HomeMy WebLinkAboutChange Order No 1 - East Race Sidewalk Repair Proj No. 117-130 - Milestone Contractors1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
February 13, 2024
Mr. Josh Burris
Milestone Contractors North, Inc.
24358 State Road 23
South Bend, IN 46614
akrueger&mile stonelp. com
RE: Change Order No. 1 (Final) — East Race Sidewalk Repair
Project No. 117-130
Dear Mr. Burris:
At its February 13, 2024 meeting, the Board of Public Works approved the above
referenced Change Order be increased by $27,073, bringing the revised contract amount to
$98,743.
Enclosed is a copy of the Change Order for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/lh
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MIcou
uTH INTER -OFFICE MEMORANDUM
r
U\
DEPARTMENT OF PUBLIC WORKS
x �4i5 k DIVISION OF ENGINEERING
TO: Theresa Heffner, Clerk
Board of Public Works
FROM: Zach Hurst, PE, Sr. Project Engineer
SUBJECT: Final Change Order - Project No. 117-130
East Race Sidewalk Repairs
DATE: 01 /30/2024
On December 17, 2020, the Board of Public Works awarded the subject quote to Milestone
Contractors North in the amount of $71,670. The scope of work is to perform concrete repairs to
address portions of sunken/uneven sidewalk along the East Race waterway, along with in -
channel repairs to help stop leaking water from exiting the raceway and eroding the soil
underneath the sidewalk. The Contractor needs a continuous three-week window to perform the
work.
To perform these repairs, the East Race waterway must be closed to all recreational users and
the headgates raised and shut. Even with the raceway headgates shut, there is approximately
10-12 inches of water in the channel. High water levels on the St. Joseph River exacerbate the
problem in springtime, eliminating that as a viable work window. The Venues, Parks and Arts
revenue season on the raceway runs from April through September, eliminating the summer
months as a viable work window.
The remaining work window is late September through October, before temperatures fall to the
point where quality concrete work is no longer feasible in Northern Indiana. Both the October
2021 and October 2022 work windows had conflicts with river rescue training operations (DNR,
fire departments, etc.), which did not allow the Contractor the time needed to perform the work.
These river rescue trainings were scheduled prior to contract award and were not able to be
rescheduled.
The work was able to be performed in September/October of 2023. The attached pages show
the original prices and the final 2023 pricing. While the 37.77% cost increase is in excess of
Indiana state code's 20% maximum, these increases are due to cost escalation rather than
scope additions.
Page 1 of 1
CITY OF SOUTH BEND, INDIANA
�'
DEPARTMENT OF PUBLIC WORKS
PROJECT CHANGE ORDER • 1855
DATE:
8/10/2023
PROJECT NO:
117-130
PROJECT NAME:
East Race Sidewalk Repairs
CONTRACT DATE:
12/17/2020
CHANGE ORDER NO:
SUBJECT OF CHANGE ORDER:
1
PCR #1-COST INCREASE DUE TO 2 YEAR DELAY (CITY)
The original contract sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
CONTRACTOR
Contractor Signature
$
71,670.00
$
0.00
$
71,670.00
�X Increased
Decreased
$
27,073.00
$
98,743.00
37.77 %
37.77 %
1 /1 /2024
0 days
0 days
1 /1 /2024
RECOMMENDED FOR APPROVAL
/1 A
CON RUCTION MANAGER
I / / L CITY OF SOUTH BEND
DS h.. � (+����s G2r�ei�.I Jrnpa,•r'.++�-r�.�t1 'T
Printed Name and Title BOARD OF PUBLIC WORKS
Walsh & Kelly, Milestone Contractors
North, Inc. CITY OF SOUTH BEND, INDIANA
Company Name BOARD OF PUBLIC WORKS
24358 SR23
Address
South Bend, IN 46614
City, State, Zip
1,
Elizabeth A. Maradik, President
1-Mall, '.ice
Gary A. Gilot, Member
Murray L. Miller, Member
��t
Joseph R. Molnar, Vice President
Briana Micou, Member
Attest: Theresa M. Heffner, Clerk
Date: February 13, 2024
QUOTE/PROPOSAL
CITY OF SOUTH BEND
PROJECT NAME East Race Sidewalk Repair (Under Colfax)
PROJECT NO. 117-130
QUOTES DUE November 24, 2020, before 9:00 a.m. local time
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Mobilization and Demobilization
1
LSUM
9,600.00
$9,600.00
2
Construction Engineering
1
LSUM
3,400.00
$3,400.00
3
Maintenance of Traffic
1
LSUM
3,100.00
$3,100.00
4
Clearing Right -of -Way
1
LSUM
7,785.00
$7,785.00
5
Temporary Erosion and Sediment
Control
1
LSUM
1,900.00
$1,900.00
8
Sidewalk Remove
51
SYS
78.00
$3,978.00
10
4" Plain Concrete Sidewalk
51
SYS
182.00
$9,282.00
11
Deep Concrete Surface Repair
25
SF
173.00
$4,325.00
12
Shallow Concrete Surface Repair
25
SF
136.00
$3,400.00
13
Crack Repair
100
LF
155.00
$15,500.00
14
Joint Repair
50
LF
70.00
$3,500.00
15
4" Flap Valve, Repair
1
EACH
5,900.00
$5,900.00
Total Amount of Base Quote
$71,670.00
Quote Alternate No. 1
Common Excavation
19
CYS
210.00
$3,9
7
Compac gate, No. 8
31
TON
140.00
$4,340.00
8
Sidewalk Remove
63
SYS
78.00
$4,914.00
9
Geotextile, Type 1A
SYS
30.00
$3,420.00
10
4" Plain Concrete Sidewalk
63
S
182.00
$11,466.00
Total Amount of Quote Alternate No. 1
$28,130.00
Total Amount of Base Quote and Alternate No. 1
I -$7t"&4q-j
Bidder(Firm):
Address:
City/State/Zip
Telephone Number
Fax Number:
�r%%%J11100KE
�����
Cj
L()RPORAIF
.tee..®
r
s�6®®/AIDf AAF. 1140, ``ao
Walsh & Kelly, Inc.
24358 SR 23
South Bend,IN 46614
574-288-4811
574-289-7174
- �- By:
(Signature)
Jo . Peisker, President
(Printed Name of Person Signing)
Item No
1
2
3
4
5
8
10
11
12
13
14
15
Milestone Contractors North, Inc.
GRIFFITH
1700 E. Main St.
Griffith, IN 46319
Phone: (219) 924-5900
Fax (219) 924-8768
SOUTH BEND
24358 SR 23
South Bend, IN 46614
Phone: (574) 2884811
Fax (574) 289-7174
DATE:
Revised 8/10/23
City of South Bend
East Race Sidewalk Repair (Under Colfax)
BASE BID ONLY
Description
Quantity
Unit
Unit Price
Extension
Mobilization and Demobilization
1
LSUM
11,500.00
$11,500.00
Construction Engineering
1
LSUM
4,100.00
$4,100.00
Maintenance of Traffic
1
LSUM
3,300.00
$3,300.00
Clearing Right -of -Way
1
LSUM
7,900.00
$7,900.00
Temporary Erosion and Sediment
Control 1
LSUM
2,100.00
$2,100.00
Sidewalk Remove
51
SYS
138.00
$7,038.00
4" Plain Concrete Sidewalk
51
SYS
330.00
$16,830.00
Deep Concrete Surface Repair
25
SF
188.00
$4,700.00
Shallow Concrete Surface Repair
25
SF
151.00
$3,775.00
Crack Repair
100
LF
170.00
$17,000.00
Joint Repair
50
LF
98.00
$4,900.00
4" Flap Valve, Repair
1
EACH
15,600.00
$15,600.00
BASE BID:
$98,743.00
Please call if you have any questions.
Thank You for your consideration.
Ed Pilipow, P.E.
574-288-4811 office
epilipow@milestonelp.com
574-274-5545 mobile
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 01/30/2024
Name Zach Hurst Department DPW
BPW Date 02/13/2024 Phone Extension 3057
Review and Approval Required Prior to Submittal to Board
Diversity Compliance ❑
Officer Name
and Inclusion Officer
BPW Attorney
❑ Attorney Name
Dept. Attorney ❑ Attorney Name
Purchasing ❑
Check the Appropriate Item Type — Required. for All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
® Chg. Order, No. IIFI ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Information
Milestone Contractors North
❑ Yes ❑ If Yes, Approved by Purchasing
® No
❑❑ ❑
MBE Completed E-Verify Form Attached ❑ Yes
No
East Race Sidewalk Repair
117-130
River East DA TIF
PO-0026737
Change: $27,073; Revised Amount: $98,743
This change order addresses cost increases incurred due to a two-vear delav it
scheduling the work.
For Chance Orders Onl
Amount of ® Increase $ 27,073
❑ Decrease ($ )
Previous Amount $ 71,670
Current Percent of Change
New Amount
Total Percent of Change:
Time Extension Amount:
New Completion Date:
Increase
37.77%
Decrease
( %)
$ 98,743
Increase
37.77%
Decrease
( %1