CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
November 28, 2023
Ms. Angela DeWees, PE
Shrewsberry
7321 Shadeland Station, Suite 160
Indianapolis, IN 46256
adewees@shrewsusa.com
RE: Amendment No. 1 to Professional Services Agreement
Dear Ms. DeWees:
At its November 28, 2023 meeting, the Board of Public Works approved the above
referenced amendment for a survey and design of additional elements outside the scope of the
original contract, Project No. 122-007 in the amount of $39,750 total cost: eligible for 80%
reimbursement from INDOT.
Enclosed please find a copy of the amendment for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/lh
October 16, 2023
Gemma Stanton
Project Engineer
City of South Bend DPW
227 W. Jefferson Blvd., Ste. 1316
South Bend, IN 46601
RE: Our Lady of Hungary Safe Routes to School – Des. 2100025
Scope & Fee Proposal for Supplemental Design Services
Dear Ms. Stanton:
Shrewsberry appreciates the opportunity to submit this scope and fee proposal for Amendment 1 for additional
design services provided for the Our Lady of Hungary Safe Routes to School (Des 2100025) project.
SUPPLEMENTAL SERVICES
The scope of services in our LPA-Consulting contract executed on April 12, 2022, anticipated design of a
maximum of 12 intersection corners (curb ramps) at approximately 3 intersections and 1,000 feet of sidewalk.
Expanded Scope:
Ultimately, to maximize use of the awarded $800,000 construction funds while staying within the $12,500 survey
budget, the approved Preliminary Engineering Report (PER) recommended design of improvements to 35 curb
ramps at 13 intersections and approximately 3,500 feet of sidewalk. It was our intention to be as efficient as
possible and complete design of the PER recommendations within our original contract design fee. Unfortunately,
we found we have been unable to absorb nearly triple the original scope of work. The scope of work was
expanded further following the Preliminary Field Check (PFC) meeting to include additional sidewalk locations,
brush removal, stump removals, and tree planting to increase the total construction cost estimate to
approximately $950,000 to maximize use of additional construction funds made available by accelerating this
project to letting in March 2023. In addition to requiring additional design effort, the expanded scope of the
project requires a Note to File submittal and re-coordination with INDOT to update the previously submitted
Programmatic Categorical Exclusion (PCE) Environmental Document.
Added Curb Ramp:
Also, it was requested during the PFC meeting to add the curb ramp in the southeast corner of Catalpa Street and
Donald Street (Area 10). Adding this curb ramp to the project requires supplemental topographic survey, design
services, and Note to File update to the PCE document.
SUPPLEMENTAL FEE
Shrewsberry proposes a supplemental fee of $39,750.00 on a lump sum basis as shown in attached fee
justification and as summarized below:
Expanded Scope:
Design Services $25,000 Lump Sum
Environmental Document – Note to File $ 7,000 Lump Sum
Project Management $ 3,000 Lump Sum
Additional Curb Ramp:
Environmental Document – Note to File (included in Expanded Scope above)
Topographic Survey (Area 10) $ 1,250 Lump Sum
Design Services $ 3,500 Lump Sum
Should you have any questions or comments, please do not hesitate to contact me at 317-459-8526 or
adewees@shrewsusa.com. Thank you for your consideration of this request.
Sincerely,
Angela DeWees, PE
Senior Project Manager
Cc: file
Michael Farmer – Shrewsberry
Enc.: Fee Justification
November 28, 2023
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 11/20/23
Name: Gemma Stanton Department of Public Works – Engineering Division
BPW Date: November 28, 2023 Phone Extension: 9083
Required Prior to Submittal to Board BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Shrewsberry
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Safe Routes to School – Our Lady of Hungary Neighborhood
Project Number 122-007 (INDOT DES #2100025)
Funding Source River West TIF
Account No. 324
Amount $39,750
Terms of Contract Lump Sum
Purpose/Description Amendment to PSA will cover survey and design of additional
elements outside the scope of the original contract. Additional
construction budget was available to expand the project. The design
portion of the project is 80% reimbursable by INDOT.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: