Loading...
HomeMy WebLinkAboutOpening of Bids - 2023 Residential Demolitions Proj No. 123-068 - Green Demolitions Contractors, Inc.t� CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name 2023 Residential Demolitions Project No. 123-068 For Bids Due Tuesday, November 28, 2023 @ 9:00 A.M. jE.S.T.j From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of MANBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.01 and MNME Contacted Forms [MBE-2.1 and X WBE-2.1]. X Acknowledge Receipt of Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, It does not Include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Green Demolition Contractors. Inc. Date: 11-27-2023 By Authorized Represe tative: / Signature: �r I 4Print Name & Title: President Version 07119/2023 Contractor's Bid for Public Works -1 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name 2023 Residential Demolitions Project No. 123.068 For Bids Due Tuesday, Noveniber 28, 2023 @ 9:00 A.M. (E.S,T.) PART I (Must be completed for all bids. Please type or print) Date: 1-27-202 Bidder (Firm): Green Demolition Contractors Inc. Address, 315 Brighton St, Suite 1 City/State/Zip: LaPorte. IN 46350 Telephone Number: 219 379-5311 Agent of Bidder (if Applicable): _NIA Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: 2023 Residential Demolitions the City of South Bend, Indiana, in accordance with plans and specifications prepared by: City of South Bend, Engineering Division and dated 10/27/2023 for the sum of (enter the Total Bides shown on the Proposal) Three hundred seven:Y-two thousand, four hundred fifty dollars and no cents ;$372.450.00 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be showr on a separate attachment By fsi�+ (Rrinted Name or Person Signing) ACCEPTANCE The above bid is accepted this day of Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President r�7 Joseph R. Molnar, Vice President Gary A. Gilot, Member Alexandra Dolz-Lane, Member Murray L. Miller, Member Attest: Theresa Heffner, Clerk Version 07/19/2023 Contractor's Bid for Public Works - 2 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to. consider your bid,) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 07/19/2023 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attack an explanation to this Affidavit CONTRACTOR'S NON -COLLUSION AND NON DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRDIINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF _ Indiana ) ) SS: St Joeseph COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the fine, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrtanentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-9, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ft. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 07119/2023 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/herhts subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the tens of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City, 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performanoe of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, sensices, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an M%93E; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States aI C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United Sues, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 0711912023 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. AAA I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 27th day of November, 20 23 Subscribed and sworn to before me this My Commissim Expires Green Demolition Contractors. Inc. Conlin, c�tor/Bidder (Finn) Signature of Contra or/Bid r or is . gen Michael Brou h President Printed Name and Title 27th day of November , 2023- Notary bblic County of Residence EJANET M DOMMER Notary Public - Seal M orter County - State of Indiana mmission Number NP0746920 P -... -ommission Expires Feb 16, 2031 . - Version 07/19/202S Contractor's Bid for Public Works - 6 BIDIPROPOSAL CITY OF SOUTH BEND Project Name: 2023 Residential Demolitions Project Number: 123-068 For Bids Due: Tuesday, November 28, 2023 @ 9:00 A.M. (E.S.T.) Contractor Name: Green Demolition Contractors. Inc. Item No. Asbestos Description Abasement (LS) Demolition (LS) Total Amount $ 17,500.00 $17,500.00 1 Demolition of 823 S. Arnold St. House, Shed and Fence . $OOD 2 Demolition of 219 S. Chestnut St. House $0.00 $19,500.00 $ 99.500.00 3 Demolition of 226 E. Donald St. House, $ 1,500.00 $19,500.00 $21,000.00 Deck and Fence **DUCT WRAP 4 Demolition of 1132 E. Donald St House **DUCT $1,500.00 $17,500.00 $ 19,000.00 and Garage WRAP $ 20,350.00 5 Demolition of 610 E. Fairview Ave. $ 2 850.00 $ 17,500.00 House, Gara a and Fence **LINOLEUM 6 Demolition of 1329 Fisher St. House, $0,00 $16,000.00 $ 16 000.00 Shed, and Fence 7 Demolition of 1031 Hancock St. House $0.00 $11,000.00 $11,000.00 and Fence $0.00 $11,000.00 $11,000.00 8 Demolition of 601 S. Illinois St. House and Fence Demolition of 227 E. Indiana Ave. House 9 and Fence **LINOLEUM 'SIDING $ 8,500.00 $12,000.00 $ 20,500.00 **DUCT WRAP i 10 Demolition of 732 E. Indiana Ave. House $0.00 $17,500.00 $ 17,500.00 11 Demolition of 722 W. Jefferson Blvd. **DUCT $1,500.00 $15 000.00 $ 16,500.00 House and Fence WRAP Demolition of 253 N. Kenmore St. House 12 and Fence **FURNACE GASKET *"TILE $1,500.00 $13,500.00 $15,000.00 ADHESIVE Demolition of 2001 Leer St. House, 13 Fence and Retaining Wall **DUCT $ 10,250.00 $ 15,500.00 $ 25,750.00 WRAP **SIDING Demolition of 615 Leland Ave. House and 14 Fence **INSULATION **SIDING $ 12,000.00 $ 17,000.00 $ 29,000.00 **PORCH FLOOR 15 Demolition of 507 W. Marion St House "*DUCT $ 1,500.00 $15,000.00 $16 5000.00 WRAP $ 17 500.00 $19 000.00 16 Demoliticn of 1011 O'Brien St. House **DUCT $1,500.00 and Garage TAPE 17 Demolition of 2424 Orange St. House and Fence LINOLEUM $ 2 850.00 $ 15,000.00 $17,850.00 18 Demolition of 1328 Randolph St. House **DUCT $1,500.00 $19,500.00 $ 21,000.00 WRAP 19 Demolition of 2114 S. St. Joseph House $0.00 $12,500.00 $ 12,500.00 20 Demolition of 1912 S. Scott St. House, $0.00 $13,500.00 $13,500.00 Garage and Fence 21 Demolition of 213 S. Wellington St. $0.00 $13,500.00 $13,500.00 -] House and Fence 22 Environmental Allowance - - $10,000 Version 07/19/2023 Contractor's Bid for Public Works - 7 BIDIPROPOSAI. F •. i.: •' yr' CITY OF SOUTH BEND Project Name: 2023 Residential Demolitions Project Number: 123-068 For Bids Due: Tuesday, November 28, 2023 @ 9:00 A.M. (E.S.T.) Contractor Name: Green Demolition Contractors Inc. BASE BID TOTAL 372,450.00 "DENOTES HOMES WITH ASBESTOS MATERIAL. VERIFY WITH INSPECTIONS & REPORTS FOR PROPER DISPOSAL. Bidder (Firm): Green Demolition Contractors Inc. Address: 315 Brighton St. Suite 1 City/State2ip: LaPorte. IN 46350 Telephone Number: (219)379-5311 By (signature) Michael Brough (Printed Name of Person Signing) Version 07/19/2023 Contractor's Bid for Public Works - 8 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN` FORM MBE-1.0 MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned buslnoss meats the MBE qualifications. "*Goals should be calculated based on the Base Bid only.""' Project Number: Bidder: 123-068 Project Name: 2023 Residential Demolitions GrBen Demolition Contractors, Inc. Base Bid Amount: $$372,450.00 Name & Address of MBE MBE Goal: 1.4% Page 1 of 2 Primary Contact Ps— Scope of Work to be Performed Cdlw Amount of MBE Pere (NameRelephone) (Attach scopetschedule If you need additional space) Component Of Bld/F San Corporation Sandra Smith Trucking & Hauling Debris to and from site $150,000.00 33% 1112 East Summit St 219-299-6830 Crown Point, Indiana 46307 Submitted by: Michael BrcughZ_ 11-27-22! Print Name Signature Date * Goals should be calcul d based on the Base Bid only. — Version 07/19/2023 Contractors Bid for Public Works - 9 CITY OF SOUTH BEND u MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business maets the WBE qualifications. ***Goals should be calculated based on the Base Bid only.*** Project Number: Bidder: _123-068 Project Name: 2023 Residential Demolitions rreen nPmniitinn Contractors_ Inc. Base Bid Amount: ;)372 450.00 Name & Address of WBE I Primary Contact Person (Namefretephone) San Corporation Sandra Smith 1112 East Summit St Crown Point, Indiana 46307 Submitted by: Michael Brough Print Name Scope of Work to be Performed (Attach scops/schedule If you need additional space) Trucking & Hauling Debris to and from site —Goals should be calcu Version 07119/2023 Contractors Bid for Public Works - 10 on the Base Bid only.**" WBE Goal: 4.6% Page_2_of_ _ Ddiar Amount of WBE Percentage of Tatal Component SNIP, osal $150,000.00 33% 11-27-23 Date CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN :t : _ : • .,,. FORM MBE-2.0 : ;r _ w✓f': EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number. 123-068 Date: 11-27-23 Project Name: 2023 Residential Demolitions Bidder Green D moll ion Contractors, Inc. Contact Person: Michael Brough Telephone: 219-379-5311 Address: 315 Brighton St Suite 1 city: LaPorte state: Indiana zip: 46360 Email: estimating(a)g reendemolition inc.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below`: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST($): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2)the list of certified MWBEs provided by the City; and 3)the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: ht o-Mvww.in oov/idoak GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The blddershall Initial each Item below, as evidence of Its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website MB (http:Jwww.in.govfidoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into M B economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available M B means the Interest of all MBEs In the scopes of work of the contract I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform MB MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed MR sufficient time for M BEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs In good faith, Including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist Interested MBEs in obtaining bonding, lines of credit, or Insurance as required by the City or the bidder, where appropriate. Version 07/1912023 Contractor's Bid for Public Works -11 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good Faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. M CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. -Proper oemonstratlon of Goocl Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 0711912023 Contractor's Bid for Public Works -12 THE CINCINNATI INSURANCE COMPANY CONTRACTOR (Name, legal status and address): Green Demolition Contractors, Inc. 315 Brighton St, Suite 1 La Porte, IN 46350 OWNER (Name, legal status and address): City of South Bend Indiana - Board of Public Works 227 Jefferson Blvd - County -City Building Room 1316 South Bend, IN 46601 BOND AMOUNT: 5% of Total Bid Amount SURETY (Name, legal status and principal place of business): THE CINCINNATI INSURANCE COMPANY 6200 S. GILMORE ROAD FAIRFIELD, OHIO 45014-5141 This document has important legal consequences, Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. PROJECT (Name, location or address, and Project number, if any): Full Building Wrecks - 2023 Residential Demolitions - Various Project Number, if any: Properties. 123-068 The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond the sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirements shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this day of / v 112!Ag13fil Green Demotj'lpn Contractors, Inc. (Principe (Seal) 'itness '' (Title) Michael Br gh - President THE CINCINNATI INSURANCE COMPANY (Surety) -.+* • (Sealy David S. Parrilli - Attorney -in -Fact The Company executing this bond vouches that this documentconforms to American Institute of Architects Docurr=t A310, 2010 Edition. S-2000-AIA (11/10) PUBLIC THE CINCINNATI INSURANCE COMPANY THE CINCINNATI CASUALTY COMPANY Fairfield, Ohio POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY and THE CINCINNATI CASUALTY COMPANY, corporations organized under the laws of the State of Ohio, and having their principal offices in the City of Fairfield, Ohio (herein collectively called the "Companies"), do hereby constitute and appoint David L. Jennings; Amy C. Homer; Donald Petterson; Philip C. Reimer; Susan M. Preissing; Robert H. Walker; Doug O'Neill; George F. Manikas, Jr. and/or David S. Parrilli of Chicago, Illinois their true and legal Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and deliver on behalf of the Companies as Surety, any and all bonds, policies, undertakings or other like instruments, as follows: Any such obligations in the United States, up to Twenty Million and No/100 Dollars ($20,000,000.00). This appointment is made under and by authority of the following resolutions adopted by the Boards of Directors of The Cincinnati Insurance Company and The Cincinnati Casualty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the President or any Vice President be hereby authorized, and empowered to appoint Attorneys -in -Fact of the Company to execute any and all bonds, policies, undertakings, or other like instruments on behalf of the Corporation, and may authorize any officer or any such Attorney -in -Fact to affix the corporate seal; and may with or without cause modify or revoke any such appointment or authority. Any such writings so executed by such Attorneys -in -Fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company. RESOLVED, that the signature of the President or a Vice President and the seal of the Company may be affixed by facsimile on any power of attorney granted, and the signature of the Secretary and the Seal of the Company may be affixed by facsimile to any certificate of any such power and any such power of certificate bearing such facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed and certified by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue to be valid and binding on the Company. IN WITNESS WHEREOF, the Companies have caused these presents to be sealed with their corporate seals, duly attested by their President or a Senior Vice President this 19th day of December, 2018. ee STATE OF OHIO )SS: COUNTY OF BUTLER ) THE CINCINNATI INSURANCE COMPANY THE CINCINNATI CASUALTY COMPANY On this 19th day of December, 2018 before me came the above -named President or Vice President of The Cincinnati Insurance Com- pany and The Cincinnati Casualty Company, to me personally known to be the officer described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of said Companies and the corporate seals and the signature of the officer were duly affixed and subscribed to said instrument by the authority and direction of said corporations. °,.•�PRIAL SF �•'9lE of �..• Keith C�tt, Attorney at Law Notary Public — State of Ohio My commission has no expiration date. Section 147.03 O.R.C. I, the undersigned Secretary or Assistant Secretary of The Cincinnati Insurance Company and The Cincinnati Casualty Company, hereby certify that the above is the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Power of Attorney is still in full force and effect. Given under my hand and seal of said Companies at Fairfield, Ohio, this J?2"Ic day of (00 BN-1457 (4/19) "pile green c f�l tit PART If GREEN DEMOLITION CONTRACTORS, INC. 315 BRIGHTON ST, SUITE I LAPORTE, IN 46350 312-409-4771 PRE -QUALIFICATION CHECKLIST (b) Attachments (i) See attached State of Indiana Business ID/ Status, Certif cote of Organization, and St Joseph Countyl City of South Bend Demolition Contractor registration. (R) NIA — No former business names. (iii) NIA — No violation of Federal, State or Local Laws. (iv) Green Demolition Contractors has the capability to staff this project as necessary from project start to project completion. Green Demolition has a full-time staff of approximately 25 full-time employees with the ability to pull additional resources from the Local Unions we are signatory to. (v) Green Demolition Contractors intends to utilize its full-time staff and will be compliant with Federal, State and Local Laws. If additional labor is necessary to meet the scheduled project completion, Green Demolition can hire additional labor from the local Union from which we are signatory. (vi) Green Demolition is signatory to both the Laborers and Operators Unions. Employees participate in the Union apprenticeship programs (See Attached). (vii) A copy of the Green Demolition employee drug/ alcohol policy is included in this submission. (viii) Attached is a letter from our approved Surety Company noting applicable ratings. (ix) r) Green Demolition Contractors is not delinquent currently on any Federal, State or Local Taxes nor has it been in the past three years. Please see list included in Section i — Experience Questionnaire. Recycling Today For A Greener Tomorrow State of Indiana Office of the Secretary of State CERTIFICATE OF ORCIANIZATION Of GREEN DEMOLITION CONTRACTORS INCORPORATED I. Connie Lawson. Secretary of State of Indiana, hereby certify that Articles of 01�anization of the above Domestic Limited Liability Company (LLC) has been presented to me at my office, accompanied by the fees prescribed by lass- and that the documentation presented conforms to la«- as prescribed by the pro-%islons of the Indiana Business Flexibility Act. NOW, THEREFORE. with this document I certify that said transaction will become effect-Ve Thursday, .tune 11. 2015 In Witness Whereof, I have caused to be affixed illy si_gnature and the seal of the State of Indiana, at the Cit4 of Indianapolis. Tune 11, 2015 C-ONNIE LAWSON, SECRETARY OF STATE 201506110017711015061100177 Mgvwmxm J.ox SI xo]LLVMIE)U sm OtSZ�bZ-6TZ OSM NI `AModVi i 31inS 1S NQl.H91ilB 5T£ aauotssLmmo0 guiPlEng ' -- saeaep �Cpasg b oa �8 dnunusr :SMdX'3 NIOLMUSIM SHU JoIOe quop uolmlowea `QN HH Hd f OS tip AJJ3 a ue use � P �.LNII00 Hd'riSor 'ZS � �$ Pa;�TodToau�un aTp ut a� Q'32 USIA Aq�q sc squap ojaZ Pup gnt[oa and u paapunH aup;o ums aT Iua edo Piing gillo} pied �fep stgl gurnsq *3HI `3Zio.L'JV2i. -KCK) Ait?Uno7A a mmmf) `SVMHM Sam `aahm h'AiW(W `aNRR HMOS Ao AJJI0 aWA.LMOD HdHSOr •.LS oo•SZI$ NOI WHISIJaw _ K-868b '4N Business Details Business Name: GREEN DEMOLITION CONTRACTORS INCORPORATED Entity Type: Domestic Limited Liability Company Creation Date: 06/11/2015 Principal Office Address: USBrighten St Suite 1, LaPorte, IN, 46360, Jurisdiction of Formation: Indiana Governing Person Information Title Name President Michael Brough i Registered Agent Information BUSINESS INFORMATION DIEGO MORALES INDIANA SECRETARY OF STATE 05/22/2023 01:06 PM Business ID: 201N61100177 Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due 06/30/2025 Date: Years Due: Address 315 Brighton St Suite 1, La Porte, IN, 46350, USA Type: Individual Name: MICHAEL BROUGH Address: 315 Brighton St Suite 1, La Porte, IN, 46350, USA 4MpLqgF sub 4-JL IF �' isfrrxc Gala 264ftwlp-l�e. 4?"As 41-e��� ,J�e�isfereoras prrrf of 'fie �fiana�✓�pprertfices�itp �,a��-gym rn a�car�arice wif�i fie 6'asic sfarad� o�`a�nprenfices�rp ssfs6lrsfaed6 fie cSecrefar� o Co-,,� &ad a 192_ 2'"'yREW80 August 13, 2W4 I nimano i 0 e o , - kt� Own afh;Tr�ldru* lur4fttbx vier mt� Pk=oswl&w a�.r�vr�li�s�� Jegrsfered �as�arf o�'ecrfranr�f�v�drefr�es.rp �ro ram .rn accol'��ce ir�i�f�e �gsrC sf¢rsorctr� o/� 3p 1"enfic l° p�r, Bsf¢Dll�e0�6y f�6 1..�6G`l'�fQ! t� Of�7dOQd` .a • !�'! 5 r200EZ /,� \moo S9fClf� � ?^may •'' '{ �i�� 1L.092020003�,� J, O � O - W tya rIlk, nub TIAMAubbw no &A%his #1so aj &?mow* h, acvO^'/-amoo mrACACw.s�exnd of�P h''c�s. rp Nar�eMcd e9, 6, ..ZOo2 . N - F V Ao 1 a .a 11/14/2014 08:21 FAX 00002/0004 INTERNATIONAL UNION OF OPERATING EN'GINEERS LOCAL UNION NO. 180, 1508, IBOA, 180C, IOWA, 180% t806, ISom AFFR WN D Wf►R TRL A.F".L& AND WHAAM TRAM 08PAMMEW JAMES M. SWEENEY PREDMX 49US 4M MAhK"Pt November 14, 2014 Green Demolition Contractors, Inc. 1427 W Dickens Ave Suite 200 Chicago, IL 60614 Re: Proof of Compliance with 30 ILCS 500/30-22(6) Our File No. MI-00321 Dar Sir or Madam: 0M AIMIGN • FAX (70W 4W-7Pj8@ GM JOU91 ROAD COIINIUVWK LL 00629+9 " At the request of Green Demolition Contractors, Inc., I am providing you with evidence ofthe Campany's compliance with the apprenticeship requirements in 30 ILCS 500/30- 22(6) of the Illinois Procurement Code. I am submitting this letter along with apprenticeship certificates (Nos.IL012020003 and UMS780173). As a signatory contractor with the International Union of Operating Engineers, Local 150, AFL CIO, Brothers Green Demolition Contractors, Inc., is required by Collective Bargaining Agreement to participate in an applicable apprenticeship and training program approved by and registered with the United States Department of Labor's Bureau of Apprenticeship and Training. The attached certificates are evidence of compliance with the U.S. Department of Labor's apprenticeship requirements. Thank you for your cooperation in this matter. If you have any questions or concerns, please do not hesitate to contact me. Very truly yours, IUOE, Local 150, AFL-CIO District I dispatch office P0-t4-"- 4 Pauline L• eitzall PUag Enclosures: Certificates ,�j�j�f GREEN DEMOLITION CONTRACTORS, INC. *� �t� 315 BRIGHTON ST. SUITE j�`�S, LAPORTE, IN 46350 312-409-4771 Employee Drug/ Alcohol Polic�r: The past success and future growth of Green Demolition Contractors are a direct result of our most important asset: Our people. Consequently, Green Demolition Contractors is concerned about the use of alcohol, illegal drugs, or controlled substances as it affects the workplace. Use of these substances, whether on or off the job, can adversely affect an employee's work performance, efficiency, safety and health, and may therefore seriously impair his or her value to the Company. In addition, the use or possession of these substances on the job constitutes a potential danger to the welfare and safety of other employees and exposes the company to risks of property loss or damage, or injury to other people. Green Demolition Contractors has a vital interest in maintaining safe and efficient working conditions for its employees and ensuring that all the company vehicles are properly maintained and operated in a safe manner. Furthermore, the use of prescription drugs and/or over-the-counter drugs may affect an employee's job performance and seriously impair the employee's value to the company. Any employee who is using prescription and/or over-the-counter drugs that may impair the employee's ability to safely perform the job, or affect the safety or well-being of others, should not report for work during the time the employee is using the medication. You may be required to provide a doctor's note validating your need for time off due to the use of medication which interferes with your ability to safely perform your duties. The employee should use any accrued vacation or sick leave during this time period. If the employee does not have accrued leave, the employee should discuss their need for time off with their supervisor or Human Resources to determine if alternative accommodation can be provided. Proper use of prescription drugs directly prescribed to the employee is exempt from these restrictions so long as the employee is complying with physician orders and does not create a safety hazard for the employee or his/her co-workers. Contact Green Demolition Contractors Human Resources Department when an employee has been prescribed drugs from a complying physician. The following rules and standards of conduct apply to all employees either on the company property (owned or leased or off premises job site) or during the workday (including meals and rest periods). The following are strictly prohibited by the company; however, this section does not apply to the Lqgal use of prescription drugs. 1. Possession or use of alcohol or being under the influence of alcohol while on the job. Recycling Today For A Greener Tomorrow 2. Driving a company vehicle while under the influence of alcohol or a controlled substance. 3. Distribution, sale, or purchase of an illegal or controlled substance. 4. Possession or use of an illegal or controlled substance or being under the influence of an illegal or controlled substance while on the job. The following items at a minimum shall always be applicable and enforceable. 1. Drug Testing: a. Each employee, as a condition of employment, may be required to participate in pre -employment, reasonable suspicion, project specific and follow-up testing upon selection or request of management. Any employee who refuses to submit to drug or alcohol testing requested by management will be subject to disciplinary action, up to and including immediate termination. Altered samples, substituted samples and negative dilutes constitute employee failure to cooperate with a management investigation in violation of Green Demolition Contractors business conduct policy. Any employee submitting such a sample will be subject to disciplinary action, up to and including immediate termination. b. Drug or alcohol testing required or requested by the company will be conducted at the company expense. Testing for the presence of alcohol will be conducted by analysis of breath and or cognitive function. Testing for the presence of the metabolites of drugs will be conducted by the analysis of urine. c. To ensure the accuracy and fairness of our testing program, all testing will be conducted according to DHHS/SAMHSA guidelines where applicable and will include a screening test; a confirmation test; the opportunity for a split sample; review by a Medical Review Officer, including the opportunity for employees who test positive to provide a legitimate medical explanation, such as a physician's prescription, for the positive result; and a documented chain of custody. 