My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes & Award -SRTS Our Lady of Hungary Tree Removal Proj No. 122-007B - KC Tree, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotes & Award -SRTS Our Lady of Hungary Tree Removal Proj No. 122-007B - KC Tree, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:14:52 PM
Creation date
2/13/2024 2:57:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />om5""- <br />PROJECTNAME: CITY OF SOUTH BEND, INDIANACONTRACTOR'S QUOTE FOR PUBLIC WORK SRTS Our Lady of Hungary Tree Removal <br />PROJECT NO. 122-007B <br />QUOTES DUE February 13", 2024 by 9:30 am. Electronic quotes are to be <br />delivered via email to bpwbids(Zsouthbendin.gov <br />r� �1 Must be completed for all <br />quotes. Please type or print) <br />Date: OtG Firm: Owe 1�(C —i—su e <br />Address: 9913 C{s xltl6wd�44 r' Zeq <br />City/State/Zip: 5%;F. uTTelephone Number: <br />r Iryr5i7r �77 ' 7�- - <br />Agent of Bidder (if Applicable): r-r awiw P.t t rfi( C pQ PfA Q=+ <br />Pursuant to notices given, the undersigned offer o f mish labor r /or m en I necessary to complete the <br />public works pr9ect of: I I n A r-7 I/ <br />the City of South Bend, Indiana, in accordance with plans/and s(3ecifications prepared by: <br />The city of South Bend, Department of Public Works <br />and dated / Z ZOO for the sum of (enter the Total Quote as shown on the Proposal) <br />`kk t hTwt'7i s3!q so 0 ) <br />(Enter SuM of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. By AKA —,(Si ature) /Gn5wat-e 1rr�r <br />— 4 �r t m aeof Person sin g) <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />Murray L. Miller, Member <br />ACCEPTANCE <br />day of 20 <br />Joseph R. Molnar, Vice President <br />Breana N. Micou, Member <br />Attest: Theresa Heffner, Clerk <br />Version 9/29/2021 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.