Loading...
HomeMy WebLinkAboutChange Order No 1 - South Well Field WWTP & Dist. System Imprvmts. - Contract B -Watermain Proj No. 117-059B - C&E1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/235-9171 CITY OF SOUTH BEND TAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS April 9, 2024 Mr. Thad Bessinger C&E Excavating, Inc. 53767 County Road 9 Elkhart, IN 46514 TimBkcandeexcavating com RE: Change Order No. 1 — South Well Field WWTP and Distribution System Improvements - Contract B-Watermain — Project No. I I7-059B Dear Mr. Bessinger: At its April 9, 2024 meeting, the Board of Public Works approved the above referenced Change Order be increased by $23,606.65, bringing the revised contract amount to $1,620,606.65. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MIcou INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Michael Schmidt, Assistant City Attorney Public Works Theresa Heffner, Clerk FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: 117-059B South Well Field Water Treatment Plant and Distribution System Improvements — Contract B — Water Main (PROJ00000082) Agenda Request — Change Order No. 1 DATE: April 1, 2024 The Division of Engineering and Division of Water are issuing this Agenda Request for the Board of Public Works approval of Change Order No. 1 for Project No. 117-059B South Well Field Water Treatment Plant and Distribution System Improvements — Contract B — Watermain. Described, herein, are the additional scope of work items: Change Order No. 1 — Description of Additional Scope Items Item 1: Addition of Water Main Insulation at Chippewa Avenue Reason: Unforeseen condition. Existing utilities were discovered to be closer than anticipated requiring a shallower watermain profile through a portion of Chippewa Avenue. Item 1 Cost: $10,251.95 See attachment for detail. Item 2: 24-inch Water Main Repair Reason: Unforeseen condition. During excavation activities at the South Well Field property, a leaking corporation stop and valve were discovered to be leaking beyond the contractor's excavation. Exploratory excavation uncovered leaking valve and C&E Excavating assisted with the corporation stop replacement since Water Works crews were unavailable due to City crews responding to other water main breaks. Item 2 Cost: $ 7,594.70 See attachment for detail. Item 3: Addition of two (2) 16-inch diameter ductile iron 22.5-degree fittings Reason: Unforeseen condition. The two additional 16-inch ductile iron water main 22.5-degree fittings were required to adjust the vertical profile of the water main at the South Well Field property. Actual depth of the water main differed from the anticipated water main profile. Item 3 Cost: 2 x $2,700.00 each = $5,400.00 See attachment for detail. 117-059B Contract Cost Summary and Impact of Change Order No. 1 Original Contract Sum: $1,597,000.00 Net Change by previously authorized change orders: $ 0.00 The contract sum prior to this change order: $1,597,000.00 By this Change Order the project amount is increased by: $ 23,606.65 The new contract sum including this change order: $1,620,606.65 This Change Order represents a total percent change of: 1.48% Total percent change for entire project: 1.48% The Division of Engineering and Division of Water Works recommend approval of the subject change order for Project No. 117-059B South Well Field Water Treatment Plant and Distribution System Improvements — Contract B — Watermain. Account amounts shall be adjusted in DFO to adjust the addition of Change Order No. 1 to the contract purchase order PO-0027554. Funding for this project change order is provided by TIF Southside Development #1 (Account No. 430-10-102-121-444000). For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO. CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER 04-01-2024 117-059B DFO PROJ00000082 South Well Field Water Treatment Plant and Distribution System Improvements - Contract B - Water Main 09/12/2023 1 SUBJECT OF CHANGE ORDER: Additional Scope Items: Water Main Insulation Water Main Repair. Additional Ductile Iron Fittings All items completed substantially as planned. See attached Comparison of Estimate for overruns and underruns. The original contract sum $ 1,597,000.00 Net change by previously authorized change orders $ 0.00 The contract sum prior to this change order $ 1,597,000.00 By this Change Order, the project amount is ® Increased The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR ❑ Decreased $ 23,606.65 $ 1,620,606.65 1.48 % 1.48 % 05/31 /2024 0 Days 5 Days 06/05/2024 RECOMMENDED FOR APPROVAL N. XAz� 04-05-2024 Construction Manager CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Contractor Signature Thad Bessinoer, President Printed Name and Title C&E Excavating, Inc. Company name 53767 County Road 9 Address Elkhart, Indiana 46514 City, State, Zip CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President 00�r 1� Gary A. Gilot, Member 7r", ,C 7n'A�`+ Murray L. Miller, Member M/1 l Joseph R. Molnar, Vice President Briana�(Miicou, Member ' "/° Attest: Theresa M. Heffner, Clerk Date: April 9, 2024 vAlik, y � T EXCAVATING (574) Z62.4346 City of South Bend South Well Field - Chippewa Foam Board Insulation 1.12.24 Labor Type Cost Unit Total Foreman $66.00 x 5.50 HR = $363.00 Foreman OT $87.00 x HR = $0.00 Operator $61.00 x 8.75 HR = $533.75 Operator OT $80.00 x 2.00 HR = $160.00 Truck Driver $43.00 x 2.00 HR = $86.00 Truck Driver OT $58.00 x HR = $0.00 Laborer $34.00 x 11.00 HR = $374.00 Laborer OT $46.00 x 1.00 HR = $46.00 Labor Sub -Total: $1,562.75 Equipment Type Cost Unit Total Deere 3506 - 2018 $268.92 x HR = $0.00 John Deere 135 Excavator $160.45 x HR = $0.00 John Deere 60G Excavator $73.00 x HR = $0.00 John Deere 544P Loader $96.70 x 2.00 HR = $193.40 John Deere 333G Skid Steer $73.14 x HR = $0.00 John Deere Off Road Truck $187.55 x HR = $0.00 Peterbilt $118.43 x HR = $0.00 Lowboy, 55 Ton $39.11 x HR = $0.00 Ford F-550 Super Duty $45.00 x HR = $0.00 Equipment Sub -Total: $193.40 Material & Subs Type Cost Unit Total 2"x4"x8 Highload 60PSI Styrofoam $89.00 x 80.00 LS = $7,120.00 x SY = $0.00 x LS - $0.00 x LS = $0.00 x TN - $0.00 x LS - $0.00 x LS = $0.00 Subcontractor Sub -Total: $7,120.00 Direct Costs: $8,876.15 Overhead: 10% $887.62 Cost & Overhead: $9,763.77 Markup: 5% $488.19 C and E Excavating, Inc. T&M TOTAL: $10,251.95 53767 County Road 9 Elkhart, IN 46514 C & E Excavating Job Name: 2023/46 SOUTH WELL FIELD WWTP COSB Job Code: 23-046WELLFI Cost Code Review Cost Code: XW-003 Install Foam Board Insulation on Ch LF Code Description Class Rcg. Hours OT Hours Other Hours Base Rate * Cost Date: 11/17/2023 Foreman: JOHN B Cost Code Notes: Date: 11/20/2023 Foreman: ALLEN E Shift: 1 Time Card: Production Quantities: 90.000 ALLEN E ALLEN C EISENHART CHUCKS CHARLES J SILLS 8419 Loader Deere 544P 2022 CORY E CORY R EISENHART DACODA DACODA R FERGUSON LEVI L LEVI J LIVERMORE ZACH S ZACHARY T STRUKEL Totals for 11/20/2023 ALLEN E Date: 11/20/2023 Foreman: JOHN B Shift: 1 Time Card: Production Quantities: 0.000 JOHN B JOHN D BENDER EDDIE A EDDIE A AREVALO AE REG 2.00 0.00 0.00 40.00 98.22 CS REG 1.00 1.00 0.00 27.50 81.81 1.00 0.00 0.00 78.57 78.57 CE REG 3.75 1.00 0.00 35.00 231.20 DF REG 4.75 1.00 0.00 22.50 176.97 LL REG 4.75 1.00 0.00 27.00 181.66 ZS REG 3.00 0.00 0.00 30.00 111.23 Labor Totals: Hours - 23.2 Cost - 881 Equip Totals: Hours - 1.0 Cost - 79 Unit Cost: ($) 10.66 per LF (90.000 LF) Total Cost: 960 JB REG 2.00 0.00 0.00 41.00 113.43 EA REG 2.00 0.00 0.00 24.00 60.45 Labor Totals: Hours - 4.0 Cost - 174 Equip Totals: Hours - 0.0 Cost - 0 "- Base Rate is Unburdened and does NOT Printed on: 01/24/2024 06:54:11 include taxes, fringes, worker's comp., etc. x Date: A 440nionro/Alnn_I I.o r`-A.. i-h.,A-i in W- ..... C W F %/ T A \A/ / r) C RA P T W 0- 1 C & E Excavating Job Name: 2023/46 SOUTH WELL FIELD WWTP COSB Job Code: 23-046WELLFI Cost Code Review Cost Code: XW-003 Code Description Totals for 11/20/2023 JOHN B: Date: 01/11/2024 Foreman: JACK B Shift: 1 Time Card: Production Quantities: 32.000 JACK B JACKSON W BRADY JACOB W JACOB B WOODILL HUNTER K HUNTER D KONRATH BILLY Y WILLIAM J YUHAS Install Foam Board Insulation on Ch Class Reg. Hours OT Hours No Production Quantites listed Today. Totals for 01/11/2024 JACK B: Date: 01/12/2024 Foreman: JACK B Shift: 1 Time Card: Production Quantities: 25.000 JACK B JACKSON W BRADY JACOB W JACOB B WOODILL HUNTER K HUNTER D KONRATH ZACH S ZACHARY T STRUKEL BILLY Y WILLIAM J YUHAS LF Other Hours Base Rate * Cost Total Cost: 174 JWB REG 1.00 0.00 0.00 32.00 39.99 JBW REG 1.00 0.00 0.00 34.00 43.42 HK REG 1.00 0.00 0.00 17.00 18.30 BY REG 1.00 0.00 0.00 38.00 54.98 Labor Totals: Hours - 4.0 Cost - 157 Equip Totals: Hours - 0.0 Cost - 0 Unit Cost: ($) 4.90 per LF (32.000 LF) Total Cost: 157 JWB REG 0.50 0.00 0.00 32.00 19.99 JBW REG 0.50 0.00 0.00 34.00 21.71 HK REG 0.50 0.00 0.00 17.00 9.15 ZS REG 0.50 0.00 0.00 30.00 18.54 BY REG 0.50 0.00 0.00 38.00 27.49 Labor Totals: Hours - 2.5 Cost - 97 Equip Totals: Hours - 0.0 Cost - 0 "- Base Rate is Unburdened and does NOT Printed on: 0112412024 06:54:11 include taxes, fringes, workers comp., etc. A++e.,A..,,.vAi,,.,_i i.e rr 4.. i., l..A.A i. F--r- C u G \/ T A \A/ / rl C RA D T \A/ D--- x Date: C & E Excavating Job Name: 2023/46 SOUTH WELL FIELD WWTP COSB Cost Code: XW-003 Code Description Totals for 0111212024 JACK B: Cost Code Review Install Foam Board Insulation on Ch LF Class Reg. Hours OT Hours Other Hours Unit Cost: M 3.88 per LF (25,000 LF) Job Code: 23-046WELLFI Base Rate * Cost Total Cost: 97 Labor Totals: Hours - 0.0 Cost - 0 Equip Totals: Hours - 0.0 Cost - 0 Matl-Sub-Expense Totals: Cost - 0 Trueup and Beginning Balance Totals for 1011212023 Through 01/24/2024 : Total Cost: 0 Labor Totals: Cost - 0 Equip Totals: Cost - 0 Matl-Sub-Expense Totals: Cost - 0 Work Order and Fuel Cost Totals for 1011212023 Through 01/24/2024 : Total Cost: 0 * - Base Rate is Unburdened and does NOT Printed on: 01242024 06:54:18 include taxes, fringes, workers comp., etc. x Date: _ A++anrlonra/Alnn_I lea r`nrlae i—hirlarl in I-Ine— C W C \/ T A \A/ / r) C RAPT %A/ Dana 1 C & E Excavating Job Name: 2023/46 SOUTH WELL FIELD WWTP COSB Job Code: 23-046WELLFI Cost Code Review Cost Code: XW-003 Install Foam Board Insulation on Ch LF Code Description Class Reg. Hours OT Hours Other Hours Base Rate * Cost Unit Cost Total Cost (per LF) Totals in the Date Labor Cost: 8.90 1,309 Range for Cost Code XW-003 Equipment Cost: 0.54 79 Material Cost: 0.00 0 Total Production: 147.000 LF Subcontract Cost: 0.00 0 Supply Cost: 0.00 0 Misc 1 Cost: 0.00 0 Misc 2 Cost: 0.00 0 Misc 3 Cost: 0.00 0 Total Cost: 9.44 1,387 "- Base Rate is Unburdened and does NOT Printed on: 012412024 06:54:24 include taxes, fringes, worker's comp., etc. X Date: A 44en.4�nre/Alnn_I lee r mice innL vlerl in Wn ,� Q W C V T A %A/ / Il Q AA 0 T %A/ 0ene d C & E Excavating Job Name: 2023/46 SOUTH WELL FIELD WWTP COSB Cost Code: XW-003 Code Description Totals by individual items: Employees: Cost Code Review Install Foam Board Insulation on Ch Class Reg. Hours OT Hours LF Other Hours Job Code: 23-046WELLFI Base Rate * Cost ALLEN E ALLEN C EISENHART AE REG 2.00 0.00 0.00 98 BILLY Y WILLIAM J YUHAS BY REG 1.50 0.00 0.00 82 CHUCKS CHARLES J SILLS CS REG 1.00 1.00 0.00 82 CORY E CORY R EISENHART CE REG 3.75 1.00 0.00 231 DACODA DACODA R FERGUSON DF REG 4.75 1.00 0.00 177 EDDIE A EDDIE A AREVALO EA REG 2.00 0.00 0.00 60 HUNTER K HUNTER D KONRATH HK REG 1.50 0.00 0.00 27 JACK B JACKSON W BRADY JWB REG 1.50 0.00 0.00 60 JACOB W JACOB B WOODILL JBW REG 1.50 0.00 0.00 65 JOHN B JOHN D BENDER JB REG 2.00 0.00 0.00 113 LEVI L LEVI J LIVERMORE LL REG 4.75 1.00 0.00 182 ZACH S ZACHARY T STRUKEL ZS REG 3.50 0.00 0.00 130 Totals: 29.75 4.00 0.00 1,309 Equipment: 8419 Loader Deere 544P 2022 1.00 0.00 0.00 79 Totals: 1.00 0.00 0.00 79 Materials: Cost Type Units Received Used Cost Totals: 0 * - Base Rate is Unburdened and does NOT Printed on: 012412024 06:54:25 include taxes, fringes, worker's comp., etc. x Date: A 44cnrl�nrc/Alnn_I 1- r`Mn. innl-4-4 in I-Ini- C I -I F %/ T A %A/ / r) C RAPT %A/ Dnnc r. C & E Excavating Job Name: 2023/46 SOUTH WELL FIELD WWTP COSB Cost Code Review Job Code: 23-046WELLFI Cost Code: XW-003 Install Foam Board Insulation on Ch LF Code Description Class Reg. Hours OT Hours Other Hours Base Rate * Cost Subcontracts: Cast Type Units Received Totals: 0 Supplies: Cast Type Units Received Used Cost Totals: 0 Misc 1: Cost Type Units Received Used Cost Totals: 0 Misc 2: Cast Type Oft nowd"d Lft" am Totals: 0 Misc 3: Cost Type Units Received Used Cost Totals: 0 Grand Total: 1,387 NOTE: Filters in effect: All Foremen. Cost code = xw-003. Dates >= 10/12/2023 and Dates <= 01/24/2024. * - Base Rate is Unburdened and does NOT Printed on: 01/24/2024 065425 include taxes, fringes, worker's comp., etc. x Date: A4fonrienrn/Alnn_I Im r`niiec inch irao� in I -Inure• C LJ C V T A U/ / r1 C AA A T \AI Chad It WHITE CAP. White Cap, L.P. PO Box 4944 Orlando, FL 32802-4944 SOLD TO: 10000630717 179 1 MB 0.561 E0117X 10248 012152833566 S2 P10030306 0001:0001 Illaelleeelll�lllo�ll�lllill�lllllllolil0111lllllalllllalleelll�� ° C & E EXCAVATING, INC. 53767 COUNTY ROAD 9 ELKHART IN 46514-5026 BRANCH ADDRESS _---__785 - WC SOUTH BEND IN (CVV) (574) 231-9000 910 W. IRELAND RD. SOUTH BEND IN 46614 ST.JOSEPH TO VIEW AND PAY ONLINE GO TO: http://whitecap.bilitrust.com ENROLLMENT TOKEN: MRW BQV QZT TERRITORY: SHIP TO: 100042823�7 C&E EXCAVATING, INC./YARD 53767 COUNTY ROAD 9 ELKHART IN 46514 INVOICE INVOICE NUMBER 50024723381 INVOICE DATE 11 /20/2023 CUSTOMER PO NUMBER PO #23-46 MAKE CHECKS PAYABLE TO: White Cap, L.P. P.O. Box 4852 ORLANDO,FL 32802-4852 ORDER DATE ORDER NO. ORDERED BY ACCOUNT MANAGER TAKEN BY 11/17/2023 56315546 ADAM CLARK HANDY, DONALD DILL, CALIB P BRANCH ACCT JOB NO. TERMS SHIP VIA I ROUTING CUSTOMER JOB NO. 785 10004282377 NET 30 DAYS 0. WILL CALL C E EXCAVATING INC LINE PART NUMBER DESCRIPTION QTY ORD UNIT PRICE QTY BKO QTY SHP EXTENDED PRICE TAX AMT 0 HDRDESC 1 0 0 1 0.00 DELIVERY TAG#: 27233006 SHIPPING NOTES: ADAM CLARK 574-320-2050 k..............r......,y............,....... ..... .....,,,.. 1 635199981 2"X4'X8' HIGHLOAD 60PSI SE STYROFOAM 80 89.00 I;A 0 80 7,120,00 498.40 DUPONT The White Cap Family of Brands includes All -Tex Waterproofing Solutions, Harmac, Kenseal, Marvel Building & Masonry Supply, MASONPRO, Williams Equipment & Supply, Valley Supply Co, and Diamond Tool. Learn more at About.WhiteCap.com Pay your. invoices online by visiting: https://whitecap.billtrust.com Sales Tax Exemption Questions or Certificates: TaxExemptCredit@whitecap.com THESE ITEMS ARE CONTROLLED BY THE U.S GOVERNMENT AND AUTHORIZED FOR EXPORT ONLY TO THE COUNTRY OF ULTIMATE DESTINATION FOR USE BY THE ULTIMATE CONSIGNEE OR END-USER(S) HEREIN IDENTIFIED THEY MAY NOT BE RESOLD, TRANSFERRED OR OTHERWISE DISPOSED OF TO ANY OTHER COUNTRY OR ANY PERSON OTHER THAN THE AUTHORIZED ULTIMATE CONSIGNEE OR END-USER(S), EITHER IN THEIR ORIGINAL FORM OR AFTER BEING INCORPORATED INTO OTHER ITEMS, WITHOUT FIRST OBTAINING APPROVAL FROM THE U.S. GOVERNMENT OR AS OTHERWISE AUTHORIZED BY U.S LAW AND REGULATIONS. I For questions regarding this invoice please call 1-866-857-0295. TOTAL GROSS 7,120.00' TOTAL TAX 498.40 NO REFUNDS OR EXCHANGES ON NON STOCK MERCHANDISE Visit https://www.whitecap.com/terms/terms-conditions-of-sale-terms to view TOTAL SHIPPING 0.00 cam le a terms and conditt ns. AND HANDLING RECEIVED BY: ADAM CLARK SIGNATURE COPY ON FILE TOTAL INVOICE 7,618.40 0001:0001 /7J1._�17-J all lea _H,.I -i_ Page 1 of 1 PRT. rly0 Y � y EXCAVATING (574)Z62-4346 City of South Bend South Well Field - 24" Waterline Break 1.12.24 Labor Type Cost Unit Total Foreman $66.00 x 4.75 HR = $313.50 Foreman OT $87.00 x 9.50 HR = $826.50 Operator $61.00 x HR = $0.00 Operator OT $80.00 x HR = $0.00 Truck Driver $43.00 x HR = $0.00 Truck Driver OT $58.00 x HR = $0.00 Laborer $34.00 x 1.00 HR = $34.00 Laborer OT $46.00 x HR = $0.00 Labor Sub -Total: $1,174.00 Equipment Type Cost Unit Total Deere 3506 - 2018 $268.92 x HR = $0.00 John Deere 135 Excavator $160.45 x 10.25 HR = $1,644.61 John Deere 60G Excavator $73.00 x HR = $0.00 John Deere 544P Loader $96.70 x HR = $0.00 John Deere 333G Skid Steer $73.14 x HR = $0.00 John Deere Off Road Truck $187.55 x HR = $0.00 Peterbilt $118.43 x HR = $0.00 Lowboy, 55 Ton $39.11 x HR = $0.00 Ford F-550 Super Duty $45.00 x 14.25 HR = $641.25 Equipment Sub -Total: $2,285.86 Material & Subs Type Cost Unit Total Badger Daylighting $3,115.64 x 1.00 LS $3,115.64 x SY $0.00 x LS = $0.00 x LS - $0.00 x TN = $0.00 x LS - $0.00 x LS - $0.00 Subcontractor Sub -Total: $3,115.64 Direct Costs: $6,575.50 Overhead: 10% $657.55 Cost & Overhead: $7,233.05 Markup: 5% $361.65 C and E Excavating, Inc. T&M TOTAL: $7,594.70 53767 County Road 9 Elkhart, IN 46514 C & E Excavating Job Name: 2023/46 SOUTH WELL FIELD WWTP COSB Daily Report Diary: Date - 01/12/2024 (Friday) Job Code 23-046WELLFI Foreman - JOHN B JOHN BENDER J B KJ Started day as checking pipe diameters in the 24 inch tee area. Mob machine from Ozinga area up to pump buildings. When nearing 24 inch pipe with nearly 8 ft of cover we had water starting to seep up from excavation. We did not feel like we hit anything. Dug farther away from where we started at a higher elevation and water would keep seeping up in areas we did not dig. At this point talked with Adam and it was deemed best to get city involved as they have struggled to locate anything in the area. Kyle from engineering came out, then Travis from construction crew then Rick the head of construction and repair came. There was currently 2 leaks in the city with a crew at each so it was a slow response to this situation. Both city vac trucks were in use and the sewer dept vac truck had no one to operate it as they were all involved in snow removal. Under Kyle's direction and working with Jacob they asked us to order up a 3rd party vac if possible to investigate. Badger was available and on -site within the hour. As we began to vac you could see the water coming from along the pipe upstream farther. I removed the top 4 to 5 ft with excavator and the vac investigated to main. Kyle found a print with a line stop in the area. Dug, found post, line stop on the 24 inch with the test port on the line stop being the leak. There was a brass nipple with ball valve that was spraying from a split in valve or nipple. Soil caved a bit and 3/4 inch ball valve fell off. Got 2-2 inch pumps running and that was receding the waters slightly. By this time the city showed up with what we thought was parts and maybe a guy would attempt repair or us doing it. They showed up in full force with 4 guys and 3 trucks as there other 2 repairs were now completed in city. They hooked up a 3 or 4 inch hydraulic pump and started pumping as the vac truck began to suck hole for pump and open up repair spot again. They took out brass nipple and threaded in a 12 inch galvanized nipple with a brass curb stop then closed valve. I was impressed with the crew and gave fist bumps and praise all around. I think we need this relationship with these guys as south bend water seems lacking in locating and knowledge where things are buried at least in the wellfield. The crew had a good attitude about this and Rick was happy to have us on hand and vac truck to get this done before cold snap. This line stop was approximately 30 ft from where we started and had nothing to do with us digging. The vac truck probably dumped 4 times on -site 50 west of vac area. Crew made the repair with it under pressure. Backfil led excavation, only able to bucket press layers of soil because to wet to compact. Caution tape area backfilled. Cleaned up tracks and placed machine on bark from tree chips as temps are plunging next week. Water seep began at 10 am. Time Card: Date - 01/12/2024 (Friday) Foreman - JOHN B JOHN BENDER Revision-0 Shift-1 Cost Codes XW-004 0330-6FI12489 0330-6FI12492 0140-6PI13194 Description 24" Waterline Break Sou 24" MJ Long Sleeve DIP 24" MJ Tee DIP WATR 24" DIP WATR TJ CL50, Prod. City. 11.25 HR 0 EA 0 EA 0 LF Code Name Class Totals JOHN B JOHN D BENDER JB REG 4.25/6 1.25 1.25 1.25 8/6 KYLE J KYLE B JOHNSON KJ REG 1 .75 .75 .75 3.25 Totals for Labor Hours: 17.25 Worked:17.25 Broken Out: (11.25/6/0) x Date: 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override. Printed on: 0112412024 06:48:21 Page 1 Page 1 of 1 C AND E EXCAVATING 53767 CR 9 ELKHART, IN, 46514 Title: C AND E EXCAVATING - Ireland Rd & S Michigan St, South Bend, IN 46614, USA Site Location: 729 W Chippewa Ave South Bend, IN, 46614 Requesters Name: Cost Centre/GL: 1-1. col....... - Item Badger Hydrovac With Operator Badger Hydrovac With Operator Overtime Consumable Materials Supply Water Fluctuating Fuel Recovery Notes: Badger Contact Info: 5597 Old Porter Rd Building D Portage, IN 46368 Ticket Number: TKT-011224-1102220 Ticket Date: 01-12-2024 Job Number: SR0000497455 Paper Ticket #: PO/WO #: AFE/JOB #: 23-46 Phone: 574 3208601 Major/Minor: RigfWell Pad #: User/Approver ID: Other Order #: This is not an invoice Total subject to change based on taxes, fees and other charges. Item Description Unit # Quantity Rate UOM Amount PORT TO PORT 1327 2 $286.00 HR $572.00 OT AFTER 3PM 1327 6 $360.53 HR $2163.18 1327 1 $31.35 EA $31.35 1327 1 $104.50 EA $104.50 1327 EA $244.61 Ticket Total: $3115.64 Emergency Call Out Scope of work: vac for water leak. Dump onsite. Approved By: Approver Name: Approver Phone #: Unless Buyer expressly advises alherwise, Buyer represents and warrants that the soil and groundwater in the area of the Hydrovsc excavation operalions is not contaminated with any non -naturally owurring substance, and buyer hereby indemnifies and holds Badger Daylighting Corp (or LP in Canada's case), and its directors, officers, employees, agents, and contractors harmless from all losses, costs, expenses. and penalties which it or they directly or indirectly suffer or incur in the event the soil and or groundwater is contaminated with any substance other than naturally occurring substances M-b BADGER DAYLIGHTING- BILL TO C AND E EXCAVATING 53767 CR 9 ELKHART, IN 46514 Customer Number 34947 Service Ticket # Date 01-12-2024 TKT-011224-1102220 01-12-2024 TKT-011224-1102220 01-12-2024 TKT-011224-1102220 01-12-2024 TKT-011224-1102220 01-12-2024 TKT-011224-1102220 Badger Daylighting Corp Invoice Number 2636987 Invoice Date 01-15-2024 Payment Terms 30 Net Amount Due 3,115.64 REMIT TO Badger Daylighting Corp PO Box 95000 LB#1627 Philadelphia, PA 19195-0001 Bank Routing #: 026013673 Account #: 03248177952 POIWork Order 23-46 F AFE/Job 23-46 Badger Sales Area 40050 Unit # Item Description Qty Unit of Unit Price Amount Measure 1327 Badger Hydrovac 2 Hour 286.00 572.00 With Operator 1327 Consumable 1 Each 31.35 31.35 Materials 1327 Badger Hydrovac 6 Hour 360.53 2,163.18 With Operator Overtime 1327 Fluctuating Fuel 1 Each 244.61 244.61 Recovery 1327 Supply Water 1 Each 104.50 104.50 Total Due(USD)_ 3,115.64 Page 1 of 1 Please see attached tickets for additional detail Badger Daylighting Corp PO Box 95000, LB# 1627, Philadelphia, PA 19195-0001 Phone: (877) 322-3437 Please direct all invoicing inquiries to accountsreceivable@badgerinc.com and remittances to remittance@badgerinc.com From: Adam Clark To: Jacob Klosinski Cc: Jason Minne Subject: South Well Field 16" CO Date: Thursday, March 28, 2024 2:47:19 PM Jacob, Sorry I don't have this on a formal change order request, but we are looking at $2,700.00 ea for (2) 16" 22.5 Deg Bend. This would be the only "non contract" fittings that we would need included in the change order. Please let me know if you have any questions. Adam D. Clark Project Manager C&E Excavating, Inc. Phone: (574)262-4346 Fax: (574)262-9251 Cell: (574)320-2050 candeexcavating.com BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 04-01-2024 Name: Jacob M. Klosinski Department of Public Works — Engineering Division BPW Date: 04-09-2024 Phone Extension: 9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney ® Attorney Name Purchasing ® Mickey Love Michael Schmidt Check the Appropriate Item Type — Required. for All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ® Chg. Order, No. 1 ❑ Traffic Control ❑ Resolution n Other: n Ease./Encroach Information Company or Vendor Name C&E Excavating, Inc. New Vendor U YesU If Yes, Approved by Purchasing ® No MBE/WBE Contractor ❑❑ WBE Completed E-Verify Form Attached ❑❑ Nos South Well Field Water Treatment Plant and Distribution System Project Name Project Number Funding Source Account No. Amount Terms of Contract Special Contract Provisions Purpose/Description Improvements — Contract B - Watermain PROJ00000082; PR-00026362; PO-0027554 TIF — Southside Development #1 and Water Works Capital 430-10-102-121-444000 and 622-06-604-620-442010 Base Bid (Unit Prices) Unit Prices The Division of Engineering and Division of Water Works recommend the Board of Public Works approval of Change Order No. 1 for the subject project. Items added to the scope of work were due to unforeseen conditions impacting the alignment of the water main profile and a water main repair. For Change Orders Only Amount of ® Increase $ 23,606.65 ❑ Decrease ($ ) Previous Amount $ 1,597,000.00 Increase 1.48%% Current Percent of Change: Decrease ( %) New Amount $ 1,620,606.65 Increase 1.48% Total Percent of Change: Decrease ( %) Time Extension Amount: 0 Days New Completion Date: 05/31/2024 - No Change