HomeMy WebLinkAboutConstruction Access & Installation Agreement – Parsons Environment & Infrastructure Group Inc.city of South Bend
- Public Works
O•11III .14M"M
0-0310000roffib Ink
From: Andrea Alexander, Wastewater Utility
Subject: Parsons Environment and Infrastructure
Date: March 19, 2024
Parsons is developing biofilter technology to remedy nuisance methane emissions from
abandoned gas well sites as well as closed landfills. They had reached out to Indiana Department
of Environmental Management (IDEM) in search of "antique" landfills to develop this technology
in Midwest conditions. IDEM contacted the City to see if there was interest in taking part in a
pilot project at no cost to the City at the closed landfill located at Fredrickson Park.
This technology reduces methane emissions that are a greenhouse gas. This project opens
piggy -back opportunities for the Office of Sustainability and possibly the Boy Scouts.
An Agreement with Parsons was developed due to the regulations that must be adhered to with
the closed landfill.
Excellence
Accountability
Innovation
Inclusion
Empowerment
visit
County -City Building
227 W Jefferson Blvd, Suite 1300 N
South Bend, IN 46601
Phone
311 inside City limits
(574) 233-0311 outside City limits
Email: 3110southbendin.Qov
Website: Southbendin.Qov
CONSTRUCTION ACCESS AND INSTALLATION AGREEMENT
THIS CONSTRUCTION ACCESS AND INSTALLATION AGREEMENT
("Agreement") is entered into as of the 20th day of February, 2024, by the City of South
Bend, Indiana, acting through its Board of Public Works and on behalf of the Board of
Parks Commissioners (collectively, the "City") and Parsons Environment & Infrastructure
Group Inc. ("Parsons").
WHEREAS, the City owns and manages 14 acres of park land at 1300 South Bend
Avenue, South Bend, IN 46617, more commonly known as Fredrickson Park ("Fredrickson
Park");
WHEREAS, Fredrickson Park is subject to an environmental remediation plan managed
collaboratively between the City and Indiana Department of Environmental Management
("IDEM");
WHEREAS, Parsons is a leading and innovative environmental service company
seeking solutions for cleaner communities;
WHEREAS, Parsons desires to install a methane biofiltration system at Fredrickson Park
which will serve as a pilot program with the intent to capture a portion of the landfill gases and
ultimately convert those gases to water and carbon dioxide;
WHEREAS, Parsons has successfully tested the technology it intends to install at
Fredrickson Park with success both in its laboratory and oil and gas wells throughout Canada;
WHEREAS, both the City and Parsons believe this pilot program aligns with the City's
long term sustainability goals.
NOW, THEREFORE, for and in consideration of other good and valuable
consideration, the receipt and sufficiency of which is hereby acknowledged, it is agreed as
follows:
1. City agrees to allow Parsons access to Fredrickson Park for the limited purpose of
installing a methane biofiltration system. Parsons shall install in a manner that does not
disturb the clay landfill cap. The location of the methane biofiltration system on
Fredrickson Park shall be consistent with Exhibit A, attached hereto. Nothing in this
Agreement shall permit Parsons to pierce the clay landfill cap or otherwise disturb or dig
in any area of Fredrickson Park without the express consent of the City and Indiana
Department of Environmental Management. Further, Parsons agrees to comply with the
technical guidance provided by IDEM as set forth in Exhibit B throughout the
construction, installation and implementation period.
-1-
2. Parsons, at its sole expense, shall construct, install, and maintain the methane biofiltration
system. Further, Parsons shall provide the City with all data points related to the
operation of the methane biofiltration system as well as any other data reasonably
requested by the City.
3. The term of this Agreement shall be year to year and shall automatically renew unless the
either party provides written notice of its intention to terminate the relationship. Upon
termination of this Agreement, Parsons, at its sole expense, shall be responsible for the
safe dismantling of the methane biofiltration system and remove all related materials and
equipment from Fredrickson Park. Any such dismantling of the methane biofiltration
system must abide by all rules imposed on the land by the Indiana Department of
Environmental Management.
4. Parsons agrees to make its representatives available in person for a public meeting to
answer questions from concerned citizens, community groups and other key City
stakeholders. This City shall provide Parsons a minimum of four (4) weeks' notice prior
to the scheduling of such public meeting.
5. Parsons agrees and undertakes to indemnify and hold the City, and its respective agents,
employees, successors, and assigns, harmless from any liability, loss, costs, damages or
expenses, including attorneys' fees, which City may suffer or incur as a result of any
third party claims or actions. Parsons' duty to indemnify the City is limited to the extent
that the claims or actions are caused by Parsons actions under this Agreement. If any
action is brought against City or its respective agents, employees, successors, or assigns,
in connection with this Agreement, Parsons agrees to defend such action or proceedings
at its own expense and to pay any judgment rendered therein.
6. This Agreement may not be assigned by Parsons without the express written consent of
City which such consent may be withheld for any reason. Any violation of this limitation
shall terminate this Agreement and forfeit Parsons's rights under this Agreement.
7. This Agreement shall be construed and interpreted according to the laws of the State of
Indiana.
8. This Agreement sets forth the entire agreement and understanding between the parties as
to the subject matter hereof, and merges and supersedes all prior discussions, agreements,
and understanding of any and every nature between them.
9. The person signing on behalf of Parsons represents that he/she has been duly authorized
to execute this Agreement on behalf of Parsons.
IN WITNESS WHEREOF, City and Parsons, through their duly authorized representatives,
have caused this Agreement to be executed as of the day and year first written above. The parties
have read and understand the foregoing terms of this Agreement and do, by their respective
signatures hereby agree to its terms.
-2-
(Remainder of page intentionally left blank)
Date: CITY OF SOUTH BEND, INDIANA
2/20/2024 BOARD OF PUBLIC WORKS
PARSONS ENVIRONMENT & Elizabeth A. Maradik, President
INFRASTRUCTURE GROUP
Gary A. Gilot, Member
Josef h Culey, Seni r ice President Murray L. Miller, Member
-3-
Joseph R. Molnar, Vice President
Breana N. Micou, Member
Attest: Laura D. Hensley, Acting Clerk
Date: March 26, 2024
EXHIBIT A
51
EXHIBIT B
Guidance from IDEM Technical Staff for Installation
The Indiana Brownfields Program and IDEM Technical staff have reviewed the
proposed construction of the biofilter and associated piping for a methane treatment pilot
project, as submitted September 25, 2023 (VFC #83536075 [ecm.idem.in.govl). The following is
recommended during and after installation of the methane treatment biofilter:
(1) The proposed design indicates that the landfill cover will not be disturbed, because the
biofilter will be constructed on top of the cover. IDEM reiterates that the landfill's two
feet of clay cap AND six inches of topsoil should not be excavated or disturbed during
installation of the biofilter. All topsoil referenced in project documents needs to be moved
on to the landfill without the use of large trucks traversing the cap, due to the potential
for cap damage from oversized vehicles.
(2) The biofilter design proposes to divert a slipstream of gas to the biofilter, while leaving
the existing gas collection lines and gas extraction system intact and active, as originally
designed. The biofilter design includes a return line for treated gas to the blower/flare
system after passing through the biofilter. IDEM notes that construction of the return line
is crucial to prevent a build-up of methane gas.
(3) The biofilter needs to be maintained and in good condition during the lifetime of its use.
IDEM requires repair of the cover and equipment if disturbed/damaged during the
biofilter installation and operation and return of the facility back to the pre-biofilter
condition upon completion of the project.
(4) Applicable requirements of 329IAC 10-23-3 need to be followed. "
-5-
Legend
Biofilter Footprint,
Sloped to Land Surface
Biofilter Footprint,
Flat Top
Gas In
to Biofilter
Gas Out
of Biofilter
■...■
■ ■Flare and Blower
Construction
Enclosure
�
Footprint/Fencing
Material Staging and
O Sensor Ports
Mixing Area
moo, Path for Material Delivery
X" Preexisting
and Biofilter Access
/ Buried Lines
�-
I
Preexisting
Buried Lines
ti
N 0 25 50 75 100ft
0 e
Boy Scouts Parking v ¢ v
Lasalle Council,
vvvvv
Boy Scouts of America #165 v o
ova
4449'i
ooa�r
. p 9 -
4 �744
4 4
� Q
Methane
Biofilter
/ Location
Remove Corner r
�> Post of Enclosure f
■
x, Remove Dead 1 1
Arborvitae Ike.,
Path for Material `
Delivery/Access I.1
FREDRICKSON PARK METHANE
_ ;---------
BIOFILTER OVERVIEW MAP Material Staging
Preliminary Draft - Subject to Change 1 and Mixing Area �+
,
PROJECT DRAWN BY L
PARSONS' FREDRICKSON PARK J. STOCK _
— SOUTH BEND, INDIANA
APPROVED BY
14291 Park Meadow Drive, Suite 100 _
Chantilly, VA 20151 DATE
FEBRUARY 15, 2024
1
Biofilter Dimensions and Notes
35 ft
k_4 7 ft 25 ft 3 ft
Lr) O
N 1
A-----------------Biofilter Cross Section----------------- A,
Gas Out Return Piping
to Land Surface
Sloped
---- - Biofilter
Gas Flow ,; Medium
Ln
Through
ni
Medium
------------
Clay
Soil Gas In Distribution Piping
N
U
3
C
m
J
0
m
Q
0
M
Cross z' I A I
Section
A -A'
Flat
Top
X
Torts
Gas -In Subsurface Gas -Out Subsurface
Piping from blower Piping from Biofilter to
to biofilter blower
Methane Biofilter Dimensions
and Features
• Flat top (white dashed line, 20 X 25 X 2.5ft)
• Sloped to land surface (yellow, total footprint
of 30 X 28.5 X 2.5 ft)
• 3 small flush mount valve boxes visible at
surface
• One stream of gas from after the blower and
before the flare piped below grade to biofilter
• Gas exiting biofilter piped back to the blower
enclosure
• Total gas flow at existing blower will not be
significantly influenced
• Estimated construction time is 1 to 2 weeks
• Blower enclosure fencing may need to be
removed during construction but will be
restored to pre-existing conditions.
2/6/2024 1:42:30 PM
License $125.00
Credit Card $125.00
kwidawsk 69931
No. 7627-25 REGISTRATION $125.00
ST. JOSEPH COUNTY AND CITY OF SOUTH BEND, INDIANA
February 6, 2024
WHEREAS, PARSONS ENVIRONMENT & INFRASTRUCTURE GROUP INC having this day
paid to the Building Department the sum of One Hundred Twenty Five Dollars and Zero Cents is
hereby REGISTERED to operate in the unincorporated areas of ST. JOSEPH COUNTY and the
CITY OF SOUTH BEND, as a
Industrial Piping Contractor
THIS REGISTRATION EXPIRES: January 24, 2025
Randy James
1422 S. TRYON ST
SUITE 800
CHARLOTTE, NC 28203
(704)558-4067
THIS REGISTRATION IS NOT TRANSFERABLE
, Building Commissioner
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
DEPARTMENT OF PUBLIC WORKS
ERIC HORVATH, DIRECTOR
September 25, 2023
Ms. Andrea Robertson
Brownfields Senior Project Manager
OLQ Remediation Service
IGCN 1275
100 North Senate Avenue
Indianapolis, IN 46204
RE: Fredrickson Park —South Bend, Indiana
Ms. Robertson,
The City of South Bend, Indiana in conjunction with Parsons is planning to construct a methane biofilter
at the former landfill also known as Fredrickson Park. The purpose of the activity is to conduct a field
pilot study of this emerging technology.
This technology utilizes microbial degradation of methane gas to reduce greenhouse gas emissions.
Parsons has proven the technology's efficacy in both a laboratory setting (including samples from
Fredrickson Park) and has field piloted the technology at orphan oil and gas wells in Canada. Parsons
wishes to construct their methane biofilter to conduct pilot scale testing of the technology in a landfill
setting and a Midwest state climate.
Parsons will construct the biofilter such that a portion of the landfill gases collected by the existing gas
extraction system will be piped to the biofilter which is constructed on top of the clay cap. The design
distributes the gas through the filter media where methanotrophs metabolize the methane converting it
to water and carbon dioxide. Attached to this letter you will find a figure that provides additional details
on the size, location, and general specifications of the biofilter and construction considerations.
We have worked with Parsons to ensure that the protective elements currently in place at the landfill
continue to protect the citizens and environment of South Bend. Parsons has demonstrated that the
biofilter design, construction and operation will not impact the protective elements currently in place at
Fredrickson Park. The clay cap in place over the extent of the landfill will not be impacted as the biofilter
will be constructed on top of the cap and will not be penetrated during construction nor operation.
Secondly, the gas extraction system will continue to operate as designed. A slip stream of gas (adjustable
percentage) will be diverted to the biofilter from a location in the system after the blower and before the
flare/exhaust stack.
This project aligns with The City of South Bend's sustainability goals, and we are excited to facilitate the
evaluation of this technology. Please feel free to reach out to us with any questions or concerns you may
have regarding this project.
Sincerely,
&C Q4C",
Andrea Alexander
Director of Environmental Compliance
City of South Bend — Wastewater Utility
Cc:
Mr. Jason Price - Parsons
Attachment:
Fredrickson Park Methane Biofilter Overview Map
From:
ROBERTSON,ANDREA
To:
Andrea Alexander
Subject:
RE: Fred Park - Methane Treatment Pilot Project
Date:
Thursday, January 18, 2024 9:36:28 AM
Great, thanks for the response.
Andrea
From: Andrea Alexander <aalexand@south bendin.gov>
Sent: Thursday, January 18, 2024 9:27 AM
To: ROBERTSON, ANDREA <AROBERTS@ifa.IN.gov>
Cc: VEDDER, KIM <KVEDDER@idem.IN.gov>; Kim Thompson <kthompso@south bend in.gov>
Subject: RE: Fred Park - Methane Treatment Pilot Project
**** This is an EXTERNAL email. Exercise caution. DO NOT open attachments or
click links from unknown senders or unexpected email. ****
Andrea,
IDEM's emailed comments will suffice. The email will be included in the agreement as an Exhibit.
Thank you for your attention to this matter.
Andrea Alexander
City of South Bend
574-235-5813
From: ROBERTSON, ANDREA <AROBERTS(@ifa.IN.gov>
Sent: Friday, January 12, 2024 1:41 PM
To: Andrea Alexander <aalexand(@southbend in.gov>
Cc: VEDDER, KIM <KVEDDERCo)idem.IN.gov>
Subject: Fred Park - Methane Treatment Pilot Project
Andrea,
The Indiana Brownfields Program and IDEM Technical staff have reviewed the proposed construction
of the biofilter and associated piping for a methane treatment pilot project, as submitted September
25, 2023 (VFC #83536075). The following is recommended during and after installation of the
methane treatment biofilter:
1. The proposed design indicates that the landfill cover will not be disturbed, because the
biofilter will be constructed on top of the cover. IDEM reiterates that the landfill's two feet of
clay cap AND six inches of topsoil should not be excavated or disturbed during installation of
the biofilter. All topsoil referenced in project documents needs to be moved on to the landfill
without the use of large trucks traversing the cap, due to the potential for cap damage from
oversized vehicles.
2. The biofilter design proposes to divert a slipstream of gas to the biofilter, while leaving the
existing gas collection lines and gas extraction system intact and active, as originally designed.
The biofilter design includes a return line for treated gas to the blower/flare system after
passing through the biofilter. IDEM notes that construction of the return line is crucial to
prevent a build-up of methane gas.
3. The biofilter needs to be maintained and in good condition during the lifetime of its use. IDEM
requires repair of the cover and equipment if disturbed/damaged during the biofilter
installation and operation and return of the facility back to the pre-biofilter condition upon
completion of the project.
4. Applicable requirements of 329 IAC 10-23-3 need to be followed."
Please let me know if this email is sufficient or if you would like a formal letter regarding the above
comments.
Thanks
Andrea
"► Andrea Robertson Habeck
A� Technical Staff Coordinator
1 INDIANA FINANCE AUTHORITY
100 North Senate Ave., STE 1275
Indianapolis, IN 46204
(p): 317-234-0968
(e): aroberts(2ifa.in.gov
IMPORTANT NOTICE! This E-Mail transmission and any accompanying attachments may contain
confidential information intended only for the use of the individual or entity named above. Any
dissemination, distribution, copying or action taken in reliance on the contents of this E-Mail by
anyone other than the intended recipient is strictly prohibited and is not intended to, in anyway,
waive privilege or confidentiality. If you have received this E-Mail in error please immediately delete
it and notify sender at the above E-Mail address. Please note that incoming e-mails are not routinely
screened for response deadlines, and as such, please notify the sender separately by fax of any
message containing deadlines. In addition, E-Mail information cannot be guaranteed to be secure or
error -free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete,
or contain virus. Therefore, the sender does not accept liability for any errors or omissions in the
contents of this message which arise as a consequence of E-Mail transmission. If verification is
required, please request a hard -copy version.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date March 19, 2024
Department
Name Andrea Alexander Wastewater
BPW Date March 26, 2024 Phone Extension 5813
Review and Approval Required Prior to Submittal to Board
Diversity Compliance ❑ Officer Name
and Inclusion Officer
BPW Attorney x❑ Attorney Name
Dept. Attorney ❑ Attorney Name
Michael Schmidt
Purchasing ❑
Check the Appropriate
Item Type — Re uired or All Submissions
❑ Professional Services Agreement
x❑ Contract
❑ Proposal
❑ Open Market Contract
❑ Amendment/Addendum
❑ Special Purchase, QPA
❑ Bid Opening
❑ Bid Award
❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening
❑ Quote Award
❑ Reject Bids/Quotes
❑ Proposal Opening
❑ C/O & PCA No.
❑ PCA
❑ Chg. Order, No.
❑ Traffic Control
❑ Resolution
❑ Other:
❑ Ease./Encroach
Information
Company or Vendor Name
Parsons Environment & Infrastructure Group
x❑ Yes ❑ If Yes, Approved by Purchasing
New Vendor
❑ No
❑
MBE/WBE Contractor
Completed E-Verify Form Attached
❑ WBE ❑ Nos
Project Name
Methane Biofilter Pilot Study
Project Number
N/A
Funding Source
N/A
Account No.
N/A
Amount
N/A
Terms of Contract
See attached Agreement
Purpose/Description
_As part of a pilot study, Parsons proposes constructing a methane biofilter
at Fredrickson Park Landfill. This technology utilizes microbial degradation
to reduce greenhouse gas emissions. This project is at no cost to the
City.
For Change Orders Only
Amount of ❑ Increase $
❑ Decrease ($ )
Previous Amount
Current Percent of Change:
New Amount
Increase %
Decrease ( %
Increase %
Total Percent of Change: Decrease