AGENDA REVIEW SESSION ACTION ITEM
1. LICENSES AND PERMITS
A. Street Closures for Special Events
1. Event: March for Life-South Bend
a) Date/Times: January 19, 2024; 11:30 a.m. to 1:15 p.m.
b) Location: Sidewalk from Knights of Columbus to Federal Courthouse
c) Favorable Recommendations
2. REVIEW OF MINUTES
A. Approve Agenda Review, and Regular Meeting Minutes of January 4, and
January 9, 2024
3. AWARD BIDS AND APPROVE CONTRACTS
A. Liberty Tower TIF Project - Parking Garage – Project No. 123-054R
1. Company: RAM Construction Services of Michigan, Inc.
2. Amount: $1,170,220; Base Bid Plus Alternates 1 & 3
3. Funding: PR-00027141
4. AWARD QUOTATIONS AND APPROVE CONTRACTS
A. Northwest Elevated Tank Valve Vault Coating – Project No. 122-018B
1. Company: Jetco, Ltd.
2. Amount: $46,486
3. Funding: PR-00029298
5. CHANGE ORDERS
A. Coal Line Trail, Phase IIB – Project No. 122-035
1. Company: Indiana Department of Transportation, Milestone Contractors
North, Inc.
2. Change Order No.: 5
3. Description: To Extend Intermediate Completion Date. Everything Else Stays
the Same
4. Increase Amount: Ninety-Eight (98) Days; Completion Date: May 1, 2024
5. Funding: PO-0025244
B. LaSalle Streetscape – Project No. 122-013R
1. Company: Milestone Contractors North, Inc.
2. Change Order No.: 2
3. Increase Amount: $97,575.86
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
AGENDA REVIEW SESSION
January 18, 2024 – 10:30 a.m.
Virtual Meeting Link http://tinyurl.com/2024BPW-AgendaReview
1308 County-City Building, South Bend, IN 46601
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU
Page 2
4. Percent of Increase: 1.67%
5. Total Percent Change: 5.30%
6. Revised Contract Amount: $5,955.090.16
7. Funding: PO-0023705
C. The Hill TIF Project - Site Work – Project No. 123-030
1. Company: Majority Builders, Inc.
2. Change Order No.: 1 (Final)
3. Increase Amount: $23,214
4. Percent of Increase: 4.87%
5. Revised Contract Amount: $500,000
6. Funding: PO-0024347
6. PROJECT COMPLETION AFFIDAVITS
A. Small Drainage Improvements – Beale St. & Chapin St. – Project No. 121-006B
1. Company: HRP Construction, Inc.
2. Final Contract Amount: $177,765.50
3. Funding: PO-0023950
7. REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS
A. 2024 Water Works Utility Service Line Repair Program
B. 2024 Sewer Insurance Lateral Repair Program
C. Wastewater Treatment Plant CNG Compressor Upgrade – Project No. 119-109R
1. Title Sheet
2. Funding: PR-00027076
D. Demolition of 1000 W. Sample St. (Former Fun FX Bldg.) – Project No. 123-014
1. Funding: PR-00030442
E. Wastewater Treatment Plant Degrit Building Yard Piping Replacement – Project
No. 123-031A
1. Title Sheet
2. Funding: PR-000
8. AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
A. Release of Utility Easement – Five Corner, LLC
1. Description: Associated with Alley Vacation at 1200 Block of Howard St.
B. Amendment No. 1 to Professional Services Agreement – DLZ Indiana, LLC
1. Description: Design Services for Bendix Drive Improvements (Lathrop to
Voorde) Project No. 121-047
2. Amount: NTE $270,954
3. Funding: PO-0015848
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
AGENDA REVIEW SESSION
January 18, 2024 – 10:30 a.m.
Virtual Meeting Link http://tinyurl.com/2024BPW-AgendaReview
1308 County-City Building, South Bend, IN 46601
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU
Page 3
C. Real Property Transfer Agreement – South Bend Mutual Housing Cooperative
1. Description: Request to Transfer City Property at 324 Cottage Grove for
Development of Affordable Housing
D. Wayfinding Signs Agreement – Indiana Department of Transportation
1. Description: Policy for Guide Signs to be Installed and Maintained at Various
Locations in South Bend & St. Joseph County, Phase III, Project No. 123-013
E. Right of Entry for Demolition Agreement – Jerid Enterprises, LLC
1. Description: Allows Contractor onto Parcels Adjacent 1000 W. Sample St.-
Former Fun FX Building for Purposes of Demolition through Indiana’s
Unsafe Building Law Project No. 123-014
F. Right of Entry for Demolition Agreement – Shark Investments LLC
1. Description: Allows Contractor onto Parcels Adjacent 1000 W. Sample St.-
Former Fun FX Building for Purposes of Demolition through Indiana’s
Unsafe Building Law Project No. 123-014
9. LICENSES AND PERMITS
B. Street Closures for Special Events
1. Event: Girls on the Run Michiana 5K
a) Date/Times: May 18, 2024; 5:00 a.m. to 12:00 p.m.
b) Location: Wall St. to S. Greenlawn Ave., Belmont Ave., S. Twyckenham
Dr., Sunnymede Ave., E. Wayne St., S. Sunnymede Ave., E. South St.,
Longfellow Ave., and back to Wall St.
c) Favorable Recommendations
2. Event: St. Patrick’s Day Parade
a) Date/Times: March 16, 2024; 9:30 a.m. to 1:00 p.m., No Parking 7:00 a.m.
to Noon (Along Route)
b) Location: S. Frances St. at E. Jefferson Blvd., Jefferson Blvd. to N. Niles
Ave.
c) Favorable Recommendations; Rain Date March 23, 2024
10. TRAFFIC CONTROL DEVICES
A. Reserved Handicapped Accessible Parking Space Sign
1. Location: East Side of Lafayette, North of Jefferson Blvd., #5
a) All Criteria Met
B. New Installation – (2) No Parking Right Arrow Signs & Here to Corner
1. Locations:
a) Indiana at Catalpa
b) All Criteria Met
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
AGENDA REVIEW SESSION
January 18, 2024 – 10:30 a.m.
Virtual Meeting Link http://tinyurl.com/2024BPW-AgendaReview
1308 County-City Building, South Bend, IN 46601
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BREANA N. MICOU
Page 4
C. New Installation – (2) No Parking This Side of Street Signs
1. Locations:
a) Fuerbringer St.
b) All Criteria Met
D. New Installation – (8) No Parking Right Arrow Signs & Here to Corner
1. Locations:
a) Intersection of Woodward & Yukon
b) All Criteria Met
E. New Installation – (2) Stop Signs
1. Locations:
a) Intersection of Kaley St. & Linden Ave.
b) All Criteria Met
F. New Installation – (2) Stop Signs
1. Locations:
a) Intersection of Colfax Ave. & Sunnyside Ave.
b) All Criteria Met
11. CLAIMS
A. Ratification of Preapproved City of South Bend Claims Payments
1. Claim Nos.: GBLN-70708, GBLN-70896
a) Date: 01/02/2024
b) Amount: $83,549.51
2. Claim No.: GBLN-70673
a) Date: 01/02/2024
b) Amount: $1,558,311.23
12. PRIVILEGE OF THE FLOOR
13. ADJOURNMENT
NOTICE
FOR HEARING AND SIGHT IMPAIRED PERSONS
Auxiliary Aid or Other Services are Available upon Request at No Charge. Please Give