Loading...
HomeMy WebLinkAboutAmendment No 1 to PSA - SRTS Muessel & Holy Cross Proj No. 122-006 – The Troyer Group ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS April 23, 2024 Mr. Stephan M. Summers The Troyer Group 3930 Edison Lakes Pkwy. Mishawaka, IN 46545 ssummers@troyergroup.com RE: Amendment No. 1 to Professional Services Agreement Dear Mr. Summers: At its April 23, 2024 meeting, the Board of Public Works approved the above referenced amendment for additional engineering services for the Safe Routes to School Muessel Primary & Holy Cross School Area, Project No. 122-006 in an amount not to exceed $41,500; with a total cost of $230,000: eligible for 80% reimbursement from INDOT with a 20% local match of $8,300. Enclosed please find a copy of the amendment for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh 22031-00 February 13, 2024 Gemma Stanton, Project Engineer 227 W. Jefferson Blvd South Bend, IN 46601 gstanton@southbendin.gov RE: RFP Safe Routes to School PE Services Des. No.: 1900447 Muessel Primary & Holy Cross School Area Amendment No. 1 Dear Ms. Stanton: The Troyer Group (TTG) hereby presents amendment #1 to the City of South Bend for the Safe Routes to School project near the Muessel Primary and Holy Cross Schools neighborhood. We understand that this project is replacement of sidewalks and handicap accessible ramps within the neighborhood. The primary focus being on the primary routes to and from the schools. The sidewalks that will be replaced will be with 5-foot-wide sidewalks from back of existing sidewalks towards the existing curb line. Additional crosswalk striping and signage may be included. The current sidewalks and ADA ramps are not in compliance with current standards. The project is needed to provide a safe route for students walking to and from Muessel Primary and Holy Cross Schools. The preliminary cost estimate of $1,625,000 for Construction has been reduced to $1,315,938 per Macog’s direction. The project’s letting has been moved into FY-2025. Ms. Gemma Stanton February 13, 2024 The project scope has been set at the Preliminary Field Check. The additional scoped areas include additional curb ramps, sidewalks, curb and gutters and, storm water structures. The Project Development Process and Review Submittals will be prepared in accordance with IDM 14-2.03 Road Plans, Partial 3R Project. Field Survey: Additional topographic survey will be performed in the additional areas as discussed during the Preliminary Field Check. Environmental Document: Section 106 Documentation pursuant to Minor Projects Programmatic Agreement (MPPA) Section 1. The project will remain a CE-1, if project elements affect the level, they will be removed from the project unless authorized by the city of South Bend. Construction Storm Water General Permit: It is anticipated that ~1.86 acres of disturbance are needed for the reconstruction of the sidewalks and curb ramps. Due to the disturbance exceeding one acre a Construction Storm Water General Permit will be required. We understand that the project will be a partial 3R project in accordance with IDM 40 and will follow the Resurfacing, Non-Freeway Project Development Process. Based on our experience with projects of similar size and scope and our discussions with your office the following milestones will be included in the scope of work. • Project Assessment • Field Survey • Utility Coordination • Stage 1 Review Submission • Preliminary Field Check Meeting • Stage 3 Review Submission (INDOT for Time Set) • Tracings • CIB Review • Bid Phase Services • Pre-Construction Conference • Construction Phase Office Services Ms. Gemma Stanton February 13, 2024 The attached man-hour justification (Exhibit A) provides more definition for the amended scope of services as a result of the Preliminary Field Check. Work, including by not limited to, improvements to facilities outside the scope of design services as defined by the projects Engineering Assessment, environmental documentation beyond the assumed level, etc. is considered supplemental and will be performed on the negotiated hourly rates as referenced in the Billing Rate Table in Exhibit A. Additional services maybe requested for additional Stage 3, Final Tracings, Bid Phase and Office of Construction Administration Services if these phases exceed the agreed to services via time and material versus lump sum fees. These fees shall be requested in advance of the corresponding services exceeding the lump sum amounts with the provided justification herein. Field Survey* $39,700 $15,600 $55,300 Design and Plan Development, SWGP $117,900 $15,700 $133,600 NEPA Document Preparation $11,200 $0 $11,200 Cultural Resource Investigation* $5,500 $0 $5,500 Utility Coordination $13,200 $0 $13,200 Section 106, MPPA Section 1* $0 $8,200 $8,200 Office Construction Administration $1,000 $2,000 $3,000 * Work completed by a Sub-Consultant, see attached proposals for each category It is our understanding that the project’s letting date has moved into Fiscal Year 2025. $41,500 $230,000 Ms. Gemma Stanton February 13, 2024 We appreciate and look forward to the opportunity of working together with the City of South Bend. Sincerely, ________________________________ _____________________________ Jonathon Geels Stephan M. Summers President Executive Director of Transportation April 23, 2024 City of South Bend - Muessel/Holy Cross Sidewalks Manhour Justification for Design-Bid-Build Project Sidewalk/Curb Ramp Design TTG Project # 22031-00 WORK ITEM Senior Project Manager Executive Director of Transportation Civil Engineer Project Manager Civil Project Engineer Civil Engineering Assoc. Clerical Landscape Architect Total Labor Labor Code A T P 5 6 EM L Allowable Billing Rate $128.21 $123.14 $102.57 $87.99 $75.08 $45.75 $117.13 Scope Analysis Project Management 0 Quarterly Reports 0 Field Reconnaissance 0 Assemble findings 0 Meet with Schools, including preparation 0 Assemble initial report 0 Exhibits 0 QA/QC 0 Address Comments 0 Submit Assessment to the City 0 Meet with City of South Bend 0 Mark-Ups from mtg w/ City - Final Report 0 Man Hours Subtotal 0 0 0 0 0 0 0 0 Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 Labor Cost $0 $0 $0 $0 $0 $0 $0 $0 Storm Water General Permit (SWGP) Coordination 1 2 2 5 Project Map 1 1 Narrative 3 3 Project Location Elements (Proposed improvements, utilities, etc)2 2 Building Locations within project limits 2 2 Land use adjacent to project areas 2 2 Existing Vegetation (Identify/Delineate)2 2 Location/Name of all wetlands, lakes, water courses 2 2 100 year floodplains, floodway fringes, and floodways 1 1 Soils Information 1 1 Existing and planned contours 8 8 Location where off-site drainage will enter the project area 6 6 Location of specific points where stormwater discharge will leave site 6 6 Identify all receiving waters 1 1 Potential areas where stormwater may enter groundwater 2 2 Location of stormwater system 3 3 Location and approximate dimensions of disturbed areas 3 3 Monitoring and maintenance guidelines (INDOT Standard Specs)1 1 Temporary Seeding Standard Specifications retrieval 0 Temporary erosion and sediment control measures 2 1 3 Permanent erosion and sediment control measures 2 1 3 Storm drain inlet protection 4 4 Storm drain outlet protection 4 4 NOI Form 2 2 QC / QA 4 2 6 MS4 Submittal (Electronic Only)2 INDOT Submittal NOI Approval 1 NOS Approval 1 Final Assembly of Rule 5 (Application, NOI, NOS)1 2 Man Hours Subtotal 1 11 66 2 0 0 0 80 Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 Labor Cost $128 $1,355 $6,770 $176 $0 $0 $0 $8,428 Preliminary Field Check Project Management 0 Field Check Notification 0 Attendance and preparation 0 Meeting Minutes 0 Resolution to Field Check Comments 0 Man Hours Subtotal 0 0 0 0 0 0 0 0 Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 Labor Cost $0 $0 $0 $0 $0 $0 $0 $0 Stage 3 Submission Project Management 16 16 Quarterly Reports 12 12 Review Stage 1 Comments 0 Conformance 0 Typical Sections 0 Curb Ramp Design 0 Sidewalk Design 0 Plan Sheets 0 Title Sheet 0 Index and General Notes Sheet 0 Pedestrian MOT 0 Plan Sheets 0 Appendix A1 Detail Sheets 0 Approach Table 0 Structure Data Table 0 Quantities 0 Cost Estimate 0 Level One Checklist and Design Computations 0 Certification 0 Special Provisions - Recurring and USP 0 Special Provisions - Submit to INDOT Sharepoint 0 INDOT All Project Commitments Report 0 Contract Preparation Document 0 Environmental Consultation Form 0 Traffic Control Plan Checklist 0 QC / QA 0 INDOT Submittal 0 Man Hours Subtotal 0 28 0 0 0 0 0 28 Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 Labor Cost $0 $3,448 $0 $0 $0 $0 $0 $3,448 Tracings Project Management 12 12 Quarterly Reports 8 8 Review Stage 3 comments 0 Curb Ramp Design 0 Sidewalk Design 0 Plan Sheets 0 Title Sheet 0 Index and General Notes Sheet 0 Pedestrian MOT 0 Plan Sheets 0 Detail Sheets 0 Approach Table 0 Structure Data Table 0 Coordination w/ INDOT RR (Certification)0 R/W Cert Coordination (City & INDOT)0 Conformance Documents 0 Quantities 0 Cost Estimate 0 Special Provisions - Recurring and USP 0 Tracing Checklist 0 QC / QA 0 INDOT Submittal 0 INDOT CIB Review 0 Man Hours Subtotal 0 20 0 0 0 0 0 20 Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 Labor Cost $0 $2,463 $0 $0 $0 $0 $0 $2,463 Bid Phase Services Answering Contractor Questions 2 12 14 Man Hours Subtotal 0 2 0 12 0 0 0 14 Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 Labor Cost $0 $246 $0 $1,056 $0 $0 $0 $1,302 MANHOURS 1 61 66 14 0 0 0 142 Negotiated Labor Rate $128 $123 $103 $88 $75 $46 $117 Labor Cost $128 $7,512 $6,770 $1,232 $0 $0 $0 $15,641 $15,700TOTAL FEE - SIDEWALK/CURB RAMP DESIGN Overhead Rate =76.02%Base Profit =7.0%Total Profit = 11.30% Facility Capital Cost of Money =0.01%4.3% Position Labor Rate Adjusted Labor Rate Overhead Labor + Overhead Profit Facilty Capital Cost of Money Billable Rate Senior Project Manager $62.50 $65.44 $49.75 $115.18 $13.02 $0.01 $128.21 Executive Director of Transportation $60.03 $62.85 $47.78 $110.63 $12.50 $0.01 $123.14 Manager Environmental Services $38.94 $40.77 $30.99 $71.76 $8.11 $0.01 $79.88 Civil Engineer Project Manager $50.00 $52.35 $39.80 $92.15 $10.41 $0.01 $102.57 Civil Project Engineer $42.89 $44.91 $34.14 $79.04 $8.93 $0.01 $87.99 Civil Engineering Design Assoc.$34.33 $35.94 $27.32 $63.27 $7.15 $0.01 $70.43 Civil Engineering Assoc.$36.60 $38.32 $29.13 $67.45 $7.62 $0.01 $75.08 Landscape Architect $57.10 $59.78 $45.45 $105.23 $11.89 $0.01 $117.13 Landscape Design Assoc.$29.00 $30.36 $23.08 $53.44 $6.04 $0.01 $59.49 Clerical $22.30 $23.35 $17.75 $41.10 $4.64 $0.01 $45.75 Intern $17.00 $17.80 $13.53 $31.33 $3.54 $0.01 $34.88 Vice President Landscape Architecture $58.77 $61.53 $46.78 $108.31 $12.24 $0.01 $120.56 Director of Transportation $56.39 $59.04 $44.88 $103.92 $11.74 $0.01 $115.68 Civil Engineer $49.64 $51.97 $39.51 $91.48 $10.34 $0.01 $101.83 South Bend SRTS Holy Cross, Muessal School Area The Troyer Group 2022 Billing Rate Summary ( Lump Sum Contract) Additives = Certified MBE, State of Indiana; City of Indianapolis INDOT Certified DBE 9102 N. Meridian Street, Suite 200 • Indianapolis, IN 46260 • Phone 317-566-0629 • Fax 317-566-0633 • www.SJCAinc.com October 6, 2023 Stephan Summers Troyer Group 3930 Edison Lakes Pkwy Mishawaka, IN 46545 RE:Muessel / Holy Cross SRTS DES 1900447 St. Joseph County, Indiana Supplemental Survey Request #1 Project Description Provide additional topographic survey as requested by the design engineer at various locations throughout the project area. The limits of the additional topographic survey are shown on the attached Exhibit 1. Scope of Work SJCA will furnish a plat or map of survey in accordance with the following: Research including the last deed of record for adjoining owners, old road plans, right-of-way grants, section corner information, tax cards, subdivision plats, auditor’s maps, benchmark information, regulated drain information, utility maps, recorded surveys, etc. Locate all centerline monuments, section corners or property corners as-needed to determine the centerline alignment and existing right-of-way. Use GPS and conventional radial survey methods to locate all section corners, property and centerline monumentation. Horizontal datum shall be the Indiana Geospatial Coordinate System for the subject project’s County from GPS observations using INDOT’s Continuously Operating Reference System (InCORS). Run a level circuit to establish project vertical data. Vertical datum shall be NAVD88 from GPS observations using INDOT’s Continuously Operating Reference System (InCORS). Project benchmarks shall be set at ¼ mile intervals (minimum of 3) with descriptions and elevations shown in the field book. Topographic Route survey from the back of curb to the right of way line for the areas shown in red and yellow in the attached Exhibit 1, which exhibit was provided by Troyer Group via email on 5/12/23. Additionally full topo survey of the intersection of Vasser Ave. and Wilbur St. for a distance of 50 feet beyond the apparent existing right of way along each intersecting street. Submittal of a design ticket through Indiana811 to obtain name, address and contact information for each utility company with facilities within the survey limits. Download the data and complete CAD drawings of planimetric features as well as topographic features including the creation of a digital terrain model and contours. Determination of right-of-way lines and adjacent boundaries based on deeds, monuments, plats, surveys and best field evidence available. Set and reference control points for use by the contractor during the construction phase of the project. Preparation of a survey field book per current INDOT standards including a sketch of an elevation view of the bridge. Delivery of all files as currently required by the Indiana Design Manual. CAD files shall be delivered in MicroStation .dgn format. Certified MBE, State of Indiana; City of Indianapolis INDOT Certified DBE 9102 N. Meridian Street, Suite 200 • Indianapolis, IN 46260 • Phone 317-566-0629 • Fax 317-566-0633 • www.SJCAinc.com Project Schedule SJCA will conduct its services in an expeditious manner subject to limitations such as weather, information acquisition, communications, and other factors outside of SJCA’s control. Both parties recognize that the schedule of services is subject to factors that may be unknown at the time of notice to proceed. If modifications, changes, or adjustments to the schedule become necessary, such modifications shall be agreed upon by both parties. Fee Justification A fee justification has been developed based on the scope of services outlined above. We propose a fee increase of $15,500 (Lump Sum) for the scope of services as expressly described herein. This will increase the topographic survey phase of the project from $39,700 to $55,300. If you have any questions, please reach out to me at rperry@sjcainc.com or 317-566-0629. Sincerely, SJCA, Inc. Ryan D. Perry, PS Director of Survey Services Attachments: Manhour Fee Justification Exhibit 1 Prof.Survey Survey Survey Survey CAD Total Surveyor Proj. Mgr. Party Chief Technician Technician Hours 1 12 13 2 2 0 2 2 0 6 5 5 16 0 0 2 2 4 24 24 48 6 6 12 2 2 4 6 10 16 0 4 4 0 0 1 2 4 7 0 4 4 8 3 5 8 5 39 43 43 14 144 $225.32 $128.72 $93.24 $70.74 $88.47 $1,126.60 $5,020.08 $4,009.32 $3,041.82 $1,238.58 $14,436.40 $14,436.40 Mileage:2 trips at 297 miles at 0.45$per mile $267.30 Meal:2 persons for 4 days at 35.00$per day $280.00 Lodging:2 persons for 3 nights at 96.00$per night $576.00 Copies:copies at per copy $0.00 Deed Research:deeds at $0.00 $0.00 $1,123.30 $15,559.70 $15,600.00PROPOSED LUMP SUM FEE ESTIMATED HOURS HOURLY JUSTIFICATION, SURVEY Muessel / Holy Cross SRTS; Des 1900447 - Supplemental Survey South Bend, St. Joseph County PAGE 1 OF 1 WORK ELEMENT Project Horizontal Control Run Level Circuit Topographic Survey Detail Structures SURVEY Send Survey Notices Interview Land Owners Set & Locate Mobile LiDAR Targets Locate Monuments Request Utility Locations Preperation and Initial Research TOTAL HOURS HOURLY RATE Sewer Structure Details Download & Draft Topography Determine Alignment Location Determine Boundaries Set & Reference Alignment GPS Horizontal Control TOTAL FEE FOR LABOR Set & Reference Section Corners Complete Field Book Information Prepare Location Control Route Survey Travel Time Supervision Total Direct Cost Total Other Direct Cost TOTAL PROJECT COSTS OTHER SURVEY DIRECT PROJECT COSTS Record LCRSP Certified MBE, State of Indiana; City of Indianapolis INDOT Certified DBE 9102 N. Meridian Street, Suite 200 • Indianapolis, IN 46260 • Phone 317-566-0629 • Fax 317-566-0633 • www.SJCAinc.com SCOPE OF SERVICES August 22, 2023; rev November 15, 2023 The City of South Bend proposes to proceed with the Muessel Elementary School-Holy Cross Safe Routes to School (SRTS) Project (Des. No. 1900477). Troyer Group will enter into a subconsultant agreement with SJCA Inc., who will complete the National Environmental Policy Act (NEPA) documentation, Archaeology, and documentation in compliance with Section 106 of the National Historic Preservation Act (NHPA), and all related federal, state, and local laws in accordance with the most current INDOT regulations. Client Contact: Stephan Summers, Executive Director of Transportation, ssummers@troyergroup.com Troyer Group 219.779.5532 Project Location: The proposed undertaking is located along various streets in the neighborhood surrounding Muessell Elementary School, generally bounded by Wilber Street, Vassar Ave, Sherman Ave, and Lincoln Way. The project will improve sidewalks, curbs, crosswalks, and ramps. SJCA Level of Work and Deliverables:  CE-Level 2 Document.  Section 106 Documentation pursuant to Minor Projects Programmatic Agreement (MPPA) Section 1 form. Project Description: Based on information received by the client, the purpose of the project is to improve the pedestrian network surrounding Muessel Elementary School. Work involves sidewalk reconstruction, updating curb ramps to ADA compliance, and installing a curb bump out at the intersection of Vassar Ave. and Wilber St. Right-of-way acquisition over 0.5 acre and tree removal are not anticipated. SJCA has a previous contract with Troyer Group that covers the Topographic Survey and MPPA Section 2 form. Therefore, these fees will only include a MPPA Section 1 form since the MPPA Section 2 form is previously covered under contract. Scope of Work/Concerns:  Because this project may require completion of the full Section 106 process, this scope of services includes a CE document up to a Level 2 with a Section 106 finding of “No Adverse Effect” based on preliminary review of the project areas by SJCA IDNR Qualified Professionals. Refer to the INDOT threshold table for CE documents here: Attachment-5-CE-Level-Threshold- Table.pdf (in.gov).  Based on preliminary project information, less than 0.5 acre of right-of-way (ROW) is anticipated; therefore, public involvement activities and environmental justice analyses are not Certified MBE, State of Indiana; City of Indianapolis INDOT Certified DBE 9102 N. Meridian Street, Suite 200 • Indianapolis, IN 46260 • Phone 317-566-0629 • Fax 317-566-0633 • www.SJCAinc.com included in this scope of services. Should public engagement be determined to be in the best interest of the community, those services would be in addition to this scope of services.  A full Red Flag Investigation (RFI) may be required. There are hazardous materials sites along Lincoln Way that will require additional investigation for the RFI. Any recommendations regarding contamination will be forwarded to Troyer Group to incorporate into the design and project schedule.  Muessel Grove Park and the Coal Line Trail, which are resources protected by Section 4(f) of the US Department of Transportation Act, are located within/adjacent to the proposed pedestrian improvements. This scope of services includes coordination with INDOT and the resource owners for concurrence of temporary occupancy or exception use of the resources. Based on preliminary project information, trails and/or sidewalks connecting to these resources will be improved and may require closures and/or detours for users during construction. Historical/Archaeological  Section 106 consultation, as required by the National Historic Preservation Act (NHPA) of 1966, will be completed prior to submittal of the CE document for approval. It is anticipated that the project will follow the procedures as outlined in the INDOT Cultural Resources Office (CRO) Manual.  SJCA will prepare an MPPA Section 1 & 2 form and submit it to INDOT CRO.  Due to the project scope, archaeological studies are not anticipated. Background research will be completed using Indiana State Historic Architectural and Archaeological Research Database (SHAARD) and SHAARD GIS records to complete the archaeological assessment for the proposed project. Tasks Not Covered under This Proposal:  Any changes in scope or impacts to resources not observed during preliminary desktop review that would require additional documentation.  Notice of entry mailings.  A CE Level 3 or higher environmental document.  Any endangered/threatened species surveys or special studies, including guano genetic testing, or agency coordination above the standard early coordination per INDOT guidelines. This includes Section 7 coordination and/or Biological Opinions.  Additional inspection of structures in the event the initial inspection is over 2 years old.  Any special studies or testing, such as noise, air, or Karst studies.  Any onsite meeting with regulatory agencies.  Public involvement activities, including but not limited to public meetings and public notice advertisements.  An environmental justice analysis.  A Waters of the US Report.  Any Section 4(f) documentation and coordination above a temporary occupancy or exception use, including but not limited to a de minimis use finding.  Preparation of any local or waterway permits, a permit determination, or mitigation plans. It is assumed that all permit-related activities will be completed by others.  Any documentation relating to Full Section 106 review or any other special study requested by Certified MBE, State of Indiana; City of Indianapolis INDOT Certified DBE 9102 N. Meridian Street, Suite 200 • Indianapolis, IN 46260 • Phone 317-566-0629 • Fax 317-566-0633 • www.SJCAinc.com INDOT Cultural Resources Office (CRO) or the Indiana SHPO.  Any archaeological fieldwork and Phase Ia report. Anticipated Project Schedule: After the client gives the Notice to Proceed along with the approved project schedule, SJCA Inc. will complete the scope of work, dependent upon receiving the appropriate project information and seasonal weather conditions. NEPA and Section 106 work will begin as soon as a solid preliminary scope and basic project description is developed for the red flag investigation. Sunset Provision If this contract is not fully executed within six months of the date that the Scope of Services and Fees have been submitted to the client, then the fees and scope are subject to change. This may be due to a change in local, state, or federal guidance which would render the scope and fees outdated and would require updates. If, upon consultation with all local, state, and federal agencies regarding the project, additional studies are requested or the project scope/area changes, then additional fees will be required to meet the additional scope of services. The fees for this project will be hourly (time & expense; not to exceed). Totals for the project are listed in the table below (rounded to the nearest one hundred dollars). The task and hourly breakdown for each service is attached. Subtotal Fee for CE 2 $35,000 Subtotal Fee for Section 106 MPPA (Cat. B) Section 1 form $8,200 TOTAL $43,200 Thank you, and we look forward to working with you. Kind Regards, Erin Mulryan, MPA Director of Environmental Services SJCA Inc. $8,200 Principal of Env. Planning Senior Project Manager Ecologist I (Lead) Ecologist II GIS Specialist Totals 10.0 10.0 12.0 6.0 6.0 44.0 24.0 2.0 26.0 14.0 14.0 2.0 30.0 12.0 12.0 24.0 4.0 10.0 20.0 34.0 1.0 2.0 30.0 33.0 6.0 6.0 4.0 4.0 8.0 4.0 20.0 2.0 26.0 2.0 4.0 6.0 12.0 2.0 60.0 62.0 8.0 2.0 8.0 8.0 26.0 2.0 1.0 6.0 24.0 33.0 41.0 13.0 86.0 194.0 30.0 364.0 $128.26 $113.54 $87.67 $87.67 $110.87 $5,258.66 $1,476.02 $7,539.62 $17,007.98 $3,326.10 $34,608.38 Expenses:$10.00 $352.80 $34,971.18 Rounded to $35,000 Job Type: CE-2 CE-2 Form and Appendices INDOT Submissions/Final Sign Off/Commitments Subtotal Fee Printing Total Fee For CE Total Hours Billing Rates Internal QA/QC for CE Internal QA/QC for RFI and Early Coordination Mileage (360 miles x 0.49/mile) x 2 site visits Name of Project: South Bend Safe Routes to School, Muessel & Holy Cross Neighborhood, Des. 1900447 Fee Justification Section 106 Coordination CE Maps & Exhibit Development Early Coordination with Regulatory Agencies Task Description Project Coordination and Management CE Field Check Prep, Site Visit, and Field Inventory Forms PFC Meeting Coordination and Attendance Red Flag Investigation Documentation and Submittal CE-2 Bat Policy Inspection and Documentation Section 4(f) Coordination and Temp Occupancy/Exception Documentation Cultural Resources Manager Project Manager Cultural Resources Associate GIS Specialist Totals 4.0 13.0 2.0 2.0 21.0 33.0 33.0 16.0 16.0 2.0 5.0 5.0 3.0 15.0 1.0 3.0 4.0 7.0 21.0 40.0 21.0 89.0 $103.44 $98.35 $77.08 $110.87 $724.08 $2,065.35 $3,083.20 $2,328.27 $8,200.90 $8,200.90 Name of Project: South Bend Safe Routes to School, Muessel & Holy Cross Neighborhood, Des. 1900447 Fee Justification Coordination with Cultural Resources Office (CRO) Task Description Project Coordination and Management Mapping & GIS Coordination QA/QC Internal Review Section 1 form Preparation of MPPA Section 1 form MPPA Category B Rounded to $8,200 Job Type: Section 106 - Minor Projects Programmatic Agreement (MPPA), Category B Subtotal Fee Total Fee For MPPA Category B Total Hours Billing Rates BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: April 15th, 2024 Name: Gemma Stanton Department of Public Works – Engineering Division BPW Date: April 23rd, 2022 Phone Extension: 9083 Required Prior to Submittal to Board BPW Attorney X Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Troyer Group New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name PE Services for SRTS Muessel Primary and Holy Cross School Area Project Number 122-006 (INDOT DES 1900447) Funding Source PO-0017654 Account No. 251-06-600-506-431000--PROJ00000335 Amount $41,500 (total contract amount $230,000) Terms of Contract NTE Purpose/Description Increase amount of PE contract as a result of increase in project scope and environmental documentation requirements. Eligible for 80% funding from INDOT with 20% local match of $8,300. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: