HomeMy WebLinkAboutChange Order No 1 - Monroe Circle Demolition Proj No. 123-048 - Green Demolition ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT ALEXANDRA DOLZ-LANE MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS September 26, 2023 Mr. Jason Bennett Green Demolition Contractors, Inc. 315 Brighton Street, Suite 1 LaPorte, IN 46350 jason@greendemolitioninc.com RE: Change Order No. 1 – Monroe Circle Demolition – Project No. 123-048 Dear Mr. Bennett: At its September 26, 2023 meeting, the Board of Public Works approved the above referenced Change Order be increased by $455,000, bringing the revised contract amount to $1,306,600. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Zach Hurst, PE, Sr. Project Engineer SUBJECT: Change Order No. 1 - Project No. 123-048 Monroe Circle Demolition DATE: 09/15/2023 During demolition of the existing townhomes at Monroe Circle, it was discovered that the concrete foundation slabs were cast on top of transite pipe, which is an asbestos containing material. The bid specifications noted that this was a possibility, but no removal quantity was included, nor any contingency added to the contract. The transite pipe acted as air ducts, traveling in all directions underneath the slab, and was also cast monolithically with the foundation slab, meaning that separating the pipe from the slab was not possible. To this end, the entire foundation slabs needed to be treated as hazardous material and disposed of accordingly. It was not possible to determine the extent of the transite pipe until the buildings were removed and the foundation slabs uncovered. This was an unforeseen circumstance. The cost for removal is $450,000: 90,000 cubic feet of foundation slab, removed at $5 per cubic foot. The percentage change to the contract for unforeseen conditions is 52.8%. The added tree removal, which is a $5,000 scope addition, is a 0.6% change to the contract. September 26, 2023 City of South Bend Project No. 123-048 9/26/2023 Monroe Circle Demolition Line Item Qty Unit Price Total Remove Hazardous Foundation Slabs 1 LS $450,000.00 $450,000.00 Remove 3 Trees 1 LS $5,000.00 $5,000.00 CO Total =$455,000.00 Change Order #1 Notes Unforeseen: Existing slabs contain conduit with asbestos; cannot be separated. Entire slab needs to be treated as hazardous. 90,000 cubic feet at $5 per cubic foot. Scope: Existing trees in poor condition; require removal. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 09/15/2023 Name Zach Hurst Department DPW BPW Date 09/26/2023 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Green Demolition Contractors New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Monroe Circle Demolition Project Number 123-048 Funding Source River West DA TIF Account No. PO-0024348 Amount Change: $455,000; Revised Amount: $1,306,600 Terms of Contract Purpose/Description Change Order No. 1 addresses unforeseen asbestos removal and added tree removal. For Change Orders Only Amount of Increase Decrease $ 455,000 ($ ) Previous Amount $ 851,600 Current Percent of Change: Increase Decrease 53.43% ( %) New Amount $ 1,306,600 Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: