Loading...
HomeMy WebLinkAboutRequest to Advertise & Title Sheet - WWTP Degrit Building Yard Piping Replacement Proj No. 123-031ABOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 01-16-2024 Name: Jacob M. Klosinski Department of Public Works – Engineering Division BPW Date: 01-23-2024 Phone Extension: 9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Mickey Lovy / Ron O'Connor Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name WWTP Degrit Building Yard Piping Replacement Project Number 123-031A / PROJ00000435 Funding Source Sewage Works – Wastewater Capital Account No. PR/PO # Amount Terms of Contract Special Contract Provisions Purpose/Description The Division of Engineering and Division of Wastewater request approval of a Title Sheet and Request to Advertise for Public Bids for the subject project. Bids will be due to the Board of Public Works on February 27, 2024. Refer to Inter-Office Memorandum for additional information. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % (%) New Amount $ Total Percent of Change: Increase Decrease % (%) Time Extension Amount: New Completion Date: January 23, 2024 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Michael Schmidt, Assistant City Attorney Public Works Theresa Heffner, Clerk of the Board of Public Works FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: 123-031A WWTP Degrit Building Yard Piping Replacement (PROJ00000435) Agenda Request – Title Sheet & Request to Advertise DATE: January 16, 2024 The Divisions of Engineering and Wastewater request that the Board of Public Works approve a Title Sheet and Request to Advertise for Public Bids for Project No. 123-031 WWTP Degrit Building Yard Piping Replacement at its Regular Meeting on January 23, 2024. This is the first letting of two scheduled projects for improvements in this area of the Wastewater Treatment Plant. The first project addresses Yard Piping. The second project will replace the DAF Units with gravity belt thickeners. Project Background The existing Primary Sludge and Waste Activated Sludge yard piping will be replaced between the Compressor Building #5 basement and the Degrit Building #6 basement. Concrete sidewalk, asphalt pavement, concrete stairs and handrail will also be replaced as required to expose and replace the yard piping between the buildings and existing tanks in this area of the Wastewater Treatment Plant. The 30+ year old sludge piping has experienced multiple breaks and repairs over the last three years, and the section loss of the pipe has slowly deteriorated due to the abrasive nature of the grit and solids that carry through the primary sludge and waste activated sludge piping. New, Protecto 401 interior coated ceramic lined ductile iron pipe will be installed to replace the existing cement lined ductile iron pipe. Public Bid Schedule Advertisement 1: January 26, 2024 Advertisement 2: February 2, 2024 Pre-Bid Meeting: February 8, 2024 Bid Opening: February 27, 2024 Bid Award (tentative): March 12, 2024 The Plans and Specifications are in final revisions and will be ready prior to the first advertisement on Friday, January 26, 2024. The Purchase Requisition is being added to DFO the afternoon of January 16, 2024. Funding for this project is directed out of the Sewage Works Capital – Wastewater Capital, Account 642-06-605-514-442005. For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. G - GENERALC- CIVILS- STRUCTURALPLANS PREPARED BY:PLANS PREPARED FOR:BOARD OF PUBLIC WORKSDRAWING GENERAL TABLE OF CONTENTSCITY OF SOUTH BEND, INDIANADEPARTMENT OF PUBLIC WORKSPROJECTSEWERWATERTRAFFICSTREETOTHERSOUTH BEND WWTPDEGRIT BUILDING YARD PIPINGREPLACEMENTPROJECT NO. 123-031AJANUARY 2024AS PER CITY CONSTRUCTION STANDARDS & SPECIFICATIONSSPECIFICATION GENERAL TABLE OF CONTENTS8415 Allison Pointe Blvd, Suite 410Indianapolis, Indiana 462501/17/24PE10504819HEATACHESLEKREGISTERED STATE OFP ROFESSIONALENGINEERINDIANAHERSOUTH BEND WASTEWATER TREATMENT PLANTPROJECT LOCATION3113 RIVERSIDE DRSOUTH BEND, IN4662801/17/2401-17-2024 Jacob M. Klosinski1/18/202401-18-2024January 23, 2024