Loading...
HomeMy WebLinkAboutChange Order No 2 - Fire Station No. 8 Replacement Proj No. 122-034 - R Yoder Construction ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MICOU 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS February 27, 2024 Mr. Brad Yoder R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, IN 46550 shelly@ryoderconstruction.com RE: Change Order No. 2 – Fire Station No. 8 Replacement – Project No. 122-034 Dear Mr. Yoder: At its February 27, 2024 meeting, the Board of Public Works approved the above referenced Change Order be increased by $101,833, bringing the revised contract amount to $3,882,440.37. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Zach Hurst, PE, Sr. Project Engineer SUBJECT: Change Order No. 2 - Project No. 122-034 Fire Station #8 Replacement DATE: 02/16/2024 Change Order No. 2 for the subject project adds the following scope items to the contract: • Third Party Testing: $11,573.00 o This is an omission from the Specifications. This covers necessary soil and concrete testing. • Garden Shed Power: $2,260.00 o This is an owner-initiated scope change to provide power to the landscaping shed. • Flooring Changes: $1,179.00 o This is an error in the plans, requiring a change in flooring type to provide more traction. • Apparatus Bay Sub Siding: $3,621.00 o This is an owner-initiated scope change to modify the detail where the subsiding in the apparatus bay meets the foundation concrete. • Four-Fold Doors: $83,200.00 o This is an owner-initiated scope change to modify the exit doors for the apparatus bay. Four-fold doors open faster than overhead doors. • TOTAL: $101,833.00 This change order does not affect the existing contract completion date of September 19, 2024. Funding for this change order is available through the Fire Department’s capital fund. CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: CONTRACTOR RECOMMENDED FOR APPROVAL CONSTRUCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS 2/27/2024 122-034 Fire Station No. 8 Replacement 9/12/2023 2 PCR #5-Third Party Testing PCR #6-Add Power to Garden Shed PCR #7-Flooring Changes PCR #8-Apparatus Bay Sub Siding PCR #9-Four Fold Doors The original contract sum $ 3,703,850.00 Net change by previously authorized change orders $ 76,757.37 The contract sum prior to this change order $ 3,780,607.37 By this Change Order, the project amount is X Increased 101,833.00Decreased $ The new contract sum including this change order $ 3,882,440.37 This Change Order represents a total change of 2.69 % Total change for entire project 4.82 % Original contracted completion date/time 9/19/2024 Extension of date/time by previous change orders 0 days Date/time extension by this change order 0 days New completion date/time 9/19/2024 Contractor Signature Printed Name and Title Approved Date: R. Yoder Construction, Inc. Company Name President Station # 8, 2402 S. Twyckenham Dr. Address Member South Bend, IN 46614 City, State, Zip Member Member Member Erik Parcell, Project Manager February 27, 2024 City of South Bend Project No. 122-034 2/27/2024 Fire Station #8 Replacement Line Item Qty Unit Price Total Third Party Testing 1 LS $11,573.00 $11,573.00 Add Power to Garden Shed 1 LS $2,260.00 $2,260.00 Flooring Changes 1 LS $1,179.00 $1,179.00 Apparatus Bay Sub Siding 1 LS $3,621.00 $3,621.00 Four Fold Doors 1 LS $83,200.00 $83,200.00 CO Total =$101,833.00 Change Order #2 Notes Scope: Error/Ommission: Error/Ommission: Scope: Scope: BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 02/16/2024 Name Zach Hurst Department DPW BPW Date 02/27/2024 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 2 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name R Yoder Construction New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Fire Station 8 Replacement Project Number 122-034 Funding Source FD Capital Account No. PO-0026318 Amount Change: $101,833.00; Revised Amount: $3,882,440.37 Terms of Contract Purpose/Description Change Order addresses material testing, shed power, flooring changes, apparatus bay siding, and different app. bay doors. For Change Orders Only Amount of Increase Decrease $ 101,833.00 ($ ) Previous Amount $ 3,780,607.37 Current Percent of Change: Increase Decrease 2.69% ( %) New Amount $ 3,882,440.37 Total Percent of Change: Increase Decrease 4.82% ( %) Time Extension Amount: New Completion Date: