HomeMy WebLinkAboutOpening of Quotes & Award -SRTS Our Lady of Hungary Tree Removal Proj No. 122-007B - KC Tree, Inc.I
om5""-
PROJECTNAME: CITY OF SOUTH BEND, INDIANACONTRACTOR'S QUOTE FOR PUBLIC WORK SRTS Our Lady of Hungary Tree Removal
PROJECT NO. 122-007B
QUOTES DUE February 13", 2024 by 9:30 am. Electronic quotes are to be
delivered via email to bpwbids(Zsouthbendin.gov
r� �1 Must be completed for all
quotes. Please type or print)
Date: OtG Firm: Owe 1�(C —i—su e
Address: 9913 C{s xltl6wd�44 r' Zeq
City/State/Zip: 5%;F. uTTelephone Number:
r Iryr5i7r �77 ' 7�- -
Agent of Bidder (if Applicable): r-r awiw P.t t rfi( C pQ PfA Q=+
Pursuant to notices given, the undersigned offer o f mish labor r /or m en I necessary to complete the
public works pr9ect of: I I n A r-7 I/
the City of South Bend, Indiana, in accordance with plans/and s(3ecifications prepared by:
The city of South Bend, Department of Public Works
and dated / Z ZOO for the sum of (enter the Total Quote as shown on the Proposal)
`kk t hTwt'7i s3!q so 0 )
(Enter SuM of Total Quote plus Alternates shown on Proposal) (Numerical)
If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any
addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown
in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the
itemization of the units shall be shown on a separate attachment. By AKA —,(Si ature) /Gn5wat-e 1rr�r
— 4 �r t m aeof Person sin g)
The above quote is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
Murray L. Miller, Member
ACCEPTANCE
day of 20
Joseph R. Molnar, Vice President
Breana N. Micou, Member
Attest: Theresa Heffner, Clerk
Version 9/29/2021 Page - 8 Public Works Quote
IV.
V.
o45pUTH dF�d '.
SCOPE OF WORK
CITY OF SOUTH BEND
IBti5
PROJECT NAME: SRTS Our Lady of Hungary Tree Removal
PROJECT NO. 122-007B
QUOTES DUE February 131, 2024 by 9:30 am. Electronic quotes are to be
delivered via email to bpwbids(ftouthbendin.gov
A. The project includes the furnishing of all equipment, material, insurance, and labor for tree removal
within the City of South Bend, IN.
PREVAILING SPECIFICATIONS AND CONSTRUCTION STANDARDS AND SPECIFICATIONS
A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and
CONSTRUCTION STANDARDS AND SPECIFICATIONS, most recent version, are to be used on this
project.
B. Each Quote provider is specifically instructed to become completely familiar with the most recent
version of the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANDARDS AND
SPECIFICATIONS prior to submitting a quote.
C. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the 2022
INDOT Standard Specifications for the letting effective after September 1, 2021.
D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING
SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS.
E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS,
the SPECIAL PROVISIONS will govern.
TERM "OR EQUAL"
A. Prevailing Specifications: None
B. Additions
1. Where the term "or equal" is used in these specifications, the Quote provider deviating from
specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its
proposed article or equal. The City of South Bend shall be the sole judge in determining if the "or
equal" offered meets the specification.
TAX EXEMPT
A. Prevailing Specifications: None
B. Additions
1. Materials and properties purchased under contract with the Owner that becomes a permanent part
of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax).
The exemption number will be furnished to the Contractor upon award.
A. Prevailing Specifications: None
B. Additions
1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents,
officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees,
and other expenses, arising from or out of the negligent performance of this Contract by Contractor,
or because of arising out of any defect in the goods, materials or equipment supplied by the Quote
provider.
Version 9/29/2021 Page - 1 Public Works Quote
VI. INSURANCE
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 103
B. Additions:
All Contractors and subcontractors doing business with the City of South Bend shall present a
Certificate of Insurance showing coverage in the following minimum amount:
a. General Liability: Premises -Completed Operations or Products, Bodily Injury and Property
Damage Combined Single Limit - $5,000,000.
b. There shall be no exclusion for explosion, collapse or underground hazard.
c. Workmen's Compensation: Statutory State of Indiana Employer's Liability - $100,000.
d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000.
e. The City of South Bend shall be named as additional insured on the Certificate of Insurance.
VII. CONTROL OF WORK
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 105
B. Additions:
1. The complete responsibility for this project lies with the Director of Public Works of the City of South
Bend, Indiana acting through his authorized representatives.
2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel,
equipment and supplies to perform all work required under this item. There will be no direct payment
for this item.
3. The contractor is responsible to maintain the site which includes but is not limited to; dust control,
site security, erosion control, and protecting adjacent properties.
4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No
work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South
Bend Department of Public Works.
VIII. LEGAL RELATIONS
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 107
B. Additions:
1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where
mentioned in these documents, is City of South Bend Public Works staff.
2. The Contractor shall apply for and obtain any and all required permits for the work from local, state,
and federal agencies and shall comply with permit requirements, including the St. Joseph County
/ City of South Bend Building Department.
3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor
shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with
the Secretary of State of Indiana to engage in business within the State of Indiana.
4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner
reserves the right to immediately terminate the public work project awarded should the Contractor
be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result
in the forfeiture of Contractor's performance bond to the Owner.
IX. PROSECUTION AND PROGRESS
A. Prevailing Specifications: 2022, INDOT Standard Specifications Sec. 108
B. Additions:
1. The project will have a completion date of March 12, 2024. The contract time will start when the
Notice to Proceed is delivered and signed.
2. The City, Engineer, and Contractor will hold a pre -construction meeting following award of the
contract. The date of the Notice to Proceed will be agreed at that meeting.
Version 9/29/2021 Page - 2 Public Works Quote
3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site.
X. CHANGE OF CONTRACT TIME
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 108
B. Additions
1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the
Contract Time shall be based on written notice delivered to the Department of Public Works within
seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent
of the claim with supporting data shall be delivered within fourteen (14) calendar days after such
occurrence unless an official of the Public Works Department allows an additional period of time to
ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost
to delays beyond the control of the Contractor if a claim is made in accordance with this provision.
Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor
disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God.
2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An
extension is granted for weather conditions significantly more severe than normal if the Contractor
demonstrates to the satisfaction of the City that the delay in the progress of the work was due to
such weather. The basis to define normal weather with be the data compiled by the United States
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA).
3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including
fault or negligence of Contractor's subcontractors, caused the delay, or for which any remedies are
provided under any other provision of this agreement.
4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of
any rights or remedies existing under this contract at law or in equity.
XI. DEFAULT AND TERMINATION
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 108
B. Additions:
1. Events of Default shall include Contractor's failure to perform any of its obligations under this
contract including failure to commence work at the time specified, failure to perform the work in
accordance with these specifications, unauthorized discontinuation of the work, failure to carry out
the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or
regulations, and failure to comply with any other term of this contract.
2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit
Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is
not cured within the ten (10) day cure period, the City may at any time thereafter terminate this
contract in which case the termination shall be final and effective.
3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies
provided under separate provisions of this contract, the right of set-off against any payments due
or to become due to the Contractor against the retainage, the right to take over and complete the
Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that
the Contractor has in order under Contractor's subcontracts are assigned to the City, subject to the
City's right to take assignment of all or only selected subcontracts at the City's discretion. The sole
obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed
after the date of the assignment. In the event a conditional assignment has not been executed, the
Contractor shall execute or cause to be executed any assignment, agreement, or other document
that may be necessary in the sole opinion of legal counsel to the City's Board of Public Works to
evidence compliance with this provision. The Contractor shall promptly deliver such documents
upon the City's request. In the case of such assignment, unless otherwise agreed in writing, The
Contractor remains liability to subcontractors for any payment already involved, and for any claim,
suit or cause of action based upon or resulting from any error, omission, negligence or other breach
of contract by the Contractor, its officers, employees, or agents arising prior to the date of
assignment to the City.
XII. LIQUIDATED DAMAGES
Version 9/29/2021 Page - 3 Public Works Quote
A. Prevailing Specifications: 2022, IN DOT Standard Specifications Section 108
B. Additions:
1. The contractor shall proceed with the work at such rate of progress to insure full completion within
the Contract Time. It is expressly understood and agreed, by and between the Contractor and the
Owner, that the Contract Time for completion of the work described herein is a reasonable time,
taking into consideration the average climatic and economic conditions and other factors prevailing
in the locality of the work, and excludes the time for unavoidable delays which were beyond the
control and without the fault of the Contractor.
2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time
granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages
a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in
default after the time of completion stipulated in the Contract Documents.
3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay
in completion of the work is due to the following and the Contractor has promptly given written
notice of such delay to the Owner and Engineer/Architect.
a. To any preference, priority, or allocation order duly issued by the Owner.
b. To unforeseeable causes beyond the control and without the fault or negligence of the
Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner,
acts of another Contractor in the performance of a Contract with the Owner, fires, floods,
epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and
unforeseeable weather.
XIII. RETAINAGE AND FINAL PAYMENT
A. Prevailing Specifications: 2022, IN DOT Standard Specifications Section 109
B. Additions:
1. Payments will be made every thirty (30) calendar days
2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of
payments throughout the duration of the project.
3. Before final payment and retainage are released the Contractor must satisfy the following:
a. All parts and labor meet requirements stated in the specifications.
b. Provide copies of test reports or cut sheets on all materials supplied.
c. Provide As -Built drawings in accordance with the City of South Bend Prevailing Specifications
for Public Works.
d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver
of Lien.
XIV. WARRANTY
A. Prevailing Specifications: None
B. Additions
1. All Parts shall include the following:
a. Performance specifications
b. Bill of Materials
c. Warranties on all parts
d. Installation and safety requirements
XV. OTHER UTILITIES
A. Prevailing Specifications: None
B. Additions:
Version 9/29/2021 Page - 4 Public Works Quote
I . The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 811 (in
Indiana) or 1-800-382-5544 (outside of Indiana), or via www.indiana8li.org, at least two (2)
working days, not counting Saturdays, Sundays or federal and state holidays before proceeding
with construction. It shall also be the Contractor's responsibility to contact any other utility that is
not contacted by Indiana811 and verify the utility locations.
2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone,
etc. in order to assure that all utilities that need to be replaced or relocated can be done with a
minimum disturbance to service. The Contractor shall also be responsible for coordinating
schedules with the various utilities such that they can proceed with their relocation work as
efficiently as possible.
3. If the odor of natural gas is detected in a work area at any time during the course of work, the
Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also
immediately notify the residents of adjacent properties. The Contractor shall advise the residents
to evacuate their homes immediately if the odor is present within the dwelling.
4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the
Contractor at no additional cost to the City or the Owner of the system.
XVI. MAINTENANCE OF TRAFFIC
A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 105 & 801
B. Additions:
1. Maintenance of traffic during construction shall conform to the "Indiana Manual on Uniform Traffic
Control Devices" and the City of South Bend Design and Construction Standards.
2. The attached "Traffic Closure Request" form is to be used for any lane restrictions or closures and
required to be filled out and sent to the Department of Public Works
3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner
that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve
the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary
facilities shall be left unattended in the right-of-way of any street or left parked overnight without
proper marking and lighting.
4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its
proposed schedule of operations for the review of the Engineer. The schedule of operations as
reviewed by the Engineer shall be maintained at all times.
5. There will be no direct payment for this work.
XVII. DESCRIPTION OF WORK
A. Prevailing Specifications: None
B. Additions
1. Work to be performed shall include furnishing all labor, services, materials, insurance and
equipment to the removal of trees within the public right of way at various locations within
the City of South Bend.
2. The tree removals done as part of this project are intended to facilitate curb and sidewalk
replacement work to be done by the city of South Bend Department of Public Works,
Streets Division. The contractor shall coordinate the schedule for each tree removal with
the Streets Division.
3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and
their property from damage caused by the Contractor's operations.
XVIII. TREE REMOVALS
A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 201, 211, and 621
B. Additions:
1. All work on trees in City right of way shall be done by a Licensed Arborist registered with the South
Bend Board of Park Commissioners. Any subcontractor must comply with all requirements of the
Prevailing Specifications, General Conditions, and Special Provisions for this work.
Version 9/29/2021 Page - 5 Public Works Quote
2. The Contractor shall obtain the following permits before beginning Tree Removal work at any site.
The Contractor must note that the permits are being submitted as part of this City project to have
permit fees waived by the City.
a. Tree Permit from the City Forester, 321 East Walter Street
b. Occupancy Permitfrom the Division of Engineering, Room 1316, County -City Building (for right
Of way occupancy lasting two (2) hours or longer). The Occupancy Permit application shall
include a traffic control plan.
(i) Note: Occupancy Bond is required for Occupancy Permit.
3. The Contractor shall take diligent care to protect the public, the workers, streets, sidewalks, and
adjacent public and private property from the hazards of tree removal operations.
4. Trees to be removed and all their debris shall be completely removed from the site daily. No
piles of debris are allowed to sit on site after work is completed daily. No fires or burning will be
allowed. The debris shall be removed in accordance with all applicable Federal, State, and local
laws and ordinances to a facility licensed to receive such waste. The Contractor shall inform the
Engineer of the name of the facility receiving the waste. Items of salvageable value to the
Contractor, such as firewood or kindling, must be removed from the site as the work progresses.
Storage or sale on the site will not be permitted. The Contractor may choose to sell or provide
firewood, kindling, or mulch gratis to the adjacent homeowner or a neighbor. All such salvaged
materials must be removed to the receiver's premises as the work progresses in compliance with
all laws, statutes, and ordinances regulating such transactions including transportation, zoning, and
storage.
5. The tree removals within this contract correspond with sidewalk replacement being completed in
2024 Public Works projects.
6. The bid price for removal of any size tree shall not include removal of its stump and roots. The
stump shall be left in place to match the surrounding grade.
Pay Item Diameters are defined as follows:
Measured DBH
Pa Item Diameter
Oto18in.
18in
Over 18 to 24 in.
24 in.
Over 24 to 36 in.
30 in.
Over 36 to 48 in.
48 in.
8. Tree diameters shall be confirmed prior to removal. All trees shall be marked for removal and
measured with a representative from the City of South Bend Engineering Division on site. The City
will not pay for any trees measured and removed without the on -site approval of the Engineer.
9. Payment for all labor, materials, equipment, and associated incidentals for tree removals shall be
made at the Unit Prices for the various items bid in the Proposal as follows:
REMOVAL, TREE, 18-INCH ............................EA
REMOVAL, TREE, 24-INCH ............................EA
REMOVAL, TREE, 30-INCH ............................EA
REMOVAL, TREE, 48-INCH ............................EA
XIX. TREE LOCATIONS
A. Contractor shall verify locations with City representative on site before removing any trees.
B. Locations of trees included in this quote are as follows:
Version 9/2912021 Page - 6 Public Works Quote
Sefttrt'S;, •` "`1tltPlltl4'P'_Y
. ',_
lea #toLTi.il13¥4'tPf
1923 S Taylor St
2
25" , 22"
24",24"
2003 Kendall St
1
21"
24"
2026 Kendall St
1
18"
18"
2108 Kendall St
1
29"
30"
1919 Kendall St
1
23"
24"
2202 Chapin
3
26" , 40" ,
35"
30",48",30"
2017 Chapin St
1
32"
30"
2013 Chapin St
2
20" , 23"
24",24"
2211 Catalpa (just south of property
line
1
35"
30"
2201 Catalpa
1
46"
48"
2202 Catalpa
1
28.5"
30"
2210 Catalpa
1
16"
18"
2009 Catalpa
1
26"
30"
2002 Catalpa
1
35"
30"
911 W Calvert
1
28"
30"
914 W Calvert St
2
28" , 31"
30",30"
Version 9/29/2021 Page - 7 Public Works Quote
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to
this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT,
CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY
VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE
OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF )
SS:
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms tinder the penalties of perjury that:
1. Contractor has not, nor has any other member, representative, or agent of the firm,
company, corporation or partnership represented by him, entered into any combination, collusion
or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent
any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made
without reference to any other bid and without any agreement, understanding or combination with
any other person in reference to such bidding. Contractor further says that no person or persons,
firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift,
commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any Federal department or agency;
and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment
activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency or
instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from
time -to -rime.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is
engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty million
dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty
million dollars ($20,000,000) or more in credit to another person for forty -Five (45)
days or more, if that person will (i) use the credit to provides goods and services in
the energy sector in Iran; and (ii) at the time the financial institution extends credit, is
a person identified on list published by the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the Contractor subsequently learns is an unauthorized
r' n t
s uo e
Version 9/29/2021 Page - 9 Public Wo
alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of
Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3.
Contractor's documentation of enrollment and participation in the E-Verify Program is included
and attached as part of this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public
contract to certify that the subcontractors do not knowingly employ or contract with an
unauthorized alien, nor retain any employee or contract with a person that the subcontractor
subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is
participating in the E-Verify Program. The Contractor agrees to maintain this certification
throughout the term of the contract with the City of South Bend, and understands that the City
may terminate the contract for default if the Contractor fails to cure a breach of this provision no
later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a
contract by the City of South Bend through its agencies, boards, or commissions shall not
discriminate against any employee or applicant for employment in the performance of a City
contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter
directly or indirectly related to employment because of race, sex, religion, color, national origin,
ancestry, age, gender expression, gender identity, sexual orientation or disability that does not
affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or
any combination of the foregoing including, but not limited to, public works contracts awarded
under public bidding laws or other contracts in which public bids are not required by law, the City,
its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain
participation by those subcontractors certified by the State of Indiana as a Minority Business
("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest,
responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to am
MWBE; however, they may not unlawfully discriminate against said MBE/WBE. A finding of
noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a
City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact to which the discriminatory practice
or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall
be made a part of any contract which it may henceforth enter into with the City of South Bend,
Indiana or any of its agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for
employment in the performance of this contract with privileges of employment, or any matter
directly or indirectly related to employment, because of race, religion, color, sex, gender
expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of
this provision may be regarded as material breach of contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-
8-1). I hereby certify that I and all subcontractors employed by me for this project Public ill uss Quote
Version 9/29/2021 Page - 10
products or foundry products made in the United States on this project if awarded. I understand I
have an affirmative duty to notify the City in my bid that my proposal does not include the use of
steel products or foundry products made in the United States. I understand it is my sole obligation
and responsibility to provide a justification to the City, subject to review and approval, why the
cost of United States made steel or foundry products is unreasonable. Prior to award and upon
submission of bid which does not use steel products or foundry products made in the United States,
the City, through its director of public works, shall make a determination if the price of United
States made steel or foundry is unreasonable. I understand that violations hereunder may result in
forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public
works are true and correct.
Dated this 1 day of�0j _
kC 1 /Mc
Contractor/Bidder (Firm)
SAgnatike of C tractorBidder or Its Agent
Krl!A t K( I,
PrintedNIIune atiLTTitld
Subscribed and sworn to before me this day f , 201c-I
My Commission Expires
TVtiry Publi
County of Residence
LISA NOEL KEIGLEY
o�•"• �8� Notary Public, State of Indiana
`�jSEAQ0=- St. Joseph County
* = Commission 8 704538
/�Hp.....
'ANP` My Commission Expires
August 24, 2025
Version 9/2912021 Page - 11 Public Works Quote
QUOTE/PROPOSAL
CITY OF SOUTH BEND
PROJECT NAME SRTS Our Lady of Hungary Tree Removal
PROJECT NO. 122-007B
February 13"' , 2024 by 9:30 am. Electronic quotes are to be
QUOTES DUE delivered via email to bpwbids(a)southbendin.gov
Item
No.
Description
QuantityUnit
Unit Price
Total Amount
REMOVAL, TREE, 18-IN
2
EA
sD
$II _/-111 "
1
`(JV
REMOVAL, TREE, 24-IN
6
EA
$
2
��� +Qv
3
REMOVAL, TREE, 30-IN
11
EA
I
D
$
+pD
REMOVAL, TREE, 48-IN
2
EA
�
$ 6fl
4
Total Amount of Quote
$
Firm:
Address: O l l 1 VI r_ )
City/State/Zip: �( � It; V
YU55?
Telephone Number:
Fax Number:
QI
Version 9/29/2021 Page - 12 Public Works Quote
KC '
574-674-7722
RECIPIENT:
KC Tree Inc
8913 East U.S. HWY 20 1 New Carlisle, IN 46552
574.674.7722 1 https://www.kctree.com/
Gemma Stanton
Our Lady of Hungary Neighborhood
South Bend, In 46613
Phone: 574-235-9083
•
Sent on 01 /26/2024
Product/Service•
Tree Removal
18" tree cut down, grind brush, haul wood away,
2 $800.00
$1,600.00
leave stump cut down low.
Tree Removal
24" tree, cut down, grind brush, haul wood away,
6 $1,000.00
$6,000.00
leave stump cut down low.
Tree Removal
30" tree, cut down , grind brush, haul wood away,
11 $1,900.00
$20,900.00
leave stump cut down low
Tree Removal
48" tree, cut down, grind brush, haul wood away,
2 $3,000.00
$6,000.00
leave stump cut down low.
Total $34,500.00
We look forward to doing business with you! Kannon Keigley
Quote is valid for the next 10 days, after, may be subject to change.
I hereby agree to the above terms and conditions of the contract and
agree to 1 1 /2% (18%) service charge and any legal fees involved in
collecting late payments.
Signature Date
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date:
Name
1 /25/2024
Gemma Stanton
Department of Public Works — Engineering Division
BPW Date: February 131h, 2024 Phone Extension: 9083
Required Prior to Submittal to Board
BPW Attorney Attorney Name
Dept. Attorney ❑ Attorney Name
Purchasing
❑�
Check the Appropriate Item Type — Required. for All Submissions
❑ Professional Services Agreement ❑ Contract ❑ Proposal
❑ Open Market Contract ® Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ® Title Sheet
® Quote Opening ® Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Amount of ❑
Previous Amount
Current Percent of Change
New Amount
uired Information
❑ Yes❑ If Yes, Approved by Purchasing
❑ No
E] MBE Yes
❑ WBE Completed E-Verify Form Attached ❑❑ No
Safe Routes to School — Our Lady of Hungary Neighborhood Tree
Removal
122-007B
PR-00030699
324-10-102-121-442001—PROJ00000339
Request to Open/Award at same meeting. Contractor quote for Tree
Removal to facilitate Safe Routes to School project in the area.
Increase
Decrease
Increase %
Decrease ( %)
Increase %
Total Percent of Change: Decrease ( %)
Time Extension Amount:
New Completion Date:
� 4SpUTH 8���
SCOPE OF WORK PEA
CE
CITY OF SOUTH BEND
x x
1865
PROJECT NAME: SRTS Our Lady of Hungary Tree Removal
PROJECT NO. 122-007B
QUOTES DUE February 13t", 2024 by 9:30 am. Electronic quotes are to be
delivered via email to bpwbids(a)-southbend in.gov
PROJECT DESCRIPTION
A. The project includes the furnishing of all equipment, material, insurance, and labor for tree removal
within the City of South Bend, IN.
PREVAILING SPECIFICATIONS AND CONSTRUCTION STANDARDS AND SPECIFICATIONS
A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and
CONSTRUCTION STANDARDS AND SPECIFICATIONS, most recent version, are to be used on this
project.
B. Each Quote provider is specifically instructed to become completely familiar with the most recent
version of the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANDARDS AND
SPECIFICATIONS prior to submitting a quote.
C. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the 2022
INDOT Standard Specifications for the letting effective after September 1, 2021.
D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING
SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS.
E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS,
the SPECIAL PROVISIONS will govern.
III. TERM "OR EQUAL"
A. Prevailing Specifications: None
B. Additions
1. Where the term "or equal" is used in these specifications, the Quote provider deviating from
specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its
proposed article or equal. The City of South Bend shall be the sole judge in determining if the "or
equal" offered meets the specification.
IV. TAX EXEMPT
A. Prevailing Specifications: None
B. Additions
1. Materials and properties purchased under contract with the Owner that becomes a permanent part
of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax).
The exemption number will be furnished to the Contractor upon award.
V. INDEMNIFICATION
A. Prevailing Specifications: None
B. Additions
1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents,
officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees,
and other expenses, arising from or out of the negligent performance of this Contract by Contractor,
or because of arising out of any defect in the goods, materials or equipment supplied by the Quote
provider.
Version 9/29/2021 Page - 1 Public Works Quote
VI. INSURANCE
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 103
B. Additions:
All Contractors and subcontractors doing business with the City of South Bend shall present a
Certificate of Insurance showing coverage in the following minimum amount:
a. General Liability: Premises -Completed Operations or Products, Bodily Injury and Property
Damage Combined Single Limit - $5,000,000.
b. There shall be no exclusion for explosion, collapse or underground hazard.
c. Workmen's Compensation: Statutory State of Indiana Employer's Liability - $100,000.
d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000.
e. The City of South Bend shall be named as additional insured on the Certificate of Insurance.
VII. CONTROL OF WORK
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 105
B. Additions:
1. The complete responsibility for this project lies with the Director of Public Works of the City of South
Bend, Indiana acting through his authorized representatives.
2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel,
equipment and supplies to perform all work required under this item. There will be no direct payment
for this item.
3. The contractor is responsible to maintain the site which includes but is not limited to; dust control,
site security, erosion control, and protecting adjacent properties.
4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No
work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South
Bend Department of Public Works.
Vill. LEGAL RELATIONS
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 107
B. Additions:
1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where
mentioned in these documents, is City of South Bend Public Works staff.
2. The Contractor shall apply for and obtain any and all required permits for the work from local, state,
and federal agencies and shall comply with permit requirements, including the St. Joseph County
/ City of South Bend Building Department.
3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor
shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with
the Secretary of State of Indiana to engage in business within the State of Indiana.
4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner
reserves the right to immediately terminate the public work project awarded should the Contractor
be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result
in the forfeiture of Contractor's performance bond to the Owner.
IX. PROSECUTION AND PROGRESS
A. Prevailing Specifications: 2022, INDOT Standard Specifications Sec. 108
B. Additions:
The project will have a completion date of March 12, 2024. The contract time will start when the
Notice to Proceed is delivered and signed.
The City, Engineer, and Contractor will hold a pre -construction meeting following award of the
contract. The date of the Notice to Proceed will be agreed at that meeting.
Version 9/29/2021 Page - 2 Public Works Quote
3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site.
X. CHANGE OF CONTRACT TIME
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 108
B. Additions
1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the
Contract Time shall be based on written notice delivered to the Department of Public Works within
seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent
of the claim with supporting data shall be delivered within fourteen (14) calendar days after such
occurrence unless an official of the Public Works Department allows an additional period of time to
ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost
to delays beyond the control of the Contractor if a claim is made in accordance with this provision.
Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor
disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God.
2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An
extension is granted for weather conditions significantly more severe than normal if the Contractor
demonstrates to the satisfaction of the City that the delay in the progress of the work was due to
such weather. The basis to define normal weather with be the data compiled by the United States
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA).
3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including
fault or negligence of Contractor's subcontractors, caused the delay, or for which any remedies are
provided under any other provision of this agreement.
4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of
any rights or remedies existing under this contract at law or in equity.
XI. DEFAULT AND TERMINATION
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 108
B. Additions:
Events of Default shall include Contractor's failure to perform any of its obligations under this
contract including failure to commence work at the time specified, failure to perform the work in
accordance with these specifications, unauthorized discontinuation of the work, failure to carry out
the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or
regulations, and failure to comply with any other term of this contract.
If an Event of Default occurs, the City shall provide Contractor written notice and may permit
Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is
not cured within the ten (10) day cure period, the City may at any time thereafter terminate this
contract in which case the termination shall be final and effective.
Upon an Event of Default, the City may invoke the following remedies in addition to those remedies
provided under separate provisions of this contract, the right of set-off against any payments due
or to become due to the Contractor against the retainage, the right to take over and complete the
Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that
the Contractor has in order under Contractor's subcontracts are assigned to the City, subject to the
City's right to take assignment of all or only selected subcontracts at the City's discretion. The sole
obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed
after the date of the assignment. In the event a conditional assignment has not been executed, the
Contractor shall execute or cause to be executed any assignment, agreement, or other document
that may be necessary in the sole opinion of legal counsel to the City's Board of Public Works to
evidence compliance with this provision. The Contractor shall promptly deliver such documents
upon the City's request. In the case of such assignment, unless otherwise agreed in writing, The
Contractor remains liability to subcontractors for any payment already involved, and for any claim,
suit or cause of action based upon or resulting from any error, omission, negligence or other breach
of contract by the Contractor, its officers, employees, or agents arising prior to the date of
assignment to the City.
XII. LIQUIDATED DAMAGES
Version 9/29/2021 Page - 3
Public Works Quote
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 108
B. Additions:
The contractor shall proceed with the work at such rate of progress to insure full completion within
the Contract Time. It is expressly understood and agreed, by and between the Contractor and the
Owner, that the Contract Time for completion of the work described herein is a reasonable time,
taking into consideration the average climatic and economic conditions and other factors prevailing
in the locality of the work, and excludes the time for unavoidable delays which were beyond the
control and without the fault of the Contractor.
If the Contractor shall fail to complete the work within the Contract Time, or extension of time
granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages
a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in
default after the time of completion stipulated in the Contract Documents.
The Contractor shall not be charged with liquidated damages or any excess cost when the delay
in completion of the work is due to the following and the Contractor has promptly given written
notice of such delay to the Owner and Engineer/Architect.
a. To any preference, priority, or allocation order duly issued by the Owner.
b. To unforeseeable causes beyond the control and without the fault or negligence of the
Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner,
acts of another Contractor in the performance of a Contract with the Owner, fires, floods,
epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and
unforeseeable weather.
XIII. RETAINAGE AND FINAL PAYMENT
A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 109
B. Additions:
1. Payments will be made every thirty (30) calendar days
2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of
payments throughout the duration of the project.
3. Before final payment and retainage are released the Contractor must satisfy the following:
a. All parts and labor meet requirements stated in the specifications.
b. Provide copies of test reports or cut sheets on all materials supplied.
c. Provide As -Built drawings in accordance with the City of South Bend Prevailing Specifications
for Public Works.
d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver
of Lien.
XIV. WARRANTY
A. Prevailing Specifications: None
B. Additions
1. All Parts shall include the following:
a. Performance specifications
b. Bill of Materials
c. Warranties on all parts
d. Installation and safety requirements
XV. OTHER UTILITIES
A. Prevailing Specifications: None
B. Additions:
Version 9/29/2021 Page - 4 Public Works Quote
1. The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 811 (in
Indiana) or 1-800-382-5544 (outside of Indiana), or via www.indiana8ll.org, at least two (2)
working days, not counting Saturdays, Sundays or federal and state holidays before proceeding
with construction. It shall also be the Contractor's responsibility to contact any other utility that is
not contacted by Indiana811 and verify the utility locations.
2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone,
etc. in order to assure that all utilities that need to be replaced or relocated can be done with a
minimum disturbance to service. The Contractor shall also be responsible for coordinating
schedules with the various utilities such that they can proceed with their relocation work as
efficiently as possible.
3. If the odor of natural gas is detected in a work area at any time during the course of work, the
Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also
immediately notify the residents of adjacent properties. The Contractor shall advise the residents
to evacuate their homes immediately if the odor is present within the dwelling.
4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the
Contractor at no additional cost to the City or the Owner of the system.
XVI. MAINTENANCE OF TRAFFIC
A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 105 & 801
B. Additions:
1. Maintenance of traffic during construction shall conform to the "Indiana Manual on Uniform Traffic
Control Devices" and the City of South Bend Design and Construction Standards.
2. The attached "Traffic Closure Request" form is to be used for any lane restrictions or closures and
required to be filled out and sent to the Department of Public Works
3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner
that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve
the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary
facilities shall be left unattended in the right-of-way of any street or left parked overnight without
proper marking and lighting.
4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its
proposed schedule of operations for the review of the Engineer. The schedule of operations as
reviewed by the Engineer shall be maintained at all times.
5. There will be no direct payment for this work.
XVII. DESCRIPTION OF WORK
A. Prevailing Specifications: None
B. Additions
1. Work to be performed shall include furnishing all labor, services, materials, insurance and
equipment to the removal of trees within the public right of way at various locations within
the City of South Bend.
2. The tree removals done as part of this project are intended to facilitate curb and sidewalk
replacement work to be done by the City of South Bend Department of Public Works,
Streets Division. The contractor shall coordinate the schedule for each tree removal with
the Streets Division.
3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and
their property from damage caused by the Contractor's operations.
XVIII. TREE REMOVALS
A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 201, 211, and 621
B. Additions:
1. All work on trees in City right of way shall be done by a Licensed Arborist registered with the South
Bend Board of Park Commissioners. Any subcontractor must comply with all requirements of the
Prevailing Specifications, General Conditions, and Special Provisions for this work.
Version 9/29/2021 Page - 5 Public Works Quote
The Contractor shall obtain the following permits before beginning Tree Removal work at any site.
The Contractor must note that the permits are being submitted as part of this City project to have
permit fees waived by the City.
a. Tree Permit from the City Forester, 321 East Walter Street
b. Occupancy Permit from the Division of Engineering, Room 1316, County -City Building (for right
of way occupancy lasting two (2) hours or longer). The Occupancy Permit application shall
include a traffic control plan.
(i) Note: Occupancy Bond is required for Occupancy Permit.
3. The Contractor shall take diligent care to protect the public, the workers, streets, sidewalks, and
adjacent public and private property from the hazards of tree removal operations.
4. Trees to be removed and all their debris shall be completely removed from the site daily. No
piles of debris are allowed to sit on site after work is completed daily. No fires or burning will be
allowed. The debris shall be removed in accordance with all applicable Federal, State, and local
laws and ordinances to a facility licensed to receive such waste. The Contractor shall inform the
Engineer of the name of the facility receiving the waste. Items of salvageable value to the
Contractor, such as firewood or kindling, must be removed from the site as the work progresses.
Storage or sale on the site will not be permitted. The Contractor may choose to sell or provide
firewood, kindling, or mulch gratis to the adjacent homeowner or a neighbor. All such salvaged
materials must be removed to the receiver's premises as the work progresses in compliance with
all laws, statutes, and ordinances regulating such transactions including transportation, zoning, and
storage.
5. The tree removals within this contract correspond with sidewalk replacement being completed in
2024 Public Works projects.
6. The bid price for removal of any size tree shall not include removal of its stump and roots. The
stump shall be left in place to match the surrounding grade.
Pay Item Diameters are defined as follows:
Measured DBH
Pay Item Diameter
0 to 18 in.
18 in
Over 18 to 24 in.
24 in.
Over 24 to 36 in.
30 in.
Over 36 to 48 in.
48 in.
8. Tree diameters shall be confirmed prior to removal. All trees shall be marked for removal and
measured with a representative from the City of South Bend Engineering Division on site. The City
will not pay for any trees measured and removed without the on -site approval of the Engineer.
9. Payment for all labor, materials, equipment, and associated incidentals for tree removals shall be
made at the Unit Prices for the various items bid in the Proposal as follows:
REMOVAL, TREE, 18-INCH ............................EA
REMOVAL, TREE, 24-INCH ............................EA
REMOVAL, TREE, 30-INCH ............................EA
REMOVAL, TREE, 48-INCH ............................EA
XIX. TREE LOCATIONS
A. Contractor shall verify locations with City representative on site before removing any trees.
B. Locations of trees included in this quote are as follows:
Version 9/29/2021 Page - 6 Public Works Quote
Address
Number
DBH
Pay Item Diameter
1923 S Taylor St
2
25" , 22"
24",24"
2003 Kendall St
1
21"
24"
2026 Kendall St
1
18"
18"
2108 Kendall St
1
29"
30"
1919 Kendall St
1
23"
24"
2202 Chapin
3
26" , 40" ,
35"
3011,48",3011
2017 Chapin St
1
32"
30"
2013 Chapin St
2
20" , 23"
24",24"
2211 Catalpa (just south of property
line
1
35"
30"
2201 Catalpa
1
46"
48"
2202 Catalpa
1
28.5"
30"
2210 Catalpa
1
16"
18"
2009 Catalpa
1
26"
30"
2002 Catalpa
1
35"
30"
911 W Calvert
1
28"
30"
914 W Calvert St
2
28" , 31"
301153011
Total
21
Version 9/29/2021 Page - 7 Public Works Quote
� 4SpUTH 8��d
r�
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S QUOTE FOR PUBLIC WORK`\PFAcr {
x x
1865
PROJECT NAME:
PROJECT NO.
QUOTES DUE
Date:
Address:
City/State/Zip:
SRTS Our Lady of Hungary Tree Removal
122-007B
February 13t", 2024 by 9:30 am. Electronic quotes are to be
delivered via email to bpwbids(a)-southbend in.gov
(Must be completed for all quotes. Please type or print)
Firm:
Telephone Number: ( )
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
The City of South Bend, Department of Public Works
and dated for the sum of (enter the Total Quote as shown on the Proposal)
(Enter Sum of Total Quote plus Alternates shown on Proposal)
(Numerical)
If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any
addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown
in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the
itemization of the units shall be shown on a separate attachment.
The above quote is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
Murray L. Miller, Member
Version 9/29/2021
By
ACCEPTANCE
day of
(Signature)
(Printed Name of Person Signing)
20
Joseph R. Molnar, Vice President
Breana N. Micou, Member
Attest: Theresa Heffner, Clerk
Page - 8 Public Works Quote
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to
this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT,
CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY
VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE
OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS
STATE OF
(Must be completed for all quotes and bids. Please type or print)
SS:
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that:
1. Contractor has not, nor has any other member, representative, or agent of the firm,
company, corporation or partnership represented by him, entered into any combination, collusion
or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent
any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made
without reference to any other bid and without any agreement, understanding or combination with
any other person in reference to such bidding. Contractor further says that no person or persons,
firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift,
commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any Federal department or agency;
and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment
activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency or
instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from
time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is
engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty million
dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty
million dollars ($20,000,000) or more in credit to another person for forty-five (45)
days or more, if that person will (i) use the credit to provides goods and services in
the energy sector in Iran; and (ii) at the time the financial institution extends credit, is
a person identified on list published by the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the Contractor subsequently learns is an unauthorized
Version 9/29/2021 Page - 9 Public Works Quote
alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of
Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3.
Contractor's documentation of enrollment and participation in the E-Verify Program is included
and attached as part of this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public
contract to certify that the subcontractors do not knowingly employ or contract with an
unauthorized alien, nor retain any employee or contract with a person that the subcontractor
subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is
participating in the E-Verify Program. The Contractor agrees to maintain this certification
throughout the term of the contract with the City of South Bend, and understands that the City
may terminate the contract for default if the Contractor fails to cure a breach of this provision no
later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a
contract by the City of South Bend through its agencies, boards, or commissions shall not
discriminate against any employee or applicant for employment in the performance of a City
contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter
directly or indirectly related to employment because of race, sex, religion, color, national origin,
ancestry, age, gender expression, gender identity, sexual orientation or disability that does not
affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or
any combination of the foregoing including, but not limited to, public works contracts awarded
under public bidding laws or other contracts in which public bids are not required by law, the City,
its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain
participation by those subcontractors certified by the State of Indiana as a Minority Business
("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest,
responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an
MWBE; however, they may not unlawfully discriminate against said MBE/WBE. A finding of
noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a
City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact to which the discriminatory practice
or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall
be made a part of any contract which it may henceforth enter into with the City of South Bend,
Indiana or any of its agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for
employment in the performance of this contract with privileges of employment, or any matter
directly or indirectly related to employment, because of race, religion, color, sex, gender
expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of
this provision may be regarded as material breach of contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-
8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel
Version 9/29/2021 Page - 10 Public Works Quote
products or foundry products made in the United States on this project if awarded. I understand I
have an affirmative duty to notify the City in my bid that my proposal does not include the use of
steel products or foundry products made in the United States. I understand it is my sole obligation
and responsibility to provide a justification to the City, subject to review and approval, why the
cost of United States made steel or foundry products is unreasonable. Prior to award and upon
submission of bid which does not use steel products or foundry products made in the United States,
the City, through its director of public works, shall make a determination if the price of United
States made steel or foundry is unreasonable. I understand that violations hereunder may result in
forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public
works are true and correct.
Dated this day of , 20
Contractor/Bidder (Firm)
Signature of Contractor/Bidder or Its Agent
Printed Name and Title
Subscribed and sworn to before me this day of , 20.
My Commission Expires
County of Residence
Notary Public
Version 9/29/2021 Page - 11 Public Works Quote
QUOTE/PROPOSAL
CITY OF SOUTH BEND
PROJECT NAME SRTS Our Lady of Hungary Tree Removal
PROJECT NO. 122-007B
4SpQTH 8���
U c7
w a
x\ PF.ACF.
x x
1865
February 13t" , 2024 by 9:30 am. Electronic quotes are to be
QUOTES DUE delivered via email to bpwbids(a-_)southbendin.gov
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
REMOVAL, TREE, 18-IN
2
EA
1
$
REMOVAL, TREE, 24-IN
6
EA
2
$
REMOVAL, TREE, 30-IN
11
EA
3
$
REMOVAL, TREE, 48-IN
2
EA
4
$
Total Amount of Quote
$
Firm:
Address:
City/State/Zip:
Telephone Number:
Fax Number:
By
(Signature)
(Printed Name of Person Signing)
Version 9/29/2021 Page - 12 Public Works Quote
From: Gemma Stanton
To: Gemma Stanton
Bcc: Kevin Kenney _(treecutterkev(obyahoo.com); kannon(obkc-tree.com; kannon(cbkctree.com; manfire2ftaol.com;
oilbertomiramontes(c�att.net; Veracruz24265(caamail.com
Subject: Tree Removal Quote
Date: Wednesday, January 24, 2024 4:34:00 PM
Attachments: imaae001.pnno
122-007B SRTS Our Lady of Hungary Tree Removal.Ddf
Good afternoon,
I am soliciting quotes for the attached tree removal project in the City of South Bend. This quote
includes tree removals in the Our Lady of Hungary neighborhood down to the stump. This project
does not involve stump removal. The project completion deadline is March 12th, 2024.
The deadline to submit quotes is 9:30am EST on February 13th, 2024. The quotes should be
delivered electronically to bawbidsC,)southbend in.gov.
Please reach out if you have any questions.
Thanks!
-
Gemma Stanton (she/her)
Project Engineer, Division Engineering
of
Department of Public Works
(574) 235-9083
t
p_stantonCcDsouthbendin.g_ov
J5
City of South Bend
227 W. Jefferson Blvd., Ste. 1316
South Bend, IN 46601
Excellence i Accountability i Innovation i Inclusion i Empowerment