HomeMy WebLinkAboutAmendment No. 1 to PSA - WWTP Final Clarifier Proj No. 119-069 – Arcadis U.S., Inc.
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT MURRAY L. MILLER BRIANA MICOU
1316 COUNTY-CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
December 19, 2023
Ms. Amy E. Smitley, PE
Arcadis U.S., Inc.
150 W. Market St., Suite 728
Indianapolis, IN 46204
Amy.smitley@arcadis.com
RE: Amendment No. 1 to Professional Services Agreement
Dear Ms. Smitley:
At its December 19, 2023 meeting, the Board of Public Works approved the above
referenced amendment for construction administration services for the WWTP Final Clarifier
1, 2, and 3, Project No. 119-069 in the amount of $175,100 with a new adjusted total of
$968,870.
Enclosed please find a copy of the amendment for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/lh
INTER-OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENGINEERING
TO: Members of the Board of Public Works
Michael Schmidt, Assistant City Attorney Public Works
Theresa Heffner, Clerk of Board of Public Works
FROM: Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: 119-069 WWTP Secondary Improvements
Amendment to Professional Services Agreement with Arcadis US
(PROJ00000078 & PROJ00000367; PO-0000413)
DATE: December 11, 2023
The Division of Engineering recommends the Board of Public Works approval of an
Amendment to a Professional Services Agreement with Arcadis US (V-00000135) that
includes construction administration services for Project No. 119-069 WWTP Secondary
Improvements. Approval is requested at the 12-19-2023 Board of Public Works Meeting.
Amendment No. 1 (Attached)
Amendment No. 1 scope of work will include construction administration and record
drawings for the subject project. The City split Project 119-069 into two projects: 119-069A
WWTP Final Clarifiers 4 & 5, Aerations Tanks 1-4, and Disinfection Improvements and 119-
069B Final Clarifiers 1, 2, and 3 Improvements due to cost. The City utilized funds from the
original construction administration budget to accommodate the development of the
Preliminary Engineering Report for the WWTP Hydraulic Improvements project and project
support for the Indiana Finance Authority and State Revolving Loan Fund Wastewater
project application that was submitted successfully in conjunction with the WWTP
Equalization Basin project. As a result, Amendment No. 1 will cover the design services
required to complete the Construction Administration Services, periodic inspection, project
support, and record drawings for the project during the upcoming construction phase.
The contract amounts will change as follows:
Original agreement amount: $793,770.00
Net change for prior amendments: $ 0.00
Amendment No. 1 amount: $175,100.00
Adjusted agreement amount: $968,870.00
This project is funded through Sewage Works, Wastewater Capital Account 641-06-
605-514-431002.
For questions regarding the subject agenda request, contact Jacob M. Klosinski, P.E.
(Ext. 9496) at the Division of Engineering.
https://arcadiso365.sharepoint.com/teams/SouthBendWWTPSecondaryDisinfectionImprovements/Shared Documents/PM/Amendment 1/SB WWTP Final Clarifier 123
Construction_Amendment No. 1 Ltr.docx
Arcadis U.S., Inc.
150 W. Market Street
Suite 728
Indianapolis
Indiana 46204
Tel 317 231 6500
Fax 317 231 6514
www.arcadis.com
Page:
1/1
Jacob Klosinski
Assistant City Engineer
City of South Bend
1316 County-City Building
227 West Jefferson Boulevard
South Bend, IN 46601
Subject:
WWTP Secondary and Disinfection Improvements
Amendment No. 1, Final Clarifier Nos. 1-3 Design Update and CA
Dear Jacob:
Enclosed are signed copies of Amendment No. 1 for Professional Services
associated with the additional design and construction administration (CA)
engineering services for Final Clarifier Nos. 1 through 3 Improvements, as part of
the WWTP Secondary and Disinfection Improvements project. If the Amendment
is acceptable to the Board, please return one fully executed copy for our files.
Sincerely,
Arcadis U.S., Inc.
Amy E. Smitley, PE
Vice President
Date:
December 6, 2023
Contact:
Amy Smitley
Phone:
317-236-2844
Email:
amy.smitley@arcadis.com
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 1 of 6
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 1
SB WWTP Final Clarifier 123 Construction_Amendment No. 1.docx
An Agreement was executed on July 23, 2019 between the City of South Bend, Indiana [Client], having its principal place of
business at 1316 County-City Building, 227 West Jefferson Boulevard, South Bend, Indiana 46601, and Arcadis U.S., Inc.
[Arcadis], having its principal place of business at 630 Plaza Drive, Highlands Ranch, Colorado 80129 and having an office at
55 Monument Circle, Suite 300B, Indianapolis, Indiana 46204.
Under the Agreement, Arcadis provides certain professional engineering services related to design, bid and construction
administration engineering services for Final Clarifier Nos. 1 through 5 rehabilitation, Aeration Tank Nos. 1 through 4
modifications and effluent disinfection chemical expansion.
Client and Arcadis now desire to amend the Agreement to include the amended Services as described below.
In consideration of the mutual promises in the Agreement, Client and Arcadis agree to amend the Agreement as the following:
1.Schedule A-1,Scope of Amended Services.
2.Schedule B-1,Compensation for Amended Services.
Other Provisions. Except as amended herein, all other provisions, terms and conditions in the Agreement shall remain in full
force and effect.
Execution Authority. This Amendment to the Agreement is a valid and authorized undertaking of Client and Arcadis. The
representatives of Client and Arcadis who have signed below have been authorized to do so.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment to the Agreement as of this date:
_______________, 2023.
CITY OF SOUTH BEND Arcadis U.S., Inc.
By: ___________________________________
Title: Vice President
December 19
December 19, 2023
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 2 of 6
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 1
SB WWTP Final Clarifier 123 Construction_Amendment No. 1.docx
Schedule A-1
Scope of Amended Services and Related Matters
ENGINEERING SERVICES BY ARCADIS
Final Clarifier Nos. 1 through 3 Rehabilitation. The WWTP has seven final clarifiers. Final Clarifier Nos. 1 through 3
(112.5 ft dia.) were part of the original plant constructed in the early 1950s. Final Clarifier Nos. 4 and 5 (145 ft dia.) were
added in the 1970s. Final Clarifier Nos. 6 and 7 (200 ft dia.) were added in the 1970s as tertiary clarifiers. In 2001, all final
clarifiers were rehabilitated with new collector mechanisms, skimmers (Nos. 1 to 5 only), effluent weirs, and return sludge
pumps. Final Clarifier Nos. 6 and 7 were converted from tertiary clarifiers to final (secondary) clarifiers during that time. As
part of the recent WWTP Secondary Treatment Improvements project, Final Clarifier Nos. 6 and 7 were rehabilitated and
enhanced and are operating exceptionally well (e.g. concentrated return sludge allowing lower pumping rates). As part of
the WWTP Secondary and Disinfection Improvements project, Final Clarifier Nos. 4 and 5 were rehabilitated. Final
Clarifier Nos. 1 through 3 have reached the end of their useful life and are in need of rehabilitation and replacement
similar to Final Clarifier Nos. 4 through 7.
Final Clarifier Nos. 1 through 3 are each 112.5 feet in diameter with a sidewater depth of 12 feet. The sludge collector
mechanisms are suction sludge removal type. The clarifiers are drained by their associated return sludge pumps.
Skimmings removal is provided in all clarifiers. As part of this project, the internal clarifier equipment including the sludge
collector mechanisms and scum removal will be replaced. The influent and effluent troughs, and effluent weirs will be
replaced and provided with concrete channels. The existing scum removal beyond that being replaced internal to the
clarifiers will be reused.
In addition, the clarifier structures will be inspected and rehabilitated and repaired, as necessary. The exposed concrete and
just below the water line will also be coated. The limits of the structural inspection and rehabilitation include within the concrete
tank structures only. Railing will be replaced; limits include these clarifiers and the final clarifier influent channel leading into
these clarifiers from the main channel. The individual influent channels into each of Final Clarifier Nos. 1 through 3 also require
improvements to eliminate this area overtopping during peak flows and spilling into the gallery buildings.
The clarifier drive mechanisms are monitored by SCADA. Instrumentation and controls (i.e. over-torque alarm) will be
provided, and HMI screens will be updated to match Final Clarifier Nos. 4 through 7. The clarifier equipment is electrically
fed from their associated gallery buildings, which has been replaced through another City project and is assumed can be
reused.
These clarifiers will primarily be used during wet weather when the plant exceeds 77 mgd and is required to treat 100 mgd
as part of the CSO LTCP requirement. Considering this and due to market conditions, these clarifiers will be replaced and
rehabilitated in-kind, matching their current rim feed configuration. This project entails updating the prior Final Clarifier
Nos. 1 through 3 design to replace and rehabilitate the clarifiers as perimeter feed type clarifiers, and to provide
construction administration services during the City’s selected Guaranteed Savings Contract type delivery method,
already awarded to the contract.
The scope of engineering services shall include the following:
1. Project Management. Provide project management including scope, budget and schedule control; project
coordination; maintenance of records; project setup, invoicing, and close-out.
2. Design Updates. Update the contract documents to replace and rehabilitate the clarifiers as perimeter feed type
clarifiers.
Upon acceptance of the Guaranteed Maximum Price, the following construction services apply.
3. General Administration of Construction Contract. Consult with Owner and act as Owner’s representative as
provided in the Construction Contract. The extent and limitations of the duties, responsibilities, and authority of
Engineer as assigned in the Construction Contract shall not be modified, except as Engineer may otherwise agree in
writing. All of Owner’s instructions to Contractor will be issued through Engineer, which shall have authority to act on
behalf of Owner in dealings with Contractor to the extent provided in this Agreement and the Construction Contract
except as otherwise provided in writing.
4. Pre-Construction Conference. Participate in a Pre-Construction Conference prior to commencement of Work at the
Site. The conference will be attended by Engineer.
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 3 of 6
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 1
SB WWTP Final Clarifier 123 Construction_Amendment No. 1.docx
5. Schedules. Receive, review, and determine the acceptability of schedules that Contractor is required to submit to
Engineer, including the Progress Schedule, Schedule of Submittals, and Schedule of Values.
6. Visits to Site and Observation of Construction. In connection with observations of Contractor’s Work while it is in
progress:
• Make visits to the Site at intervals appropriate to the various stages of construction, as Engineer deems necessary, to
observe as an experienced and qualified design professional the progress of Contractor’s executed Work. Such visits
and observations by Engineer are not intended to be exhaustive or to extend to every aspect of Contractor’s Work in
progress or to involve detailed inspections of Contractor’s Work in progress beyond the responsibilities specifically
assigned to Engineer in this Agreement and the Contract Documents, but rather are to be limited to spot checking,
selective sampling, and similar methods of general observation of the Work based on Engineer’s exercise of
professional judgment, as assisted by the Owner’s Resident Project Representative. Based on information obtained
during such visits and observations, Engineer will determine in general if the Work is proceeding in accordance with
the Contract Documents, and Engineer shall keep owner informed of the progress of the Work. Engineer will visit the
Site on the same day of each construction progress meeting. The scope of these engineering services is based on up
to 12 months of progress meetings.
• The purpose of Engineer’s visits to the Site will be to enable Engineer to better carry out the duties and responsibilities
assigned to and undertaken by Engineer during the Construction Phase, and, in addition, by the exercise of
Engineer’s efforts as an experienced and qualified design professional, to provide for Owner a greater degree of
confidence that the completed Work will conform in general to the Contract Documents and that Contractor has
implemented and maintained the integrity of the design concept of the completed Project as a functioning whole as
indicated in the Contract Documents. Engineer shall not, during such visits or as a result of such observations of
Contractor’s Work in progress, supervise, direct, or have control over Contractor’s Work, nor shall Engineer have
authority over or responsibility for the means, methods, techniques, sequences, or procedures of construction selected
or used by Contractor, for security or safety at the Site, for safety precautions and programs incident to Contractor’s
Work, nor for any failure of Contractor to comply with Laws and Regulations applicable to Contractor’s furnishing and
performing the Work. Accordingly, Engineer neither guarantees the performance of any Contractor nor assumes
responsibility for any Contractor’s failure to furnish or perform the Work in accordance with the Contract Documents.
7. Defective Work. Reject Work if, on the basis of Engineer’s observations, Engineer believes that such Work (a) is
defective under the standards set forth in the Contract Documents, (b) will not produce a completed Project that
conforms to the Contract Documents, or (c) will imperil the integrity of the design concept of the completed Project as
a functioning whole as indicated by the Contract Documents.
8. Clarifications and Interpretations; Field Orders. Issue necessary clarifications and interpretations of the Contract
Documents as appropriate to the orderly completion of Contractor’s work. Such clarifications and interpretations will be
consistent with the intent of and reasonably inferable from the Contract Documents. Subject to any limitations in the
Contract Documents, Engineer may issue field orders authorizing minor variations in the Work from the requirements
of the Contract Documents. Coordinate a tracking log for clarifications and interpretations as part of the electronic data
information system developed by Engineer.
9. Change Orders and Work Change Directives. Recommend change orders and work change directives to Owner, as
appropriate, and prepare change orders and work change directives as required.
10. Shop Drawings and Samples. Review and approve or take other appropriate action in respect to Shop Drawings and
Samples and other data which Contractor is required to submit, but only for conformance with the information given in
the Contract Documents and compatibility with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. Such reviews and approvals or other action will not extend to means, methods,
techniques, sequences, or procedures of construction or to safety precautions and programs incident thereto.
Engineer shall meet any Contractor’s submittal schedule that Engineer has accepted. Coordinate a tracking log for
submittals as part of the electronic data information system developed by Engineer.
11. Substitutes and “or-equal” Requests. Review the Contractor’s requests for product substitutions and “or equal”;
Engineer will separately track the time and expense required for such reviews and invoice the Client for such reviews
as Additional Services.
12. Inspections and Tests. The Owner’s Resident Project Representative will require such special inspections or tests of
Contractor’s work as deemed reasonably necessary, and receive and review all certificates of inspections, tests, and
approvals required by Laws and Regulations or the Contract Documents. Any review by Engineer of such certificates
will be for the purpose of determining that the results certified indicate compliance with the Contract Documents and
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 4 of 6
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 1
SB WWTP Final Clarifier 123 Construction_Amendment No. 1.docx
will not constitute an independent evaluation that the content or procedures of such inspections, tests, or approvals
comply with the requirements of the Contract Documents. Engineer shall be entitled to rely on the results of such
tests.
13. Change Proposals and Claims. (a) Review and respond to Change Proposals. Review each duly submitted Change
Proposal from Contractor and, within 30 days after receipt of the Contractor’s supporting data, either deny the Change
Proposal in whole, approve it in whole, or deny it in part and approve it in part. Such actions shall be in writing, with a
copy provided to Owner and Contractor. If the Change Proposal does not involve the design (as set forth in the
Drawings, Specifications, or otherwise), the acceptability of the Work, or other engineering or technical matters, then
Engineer will notify the parties that the Engineer will not resolve the Change Proposal. (b) Provide information or data
to Owner regarding engineering or technical matters pertaining to Claims.
14. Applications for Payment. Based on Engineer’s observations as an experienced and qualified design professional
and on review of Applications for Payment and accompanying supporting documentation:
• Determine the amounts that Engineer recommends Contractor be paid. Such recommendations of payment will be in
writing and will constitute Engineer’s representation to Owner, based on such observations and review, that, to the
best of Engineer’s knowledge, information and belief, Contractor’s Work has progressed to the point indicated, the
Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning
whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract
Documents, and to any other qualifications stated in the recommendation), and the conditions precedent to
Contractor’s being entitled to such payment appear to have been fulfilled in so far as it is Engineer’s responsibility to
observe Contractor’s Work. In the case of unit price work, Engineer’s recommendations of payment will include final
determinations of quantities and classifications of Contractor’s Work (subject to any subsequent adjustments allowed
by the Contract Documents).
• By recommending any payment, Engineer shall not thereby be deemed to have represented that observations made
by Engineer to check the quality or quantity of Contractor’s Work as it is performed and furnished have been
exhaustive, extended to every aspect of Contractor’s Work in progress, or involved detailed inspections of the Work
beyond the responsibilities specifically assigned to Engineer in this Agreement and the Contract Documents. Neither
Engineer’s review of Contractor’s Work for the purposes of recommending payments nor Engineer’s recommendation
of any payment including final payment will impose on Engineer responsibility to supervise, direct, or control
Contractor’s Work in progress or for the means, methods, techniques, sequences, or procedures of construction or
safety precautions or programs incident thereto, or Contractor’s compliance with Laws and Regulations applicable to
Contractor’s furnishing and performing the Work. It will also not impose responsibility on Engineer to make any
examination to ascertain how or for what purposes Contractor has used the moneys paid on account of the Contract
Price, or to determine that title to any portion of the Work in progress, materials, or equipment has passed to Owner
free and clear of any liens, claims, security interests, or encumbrances, or that there may not be other matters at issue
between Owner and Contractor that might affect the amount that should be paid.
15. Contractor’s Completion Documents. Receive, review, and transmit to Owner maintenance and operating
instructions, schedules, guarantees, bonds, certificates or other evidence of insurance required by the Contract
Documents, certificates of inspection, tests and approvals, Shop Drawings, Samples and other data approved, and
transmit the annotated record documents which are to be assembled by Contractor in accordance with the Contract
Documents to obtain final payment.
16. Substantial Completion. Promptly after notice from Contractor that Contractor considers the entire Work ready for its
intended use, in company with Owner and Contractor, visit the Project to determine if the Work is substantially
complete. If after considering any objections of Owner, Engineer considers the Work substantially complete, Engineer
shall deliver a certificate of Substantial Completion to Owner and Contractor.
17. Record Drawings. Prepare Record Drawings showing appropriate record information based on Project annotated
record documents received from Contractor and furnishing such Record Drawings to Owner. A hard copy (full size
drawings) and electronic copy (in AutoCAD and pdf file format) will be submitted to the Owner. AutoCAD version shall
be based on the Owner’s standards.
18. Final Notice of Acceptability of the Work. Conduct a final visit to the Project to determine if the completed Work of
Contractor is acceptable so that Engineer may recommend, in writing, final payment to Contractor. Accompanying the
recommendation for final payment, Engineer shall also provide a notice in the form attached hereto as Exhibit E (the
“Notice of Acceptability of Work”) that the Work is acceptable to the best of Engineer’s knowledge, information, and
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 5 of 6
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 1
SB WWTP Final Clarifier 123 Construction_Amendment No. 1.docx
belief and based on the extent of the services provided by Engineer under this Agreement. The scope of these
engineering services is based on the final visit conducted during the regular progress meeting.
DELIVERABLES
This project includes the following deliverables.
1. Final Submittal. This submittal includes 100% complete drawings and specifications, construction schedule, and design
calculations, and has all City comments incorporated. Hard copies (three full-size drawings, four half-size drawings, and
four project manuals) and one electronic copy (pdf, searchable format) will be submitted to the City.
Schedule
Arcadis is prepared to begin work immediately upon written authorization to proceed. It is assumed that the
construction schedule will be 12 months and will begin immediately upon completion of the design updates.
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 6 of 6
Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091
AMENDMENT No. 1
SB WWTP Final Clarifier 123 Construction_Amendment No. 1.docx
Schedule B-1
Amended Pricing Schedule
The estimated budget for services under this Amendment No. 1 is indicated below and as estimated in the attached table.
The overall limit of compensation under this Agreement is as follows:
Original Agreement $793,770
Amendment No. 1 $175,100
Overall Limit of Compensation $968,870
Hourly rates for services performed for this amended scope of work are as follows:
Category Hourly Rate
Project/Program Director $313
Principal Engineer/Scientist/Architect II $292
Principal Engineer/Scientist/Architect I $254
Senior Engineer/Scientist/Architect II $196
Senior Engineer/ Scientist/Architect I $180
Project Engineer/ Scientist/Architect $170
Staff Engineer/Scientist/Architect $159
Engineer/Scientist $138
Technician/Project Assistant IV $170
Technician/Project Assistant III $142
Technician/Project Assistant II $127
Technician/Project Assistant I $117
Design Tech / Field Technician $71
Amy Smitley(Technical Advisor)John Huston (QAQC)Ben Burroughs(Project Manager)Brett Schnur(Engineer)Matt Hemmelgarn(Structural Engineer)Matt Palte(Structural Engineer)CAD DrafterShelly Baxter(Assistant)SubconsultantTOTAL LABOR
TASK DESCRIPTION HOURS COST EXPENSES TOTAL
PM Project Management 16 24 40 80 14,960 14,960
1. General Construction Administration 12 20 45 75 12 8 40 212 31,640 400 32,040
2. Meetings and Inspections 20 24 160 80 24 308 56,640 800 57,440
3. Submittals 12 40 40 24 116 19,530 19,530
4. Record Drawings 4 12 24 8 40 88 9,250 300 9,550
5. Design Document Updates 4 4 15 25 12 40 100 11,400 11,400
6. Subconsultant - Donohue (Electrical and I&C)30,175 30,175
TOTAL ESTIMATED HOURS 56 60 296 244 80 8 120 40 904 173,595
HOURLY RATES $286 $196 $196 $138 $159 $254 $29 $142
TOTAL 16,016$ 11,760$ 58,016$ 33,672$ 12,720$ 2,032$ 3,509$ 5,680$ 173,595$ 1,500$ 175,100$
ESTIMATED NOT-TO-EXCEED COMPENSATION:175,100$
Estimated Compensation - ARCADIS U.S., Inc.
11/06/23
CITY OF SOUTH BEND
Final Clarifier Nos. 1 through 3 Construction Administration Services
DIVISION OF ENVIRONMENTAL SERVICES
Wastewater Treatment Plant
TO: ARCADIS US INC SHIP TO: WASTEWATER OFFICE
62638 COLLECTIONS CENTER BUREAU OF WASTEWATER
CHICAGO, IL 60693-0626 3113 RIVERSIDE DRIVE
SOUTH BEND, IN 46628
REQUISITION # 0000222148 NOTICE TO VENDOR
1. If Vendor delivers any merchandise without valid purchase order, no liability exists for City of South Bend
2. City of South Bend reserves right to cancel all or part of this order if delivery is not made when and as
specified.
3. Vendor accepts this order at listed price or lowest prevailing market price. No price increase allowed after
acceptance.
4. All goods subject to inspection and rejection (freight at vendor’s expense), not withstanding prior
payments to secure cash discount..
5 If subject to cash discount, please indicate on invoice or claim.
DELIVER BY DATE 07/18/2019
ACCOUNT NO Multiple Accounts
VENDOR’S NO 20718
PROJECT NO
REQUISITION DATE 07/18/2019 FEDERAL EXCISE TAX EXEMPTION INDIANA SALES TAX EXEMPTION
35-6001201 0003502538-001
ITEM # QUANTITY/UNIT ITEMS and DESCRIPTION Price Total
This order issued in compliance with Chapter 99, Acts 1945 and acts
amendatory thereof and supplemental thereto.
I hereby certify there is an unobligated balance in this appropriation
sufficient to pay for this order.
Controller or Authorized Representative APPROVED – Central Purchasing Office
PO. Number 253299
THE ABOVE ORDER NUMBER
MUST APPEAR ON ALL INVOICES,
CLAIMS, PACKAGES, DELIVERY
SLIPS, AND CORRESPONDENCE
CITY OF SOUTH BEND
Accounts Payable -12 Floor County/City Building
227 W. Jefferson Blvd. , South Bend, IN 46601 – Fax (574) 235-9928
The City of South Bend is an Equal Opportunity Employer
PURCHASE
ORDER 253299
1
400,000.00
/ EA
SECONDARY TREATMNT & DISINFECTION IMPROV
119-069
1.0000
400,000.00
2
393,770.00
/ EA
SECONDARY TREATMNT & DISINFECTION IMPROV
119-069
1.0000
393,770.00
TOTAL PURCHASE AMOUNT $793,770.00
TO: ARCADIS US INC SHIP TO: WASTEWATER OFFICE
62638 COLLECTIONS CENTER BUREAU OF WASTEWATER
CHICAGO, IL 60693-0626 3113 RIVERSIDE DRIVE
SOUTH BEND, IN 46628
REQUISITION # 0000222148 NOTICE TO VENDOR
1. If Vendor delivers any merchandise without valid purchase order, no liability exists for City of South Bend
2. City of South Bend reserves right to cancel all or part of this order if delivery is not made when and as
specified.
3. Vendor accepts this order at listed price or lowest prevailing market price. No price increase allowed after
acceptance.