2. Testing Based on Reasonable Suspicion: a. Employees may be referred by a supervisor to a company -approved physician or medical group for evaluation when a supervisor has reason to believe that the employee is intoxicated or using controlled substances or other illegal drugs during work hours or at a time which may affect job performance or safety. Evidence of such behavior may include, but is not limited to: I. Slurred speech 2. Uneven gait 3. Mood swings 4. Violent temper 5. Excessive absenteeism/ tardiness 3. Employee Consent to Release Chemical Analysis: a. When the Company requires an employee to submit body fluids for chemical analysis, the employee must sign an employee consent form authorizing the results to be forwarded to Green Demolition Contractors HR Representative. An employee who refuses to submit body fluid samples upon request of the company or who refuses to execute the employee consent form has failed to cooperate with a management investigation in violation of the company business conduct policy. Such conduct will subject the employee to disciplinary action, up to and including immediate termination of employment. 4. Confidentiality of Test Results: a. Test results of the chemical analysis of body fluids for substance abuse will be kept confidential in the same manner that all other confidential personnel records and confidential medical records are kept. Upon written request, the employee will be furnished with a copy of his or her substance abuse test results. 5. Analysis of Test Results a. Being under the influence of drugs or alcohol on the job or during work hours will be presumed by Green Demolition Contractors to pose a serious safety and health risk. Additionally, any use of alcohol or drugs during non -work time which results in a positive test of the employee during work hours may result in a similar presumption that the use of the drugs or alcohol poses serious safety and health risks. b. Positive Test a. Green Demolition Contractors reserves the right to impose discipline, up to and including immediate termination of employment, upon any employee who tests positive. Green Demolition Contractors reserves the right to require, as a condition of reinstatement and continued employment, completion of an approved rehabilitation program, at the employee's expense, which shall include but not be limited to: 1. A period of inpatient care 2. A return -to -work test prior to reinstatement 3. Follow-up testing at intervals as specified by Green Demolition Contractors HR Representative **Any employee testing positive during or after a rehabilitation program will be subject to immediate termination. Violation of the above rules and standards of conduct will not be tolerated and may result in immediate termination of employment. Green Demolition Contractors reserves the right to bring the matter to the attention of appropriate law enforcement authorities. Employee Signature Supervisor/ Witness Signature Date Date ♦�i1�I green :. PART 11 GREEN DEMOLITION CONTRACTORS, INC. 315 BRIGHTON ST, SUITE I LAPORTE, IN 46350 312-409-4771 SECTION I EXPERIENCE QUESTIONNAIRE #1 See Attached Documentation #2 See Attached Documentation #3 Green Demolition Contractors, Incorporated has not failed to complete any projects bid or awarded to the company. #4 See Attached Reference List SECTION 11 PLAN AND E'.: UIPMENT UESTIONNAIRE # 1 Green Demolition Contractors Incorporated will mobilize at the site and perform inspections. We will confirm utilities are disconnected, abatement is complete (►f applicable), and the building is free of pedestrians. Temporary protection measures will be placed at and around the affected project site. Demolition will progress on each structure from high to low. We will salvage and recycle materials to meet specificationslqualifications and load out debris. Concrete and brick will be demolished and loaded out We will backfrll all below grade removals and compact as required. Once complete, black dirt will be delivered, spread and site seeded. #2 Son Corporation (Trucking/ Hauling/ WBE) 1112 E Summit Crown Point, IN 46307 Kennedy Expresslinel Trucks R Us (Trucking/ Haulingl MBE) 2300 IN-23 South Bend, iN 46601 Safe Environmental (Abatement) 10030 Express Dr. Highland, iN 46322 Prairie View Landfill 15505 Shively Rd. Wyatt, IN 46595 Recycling Today For A Greener Tomorrow GREEN DEMOLITION CONTRACTORS, INC. i' �7 _ 315 BRIGHTON ST, SUITE I LAPORTE, IN 46350 312-409-4771 #3 A list of subcontractors will be provided upon contract award #4 See attached equipment list. #5 We have not issued any contracts for this project however we have received pricing/ rates substantiating pricing contained within the bid amount. Contracts will not be issued until after the contract has been awarded. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Green Demolition Contractor's financial statement is included. We respect fully request this information provided with the bid be shared only with those parties within the City of South Send Indiana. if possible, please do not post Green Demolition Financial Statement/ Information to the general public. Recycling Today For A Greener Tomorrow �l GREEN DEMOLITION CONTRACTORS, INC. gren -^ 315 BRIGHTON ST, SUITE I � LAPORTE, IN 46350 312-409-4771 SECTION 1 EXPERIENCE QUESTIONNAIRE #1 - Previously Completed Projects Northern Indiana Commuter Transportation District (NICTD) 333 East US Highway 12 Chesterton, Indiana Mr. Jeff Decker 219-926-5744 Double Track Northwest Indiana Project Contract I Double Track Northwest Indiana Project Contract 2 $1,709,712.00 $ 898,165.00 Wreck and remove various residential and commercial properties, backfill and restore site. Tonn & Blank Construction 1623 Greenwood Avenue Michigan City, IN 46360 219-878-6289 Mr. Curt Cipares Franciscan Health Hospital Michigan City $2,14S, 745.00 Wreck and removal of an existing six story 500,000 sf operational hospital building including tower. Self -perform on site concrete crushing/recycling, reduced and repurposed to be used as suitable compacted backfill material for site. Manage front end of demolition project i.e., coordination of all utility disconnects, environmental remediation, etc. Perform all HSMS removals. Dismantle existing 8 story building from portion of operational hospital to remain. Wreck and remove approx. 