Loading...
HomeMy WebLinkAboutAward Quote - River Crossing 1&2 Stair - HRP ConstructionC►ONSTRUCTION1 EXCAVATING•SEWERS•WATERMAINS `�' VV02f2CYLQ JU �i IJ�JE4CTCeG,� August 24, 2023 Mr. Richard Radcliff, CSO Operations Mgr. City of South Bend Wastewater 3113 Riverside Drive South Bend, IN 46608 Re: River Crossing 1 & 2 — 304 Stainless Steel Ladder Extensions Dear Mr. Radcliff, HRP Construction is providing the material, labor, and equipment quote to provide and install the listed (304) stainless steel ladder extensions as outlined below. Please review attached ladder extension drawings for approval at each location and provide as much lead time as possible. The ladder builds will take up to 4 weeks to build upon notice to proceed and contract. HRP will schedule the work as soon as possible. River Crossing #1 — 304 SS (See attached ladder extension drawingsl # 1 -Ladder Extension — 3'- 6" Ladder Extension # 2 -Ladder Extension — 6'- 6" Ladder Extension River Crossing #2 — 304 SS (See attached ladder extension drawings) # 1 - Ladder Extension —13' -9" Ladder Extension # 2 — Ladder Extension — 5' - 6" Ladder Extension Our total price for this work is $ 26,000.00 Quote: Valid for 15 days from date of quote. Please let me know if you have any questions about this proposal or need anything else. Sincerely, J . Wells Estimator/Project Manager CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS tV�a Elizabeth A. Maradik, President lb Gary A. Gilot, Member pe-, L Murray L. Miller, Member Joseph R. Molnar, Vice President Alexandra Dolz-Lane, Member Attest: Theresa M. Heffner, Clerk Date: November 14, 2023 1!F9ua[(10 15 so¢Eur1ty Enzplotfc¢ Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 26.00 3 00 3 4 1/8" TREAD PLATE 4 NOTE: MATERIAL IS ALL , STAINLESS STEEL 20.50 23.50 3 2 v 20.00 18.00 4.50 ID 3.00 200 2 .25 �- �— 4 1 2 1.00 3.00 4 .25 11.00 42.00 2.00 TYP. .15.00 4.50 PARTS LIST ITEM QTY PART NUMBER 1.00 1 2 HRP-SSL-001 9 00 2 4 HRP-SSL-003 3 4 HRP-SSL-004 RRpp 4 4 HRP-SSL-002 AKN 7/17/2023 CHECKED �J vfo' &vss QA TITLE MFG APPROVED 3' 6" SS LADDER SECTION SIZE MACH. SHOP # PART NUMBER B HRP-SSL-01 SHEET 1 OF 1 Y:\HRP CONSTRUCTION\SS LADDER SECTIONS\HRP-SSL-01.iam 26.00 3.00 --i 2 3 3 NOTE: MATERIAL IS ALL 1 STAINLESS STEEL �- — 20.50 ---I 2 4 1 i 1/8" TREAD PLATE 23.50 20.00 18ID 0 3.00 2.00 1 6.00 }— .25 1 2 2 1 1.00 78.00 3.00 3 1 4 PARTS LIST 11.00 ITEM QTY PART NUMBER TYP. 1 7 HRP-SSL-003 2 4 HRP-SSL-004 3 4 HRP-SSL-002 T225 .00 4 2 HRP-SSL-005 gi.56 � -7- 7 All7/17/2023 CHECKED �n / - 16.00 QA MFG TITLE APPROVED 6' 6" SS LADDER SECTION 1.00 6.00 9.00 _ SIZE MACH. SHOP # PART NUMBER B HRP-SSL-02 SHEET 1 OF 1 Y:\HRP CONSTRUCTION\SS LADDER SECTIONS\HRP-SSL-02.iam 26.00�r� 3 3.00 1 i 2 3 IL_ll J-20.50-1 NOTE: MATERIAL IS ALL 1 2 STAINLESS STEEL 23.50 1 20.00 1 18.00 3.00 2.00 ID .25 i 5.50 1 i 1 1 1.00 71.00 1 3.00 1 1/8" TREAD PLATE 1 1 4 165.00 4 2 2 PARTS LIST 3 ITEM QTYJ PART NUMBER 71.00 i 3 i 15 HRP-SSL-003 11.00 2 6 HRP-SSL-004 TYP. 3 4 HRP SSL-002 4 2 HRP-SSL-006 25 T2. ARE CHECKED 7/17/2023 ��i� � vy�7' f:� d )ei n G � QA �.56 MFG THEJ_" j 16.00 15.00 APPROVED 13' 9" SS LADDER SECTION 1.00 ;-`- SIZE MACH, SHOP A PART NUMBER 5.50 9.00 B HRP-SSL-03 SHEET 1 OF 1 Y:\HRP CONSTRUCTION\55 LADDER SLCI TUNS\HRP-SSL-U3.lam 26.00----:4 3.00 2 3 3 NOTE: MATERIAL IS ALL STAINLESS STEEL 20.50 4 2 1/8" TREAD PLATE 23.50 1 20.00- 18.00 r�— 5.50 ID 3.00 2.00 1 ............. . . I --��—.25 2 2 —1.00 66.00 3 1 4 3.00 3 30 11.00 TYP. PARTS LIST ITEM QTY PART NUMBER 1 6 HRP-SSL-003 .25 2 4 HRP-SSL-004 2.00 3 4 HRP-SSL-002 4 2 HRP-SSL-007 Eja 0.56—/J41 -T T CHErR'CKED g' 7/17/2023 5.50 16.00 15.00 QA TIRE MFG T- 1.00 APPROVED 5'6" SS LADDER SECTION 9.00 SIZE SHOP # NUMBER IMACH. JPART B HRP-SSL-04 I IIATERIAL ISHEET I OF Y:\HRP CONSTRUCTION\SS LADDER SECTIONS\HRP-SSL-04.iam James Clay From: Richard Radcliff Sent: Wednesday, November 1, 2023 2:13 PM To: James Clay Cc: Kim Thompson Subject: PO Needed For HRP Attachments: doc20230824152304.pdf James I am not sure if I have to take this through the Board. Could you please forward it for review and let me know if I need to prepare for the Board? I reached out to Selge for a quote several times and they have not responded. I also asked Centerline for a quote, but they did not respond. HRP was responsive. Please request a PO for $26,000 to address work safety concerns raised by the CSO crew while performing maintenance at the River Crossings (RC1 & RC2). BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/6/2023 Department Name Richard Radcliff Wastewater BPW Date 11/14/2023 Phone Extension 5889 Review and Approval Required Prior to Submittal to Board Diversity Compliance ❑ Officer Name and Inclusion Officer BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing ❑ Check the Appropriate Item I Professional Services Agreement ❑ Contract ❑ Open Market Contract ❑ Bid Opening ❑ Quote Opening ❑ Proposal Opening ❑ Chg. Order, No. n Other: Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description ❑ Amendment/Addendum ❑ Bid Award ❑ Quote Award ❑ C/O & PCA No. ❑ Traffic Control Information All Submissions U Proposal ❑ Special Purchase, QPA ❑ Req. to Advertise ❑ Reject Bids/Quotes ❑ PCA ❑ Resolution Ease./Encroach ❑ Title Sheet ❑ Yes ❑ If Yes, Approved by Purchasing x❑ No ❑ WBE Completed E-Verify Form Attached ❑ Yes No River Crossing 1 & 2 Stair Installation For Maintenance Safety Concerns PR 28831 641-06-605-514-439001 _Install stairs in the River Crossings to allow for safe entry to perform maintenance. For Change Orders Only Amount of ❑ Increase $ ❑ Decrease ($ ) Previous Amount Current Percent of Change New Amount Total Percent of Change: Time Extension Amount: Increase Decrease Increase Decrease New Completion Date: