuration (lanes) can be changed
to meet both traffic needs and to support commercial properties
while creating a pedestrian-friendly environment. The general lane
configuration is discussed below.
Snow is a large impediment to the use of bike lanes and sidewalks.
The City can plow the bike lanes as it clears the streets and should
consider plowing the sidewalks along Western Avenue (this is
important as Transpo changes from a flag system to fixed bus stops).Street Diagram
1095. Western Avenue Bike Lanes
As noted previously, cycling has great health benefits, is an
economical method of transportation, and also boosts retail
sales. Bicycle and bicycle parking studies have shown a boost
in retail sales when bike lanes are present.
a. Bike lanes along Western Avenue are on-street and the
goal is to provide a bike lane on each side of the street
between the traffic lane and the on-street parking.
Where dimension permits, a 2’ buffer between the bike
lane and the traffic lane is provided to provide a safer
environment. Along the suburban sections of road with
no on-street parking, a protected bike lane should be
provided (ex. collapsible bollards or raised curb). Along
two segments of Western Avenue there is insufficient di-
mension for a dedicated bike lane, and in those segments,
a sharrow is proposed (a shared car and bike lane that
is wider than typical and that has a shared lane marking
painted in the lane).
b. Painted bike lanes provide a visual cue for drivers and
pedestrians leading to greater awareness, especially at
intersections. In addition, the perceived width/expanse
of paving of the overall road feels more narrow leading to
traffic calming. This type of painting can be expensive, but
painting of the bike lane can also be a great community
building event where bike advocacy groups, residents,
and business owners get together over a few weekends to
paint the lanes block by block.
On-Street Parking
The existing small and shallow lots limit the amount of parking
that can be provided for retail and other commercial uses.
The proposed provision of on-street parking helps to support
retailers to make them more viable enterprises. It also creates
a barrier between the car and bike traffic and the sidewalk to
create a public realm/sidewalk that feels more protected and
safe.
Retail Street with On-Street Parking Precedent
110
WEST SIDE MAIN STREETS REVITALIZATION PLAN
STREET SECTIONS
The street sections illustrated on the following
pages represent the reconfiguration of lanes
within the existing curbs only. For a description
of streetscapes (zone from the curb to the face
of buildings), see “West Side Neighborhood
Overlay Zone: Colfax District & Olive Cultural
District.”
1115. Western AvenueExisting Between Summit Drive and Lombardy Drive
Existing Between Sheridan Street and Olive Street
Existing Between Maple Street and Chapin Street
112
WEST SIDE MAIN STREETS REVITALIZATION PLAN
existing section A - between mAyflower roAd And summit driVe (looking west)
*All dimensions are approximate
1135. Western AvenueProPosed section A (short term) - between mAyflower roAd And summit driVe (looking west)
*All dimensions are approximate
114
WEST SIDE MAIN STREETS REVITALIZATION PLAN
existing section A - between mAyflower roAd And summit driVe (looking west)
*All dimensions are approximate
1155. Western AvenueProPosed section A (long term) - between mAyflower roAd And summit driVe (looking west)
*All dimensions are approximate
116
WEST SIDE MAIN STREETS REVITALIZATION PLAN
existing section b - between summit driVe And lombArdy driVe (looking west)ProPosed section b (short term) - between summit driVe And lombArdy driVe (looking west)
*All dimensions are approximate *All dimensions are approximate
1175. Western AvenueProPosed section b (long term) - between summit driVe And lombArdy driVe (looking west)
*All dimensions are approximate
118
WEST SIDE MAIN STREETS REVITALIZATION PLAN
existing section c - between lombArdy driVe And sheridAn street (looking west)ProPosed section c - between lombArdy driVe And sheridAn street (looking west)
*All dimensions are approximate *All dimensions are approximate
1195. Western Avenueexisting section d - between sheridAn street And oliVe street (looking west)ProPosed section d - between sheridAn street And oliVe street (looking west)
*All dimensions are approximate *All dimensions are approximate
120
WEST SIDE MAIN STREETS REVITALIZATION PLAN
existing section e - between oliVe street And kosciuZsko street (looking west)ProPosed section e - between oliVe street And kosciusZko street (looking west)
*All dimensions are approximate *All dimensions are approximate
1215. Western Avenueexisting section f - between kosciusZko street And mAPle street (looking west)ProPosed section f - between kosciusZko street And mAPle street (looking west)
*All dimensions are approximate *All dimensions are approximate
122
WEST SIDE MAIN STREETS REVITALIZATION PLAN
existing section g - between mAPle street And chAPin street (looking west)ProPosed section g - between mAPle street And chAPin street (looking west)
*All dimensions are approximate *All dimensions are approximate
1235. Western Avenueexisting section h - between chAPin street And williAm street (looking west)ProPosed section g - between chAPin street And williAm street (looking west)
*All dimensions are approximate *All dimensions are approximate
124
WEST SIDE MAIN STREETS REVITALIZATION PLAN
STREETSCAPES/SIDEWALkS
1. Urban Mixed-Use Areas/Nodes
a. Sidewalk should extend from the curb to the face of the retail building
b. Street trees should be planted at regular spacing along the curb in tree pits and spaced no
more than 40’ apart and no less than 30’ apart
c. Where existing dimensions do not permit tree pits in the sidewalk, tree planting islands
with street trees should be provided in the on-street parking zone between parking spaces
d. Large shade tree species should be selected
e. Ornamental pedestrian scale street lighting should be provided
Urban Mixed-Use Streetscape Precedent
1255. Western Avenue2. Suburban Retail Areas/Node (Interim Improvements)
a. A continuous tree planting strip should occur along the edge
of the curb with a 6’ minimum width, but a 12’ – 15’ width is
preferred. The remaining dimension to the right-of-way line,
except sidewalk, should be grass, but a low evergreen hedge
should occur along the right-of-way line to provide screening of
parking pavement and cars, but still provide visibility to retail
buildings.
b. Street trees should be planted at regular spacing centered in
the tree planting strip spaced no more than 40’ apart and no
less than 30’ apart
c. Large shade tree species should be selected
d. A 5’ minimum width sidewalk should be provided along the
outside edge of the tree planting strip
3. Western Avenue Residential Areas (Outside of Nodes)
a. A continuous tree planting strip should occur along the edge
of the curb with a 6’ minimum width, but a 12’ – 15’ width is
preferred, as permitted by right-of-way
b. Street trees should be planted at regular spacing centered in
the tree planting strip spaced no more than 40’ apart and no
less than 30’ apart
c. Large shade tree species should be selected
d. A 5’ minimum width sidewalk, or paving from tree planting strip
to face of buildings should be provided along the outside edge
of the tree planting strip
Suburban Retail Streetscape Precedent Residential Streetscape Precedent
126
WEST SIDE MAIN STREETS REVITALIZATION PLAN
STREETSCAPE TYPE LOCATION PLAN
1275. western AVenueLEGEND
Urban Mixed-Use Areas/Nodes
Suburban Retail Areas
(Interim Improvements)
Western Avenue Residential
Areas (Outside of Nodes)
Urban Mixed-Use Areas/Nodes
128
WEST SIDE MAIN STREETS REVITALIZATION PLAN
BUSES
In addition to providing transportation options,
transit also helps to support retail and other
uses by bringing people to a central location.
The greatest benefits are seen from fixed
transit, such as streetcars, since the stations are
fixed and investments can be made with relative
assurance that there will not be a change in
the foreseeable future. Non-fixed transit, such
as buses, can still aid in supporting uses, but
works best when stops are more permanent
in nature. Hubs, crossing route locations, and
fixed shelters provide more assured long term
commitment to transit stops in a particular
location. Zoning should reflect this investment
and commitment with corresponding land use
policy (uses and density). Bus stops and shelters
should support the West Side Corridors Plan
policies. Based on the most recent Transpo bus
stop and shelter plan, recommendations for
adjustments are shown on the accompanying
plan.
Designated Stop Map Provided by Transpo
1295. Western AvenueLEGEND
Transpo Proposed Inbound Bus Stop
Transpo Proposed Outbound Bus Stop
Transpo Proposed Bus Shelter
Recommended Additional Bus Shelter
6. implemen-
tation tools
and matrix
6.1 imPlementAtion tools
As evidenced by the last 50 years, the revi-
talization of the West Side Corridors, and the
West Side in its entirety, is challenging. Imple-
mentation tools are required to make many
of the recommendations possible. Below is a
list of already available implementation tools,
existing programs that are recommended to be
extended/made available in the Study Area or
Pilot Project areas, and potential new strategies.
A complete list of Economic Development tools
is contained in the “Economic Development
Services Portfolio” published by the City of
South Bend.
Create/Expand Redevelopment Area
One of the first steps should be the
undertaking of a study and determination
of blight with an accompanying City
designation of a redevelopment area to
focus City resources and programs. A TIF
allocation area is typically tied to desig-
nated Redevelopment Areas.
Potential New Programs
Focused and Extended Land Consolida-
tion
The scattered nature of vacant homes
and vacant parcels makes inefficient
use of infrastructure and accompanying
maintenance dollars, it deters investment,
it makes it difficult to implement a project
large enough to change perceptions,
and is a deterrent to private investment
dollars. Land consolidation will require
acquiring contiguous parcels through
purchase or relocation, as well as holding
properties over sufficient time to create a
consolidated contiguous area for redevel-
opment.
Employer Assisted Housing - Institutional
Development District
Downtown institutions have the ability
to become a catalyst for development/
redevelopment in close proximity to
their facilities. Multiple institutions could
create a district in close proximity to their
facilities where the institutions would
own, rent, or subsidize the ownership of
housing for their staff. This would provide
a convenient location for employees while
improving the areas immediately adjacent
to the institution. Importantly, it would
also communicate to potential investors
and homeowners that their individual
investments in this district are supported
by a larger strategy and that their invest-
ment is likely to be a stable or profitable
one. A revolving fund could be established
by institutions to provide low-cost financ-
ing allowing for a positive cash flow and a
guaranteed continuation of the program.
Employer Assisted Housing - Police,
Firefighter, and City Employee Subsidies
Building on what has been done in other
jurisdictions, targeted areas could be de-
fined where police, firefighters, or other
City employees would receive a subsidy,
1316. ImplementatIon tools and matrIxthrough a higher salary or other means, to
live in a targeted area.
Business Related Programs
TIF (Tax Increment Financing)
A TIF in the commercial/mixed-use areas
is a manner in which funds can be raised
to implement specific recommendations.
Tax Abatement
Tax abatement is a “carrot” which can
attract either new development or
improvements that has a real financial
benefit to the private sector without
requiring a cash outlay by the City.
Urban Enterprise Zone Tax Credits
Various tax credits which reduce the
amount of tax to be paid are available for
qualified businesses.
Facade Grants/Building Enhancement
Grants
It is recommended that the Building
Enhancement Grants program be extend-
ed to the Western Avenue and Lincoln
Way nodes.
Brownfield Redevelopment Grants
The City can provide assistance with
identifying and defining the scope of
remediation and pursuing grants.
Small Business Development
This includes advisory services at the
North Central Indiana Small Business
Development Center, small business
loans (SBA 504) for expansion assistance
through investment in equipment or real
estate, as well as consultation services to
find grants, financing, and networking.
Residential Programs
Tax Abatement for New Housing Con-
struction
Tax abatement is a “carrot” which can
attract either new development or
improvements that has a real financial
benefit to the private sector without
requiring a cash outlay by the City.
Low Income Housing Tax Credit
In order to reduce the debt a developer
would otherwise have to borrow, tax
credits are awarded to developers of
affordable rental housing who then sell
the credits to investors.
Community Development Block Grant
CDBG can be used for housing acquisition,
rehabilitation, demolition, and new
construction.
Development Subsidies
Providing subsidies to developers can
bridge the financial feasibility gap so that
a private developer can implement the
proposed vision.
Individual Rental Subsidies
Individual rental subsidies should be
focused on scattered sites so that there is
not an undue concentration of poverty. If
the community development corporations
could manage the rentals and a significant
number of Section 8 vouchers are distrib-
uted throughout the new rental housing
in a scattered-site format, then we can be-
gin to have the best of both worlds: rental
housing managed by a caring company
and rental housing that can bridge a very
wide range of incomes.
Downpayment Assistance/Mortgage
Assistance/Forgivable Second Mortgage
These incentives are available through the
Community Homebuyers Corporation.
Individual Homeownership Subsidies
For selected boundaries where the City
will have consolidated vacant land and
homes, the City could establish a revolv-
ing fund to subsidize these homes, such as
through a low-cost financing program that
would allow for a positive cash flow and a
guaranteed continuation of the program.
Housing Rehabilitation Assistance
The South Bend Improvement Program
and Rebuilding Together are programs
available for low to moderate income
households.
132
WEST SIDE MAIN STREETS REVITALIZATION PLAN
6.2 strAtegic imPlementAtion mAtrix
West Side
Task Lead Role Potential
Partners 1‐Year 2‐3 Years 4‐5 Years Estimated Cost Potential Funding
Source
1 Establish and Select West Side Corridors Manager DCI ●N/A N/A
2 Implement Zoning Changes That Support West Side Corridors Plan DCI, APC Bldg ●$150,000 Civil City
3 Address Crime Through Additional Programs SBPD DCI ●N/A Civil City
4 Create Magnet Schools Priority Attendance Zones for Qualifying Students Living in the
Study Area SBCSC ●N/A N/A
5 Coordinate Bus Shelter Locations to Coincide with West Side Corridors Plan DCI,
Transpo DPW ●$25,000/Shelter Civil City
6 Acquire and Consolidate Vacant Parcels/Homes to Create Larger Development Parcels
That Will Attract New Home Developers, Recreational Needs, and Urban Agriculture DCI
CDCs,
Developers,
Parks
●●●$2,000 ‐
$40,000/parcel
TIF/Civil City/
Private
7 Expand City Cemetery DCI Parks ●●N/A Civil City/Parks
8 Consolidate Properties Along Tracks to Meet Needs of New Industrial Tenants to Leverage
Proximity to Rail in Order to Bring New Jobs to the Area (South of Tracks)Developers DCI ●N/A TIF/Civil City/
Private
9 Create Spur Trail Recreational Path Linking the St. Joseph River at Angela Boulevard North
of Downtown to The Western Avenue Arts and Design District DCI,DPW Parks ●●$3,000,000 TIF/Federal (Trans
Altern)
10 Expand City Cemetery, Provide Improved Visibility, Provide Distinguished Entry, and
Reduce Number of Vacant Parcels (North of Tracks)DCI Parks ●●●N/A Civil City/Parks
11 Enhance and Connect the Historic Neighborhoods and Create the “Near Downtown West
District” (North of Tracks)DCI ●N/A N/A
12 Differentiate Between North of Tracks and South of Tracks, as well as Between the Lincoln
Way and Western Avenue Corridors DCI ●N/A N/A
13 Create Destinations and Focus Retail into Nodes Rather than Strip Development (North
and South of Tracks)APC ●●●N/A N/A
APC = Area Plan Commission of St. Joseph County
Bldg = City of South Bend Building Department
CDC = Community Development Corporation
DPW = City of South Bend Department of Public Works
SBPD = South Bend Police Department
SBCSC = South Bend Community School Corporation
DCI = City of South Bend Department of Community Investment
Parks = City of South Bend Department of Parks & Recreation
1336. ImplementatIon tools and matrIxIllustration of MLK Node
134
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Lincoln Way and Pilot Projects
Task Lead Role Potential Partners 1‐Year 2‐3 Years 4‐5 Years Estimated Cost Potential Funding Source
1 Lincoln Way and MLK Roundabout DCI, DPW ●●$3,500,000 Civil City/TIF
o Design
o Property Acquisition
o Funding
o Construction
2 Corridor Road, Bicycle, and Parking Striping DCI, DPW Bicycle Advocacy Groups ●$950,000 Civil City
o Typical Street Sections
o Intersection Striping Designs
o Striping
o Community Painting of Bike Lanes
3 Implement Roundabout Memorial/Art DCI Arts Organizations ●$250,000 Civil City/Private
o Identify Coordinator
o Design and Design Approval
o Manufacture and Install
4 Residential Neighborhood North of Lincoln Way DCI Developers/ CDCs ●
$2,000 ‐
$40,000/parcel
acquisition
Civil City/TIF/Private
o Identify Blocks to be Cleared and Blocks to be In‐filled
o Property Acquisition
o Develop and Issue RFP for Consolidated Residential Parcels
5 Create Sherman Square and Harrison Square DCI, Developers CDCs ●$500,000 Civil City/Private
o Property Acquisition
o Design
o Construction
1356. ImplementatIon tools and matrIxLincoln Way West and Pilot Project
Task Lead Role Potential Partners 1‐Year 2‐3 Years 4‐5 Years Estimated Cost Potential Funding Source
6 Create Colfax Triangle DCI Developers/ CDCs ●$2,000,000 TIF/Civil City/Private
o Property Acquisition
o Street Vacation/Turnaround South of Colfax Triangle
o Design
o Construction
7 Financing and Coordination DCI, Corridor Businesses ●●N/A N/A
o Create a Business Owners Association
o Realign TIF to assist in financing
o Consider Creating a BID (Business Improvement District)
8 Marketing
DCI, Business
Organizations, CDCs,
Neighborhood
Organizations
●$25,000 TIF/Civil City/Private
o Create and Brand a Marketing Strategy
APC = Area Plan Commission of St. Joseph County
Bldg = City of South Bend Building Department
CDC = Community Development Corporation
DPW = City of South Bend Department of Public Works
SBPD = South Bend Police Department
SBCSC = South Bend Community School Corporation
DCI = City of South Bend Department of Community Investment
136
WEST SIDE MAIN STREETS REVITALIZATION PLAN
Western Avenue and Pilot Projects
Task Lead Role Potential Partners 1‐Year 2‐3 Years 4‐5 Years Estimated Cost Potential Funding
Source
1 Corridor Road, Bicycle, and Parking Striping DCI, DPW ●$1,400,000 TIF
o Typical Street Sections
o Intersection Striping Designs
o Striping & Trees
o Curbs, Sidewalks, Lighting
o Community Painting of Bike Lanes
2 Financing and Coordination DCI, Corridor
Businesses ●●N/A N/A
o Create a Business Owners Association
o Realign TIF to assist in financing
o Consider Creating a BID (Business Improvement District)
3 Create Near West Arts and Design District/Connect to West Washington Historic District DCI ●N/A N/A
4 Residential Neighborhood North of Western and South of LaSalle Park DCI, DPW Developers ●●
$2,000 ‐ $40,000/
parcel acquisition,
$1,000,000 parking
lots
TIF/Civil
City/Private
o Identify Blocks to be Cleared and Blocks to be In‐filled
o Identify City Parking Lot Locations
o Property Acquisition and Street Vacation
o Design Parking Lots
o Construct Parking Lots
o Develop and Issue RFP for Consolidated Parcels
5 Create LaSalle Park Extension DCI, Parks DPW ●●●$1,200,000 Civil City/Parks
o Property Acquisition
o Memorial Ellipse Coordination/Agreement with Schools (not part of pilot project)
o Memorial Subject Determination
o Construction
6 Create Liberty Square DCI
Developers, DPW,
Arts Organizations
and Programs
●$1,500,000 (excludes
new buildings)Civil City/TIF
o Property Acquisition for Square, New Buildings, Parking
o Design
o Reach Out to University for Art Components
o Curbs, Sidewalks, Lighting
o Construction
(pilot project is 1/4 of recreational fields)
o Develop and Issue RFP for Adjoining Commercial/Mixed‐Use Components
o Western Avenue Ellipse and Recreational Field Design
1376. ImplementatIon tools and matrIxWestern Avenue and Pilot Project
Task Lead Role Potential Partners 1‐Year 2‐3 Years 4‐5 Years Estimated Cost Potential Funding
Source
7 Western Avenue and Olive Intersection DPW DCI ●●N/A TIF/Federal/Private
o Assess Intersection Problems
o Design Intersection
o Property Acquisition, if Required
o Define Source of Gateway Funding
o Gateway Design
o Gateway Construction
8 Implement Art Program for Near West Arts and Design District and Cultural District DCI, Arts
Organizations ●$200,000 Civil City/Private
o Identify Art Coordinator
o Explore Relationships with Local Universities
o Identify Potential Art Projects/Arts Master Plan
9 Marketing
DCI, CDCs, Business
Organizations,
Neighborhood
Organizations
●$25,000 TIF/Civil City/
Private
o Create and Brand a Marketing Strategy
o Create a “Taste of Western Avenue” Event
o Host a Local and Regional Soccer Championship with the new Active Recreation Fields
APC = Area Plan Commission of St. Joseph County
Bldg = City of South Bend Building Department
CDC = Community Development Corporation
DPW = City of South Bend Department of Public Works
SBPD = South Bend Police Department
SBCSC = South Bend Community School Corporation
DCI = City of South Bend Department of Community Investment