4. All goods subject to inspection and rejection (freight at vendor’s expense), not withstanding prior
payments to secure cash discount..
5 If subject to cash discount, please indicate on invoice or claim.
DELIVER BY DATE 07/18/2019
ACCOUNT NO Multiple Accounts
VENDOR’S NO 20718
PROJECT NO
REQUISITION DATE 07/18/2019 FEDERAL EXCISE TAX EXEMPTION INDIANA SALES TAX EXEMPTION
35-6001201 0003502538-001
ITEM # QUANTITY/UNIT ITEMS and DESCRIPTION Price Total
This order issued in compliance with Chapter 99, Acts 1945 and acts
amendatory thereof and supplemental thereto.
I hereby certify there is an unobligated balance in this appropriation
sufficient to pay for this order.
Controller or Authorized Representative APPROVED – Central Purchasing Office
PO. Number 253299
THE ABOVE ORDER NUMBER
MUST APPEAR ON ALL INVOICES,
CLAIMS, PACKAGES, DELIVERY
SLIPS, AND CORRESPONDENCE
CITY OF SOUTH BEND
Accounts Payable -12 Floor County/City Building
227 W. Jefferson Blvd. , South Bend, IN 46601 – Fax (574) 235-9928
The City of South Bend is an Equal Opportunity Employer
PURCHASE
ORDER 253299
Account Project Amount
64106307933102 V6PT 400,000.00
64206304154366 V6PT 393,770.00
City of South Bend
Department of Administration & Finance
Change Order Request Form
Multiple PO lines:
Project POs:
PO Number PO-0000413 (ARCADIS US, V-00000135)
Line Number Add Line Item 3, Amendment No. 1
Original Dollar Amount $793,770.00 (Contract) Note: Project original Naviline PO-253299
New Dollar Amount
(For liquidation request, enter $0)$175,100.00 for Line Item 3; Total Project: $968,870.00
Reason Code (if changed)No change
Financial Dimensions (fund-dept-
division-subdivision-main account)641-06-605-514-431002
Project Code (if applicable)No change
Description of change (include
budget impact)Engineering services for Construction Administration
APPROVED BY PROJECT
ACCOUNTING TEAM (if applicable)(PAT member's name and date to be completed by PAT member)
PO Number
Line Number
Original Dollar Amount
New Dollar Amount
(For liquidation request, enter $0)
Reason Code (if changed)
Financial Dimensions (fund-dept-
division-subdivision-main account)
Project Code (if applicable)
Description of change (include
budget impact)
APPROVED BY PROJECT
ACCOUNTING TEAM (if applicable)(PAT member's name and date to be completed by PAT member)
PO Number
Line Number
Original Dollar Amount
Changing the line amount:
You can only change a line amount if it has NOT been invoiced against.
• If the line has NOT been invoiced – reduce the line amount to equal what it should be.
• If the line has been invoiced – cancel the delivery remainder and finalize the individual line, then add a new line for the
amount that should be remaining.
If you have changes to more than one line on the same PO, fill out a separate section for each line affected by the change
order.
For change orders on project-related POs, this form must be approved by the Project Accounting Team as described in
Supplement 508.
Supplement 508 Form - Change Order Request Form - PO-0000413 1 of 3
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 12-11-2023
Name: Jacob M. Klosinski Department of Public Works – Engineering Division
BPW Date: 12-19-2023 Phone Extension: 9496
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney Attorney Name Michael Schmidt
Purchasing Mickey Lovy / Ron O'Connor
Check the Appropriate Item Type –Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Arcadis US (V-00000135)
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name WWTP Secondary and Disinfection Improvements
Project Number 119-069 (PO-0000413)
Funding Source Sewage Works, Wastewater Capital, Professional Services Engineering
Account No. 641-06-605-514-431002
Amount $175,100.00
Terms of Contract Lum Sum Fee (Task List included Amendment 1, attached)
Special Contract Provisions
Purpose/Description The Division of Engineering requests the Board of Public Works approval ofa
an Amendment to a professional services agreement with Arcadis US for
construction administration services for WWTP Final Clarifier 1, 2, and 3
project.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
(%)
New Amount $
Total Percent of Change:
Increase
Decrease
%
(%)
Time Extension Amount:
New Completion Date: