HomeMy WebLinkAboutAmendment No 1 to PSA - Bendix Dr. Improvements (Lathrop to Voorde) Proj No. 122-047 - DLZ1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
January 23, 2024
Ms. Laurie D. Johnson, P.E.
DLZ Indiana, LLC
2211 E. Jefferson Blvd.
South Bend, IN 46615
Liohnson&dlz.com
RE: Amendment No. 1 to Professional Services Agreement
Dear Ms. Johnson:
At its January 23, 2024 meeting, the Board of Public Works approved the above
referenced amendment for design services for Bendix Drive improvements (Lathrop to
Voorde), Project No. 121-047 in an amount not to exceed $270,954.
Enclosed please find a copy of the amendment for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Hefner
Theresa Heffner, Clerk
Enclosures
TH/lh
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA N. MIcou
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
TO: Board of Public Works
FROM: Leslie Biek, P.E., Assistant City Engineer
SUBJECT: Bendix Ph 2 Amendment with DLZ
121-047 (Des # 2100022)
DATE: January 23, 2024
Attached is Amendment #1 for the Bendix Ph 2 project from Lathrop to Voorde with DLZ Indiana.
The original agreement approved the work to around 60% completion of the design. This was due
to funding constraints and approval timing due to the federal fiscal year. This agreement brings the
design to 100% as needed to complete the design.
The project is expected to bid late 2026 with construction starting in 2027. The project will continue
the roadway reduction from Ph 1, reducing the travel lanes from 4 to 3 (two through lanes with a
center turn lane) and adding a separated path on the east side.
The funding for this amendment is to be paid from RWTIF. The Redevelopment Commission has
approved of the funds for this request.
It is requested the Board of Public Works approve Amendment #1 with DLZ for the Bendix
Ph 2 project PE phase of the project for a cost increase of $270,940 to the PSA bringing the
revised contract amount to $1,048,050.
Thank you for your consideration of this request.
SUPPLEMENTAL AGREEMENT NO. 1
This Supplemental Agreement No. 1 is made and entered into this 23rd. day of January,
2024, by and between the City of South Bend, Indiana, acting by and through its proper officials,
hereinafter referred to as the "LPA", and DLZ Indiana, LLC, hereinafter referred to as the
"CONSULTANT".
WITNESSETH
WHEREAS, the LPA and CONSULTANT did, on March 31, 2022 enter into an LPA-Consulting
Contract (Contract) for the preparation of preliminary design and plans for reconstruction of Bendix
Drive, Lathrop Street to Voorde Drive, with a road diet from 4 lanes to 3 lanes, a multi -use path
construction and installation of storm sewer.
WHEREAS, during the course of design, certain additional services, not included in the
original Contract, have become necessary; specifically:
• Additional Topographic Field Survey for the new basin location along Voorde Drive.
• Completion of the Roadway Design (Appendix A, Section E) from 65% to 100%.
• Completion of the Water Main and Sanitary Sewer Design (Appendix A, Section F) from 50% to
100% including existing sanitary sewer system evaluation and televising.
• Completion of the Traffic Signal Design at Voorde Drive and Bendix Drive (Appendix A, Section
G) from 40% to 100%.
• Completion of the Traffic Signal Design at Lathrop Street and Bendix Drive (Appendix A,
Section H) from 40% to 100%.
• Additional Environmental Services required for the proposed basin location.
• Additional soil borings and a percolation test at the proposed basin location.
• Adjustment of the number of parcels for Right of Way Engineering and Right of Way
Acquisition Services
• Perform services related to Signal Timing Optimization.
• Preparation and submission of the Construction Stormwater General Permit.
• Preparation and submission of the IDEM Water Main Construction Permit.
• Perform Bid and Construction Phase Office Services.
NOW THEREFORE, the LPA and the CONSULTANT desire to amend the above referenced Contract
as follows:
Revise Section "IV" COMPENSATION as follows:
The LPA shall pay the CONSULTANT for the Services performed under this Contract as set forth in
Appendix "D" which is herein attached to and made an integral part of this Contract. The
maximum amount payable under this Contract shall not exceed t"'�, ,-''�0$1,048,050.00.
II. Revise Appendix "A" Section B.1.b. as follows:
Along Voorde Drive from the centerline of Bendix Drive to 2150� 950" west. Width of topography
to be 4r5 40 feet each side of existing roadway edge of pavement for a total width of approximately
80 feet. Additionally, Parcel 018-2184-6938, currently owned by Indiana District 11 Little League
and located approximately 500-900 feet west of Bendix Drive, between Voorde Drive and Keller
Street, will be surveyed as a potential basin location (approximately 350 ft x 410 ft). The LPA
will make attempts at contacting the property owner prior to the survey fieldwork being
performed.
1of12
Supplemental Agreement No. 1
III. Revise Appendix "A" Section 13.1.1., as follows:
Alignments will be established along Bendix Drive from north of Lathrop Street to south of Voorde
Drive (total length of 4500 feet) and along Lathrop Street and Voorde Drive (total length of 999
1,350 feet).
IV. Revise Appendix "A" Section E.2, as follows:
Lathrop Street approaches to Bendix Drive will only be reconstructed as far back
as necessary to transition from their existing configuration to the proposed Bendix Drive layout.
Voorde Drive will be reconstructed as far back as necessary to provide the necessary storm
sewer outlet to the proposed basin location, up to approximately 850 feet.
V. Revise Appendix "A" Section E.S.b, as follows:
UP i on . hA" . id thy, 1-14all l cat.en fee the r ed st,,.-m seweF t,.,er-k. A basin will be
sized and located on Parcel 018-2184-6938, which will be the outfall location for the proposed
storm sewer network. The basin will be designed without an outlet or overflow, and sized in
accordance with the City of South Bend Design and Construction Standards, dated June 26, 2018.
In addition to the basin being sized for this project, an additional capacity will be estimated for
collecting the stormwater for the remaining portion of Bendix Road up to Lincolnway West. This
is a future project and the basin capacity will be confirmed at that time.
VI. Delete and replace Appendix "A" Section E.9, as follows:
9. The LPA is considered a Certified LPA; therefore, formal submittal of preliminary plan
milestones to INDOT is not required. The plans and supporting design documents will be
submitted as follows:
a. Stage 1, Preliminary Field Check (PFC), and Stage 3 plans will be submitted to the LPA
for review.
Final Tracings, calculations, and supporting documentation in accordance with IDM
Chapter 14 will be submitted to INDOT.
VII. Delete Appendix "A" Section E.10 in its entirety.
Vill. Delete Appendix "A" Section F.5 in its entirety .
IX. Delete Appendix "A" Section G.3 in its entirety.
X. Delete Appendix "A" Section H.3 in its entirety.
2of12
Supplemental Agreement No. 1
* Allowance amounts are estimates only. Actual amounts to be invoiced will be based on actual
subconsultant's invoices and/or DLZ hourly rates in accordance with actual services provided
** Amounts are estimates only. Actual amounts to be invoiced will be based on actual number of
parcels and/or Tax IDs.
*** Amounts shown are estimates only. Actual amounts to be invoiced will be based on actual
subconsultant's invoices and/or DLZ hourly rates in accordance with actual services provided based
on the approved INDOT rate schedule effective at the time of performance of services.
Toll telephone calls, printing, mailing, FAX costs required for the permits enumerated
hereinabove will not be reimbursable expenses and the costs thereof are included in the
itemized costs as shown herein in Appendix "D", Section A.2.
The cost of permit application/regulatory fees will be considered as a reimbursable
expense.
The CONSULTANT shall not be paid for any services performed by the LPA or not required
to develop this project.
XVIII. Delete Appendix "D" Section B.2 in its entiretv and replace with the following:
1. The LPA, for and in consideration of the rendering of the engineering services provided for in
Appendix "A", agrees to pay to the CONSULTANT for rendering such services the fees
established above in the following manner:
a. The amount invoiced based upon percent complete or the contract unit price, except
that:
i. Upon completion of the geotechnical fieldwork, the first submission of the
Geotechnical Report and the Geotechnical Profile Drawings to the LPA, the
CONSULTANT may submit a request for payment for the soils field work.
(a) Upon completion of the field investigation (cores and soil borings) 80%
(b) Upon Completion of the Final Report 100%
ii. The maximum payment for Roadway Design Plans shall be in accordance with the
following schedule:
(a) Stage 1 5" 35%
(b) Preliminary Field Check (PFC) 9-5%65%
(c) Stage (Nata fa-R .al 1NQQT i00%
(d) Stage 3 90%
(e) Final Tracings 100%
;FegFessing the —des+gRplans to an !Stage 2(5594) level @nd- th-at a
CiRal T-Fa GiRgs
iv. Payment for any item not otherwise set out herein shall be made based upon
percentage of completion.
M. Delete Items 42, 46, 47, and 51 through 57 in Appendix "E" Section A, in their entirety.
10 of 12
Supplemental Agreement No. 1
XI. Add Items 2 & 3 to Appendix "A", Section J, as follows:
2. The CONSULTANT shall perform the following tasks for the proposed basin location:
a. Additional Project Management: This task includes all file management, subconsultant
management, review of project budget, and general project management activities
associated with the preparation of the CE document.
b. Perform additional field reconnaissance to verify that the INDOT Level 2 CE impact
criteria and thresholds would not be exceeded by the project, and to collect
information on resources within the project area.
c. Update preliminary resource information about the project and project area including
supporting maps and photographs (aerial and ground).
d. Prepare an addendum Red Flag Investigation (RFI) using the current INDOT template,
including IDEM Virtual File Cabinet Data review. The RFI was approved for the original
scope of services on April 19, 2023.
e. Update Section 106 Minor Projects Programmatic Agreement submittal for added
basin and submit to INDOT. The original scope of services required a Category A
submittal. A Category a submittal is now required due the added basin and
archaeological requirement for work in potentially undisturbed soils.
3. The CONSULTANT shall perform a Phase la Archaeological Investigation:
a. Conduct a literature review to check the State Historic Architectural and Archaeological
Research Database (SHAARD) files and other resources at the Indiana Department of
Natural Resources — Division of Historic Preservation and Archaeology (DHPA) to
determine if any investigations have been conducted within the study area, and if
previously identified sites are located within the project area. The records check study
area will extend for 0.8 kilometers (0.5 miles) surrounding the project area.
b. A standard methodology for a Phase la Archaeological survey includes surface
collection/survey and the excavation of shovel test probes (STP). Surface
collection/survey occurs when there is at least 30 percent surface visibility and well
weathered surface conditions, generally within agricultural fields. The area is
examined via pedestrian survey, with transects spaced at no more than 10-meter (32.8-
foot) intervals. When subsurface testing is required, STPs are placed at 15-meter (50-
foot) intervals along systematically spaced transects. In areas where sites are
identified, the interval will be reduced to 5 meters (16.4 feet) to better defined site
boundaries, artifact distributions, and to identify possible feature remnants. STPs will
be 30 centimeters (12 inches) in diameter and extend to a depth to penetrate the
subsoil by at least 5 centimeters (2 inches). Soil will be examined via screening through
0.64-centimeter (0.25-inch) mesh hardware cloth. Soil and sod will be replaced
following the completion of the STP.
c. STP information will be recorded on standardized forms, with notes regarding soil
color, texture, depth, inclusions, and artifact content. Photographs will be taken of the
project area, sites encountered, and representative STPs. Archaeological sites
identified during the survey will be mapped and photographed in the field, and GPS
will be used to record locations. In addition, cultural artifacts encountered will be
collected for analysis. If large numbers of artifacts, particularly historic artifacts, are
encountered, or if large bulky artifacts are encountered, notes and photographs will
be taken regarding the resources, but discretion will be used in collecting these items.
3of12
Supplemental Agreement No. 1
d. It is assumed that the majority of the project will be disturbed because of urban
development and will just require disturbance assessment, and the area of the
detention basin appears to have been the location of a baseball field complex and no
more than 30 STPs will be required. It is also anticipated that no archaeological sites
will be recorded and that only an Archaeological Short Report (ASR) will be required
for reporting the results.
e. The Phase la ASR will summarize results of the literature review, will document results
of fieldwork, and provide a summary of the natural and cultural setting of the project
area.
f. If a site is located, artifacts collected during the survey will be taken to the laboratory
for processing and analysis. Following artifact analysis, the CONSULTANT will prepare
a full archaeological report that meets INDOT standards. This report will summarize
the results of the literature review, document the results of fieldwork, and provide a
summary of the natural and cultural setting of the project area. Finally, the report will
provide management recommendations regarding archaeological sites identified
during the survey.
g. Notes, photographs, documentation, and artifacts will be curated at an accredited
curatorial facility, such as the Indiana State Museum, pending donation by the
landowner. Artifacts and notes will be processed to meet the standard for permanent
storage at the accredited curatorial facility. If no sites are identified, the CONSULTANT
will retain the project documentation at their offices for a standard 5 years.
h. Archaeological Phase 1b, 1c, Phase 11, or Phase Ill Investigations or any tasks associated
with the discovery of human remains are not included.
i. Subconsultant services will be required all or part of this scope item.
XII. Revise Section 0 and 0.1 in Appendix "A", as follows:
The CONSULTANT shall make or cause to be made, a complete roadway geotechnical
investigation to be in accordance with the Geotechnical Manual, INDOT Materials and Tests
Division, 2016 Edition, of which a copy is on file with the Indiana Department of Transportation
and same is incorporated herein by reference and is made a part hereof. The Geotechnical
investigation shall include up to -7 8 roadway borings to a depth of 15 feet and up to 2 3 borings
to a depth of 25 feet for proposed traffic signals and proposed basin location. Location of the
borings are to be determined.
An allowance of $'0�00 $35,800.00 has been included for the CONSULTANT and/or
SUBCONSULTANT to perform Geotechnical Investigation services, as directed and
described below.
XIII. Add item 3 to Appendix "A", Section 0, as follows:
3. A percolation test will occur on the proposed basin site. The LPA will make attempts at
contacting the property owner prior to the CONSULTANT performing or causing this work
to be performed.
4of12
Supplemental Agreement No. 1
XIV. Revise Section Q.1 in Appendix "A", as follows:
In fulfillment of this Contract, the CONSULTANT shall comply with the requirements of the
appropriate regulations and requirements of the Indiana Department of Transportation and
Federal Highway Administration.
It is anticipated the project requires acquisition from approximately -14 8 parcels.
XV. Add Section V, W, X, and Y to Appendix "A", as follows:
V. Existing Sewer System Evaluation and Televising
The CONSULTANT shall perform or cause to perform video inspection of the existing 24-
inch and 18-inch combined sewer along Bendix Drive.
1. The anticipated limits of this work are from the first manhole approximately 260 feet
south of Voorde Drive to the manhole approximately 500 feet north of Voorde Drive.
2. The CONSULTANT shall review videos and provide recommendations for rehabilitation
or replacement, if necessary. Recommendations will be documented in email
correspondence to the LPA.
3. A Subconsultant services may be required to perform all or part of this scope item.
W. Traffic Signal Timing Optimization
The CONSULTANT shall develop optimized signal timing — cycle lengths and splits —for the
Bendix Drive/Lathrop Street and Bendix Drive/Voorde Drive intersections for the AM peak,
PM peak, and off-peak hours using Synchro software and develop signal timing
recommendations.
1. Traffic counts will be collected for the AM and PM peak hours during the hours of 7-9
AM (or 6-8 AM) and 4-6 PM.
2. The CONSULTANT shall determine the appropriate vehicle clearance intervals based on
the recommended minimums published by the Institute of Transportation Engineers.
3. The CONSULTANT shall present the recommended signal timings in a letter format
memo.
4. It is assumed that the signals will operate with the phase sequence operation as shown
on the final traffic signal design plans.
5. Left turn phase warrant and corridor signal progression analysis is not included in the
scope.
X. Permitting
The CONSULTANT shall prepare and submit the application and back-up documentation for
the following permits:
1. Construction Storm water General Permit (CSGP): The CONSULTANT shall prepare and
submit the documentation required to apply for permit coverage under the CSGP. The
scope shall include the following:
a. Prepare a Storm Water Pollution Prevention Plan Report document to include the
following:
5of12
Supplemental Agreement No. 1
i. Using existing and available GIS information, show vicinity map, legal
description of project site, hydrologic 14-digit unit code, location of all
wetlands, lakes, and water courses in vicinity of project. Identify existing
vegetation, drainage patterns, adjacent land use, potential discharges to
groundwater, and ultimate receiving waters on the project site.
ii. Provide maps showing the Floodplains, Floodways, and Floodway Fringes, if
applicable. Note any State or Federal water quality permits (i.e. DNR, Army
Corps, etc.) required.
iii. Determine soil types within the project area using the NRCS soil map — no
actual soil samples will be performed.
iv. Calculate Pre -Construction and Post Construction Estimate of Peak Discharge.
v. Develop sequence describing storm water quality measure implementation
relative to land disturbing activities.
vi. Document elements of this SWPPP where applicable within the Report,
including but not limited to, sediment control, runoff control, inlet protection,
pollutant sources, Best Management Practice (BMP) implementation, and
temporary and final stabilization methods.
b. Prepare Storm Water Pollution Prevention Plan (SWPPP).
i. Base drawings should indicate the following:
• Plat or Survey of existing project site.
• Location and approximate boundaries of all disturbed areas with
construction limits clearly shown.
• Location of all lots and proposed site improvements.
• Existing site topography at an interval appropriate to show detailed
drainage patterns.
• Proposed final site topography at an interval appropriate to show detailed
drainage patterns.
• Location, size and dimensions of proposed storm water system.
• Pre -Construction and Post Construction Infiltration Rates.
• Location, size and dimensions of proposed Best Management Practices.
• Location of all environmentally sensitive areas on the site (i.e. wetlands)
• Specific points where stormwater will leave the site.
ii. The SWPPP will show the location, dimensions, and construction details for all
erosion control measures required, including but not limited to, temporary and
permanent erosion control measures, water quality measures, perimeter
control and stable construction entrances. It will also delineate the disturbed
and preserved areas and proposed locations of soil stockpiles and borrow areas
and other staging elements, as required.
c. Submit Report and SWPPP to the local reviewing agency for 30-day review period.
d. Monitor the approval process and provide customary additional information that
may be required to secure permit approval.
e. Prepare and publish the Public Notice.
f. Complete draft application via the IDEM Regulatory ePortal, including upload of
proof of publication and local review agency approval forms. Provide completed
State Form 56679 Construction Stormwater Signed Certification for Owner
signature.
g. Submit final application to IDEM Regulatory ePortal along with $1001DEM permit
fee. Submit State Form 56679 via mail no later than 48 hours prior to start of
construction.
6of12
Supplemental Agreement No. 1
h. IDEM will provide Notice of Sufficiency directly to the LPA documenting the
approved permit number.
i. If requested, assist with submission of Notice of Termination form via the IDEM
Regulatory ePortal at completion of construction.
2. IDEM Water Main Construction Permit: The CONSULTANT shall prepare and submit the
application and back-up documentation for the Indiana Department of Environmental
Management (IDEM) Construction Permit for water main.
3. Permit fees, noted above, shall be paid by CONSULTANT at the time of submission. The
CONSULTANT shall monitor the approval process and provide any additional
information that may be required to secure the permit(s).
Y. Bid and Construction Phase Office Services
1. The CONSULTANT shall provide Bid phase services, which shall include the following
tasks:
a. Review the final construction documents distributed by INDOT for bidding purposes
for conformance with the CONSULTANT's final tracings submittal.
b. Issue contract document modifications, as appropriate to interpret, clarify or
expand the Bidding Documents that are not directly related to an error or omission
by the CONSULTANT.
c. Consult with the LPA concerning and determine the acceptability of substitute
materials and equipment proposed by the Contractor when substitution prior to
the award of contract is allowed by the Bidding Documents.
d. Answer any bidder questions at the request of INDOT during the bidding process.
2. The CONSULTANT shall provide Construction Phase Office services, which shall include
the following tasks:
a. Attend the pre -construction meeting.
b. Provide design support to the LPA's Resident Project Engineer, as required and as
directed by the LPA. The CONSULTANT will meet at the project site with the LPA or
their Resident Project Engineer, as required and as directed by the LPA, to assist in
resolution of matters that may arise during construction of the project.
c. Review or take other appropriate action upon the Contractor's submittals such as
Shop Drawings, Requests for Information (RFI), Product Data and Samples for the
limited purpose of checking for conformance with information given and the design
concept expressed in the Contract Documents. The CONSULTANT's action shall be
taken with such reasonable promptness as to cause no delay in the Work or in the
activities of the LPA, the Contractor or separate contractors, while allowing
sufficient time in the CONSULTANT's professional judgment to permit adequate
review. Review of such submittals is not conducted for the purpose of determining
the accuracy and completeness of other details such as dimensions and quantities,
or for substantiating instructions for installation or performance of equipment or
systems, all of which remain the responsibility of the Contractor as required by the
Contract. The CONSULTANT's review shall not constitute approval of safety
precautions or, of any construction means, methods, techniques, sequences, or
procedures. The CONSULTANT's approval of a specific item shall not indicate
approval of an assembly of which the item is a component.
7of12
Supplemental Agreement No. 1
d. If professional design services or certifications by a design professional related to
systems, materials or equipment are specifically required of the Contractor by the
Contract Documents, the CONSULTANT shall specify appropriate performance and
design criteria that such services must satisfy. Shop Drawings and other submittals
related to the work designed or certified by the design professional retained by the
Contractor shall bear such professional's written approval when submitted to the
CONSULTANT. The CONSULTANT shall be entitled to rely upon the adequacy,
accuracy and completeness of the services, certifications or approvals performed
by such design professionals.
e. Following Utility Coordination Certification, utility coordination services shall
include, issuing notice to proceed for utility relocation to begin, on site field
observation (as requested), acting as a liaison between utility companies and the
LPA, assisting the LPA's Resident Project Engineer, as requested, with tracking and
correspondence with utilities, answering questions, interpreting plans, reviewing
utility work plan revisions, and coordinating utility relocation activities.
3. The CONSULTANT shall provide Bid and Construction Phase Office Services, as listed
above, up to the level of effort reflected by the fee provided in Appendix D. The LPA
acknowledges that additional funds may be necessary if the level of effort exceeds that
which is agreed upon in Appendix D.
XVI. Delete Appendix "C" Section 3.e in its entirety.
The Remainder of This Page Intentionally Left Blank
8of12
Supplemental Agreement No. 1
XVII. Revise Appendix "D", Sections A.1 and A.2, as follows:
A. Amount of Payment
1. The CONSULTANT shall receive as payment for the work performed under this Agreement the
total fee not to exceed c'7'�00 $1,048,050.00 unless a modification of this agreement is
approved in writing by the LPA.
2. The CONSULTANT will be paid for the work performed under Appendix "A" of this Agreement
on a Lump Sum basis in accordance with the following schedule, except as noted in the items
below:
Task
Description
Amount
A.
Project Management
$59,300.00
B.
Topographic Field Survey
c�n�
$56, 600.00
C.
Location Control Route Survey Plat (LCRSP)
$8,900.00
D.
Subsurface Utility Engineering (Allowance)*
$65 700.00
E.
Roadway Design Plans (PFe►:....,:.,,..-.,
$323,010.0o
$453, 600.00
F.
Water Main and Sanitary Sewer Design (PFe miner- • Planq
$39,800.00
$79,600.00
G.
Traffic Signal Design at Voorde Drive and Bendix Drive (AFeuw. nart •
$9,goo.0o
$20,200.00
H.
Traffic Signal Design at Lathrop Street and Bendix Drive (Pr-e4., nGr-y
co�0()
$22,700.00
I.
1 Pavement Design
$7,300.00
J.
Environmental Document Preparation (NEPA)
c23�
$34,400.00
K.
Waters of the US Determination Report
$6,700.00
L.
Public Information/Design Hearing Meeting (Hourly Rate)
$17,400.00
M.
Airport and Railroad Coordination (Allowance)*
$18,400.00
N.
Utility Coordination
$21,800.00
O.
Geotechnical Investigation (Allowance)*
0
$35,800.00
P.
Right of Way Engineering Services**
1. Title Abstracting (Est. 2913 Tax 1Ds @ $550.00 ea.) =_c, $7,150.00
2. Right of Way Engineering & Plans (Est. 34 8 Parcels @ $3,100.00 ea.) _
Can inn nn 24,800.00
3. Right of Way Staking (Est. 418 Parcels @ $500.00 ea.) = cry7` $4,000.00
�
$35,950.00
Q.
Right of Way Acquisition Services***
1. Right of Way Early Assessment (118 @ Est. $140.00 ea.) = $1,540.00
2. Appraisal Problem Analysis (34 8 @ Est. $260.00) = 4860.00-$2,080.00
3. Appraisal Services (34 8 @ Est. $2,000.00) = r"Z^^�00-$16,000.00
4. Appraisal Review Services (34 8 @ Est. $1,000.00) = r"�&$8,000.00
$37,490-08
$27,200.00
R.
Existing Sewer System Evaluation and Televising
$7,300.00
S.
Traffic Signal Timing Optimization
$6,600.00
T.
Permitting
$8,600.00
U.
Bid and Construction Phase Office Services
$54,000.00
Total =
$1,048,050.
9of12
Supplemental Agreement No. 1
XX. Amendment:
Supplement Agreement No. 1 increases the current contract fee of $777,110.00 by $270,940.00 to
$1,048,050.00. All other terms and conditions as set forth in the original Contract dated March 31, 2022
shall remain in full force and effect, except as herein modified.
The undersigned attests, subject to the penalties for perjury, that he is the contract party, or that he is
the representative, agent, member or officer of the CONSULTANT that he has not, nor has any other
member, employee, representative, agent or officer of the firm, company, corporation or partnership
represented by him, directly or indirectly, to the best of his knowledge, entered into or offered to enter
into any combination, collusion of agreement to receive or pay, and that he has not received or paid, any
sum of money or other consideration for the execution of this Contract other than that which appears
upon the face of the Contract.
IN TESTIMONY WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1.
CONSULTANT LOCAL PUBLIC AGENCY
DLZ Indiana, LLC
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Signature NJ
Laurie D. Johnson, P.E., Vice President
(Print or type name and title)
Attest:
J"'A'o,titX
Si nature
Anthony M. Glenn, P.E., Project Manager
(Print or type name and title)
Elizabeth A. Maradik, President
Joseph R. Molnar, Vice President
PQJ
" 6i 04'�
Gary A. Gilot, Member
Briana Micou, Member
Murray L. Miller, Member
ATTEST:
Theresa M. Heffner, Clerk
Date: January 23, 2024
11
Supplemental Agreement No. 1
ACKNOWLEDGMENT
STATE OF INDIANA
COUNTY OF ST. JOSEPH SS:
Before me, the undersigned Notary Public in and for said County personally appeared Laurie D. Johnson,
Vice President and Anthony M. Glenn, Project Manager, of DLZ Indiana, LLC, 2211 E. Jefferson Blvd.,
South Bend, IN 46615, and each acknowledged the execution of the foregoing agreement on this
day of , 2023 and each acknowledged and stated that he is the party
authorized by the said firm to execute the foregoing agreement.
Witness my hand and seal the said last named date.
My Commission Expires:
December 18, 2024
County of Residence: St. Joseph
STATE OF INDIANA
Mary Ann Myers, Notary Public
KNOWLEDGMENT
COUNTY OF SS:
Before me, the undersigned Notary Public in and for said County personally appeared Elizabeth A.
Maradik, President, Joseph R. Molnar, Vice President, Gary A. Gilot, Member, Breana Micou, Member,
Murray L. Miller, Member and Theresa M. Heffner Member, of the City of South Bend, Indiana Board
of Public Works and acknowledged the execution of the foregoing agreement on this JIJ. day of
FNotary
D. HENSLEY
Witness m hand and seal the said last named date.ty-SPublt-seal
Y ty State of Indiana
umber NP0732150 Expires Mar 3, 2029
My Commission Expires:
V V 1 011 L. 1,1 3. "� ci --� 9
County of Residence:
,-�A • '� 0sfph , -I'-rdi'a n R
Not y Public
1
12 of 12
Supplemental Agreement No. 1
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date:
Name
January 16, 2024
Leslie Biek Department of Public Works — Engineering Division
BPW Date: January 23, 2024 Phone Extension: 9323
Required Prior to Submittal to Board
BPW Attorney X Attorney Name
Dept. Attorney ❑ Attorney Name
Purchasing
I Check the ADDroDriate Item TVDe — Reauired for All Submissions I
U Professional Services Agreement U Contract U Proposal
❑ Open Market Contract ® Amendment/Addendum ❑ Special Purchase, QPA
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes
❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA
❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution
n Other: n Ease./Encroach
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Information
DLZ Indiana
U Yes❑ If Yes, Approved by Purchasing
® No
E] MBE ❑ WBE Completed E-Verify Form Attached ❑❑ Nos
Bendix Drive Improvements (Lathrop to Voorde)
121-047; INDOT DES2100022; PROJ 338
PO 15848
RWTIF
$270,940
NTE
Design and R/W professional services for Bendix Ph 2.
For Change Orders Only
Amount of ❑ Increase $
❑ Decrease ($ )
Previous Amount
Current Percent of Change
New Amount
Total Percent of Change:
Time Extension Amount:
New Completion Date:
Increase %
Decrease ( %)
Increase %
Decrease ( %)