HomeMy WebLinkAboutOpening of Bids - Demo 1000 W. Sample St. (Fun FX Building) Proj No. 123-014R - Green DemolitionTH
A[t
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Demolition of 1000 West Sample Street
Project No. 123-014R
For Bids Due Tuesday, March 26, 2024 @ 9:00 A.M. (E.D.T.)
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
X Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good
Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and
X WBE-2.1].
X Acknowledge Receipt of Addendum(s) included with the bid.
X All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X
printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Green Demolition Contractors, Inc. Date: _ _ 4
By Authorized Represe i
Signature:
Print Name & Title: Michael Brough. President
Version 07/19/2023 Contractor's Bid for Public Works -1
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Demolition of 1000 West Sample Street
Project No. 123-014R
For Bids Due Tuesday, March 26, 2024 @ 8:00 A.M. (E.D.T.)
PART
(Must be completed for all bids. Please type or print)
Date: 3-25-24 Bidder (Firm): Green Demolition ontractorS, Inc
Address: 315 Brighton St. Suite 1
City/State/Zip: LaPorte, IN46350 Telephone Number: ( 219) $79_5311
Agent of Bidder (if Applicable): Michael BrOuoh
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Demolition of 1000 West Sample Street — Former Fun FIX Building
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
City of South Bend, Engineering Division
and dated 03/0112024 for the sum of (enter the Total Bid as shown on the Proposal)
Five Hundred twenty-eight thousand Eight Hundred Dollars ($ 528,800.00 )
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown n ep t attachment.
By
(Signature)
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
Murray L. Miller, Member
Michael Brou h
(Printed Name of Person Signing)
ACCEPTANCE
day of
20
Joseph R. Molnar, Vice President
Breana N. Micou, Member
Attest: Theresa Heffner, Clerk
Version 07/19/2023 Contractor's Bid for Public Works - 2
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.) See Attached
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor. See Attached
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
See Attached
4. Attach a listing of equipment you have available to use for the proposed project.
See Attached
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed. Yes
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded. See Attached
Version 07/19/2023 Contractor's Bid for Public Works - 3
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
) SS:
LaPorte COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran..
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran,
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 07/19/2023 Contractor's Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 07/19/2023 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 25th day of March , 2024
Green Demolition Contractors, Inc.
Co 1 de Firm)
Signature of Contractor/Bidder or Its Agent
Michael Brough, President
Printed Name and Title
Subscribed and sworn to before me this 25th day of March , 2024
My Commission Expires 1118ha
No ary Publi
County of Residence LaPorte
,spa"r'P�B�,
Kimberly Martin
Notary Public, State of Indiana
=
SEAL
LaPorte county
Commission Number NP0470193
MyCon uri,slonF_xpires
Version 07/19/2023 Contractor's Bid for Public Works - 6
=" 4F
ktj(
BID/PROPOSAL _
CITY OF SOUTH BEND
Project Name: Demolition of 1000 West Sample Street r
Project Number: 123-014R
For Bids Due: Tuesday, March 26, 2024 @ 9:00 A.M. (E.D.T.)
Contractor Name: Green Demolition Contractors Inc.
Item
No. Description Quantity Unit Unit Price Total Amount
Provide a Lump Sum price to
1 perform the demolition, backfill, 1 LSUM $ 528,800.00 $ 528,800.00
grading and seeding as intended
by these Specifications
Total Amount of Bid $ 528,800.00
Bidder (Firm): Green Demolition Contractors, Inc.
Address: 315 Brliahton St Spite 1
City/State/Zip: LaPorte, IN 46350 Telephone Number: (219 ) 37cl-fi,
By
(Signature)
Michael Brough
(Printed Name of Person Signing)
Version 07/19/2023 Contractor's Bid for Public Works - 7
x n
CITY OF SOUTH BEND 19
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-1.0 �..\�;✓
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
***Goals should be calculated based on the Base Bid only.*"
Project Number: 123-"4R Project Name: Demolition of 1000 West Sample Street
Bidder: Green Demolition Contractors. Inc. _ Base Bid Amount: 152&000.00 MBE Goal: 1.39%
Page 1 off
Name &Address of MBE
Primary Contact Person
(Name/Telephone)
Scope of Work to be Performed
(Attach soope/schedute'rf you need additional space)
Mar Amount of MBE
Component
Percentage
Of Total
B' I
1 st Class Logistics
2213 Saint Charles
South Bend, IN 46601
Bernard Coutee
Trucking & Hauling
(Dump Truck)
$7,392.00
1.4%
Submitted by: Michael Bro h _ 3-25-2024
Print Name ignature Date
***Goals should be calculated based on the Base Bid only.***
Version 07/19/2023 Contractors Bid for Public Works - 8
?4//�,umi
CITY OF SOUTH BEND
Ilk
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
;=
FORM WBE-1.0
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
***Goals should be calculated based on the Base Bid only.***
Project Number: 123-014R Project Name: Demolition of 1000 West Sample Street
Bidder: Green Demolition Contractors. Inc. Base Bid Amount: $528,800.00 WBE Goal: 4.65%
Page 2 of 2
Name & Address of WBE
Printery Contact Person
(Namelfelephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Trucking & Hauling
DalmAmount of WBE
C-4-namt
$23,780.00
Percentage
of Total
Bid/Proposal
San Corporation
1112 East Summit St
Crown Point, Indiana
46307
Sandra Smith
219-299-6830
4.5%
Submitted by: Michael Brough
Print Name
3-25-2024
'Signature Date
*"Goals should be calculated based on the Base Bid only.*'*
Version 07/19/2023 Contractor's Bid for Public Works - 9
CITY OF SOUTH BEND 4
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN <' r
FORM MBE-2.0 '
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 123-014R Date: 3/25/2024
Project Name: Demolition of 1000 West Sample Street
Bidder: Green Demolition Contractors, Inc.
Contact Person: Bernard Coutee Telephone: 574-993-0071
Address: 2213 Saint Charles Ave
City: South Bend State: Indiana zip: 46614
Email: lstclasslogistics2013i2amail.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: htto://www.in.gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
MB
(http:/Avww.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by MWBEs, including, where appropriate, breaking out contract work items into
MB
economically feasible units to facilitate MBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
MB
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
MB
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
MB
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
MB
sufficient time for MBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested MBEs.
MB
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
MB
subcontract.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
MB
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 07/19/2023 Contractor's Bid for Public Works -10
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
MB
equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
MB
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor, and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 07/19/2023 Contractor's Bid for Public Works -11
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANS
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number:
Project Name:
Bidder:
Contact Person:
Address:
City:
Email:
123-014R
Demolition of 1000 West Sample Street
Date: 3/25/2024
Green Demolition Contractors, Inc.
Sandra Smith Telephone: 219-299-6830
1112 East Summit St
Crown Point State: Indiana zip: 46307
sandy0sancorptruckina.com
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below`:
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3)the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: htt ://www.in. ov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
MB
lhttp:/twww.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
MB
economically feasible units to facilitate WBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
MB
means the interest of all WBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
MB
WBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
MB
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
MB
sufficient time for WBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested WBEs.
MB
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
MB
subcontract.
I
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
MB
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 07/19/2023 Contractor's Bid for Public Works -12
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
:fi
oM ti
MB
I affirm that I have made good faith efforts to assist interested WBEs in obtaining
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
I affirm that I did not reject any WBEs as unqualified without sound business reasons
MB
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 07/19/2023 Contractor's Bid for Public Works -13
CITY OF SOUTH BEND t
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.1
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority -owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE__L_OF 2
Project Number: 123-014R MBE Participation Goal 1.39%
Project Name: Demolition of 1000 West Sample Street
By:
(Signature) (Title) (Date)
MBE Firm 1st Class Logistics
Owner or Contact at MBE Firm Bernard Coutee
Telephone: 574-993-0071 Fax: N/A Email: 1stcl sl istics2013 mail.com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Trucking & Hauling Dum Truck
RESULTS OF CONTACT WITH THE MBE FIRM:
Agreed to Participate in Project
MBE Finn
Owner or Contact at MBE Firm
Telephone: Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Email:
Version 07/19/2023 Contractor's Bid for Public Works -14
4x TN
+: l
CITY OF SOUTH BEND r��
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN F
FORM MBE-2.1 ='
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE__2_OF 2
Project Number: 123-014R WBE Participation Goal 4.65%
Project Name: Demolition of 1000 West Sample Street
Bidder: Green Demolition Contractors Inc.
By: President 3/25/2024
(Signature) (Title) (Date)
WBE Firm San Corporation
Owner or Contact at WBE Firm
Telephone: 219-299-6630
Sandra Smith
Fax: N/A Email: sand sancor truckin .com
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Trucking & Hauling
RESULTS OF CONTACT WITH THE WBE FIRM:
Agreed to Participate in Project _
ffi *8rmi,
Owner or Contact at WBE Firm
Telephone:
Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
Email:
Version 07/19/2023 Contractor's Bid for Public Works -15
THE CINCINNATI INSURANCE COMPANY
CONTRACTOR (Name, legal status and address):
Green Demolition Contractors, Inc.
315 Brighton St, Suite 1
La Porte, IN 46350
OWNER (Name, legal status and address):
City of South Bend Indiana - Board of Public Works
227 Jefferson Blvd - County -City Building Room 1316
South Bend, IN 46601
BOND AMOUNT:
5% of Total Bid Amount
SURETY (Name, legal status and principal place of business):
THE CINCINNATI INSURANCE COMPANY
6200 S. GILMORE ROAD
FAIRFIELD, OHIO 45014-5141
This document has important legal
consequences, Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
PROJECT (Name, location or address, and Project number, if any):
Demolition & Site Restoration - Demolition of 1000 West Sample Project Number, if any:
Street - 1000 W. Sample Street, South Bend, IN 46601 123-014R
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the
Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the
Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the
terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with
a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful
performance of such Contract and for the prompt payment of labor and material furnished in the prosecution
thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount
specified in said bid and such larger amount for which the Owner may in good faith contract with another party
to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full
force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to
extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any
extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid
documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond the sixty (60)
days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond
shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the
Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted
herefrom and provisions conforming to such statutory or other legal requirements shall be deemed incorporated
herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a
common law bond.
41
Signed and sealed this y17 day of hfe*re11 .zp.L -v
("Witness)
(Witness)
Green Demolition Contractors, Inc
(Seal) —
(Title
Michael Brough - President
THE CINCINNATI INSURA: 'CE COMPANY
6suret v y � eat)
(Title)
David S. Parrilli - Attorney -in -Fact
The Company executing this bond vouches that this document conforms to American Institute of Architects Document A310, 20 lC Edition.
S 2000 AIA (11/10) PUBLIC
THE CINCINNATI INSURANCE COMPANY
THE CINCINNATI CASUALTY COMPANY
Fairfield, Ohio
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY and THE CINCINNATI CASUALTY
COMPANY, corporations organized under the laws of the State of Ohio, and having their principal offices in the City of Fairfield, Ohio
(herein collectively called the "Companies"), do hereby constitute and appoint
David L. Jennings; Amy C. Homer; Donald Petterson; Philip C. Reimer; Susan M. Preissing; Robert H. Walker; Doug O'Neill;
George F. Manikas, Jr. and/or David S. Parrilli
of Chicago, Illinois their true and legal Attorney(s)-in-Fact, each in their separate capacity if more than one is named
above, to sign, execute, seal and deliver on behalf of the Companies as Surety, any and all bonds, policies, undertakings or other like
instruments, as follows: Any such obligations in the United States, up to
Twenty Million and No/100 Dollars ($20,000,000.00).
This appointment is made under and by authority of the following resolutions adopted by the Boards of Directors of The Cincinnati
Insurance Company and The Cincinnati Casualty Company, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the President or any Vice President be hereby authorized, and empowered to appoint Attorneys -in -Fact of
the Company to execute any and all bonds, policies, undertakings, or other like instruments on behalf of the Corporation, and
may authorize any officer or any such Attorney -in -Fact to affix the corporate seal; and may with or without cause modify or
revoke any such appointment or authority. Any such writings so executed by such Attorneys -in -Fact shall be binding upon the
Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company.
RESOLVED, that the signature of the President or a Vice President and the seal of the Company may be affixed by facsimile on
any power of attorney granted, and the signature of the Secretary and the Seal of the Company may be affixed by facsimile to
any certificate of any such power and any such power of certificate bearing such facsimile signature and seal shall be valid and
binding on the Company. Any such power so executed and sealed and certified by certificate so executed and sealed shall, with
respect to any bond or undertaking to which it is attached, continue to be valid and binding on the Company.
IN WITNESS WHEREOF, the Companies have caused these presents to be sealed with their corporate seals, duly attested by their
President or a Senior Vice President this 19th day of December, 2018.
�l\Inf Yidq�a pall (af41/
5 ,
:`CORPORATE y`CORPORATE
�SEALY "SEAL`
oHlo oxla
STATE OF OHIO )SS:
COUNTY OF BUTLER )
THE CINCINNATI INSURANCE COMPANY
THE CINCINNATI CASUALTY COMPANY
On this 19th day of December, 2018 before me came the above -named President or Vice President of The Cincinnati Insurance Com-
pany and The Cincinnati Casualty Company, to me personally known to be the officer described herein, and acknowledged that the seals
affixed to the preceding instrument are the corporate seals of said Companies and the corporate seals and the signature of the officer
were duly affixed and subscribed to said instrument by the authority and direction of sajo corporations.
Keith Co tt, Attorney at Law
Notary Public— State of Ohio
My commission has no expiration date.
Section 147.03 O.R.C.
I, the undersigned Secretary or Assistant Secretary of The Cincinnati Insurance Company and The Cincinnati Casualty Company, hereby
certify that the above is the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Power of
Attorney is still in full force and effect.
Given under my hand and seal of said Companies at Fairfield, Ohio, this ,y day of .110-4Oek/ 20-a Y
a�y69ATE(ee
L`
BN-1457 (4/19)
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Demolition of 1000 West Sample Street
Project No. 123-014R
For Bids Due Tuesday, March 26, 2024 @ 9:00 A.M. (E.D.T.)
Contractor Name: Green Demolition Contractors, Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 07/19/2023 General Conditions -11
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(►)
By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
By checking this box,
-,Av
I hereby acknowledge that the City reserves the right to
request supplemental Information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all Information provided in this
submission and all Information obtained in inquiries or requests to determine If a
bidder is responsive and responsible. Additionally, I acknowledge that all
(fir) X
information provided to the City shall be regarded as public records.
By
checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shelf be furnished
(id) X
upon request
By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensue; that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub.
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments;
(i)
Indiana Secretary
of States on-line records Qa. Business verification) dated within
sixty (60) days of the submission of said document showing that business is In
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
X
proprietors or partnerships).
Ci)
List identifying all former business names.
Any determinations
by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Ads, within the preceding five (5)
(Iv)
years.
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
Xam
bidding on OR outlines how I intend to meet the staffing needs of the work.
(v)
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
For
every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
(vii)
Apprenticeship, or its successor organization.
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
(vfii)
requirements set Barth in IC 4-13-18-5 or IC 4-13-18-6.
Evidence that f am utilizing a surety company which Is on the Bureau of Fiscal
Service °Department of Treasury's Listing of Approved Sureties° as required in the
bid specifications or contract.
Version 07/19/2023 General Conditions -14
(IJA) 5 Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
M X List of projects of similar size and scope of wodc performed In all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
—Date: March 25 2024
"..(Sign Here)
Michael Brou h
(Print Name Here)
De molition Contractors Inc.
(Name of Company)
315 Brighton St. Suite 1
(Address of Company) `
LaPorte
(City)
Indiana, 46350
(State)
? 19-379-5311
(Telephone Number)
Version 07/1912023 General Conditions -15
INTERNATIONAL UNION OF OPERATING RXGjN BRB
IACAL UN'" NO. 1Do, 111006 MCA, 150C, son", IS=, Isar., Isom
AMRJAT[O IATH THE 4L11A-{J.&-AN02UtldWC 7RA6" 0"ML"uf "
JAMES M. SWEENEY
�fi661DENf-bIISpESS MNVK${I 1^
COUNTIIYl1=J*Xr ROAD
L 80"S m
January 5, 2024
Green Demolition Contmctors
315 Brighton St, SlAte 1
LaP0rte,1N 46350
Re: Proof of Compliance with 30 ILCS 500/30-22(6)
Our File No. MI-00321
Dear Sir or Madam:
At the request of Green Demolition Contractors, I am providing you yyi� ence of the
Company's compliance with the apprenticeship requirements in 30 ILCS 500/30-22(6) of
the Illinois Procu=ent Code. I am submitting this letter along with appmnticesldp
certificates (NOs.IL012020003 and ILOWS0173).
As a signatory contractor with the Lot0n1GdOnel Union of Operating Fierce 150, AFL-CIO, Green Demolition Contractors, is required by Collective $��ng
Agreement to participate in an applicable apPaentic W ip and training program approved
by and registered with the United States Department of I,abor's Btu of Apprenticeship
and Training. The attached certificates am evidence of'compliancc with the U.S.
Dcpartment of Labor's apprenticeship requirmart,
Thank you for your cooperation in this matter. If you have any questions or corncerns,
please do not hesitate to contact me.
Very truly yours,
IUOK Local 150, AFL-CIO
District 1 dispatch office
Maribe(Heanandez
Enciosures: Certificates
. 0f sficl
Illom", M�l
�8� IARM A
TorT" — o
r lwvoras part of ge �a ppr�enfrces�'ip c�ys�fern
h2 aacord=Ce mif1i fie AMic daMdWV�J- o/ap� tp
esfa�Is edGy,fie c�iecxeiar of Ba6or
Decem6er31.1978
ftv&ed,9une 23, 2011 - ,►,�
v W.
a F
10087801 T3 a
Me,qisler*oras parf 0t6e �alron��PP-�f�•"��P c5yafem
to accarorance mift�f�te basic s,fa„�o�ar� °f aPPrenfices�rp
es,fal1. SLR rfiy ge t3earefay of,' 4-ar
lct .5, 2002 ott".r. oo
ICQ1202 aUD3 `e?ans CA �' ��
LIUA!
Chicagoland
Y
January 4, 202r4
Gmw Demolition Contractors, LLC
4W S St. Louis
Chicago, IL 60652
To Whom It May C".onaem:
Encdosad you will please find a copy of the Deem of Leber c
Teountly. ertification that you requesW
You may also use this letter as verification that Greer, Demolition Contractors, LLC is indmd
slgnstory to the to the Chic ap Laborers District Council and contributes to the Labour
Apprentic aWp Fund.
Should you rbquire anything further, please do not hesitate to contact me.
Yours very truly,
�, 0 .
Felicity Ruiz
Assistant Office Manager
rats �tariia aYA I -
James P. Connoliy, Chefm n ICehti Vifdia` j�
Michad BlAns
Shmvn Fugeratd Shane High
Cell azy Am Martin Aanagen Joseph Koppers
1200 Old Gary Avenue Joseph V. HaaV L���A Z ppe� CNN"
Carol Stream,lL8(7188 Loyd 't r1y" Vaughn � ah.ft " Robert G. Krug 5700 West Hamer St
WIINam Mpnccchi Chloago, IL 60839
eO)Ie *tatrg
0epartment" ,fib
office of �prerttice��jiP
al
tprtificate of Reg%otration of appreriticegbip program
April 12,1999
-5.11
H..017990001
F.k, & - %.
CWcagoland Laborers
Carol Stream, IL
For the occupation of CONSTRUCTION CRAFT LABORER
,Weyislerred a s earl of lh-e XalionaP' 9, renlice rSip c$ys/em
in accordance w-rY ISe {asic slan&zros of appr�n f ceS�;�
esfaSfrsre0(Sy lre c5ecrelary oj-,'a&.r
4
✓-4dmui+/ro/er:• 4r�PP^'nhi'r.�fy,
RUSI'NESS INFORMATION
DIP-01) MORALES
UQDIANA SECRETARY OF STATE
1111612023 11:16 AM
LW 1, r,t,
Business Name, GREEN DEMOLITION CONTRACTORS
INCORPORATED BLWMS ID: 2015061100177
Entity Type- Domestic Limited Liability Company Business Status: Active
Creation Date: 06111120i5 Inactive Date;
Principal Office Address: 315 Br%bton St Suite 1, LgPorle, IN, 46360,
USA Expiration Date: Perpetual
Jurisdiction OfFomation: Indiana Business Entity Report Due
Date: 06G0/2025
Years Due:
Titk Name Address 2L J
Fresidmi Micheal Brough 315 Brighton St Suite 1, L9 Pon-, IN, 46350, USA
Type: Individual
Name: MICHAEL BROUGH
Address: 315 Brighton St Suite 1, La Porte, IN, 46350, USA
State of Indims
Office of the Semtei-y of State
CERTIFICATE OF ORGANIZATION
Of
GREEN DEMOLITION CONTRACTORS INC`OR ORATLD
I. Connie La%sm Secretary of .State of Lidia a' hereby certify that Articlog of 0t gtioa oI the above
Domestic Limited LiabiliN Company (LLC) has been presented to we at 1riy office. accompanied
fees prescrAvd by law and that the documentation presented conknins to laty as pnescribc d bs by the
provisions of the Indiana Business Flaw Act.
NOW. THEREFORE. vkith this document I certify that said transaction
.Tune 11. ,2015. ;gill become effective Thursday.
In Witness Whereof, I have caused to be a ed my
signature and the seal of the State of Indiana, at the City of
Indianapolis. June 11.2015
CONNIE LAWSON,
SECRETARY OF STATE
220150611061-17 12015061100177
7MVwLa
RMxON $ idaLLVmmDn smu
on -at
tunu03 S _ _o�x T pis Kau saE
ftovW=nTmjr ;5' IIdXtI HOUVxtspym SILL
4u°O uomouna
"am Mao$ SO LM OF pas Ajxnon HdMOp 'J S ,;o sears paw use
GMMZSIM st nna4 �Z Ptm MPG � Aua,� e'N ul opmo o;
ftWH di ptsd Sup s ►sq �HI ` ,ZL.W lMZOZti .MZa Q
Saoa `cc Aqq
r zvrar� `erg HlaoSaOIM AMnoo xa�rsor :ts
oo•s�$ AIDI.LnUSI )aR
W-MIF ` N
Business Name: GREEN DEMOLITION CONTRACTORS
INCORPORATED
Entity Type; Domestic Limited Liability Company
Creation Date: 06/11/2015
Principal Oficc Address: 315 USA Brighton St Suite 1, LaPorte, IN, 46360,
Iurisdietica of Formation: Indiana
BUSINESS INFORMATION
DIEGO MORALES
INDIANA SECRETARY OF STATE
11/16/2023 l 1:16 AM
Business ID: 2015061100277
Business Status: Active
Inactive Date:
E.upiration Date: Perpetual
Business Entity Report Due 06/30/2025
Date;
Years Due:
Title Name Address
President Michael Bmugh 315 Brighton St Suite 1, La Porte, JN, 46350, USA
'type: Indlvtduai
Name: MICHAEL BROUGH
Address: 315 Brighton St Suite 1, La Porte, IN, 45350, USA
State of Indiana
Office of the Seeretsq of State
CERTIFICATE OF ORGANIZATION
Of
GREEN DEMOLITION CONTRACTORS INOORPORATRID
I. Connie Lawson. Secretary of State of Indiana, herby cert6 that Articles of Organization of the above
Domestic Limited Liability Company (LLC) has been presented to me at my office. accompanied by the
fees prescribed by lam' and that the documentation presented conforms to law as ptvwribed by the
pros isions of the Indiana Business Flev bility Act.
NOW. THEREFORE. Mth this document I certify that said transaction will .rune 11.2015 become effective Thursday
In Witness Whereof. I have caused to be off -ed my
sigaature and the seal of the State of Indiana, at the City of
Indianapolis. June 11, 2015
COIF NIE LAW SON,
SECRETARY OF STATE
201-406110017712015MI 100177
Na. 48918-24
REGISTRATION
Sr- JOSEpH CO �us.�:
UNWAND CITY OF SOUTH BEND, INDLUVA
MaY 22. 2023
QHFBN D�Qj•1TtQN OOP
T�oxs, 01C, having this day paid to the.
t the sum of One I'mWb,ad TWMW Pm Doft. and Za+o Buddtgg
ats to in 'he unk areas Of ST. JOSUH COMP and the Cr1Y OF SOUM BENIX
TM RLGISMATION EMU=: Ja,," s, 111,14
3s etrtoa sr sLgm 1 ,T . BQdb* Commis ma
tee. rn 4050
�TION 18 NOT TLUMU M
-%Ioe GREEN DEMOLITION CONTRACTORS, INC.
green !� iJ � � 315 INUGHTON ST. SUITE I
Arlf%1 IAPOM, IN 463SO
312-409-4771
f rnpipm§ Drug/ Aitohol Potli ,•
The past success and future growth of Green Demolition Contractors are a direct result of our
most important asset, Our people. Consequently, Green Demolition Contractors is concerned
about the use of alcohol, illegal drugs, or controlled substances as it affects the workplace. Use
of these substances, whether on or off the job, can adversely affect an employee's work
performance, efficiency, safety and health, and may therefore seriously impair his or her value
to the Company.
In addition, the use or possession of these substances on the job constitutes a potential danger to
the vvelfare and safety of other employees and exposes the company to risks of property loss or
damage, or injury to other people. Green Demolition Contractors has a viral interest In
maintaining safe and efficient working conditions for its employees and ensuring that all the
company vehicles are properly maintained and operated in a safe manner.
Furthermore, the use of prescription drugs andlor over-the-counter drugs may affect an
employee's job performance and seriously impair the employee's value to the company. Any
employee who is using prescription andlor over-the-counter drugs that may impair the employee's
ability to safely perform the job, or affect the safety or well-being of others, should not report
for work during the time the employee is using the medication. You may be required to provide
a doctor's note validating your need for time off due to the use of medication which Interferes
with your ability to safety perform your duties. The employee should use any accrued vacation or
sick leave during this time period. if the employee does not have accrued leave, the employee
should discuss their need for time off with their supervisor or Human Resources to determine if
alternative accommodation can be provided.
Proper use of prescription drugs directly prescribed to the employee is exempt from these
restrictions so long as the employee Is complying with physician orders and does not create a
safety hazard for the employee or his/her coworkers. Contact Green Demolition Contractors
Human Resources Department when an employee has been prescribed drugs from a complying
physician.
The following rules and standards of conduct apply to all employees either on the company
property (owned or leased or off premises job site) or during the wor1kday (including meals and
rest periods). The following are strictly prohibited by the company; however, this section does
not apply to the jUW use of prescription drugs.
I. Possession or use of alcohol or being under the influence of alcohol while on the job.
Recycling Today For A Greener Tomorrow
2. Driving a company vehicle while under the influence of alcohol or a controlled substance.
I Distribution, sale, or purchase of an illegal or controlled substance,
4. Possession or use of an illegal or controlled substance or being under the influence of an
illegal or controlled substance while on the job.
The following items at a minimum shall always be applicable and enforceable.
L Drug Testing;
a. Each employee, as a condition of employment, may be required to participate in
pre -employment; reasonable suspicion, project specific and follow-up testing upon
selection or request of management: Any employee who refuses to submit to drug or
alcohol testing requested by management will be subject to disciplinary action, up to
and Including immediate termination. Altered samples, substituted Samples and
negative dilutes constitute employee failure to cooperate with a rraWement
investigation in violation of Green Demolition Contractors business conduct policy.
Any employee submitting such a sample will be subject to disciplinary action, up to
and including Immediate termination,
b. Drug or alcohol testing required or requested by the company will be conducted at
the company expense. Testing for the presence of alcohol will be conducted by
analysis of breath and or cognitive function. Testing for the presence of the
metabolites of drugs will be conducted by the analysis of urine.
c. To ensure the accuracy and fairness of our testing program, all testing will be
conducted according to DHHS/SAMHSA guidelines where applicable and will
include a screening test; a confirmation test; the opportunity for a split sample;
review by a Medical Review Officer, Including the opportunity for employees who
test positive to provide a legitimate medical explanation, such as a physician's
prescription, for the positive result; and a documented chain of custody.
.2. Testing Based on Reasonable Suspicions
a. Employees may be referred by a supervisor to a company approved physician or
medical group for evaluation when a supervisor has reason to believe that the
employee is intoxicated or using controlled substances or other Illegal drugs during
work hours or at a time which may affect job performance or safety. Evidence of
such behavior may include, but is not limited to:
1. Slurred speech
2. Uneven gait
3. Mood swings
4. Violent temper
S. Excessive absenteeism/ tardiness
3• Employee Consent to Release Chemical Analysis:
a. When the Company requires an employee to submit body fluids for chemical
analysis, the employee must sign an employee consent form authorizing the results
to be forwarded to Green Demolition Contractors HR Representative. An
employee who refuses to submit body fluid samples upon request of the company
or who refuses to execute the employee consent farrn has failed to cooperate
with a management investigation in violation of the company business conduct
policy. Such conduct will subject the employee to disciplinary action, up to and
including immediate termination of employment.
4. Confidentiality of Test Results:
a. Test results of the chemical analysis of body fluids for substance abuse will be kept
confidential in the same manner that all other confidential personnel records and
confidential medical records are kept, Upon written request, the employee wiH be
furnished with a copy of his or her substance abuse test results.
Analysis e f Test Results
a. Being under the influence of drugs or alcohol on the job or during work hours will
be presumed by Green Demolition Contractors to pose a serious safety and health
risk. Additionally, any use of alcohol or drugs during non -work time which results
in a positive test of the employee during work hours may result in a similar
presumption that the use of the drugs or alcohol poses serious safety and health risks.
Positive Test
a. Green Demolition Contractors reserves the right to irnpose discipline, up to and
including immediate termination of employment, upon any employee who tests
positive. Green Demolition Contractors reserves the right to require, as acondition
of reinstatement and continued employment, completion of an approved
rehabilitation program, at the employee's expense, which shall include but not be
limited to:
1. A period of inpatient care
2. A return -to -work test prior to reinstatement
3. Follow-up testing at intervals as specked by Green Demolition Contractors HP,
Representative
'14Any employee testing positive during or after a rehabilitation program will be subject
to immediate termination. *°
Violation of the above rules and standards of conduct will not be tolerated and may
result in Immediate termination of employment.
Green Demolition Contractors reserves the right to bring the matter to the
attention of appropriate law enforcement authorities.
Employee Signature Supewlsor/ Witness Signature
Date ' Date
ti%irij GREEN DEMOLITION CONTRACTOR% INC.
` ` # 315 BRIG14TON ST. SUITE I
ll I %1' L.APORTF IN 46350
312- M-4n 1
fiction I urnent Lpt
QtY Descrotean
2 Link Belt 145 Excavamrs
2 Link Belt 350 Excavators
I Link Bch nigh -Reach Ev2vatar
I Cat 963 Track Loader
2 Cat 950 End Loaders
I Cat D-5 Dozer
2 330 Excavators Caterpillar
2 320 Excavatort Caterpillar
2 Mini Excavators
28 Skid steer Bobcats
8 Fatcahrator Hamm m
8 &Ovator Grapples
8 Overseer Contalners Converted far Roll Off Trucks
4 65 Yard Roll Off Boxes
4 40 Yard Roil Off Boxes
8 30 Yard Roll Off Boxes
6 20 YAM Roll Off Boxes
I Flat Deck for Roll Off w/ Built In Wench
1 20 Ton flat Deck Trailer
I 10 Ton Flat Deck Trailer
I Bobcat Tag Trailer
I Tilt Deck Trailer
I flat Deck Single Axel
I Ingersoll Rand Mason Lull
2 Lull Conversion BradcM
1 350 Imvator Wreclong Pete
8 Wreeld"s Pales
2 2018 K"worth Tractor Trailers
2 2020 Ford Ono Ton Dually Dump Trucks
2 2005 Mw* Tractors
2 2W6 Math Six Wheeler Roll Off Truft
Bobcat Hammers, buckets and various attachments for Eccavatona and Bobcats
1 Lour Boy Trailer
2 2011 Galbreath Semi Ml Off Trallem
2 Terminators
3 Atlas Capw 105 Air Compressors
2 Ingersoll Rand 2S0 Air Compressors
10 Cargo Trailers
1 Water Tmllem
EquipmenWnd.ka a Jisted-above are free of encumbrances, none of the above listed Items are (eased, all equipment
is owned by Michael. Bra, President Green Demolidon Contractors, Inc
Michael Br Qo-kh, PresMent
Recycling Today For A Greener Tomorrow
The Urrtr "tr krwrance Corrbp my • the C1nLrrrrtaU IndernrrCCCum
Tt,r CWKIrlrQV Casualty CoMpany • The Cwinrwli Spr-a Vty Undetwnreri msur4nCC Lamp"
1 A If' A 1 A 1 Q TI Tnc C1rxJnnan Lift. +n urarwr f nrrpany
INSURANCE ICOMVP♦AN' IES
January 31, 2024
RE: Gram Denrolrilar Contractors Inc. — Bonding Capacity
To Whom It May Concern:
The Cinckwoll Insurance Company (AM Best Rating of A+XV) provides surety bonding credit to Green
Demolition Contractors Inc. They are one of our finest accounts and we highly recommend them.
We currently have $5,000,000 single job/$10,000,000 aggregate bond program available for this firm.
Should a situation merit, we would consider requests beyond these parameters as well.
Any specific request for bonds will be underwritten on its own melba and any arr9ement for bonds
required by any contract Is a matter between Green Demolition Contractors Inc. and the surety and we
assume no Iisbli ty to you or your third parties, if for any reason we do not execute these bonds.
Feel free to contact us with any questions you may have.
since".
r
Natalie Koster
Attomey-in-l=act
Field Director Surety
NaWie—Koster@dnnn.com
1454% a rrr;,,-t 0r rii]-s9e • HtdIgwa Iets-f,laus C sr. Faittieid, Ohio 45U14-519
REVIEW REPORT
FOR THE YEAR ENDED DECEMBER 31, 2022
Se1de:n .Fox
A a—umirm for your future
Green Demolition Contrucioce, Inc,
Review Report
For the Year Ended December 31, 2022
-�= TEtblg of Canbents
Independent Acwuntm, Review Report 1-2
Financial t umunera:
Beunw Shea! a
Statement of Opennllons A
Statement of $tockholdees Equity
Statement of Cash Rows
Notes to the Financial StatPa m is 7 -17
Supplementary rnformd1oe:
Schedule of Co$t of Contract Revenues Eamed is
Schedule of Operating Expenses 19
Selden Fox
Accounting for your future
619 Emef wise Odue I Oik Brack. 10446M I wwwseldanbx.=
p =954.1400 I h 630.854.1317 I emaMl UWenfbccom
INDEPENDENT ACCGUNTANT'S REVIEW REPORT
Mr, Michael 8nwgh
Green Demolition Contractors, Inc.
Chicago, Illinois
We have reviewed the s000mpanying financial statements of Green Demolition Co"&aclaors,
Inc.. which comprise the balance sheet as of Decernber, 31. 2=. and the related statsml 6 of
operation, stockholders equity and cash flows for the !rear then ended, and the related notes to
the financial statements. A review Includes primarily applying analytical procedures m
managemenrs financial data and making Inquiries of Company management A review Is
substantially less In scope than an audit, the objective of which Is the mcpression of an opinion
regarding the financial statements as a whole. Accordingly, we do not Sues such on opinion.
flFarfrallerrren!'s Reepwalblifly for the Financial t nents
Management Is responslNe for the preparation and fair presentation of these flnandal StMernents
In accordance with accounting principles genemly accepted in the United States of America; fits
Includes the design, implementation, and maintenance of internal cor*ol relevant to the
Preparation and fair presentation of financial statements that are free from material mtsstatanwd
whether due to *mud or error.
Accountant's Responsibility
Our responsibility is to conduct the review engagement in accordance with 8ta4arnents on
tSUmlards for Accounting stud ReyIOw Bandon promulliated by the Amounting and Review
8er0ces Corrlmltbm of the AiCPA, Thom standards require us to parkm procedures to obtain
Ilinbad assurance as a basis of reporting whether we are aware of any material modifications that
should be made to the financial Stabemanils for tfhern to be In accordance wfth accounting
Principles ganeraYY accepted In the United S" of America. We bsl that the results of our
prooedunas provide a reasonable basis for our conclusion.
We are required to be independent of Green Demolition Contractors, Inc. and to ff"W our; other
ethical nesponsUfftles, in accordance with the relevant ethical requirements related to our review.
Accountant's Conclusion
Based on our review. we we not swats of any material mociftetions that should be made to the
accampanying financial stWAMWlts In order for them to be In accordance with accountng
principles generally aompied In the United Steles of America.
Am,n.h,.W
mgiworldwide .
Supplernentary Information
The accOrroarWirvi schedule of cost of contract revenues samed and eahedule of qmn tn8
eapmses are presented for purposes of additional analysis and are not a regtdmd part of the
basic flnencial statements. The Sui)PWMWTWY irfionnatbn Is the neaponsMiny of management
and was derived from, end relsiea directly ta, the underlying accoundtng and o0m records used
to preparo the financial sidffl rrtr;. ?he supplementary information has been subjected to the
review prorredures applied In our review of the basic financial statements. M are not ewers of
any material modifioatlons that should be made to the supplementary informdon. We have not
audited the supplementary tnfonnat<on and do not expnem an opinion on such infommtion.
S662 Pl Z49, Wk.
September 27, 21D23
-2-
March 25, 2024
City of South Bend
Re: 1000 W Saarple St
RFP 123-014R
Green Demolition Contractors has a team of over 50 personnel who have vast demolition expedise
in a variety of areas.
Green Demolitions Equipment Operators ace bdemational Union of Operating Engineers Local 150
Trained person nd with countless hours of machinery seat time ranging from Demolition Operations
associated with the removals of Commercial Buildings, High Rise Towers, Bridge Removals,
Structural Dismantling, Emergency Regmw e, Bli& Elimination, Environmental Clean Up, and
Decommissioning Work.
Green Demolitions Field Personnel on a daily basis perform a variety of tasks from Complete
Wreck and Removals to including but not limited to; Interior Demolition, Dism&-Ming, Struab ral
Openings, Mechanical Removals, Elevator Decoanm uioning, Torch Work, Water Tower
Removals, Steple Removals, Concrete Breaking and Crushing, to Selective Demolition i.e. Clean
Removals. Green Demolitions Office and field Personnel possesses over one hundred years of
combined experience in the ConstructioWDeindition Industry and are committed to providing for a
safe and environmentally clean work piece.
Green Demolition Contractors would be honored to take on this project as well as meet and exceed
all schedules, goals and expectations set for in the specifications.
Respectfully:
Michael J. Bough, President
Green Demolition Contractors
°'Recycling Today For A Grasper Totnnorrowr"