300,000 sf of remaining building. 90% of demolition debris recycled throughout the process all remaining debris hauled off site. Backfill and restore site. Vision Construction & Consulting 1733 N. 33'd Stone Park, Illinois 60165 Mr. Mark Weiner 708-488-1926 J. Morton Sterling SD 201 High School Knowledge Center $3,570,7SS.00 Interior selective and exterior wreck removals of an existing high school building. Perform interior demolition throughout the entire high school. Work was performed during off hours weekends, Recycling Today For A Greener Tomorrow holidays, summer vacations and at times during normal school hours while students were present GDC performed extensive structural demolition and shoring on an as needed basis on this 130-year-old school. City of South Bend Indiana 1316 County -City Bldg. Rm. 1316 South Bend, Indiana 46601 Mr. Toy Villa 574-235-5920 Demolition of 103 Abandoned Properties $1,609,090.00 Wreck and remove complete with grading and seeding of 103 properties. Wight Co. 2500 Frontage Road Darien, Illinois 60156 630-969-7000 Downers Grove SD 99 Architectural Renovations $1,096,964.00 Architectural/Structural removal of existing auditorium. Performed heavy structural demolition for the removal of an existing auditorium that was built into the school bldg on three elevations. Extensive dismantling and shoring took place to ensure the school and children were not affected throughout the course of the school day. Provided selective and structural demolition throughout the school. Brown & Momen, Inc. 823 E. Drexel Square Chicago, IL 60615 Mr. David Clark 312-788-0770 Marshall Field Garden Apartments Building S $1,744.000.00 Interior selective removals of all finishes on multi -story level HUD building. Osman Construction 70 West Seegers Road Arlington Heights, Illinois 60005 847-593-2705 Mr. Tim Silvetti Rodeway Inn Hotel Skokie Illinois $863,425.000 Complete wreck and removal of 4 story hotel, pool, restaurant, parking deck, including site restoration. Doherty Construction 163 N. Valley Hill Road Woodstock, Illinois 60098 Mr. Vern Anderson 815-334-8500 West Leyden High School $ 719,37S.000 Wreck and removed portions of school building including selective interior demolition. Cook County Land Bank Authority 69 W. Washington Suite 2938 Chicago, IL 60602 Mr. Mustafaa Saleh 312-603-8015 $ 925,000.000 Open ended contract ongoing through the depletion of grants/funds. Projects consisted of demolition of abandoned/vacant homes throughout Chicago and Cook County. City of Chicago/Wight Co. 2500 North Frontage Road Darien, IL 60561 Dennis Podzimek 630-918-9428 City Hall Space Consolidation/Mayor's Floor $1,498,800.00 Multi -level project consisting of selective demolition totaling 100,000 sf of area. Worked in strict adherence with municipal building security requirements. Rockford Construction Grand Rapids, MI 49508 Brock Burgess 616-437-4226 LaPorte, In Meijer Store $ 787,000.00 Complete 1009/o gut/re-habilitation project of an existing big box facility consisting of ceiling, drywall partitions, storefronts/facades, flooring, concrete and M.E.P. removals. Project also consisted of partial building wreck. Tonn & Blank Construction LLC 1623 Greenwood Ave. Michigan City, IN 46360 Joel Gonzales 219 877-8174 Uptown Artist Lofts Michigan City, IN $ 611,086.00 Interior selective demolition, abatement and structural removals in a multi -level facility. Barton Malow Company 150 N Upper Wacker Dr #1650 Chicago, IL 60606 Brian Courtney 312-281-0821 Argonne National Laboratory $ 212,000.00 Argonne National Lab - Materials Engineering Building 370 Building 360 Expansion Wreck/removals within building 370 adjacent to an ongoing phosphorous experiment working in direct conjunction with electric, communications systems, sprinkler systems, natural gas & steam while performing lead and asbestos abatement. Building wreck within 10 ft of a linear accelerator without service interruptions to the electric, water sewer natural gas, steam or comm. systems. ,�`�/j0 GREEN DEMOLITION CONTRACTORS, INC. greener !• 315 BRIGHTON ST. SUITE I "j` LAPORTE, IN 46350 312-409-4771 SECTION 1 EXPERIENCE QUESTIONNAIRE #2 - Currently Active Projects City of Peoria Land Development Manager City of Peoria I Community Development Department Mr. Matt Smith mjsmith@peoriagov.org Harrison School Full Wreck Peoria, IL $1,1 S6,000.00 Wreck and complete removal of the existing Harrison School including abatement of existing ACM's. The existing school consists of concrete, brick, block, and steel construction totaling approximately 135,000 sqft. This project will consist of Green Demolition managing the front end of the project confirming utility disconnects have been completed, monitoring environmental remediation efforts, and ensuring proper site security and protection including perimeter site fencing. Approximately 75%-85% of the total building debris including site concrete and asphalt paving will be recycled or re -purposed for further use. This building is surrounded by a residential neighborhood on one side, residential apartments on another plus an occupied school across the street, all requiring strict adherence to silica exposure. O'Shea Builders 3401 Constitution Drive Springfield, IL 62711 Mr. Steve Ludwig 217-522-2826 Lanphler High School Full Wreck - Peoria, 1L $1,388,000.00 Wreck and removal of selected portions of the current occupied Lanphier High School. Communication and adherence to project schedule have been critical on this project to ensure project timelines are being met all while keeping building occupants safe during demolition activities. The existing school consists of concrete, brick, block, and steel construction totaling approximately 155,000 sgft. This project requires careful coordination with the Construction Manager and all trades due to portions of the existing building remaining and detaching of demolished portions of building. Recycling Today For A Greener Tomorrow City of Peoria Land Development Manager City of Peoria I Community Development Department Mr. Matt Smith mjsmith@peoriagov.org McKinley School Full Wreck— Peoria, IL $943,700.00 The wreck and removal of the existing McKinly School including abatement of existing ACM's. The existing school consists of concrete, brick, block, and steel construction totaling approximately 65,000 sgft. This ongoing project consists of Green Demolition managing the front end of the project confirming utility disconnects have been completed, monitoring environmental remediation efforts, and ensuring proper site security and protection including perimeter site fencing. Approximately 75%-85% of the total building debris including site concrete and asphalt paving will be recycled or re -purposed for further use. This building is surrounded by a residential neighborhood requiring strict adherence to silica exposure. 315 Brighton, LLC 315 Brighton Street La Porte, IN 46350 Janet Dommer 219-242-2570 Industrial Building - La Porte, IN $1,186,000.00 Wreck and removal of selected portions of the existing industrial building that was damaged or destroyed by a building fire. The existing building consists of concrete, brick, block, and steel construction totaling approximately 125,000 sgft This project requires careful attention and demolition expertise to ensure structurally compromised portions of the building are safely removed to avoid full building collapse. City of Springfield Springfield, IL 62701 David Whitworth, P.E. 217-789-2255 Ext. 5227 Demolition of Existing 6-Story Concrete Parking Structure — Springfield, 1L $786,180.00 Wreck and complete removal of the existing 6 — story concrete parking structure closed due to structural integrity issues. The existing building consists mainly of concrete and steel construction totaling approximately 200,000 sgft. This project required careful attention and demolition expertise to ensure structurally compromised portions of the structure are safely removed to avoid full building collapse. This parking structure was between two existing occupied structures separated by a matter of inches both scheduled to remain and not being disturbed. Two major roadways just feet away added additional complexity to ensure the structure was brought down to grade safely and avoiding damage to passing motorists and pedestrians. 1* GREEN DEMOLITION CONTRACTORS, INC. r 315 BRIGHTON ST. SUITE I green i LAPORTE, IN 46350 i 1 312-409-4771 SECTION I EXPERIENCE QUESTIONNAIRE #1 —Private Firm References Amereco Engineering 54 Michigan Avenue Valparaiso, Indiana 46383 Mr. Zack Heine / Mr. John Blosky 219-531-0531 CR Realty Advisors 325 West Huron Chicago, II 60654 Mr. Josh Nadolna Cell: 847.721.7906 Office: 312-332-7100 Brown & Momen, Inc. 823 East Drexel Square Chicago, IL 60615 Mr. David Clark dclark9050@gmail.com Sterling Renaissance 430 East Illinois Rte 22 Lake Zurich, Illinois 60047 Mr. Bruce Sterling 847-307-4400 ext 223 Recycling Today For A Greener Tomorrow `� GREEN DEMOLITION CONTRACTORS, INC. r�en „�fj a-315 BRIGHTON ST. SUITE I 00 � /;�`�LAPORTE, IN 46350 312-409-4771 Section 11 Equipment List Qty Description 2 Link Belt 145 Excavators 2 Link Belt 350 Excavators I Link Belt High -Reach Excavator I Cat 963 Track Loader 2 Cat 950 End Loaders I Cat D-5 Dozer 2 330 Excavators Caterpillar 2 320 Excavators Caterpillar 2 Mini Excavators 28 Skid steer Bobcats 8 Excavator Hammers 8 Excavator Grapples 8 Overseas Containers Converted for Roll Off Trucks 4 65 Yard Roll Off Boxes 4 40 Yard Roll Off Boxes 8 30 Yard Roll Off Boxes 6 20 Yard Roll Off Boxes I Flat Deck for Roll Off w/ Built In Wench 1 20 Ton Flat Deck Trailer I 10 Ton Flat Deck Trailer I Bobcat Tag Trailer I Tilt Deck Trailer I Flat Deck Single Axel I Ingersoll Rand Mason Lull 2 Lull Conversion Brackets 1 350 Excavator Wrecking Pole 8 Wrecking Poles 2 2018 Kenilworth Tractor Trailers 2 2020 Ford One Ton Dually Dump Trucks 2 2005 Mack Tractors 2 2006 Mack Six Wheeler Roll Off Trucks Bobcat Hammers, buckets and various attachments for Excavators and Bobcats I Low Boy Trailer 2 2011 Galbreath Semi Roll Off Trailers 2 Terminators 3 Atlas Capco 185 Air Compressors 2 Ingersoll Rand 250 Air Compressors 10 Cargo Trailers 2 Water Trailers Equipment-,,.. nd tools. listed above are free of encumbrances, none of the above listed items are leased, all equipment is owned by Michha�e�l �,ugh, President Green Demolition Contractors, Inc. Michael Br. gh, President Recycling Today For A Greener Tomorrow '—�' 1 The Cincinnati insurance Company ■ The Cincinnati Indemnity Company - C k The Cincinnati Casualty Company ■ The Cincinnati Specialty Underwriters Insurance Company IN C I N NATI The Cincinnati Life Insurance Company INSURANCE COMPANIES November 27, 2023 RE: Green Demolition Contractors Inc. — Bonding Capacity To Whom It May Concern: The Cincinnati Insurance Company (AM Best Rating of A+XV) provides surety bonding credit to Green Demolition Contractors Inc. They are one of our finest accounts and we highly recommend them. We currently have $5,000,000 single job/$10,000,000 aggregate bond program available for this firm. Should a situation merit, we would consider requests beyond these parameters as well. Any specific request for bonds will be underwritten on its own merits and any arrangement for bonds required by any contract is a matter between Green Demolition Contractors Inc. and the surety and we assume no liability to you or your third parties, if for any reason we do not execute these bonds. Feel free to contact us with any questions you may have. Sincerely, r- Natalie Koster Attorney -in -Fact Field Director Surety Natalie—Koster@cinfin. corn Mailing Address: P.O. Box 145496 • Cincinnati, Ohio 45250-5496 ■ Headquarters: 6200 S. Gilmore Road • Fairfield, Ohio 45014-5141 cinfin.com ■ 513-870-2000 green Demo Contractor: Green Demolition Inc. 315 Brighton Street Ste 1 LaPorte, IN 46350 Project: 2023 Residential Demolitions City of South Bend Project No. 123-068 Demolition and Abatement Project Approach 1. Project Team and Staffing: • Michael Brough- President • Carlos Benegas-Job Foreman • Charles Eich ! H-Senior Estimator 2.Organizational Chart: • Mike Brough — Project Superintendent • Carlos Benegas — Job Foreman • Charles Eich III -Senior Estimator 11/27/2023 3.Responsibilities, durations, and Commitment percentages • Mike Brough —Project Superintendent, 100% Commitment • Carlos Benegas — Job Foreman, 100% Commitment • Charles Eich III— Senior Estimator, 100% Commitment Green Demolition Contractors, Inc. 315 Brighton St, Suite 1, LaPorte IN 46350 1 219-379-5311 1 greendemolitioninc.com tixIit greenDemo lam! #,, nrwWqW&yJwagreenerto=n= 4. Milestone Schedule: To Be Determined 5. Project Approach: Subcontracted Work: Asbestos Abatement, Universal Wastes, and Refrigerant -Recovery will be performed by subcontractors. Compaction testing will be performed by a third -party testing agent for backfilling of voids. All other work will be self -performed. On -Line Software: i An On -Line software programs will be utilized for construction documentation and a project management tool. Safety: A site specific Hazardous, Health and Safety Plan will be Provided prior to start of work. • Green Demolition and subcontractors will perform their work in a safe manner in accordance with OSHA rules, regulations, and guidelines. • Change management: • All changes will be presented to the Owner and Owner's Rep. in writing for approval, prior to proceeding with any requested change order work. Quality Control: • A third -parry engineer will be utilized for compaction testing of backfilling of void. Scheduling: • Day-to-day planned scheduling will be discussed with the owners' rep on a daily bases. Green Demolition Contractors, Inc. 315 Brighton St, Suite 1, LaPorte IN 46350 1 219-379-5311 1 greendemolitioninc.com greenDemo IZXN recycli W to&OW aWw" t MMMV Clean Up Procedures: Green Demolition and their subcontractors will clean up debris daily to maintain a clean, tidy work area at the end of each shift. Green Demolition will also conduct street cleaning as needed to maintain clear roads from truck traffic. Punch lists: • At the end of or near the end of completing Green Demolition's contract work, a Punch List will be prepared by Owner's Rep. and Green Demolition. Upon review and mutual agreement of the punch Green Demolition will diligently work on rectifying or completing the list of items. Close Process: Upon completing project scope of work and punch list items to owners representative's satisfaction. Green Demolition's Superintendent will process final billing and close out documents with Green Demolition's accounting personnel. Green Demolition Contractors, Inc. 315 Brighton St, Suite 1, LaPorte IN 46350 1 219-379-5311 1 greendemolitioninc.com REVIEW REPORT FOR THE YEAR ENDED DECEMBER 31, 2022 Selden Fox Accounting for your future Green Demolition Contractors, Inc. Review Report For the Year Ended December 31, 2022 Table of Contents Independent Accountant's Review Report 1-2 Financial Statements: Balance Sheet 3 Statement of Operations 4 Statement of Stockholder's Equity g Statement of Cash Flows g Notes to the Financial Statements 7 - 17 Supplementary Information: Schedule of Cost of Contract Revenues Earned 18 Schedule of Operating Expenses 19 VS IN "Pt T"i W-w Accounting for your future 619 Enterprise Drive € Oak Brook, Illinois 60523 1 www.seldentox.com p 630.954.1400 r f 630.954.1327 ? email c_ seldenfox.com INDEPENDENT ACCOUNTANT'S REVIEW REPORT Mr. Michael Brough Green Demolition Contractors, Inc. Chicago, Illinois We have reviewed the accompanying financial statements of Green Demolition Contractors, Inc., which comprise the balance sheet as of December, 31, 2022, and the related statements of operation, stockholder's equity and cash flows for the year then ended, and the related notes to the financial statements. A review includes primarily applying analytical procedures to management's financial data and making inquiries of company management. A review is substantially less in scope than an audit, the objective of which is the expression of an opinion regarding the financial statements as a whole. Accordingly, we do not express such an opinion. Management's Responsibility for the Financial Statements Management is responsible for the preparation and fair presentation of these financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement whether due to fraud or error. Accountant's Responsibility Our responsibility is to conduct the review engagement in accordance with Statements on Standards for Accounting and Review Services promulgated by the Accounting and Review Services Committee of the AICPA. Those standards require us to perform procedures to obtain limited assurance as a basis of reporting whether we are aware of any material modifications that should be made to the financial statements for them to be in accordance with accounting principles generally accepted in the United States of America. We believe that the results of our procedures provide a reasonable basis for our conclusion. We are required to be independent of Green Demolition Contractors, Inc. and to meet our other ethical responsibilities, in accordance with the relevant ethical requirements related to our review. Accountant's Conclusion Based on our review, we are not aware of any material modifications that should be made to the accompanying financial statements in order for them to be in accordance with accounting principles generally accepted in the United States of America. A,,—W, of mgiworldwide Supplementary Information The accompanying schedule of cost of contract revenues earned and schedule of operating expenses are presented for purposes of additional analysis and are not a required part of the basic financial statements. The supplementary information is the responsibility of management and was derived from, and relates directly to, the underlying accounting and other records used to prepare the financial statements. The supplementary information has been subjected to the review procedures applied in our review of the basic financial statements. We are not aware of any material modifications that should be made to the supplementary information. We have not audited the supplementary information and do not express an opinion on such information. &9AO Ck,c, Alk. September 27, 2023 -2-