HomeMy WebLinkAboutOpening of Bids - 2023 Residential Demolitions Proj No. 123-068 - Indiana Earth, Inc.CITY OF SOUTH BEND, INDIANA;'':�
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name 2023 Residential Demolitions
Project No. 123-068
For Bids Due Tuesday, November 28, 2023 @ 9:00 A.M. (E.S.T.)
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
/ Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
/ Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of MWBE Utilization Plans [MBE-1.0 and WBE-1,0]. Also provide Evidence of Good
Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and
WBE-2.1 ].
✓ Acknowledge Receipt of 0 Addendum(s) included with the bid.
All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
VX This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: II W I% __AM 6�' Date: G 1 2 r
By Authorized Reprf
Signature:
Print Name & Title: AA14-kk &S L.&-V_ , (?<o-_3lf)oN 1
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name 2023 Residential Demolitions
Project No. 123-068
For Bids Due Tuesday, November 28, 2023 @ 9:00 A.M. (E.S.T.)
Contractor Name:
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 3111 for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractors)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements-
(i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have metthe pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) _ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
(i) _ Indiana Secretary of State's on-line records (le. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) _ For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgments:
(i) _✓ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) V By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
/ information provided to the City shall be regarded as public records.
(iii) V By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at anytime and shall be furnished
upon request.
(iv) J_ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments,
(i)
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is In
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
(iii} ✓
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv)
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v)
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi)
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
(vii)
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii)
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
(ix) Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: [ l/
(Sign Here)
I' A-p K oS
(Print Name Here)
t kJl? tAAI * C�
(Name of Company)
1b2 E? l['JLe �
(Address of Company)
(City)
(State)
527�k—&;D��g
(Telephone Number)
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name 2023 Residential Demolitions
Project No. 123.068
For Bids Due Tuesday, November 28, 2023 @ 9:00 A.M. (E.S.T.)
PART I
(Must be completed for all bids. Please type or print)
Date: /y7IZv Bidder (Firm)j.a eNyocT tf, ETC_
Address: I U-77542' m'c�t4LtEi�_-r L-1\,-d'y
City/State/Zip: DSgg;,.A I A Telephone Number: (%57L{) may_
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
2023 Residential Demolitions
the City of South Bend, Indiana, in accordance with plans and specifications prepared by
City of South Bend, Engineering Division
and dated 10/27/2023 for the sum of (enter the Total Bid as shown on the Proposal)
D'Ui�u�u k1, ����,,•�.,�iu� � �h �, � s.� '� ($ —7 (to
(Enter sum of Total Base Bid plus Alternates shown on P oposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a e ate achm
By
(Signature)
(Printed Name of Person Signing)
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
ACCEPTANCE
day of 20
Elizabeth A. Maradik, President Joseph R. Molnar, Vice President
Gary A. Gilot, Member
Alexandra Dolz-Lane, Member
Murray L. Miller, Member Attest: Theresa Heffner, Clerk
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Project Name: 2023 Residential Demolitions
Project Number: 123.068
For Bids Due: Tuesday, November 28, 2023 @ 9:00 A.M. (E.S.T.)
Contractor Name: j ,It? rA--14A � � , t rit c —
Item
No.
Description
Asbestos
Abatement (LS)
Demolition
(LS)
Total Amount
1
Demolition of 823 S. Arnold St. House,
$0.00
$
Shed and Fence
2
Demolition of 219 S. Chestnut St. House
$0.00
$
37, c7
$
3
Demolition of 226 E. Donald -St. House,
Deck and Fence **DUCT WRAP
$
(�t�.—
$
$
4
Demolition of 1132 E. Donald St. House
$
$
$
and Garage **DUCT WRAP
da J
5
Demolition of 610 E. Fairview Ave.
"LINOLEUM
$
$
'
$
Val.,
House, Garage and Fence
.�
? ��
Demo6 Shed, lalnd Fence on of 9 Fisher St. House,
$0.00
$
7
Demolition of 1031 Hancock St. House
and Fence
$0.00
$
�,ZS°
$
'
.
8
Demolition of 601 S. Illinois St. House
and Fence
$0.00
$
$
..M—
Demolition of 227 E. Indiana Ave. House
9
and Fence **LINOLEUM **SIDING
**DUCT
$
101o� r
$
3�, o6D
$
�r'q; 0
WRAP
10
Demolition of 732 E. Indiana Ave. House
$0.00
$•-
11
Demolition of 722 W. Jefferson Blvd.
$
$
House and Fence **DUCT WRAP
Demolition of 253 N. Kenmore St. House
12
and Fence **FURNACE GASKET "TILE
ADHESIVE
Demolition of 2001 Leer St. House,
13
Fence and Retaining Wall "*DUCT
$
WRAP **SIDING
Demolition of 615 Leland Ave. House and
14
Fence "INSULATION 'SIDING
$
. ������..�-
$
:37, 5(=,D
$
**PORCH FLOOR
15
Demolition of 507 W. Marion St. Horse
**DUCT WRAP
$
l 2� -'
$
_
�f?��
$
3�0•
16
Demolition of 1011 O'Brien St. House
and Garage **DUCT TAPE
$
17
Demolition of 2424 Orange St. House
and Fence **LINOLEUM
$
` �'
$
r^ no
$
.
18
Demolition of 1328 Randolph St. House
$
$
�__�....,
$
**DUCT WRAP
s`�c�� .—.
(}
f`�C_J
3if
19
Demolition of 2114 S. St. Joseph House
$0.00
20
Demolition of 1912 S. Scott St. House,
Garage and Fence
$0.00
21
Demolition of 213 S. Wellington St.
House and Fence
$0.00
$'=
'
$
�2; v,
22
Environmental Allowance
-
-
$10,000
Project Name: 2023 Residential Demolitions
Project Number: 123-068
For Bids Due: Tuesday, November 28, 2023 @ 9:00 A.M. (E.S.T.)
Contractor Name: 1,112 6-tP.
BASE BID TOTALS
"DENOTES HOMES WITH ASBESTOS MATERIAL. VERIFY WITH INSPECTIONS & REPORTS FOR PROPER
DISPOSAL.
Bidder (Firm): IN0iAALA r4 —
Address: 102,47,
City/State/Zip: C�c. C14/Telephone Number; (sly) ��—
By
(Signature)
A4 4-k e EEhESi Del T_
(Printed Name of Person Signing)
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT,
CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY
VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE
OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF )
SS:
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that:
1. Contractor has not, nor has any other member, representative, or agent of the fine,
company, corporation or partnership represented by him, entered into any combination, collusion
or agreement with any person relative to the price to be bid by anyone at such letting nor to
prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid
is made without reference to any other bid and without any agreement, understanding or
combination with any other person in reference to such bidding. Contractor further says that no
person or persons, firms, or corporation has, have or will receive directly or indirectly, any
rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any Federal department or agency;
and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency or
instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from
time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is
engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty million
dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty
million dollars ($20,000,000) or more in credit to another person for forty-five (45)
days or more, if that person will (i) use the credit to provides goods and services in
Non -Collusion Non -Debarment Affidavit Non Iran Form
the energy sector in Iran; and (ii) at the time the financial institution extends credit, is
a person identified on list published by the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the Contractor subsequently learns is an
unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility
status of all of Contractor's newly hired employees through the E-Verify Program as defined by
I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify
Program is included and attached as part of this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public
contract to certify that the subcontractors do not knowingly employ or contract with an
unauthorized alien, nor retain any employee or contract with a person that the subcontractor
subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is
participating in the E-Verify Program. The Contractor agrees to maintain this certification
throughout the term of the contract with the City of South Bend, and understands that the City
may terminate the contract for default if the Contractor fails to cure a breach of this provision no
later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by
the City of South Bend through its agencies, boards, or commissions shall not discriminate
against any employee or applicant for employment in the performance of a City contract with
respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or
indirectly related to employment because of race, sex, religion, color, national origin, ancestry,
age, gender expression, gender identity, sexual orientation or disability that does not affect that
person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials,
or any combination of the foregoing including, but not limited to, public works contracts
awarded under public bidding laws or other contracts in which public bids are not required by
law, the City, its agencies, boards, or commissions may consider the Contractor's good faith
efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority
Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining
the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a
subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said
WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board
shall prohibit that person or entity from being awarded a City contract for a period of one (1)
year from the date of such determination, and such determination may also be grounds for
terminating the contact for which the discriminatory practice or noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment
shall be made a part of any contract which it may henceforth enter into with the City of South
Bend, Indiana or any of its agencies, boards or commissions.
Non -Collusion Non -Debarment Affidavit Non Iran Form
Contractor agrees not to discriminate against or intimidate any employee or applicant for
employment in the performance of this contract with privileges of employment, or any matter
directly or indirectly related to employment, because of race, religion, color, sex, gender
expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of
this provision may be regarded as material breach of contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my
statutory obligations to the use of steel products or foundry products made in the United States
(I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will
use steel products or foundry products made in the United States on this project if awarded. I
understand I have an affirmative duty to notify the City in my bid that my proposal does not
include the use of steel products or foundry products made in the United States. I understand it is
my sole obligation and responsibility to provide a justification to the City, subject to review and
approval, why the cost of United States made steel or foundry products is unreasonable. Prior to
award and upon submission of bid which does not use steel products or foundry products made
in the United States, the City, through its director of public works, shall make a determination if
the price of United States made steel or foundry is unreasonable. I understand that violations
hereunder may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for
public works are true and correct.
Dated this `Z-7 +5 day of L)V , 20 2�
_( fVPIA&L$ �r:.-qW iNc—
ContractorBi der inn)
Signature of Contractor/Bidder or >Agent
Gajog. Pl?asl fit.rtT—
Printed Name and Title
Subscribed and sworn to before me this '22 day of � cry' , 20 -;2 ,3
My Commission Expires 5 -31 - 2- 0
Notary Public
County of Residence
Non -Collusion Non -Debarment Affidavit Non Iran Farm
\pPPy pU�O� ROXANNE LAURE.NE ALrORU
t •.,o�'s, Notary Public, State of Indian;
`Z;SEAL;"= St. Joseph County
? , .. r Commission Number NP0741 224
My Commission Expires
May 31, 2030
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-1.0
MBE UTILIZATION PLAN
his completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
Ile bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications.
***Goals should be calculated based on the Base Bid only.***
'roject Number:
Sidder:
123-068 project Name: 2023 Residential Demolitions
Base Bid Amount: -7 11, 2f�c:,°- MBE Goal: 1.4%
Page of /
Name & Address of MBE
Primary Contact Person
(Name/Telephone)of
Scope of Work to be Performed
(Attach scope/schedule If you need addltlonal space)
Dollar Amount of MBE
Component
Percentage
Total
Bid/Proposal
I
Submitted by
arsion 07/19/2023
�;_Or 0�
0,
Print Name Si nature
***Goals should be calculated based on the Base Bid only."*
Contractor's Bid for Public Works - 9
Date
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-1.0 _ x.,•_....:.:
WBE UTILIZATION PLAN
his completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
Ile bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
***Goals should be calculated based on the Base Bid only:`"
Droject Number:
Sidder:
123-068
Project Name
2023 Residential Demolitions
/,i%•fi E- I� Base Bid Amount: ` '7 j j, ?' WBE Goal: 4.6%
Page__�_of(
Name &Address of WBE
Primary Contact Person
(Name/7elephone)
Scope of Work to be Performed
(Attach scope/schedule If you need additional space)
Dollar Amount of WBE
Component
Percentage
of Total
Bid/Proposal
r
Submitted by
Print Name
***Goals should be calculated based on the Base Bid only.***
srsion 07/19/2023 Contractor's Bid for Public Works - 10
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 123-068
Project Name: 2023 Residential Demolitions
Date: L V Z Zc
Bidder: %/elf,!-4-N1r CZi CnL 1JVC—
Contact Person: ffE/rZ4 ��- hE-k .j Telephone: S7 7zf —� jr
Address:
City:1—i— State: 11V Zip:E,j j
Email:
To determine whether a bidder has demonstrated good faith efforts to reach the M BE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below":
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1)the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2)the listof certified MWBEs provided by the City; and 3)the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: htt :/Avww.in. ov/idaa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http:J/www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
L/
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested MBEs.
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified withoutsound business reasons based
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Falth Efforts to obtain MWBE particlpatlon.
Project Number: 123.068 Date: l y
Project Name: 2023 Residential Demolitions
Bidder: rM1il4V--(- liV&—
Contact Person: k'�717 �115 Telephone. SZ�f��
Address: f Q 25 M C—KIA L" 6� 1y y
City: c?<if :cC-1 L-loc- State: f Zip: ,ram
Email: _Cl i,�r
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below":
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed t) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2)the list of certified MWBEs provided by the City; and 3)the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: httD:/1www.in.00vlidoa1
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate WBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all WBEs in the scopes of work of the contract.
I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform
/ WBEs of contracting and subcontracting opportunities.
V I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
sufficient time for WBEs to participate effectively.
V I I affirm that I followed up on initial solicitations with interested WBEs.
affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
/ I I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
�/ lines of credit, or insurance as required by the City or the bidder, where appropriate.
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
I affirm that I have made good faith efforts to assist interested WBEs in obtaining
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
I affirm that I did not reject any VVBEs as unqualified without sound business reasons
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
FORM MBE-2.1
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority -owned business meets the MBE qualifications. Attach additional pages If necessary.
PAGE OF
Project Number: 123-068 MBE Participation Goal 1.4%
Project Name: 2023 Residential Demolitions
MBE Firm��
Owner or Contact at MBE Firm r (N1�rf' c,v 5 u
Telephone: S?, g 7L' y3 Fax: Email
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Tlv v C—t4 *. cC
RESULTS OF CONTACT WITH THE MBE FIRM:
M BE Firm'
Owner or Contact at M BE Firm
Telephone: Fax: Email.
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
FORM MBE-2.1
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It Is the bidder's sole responsibility to verlfy whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages If necessary.
PAGE j OF I
Project Number: 123-068 WBE Participation Goal 4.6%
Project Name: 2023 Residential Demolitions
Bidder:
(Signature) (Title) (Date)
WBE Firm
Owner or Contact at 1
Telephone:.?�_ lZ- 2 Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
L !j�-4_- - T�
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
Init.
1A Dccumo i A
Bid Bond
CONTRACTOR: SURETY:
(Nance, legal status and address) (Name, legal stcattis and principal place
Indiana Earth, Inc. of business)
Swiss Re Corporate Solutions America Insurance Corporation
10343 McKinley Highway 1200 Main Street, Suite 800 This document has important legal
Osceola, IN 46561 Kansas City, MO 64105 consequences. Consultation with
OWNER: an attorney is encouraged with
respect to its completion or
(Name. legal staters and address) modification.
City of South Bend
227 West Jefferson Boulevard
South Bend, IN 46601
BOND AMOUNT: ***FIVE PERCENT OF AMOUNT BID***
PROJECT:
(Name, location or address, and Project number, if any)
21 House Demolitions - Project #123-068
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terns of such
bid, and -ives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount
for which the Owner may in good Faith contract with another party to perform the work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so
furnished, the intent is that this Bond shall be construed as a statutory bond and t10 s a common law bond.
Signed d sealed this 28th day of November 3
Indi
(Pr' tcipa) (Seal)
(4 itness)
(Title) ?MIW A:�- a 5 Lc 17i�'—F5(i l
Swiss Re Corporate Solutions America Ins ranee-C�
(Sureh
(Witrtt 5S )
(Title)T mas O. Chambers, Att�Srne�rin=F�tt� �C
AIA Document A31DTM' - 2010. Copyright 01963, 1970 and 2010 by The American Institute of Architects. All rights reserver,*'. t?rARWING:v is(A
rTi `f y
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of Shls-AA' Do�ncji�, or/1 r -
any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent posshte`iiifder the la r
Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Conliact Doeilme t r1e-77}}tSjI
The American Institute of Architects' legal counsel, copyright@aia.org. '� „ carl0J
SWISS RE CORPORATE SOLUTIONS
SWiSS RE CORPORATE SOLUTIONS AMERICA INSURANCE CORPORATION ("SRCSAIC")
SWISS RE CORPORATE SOLUTIONS PREMIER INSURANCE CORPORATION ("SRCSPIC")
WESTPORT INSURANCE CORPORATION ("WIC")
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, THAT SRCSAIC, a corporation duly organized and existing tinder laws of the State of Missouri, and
having its principal office in the City of Kansas City, Missouri, and SRCSPIC, a corporation organized and existing under the laws of the State of
Missouri and having its principal office in die City of Kansas City, Missouri, and WIC, organized under the laws of the State of Missouri, and having its
principal office in die City of Kansas City, Missouri, each does hereby make, constitute and appoint:
T140MAS 0. CHAMBERS, TODD SCI-JAAP, KIMBERLY S. RASCH, and PAUL JACOBSEN
JOINTLY OR SEVERALLY
its true and lawful Attoney(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by
law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the,
amount of.
UNLIMITED
This Power of Attorney is granted and is signed by facsimile tinder and by the authority of the following Resolutions adopted by the Boards of
Directors of both SRCSAIC and SRCSPIC at meetings duly called and held on the l8th of November 2021 and WIC by written consent of its
Executive Committee dated July 18, 2011.
"RESOLVED, that any two of die President, any Managing Director, any Senior Vice President, any Vice President, die Secretary or any Assistant
Secretary be, and each or any of them hereby is, authorized to execute a Power of Attorney qualifying the attorney named in the given Power of
Attorney to execute on behalf of the Corporation bonds, undertakings and all contracts of surety, and that each or any of them hereby is autliorizedto
attest to the execution of any such Power of Attorney and to attach therein the seal of the Corporation; and it is
FURTHER RESOLVED, that the signature of such officers and the seal of the Corporation may be affixed to any such Power of Attorney or to
any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Corporation when so affixed and in the future with regard to anv bond, undertaking or contract of surety to which it is attached."
J�1pN&AMBq/�'.j .,`���pN81Re' 4-VG Caan��
yd ........
o Rq�........... 0 q'�Ry
...%,3 By
- =� S Erik Janssens, Senior Vfeo President of SRCSAIC & Seufar Vice President
mq�
i �3 =o• •�5 ofSRCSP[C&SenforVlcePrrsldeafWlC
1973
.. /!S60U¢�ydar a' •t!/g90uR:• 0�`
By
Gerald Jagrowski, Vice Presidemi of SRCSAIC&Vice President orsnCSP[C
& Vice rresident orwic
IN WITNESS WHEREOF, SRCSAIC, SRCSPIC, and WJC have caused their official seals to be hereunto affixed, and these presents to be signed by their
nutborized officers
this 10 day of NOVEMBER 20 22
Swiss Re Corporate Solutions America Insurance Corporation
State of I]linois Swiss Re Corporate Solutions Premier Insurance Corporation
County of Cook ss Westport Insurance Corporation
On this 10 day of NOVEMBER 20 22 , before me, a Notary Public personally appeared Erik Janssens, Senior Vice President of SRCSAIC
and Senior Vice President of SRCSPIC and Senior Vice President of WIC and Gerald TP ra owski , Vice President of SRCSAIC and Vice President of
SPCSPIC and Vice President of WIC, personally known to nte, who being by me duly sworn, acknowledged that they signed die above Power of Attorney
as officers of and ncknowledged said instrument to be die voluntary act and deed of their respective companies.
$F.N.
CtiFtt$ r1t'1¢�'M11NI i�+Gl7
ab. AnuaGo
I, J , ptm-Call i,¢w�t}ye�Nmt3the duly elected Senior ice President and Assistant Seere4�yr of SRCSAIC and SRCSPIC and WIC, do hereby certify that the above and
vets ctu g�qa �correcl copy of a Power of Attorney given by said SRCSAIC and SRCSPIC and WIC, which is still in full force and effect,
tt\�s I�l ht J S� - �gy'r , J have set my hand and affixed the seals of the Companies thi 2s 8th day of November 2023
--
i Jeffrey Goldberg, Senior Vice President &
AAssistant Secretary of SRCSAIC and
c� L c-r _Z SRCSPIC and WIC
S
Jj� `• , .t
STATE OF WISCONSIN )
COUNTY OF Kenosha )
ON THIS 28th day of November 2023 ,
before me, a notary public, within and for said County and State, personally appeared
Thomas O. Chambers to me personally known, who being duty sworn,
upon oath did say that he is the Attorney -in -Fact of and for the
Swiss Re Corporate Solutions America Insurance Corporation , a corporation
of Missouri created, organized and existing under and
by virtue of the laws of the State of Missouri ; that the corporate seal
affixed to the foregoing within instrument is the seal of the said Company: that the seal
was affixed and the said instrument was executed by authority of its Board of Directors;
and the said Thomas O. Chambers did acknowledge that he/she
executed the said instrument as the free act and deed of said Company.
Kimberl �. Rasc "7
Notary Public, Kenosha County, Wisconsin
My Commission Expires 1/22/2026 .
BUSINESS INFORMATION
DIEGO MORALES
INDIANA SECRETARY OF STATE
11/28/2023 07:27 AM
Business Details
Business Name: INDIANA EARTH, INC. Business ID: 1990031137
Entity Type: Domestic For -Profit Corporation
Creation Date: 03/22/1990
Principal Office Address: 10343 MCKINLEY HWY., OSCEOLA, IN,
46561 - 9756, USA
Jurisdiction of Formation: Indiana
Business Status: Active
Inactive Date:
Expiration Date: Perpetual
Business Entity Report Due 03/31/2024
Date:
Years Due:
Governing Person Information
Title Name Address
President MARK L OSLER 10343 McKinley Hwy., Osceola, IN, 46561, USA
Registered Agent Information
Type: Individual
Name: MARK OSLER
Address: 10343 MCKINLEY HWY., OSCEOLA, IN, 46561 - 9756, USA
l N V rl�-KA- Ct�f4 r o-
Building Pre -qualification checklist items:
• Indiana Earth, INC has no former business names.
• Indiana Earth, INC has had no determinations by a governmental agency of any violations.
• Indiana Earth has the crew and staff to complete this project.
• Indiana Earth partners with the local 150 operators union and the local labors union for training
and apprentices.
• Those that work on this project will be employees of Indiana Earth or of a hired subcontractor
which are under all applicable state and federal laws and local ordinances.
• Operators and Laborers drug screening are through the BCRC Building Construction Resource
Center at BCRCNET.com.
• Teamster's drug screening are performed during pre -employment and by random through
Figment Group with quarterly random requirements.
• Indiana Earth, INC has no current tax liens.
