Loading...
HomeMy WebLinkAboutOpening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - DLZNovember 28, 2023 CITY OF SOUTH BEND MUESSEL PRIMARY/HOLY CROSS SCHOOL CONSTRUCTION INSPECTIONSAFE ROUTES TO SCHOOL» Project Manager Brad Dailey, PE » Division Manager 574.532.7017 » bdailey@dlz.com Authorized Negotiator Andrew C. Lemberis, PE » Vice President 574.514.3713 » alemberis@dlz.com Responsible Office DLZ Indiana, LLC 2211 East Jefferson Boulevard » South Bend, IN 46615 574.236.4400 » www.dlz.com 1City of South Bend » Safe Routes to School » Construction Inspection The City just recently completed INDOT Contract T-41189, a school zone flashing beacon project. New flashing beacons were installed for both Muessel Primary and Holy Cross School as part of the Contract mentioned above. DLZ assisted the City on the beacon project on an as-needed basis. The Safe Routes to School project at Muessel Primary/Holy Cross School is the next step in protecting students and pedestrians in the neighborhood. As City leaders apply this comprehensive plan that promotes safe access to schools, we all must offer something to make these collective efforts successful. DLZ offers our expertise in construction inspection as a key role in this project. It would be an honor to continue playing a part in the ongoing improvements to our city. Steve Menis will lead our construction inspection team. Steve’s talented communication skills and organized manner will be beneficial in tackling a project that involves construction at numerous intersections and 2 adjacent schools. The construction will also impact countless property owners. Steve takes pride in being the primary contact on projects and works to answer questions and resolve issues before they become problems. DLZ has been working with the City since 1916. With nearly 100 employees working in our South Bend Office, our local presence has produced many infrastructure projects that have changed the landscape, provided economic development and improved the quality of life of the City residents. Our team is local and has the ability to respond to any need 24 hours a day, 365 days a year. We want to continue this investment and partnership well into the future. DLZ appreciates this opportunity to submit our qualifications and look forward to the opportunity to serve together on your team to make construction of the Safe Routes to School Project a success. We will always hold the interests of the citizens of South Bend as our highest priority when we provide you with our expertise in quality control, cost management, safety, and communication. SAFE ROUTES TO SCHOOL MUESSEL PRIMARY/HOLY CROSS SCHOOL CITY OF SOUTH BEND » CONSTRUCTION INSPECTION SERVICES Your VisionOur Commitment This project illustrates your commitment to improving safety for students who walk to school. We would be excited to partner with you to make this project a success. New School Zone Flasher near Muessel Primary 2City of South Bend » Safe Routes to School » Construction Inspection IDENTIFICATION & QUALIFICATIONS DLZ Indiana, LLC DLZ Indiana, LLC (DLZ) is a State certified minority-owned business enterprise (MBE) headquartered in South Bend, Indiana. DLZ’s other Indiana offices are located in Indianapolis, Fort Wayne, Munster, and Burns Harbor. Our South Bend office is approximately three (3) miles from the project site. Our ability to quickly access the project from our South Bend office will further enhance our services to the City. We focus on meeting and exceeding our clients’ expectations and are known for our expertise, integrity, and contributions to the people and communities we serve. A family- and minority-owned, full-service firm, DLZ’s multidisciplinary, collaborative approach to professional services allows us to build and lead successful project teams providing solutions that save money, improve operations, and solve problems. Our vision is simple: Create successful partnerships with our clients that facilitate trust, commitment, and communication. We have been lucky to work with the City of South Bend for more than a century. We have completed the inspection of sidewalks, ADA ramps, and trail projects for you and dozens of communities throughout Indiana. We want to be a part of your vision to create accessible routes for students and parents to Muessel Primary and Holy Cross School. We will support your mission through our work on this project. CONSTRUCTION SERVICES DLZ is a recognized leader in the construction inspection field with one of the largest INDOT pre-qualified construction inspection (13.1) teams in the State. Through our work experience over the years with local governments and INDOT, our DLZ team has developed excellent relationships and a great understanding of the needs of each type of organization and specifically INDOT-LPA projects. The INDOT Area Engineers and Project Engineers know and have worked directly with many of the DLZ team members. These overall capabilities, our established working relationships, and our ability to work efficiently, demonstrates our high level of commitment and qualifications to perform the required services on this contract. DLZ Indiana, LLC » 95% » 13.1 McCormick Engineering, LLC (DBE) » 5% » 13.1 TEAM PARTICIPATION McCormick Engineering, LLC McCormick is a local consulting firm providing professional services for both the public and private sector for more than 35 years. McCormick Engineering, LLC (McCormick) is an Indiana Certified WBE/DBE firm. McCormick has provided engineering services to the public sector since 2008. PROJECT TEAM Principal In Charge ANDREW C. LEMBERIS, PE Quality Manager LAURIE JOHNSON, PE Project Engineer STEVE MENIS Project Manager BRAD DAILEY, PE Inspectors (as required) ELI JANG (DLZ) » JOHN BEER (MCCORMICK) INDOT LaPorte District STEVE HAUERSPERGER (AREA ENGINEER) CITY OF SOUTH BEND BRAD DAILEY, PE Project Manager »25 Years Experience »BS Civil Engineering, Tri-State University Steve has 23 years of experience performing construction supervision, administration, inspection, testing and final records documentation for various construction projects. Steve’s proactive communication skills and organizational skills make him an ideal candidate to lead this project that involves multiple intersections and the need to coordinate with both schools. He has worked on several trail, sidewalk and SRTS projects, and he understand the importance of constructing to ADA standards. Relevant Experience »INDOT Contract R-35693 North Liberty SRTS, North Liberty, IN »INDOT Contract R-39089, Stellar Trail, Trail and Boardwalk Construction in North Liberty, St. Joseph County »INDOT Contract R-37347 Tamarack Trail in North Liberty, St. Joseph County »INDOT Contract R-37346 Wrenwood Multi-Use Trail in North Liberty, St. Joseph County »INDOT Contract R-34699 Safe Routes to School in Mishawaka, St. Joseph County STEVE MENIS Project Engineer »23 Years Experience »BS Civil Engineering, Valparaiso University City of South Bend » Safe Routes to School » Construction Inspection Project Engineer’s Approach »Keep the City informed throughout the project »Make sure ample resources are available for successful completion of the project »Coordinate and monitor the contractor’s budget and schedule »Be direct liaison between DLZ Team and the City and other stakeholders, as needed »Be committed full time throughout the duration of this contract Brad has 25 years experience in the construction industry. He is currently involved in numerous construction projects including all types of road, bridge, traffic and building projects. As the Division Manager for DLZ’s Construction operations, Brad is a hands-on leader and is responsible for quality control, scheduling, and financial management of field services professional services contracts. His responsibilities also include administrative management of the division and project coordination of its professional staff. Relevant Experience »INDOT Contract R-34602 Pennsy-Greenway Trail Phase 2 and 3, Schererville, IN »INDOT Contract R-39012 Northview School SRTS, Valparaiso, IN »INDOT Contract R-35693 North Liberty SRTS, North Liberty, IN »INDOT Contract R-38150 US 30 Multi-Use Trail Phase 2A, Valparaiso, IN »INDOT Contract R-37323 ADA Sidewalk Ramp Improvements, South Whitley, IN »INDOT Contract R-37372 Calumet Avenue Multi-Use Trail, Valparaiso, IN »INDOT Contract R-36481 Safe Routes to School Project, Twin Branch Elementary, Mishawaka, IN »INDOT Contract R-36482 Safe Routes to School Project, Beiger Elementary, Mishawaka, IN »Pennsy Greenway Trail, Phase IV, Schererville, IN »INDOT Contract R-39513, SRTS at Monroe Primary/Studebaker Elementary in South Bend, St. Joseph County, IN »INDOT Contract R-39089, Stellar Trail, Trail and Boardwalk Construction in North Liberty, St. Joseph County, IN »INDOT Contract R-37347 Tamarack Trail in North Liberty, St. Joseph County, IN »INDOT Contract R-37346, Wrenwood Multi-Use Trail in North Liberty, St. Joseph County, IN »INDOT Contract R-38061, LaSalle Trail, Phase III in St. Joseph County, IN 3 4City of South Bend » Safe Routes to School » Construction Inspection Since joining DLZ, Eli has performed construction inspection on several Local Public Agency projects. She has experience in the observation and documentation of various aspects of road construction including asphalt pavement, concrete curb, sidewalk, as well as water main and storm sewer installation. Relevant Experience »Mishawaka City Project ENP-23-001, Community Crossing Matching Grant 2022-2, 2023 Patch, Mill and Overlay of Various City Streets, Mishawaka, Indiana. Project Inspector. Responsible for inspection and documentation of asphalt resurfacing, ADA ramps, and new sidewalks. »Mishawaka City Project ENT-22-013, Veterans Parkway – Phase IIA, Mishawaka, Indiana. Project Inspector. Responsible for inspection and documentation of new sanitary sewer, storm sewer, water main, HMA pavement, concrete pavement, concrete roundabout, multi-use path, and ADA ramps. »Mishawaka City Project ENT-21-024, Intersection Improvements to Front Street, Main Street, and Church Street, Mishawaka, Indiana. Project Inspector. Responsible for inspection and documentation of the construction of new concrete pavement, concrete curb, sidewalk, storm sewer, and traffic signals. »Mishawaka City Project ENT-20-014, Niles Avenue Reconstruction in Mishawaka, Indiana. Project Inspector. Responsible for the inspection and documentation of new water main installation and road replacement. »Mishawaka City Project ENT-22-010, 2022 Community Crossing Project, Jefferson Boulevard Reconstruction and Resurfacing of Byrkit Avenue, Mishawaka, Indiana. Project Inspector. Responsible for inspection and documentation of the construction of new asphalt pavement, asphalt resurfacing, concrete curb, storm sewer, and multi-use path. John is an experienced technician with 30 years in the construction industry. Observation experience includes performance of material testing, monitoring daily construction activities and preparing Daily Work Reports for roadway reconstruction, bridge deck replacement and telecommunication fiber installation projects. Relevant Experience »INDOT On-Call, SR 331 over US 30 Bridge Deck Overlay, Marshall County »INDOT On-Call, US 24 Bridge Bundle, Fulton County »INDOT On-Call, US 31 Reconstruction, St. Joseph County »INDOT On-call, SR 49 Bridge Bundle, Porter County »INDOT On-call, I-69 Bridge over Robinson Creek Reconstruction, Fort Wayne »Coal Line Trail, St. Joseph County »Olive Street Reconstruction (2 phases), South Bend »Indiana Toll Road Concessions, ITS Phase II, Lake, Elkhart, LaGrange & Steuben County »Handley Elementary Safe Routes to School, LaPorte »Bendix Drive Reconstruction, South Bend »Maplecrest Road Widening, Fort Wayne »Kercher Road Reconstruction, Goshen »LaPorte Street Footbridge Rehabilitation, Plymouth »Mishawaka Bridge over Yellow Creek, Elkhart ELI JANG DLZ Inspector JOHN BEER McCormick Inspector »2 Year Experience »31 Years Experience »BS Civil Engineering, Purdue University »Indiana Department of Transportation Certified Technician KEY STAFF We all Hold the Keys to Safety Safety is a core value at DLZ. As such, we are lucky to have a full-time dedicated safety professional, Phil Yrjanson, that works with our Indiana team. Phil’s responsibility is to visit project sites and work with our teams on injury and accident prevention. He also leads our monthly targeted field safety training. In recent months he or our staff have noted several deficient items in the field and shared those lessons learned with the entire staff in order to raise awareness. Some examples include: • Alerted a contractor that their workers were performing hot welding while standing on a gas line attached to a bridge. • Noted several instances of inconsistent use of PPE and emphasizing to wear the same PPE as the worker performing the task or move to a safe location outside the work zone. • Alerted contractor to loose handrail that had an insufficient nail pattern. Potential Drainage Issues at the Intersection of Lawndale and VanBuren City of South Bend » Safe Routes to School » Construction Inspection PROJECT APPROACH Coal Line Trail at Vassar Avenue and Lawndale Avenue PROJECT UNDERSTANDING It is our understanding that CE services are requested for Safe Routes to School at Muessel Primary/Holy Cross School (INDOT Des. No. 19004477). We have completed a recent site visit of the proposed project location. The Safe Routes to School project will include replacement of deteriorated or failing sidewalks and ADA ramps along pedestrian routes to Muessel Primary and Holy Cross School. This project complements the recently completed School Zone Flasher Beacons project (INDOT Contract T-41189). Due to the recent Coal Line Trail (Phase I) Project (INDOT Contract R-38064), several of the intersections located within the project limits have already been upgraded to meet ADA Compliance. Untitled M ap W rite a description for your m ap. Legend Coal Line Trail Feature 1 Feature 2 Peek A Boo Daycare School The Local Cup SB Tony?s Kitchen 1000 ft N➤➤N LEGEND Project Limits Intersections that need Sidewalk and ADA Ramp Updates Vassar AvenueVassar Avenue Wilber StreetWilber StreetLincol n w a y W e s t Lincol n w a y W e s t Allen StreetAllen StreetCoal Line TrailCoal Line TrailHoly Cross SchoolHoly Cross School Muessel PrimaryMuessel Primary 5 6City of South Bend » Safe Routes to School » Construction Inspection MAINTENANCE OF TRAFFIC Challenge Because numerous intersections will be upgraded, it is not reasonable to detail a maintenance of traffic (MOT) plan that will fit each location. A typical MOT layout will be included in the plans, but site specific interpretation of MOT by the contractor and construction inspection team will be required for most locations. Solution DLZ will work with the City, the contractor, both schools and affected adjacent property owners to maintain accessibility while considering worker safety and mobility of the traveling public. This could include prohibiting lane restrictions on adjacent streets in order to reduce congestion. DLZ’s inspection team has decades of experience working with MOT plans and will identify deficiencies. In more complex locations, our team will consult with our transportation design team if needed. Existing deteriorated sidewalk at the southwest corner of Cleveland and Vassar SITE CONSIDERATIONS & CHALLENGES After a recent site visit, we have a thorough understanding of the requirements of this project and the City’s expectations. With a targeted August 2024 letting date, DLZ anticipates that construction activities will begin in the Fall of 2024 and may continue through 2025, depending on weather. Our experience on similar projects tells us that the “best laid plans often go awry.” Even with the most thorough project planning and scrutinized design, existing conditions can create a need to make adjustments in construction. We have identified the following risks and will work to mitigate these and other issues in a proactive manner. SCHOOL DROP-OFF AND PICK-UP Challenge The Safe Routes to School (SRTS) project will include ADA ramp construction at all four (4) street intersections at Muessel Primary. Construction work and equipment operating nearby during drop-off and pick-up times could cause significant backups. Solution Steve Menis will meet with school officials to discuss drop-off and pick-up times, procedures, and any other special events that the contractor will need to be aware of to minimize disruptions to the school. New ADA ramp needed at Blaine and California CITY OF SOUTH BEND PROJECT ENGINEER Steve Menis Schedule and facilitate meetings for all stakeholders, including progress meetings. Clearly communicate through meeting minutes/summaries and time-critical action items. Return phone calls and emails the same business day or within 24 hours. Establish and confirm expectations and goals early in the planning/design process. COMMUNICATION PLAN 7City of South Bend » Safe Routes to School » Construction Inspection Existing fire hydrant at the southwest corner of California and Lawndale FIELD ADJUSTMENTS WITHIN RIGHT-OF-WAY CONSTRAINTS Challenge The plans should detail the proposed construction at numerous intersections throughout the project area. Based on existing locations of fire hydrants, power poles, storm drains, retaining walls, etc., further details for the relocation or protection of facilities may be required. We’re also assuming that there is no additional right-of-way being acquired for the project, requiring that all improvement remain within the existing right-of-way. These constraints may necessitate field changes to meet the intent of the plans to construct ADA compliant facilities. Approach The DLZ team is experienced in the inspection of new sidewalk and trail systems that retrofit existing or are built adjacent to constrained elevations or permanent features. In circumstances such as these, we understand that field changes are inevitable. We will work closely with the contractor to verify that any needed changes meet the intent of the plans and also ADA regulations. INDOT LAPORTE DISTRICT Steve Hauersperger COMMUNICATION WITH STAKEHOLDERS Challenge Construction of the SRTS project will affect 2 schools and numerous adjacent property owners. School officials, parents, and adjacent property owners are concerned about issues such as immediate access, how they will reach their home or business, etc. Communicating logistical details daily and to all parties can quickly become a complex effort. Solution DLZ knows that the City is our most important stakeholder and we will coordinate with other stakeholders based on a plan that is approved by the City. But our overall goal is to be your least concern and work directly with the contractor and stakeholders to communicate the important messages seamlessly. Steve will leverage his strong communication and organizational skills to work with the contractor and develop a database of affected owners and communicate as required via emails, door-to-door notifications and/or small group meetings. 8City of South Bend » Safe Routes to School » Construction Inspection Project Management Approach We believe that it’s not just what we do, it’s how we do it. That’s why we proactively manage our relationships with clients. As a rule, clients don’t simply want to be notified when the job is done—they want to be kept up to speed. So we listen, we communicate, and we deliver. For us, the ultimate reward is a happy client. We believe every job is different, and that we owe it to you to never make assumptions. Sure, we have plenty of experience, but we realize your needs are unique—so we won’t take anything for granted. We believe working hard for our clients is its own reward. That’s why we’re proud to stand behind the projects we work on. Besides, the majority of our business is from repeat customers. That’s a testament not only to the quality of our work, but also to the quality of our client service. Steve Menis Brad Dailey WHY CHOOSE DLZ AND OUR TEAM? The Best Project Manager and Engineer to get your job done! Quality Using best practices and guidance from the City, we will develop standards for the bidirectional flow of information between the construction and design teams. It’s critical on a project with a significant footprint, that standard processes and procedures be followed by all team members to confirm the integrity of the construction. Communication There are various audiences and types of communication on a project like this. The highest priority communications are those related to the safety of the public and workforce on site. A detailed communication plan for the project will be developed for both inter and intra project communications, including a robust plan for needs related to public outreach. Safety and Work Site Management Safety of the worker and public are of utmost importance. For this project, eliminating pedestrian and worker interactions that could create unsafe conditions will be critical. The team will scrutinize the staging and proposed work plan, and address deficiencies. We will communicate with the City to inform you of changes to site access in order to notify the public and monitor safety and mobility. Schedule DLZ will work tirelessly with the contractor to keep the project on schedule, but we will not sacrifice the quality of construction to maintain schedule. Team Compliance with ADA Experience DLZ has experience with the successful construction of various projects that accommodate ADA compliant facilities. Small tweaks to sidewalk, and ramp cross- slopes can push grades out of compliance. We have proven inspection techniques to help reduce these risks. Teamwork The DLZ Team will function as an extension of your staff, all working toward the common goal of a successful project. Cost Control The DLZ Team will be constantly vigilant for cost saving opportunities on the project. This can be accomplished through various avenues including value added opportunities, change order management, identifying potential issues prior to causing a delay, and managing inspection staffing levels. 9City of South Bend » Safe Routes to School » Construction Inspection Monroe Primary/Studebaker Elementary SRTS » South Bend, Indiana DLZ provided project management, construction inspection, and administration services to replace over 4,500 square yards of concrete sidewalk and curb ramps at approximately 100 intersections in the City of South Bend. This project included replacing selected sections of sidewalk and curb ramps within the general areas of Monroe Primary Center and Studebaker Elementary School. Significant field coordination was necessary to adjust the concrete removal limits to maximize the sidewalk replacement and control the project quantities. Grades and elevations of the newly constructed elements were monitored to confirm they met current ADA standards. Nearly 5,800 linear feet of curb was replaced throughout this project to allow for proper construction of the new curb ramps. Stellar Trail » North Liberty, Indiana Construction engineering services were provided for the construction of a new 4,600-foot asphalt trail that connects Tamarack Trail to School Trail. A 400-foot boardwalk was constructed along an existing wetland area just east of North Liberty School. The boardwalk consisted of helical piles, concrete end bents, and treated lumber. Construction of the project also included subgrade treatment, compacted aggregate, and seeding. Coordination for the project included maintenance of traffic, staging of construction, construction schedule, and material testing. EXPERIENCE Wrenwood Trail » North Liberty, Indiana DLZ provided construction engineering services for the construction of a new asphalt trail from North Liberty School to the Potato Creek Crossing Subdivision. A new 70’-2” Pre-Engineered Steel Truss Bridge was constructed over Potato Creek. The bridge consisted of steel piling, concrete end bents and reinforced concrete bridge approaches. Construction of the project also included subgrade treatment, compacted aggregate, curb ramp, and landscaping. Coordination for the project included maintenance of traffic, staging of construction, construction schedule, and material testing. LaSalle Trail, Phase III » St. Joseph County, Indiana DLZ provided construction engineering services for the extension of the LaSalle Trail shared use path from Auten Road to the Indiana/Michigan State Line. Work included construction of ADA compliant infrastructure with trail being 10 feet wide and hard- surfaced concrete pavement with 2-foot shoulders. The length of the path is 5,700 feet. The path follows the alignment on the existing former railroad bed and aligns with the trail from the previous phase, LaSalle Trail Phase II. Coordination was required to align the path from the south side of State Line Road to the north side with the existing IN-MI River Valley Trail. City of South Bend » Safe Routes to School » Construction Inspection 10 11City of South Bend » Safe Routes to School » Construction Inspection R-34699 Safe Routes to School Project » Mishawaka, Indiana INDOT Contract R-34699, was a Safe Routes to School project in Mishawaka, Indiana. Curb ramps and sidewalks along various streets near Battell Elementary School were upgraded per current ADA requirements. Several streets within the project limits had very steep grades, which required additional construction engineering and field adjustments to be made. Besides coordinating with local residents and businesses, additional coordination was performed so the project would not interfere with school. Tamarack Trail » North Liberty, Indiana DLZ provided construction administration services to construct a new 4,600-foot asphalt trail from Quinn Road to Wabash Avenue. The trail connects the North Liberty Community Center to the North Liberty Youth League Ballpark along the abandoned railroad corridor (formerly Indiana, Illinois, and Iowa Railroad). Approximately 2,200 feet of woods were cleared as part of the project. Construction of the project also included subgrade treatment, compacted aggregate, and seeding. Coordination for the project included maintenance of traffic, staging of construction, construction schedule, and material testing. (Rev. 06/27/2018) Request for Proposal Number: RFP Item Description: Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firms listed below are currently certified DBEs: INDOT: https://entapps.indot.in.gov/DBELocator/ KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx I certify that I have contacted the certified DBEs listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division. I.DBE Subconsultants to be applied toward DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % Estimated Total Percentage Credited toward DBE Goal: Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: 2% Company Name: Signature:Date: 11-28-23 *It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of negotiation of the contract scope of work. My company will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. McCormick Engineering, LLC 13.1 3 2McCormick Engineering, LLC 13.1 3% Safe Routes to School at Muessal Primary/Holy Cross School