HomeMy WebLinkAboutCouncil Update_Feb 26 - UtilitiesCommon Council Update Utilities Committee February 26, 2024 Eric Horvath, Public Works Director Lead Service Lines Water Service Line Material Inventory •New EPA regulations requiring public water utilities to identify and map all drinking water service line materials connecting from City water mains to the customer’s home by October 2024. •Water service line is the pipe that carries water from the City’s water main in the street to the house or building. •The property owner owns the service line from the water main to the house. •To create the inventory, the City is using: •Data-driven predictive modeling •Water insurance and main break reports •Residential surveys and field verification •Inventory will be regularly updated and maintained Water Service Line Material Inventory •City Water customers can get their water tested for lead for free. •Test requires water to not be used for six hours prior to testing. •If results show lead levels higher than 10 parts per billion, the City will provide a water pitcher filter. •Customers can request a lead sampling kit by calling 311 or emailing waterquality@southbendin.gov. Home Water Testing for Lead Utility Assistance Program (UAP) •Enrollment in program can reduce water and sewer bills by up to $25.50 per month for qualifying customers •Program is open to homeowners and tenants •Apply online at southbendin.gov/UAP •Monthly discount is for one year and applicant must reapply every year •2,810 customers currently enrolled Utility Assistance Program (UAP) •To be eligible, applicants must: •Meet income guidelines (Be at or below 80% of the area median income) •Receive sewer service from the City •Residents who meet income guidelines are assigned one of four tiers of credit Utility Assistance Program Income Eligibility Cutoffs as a Percentage of Area Median Income (AMI)* Credit Amount >60% -80% of AMI $8.00 >45% -60% of AMI $14.25 >30% -45% of AMI $19.25 >0% -30% of AMI $25.50 Addressing Combined Sewer Overflows Long Term Control Plan •Initial Long Term Control Plan developed in 2012 to address Combined Sewer Overflows into the St. Joseph River. •Phase 1 of Plan completed at cost of almost $150 Million •Phase 2 was expected to cost an additional $700+ Million •In 2022 a new Plan was finalized and approved by the Environmental Protection Agency (EPA) and Department of Justice (DOJ) called SAGE –Smarter Alternative for Greener Environment •Cost: $276 Million •Timeline: 2022 -2038 Smarter Alternative for Greener Environment •Smart sensors in our sewer system have allowed the City to model and better predict how the sewer system will handle stormwater during rain events. 1432 2054 1199 801 890 445 715 410 399 705 612 613 395 338 634 259 364 42 48 36.5 29.5 41.9 29.8 35.8 39.9 33.5 57.3 58.6 64 53 49 55.22 43.6546.5 5 15 25 35 45 55 65 0 500 1000 1500 2000 2500 3000 INCHES OF RAINOVERFLOW MILLION GALLONSOverflow Volume, MG Rain, IN Log. (Overflow Volume, MG) •The SAGE Plan includes the following projects that will reduce overflows into the river: •4 large Combined Sewer Overflow storage tanks •Major upgrades to the Wastewater Treatment Plan •New sewer interconnects, green stormwater infrastructure, new river crossing, among other things. •Low interest loan secured from Indiana’s Clean Water Act –State Revolving Loan Fund. •Funding approved in 2023 •Tank and current WWTP improvements -$32 Million Plan Funding Current Projects •First CSO storage tank has begun construction •Wastewater Treatment Plant upgrades underway •Second CSO storage tank project to begin engineering soon (late 2024) Water System Upgrades Fellows Booster Pumping Station •Construct a new booster pumping station along with distribution pipe improvements, 3-phase 480V electrical transformer (AEP) and improved electrical feed to the facility, and generator back-up power. •Budget: $8.2 M •2024 Construction South Distribution & Facility Improvements •Install additional water main from South WTP into South pressure zone •Install new dry chlorine scrubbing equipment and replace fluoride, chlorine and phosphate discharge piping •Budget: $5.5 M •2024 Construction Edison Water Treatment Plant Improvements •Improvements include: •Rehabilitation of 8 filters including underdrains, air scour, filter media, blowers, valves and actuators •Fluoride System Upgrades •Electrical and Controls Upgrades •Budget: $8 M •2025 Construction