• Projects similar to this one.
o Nappanee Waste Water Treatment Plant
o St Mary's College
o Laporte Intermediate School
o Concord High school
o Penn High School
o Central Park in Mishawaka
o Toll Road Plazas of Howe, IN
o Toll Road Plazas of Elkhart, IN
o Penn High School
o Howard Park
o Toll Rd Administration Building
o Kalamazoo Natatorium Demo
o Western Ave
o Eagleway Sewer Extension
o Knox Community Schools
o Nappanee Water Main Replacement
o LaPorte County Courthouse
o New Buffalo Fire Station
o Penn Township Fire Station
• All subcontractors working for Indiana Earth are qualified under EC 4-13.4 or IC 8-23-10
5/23/23, 8:43 AM
Surety Bonds - List of Certified Companies
Swiss Re Corporate Solutions America Insurance Corporations
(NAIC #29874)
BUSINESS ADDRESS: 1200 MAIN ST. SUITE 800, KANSAS CITY, MO 64105 - 2478.
PHONE: (816) 235-3700.
UNDERWRITING LIMITATION b/: $95,164,000.
SURETY LICENSES c,f/: AL, AK, AZ, AR, CA, CO, CT, DE, DC, FL, GA, HI, ID, IL, IN, IA, KS, KY, LA, ME,
MD, MA, MI, MN, MS, MO, MT, NE, NV, NH, NJ, NM, NY, NC, ND, OH, OK, OR, PA, PR, RI, SC, SD, TN,
TX, UT, VT, VA, WA, WV, WI, WY.
INCORPORATED IN: Missouri.
https:/Iwww.fiscal.treasury.gov/surety-bonds/list-certified-companies.html#s 1 /1
i
Section 1
Public Projects completed:
1) Excavation and Utility — Bremen School
2) Excavation and Utility — New Buffalo, MI Fire Station
3) Excavation and Utility— Knox Community Schools
4) Excavation and Utility — St. Joseph County Public Library
5) Demo, Excavation and Utility — Laporte County Courthouse
6) Excavation and Utility — Penn Township Fire Station
7) Excavation and Utility— Knox Community Schools
8) Excavation and Utility — Nappanee Water Main Replacement
9) Excavation and Demolition — Mishawaka City Hall
10) Excavation and Utility — Ironworks Plaza Phase 3
11) Excavation and Utility —Topeka Water Treatment Plant
Public Works in Process:
1) Excavation and Utility — LaGrange INDOT Unit Building
2) Excavation — Elkhart County Courthouse
Completed all work awarded to our firm.
References of Private Firms
1)
Rieth Riley Construction
574-288-8321
2)
FCI Construction
260-927-8516
3)
Gibson Lewis LLC
574-259-8581
4)
Larson Danielson
219-362-2127
5)
Robert Henry Const.
574-232-2091
$100,000 Summer 2021
$400,000 Summer 2021
$1,100,00 Summer 2021
$450,000 Fall 2021
$700,000 Summer 2021
$260,000 Summer 2021
$150,000 Summer 2022
$3,100,000 2022
$200,000 Summer 2022
$500,000 Summer 2022
$500,000 Summer 2022
$1,000,000 Winter 2023
$150,000 Spring 2024
10343 McKinley Hwy. • Osceola, IN 46561 • (574) 674-6488 • FAX (574) 674-6480
Section 2
Plan of proposed work
1) Per Spec
Subcontractors Utilized on Past Projects
1) Weaver Boos —South Bend, IN, Compaction Testing
2) Acorn Landscaping— IUSB West Parking Lot
3) Abonmarch — South Bend, IN, Surveying
4) Rieth Riley —Goshen, IN, Paving
5) Hawk Electric — Merrillville, IN
Subcontractors to Utilize on this Project — Possible subs listed, will determine prior to contract approval
1) Contractors to be determined
List of our Equipment Owned:
1)
29 Excavators
2)
6 Dozers
3)
27 Dump Trucks
4)
2 Semi Trucks with dump trailers
5)
6 Rollers
6)
6 Loaders
7)
6 Skidsteers
8)
2 Off Road Haul Trucks
9)
2 Man Lifts
10)
1 Vermeer Vac Truck
11)
Eagle Crusher
We have received pricing for services and materials by potential subcontractors.
10343 McKinley Hwy. • Osceola, IN 46561 • (574) 674-6488 • FAX (574) 674-6480