Loading...
HomeMy WebLinkAbout5B1 Budget Request (Market District Planning - REDA) Redevelopment Commission Agenda Item DATE: 11/20/2023 FROM: Leslie Biek, PE, Assistant City Engineer Jitin Kain, Deputy Public Works Director SUBJECT: Budget Request – Market District Planning Contract Funding Source* (circle one) River West; River East; South Side; Douglas Road; West Washington; RDC General *Funds are subject to the City Controller's determination of availability; if funds are unavailable, as solely determined by the City Controller, then the authorization of the expenditure of such funds shall be void and of no effect. Purpose of Request: Budget request for $600,000 out of River East Development Area TIF for the City’s share of the RAISE Grant for Market District Planning and Preliminary Services Last year, the City received the RAISE grant for the planning and preliminary engineering services for projects aimed at the removal of the freeway-like ramps and the introduction of interconnected multimodal streets in the Market District Area as outlined in the South Bend Market District Study done in 2022. The City has selected American Structurepoint based on proposals received for the project. The scope includes planning, survey, preliminary environmental, and preliminary engineering for priority projects in the district. _________________________Pres/V-Pres ATTEST: __________________Secretary Date: ____________________ APPROVED Not Approved SOUTH BEND REDEVELOPMENT COMMISSION Page | 2 Project segments based on conceptual redesign of streets in the neighborhood. Source: South Bend Market District Study ID Project Name ID Project Name 01 Eddy Street - East 5A Roundabout 1A Eddy Street East Ramp Removals 06 Northside Boulevard - South 1B Jefferson MS Bumpout 07 Belmont Ave Extended 1C Jefferson MS Park 08 Beyer Street 02 East South Street 8A Market Plaza 03 East Bronson Street 09 Eddy Street - West 04 Northside Boulevard - North 10 Lincolnway East - North Ramps 4A Notre Dame Boathouse Connection 11 Lincolnway East - South Ramps 4B Pocket Parks 12 Sample St 05 Mishawaka Avenue Extended 13 Eddy Street to Sample Street Connection INTERNAL USE ONLY: Project ID: 123-053 ; Total Amount – New Project Budget Appropriation $__600,000_____________; Total Amount – Existing Project Budget Change (increase or decrease) $______; Funding Limits: Engineering: $___600,000____________; Other Prof Serv Amt $_______________; Acquisition of Land/Bldg (circle one) Amt: $___________; Street Const Amt $_____; Building Imp Amt $_________; Sewers Amt $_________; Other (specify) Amt $ ________________