HomeMy WebLinkAboutOpening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - DLZNovember 28, 2023
CITY OF SOUTH BEND
MUESSEL PRIMARY/HOLY CROSS SCHOOL CONSTRUCTION INSPECTIONSAFE ROUTES TO SCHOOL»
Project Manager
Brad Dailey, PE » Division Manager
574.532.7017 » bdailey@dlz.com
Authorized Negotiator
Andrew C. Lemberis, PE » Vice President
574.514.3713 » alemberis@dlz.com
Responsible Office
DLZ Indiana, LLC
2211 East Jefferson Boulevard » South Bend, IN 46615
574.236.4400 » www.dlz.com
1City of South Bend » Safe Routes to School » Construction Inspection
The City just recently completed INDOT Contract T-41189, a school zone flashing beacon project. New flashing beacons
were installed for both Muessel Primary and Holy Cross School as part of the Contract mentioned above. DLZ assisted the
City on the beacon project on an as-needed basis. The Safe Routes to School project at Muessel Primary/Holy Cross School
is the next step in protecting students and pedestrians in the neighborhood. As City leaders apply this comprehensive plan
that promotes safe access to schools, we all must offer something to make these collective efforts successful. DLZ offers
our expertise in construction inspection as a key role in this project. It would be an honor to continue playing a part in the
ongoing improvements to our city.
Steve Menis will lead our construction inspection team. Steve’s talented communication skills and organized manner will be
beneficial in tackling a project that involves construction at numerous intersections and 2 adjacent schools. The construction
will also impact countless property owners. Steve takes pride in being the primary contact on projects and works to answer
questions and resolve issues before they become problems.
DLZ has been working with the City since 1916. With nearly 100 employees working in our South Bend Office, our local
presence has produced many infrastructure projects that have changed the landscape, provided economic development and
improved the quality of life of the City residents. Our team is local and has the ability to respond to any need 24 hours a day,
365 days a year. We want to continue this investment and partnership well into the future.
DLZ appreciates this opportunity to submit our qualifications and look forward to the opportunity to serve together on your
team to make construction of the Safe Routes to School Project a success. We will always hold the interests of the citizens of
South Bend as our highest priority when we provide you with our expertise in quality control, cost management, safety, and
communication.
SAFE ROUTES TO SCHOOL
MUESSEL PRIMARY/HOLY CROSS SCHOOL
CITY OF SOUTH BEND » CONSTRUCTION INSPECTION SERVICES
Your VisionOur Commitment
This project illustrates your commitment to improving safety for students who walk to school.
We would be excited to partner with you to make this project a success.
New School Zone Flasher near Muessel Primary
2City of South Bend » Safe Routes to School » Construction Inspection
IDENTIFICATION & QUALIFICATIONS
DLZ Indiana, LLC
DLZ Indiana, LLC (DLZ) is a State certified minority-owned business enterprise (MBE) headquartered in South Bend, Indiana.
DLZ’s other Indiana offices are located in Indianapolis, Fort Wayne, Munster, and Burns Harbor. Our South Bend office is
approximately three (3) miles from the project site. Our ability to quickly access the project from our South Bend office will
further enhance our services to the City.
We focus on meeting and exceeding our clients’ expectations and are known for our expertise, integrity, and contributions to
the people and communities we serve. A family- and minority-owned, full-service firm, DLZ’s multidisciplinary, collaborative
approach to professional services allows us to build and lead successful project teams providing solutions that save money,
improve operations, and solve problems. Our vision is simple: Create successful partnerships with our clients that facilitate
trust, commitment, and communication.
We have been lucky to work with the City of South Bend for more than a century. We have completed the inspection of
sidewalks, ADA ramps, and trail projects for you and dozens of communities throughout Indiana. We want to be a part of your
vision to create accessible routes for students and parents to Muessel Primary and Holy Cross School. We will support your
mission through our work on this project.
CONSTRUCTION
SERVICES
DLZ is a recognized leader in the construction inspection
field with one of the largest INDOT pre-qualified
construction inspection (13.1) teams in the State. Through
our work experience over the years with local governments
and INDOT, our DLZ team has developed excellent
relationships and a great understanding of the needs
of each type of organization and specifically INDOT-LPA
projects. The INDOT Area Engineers and Project Engineers
know and have worked directly with many of the DLZ team
members. These overall capabilities, our established
working relationships, and our ability to work
efficiently, demonstrates our high level of commitment
and qualifications to perform the required services on
this contract.
DLZ Indiana, LLC » 95% » 13.1
McCormick Engineering, LLC (DBE) » 5% » 13.1
TEAM PARTICIPATION
McCormick Engineering, LLC
McCormick is a local consulting firm providing professional
services for both the public and private sector for more than
35 years. McCormick Engineering, LLC (McCormick) is an
Indiana Certified WBE/DBE firm. McCormick has provided
engineering services to the public sector since 2008.
PROJECT TEAM
Principal In Charge
ANDREW C. LEMBERIS, PE
Quality Manager
LAURIE JOHNSON, PE
Project Engineer
STEVE MENIS
Project Manager
BRAD DAILEY, PE Inspectors (as required)
ELI JANG (DLZ) » JOHN BEER (MCCORMICK)
INDOT LaPorte District
STEVE HAUERSPERGER (AREA ENGINEER)
CITY OF SOUTH BEND
BRAD DAILEY, PE
Project Manager
»25 Years Experience
»BS Civil Engineering,
Tri-State University
Steve has 23 years of experience performing construction supervision, administration, inspection, testing
and final records documentation for various construction projects. Steve’s proactive communication
skills and organizational skills make him an ideal candidate to lead this project that involves multiple
intersections and the need to coordinate with both schools. He has worked on several trail, sidewalk and
SRTS projects, and he understand the importance of constructing to ADA standards.
Relevant Experience
»INDOT Contract R-35693 North Liberty SRTS, North
Liberty, IN
»INDOT Contract R-39089, Stellar Trail, Trail and
Boardwalk Construction in North Liberty, St. Joseph
County
»INDOT Contract R-37347 Tamarack Trail in North
Liberty, St. Joseph County
»INDOT Contract R-37346 Wrenwood Multi-Use Trail in
North Liberty, St. Joseph County
»INDOT Contract R-34699 Safe Routes to School in
Mishawaka, St. Joseph County
STEVE MENIS Project Engineer
»23 Years Experience »BS Civil Engineering, Valparaiso University
City of South Bend » Safe Routes to School » Construction Inspection
Project Engineer’s Approach
»Keep the City informed throughout the project
»Make sure ample resources are available for successful
completion of the project
»Coordinate and monitor the contractor’s budget and
schedule
»Be direct liaison between DLZ Team and the City and
other stakeholders, as needed
»Be committed full time throughout the duration of this
contract
Brad has 25 years experience in the construction industry. He is
currently involved in numerous construction projects including all types
of road, bridge, traffic and building projects. As the Division Manager
for DLZ’s Construction operations, Brad is a hands-on leader and is
responsible for quality control, scheduling, and financial management
of field services professional services contracts. His responsibilities
also include administrative management of the division and project
coordination of its professional staff.
Relevant Experience
»INDOT Contract R-34602 Pennsy-Greenway Trail Phase 2 and 3,
Schererville, IN
»INDOT Contract R-39012 Northview School SRTS, Valparaiso, IN
»INDOT Contract R-35693 North Liberty SRTS, North Liberty, IN
»INDOT Contract R-38150 US 30 Multi-Use Trail Phase 2A,
Valparaiso, IN
»INDOT Contract R-37323 ADA Sidewalk Ramp Improvements,
South Whitley, IN
»INDOT Contract R-37372 Calumet Avenue Multi-Use Trail,
Valparaiso, IN
»INDOT Contract R-36481 Safe Routes to School Project, Twin
Branch Elementary, Mishawaka, IN
»INDOT Contract R-36482 Safe Routes to School Project, Beiger
Elementary, Mishawaka, IN
»Pennsy Greenway Trail, Phase IV, Schererville, IN
»INDOT Contract R-39513, SRTS at Monroe Primary/Studebaker
Elementary in South Bend, St. Joseph County, IN
»INDOT Contract R-39089, Stellar Trail, Trail and Boardwalk
Construction in North Liberty, St. Joseph County, IN
»INDOT Contract R-37347 Tamarack Trail in North Liberty, St. Joseph
County, IN
»INDOT Contract R-37346, Wrenwood Multi-Use Trail in North
Liberty, St. Joseph County, IN
»INDOT Contract R-38061, LaSalle Trail, Phase III in St. Joseph
County, IN
3
4City of South Bend » Safe Routes to School » Construction Inspection
Since joining DLZ, Eli has performed construction inspection on several Local Public Agency projects. She has
experience in the observation and documentation of various aspects of road construction including asphalt
pavement, concrete curb, sidewalk, as well as water main and storm sewer installation.
Relevant Experience
»Mishawaka City Project ENP-23-001, Community Crossing
Matching Grant 2022-2, 2023 Patch, Mill and Overlay
of Various City Streets, Mishawaka, Indiana. Project
Inspector. Responsible for inspection and documentation
of asphalt resurfacing, ADA ramps, and new sidewalks.
»Mishawaka City Project ENT-22-013, Veterans Parkway
– Phase IIA, Mishawaka, Indiana. Project Inspector.
Responsible for inspection and documentation of new
sanitary sewer, storm sewer, water main, HMA pavement,
concrete pavement, concrete roundabout, multi-use path,
and ADA ramps.
»Mishawaka City Project ENT-21-024, Intersection
Improvements to Front Street, Main Street, and Church
Street, Mishawaka, Indiana. Project Inspector. Responsible
for inspection and documentation of the construction of
new concrete pavement, concrete curb, sidewalk, storm
sewer, and traffic signals.
»Mishawaka City Project ENT-20-014, Niles Avenue
Reconstruction in Mishawaka, Indiana. Project Inspector.
Responsible for the inspection and documentation of new
water main installation and road replacement.
»Mishawaka City Project ENT-22-010, 2022 Community
Crossing Project, Jefferson Boulevard Reconstruction and
Resurfacing of Byrkit Avenue, Mishawaka, Indiana. Project
Inspector. Responsible for inspection and documentation
of the construction of new asphalt pavement, asphalt
resurfacing, concrete curb, storm sewer, and multi-use
path.
John is an experienced technician with 30 years in the construction industry. Observation experience includes performance of material
testing, monitoring daily construction activities and preparing Daily Work Reports for roadway reconstruction, bridge deck replacement
and telecommunication fiber installation projects.
Relevant Experience
»INDOT On-Call, SR 331 over US 30 Bridge Deck Overlay,
Marshall County
»INDOT On-Call, US 24 Bridge Bundle, Fulton County
»INDOT On-Call, US 31 Reconstruction, St. Joseph County
»INDOT On-call, SR 49 Bridge Bundle, Porter County
»INDOT On-call, I-69 Bridge over Robinson Creek
Reconstruction, Fort Wayne
»Coal Line Trail, St. Joseph County
»Olive Street Reconstruction (2 phases), South Bend
»Indiana Toll Road Concessions, ITS Phase II,
Lake, Elkhart, LaGrange & Steuben County
»Handley Elementary Safe Routes to School, LaPorte
»Bendix Drive Reconstruction, South Bend
»Maplecrest Road Widening, Fort Wayne
»Kercher Road Reconstruction, Goshen
»LaPorte Street Footbridge Rehabilitation, Plymouth
»Mishawaka Bridge over Yellow Creek, Elkhart
ELI JANG DLZ Inspector
JOHN BEER McCormick Inspector
»2 Year Experience
»31 Years Experience
»BS Civil Engineering, Purdue University
»Indiana Department of Transportation Certified Technician
KEY STAFF We all Hold the Keys to Safety
Safety is a core value at DLZ. As such, we are lucky
to have a full-time dedicated safety professional,
Phil Yrjanson, that works with our Indiana team.
Phil’s responsibility is to visit project sites and work
with our teams on injury and accident prevention.
He also leads our monthly targeted field safety
training. In recent months he or our staff have
noted several deficient items in the field and shared
those lessons learned with the entire staff in order
to raise awareness. Some examples include:
• Alerted a contractor that their workers were
performing hot welding while standing on a gas line
attached to a bridge.
• Noted several instances of inconsistent use of
PPE and emphasizing to wear the same PPE as
the worker performing the task or move to a safe
location outside the work zone.
• Alerted contractor to loose handrail that had an
insufficient nail pattern.
Potential Drainage Issues at the Intersection of
Lawndale and VanBuren
City of South Bend » Safe Routes to School » Construction Inspection
PROJECT APPROACH
Coal Line Trail at Vassar Avenue and Lawndale Avenue
PROJECT UNDERSTANDING
It is our understanding that CE services are requested for
Safe Routes to School at Muessel Primary/Holy Cross School
(INDOT Des. No. 19004477).
We have completed a recent site visit of the proposed project
location. The Safe Routes to School project will include
replacement of deteriorated or failing sidewalks and ADA
ramps along pedestrian routes to Muessel Primary and
Holy Cross School. This project complements the recently
completed School Zone Flasher Beacons project (INDOT
Contract T-41189).
Due to the recent Coal Line Trail (Phase I) Project (INDOT
Contract R-38064), several of the intersections located within
the project limits have already been upgraded to meet ADA
Compliance.
Untitled M ap
W rite a description for your m ap.
Legend
Coal Line Trail
Feature 1
Feature 2
Peek A Boo Daycare
School
The Local Cup SB
Tony?s Kitchen
1000 ft
N➤➤N
LEGEND
Project Limits
Intersections that need Sidewalk and
ADA Ramp Updates
Vassar AvenueVassar Avenue
Wilber StreetWilber StreetLincol
n
w
a
y
W
e
s
t
Lincol
n
w
a
y
W
e
s
t Allen StreetAllen StreetCoal Line TrailCoal Line TrailHoly Cross SchoolHoly Cross School
Muessel PrimaryMuessel Primary
5
6City of South Bend » Safe Routes to School » Construction Inspection
MAINTENANCE OF TRAFFIC
Challenge
Because numerous intersections will be upgraded, it is not reasonable to detail a maintenance of traffic (MOT) plan that will fit each
location. A typical MOT layout will be included in the plans, but site specific interpretation of MOT by the contractor and construction
inspection team will be required for most locations.
Solution
DLZ will work with the City, the contractor, both schools and affected adjacent property owners to maintain accessibility while considering
worker safety and mobility of the traveling public. This could include prohibiting lane restrictions on adjacent streets in order to reduce
congestion. DLZ’s inspection team has decades of experience working with MOT plans and will identify deficiencies. In more complex
locations, our team will consult with our transportation design team if needed.
Existing deteriorated sidewalk at the southwest corner of Cleveland and Vassar
SITE CONSIDERATIONS &
CHALLENGES
After a recent site visit, we have a thorough understanding of
the requirements of this project and the City’s expectations. With
a targeted August 2024 letting date, DLZ anticipates that
construction activities will begin in the Fall of 2024 and may
continue through 2025, depending on weather.
Our experience on similar projects tells us that the “best laid
plans often go awry.” Even with the most thorough project
planning and scrutinized design, existing conditions can
create a need to make adjustments in construction. We have
identified the following risks and will work to mitigate these and
other issues in a proactive manner.
SCHOOL DROP-OFF AND PICK-UP
Challenge
The Safe Routes to School (SRTS) project will include ADA
ramp construction at all four (4) street intersections at Muessel
Primary. Construction work and equipment operating nearby
during drop-off and pick-up times could cause significant
backups.
Solution
Steve Menis will meet with school officials to discuss drop-off
and pick-up times, procedures, and any other special events
that the contractor will need to be aware of to minimize
disruptions to the school.
New ADA ramp needed at Blaine and California
CITY OF SOUTH BEND
PROJECT ENGINEER
Steve Menis
Schedule and facilitate
meetings for all stakeholders,
including progress meetings.
Clearly communicate through
meeting minutes/summaries
and time-critical action items.
Return phone calls and
emails the same business
day or within 24 hours.
Establish and confirm
expectations and goals early
in the planning/design process.
COMMUNICATION PLAN
7City of South Bend » Safe Routes to School » Construction Inspection
Existing fire hydrant at the southwest corner of
California and Lawndale
FIELD ADJUSTMENTS WITHIN
RIGHT-OF-WAY CONSTRAINTS
Challenge
The plans should detail the proposed construction at numerous
intersections throughout the project area. Based on existing locations
of fire hydrants, power poles, storm drains, retaining walls, etc., further
details for the relocation or protection of facilities may be required.
We’re also assuming that there is no additional right-of-way being
acquired for the project, requiring that all improvement remain within
the existing right-of-way. These constraints may necessitate field
changes to meet the intent of the plans to construct ADA compliant
facilities.
Approach
The DLZ team is experienced in the inspection of new sidewalk and
trail systems that retrofit existing or are built adjacent to constrained
elevations or permanent features. In circumstances such as these, we
understand that field changes are inevitable. We will work closely with
the contractor to verify that any needed changes meet the intent of the
plans and also ADA regulations. INDOT LAPORTE DISTRICT
Steve Hauersperger
COMMUNICATION WITH
STAKEHOLDERS
Challenge
Construction of the SRTS project will affect 2 schools and
numerous adjacent property owners. School officials, parents,
and adjacent property owners are concerned about issues such
as immediate access, how they will reach their home or business,
etc. Communicating logistical details daily and to all parties can
quickly become a complex effort.
Solution
DLZ knows that the City is our most important stakeholder and
we will coordinate with other stakeholders based on a plan that
is approved by the City. But our overall goal is to be your least
concern and work directly with the contractor and stakeholders
to communicate the important messages seamlessly. Steve will
leverage his strong communication and organizational skills to
work with the contractor and develop a database of affected
owners and communicate as required via emails, door-to-door
notifications and/or small group meetings.
8City of South Bend » Safe Routes to School » Construction Inspection
Project Management Approach
We believe that it’s not just what we do, it’s how we do
it. That’s why we proactively manage our relationships
with clients. As a rule, clients don’t simply want to be
notified when the job is done—they want to be kept up
to speed. So we listen, we communicate, and we deliver.
For us, the ultimate reward is a happy client. We believe
every job is different, and that we owe it to you to never
make assumptions. Sure, we have plenty of experience,
but we realize your needs are unique—so we won’t
take anything for granted. We believe working hard for
our clients is its own reward. That’s why we’re proud
to stand behind the projects we work on. Besides, the
majority of our business is from repeat customers. That’s
a testament not only to the quality of our work, but also
to the quality of our client service.
Steve
Menis
Brad
Dailey
WHY CHOOSE DLZ
AND OUR TEAM?
The Best Project
Manager and Engineer
to get your job done! Quality
Using best practices and guidance from the City, we
will develop standards for the bidirectional flow of
information between the construction and design
teams. It’s critical on a project with a significant
footprint, that standard processes and procedures be
followed by all team members to confirm the integrity
of the construction.
Communication
There are various audiences and types of
communication on a project like this. The highest
priority communications are those related to the
safety of the public and workforce on site. A detailed
communication plan for the project will be developed
for both inter and intra project communications,
including a robust plan for needs related to public
outreach.
Safety and Work Site Management
Safety of the worker and public are of utmost
importance. For this project, eliminating pedestrian
and worker interactions that could create unsafe
conditions will be critical. The team will scrutinize
the staging and proposed work plan, and address
deficiencies. We will communicate with the City to
inform you of changes to site access in order to notify
the public and monitor safety and mobility.
Schedule
DLZ will work tirelessly with the contractor to keep
the project on schedule, but we will not sacrifice the
quality of construction to maintain schedule.
Team Compliance with ADA Experience
DLZ has experience with the successful construction
of various projects that accommodate ADA compliant
facilities. Small tweaks to sidewalk, and ramp cross-
slopes can push grades out of compliance. We have
proven inspection techniques to help reduce these
risks.
Teamwork
The DLZ Team will function as an extension of your
staff, all working toward the common goal of a
successful project.
Cost Control
The DLZ Team will be constantly vigilant for cost
saving opportunities on the project. This can be
accomplished through various avenues including value
added opportunities, change order management,
identifying potential issues prior to causing a delay,
and managing inspection staffing levels.
9City of South Bend » Safe Routes to School » Construction Inspection
Monroe Primary/Studebaker
Elementary SRTS » South Bend,
Indiana
DLZ provided project management, construction inspection,
and administration services to replace over 4,500
square yards of concrete sidewalk and curb ramps at
approximately 100 intersections in the City of South Bend.
This project included replacing selected sections of
sidewalk and curb ramps within the general areas of
Monroe Primary Center and Studebaker Elementary School.
Significant field coordination was necessary to adjust
the concrete removal limits to maximize the sidewalk
replacement and control the project quantities. Grades
and elevations of the newly constructed elements were
monitored to confirm they met current ADA standards.
Nearly 5,800 linear feet of curb was replaced throughout
this project to allow for proper construction of the new curb
ramps.
Stellar Trail » North Liberty, Indiana
Construction engineering services were provided for the construction of a new 4,600-foot asphalt trail that connects Tamarack
Trail to School Trail. A 400-foot boardwalk was constructed along an existing wetland area just east of North Liberty School.
The boardwalk consisted of helical piles, concrete end bents, and treated lumber. Construction of the project also included
subgrade treatment, compacted aggregate, and seeding. Coordination for the project included maintenance of traffic, staging of
construction, construction schedule, and material testing.
EXPERIENCE
Wrenwood Trail » North Liberty, Indiana
DLZ provided construction engineering services for the construction of a
new asphalt trail from North Liberty School to the Potato Creek Crossing
Subdivision. A new 70’-2” Pre-Engineered Steel Truss Bridge was
constructed over Potato Creek. The bridge consisted of steel piling, concrete
end bents and reinforced concrete bridge approaches. Construction of
the project also included subgrade treatment, compacted aggregate, curb
ramp, and landscaping. Coordination for the project included maintenance of
traffic, staging of construction, construction schedule, and material testing.
LaSalle Trail, Phase III » St. Joseph County, Indiana
DLZ provided construction engineering services for the extension of the LaSalle Trail shared use path from Auten Road to the
Indiana/Michigan State Line. Work included construction of ADA compliant infrastructure with trail being 10 feet wide and hard-
surfaced concrete pavement with 2-foot shoulders. The length of the path is 5,700 feet.
The path follows the alignment on the existing former railroad bed and aligns with the trail from the previous phase, LaSalle Trail
Phase II. Coordination was required to align the path from the south side of State Line Road to the north side with the existing
IN-MI River Valley Trail.
City of South Bend » Safe Routes to School » Construction Inspection 10
11City of South Bend » Safe Routes to School » Construction Inspection
R-34699 Safe Routes to School
Project » Mishawaka, Indiana
INDOT Contract R-34699, was a Safe Routes to School
project in Mishawaka, Indiana. Curb ramps and sidewalks
along various streets near Battell Elementary School were
upgraded per current ADA requirements. Several streets
within the project limits had very steep grades, which
required additional construction engineering and field
adjustments to be made. Besides coordinating with local
residents and businesses, additional coordination was
performed so the project would not interfere with school.
Tamarack Trail » North Liberty, Indiana
DLZ provided construction administration services to construct a new 4,600-foot asphalt trail from Quinn Road to Wabash
Avenue. The trail connects the North Liberty Community Center to the North Liberty Youth League Ballpark along the
abandoned railroad corridor (formerly Indiana, Illinois, and Iowa Railroad). Approximately 2,200 feet of woods were cleared
as part of the project. Construction of the project also included subgrade treatment, compacted aggregate, and seeding.
Coordination for the project included maintenance of traffic, staging of construction, construction schedule, and material
testing.
(Rev. 06/27/2018)
Request for Proposal Number:
RFP Item Description:
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs)
certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as
part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in
their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f).
I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission
of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to
confirm that the firms listed below are currently certified DBEs:
INDOT: https://entapps.indot.in.gov/DBELocator/
KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx
I certify that I have contacted the certified DBEs listed below, and if my company becomes the CONSULTANT, these DBEs have
tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE
utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to
be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division.
I.DBE Subconsultants to be applied toward DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to be
Paid*
%
%
%
%
II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to be
Paid*
%
%
%
%
Estimated Total Percentage Credited toward DBE Goal:
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: 2%
Company Name:
Signature:Date: 11-28-23
*It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of
negotiation of the contract scope of work. My company will use good faith efforts to meet the overall DBE goal through the use of these
or other certified and approved DBE firms.
McCormick Engineering, LLC 13.1 3
2McCormick Engineering, LLC 13.1
3%
Safe Routes to School at Muessal Primary/Holy Cross School